CHANGE ORDER NO. 3
PROJECT NAME:
OWNER:
CONTRACTOR:
PROJECT NO;
Ellensburg Rodeo Arena Gompletion
Kittitas County
Cascade Central Construction
2025-009
SPOKAXE
2ll3 Nl W1.:slriniJl()n
Suire 400
St.)<lk-(.]r.e. WA
a??o I
r 504 8.lB 8ir68
OlSCorCilit?it rS C!)rr
PAGE 1 of 12
DESCRIPTION OF GHANGE:
COP 11 - RFI 028 - Buckaroo Seating Switch
COP 12 - RFP 02 - Hydrant Adds & Concourse Revisions
COP 17 - RFP 04 - CivilCity Comments
Original Contract Sum
Net Amount of Previously Approved Changes:
Conlract Sum Prior to This Change Order:
Contract Sum is increased by This Change Order:
Revised Conlract Sum:
Original Contract Completion Date:
Previously Approved lncreases in Time:
Completion Date Prior to This Ghange Order:
Contract time will be chanoed bY 0
Calendar Days This Change Order
Revised Substantial Completion Date:
Revised Final Acceptance Date:
$5,065,000.00 '
$221,986.49
$115.268.29
$s,402 .254.78
7t2Al2A26
7t20t2026
712312026
8t22t2026
Amount
$7,573.49
$59,812.87
$41,806.43
Total This Change Order: $109'192.79
Accepted by Conlractor:
Cascade Central Construction
By:
Date 2t5126
Recommended By:
ALSC Architects, P.S.
3
By:
Date z
By:
Date
'Does not include State or Local Sales Tax ALSC Architects I We bring our clients' stories to life
c0NsTRUCTl0llG
P.O. Box 119
Wenatchee, WA 98807-0119
Phone 509-662-71 19
Fax 509-662-6380
Kittitas County Commissioners
205 West 5th Ave, Suite 108
Ellensburg, WA 98926
MAKE CHECKS PAYABLE TO:
Cascade Central Construction, LLC
P.O Box 119
Wenatchee, WA. 98807-01 l9
THANK YOU FOR YOUR BUS',VESS'
PROPOSAL
PROJECT: Ellensburg Rodeo Arena lmprovements
coP# 11
DATE: January 27,2026
TITLE: RFI 028 - Buckaroo Seating Swltch Rev.l
CASCADE
CENTRAL
Oalt DE3CRTPaIOll EUANTTY lrox I'MTFRICE AUOUNT
112712026 Subcontractor Cost
Flectrical Srrbconlractor - See aftached Back-uo 1 LS s 12.313.00 $6.378.00
6% Mark-up $382.68
Subcontractor -6.760.68
1t27t2026 (l2qnr.la Cenlral Construction Cost
Suoeruision 0 HR 't28.1E $0.00
Proiect Manaoement & Coordination 2 HR 161.54 $323.08
rrnicct Enoineer 2 HR 'l'16.25 $232.50
Srrruevor 0 HR 210.00 $0.00
s83.34
638.92
Subtota 7,399.60
Bond s70.30
E&O lax $103.59
Schedule lmpact:
None if approved by 216126
TOTAL s7.573.49
McGann Electric ccc
Contractor Breakdown Summary
Project Name:
Project No.
Contractor:
Description:
Ellensburg Rodeo Arena lmprovements RFI'028
Source Documents:
coP-i2R1
Jack McGann Date:
Contractor Ref. No.
1t2712026
Mccann Electric
Provide and install | - 1.5" UG conduit from MDPL to 100A event switch location at buckaroo seating section.Only requesting
lengthfromMDPLtoLlTB. Provideandinstalll00AaddedbreakerinpanelMDPL.Provideandinstalll00Aaddedfeeder
without Neutral in updated on*line drawing and MDPL panel schedule per RFI-028 response. All conduit, fittings, supports,
hardware, wire, disconnect switch, fuses included. Exclusions: trenching and backfill.
