KITTITAS COUNTY
BOARD OF COUNTY COMMISSIONERS
AGENDA STAFF REPORT
AGENDA DATE: August 4, 2026
ACTION REQUESTED: Request to Approve a Resolution Authorizing Chair Signature on
Fehr and Peers Task Order No. 01 – Countywide Transportation
Model
BACKGROUND: Kittitas County authorized funds through the Distressed County Sales
and Use Tax (Fund 108) to update the Countywide transportation
model by Resolution 2025-186. The original transportation model was
developed in 2013 with a major update in 2017. An update to the
transportation model will establish a new base year and calibrate the
model including updated road networks and land use categories.
Public Works previously solicited proposals for on-call transportation
modeling and planning services and selected Fehr and Peers as an on-
call consultant. Public Works has requested a scope and fee from Fehr
and Peers to update the countywide transportation model. The project
includes expanding traffic forecasting capabilities in the upper county
area. The task order amount proposed is $150,000.00 and Fehr and
Peers would be under contract through the end of 2028.
INTERACTION: Public Works
RECOMMENDATION: Approve a Resolution Authorizing Chair Signature on Fehr and Peers
Task Order No. 01 – Countywide Transportation Model.
HANDLING: Return One original to Public Works
ATTACHMENTS: Resolution, Task Order No. 01.
LEAD STAFF: Josh Fredrickson
Public Works Director
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2026 -_____
AUTHORIZING CHAIR SIGNATURE ON FEHR AND PEERS TASK ORDER NO. 01 –
COUNTYWIDE TRANSPORTATION MODEL
WHEREAS: The Department of Public Works procured on-call professional transportation model and
planning services from Fehr and Peers consistent with state law and county code on July
2025; and
WHEREAS: Fehr and Peers prepared a scope of work and fee proposal to provide an updated
countywide transportation model; and
WHEREAS: The value of Task Order No. 01 exceeds the contract authorization amount currently
provided to the Public Works Director; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest
of the public, does hereby authorize Chair signature on Fehr and Peers Task Order No. 01
– Countywide Transportation Model.
DATED this 4th day of August 2026, in Ellensburg, Washington.
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
________________________________
Chairman
Attest:
☐ Clerk of the Board- Julie Kjorsvik ________________________________
Vice-Chairman
☐ Deputy Clerk of the Board- Mandy Buchholz
_______________________________ ________________________________
Commissioner
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
Formal Task Order Document
Fehr and Peers.
Task Order Number 01
Maximum Amount Payable $150,000.00 Completion Date 12/31/2028
The general provisions and clauses of the Master Professional Services Agreement for On-
Call Civil Engineering executed on November 13, 2025, shall be in full force and effect for
this Task Order.
Location of Project: Kittitas County
Project Title: Countywide Transportation Model
Description of Work: See attached Exhibit A
Fehr and Peers shall provide an updated countywide transportation model updated to run the
latest version of the Visum software. Model shall incorporate updated traffic counts and account
for current land use categories. Additional detail and forecasting capabilities in the upper county
area are to be provided.
Cost Breakdown: See Attached Exhibit A
Completion Date: 12/31/2028
Agency Signature: Date:
Consultant Signature: Date:
7/29/2026
Kittitas County Model Update | 1
Upper Kittitas County Model Update
Fehr & Peers has prepared the following scope of work to update the Kittitas County travel demand
model, which last underwent a major update in 2017. The model update would establish a new
existing year and would be calibrated and validated using observed traffic counts. The model would
also be updated to run with the latest version of the Visum software.
As part of this effort, the model will be enhanced to provide more detail and expanded forecasting
capabilities in the Upper County area. To better support planning in the Upper County, a secondary
time period would be incorporated to reflect peak recreational travel separate from the traditional
weekday PM peak hour time period currently in the model. In addition, the model would be enhanced
to better estimate travel generated by Upper County vacation homes and secondary residences.
