HomeMy WebLinkAbout2026-125 J-U-BBOARD OF' COUNTY COMMISSIONERS COUNTY OF KTTTITAS STATE OF WASHINGTON RESOLUTION NO. 2026 - \LV AUTHORIZING THE CHAIR'S SIGNATURE ON J-U-B ENGINEERING TASK ORDER 2026-0I FOR THE BOWERS F'IELD HANGAR TAXILANE CONSTRUCTION PROJECT WHEREAS: J-U-B Engineers is currently the service provider to Publio Works for projeots at Bowers Field selected from County procurement process in2023; and WHEREAS: J-U-B Engineering has submitted Task Order No. 2026-01 for the Hangar Taxilane Construction Project in the amount of $228,160'00; and WHEREAS: Funding for Task Order 2026-01 is through Federal Aviation Administration grant with a 5 percent County match. NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby authorize the Chair's signature on J-U-B Engineering Task Order No. 2026-01 for the Hangar Taxilane Construction Project. DATED on of July, 2026, at Ellensburg, Washington. BOARD OF COUNTY COMMISSIONERS COLINTY, WASHINGTON cory Chairman Attest: n Clerk of the Board- Julie Kjorsvik Vice-Chairman ANCFNT {peputy crerk orthe Board- ilS$"[#U"r Commissioner 6rg) J.U.E EI{GINEERS, I}IC. TASK ORDER 2026.01 HANGARTAXILANEGoMPLEXPHASEIcoNSTRUcT|oN A I P -3 -53-0 026 -025 -2025 A MASTER AGREEMENT for Engineering Services entered into and effective on,the ?td_ fl3Y of January 2023, shatt be appended herein as Task Order No. 2026-01, made as of Zt. - dqV ot ---[JJ.t{--, :"uzo:, by and between'Kittitas County, 205 West 5th Avenue, Suite '108, Ellensburg, Washington, hereiGfter referred to as the OWNER, and J-U-B ENGINEERS, lnc., 999 W Riverside Ave. Suite 700, Spokane, Washington, hereinafter referred to as the ENGINEER. The referenced Agreement for Professional Services executed between J-U-B ENGINEERS, lnc. (J-U-B) and the CLIENT is amended and supplemented to include the following provisions regarding the Scope of Services, Basis of Fee, and/or Schedule: PART 1 -PROJECT UNDERSTANDING FAA Alp 3-53-0026-025-2026 includes the Project Formulation, Construction and Project Closeout Engineering Services for the following ltems: . Construct approximately 900 linear feet of Taxilane(s) for GA Aircraft and Hangar Development adjacent to the main GA aPron. . Grade the Taxilane Safety and Object Free Areas to meet FAA Standards. . Relocate approximately 1,000 linear feet of chain link airport perimeter fencing. . lnstall utility sleeves as needed to avoid future pavement cuts to the paved Taxilane. o lmprove drainage in the vicinity of the Taxilane. Work includes grading and installation of catch basins and/or pipes to collect stormwater. PART 2 - SCOPE OF SERVICES BY J-U-B J-U-B's Services under this Agreement are limited to the following tasks. Any other items necessary to plan and implement the project, including but not limited to those specifically listed in PART 3, are the responsibility of CLIENT. A. Task 001: Project Formulation Phase 1. AssisttheCLIENTwithProjectScopedevelopmentandformulation. J-U-Bwill prepareaScope of Services narrative and detailed description of all work tasks for CLIENT and FAA review and approval. Discuss review comments and revise accordingly' 2. prepare a listing of work tasks in a spreadsheet with person-hours, hourly rates, expenses, and costs based on-the Scope of Services. This spreadsheet will be used for both J-U-B and the lndependent Fee estimate. J-U-B shall prepare a detailed cost proposal on the spreadsheet, based on estimates of work to accomplish the Scope of Services' 3. provide the CLIENT and the lndependent Fee Estimator (lFE) with a blank person-hour spreadsheet, Scope of Services, Project Layout Map, and overall project estimate. 4. prepare an Agreement for Professional Services for submittal and review by the CLIENT and FAA, including thi FAA Professional Service Agreement Checklist. The Agreement shall be "omprefiensive in description of services and responsibilities of all contract parties. 