Itemhe all costs on attachod COP Cost BFakdown form.1, CRAFT LABOR COSTS
Direct Labor Gosts:
a. crew (apprentices, journeymen, & laborers)
b. foreman
c. superintendent
$ 2,780.70
$
$
DIRECT LABOR SUBTOTAL $ 2,780.70
Supervision:
d. direct supervision (NTE 15o/o ol 1al
e. safety(NTE2%of linesla, b, &c)
2. MATERIALCOSTS
a. material costs
b. freight costs (itemize)
3. EQUIPMENT COSTS
a, owned equipmenl (per spec approved source)
b. rental equipment (per invoices attached)
4. SMALLTOOLS
a. small tools (NTE 5% of 1a & b)
5. OVERHEAD & PROFIT
NTE 15% portion of 1,2,3, & 4 up to $50,000
6. SUB.SUBCONTRACTORS
7. OVERHEAD & PROFIT ON SUB.SUBCONTRACTORS
a. NTE 15% of Line 6 up to $50,000 for each sub
8. INSURANCE
$55.61
l.CRAFTLABORCOSTS $2,836.00
$ 2,502.70
2, MATERIAL COSTS $2_503,00
$
3. EQUIPMENT COSTS $
$141.80
4. SMALLTOOLS $142.0O
SUBTOTAL 1 thru
$876.96
$
5. OVERHEAD & PROFIT $
6. SUB-SUBCONTRACTORS $
$
$
7. OVERHEAD & PROFIT ON SUB.SUBCONTRACTORS $
$4.25
15.90 8. INSURANCE $20.15
a,
b.
877.OO
$
a.
b.
c.
d.
a. payroll driven liability insurance
b, volume driven liability insurance
O.15 o/o ol 1
0.25 o/" of 1-7 $
9. BOND
a. bond 0.03 % of 1-8 9. BOND $
Fo.m Revi*d &/25/15 TOTAL
https://mcgannelectric-my.sharepoint.com/personal/jackmcgann-mcgannelectric-com/Documents/McGann Elecld'cl212i Ellensburg Rodeo 9.30/COPs/COP 1 2 1 00amp
feeder added rf1 28/Ellensburg Rodeo Arena COP -12 - Qopy Summary lssued 112712026
$
Cost Breakdown
Project Name: Ellensburg Rodeo Arena lmprovments RFI-028
Project No.
Contractor: McGann Electric
Date:
Contractor Ref. No.
coP-l2Rl
1t27t2026
Total
Cost
$
$
$ 2,780.70
$
$
$
$
$ 1.490.00
$ s00.00
$
$
$
$78.40
$14.70
$
$
$
$
$
$ 530.00
$ 89.60
$
$
$
$
$
$
$
$
$ 5,2E3.40
Eouioment
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Unt $
Material
Cost
s
$
$
$
$
$
$
$ 1,490.00
$ 300.00
$
$
$
$78.40
$14.70
$
s
$
$
$$ 53o.oo
$89.60
s
$
$
$
$
$
$
$
$ 2,502.70
Unit $
$1.490.00
$300.00
$1.12
$2.10
$2.65
$1.12
Labor
Cost
$
$
$ 2,780.70
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$ 2.780.70
$
$
$
$ 2,780.70
Unit $
$106.9s
Unit
Tvpe
HR
EA
LT
EA
EA
FT
FT
211no17
Quantity
26
1
1
70
7
200
80
Description
Electrician Labor
100A 3P PDD23G0100 breaker
100A 3pole MDPL provisions
1.5" PVC
1.5' PVC coupling
#1 thwn
#6 thwn
Labor Subtotal
Subtotal Gost of Work
Arc,r, \t-/v\ nncut t rc rs
SPOKANE
203 N WoshingtonREQUEST FOR PROPOSAL NO: t( oz
Project Name: Ellensburg Rodeo Arena Completion
Owner: Kittitas County
Contractor: Cascade Central Construction
Job Number: 2025-009
Suite 400
Spoki:ne, WA
9920 I
p 509 838.8558
qlsc(]rc h rlec is. coitl
Page 1 of 10
TO: Cascade Central Construction, Contractor, please furnish your proposal for performing the changes outlined
below and/or detailed on the attachments referred to:
o Addition of 3 yard hydrants for RV/ Vendor spots.
o Revision to concourse stabs at stadia stairs.
