Loading...
HomeMy WebLinkAboutFully Execuited Change OrderWl,'1.:r:ni,1 1'rr.r,-llt';,r.tl . ! ; fi:1;ir.:t Asc CHANGE ORDER NO. 3 PROJECT NAME: OWNER: CONTRACTOR: PROJECT NO; Ellensburg Rodeo Arena Gompletion Kittitas County Cascade Central Construction 2025-009 SPOKAXE 2ll3 Nl W1.:slriniJl()n Suire 400 St.)<lk-(.]r.e. WA a??o I r 504 8.lB 8ir68 OlSCorCilit?it rS C!)rr PAGE 1 of 12 DESCRIPTION OF GHANGE: COP 11 - RFI 028 - Buckaroo Seating Switch COP 12 - RFP 02 - Hydrant Adds & Concourse Revisions COP 17 - RFP 04 - CivilCity Comments Original Contract Sum Net Amount of Previously Approved Changes: Conlract Sum Prior to This Change Order: Contract Sum is increased by This Change Order: Revised Conlract Sum: Original Contract Completion Date: Previously Approved lncreases in Time: Completion Date Prior to This Ghange Order: Contract time will be chanoed bY 0 Calendar Days This Change Order Revised Substantial Completion Date: Revised Final Acceptance Date: $5,065,000.00 ' $221,986.49 $115.268.29 $s,402 .254.78 7t2Al2A26 7t20t2026 712312026 8t22t2026 Amount $7,573.49 $59,812.87 $41,806.43 Total This Change Order: $109'192.79 Accepted by Conlractor: Cascade Central Construction By: Date 2t5126 Recommended By: ALSC Architects, P.S. 3 By: Date z By: Date 'Does not include State or Local Sales Tax ALSC Architects I We bring our clients' stories to life c0NsTRUCTl0llG P.O. Box 119 Wenatchee, WA 98807-0119 Phone 509-662-71 19 Fax 509-662-6380 Kittitas County Commissioners 205 West 5th Ave, Suite 108 Ellensburg, WA 98926 MAKE CHECKS PAYABLE TO: Cascade Central Construction, LLC P.O Box 119 Wenatchee, WA. 98807-01 l9 THANK YOU FOR YOUR BUS',VESS' PROPOSAL PROJECT: Ellensburg Rodeo Arena lmprovements coP# 11 DATE: January 27,2026 TITLE: RFI 028 - Buckaroo Seating Swltch Rev.l CASCADE CENTRAL Oalt DE3CRTPaIOll EUANTTY lrox I'MTFRICE AUOUNT 112712026 Subcontractor Cost Flectrical Srrbconlractor - See aftached Back-uo 1 LS s 12.313.00 $6.378.00 6% Mark-up $382.68 Subcontractor -6.760.68 1t27t2026 (l2qnr.la Cenlral Construction Cost Suoeruision 0 HR 't28.1E $0.00 Proiect Manaoement & Coordination 2 HR 161.54 $323.08 rrnicct Enoineer 2 HR 'l'16.25 $232.50 Srrruevor 0 HR 210.00 $0.00 s83.34 638.92 Subtota 7,399.60 Bond s70.30 E&O lax $103.59 Schedule lmpact: None if approved by 216126 TOTAL s7.573.49 McGann Electric ccc Contractor Breakdown Summary Project Name: Project No. Contractor: Description: Ellensburg Rodeo Arena lmprovements RFI'028 Source Documents: coP-i2R1 Jack McGann Date: Contractor Ref. No. 1t2712026 Mccann Electric Provide and install | - 1.5" UG conduit from MDPL to 100A event switch location at buckaroo seating section.Only requesting lengthfromMDPLtoLlTB. Provideandinstalll00AaddedbreakerinpanelMDPL.Provideandinstalll00Aaddedfeeder without Neutral in updated on*line drawing and MDPL panel schedule per RFI-028 response. All conduit, fittings, supports, hardware, wire, disconnect switch, fuses included. Exclusions: trenching and backfill. Itemhe all costs on attachod COP Cost BFakdown form.1, CRAFT LABOR COSTS Direct Labor Gosts: a. crew (apprentices, journeymen, & laborers) b. foreman c. superintendent $ 2,780.70 $ $ DIRECT LABOR SUBTOTAL $ 2,780.70 Supervision: d. direct supervision (NTE 15o/o ol 1al e. safety(NTE2%of linesla, b, &c) 2. MATERIALCOSTS a. material costs b. freight costs (itemize) 3. EQUIPMENT COSTS a, owned equipmenl (per spec approved source) b. rental equipment (per invoices attached) 4. SMALLTOOLS a. small tools (NTE 5% of 1a & b) 5. OVERHEAD & PROFIT NTE 15% portion of 1,2,3, & 4 up to $50,000 6. SUB.SUBCONTRACTORS 7. OVERHEAD & PROFIT ON SUB.SUBCONTRACTORS a. NTE 15% of Line 6 up to $50,000 for each sub 8. INSURANCE $55.61 l.CRAFTLABORCOSTS $2,836.00 $ 2,502.70 2, MATERIAL COSTS $2_503,00 $ 3. EQUIPMENT COSTS $ $141.80 4. SMALLTOOLS $142.0O SUBTOTAL 1 thru $876.96 $ 5. OVERHEAD & PROFIT $ 6. SUB-SUBCONTRACTORS $ $ $ 7. OVERHEAD & PROFIT ON SUB.SUBCONTRACTORS $ $4.25 15.90 8. INSURANCE $20.15 a, b. 877.OO $ a. b. c. d. a. payroll driven liability insurance b, volume driven liability insurance O.15 o/o ol 1 0.25 o/" of 1-7 $ 9. BOND a. bond 0.03 % of 1-8 9. BOND $ Fo.m Revi*d &/25/15 TOTAL https://mcgannelectric-my.sharepoint.com/personal/jackmcgann-mcgannelectric-com/Documents/McGann Elecld'cl212i Ellensburg Rodeo 9.30/COPs/COP 1 2 1 00amp feeder added rf1 28/Ellensburg Rodeo Arena COP -12 - Qopy Summary lssued 112712026 $ Cost Breakdown Project Name: Ellensburg Rodeo Arena lmprovments RFI-028 Project No. Contractor: McGann Electric Date: Contractor Ref. No. coP-l2Rl 1t27t2026 Total Cost $ $ $ 2,780.70 $ $ $ $ $ 1.490.00 $ s00.00 $ $ $ $78.40 $14.70 $ $ $ $ $ $ 530.00 $ 89.60 $ $ $ $ $ $ $ $ $ 5,2E3.40 Eouioment Cost $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Unt $ Material Cost s $ $ $ $ $ $ $ 1,490.00 $ 300.00 $ $ $ $78.40 $14.70 $ s $ $ $$ 53o.oo $89.60 s $ $ $ $ $ $ $ $ 2,502.70 Unit $ $1.490.00 $300.00 $1.12 $2.10 $2.65 $1.12 Labor Cost $ $ $ 2,780.70 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 2.780.70 $ $ $ $ 2,780.70 Unit $ $106.9s Unit Tvpe HR EA LT EA EA FT FT 211no17 Quantity 26 1 1 70 7 200 80 Description Electrician Labor 100A 3P PDD23G0100 breaker 100A 3pole MDPL provisions 1.5" PVC 1.5' PVC coupling #1 thwn #6 thwn Labor Subtotal Subtotal Gost of Work Arc,r, \t-/v\ nncut t rc rs SPOKANE 203 N WoshingtonREQUEST FOR PROPOSAL NO: t( oz Project Name: Ellensburg Rodeo Arena Completion Owner: Kittitas County Contractor: Cascade Central Construction Job Number: 2025-009 Suite 400 Spoki:ne, WA 9920 I p 509 838.8558 qlsc(]rc h rlec is. coitl Page 1 of 10 TO: Cascade Central Construction, Contractor, please furnish your proposal for performing the changes outlined below and/or detailed on the attachments referred to: o Addition of 3 yard hydrants for RV/ Vendor spots. o Revision to concourse stabs at stadia stairs. ALSC P_S.By Todd Dale: 12111125 PROPOSAL: To the Owner: We propose to perform all changes described in the above request for a total ADDITIONIEEEUGHOAI (cross out one) to the contract sum of: Fifty-Nine Thousand Eight Hundred Twelve and 871100 Dollars $ 59,812.87 (not including Sales Tax) We have attached cost estimate detail sheets, and the foregoing amount covers all direct and indirect costs related to this proposal and to the effect of the proposal on the remainder of the project. All other provisions of the contract remain in full force and effect. We request the completion date be EXTENDED/RED{J€EE(cross one 0out) calendar days because of this work. The Contractor agrees to be bound to this proposal quotation for sixty (60) days after this date See attached proposal for condition e Central Constructio LC KC Carroll Date 213126 Contractor RECOMMENDATION: TO: Owner, we have examined the foregoing proposal and find it to be appropriate for the request. We recommend its acceptance. ALSC _ P.S.By Todd Keller Date 215126 PROPOSAL AGCEPTANGE: The Owner hereby accepts the foregoing proposal. This instrument, when signed below, constitutes the conditions upon which a Change Order will be issued. Date Owner ALSC Architects \\ We bring our clients' stories to life. G P.O. Box 119 Wenatchee, WA. 98807-01 l9 Phone 509-662-7119 Fax 509-662-6380 Krttrtas Uounty Commissioners 205 West Sth Ave, Suite 108 Ellensburg, WA 98926 MAKE CHECKS PAYABLE TO: Cascade Central Construction, LLC P.O Box 119 Wenatchee, WA. 98807-0119 THANK YOU FOR YOUR BUS"VESS/ PROPOSAL PROJECT: Ellensburg Rodeo Arena lmprovementl coP# 12 DATE: February 3, 2026 TITLE: RFP 02 Hydrant Adds & Goncourse SOG Rev. Rev'3 CASCADE CENTRAL Orlt DESCnFnorl QUAMTlTV uox UIIT' Ff,FE llorrm 2t312026 Subcontractor Cost Earthwork Subconhactor - See attached