5. Assist CLIENT with preparation and submittal of a FAA Grant Application for Federal Assistance for the project, including estimated project costs, drawings, and a schedule for FAA submittal prior to beginning of the Project. Page 1 B. 6. Assist CLIENT in the submittal of FM sponsor cerlifications. These include the "selection of Consultants", "project Plans and Specificaiions", "Drug Free Workplace", "EquipmenVConstruction Contracts", "Oisctosure iegarding Fotential Conflicts" bnd "Construction Project FinalAcceptance". T. provide the following services related to Federal Disadvantaged Business Enterprise requirements (DBE) a. Redevelop sponsor's DBE Program Plan in accordance with the Disadvantaged Business Enterprise lfiAf; Rrogram triggered by the lnterim Final Rule dated October 3, 2025 and submit to FM Civil Rights for review and approval' b. Analyze opportunitiesior Disadvantaged Business Enterprise (DBE) participation during construction and assist CLIENT in preparing a three-year goal for the ACIP projects' coordlnate cLlEN|T DBE GoalAdvertlsements for the new three-year goalutt tlre CLIENT's website for a minimum of 30 days. Finalize and submit new three-year goal to FAA Civil Rights office, notify FAA ADO in writing once goal has been submitted. c. Prepare and submit annual DBE reporting' B. Prepare and submit four (4) FAA Quarterly Performance Reporls and two (2) Fiscal Year End Financial FAA271 and 425 forms throughout the project' g. Attend eight (8) meetings with the Airport Advisory Board and/or County (6 virtualand 2 in person) during tn6 prbjbct in orier to keep Aiiport personneland management abreast.of the progress of the piojects. Discussions will inciude project phasing, budget and schedule updates ,10. Assist CLIENT in preparation and processing of monthly Retuest for Reimbursement (RFR) by submitting data as described. lt is anticipate.O tnatthe CLlENTwill prepare and process ten (10) monthly Jets of RFR 'packages' for this project. J-U-B will provide documentation of costs for the CLIENT,s use in performin! the Requesi for Reimbursements including consultant invoices, reimbursement spreadsheet and Standard Form 271' Subtask 002: Construction Phase 1. prepare and distribute Notice of Award, Construction Agreement and other contract documents' Review Construction Agreement, bonds and insurance documents submitted by Contractor, and assist cLIENT and contractor in processing documents for the project. Z. Coordinate with FAA and the CLIENT throughout the award process. Submit bid documentation including copies of all executed contract documents as required by the FAA' 3. provide pre-construction coordination; prepare a detailed Pre-Construction Conference agenda and displays, conduct a Pre-Construction Conference on behalf of the CLIENT and prepare and issue minutes of the pre-Construction Conference; include FAA items in conference agenda. lt is anticipated that J-U-B will conduct this meeting at the Airpod' 4. Review the Contractor's Work Schedule and verify that it is consistent with the requirements of the Contract Documents. Coordinate construction activity schedule with CLIENT and Airport operations. 5. Review submitted shop drawings, Contractor Safety and Security Plan, Quality Control Plan and all submittals required by thJ Contract Documents. Comment and return all submittals to Contractor for their use andior revisions and resubmittal' 6. Construction staking shall be provided by the contractor as part of the construction contract' J-U-B will provide b6nchmarks and horizontal control points for the contractor's use. Prior to staft of construction, .l-U-g survey crew will provide survey check to confirm control still has not be altered prior. 