ALSC P_S.By Todd Dale: 12111125
PROPOSAL:
To the Owner: We propose to perform all changes described in the above request for a total ADDITIONIEEEUGHOAI
(cross out one) to the contract sum of:
Fifty-Nine Thousand Eight Hundred Twelve and 871100 Dollars $ 59,812.87
(not including Sales Tax)
We have attached cost estimate detail sheets, and the foregoing amount covers all direct and indirect costs related to
this proposal and to the effect of the proposal on the remainder of the project. All other provisions of the contract
remain in full force and effect. We request the completion date be EXTENDED/RED{J€EE(cross one 0out)
calendar days because of this work. The Contractor agrees to be bound to this proposal quotation for sixty (60) days
after this date See attached proposal for condition
e Central Constructio LC KC Carroll Date 213126
Contractor
RECOMMENDATION:
TO: Owner, we have examined the foregoing proposal and find it to be appropriate for the request. We recommend
its acceptance.
ALSC _ P.S.By Todd Keller Date 215126
PROPOSAL AGCEPTANGE:
The Owner hereby accepts the foregoing proposal. This instrument, when signed below, constitutes the conditions
upon which a Change Order will be issued.
Date
Owner
ALSC Architects \\ We bring our clients' stories to life.
G
P.O. Box 119
Wenatchee, WA. 98807-01 l9
Phone 509-662-7119
Fax 509-662-6380
Krttrtas Uounty Commissioners
205 West Sth Ave, Suite 108
Ellensburg, WA 98926
MAKE CHECKS PAYABLE TO:
Cascade Central Construction, LLC
P.O Box 119
Wenatchee, WA. 98807-0119
THANK YOU FOR YOUR BUS"VESS/
PROPOSAL
PROJECT: Ellensburg Rodeo Arena lmprovementl
coP# 12
DATE: February 3, 2026
TITLE: RFP 02 Hydrant Adds & Goncourse SOG Rev. Rev'3
CASCADE
CENTRAL
Orlt DESCnFnorl QUAMTlTV uox UIIT' Ff,FE llorrm
2t312026 Subcontractor Cost
Earthwork Subconhactor - See attached Back-up 1 ts $19.250.00 s19.250.00
oncrele suhconlraclor - See attached Back-uo 1 LS $32,900.00 $32.900.00
3,129.00
Subcontractor -55.279.00
2t312026
SuDervision 4 HR $128.18 $512.72
Proiect Manaoement & Coordinalion 2 HR $161.54 $323.08
2 HR $116.25 s232.50
rrruevor - hvdranls onlv 8 HR $210.00 $1.680.00
15% Mark-uF 412.25
Contractor -3.1 60.55
Subtotal 58,439.55
Bonc $555.18
B&O Tal $818.15
Schedule lmpact:
None if approved by 215126.
TOTAL $59.812.87
P.O. Box I l9 Wenatchcc, WA 98807
Phone: (509)662-71 l9 Fax: (5O9)662-4465
January 13,
Genddl ContmL'tus
Ellensburg Rodeo Arena lmprovements - RFP 02 COP each
Qualificatlons: Please Read Carefullv
1. washinHton state sales Tax ha$ been ngt been included in nrnnosal.