The general area representing Upper Kittitas County within the countywide model is shown below.
Scope of Work
The tasks required to complete this project are described in more detail below. The traditional
weekday PM peak hour scenario will be calibrated and validated to Winter 2026 conditions. The
development of this model scenario will be completed before beginning work on a second time
period representing peak summer recreational travel. This secondary period would be chosen
through consultation with the County and cities to reflect visitor travel during Summer 2026 on a
typical Friday or Sunday. The model would not reflect conditions on a summer holiday weekend when
travel demand is highest.
Upper County
Kittitas County Model Update | 2
Task 1. Project Administration
This task includes coordination with the County and cities throughout the project. At a minimum,
monthly meetings are assumed, but more could be scheduled as necessary based on the specific
needs of the project at a given time. This task also includes the preparation of monthly invoices and
progress updates.
Task 2. Data Collection
To validate the volume estimates generated by the model, a database of existing traffic data is
required. This data will be compiled through traffic count vendors and provided by the cities and
County, as available. Fehr & Peers will organize and standardize the count data into a consistent
format that can be used for model validation. The cost for this task assumes that 24-hour tube counts
are collected at 80 locations, with approximately 75% collected across the county during Winter
2026 and 25% collected in the Upper County during Summer 2026.
In addition, Fehr & Peers will purchase origin -destination travel data, from a data provider such as
Streetlight, to provide information on travel behavior within the subarea for each of the validation
time periods. This data will be used to calibrate the proportion of trips generated within the subarea
and the proportion of trips coming from outside the subarea. Fehr & Peers will process and
summarize the data for use in the travel model.
Task 3. Existing Scenario Update
As part of this task, Fehr & Peers would review the arterial and highway network for consistency with
existing conditions throughout the entire county. This includes verifying characteristics such as the
number of lanes, functional classifications, speed limits, and turning restrictions. The roadway
network would also be updated to include more roadways to a level of detail consistent with the land
use zone system in the model.
In order to better estimate travel to and from the Upper County area, a new land use category would
be added to the structure of the model for households that primarily function as second homes and
vacation rentals. A separate trip purpose would also be added to the model to distinguish recreational
travel from the other trip purposes currently in the model. Travel assumptions for the new land use
category and trip purpose would be estimated using the travel data collected in Task 1. The Upper
County area of the model includes a sufficient number of land use zones and the boundaries of these
would not be substantially altered.
The County and cities would be responsible for providing changes in households and jobs that have
occurred since 2017 to be incorporated into the model. Fehr & Peers would be responsible for
updating volume assumptions at each of the gateway locations in the subarea model.
Task 4. Existing Scenario Calibration and Validation
The model will be calibrated and validated to reflect travel conditions during a Winter 2026 weekday
PM peak hour and Summer 2026 weekend peak hour. This will be accomplished by adjusting trip
generation rates, the proportion of internal vs external trips, roadway network characteristics, and
other parameters that affect travel behavior. The validation will compare existing traffic counts with
model estimates for the peak hour for both the countywide model and Upper County subarea.
Kittitas County Model Update | 3
Task 5. Horizon Scenario Development
Fehr & Peers will coordinate the development of the future year scenario, assumed to be 20+ years
beyond the existing year scenario. The county and cities will be responsible for providing a list of land
use forecasts and roadway network improvement projects to be incorporated into the model. Fehr &
Peers will be responsible for developing growth assumptions for travel outside of the model area.
These changes will be coded into the model, but no scenario analysis will be performed as part of this
scope of work. High level metrics will be summarized and compared against the existing scenarios.
A final technical memorandum will be provided summarizing the update of the model including all
tasks described herein.
Schedule
The estimated schedule for developing the model is assumed to occur between August 2026 and
June 2027.
Budget
The estimated budget for this project is $149,987. The hourly breakdown by staff person and task is
summarized below. Note that rates may change but the maximum amount will not be exceeded.