7. prepare a Construction Management Plan in accordance with FAA guidelines. lncorporate Contractor's euality Control Plin information into the plan. Submit document to the FAA and CLIENT for review. Page 2 c B. Organize and conduct weekly construction meetings with CLIENT, Contractor and others as- ap[ropriate. The Resident Prolect Representative will hold these meetings on the construction site' g. provide one full-time project representative to monitor and document construction activities as appropriate. lt is anticipaied ttrai .l-U-e will provide a Reside-nt Project Representative for a period oi bZ worXing days at 10 hours per day plus 5 hours a week for drive time and 39 nights of lodging' tn addition, the Project Manager will visit the site once a week (13 visits) for 3 hours each visit plus 5 hours of drive time to provide construction review. 10. provide office administration support and assistance to the Resident Project Representative with the Project Manager or Office Administration as field activities may require' '11..1-l-l-B shall receive ancl review the Contractor's monthly requests for payment' J-U-B shall determine whether the amount requested reflects the progress of the Contractor's work and is in accordance with the contract for construction. 12. Monitor and coordinate Contractor Quality Control Testing Program pursuant lo-current FAA specifications for Quatity Control and Quality Assurance. lt is anticipated that J-U-B will monitor and test for Quality A.rutan." testing on asphalt placement only, through the use of a subconsultant. Fees for the Geotechnicil Testing Firm Subconsultant shall be reflected in the "subconsultant" line below. 13. The pavement contract on this project is expected to exceed $500,000; as such a Quality Control (aCj/ auatity Assurance (AA) Workshop shall be conducted by the ENGINEER in accordance with the latest version of AC 1'50/5370-12. This workshop is anticipated to be conducted virtually. 14. Assist CLIENT with review of Contractor Wage and EEO documentation review. Conduct Wage interviews with Contractor personnel as required. 15. Coordinate with CLIENT and FAA throughout the construction process Submit required construction documentation, including weekty activity report forms, mix designs, change orders, etc. Coordinate with CLIENT and FAA verbally concerning change orders, as required. 16. prepare Contract Change Order/Supplemental Agreements in accordance with FAA Order 5100.3gD-Appendix U. Conduct services associated with evaluation, negotiation, and preparation and processing of Contract Change Orders or Supplemental Agreements. Cost estimate is based on the production of two Change Orders. 17. Conduct final and substantial completion inspections. The apron project will be constructed in two phases. With the completion of each phase a substantial. completion and punch list will be performed. Therefore, two substantial completions and a combined final completion will take place during the project. Produce substantial and final completion inspection certificates and field review and documentation of "punch list" items. 1B- prepare Record drawings of "As Constructed" revisions to Design and Construction Drawings for project improvements Js provided by the 'contractor. Provide CLIENT and FAA with copies of ifecorO Drawings and one electronic copy to be submitted to the FAA as required. Provide CLIENT with one set of prints of Record Drawings. Subtask 003: Project Closeout Phase L prepare the final project report and close-out documents according to FAA requirements and submit to CLIENT and FAA. 2. prepare an Airport Layout Plan Set (ALP) Revision to document improvements. A draft copy of the revised ALp will be submitted to the FAA and CLIENT for review. Upon review and comment changes, copies with be distributed to the FAA and CLIENT for signatures' 3- Report Disadvantaged Business Enterprise (DBE) project participation to FAA dbE-Connect inciuding all calculaiions and background information for review and approval. 