2. Prevailing Wage has been accounted for in proposal.
Revise
3. Rock excavation (i.e. Solid Rock, Caliche, Hard pan, cemented soils and/or Boulders larger than 1 cubic Yard) have not been included. Price Negotiation will be
required if these materials are encountered.
4. Over Excavation of Unsuitable Material has not been accounted for, price neSotiation will be required if these materials are encountered.
5. Excludes Water System SuPPort.
6. Exludes construction Survey.
7. EngineerinB & Professional Surveying Services are Excluded.
8. Fees for Utilities, County, City, Etc. are not included. Cultural Resource Seruices are not covered in our scope.
g. Hazardous Materials Abatement, Removal, Handling, Disposal, etc. are not expected onsite and are therefore Excluded
10. Watering & Dust Control are lncluded for Selland's scope of work and duration only. No OT Dust Control or beyond our work.
11. Erosion Control lnspections, Reporting, Monitoring & Maintenance are Excluded. Stormwater Permit by others.
12. Dust control has been provided while we are actively working the site. No permanent or sustained dust control or mitigation has been included.
13. Any scope of work not specifically included as a line item in this proposal is excluded.
14. Actual quantities installed shall be tracked/measured and the basis of payment at the unit prices included in this proposal unless otherwise agreed.
15. DuetoglobalsupplychaindisruptionsandmarketvolatilitywereservetheexclusiveriShttoadjustourproposalformaterialescalation.
16. Proposal is valid for 30 days. This proposal shall be made part of any subcontract.
lf you have any questions or need additional information with regard to our proposal please give us a call.
Regarding Flat Stair Pads: Because the stadium contractor needs each of the stair pad
EA at $700
TOTAL: $19,250
ares to
each
Confrimed
Sincerely,
SEILAND CONSTRUCTION, lNC.be flat with no allowable variance, the added cost is for laborers
/**
"*F
hout the concourse slab than originally anticipated from the bid
and enss+6+heyt+efe+fuetlf+*This is going to take morearea
Ron zerr lll
Yes, thank you. Pricing
revised to reflect this.
Absorbed by
175.00tF
RFP 02 - Flat Stair Pads
- 1" Copper Water Service PiPing
Where is this coming
from? Flatwork shall
conform to the
requirements of the
specifications with
regard to tolerance.
Would be more cost effective to pour
extra concrete at landings with gravel
grading consistent through out.
Page 1 of 1
Concrete Proposal- RFP #2
Datet ut9l2026
Project
Ellensburg Rodeo lmprovements
ATTN: General Contractor Project Location
Ellensburg,
Washington
Concrete contractor time to layout flat boundaries is in addition to the survey time. CCC survey will locate the corners of each
flat area but concrete subcontiactor will still need to do the work of setting up forms, setting up string lines, set grade rods, and
confirm exact elevations.
The first item captures additional manpower required due to the change in screed styles for the crew as a whole. Screeding by hand requires
an additional pour. Screeding by hand will increase truck spacing, pour out time, and screed time for all pours at the concourse slab. The
second item captures addiiionai finishing time at each stair location. The third item is associated with the pump truck for the separate pour.
Originally Jones was planning to roller screed the entire slab but these flattened areas
are too small to roller Screed and must be done by hand. Please review last
comments and proposal as well. Concrete proposal specified switch from roller
Screed to hand screed, not the other way around which Seems like was a
misunderstanding during the last review comments.
Item Work Description quantity Unit Unit Price Amount (US $)
Flat Stair Pads Below Grandstands to lnclude:
5 Hours x 12 Guys x 3 Original Pouts (Additional
11 Hours x 12 Guys x 1 Additional Pour
Pump Truck for Additional Pour
t
Time for Hand Scree
I li ,,;r::l
180
t32
1
s
5
s
16,920.00
72,408.00
3,572.OO
lncludes additional time to identify stair locations using provided survey points, maintain boundries of flatness &
additional finishing time to confirm proper elevations at each stair pad location. A roller screed provides flat
concrete with less labor. There are too many elevations to be met for a roller screed to be practical. Originally,
there was a ridge along the seating-retaining wall, 5 catch basins to meet, & forms along the outside of the slab.