Back-up 1 ts $19.250.00 s19.250.00 oncrele suhconlraclor - See attached Back-uo 1 LS $32,900.00 $32.900.00 3,129.00 Subcontractor -55.279.00 2t312026 SuDervision 4 HR $128.18 $512.72 Proiect Manaoement & Coordinalion 2 HR $161.54 $323.08 2 HR $116.25 s232.50 rrruevor - hvdranls onlv 8 HR $210.00 $1.680.00 15% Mark-uF 412.25 Contractor -3.1 60.55 Subtotal 58,439.55 Bonc $555.18 B&O Tal $818.15 Schedule lmpact: None if approved by 215126. TOTAL $59.812.87 P.O. Box I l9 Wenatchcc, WA 98807 Phone: (509)662-71 l9 Fax: (5O9)662-4465 January 13, Genddl ContmL'tus Ellensburg Rodeo Arena lmprovements - RFP 02 COP each Qualificatlons: Please Read Carefullv 1. washinHton state sales Tax ha$ been ngt been included in nrnnosal. 2. Prevailing Wage has been accounted for in proposal. Revise 3. Rock excavation (i.e. Solid Rock, Caliche, Hard pan, cemented soils and/or Boulders larger than 1 cubic Yard) have not been included. Price Negotiation will be required if these materials are encountered. 4. Over Excavation of Unsuitable Material has not been accounted for, price neSotiation will be required if these materials are encountered. 5. Excludes Water System SuPPort. 6. Exludes construction Survey. 7. EngineerinB & Professional Surveying Services are Excluded. 8. Fees for Utilities, County, City, Etc. are not included. Cultural Resource Seruices are not covered in our scope. g. Hazardous Materials Abatement, Removal, Handling, Disposal, etc. are not expected onsite and are therefore Excluded 10. Watering & Dust Control are lncluded for Selland's scope of work and duration only. No OT Dust Control or beyond our work. 11. Erosion Control lnspections, Reporting, Monitoring & Maintenance are Excluded. Stormwater Permit by others. 12. Dust control has been provided while we are actively working the site. No permanent or sustained dust control or mitigation has been included. 13. Any scope of work not specifically included as a line item in this proposal is excluded. 14. Actual quantities installed shall be tracked/measured and the basis of payment at the unit prices included in this proposal unless otherwise agreed. 15. DuetoglobalsupplychaindisruptionsandmarketvolatilitywereservetheexclusiveriShttoadjustourproposalformaterialescalation. 16. Proposal is valid for 30 days. This proposal shall be made part of any subcontract. lf you have any questions or need additional information with regard to our proposal please give us a call. Regarding Flat Stair Pads: Because the stadium contractor needs each of the stair pad EA at $700 TOTAL: $19,250 ares to each Confrimed Sincerely, SEILAND CONSTRUCTION, lNC.be flat with no allowable variance, the added cost is for laborers /** "*F hout the concourse slab than originally anticipated from the bid and enss+6+heyt+efe+fuetlf+*This is going to take morearea Ron zerr lll Yes, thank you. Pricing revised to reflect this. Absorbed by 175.00tF RFP 02 - Flat Stair Pads - 1" Copper Water Service PiPing Where is this coming from? Flatwork shall conform to the requirements of the specifications with regard to tolerance. Would be more cost effective to pour extra concrete at landings with gravel grading consistent through out. Page 1 of 1 Concrete Proposal- RFP #2 Datet ut9l2026 Project Ellensburg Rodeo lmprovements ATTN: General Contractor Project Location Ellensburg, Washington Concrete contractor time to layout flat boundaries is in addition to the survey time. CCC survey will locate the corners of each flat area but concrete subcontiactor will still need to do the work of setting up forms, setting up string lines, set grade rods, and confirm exact elevations. The first item captures additional manpower required due to the change in screed styles for the crew as a whole. Screeding by hand requires an additional pour. Screeding by hand will increase truck spacing, pour out