4. Assist and coordinate with independent auditors in locating appropriate documents for performing A-133 annual audit. ln addition to finding appropriate project files, answer questions as required' Page 3 5. provide assistance to the CLIENT in assessing, costing, and updating the five-year Capital lmprovement Plan for submittal to State Division of Aeronautics' PART 3 . ASSUMPTIONS AND EXCEPTIONS . No SMS plan is required on this project during the design or other portions of the project. r No initial AGIS survey is required for this project. PART 4 - SCHEDULE OF SERVICES J-U-B will perform all services according to the following schedule: July '1"t, 20261o June 30th, 2027 This Agreement shall be in effect from July 1,2026 to September 30,2027 . ln the event the services described shall not be completed during the term of this Agreement, the Agreement shall be amended. This schedule shall be equitably adjusted as the PROJECT progresses, allowing for changes in scope, character or size of the PROJECT requested by the CLIENT or for delays or other causes beyond J- U-B's control. PART 5 . COMPENSATION cLIENT shall pay J-U-B for the identified services herein as follows: 1. project Formulation and Closeout Phase. The CLIENT shallcompensate J-U-B on the basis of a lLrmp sum amount of Thirty Three Thousand Seven Hundred Thirty Eight Dollars and Ninety Nine Cents ($33,738.99). See Attachment '1B for a detailed cost breakdown' 2. Construction Phase a.The CLIENT shall compensate J-U-B for the Bidding and Construction Phase, on a Cost- plus-Fixed-Fee basis. The CLIENT shall reimburse J-U-B for the following items: i. payroll Cost: Actual salaries paid J-U-B's employees, without markup, for the time such employees are directly used on work necessary to fulfill the terms of this AGREEMENT. At the request of the CLIENT, a list of names of personnel actually working on this project and their salaries shall be submitted prior to the start of work on the project and shall be updated as needed to reflect any reasonable salary increases, promotions and other payroll adjustments during the course of this work. ii. payrollAdditives: Additives representing the employee benefits based on payroll cost shall be computed as a percentage of the payroll cost above. For the purposes of this AGREEMENT, that additive shall be 64.08 percent of the payroll cost based on existing audits, cost data, and other information mutually agreed to by both parties. This factor is subject to adjustment by the parties based on audits occurring during the life of this AGREEMENI. lndependently prepared cost data shall be submitted, at the request of the CLIENT, at intervals not less than every 18 months to support the payroll additives for this AGREEMENT. iii. General and Administrative Overhead Cost: These overhead costs shall be in accordance with Federal requirements contained in the 41 CFR 1-'15. These costs shall be computed at 117 52% percent of the payroll costs above. This percentage may !9 adjusted by the parties based on audits occurring during the life of this AGREEMENT. tndependehtly prepared cost data shall be submitted, at the request of the CLIENT, at intervals not less than every 18 months to support the General and Administrative Overhead for this AGREEMENT. iv. Direct Cost and Out-of-Pocket Cost: These costs shall be directly related to this project and determined in accordance with Federal requirements contained in 41 CFR 1- 15. Page 4 v. Fixed Fee: The Fixed Fee for performance completed under this task shall be Twenty Thousand Six Hundred Six Dollars and Twenty Five Cents ($20,606.25). Should there be a change in the scope of work under this AGREEMENT; the fixed fee shall be negotiated with ariappropriate adjustment for change in the scope of work. Additional fixed fees, as "pprou"d' as a portion of Supplemental Engineering Agreements,.shall be in addition to the above agreed upon amount. FAA participation in those costs is condittoned on their approval of the increased costs b. Total estimate for Construction Phase, including fixed fee, for the work under this AGREEMENT shall not exceed One Hundred Ninety Four Thousand Four Hundred Twenty One Dollars and One Cent ($194,421.01). This maximum amount is subject to adjustment in the event of any approvecl increases in scope of service as approved hy the Cl IFNT and the FM and documented by approved Authorization for Additional Services. 