This has added 32 elevation points that must be met within the center of the slab. This was not a small change.
Customer:
Authorized Signatu
Name:_
Date of Acceptance
lones Concrete & Excavotion
Estimotor - Carson Chester
547-867-8060
Sub Total s 32,900.00
SALES TAX O.OO%0.00
TOTAL S sz,goo.oo
www.JonesConcrete. pro 7/1
L
i'i
l
upi
.u::::
i1
::))"4
event switch was not
shown on the lline nor
panel schedules originally-
us we interpreted this
drawing to depict the everrt
switch being fed via LlTB
and not MDPL- that is why
we are requesting some
feeder costs.
E-401
UG FEEDER FOR
EVENT AV SWITCH
EVENT POWER
CONNECTION POINT
NEW 2P-1OOA FUSED
swrTcH (EVENT AV)
2'C W/ FIBER FOR RE-FEED
OF ARENA FIBER RING TO
GRANDSTANDS' PRESS BOX
DEMARC POINT AND 1"C FOR
FA CONNECTION TO
ANNUNCIATOR IN PRESS BOX
1TB
:; \
tru&tmHCI0
$xATrt{s
$xfiTrt}il
GN
1!
Buf,tfiitffi s /:i t
l-r ()
ttt-t -.
-:: .. -.
'-.: ..
,i't.':1 1i
Arc,rt \l-/t \./\ ancrrrre cis
SPOKANE
203 N W.rshirigionREQUEST FOR PROPOSAL NO: 04
Project Name: Ellensburg Rodeo Arena Completion
Owner: Kittitas County
Contractor: Cascade Central Construction
Job Number: 2025-009
Suite 400
Sf)okone. WA
9920 l
p 509.838 8568
o lsct]rch itecis. coi n
Page 1 of 11
TO: Cascade Central Construction, Contractor, please furnish your proposal for performing the changes outlined
below and/or detailed on the attachments referred to:
a Revisions to Civit drawings per City review comments.
ALSC PS By Todd Date : 1121126
PROPOSAL:
To the Owner:
(cross out one
We propose to perform all chang es described in the above request for a total ADDITION/EEEUGI4OIF
) to the contract sum of: See attached proposal for qualifi cations
Forty-On e Thousand Eiqht Hundred Six and 431100 Dollars $ 41,806.43
(not including Sales Tax)
We have attached cost estimate detail sheets, and the foregoing amount covers all direct and indirect costs related to
this proposal and to the effect of the proposal on the remainder of the project.All other provisions of the contract
remain in full force and effect. We request the completion date be EXTENDEDdREDTIGED{cross one out) 0
calendar days because of this work. The Contractor to be bound to this proposal quotation for sixty (60) days
after this date See attached proposal for qual
agrees
ificatio
Date 1125126
Contractor
RECOMMENDATION:
TO: Owner, we have examined the foregoing proposal and find it to be appropriate for the request. We recommend
its acceptance.
ALSC ifar:fs P s By Todd Keller Date 1t28126
PROPOSAL AGGEPTANGE:
The Owner hereby accepts the foregoing proposal. This instrument, when signed below, constitutes the conditions
upon which a Change Order will be issued.
Date
NS
Owner
ALSC Architects \\ We bring our clients' stories to life.