time, and screed time for all pours at the concourse slab. The second item captures addiiionai finishing time at each stair location. The third item is associated with the pump truck for the separate pour. Originally Jones was planning to roller screed the entire slab but these flattened areas are too small to roller Screed and must be done by hand. Please review last comments and proposal as well. Concrete proposal specified switch from roller Screed to hand screed, not the other way around which Seems like was a misunderstanding during the last review comments. Item Work Description quantity Unit Unit Price Amount (US $) Flat Stair Pads Below Grandstands to lnclude: 5 Hours x 12 Guys x 3 Original Pouts (Additional 11 Hours x 12 Guys x 1 Additional Pour Pump Truck for Additional Pour t Time for Hand Scree I li ,,;r::l 180 t32 1 s 5 s 16,920.00 72,408.00 3,572.OO lncludes additional time to identify stair locations using provided survey points, maintain boundries of flatness & additional finishing time to confirm proper elevations at each stair pad location. A roller screed provides flat concrete with less labor. There are too many elevations to be met for a roller screed to be practical. Originally, there was a ridge along the seating-retaining wall, 5 catch basins to meet, & forms along the outside of the slab. This has added 32 elevation points that must be met within the center of the slab. This was not a small change. Customer: Authorized Signatu Name:_ Date of Acceptance lones Concrete & Excavotion Estimotor - Carson Chester 547-867-8060 Sub Total s 32,900.00 SALES TAX O.OO%0.00 TOTAL S sz,goo.oo www.JonesConcrete. pro 7/1 L i'i l upi .u:::: i1 ::))"4 event switch was not shown on the lline nor panel schedules originally- us we interpreted this drawing to depict the everrt switch being fed via LlTB and not MDPL- that is why we are requesting some feeder costs. E-401 UG FEEDER FOR EVENT AV SWITCH EVENT POWER CONNECTION POINT NEW 2P-1OOA FUSED swrTcH (EVENT AV) 2'C W/ FIBER FOR RE-FEED OF ARENA FIBER RING TO GRANDSTANDS' PRESS BOX DEMARC POINT AND 1"C FOR FA CONNECTION TO ANNUNCIATOR IN PRESS BOX 1TB :; \ tru&tmHCI0 $xATrt{s $xfiTrt}il GN 1! Buf,tfiitffi s /:i t l-r () ttt-t -. -:: .. -. '-.: .. ,i't.':1 1i Arc,rt \l-/t \./\ ancrrrre cis SPOKANE 203 N W.rshirigionREQUEST FOR PROPOSAL NO: 04 Project Name: Ellensburg Rodeo Arena Completion Owner: Kittitas County Contractor: Cascade Central Construction Job Number: 2025-009 Suite 400 Sf)okone. WA 9920 l p 509.838 8568 o lsct]rch itecis. coi n Page 1 of 11 TO: Cascade Central Construction, Contractor, please furnish your proposal for performing the changes outlined below and/or detailed on the attachments referred to: a Revisions to Civit drawings per City review comments. ALSC PS By Todd Date : 1121126 PROPOSAL: To the Owner: (cross out one We propose to perform all chang es described in the above request for a total ADDITION/EEEUGI4OIF ) to the contract sum of: See attached proposal for qualifi cations Forty-On e Thousand Eiqht Hundred Six and 431100 Dollars $ 41,806.43 (not including Sales Tax) We have attached cost estimate detail sheets, and the foregoing amount covers all direct and indirect costs related to this proposal and to the effect of the proposal on the remainder of the project.All other provisions of the contract remain in full force and effect. We request the completion date be EXTENDEDdREDTIGED{cross one out) 0 calendar days because of this work. The Contractor to be bound to this proposal quotation for sixty (60) days after this date See attached proposal for qual agrees ificatio Date 1125126 Contractor RECOMMENDATION: TO: Owner, we have examined the foregoing proposal and find it to be appropriate for the request. We recommend its acceptance. ALSC ifar:fs P s By Todd Keller Date 1t28126 PROPOSAL AGGEPTANGE: The