3. Total Project Fees. Total fees as outlined above are Two Hundred Thirty Six Thousand Four Hundred f ighty Dollars ($228,160.00). See Attachment 1B for a detailed fee breakdown. This Task Order No. 2026-0l will become part of the referenced AGREEMENT when executed by both parties. lN WITNESS WHEREOF, the parties execute below: For the Owner, Kittitas County, Washington Dated this A-2026 Title // By: For the ENGINEER, Dated this 10 day J-U-B ENGINEERS,lnc e1 July 2026 Toby J . e P I er ;;-td11'ffig;:,;ig1.r'*::a;r:'-By: Name Title Page 5 ATTACHMENT 1B- Fee Breakdown 0 0 l3 0 26 0 0 0 0 39 850.00 0 2 0 0 0 $3,040.000416022 Proiect Formulation Phase s575.00DBE P 40000J000 $716.006400000200AuditAs Assist with 5-year 160.000000660000rz pdate $1,664.0010004040200ALPU Close Out Phase Sub -Total 66 30 ll'ts $166,709.0010t5052459428883 0 0 8 8 0 0 0 0 18 002t2 $645.00rr Conduct 40000I2I00w rr Review Contractor age 0 0 t2 0 0 0 0 0 28 40 $4.612.00 $2,600.00l3l300000000l5 Construction Change Orders 8 2020044200l6 Conduct Final &0 0 l0 10 0 0 0 0 2022 $3.758.00l7 $2.040.00t4 IN 000084200 Shop Drar,vings & Submittals 0 2 2 4 l6 0 0 0 0 24 $3,5 r 8.00) Survey Control Checks 0 0 0 0 0 0 l0 0 I 11 00I6 Construction Management 0 0 I z 6 0 0 0 0 9 $ 1,270.001 c ,Conduct 0 0 104 0 0 s85 0 0 0 26 689 $90,415.00t) ro Provide 0 0 I3 0 26 0 0 0 0 39 $5.850.00 Review Contlactor's Pay Request 0 0 5 0 0 5 0 0 2 t2 I 753.00lt e Attend Airport 0 6 38 0 0 0 0 a244 $9.034.000 tbr Reimbursements 0 0 2 0 0 0 0 0 10 12 r 90.00l0 Construction Phase Construction Award Documents 0 0 2 0 0 0 0 0 6 8 $874.00 on Award 0 0 8 0 0 0 0 0 t2 $ 1,916.0042 r ConductPre-Constmction 0 0 8 0 8 0 0 0 0l16 00 Review &,0 0 4 4 0 0 0 0 0 8 $1,440.004 & FormulationI 2 9 6 2 1 0 0 0 0 0 0 0 0 0 0 6 4 0 0 I I 140.00$ $ 1,619.00 Cost Proposal cope 0 0 3 0 0 0 0 0 0 t s600.003 Prol-essional Service Agreement I 0 2 0 0 0 0 0 2 5 s819.004 FAA App 0 0 4 4 0 0 0 0 2 10 $ r,598.005 e Prepare Certifications 0 0 I 0 0 0 0 0 I 2 $279.00AA DBE Services 0 0 4 0 20 0 0 0 0 24 $3 00.00'| FAA Quarterly Reports 0 0 8 0 0 0 0 0 0 8 $1 008 Senior Principal Bngineer s261.00 $239.00 Project Manager $200.00 Project Engineer $ 160.00 Design Construct Engineer Observer $125.00 $119.00 Senior Planner $ 191.00 Survey Crew $268.00 Admin. $79.00 Trips TOTAL IIRS TASK DIRECT COSTSPI{OJECT TASK IASK NO PIIOJECT TITLE: CLIENT: JOB NUMBEII: DATE: Hangar Taxilane Complex - Phase 2 Construction Kittitas County RP-26-00315 February 26,2026 ASG_Attach ment 1 B-FeeBreakdown-Loaded Page 1B-'1 ATTACHMENT 1B- Fee Breakdown PROJECT TITLE CLIENT: .IOB NT]MBER: DATE: Ilangar Taxilane Complex - Phase 2 Construction Kittitas County RP-26-0031s February 26,2026 rASK NO PROJECT TASK Principal $261.00 Senior Engineer $239.00 Project Manager $200.00 Project Engineer $160.00 Design Construct Engineer Observer $125.00 s119.00 Senior Planner $r91.00 Survey Crew s268.00 Admin. s79.00 Trips TOTAL HRS TASK DIRECT COSTS LABOR: Fixed Fee Total Labor + Overhead + Fixed Fee 15.0%006.35 Cost Per Unit $600.00 $0.725 $68.00 $ 150.00 Air Ground Trips Trip Miles 356 EXPENSES:Trips Davs Hours Markup 1.0 1.0 1.0 1.0 Air Travel Mileage Per Diem Lodging 0 $0.00 $7,743.00 s3,536.00 $s,850.00 30 52 39 GPS Survey Unit Printing $53.94 $1,000.00 4 l.o 1.0 $zts.76 s1,000.00 I 3 Geotechnical $16,45 0 1.1 1.0 1.0 $18,095.00 $0.00 s0.00 $0 $0 Subtotal - Labor + Overhead + Fixed Fee Subtotal - Expenses Subtotal - Subconsultants Total - Project Bidding & Construction Fees ASG-Attachment I B-FeeB reakdown-Loaded Page 1B-2