G
P.O. Box 119
Wenatchee, WA. 98807-0119
Phone 509{62-71'19
Fax 509-662-6380
Kittitas County Comissioners
West StlrAvc, Sultc ,l08
Ellensburg, WA 98926
MAKE CHECKS PAYABLE TO:
Cascade Central Constructlon' LLC
P.O Box 119
Wenalchee, wA. 98807-0119
THANK YOU FOR YOUR AUS'IVESS/
PROPOSAL
PROJECT: Ellensburg Rodeo Arena lmprovemcnts
coP# 17
IIAIE: January 25, 2026
TITLE: COP 17 - RFP 0/t - Clvll City Comments Approved Set
CASCABE
CENTRAL
DE DEAC$PIIOf,(f,JAilMTY uoll UIIIT PRICE Anoutl
1t25t2026 Subcontractor Cost
Civil Subcontractor - See attached back-up 1 LS $38,534.47 $38,534.47
6% Mark-uF 2.3'12.07
Subcontractor - Sub Tolal 40,846.54
1t25t2026 Cascade Ceniral Construction Cost
Supervision 0 HR $128.18 $0.00
General Conditions 0 WD $925.00 $0.00
Prcject Management & Coordinalion 0 HR $16't.U $0.00
Prcject Engineer 0 HR $1'16.25 $0.00
Laborer 0 HR $63.08 $0.00
Carp6ntor 0 HR $1 19.00 $0.00
15% Mark-ur o.o0
ceneral Contractor - Sub Total 0.00
40.446-54
$3Aa 04
ts&c) lax s571.45
Schedule lmpact:
None if approved by 1/28. Water utility installation is scheduled to begin 2/2/26
and we need time to order materials.
Quallfications:
Pricinq assumes existing fire line can be abandoned in place per RFI 053 TOTAL 41.806.43
SELLAND P.O. Box I l9 Wenatchec, WA 98807
Phone: (509)662-7119 Fax: (509)662-4465
Bid Date: lanuary22,2026
GiA;teontrctw
Ellensburp Rodeo Arena lmprovements - RFP 04 coP
Qualifi cations: Please Read Carefullv
1. Washington State Sales Tax has been not been included in proposal
2. Prevailing Wage has been accounted for in proposal.
3. Rock excavation (i.e. Solid Rock, Caliche, Hard pan, cemented soils and/or Boulders larger than 1 Cubic Yard) have not been included. Price Negotiation will be
required if these materials are encounter€d.
4. Over Excavation of Unsuitable Material has not been accounted for, price negotiation will be required if these materials are encountered.
5. Excludes Water System Support.
6. Exludes Construction Suruey.
7. Engineering & Professional Surveying Services are Excluded'
8. Fees for Utilities, County, City, Etc. are not included. Cultural Resource Services are not covered in our scope.
9. Hazardous Materials Abatement, Removal, Handling, Disposal, etc. are not expected onsite and are therefore Excluded
LO. Watering & Dust Control are lncluded for Selland's scope of work and duration only. No OT Dust Control or beyond our work.
11. Erosion Control lnspections, Reporting, MonitorinB & Maintenance are Excluded. Stormwater Permit by othets.
12. Dust control has been provided while we are actively working the site. No permanent or sustained dust control or mitigation has been included.
13. Any scope ofwork not specifically included as a line item in this proposal is excluded
14. Actual quantities installed shall be tracked/measured and the basis of payment at the unit prices included in this proposal unless otherwise agreed.
15. Due to global supply chain disruptions and market volatility we reserue the exclusive right to adiust our proposal for material escalation.
16. Proposal is valid for 30 days. This proposal shall be made part of any subcontract.
lf you have any questions or need additional information with regard to our proposal please give us a call.
Sincerely,
SELLAND CONSTRUCIION, INC.
fr*7*F
Ron Zerr lll
(s09) 961-782s
-Productlon Adjustment for 8" C90O to 8" Dl Plpe (Bid @ S61.35/LF, Now @ S88'08)
-Production Adjustment for 4" C9OO to 4" Dl Pipe (Bid @ S59.31/tF Now @ 586.04,
225 rF
2L4 l-F
1ts
3EA
s
5
$-Material Cost Difference: C900 Water to Ductile lron
-Furnish & lnstall Catch Basins
19,000.00
26.75
26.7t
Page 1 of 1