Owner hereby accepts the foregoing proposal. This instrument, when signed below, constitutes the conditions upon which a Change Order will be issued. Date NS Owner ALSC Architects \\ We bring our clients' stories to life. G P.O. Box 119 Wenatchee, WA. 98807-0119 Phone 509{62-71'19 Fax 509-662-6380 Kittitas County Comissioners West StlrAvc, Sultc ,l08 Ellensburg, WA 98926 MAKE CHECKS PAYABLE TO: Cascade Central Constructlon' LLC P.O Box 119 Wenalchee, wA. 98807-0119 THANK YOU FOR YOUR AUS'IVESS/ PROPOSAL PROJECT: Ellensburg Rodeo Arena lmprovemcnts coP# 17 IIAIE: January 25, 2026 TITLE: COP 17 - RFP 0/t - Clvll City Comments Approved Set CASCABE CENTRAL DE DEAC$PIIOf,(f,JAilMTY uoll UIIIT PRICE Anoutl 1t25t2026 Subcontractor Cost Civil Subcontractor - See attached back-up 1 LS $38,534.47 $38,534.47 6% Mark-uF 2.3'12.07 Subcontractor - Sub Tolal 40,846.54 1t25t2026 Cascade Ceniral Construction Cost Supervision 0 HR $128.18 $0.00 General Conditions 0 WD $925.00 $0.00 Prcject Management & Coordinalion 0 HR $16't.U $0.00 Prcject Engineer 0 HR $1'16.25 $0.00 Laborer 0 HR $63.08 $0.00 Carp6ntor 0 HR $1 19.00 $0.00 15% Mark-ur o.o0 ceneral Contractor - Sub Total 0.00 40.446-54 $3Aa 04 ts&c) lax s571.45 Schedule lmpact: None if approved by 1/28. Water utility installation is scheduled to begin 2/2/26 and we need time to order materials. Quallfications: Pricinq assumes existing fire line can be abandoned in place per RFI 053 TOTAL 41.806.43 SELLAND P.O. Box I l9 Wenatchec, WA 98807 Phone: (509)662-7119 Fax: (509)662-4465 Bid Date: lanuary22,2026 GiA;teontrctw Ellensburp Rodeo Arena lmprovements - RFP 04 coP Qualifi cations: Please Read Carefullv 1. Washington State Sales Tax has been not been included in proposal 2. Prevailing Wage has been accounted for in proposal. 3. Rock excavation (i.e. Solid Rock, Caliche, Hard pan, cemented soils and/or Boulders larger than 1 Cubic Yard) have not been included. Price Negotiation will be required if these materials are encounter€d. 4. Over Excavation of Unsuitable Material has not been accounted for, price negotiation will be required if these materials are encountered. 5. Excludes Water System Support. 6. Exludes Construction Suruey. 7. Engineering & Professional Surveying Services are Excluded' 8. Fees for Utilities, County, City, Etc. are not included. Cultural Resource Services are not covered in our scope. 9. Hazardous Materials Abatement, Removal, Handling, Disposal, etc. are not expected onsite and are therefore Excluded LO. Watering & Dust Control are lncluded for Selland's scope of work and duration only. No OT Dust Control or beyond our work. 11. Erosion Control lnspections, Reporting, MonitorinB & Maintenance are Excluded. Stormwater Permit by othets. 12. Dust control has been provided while we are actively working the site. No permanent or sustained dust control or mitigation has been included. 13. Any scope ofwork not specifically included as a line item in this proposal is excluded 14. Actual quantities installed shall be tracked/measured and the basis of payment at the unit prices included in this proposal unless otherwise agreed. 15. Due to global supply chain disruptions and market volatility we reserue the exclusive right to adiust our proposal for material escalation. 16. Proposal is valid for 30 days. This proposal shall be made part of any subcontract. lf you have any questions or need additional information with regard to our proposal please give us a call. Sincerely, SELLAND CONSTRUCIION, INC. fr*7*F Ron Zerr lll (s09) 961-782s -Productlon Adjustment for 8" C90O to 8" Dl Plpe (Bid @ S61.35/LF, Now @ S88'08) -Production Adjustment for 4" C9OO to 4" Dl Pipe (Bid @ S59.31/tF Now @ 586.04, 225 rF 2L4 l-F 1ts 3EA s 5 $-Material Cost Difference: C900 Water to Ductile lron -Furnish & lnstall Catch Basins 19,000.00 26.75 26.7t Page 1 of 1