Loading...
HomeMy WebLinkAboutFully Executed Document;&,*,*- - .l -.-- October 25,2024 Approval Kittitas Cou Name: fst'1:\:f'' '\\ ii t.'l'lai1'r ;t i I Kittitas County Solid Waste Programs 925 lndustrialWay, Ellensburg, WA 98926 Telephone: {509) 962jf542 RECffifiWffii;} JUL 2 7 til?$ i;n::r: i KflTrrAs c$uhi]*','' BOARD OF GOMI'til$s Ic l . SCS Engineers BY:- -^yWXAr**f,_=- Michelle P. Leonard Na TITLE . Senior Vice President SCS Engineers Attention: Tom Parker, PE, Project Director 240514A1h Ave. NE Suite 107 Bellevue, WA 98005 RE: Amendment No.3 to ProfessionalSeruice Agreement This Amendment is for construction phase engineering support services for the new lower valley transfer station, to be billed at time and malerials. Orig inal P rofessional Service Agree ment Amendments 1 -2 Amendment 3 Construction Phase engineering support Tasked out lined in Table 1 of letter dated September 30,2024. Not to Exceed $1,051,944 Total Adjust Service Contract Amount Please sign and return a copy of ihe amendment. $ 438.479 $1,490,414 Chair BY ')fi4 TITLE: DATE: 0712412026_ SCS EHGIHEERS Environmenlol Consultonts & Coniroctors September 30, 2A24 Project No. A L222292.0O PattiStacey, Director Kittitas Cou nty Sol id Waste/ Faci lity Ma intena nce Director 925 lndustrialWay Ellensburg, WA 98926 Subjec8 Project- Kittitas County LowerVaileyTransfershtion Reguest far a Qontract Amendment No. 3 Dear Patti: SCS Engineers (SCS) is requesting a contract amendment to provide engineering seruices during construction for the Lower Valley Transfer Station project in Ellensburg, WA. This amendment request also includes additional design work, project management, and additional services during the bidding phase as noted below. I.O CONSTRUCTION PHASE ENGINTERING SUPPORT SERVICES SCS will provide Kittitas County (County) construction phase support services including reviewing shop drawings, responding to Request For lnfornration (RFl's), preparing design changes, providing geotechnlcal engineering support, participation during project meetings, specialty inspection services, geotechnical engineering, asbuilts, and participation in a final project walkthrough. I .l Project Mcnogemenf SCS will provide project management services including subconsultant coordination, preparation of monthly invoices, and participation in monthly check-in calls with the county. Assurnptions . Project Management Services for a 1S-month period.o 2 hours per month for scs PM and 2 hours per month for Lead Engineer* Fifteen monthly invoices and check-in calls (30 mins each). 1.2 Submittol Review/RFl Responses/Deslgn Chcnge Notices SCS will perform review of contractor submittals. SCS will prepare responses utilizing Qwner provided software (Trimble Project Sight). The estimated number of submittals by discipline is shown below: r Civilr Structuralr Architectural o MEP r Total 56 10 57 24 147 Submittals Kittitos County Lower Volley Tronsfer Station September 3A,2A24 Poge 2 SCS will review and provide responses to an estimated 130 Request For lnformation (RFl) and prepare an estimated 30 Design Change Notices. Assumptlbns t 147 Submittal Reviews (Estimated 2.5 hours persubmittal) . Respond to 130 RFls (Estimated 4 hours per RFI)r Develop 30 Design Change Notices (Estimated 14 hours per DCN) 1 .3 Projecf Meeiings ond Speciolty lnspections One SCS staff will participate in 30 - l--hour progress meetings remotely throughout the 15- month project duration. The SCS team will provide approximately 20 specialty inspections of project components throughout the project duration. Each inspection will include 4-hours of onsite time and travel time from either Seattle of Spokane. Assumpfions o Attendance of one SCS staff at 30 - 1-hour project meetings (remotely) o 20 Specialty lnspections- 4-hours onsite 1.4 Geotechnicol Engineering Support SCS's subconsultant will provide approximately 60 hours of engineering services providing the Owner with support during construction on an as needed basis. Assumptions r 60 Hours of Geotechnical Engineering Support I .5 As-Builts ond Project Closeout SCS will prepare as-built drawings utilizing contractor provided markups. Four (4) SCS team staff will participate in a substantial completion walkthrough and will provide the Owner with a final punch list of items to be corrected by the contractor, The number of asbuilt drawings to be prepared by discipline r Civil 34o Architectural 59o Structural 27r MEP 46 r Total l-66 Asbuilt Drawings Assumptions r Preparation of 1-66 As-Built Drawings Kittitos County Lower Volley Tronsfer Stotion September 30,2024 Poge 3 r Attendance of 4 SCS Team Staff on Final Substantial Completion lnspectionr Each scs staff (4 total) to be onsite for L2 hours for the final inspection 2.A ADDITIONAL ENGINEERING SERVICES 2.1 Compost Pond Re-Design SCS will redesign the compost area contact water ponds to account for high groundwater elevations The design will be based on the highest groundwater encountered during the recent irrigation season. The Owner will provide recent groundwater depths. The design will be submitted to Department of Ecology for review and approval and SCS will submit the revised drawings to the contractor. Drawingsc-58,c-6,c-17,andc-2gwillberevisedandre-submitted. Assurnptions o Revise Drawings C-58, C-6, C-17, and C-29r One Submittalto Department of Ecologyo One Submittal to Contractor 2.2 Additionol Supporf During Bidding phase SCS will provide additional engineering support ciuring the bidding phase including utilizing and revising Owner requested AIA upfront documents, preparation of final contract documents, and development of conformed set of contract documents and drawings. Documents revised include: r Standard Form of Agreement (AlA 101-20 L7l - 6 pagesr GeneralConditions of the Contract (AlA 2OL-2OLT)- 3g pagesr lnstruction to Bidders (AlA TAL - 2ALT) - 8 pages. Supplementary lnstruction to Bidders - 1 Page. Supplementary General Conditions of the Contract - 24 pagesr Conformed Set of Upfront Documents - 2OO pagesr Conformed Set of Technical Specifications - Bb8 pages r Conformed Set of Drawings - l_68 Drawings 2.3 Owner Requested Services SCS will provide additional engineering services as requested by the OWNER during the 15-month project duration. Services may include responding to regulatory agency questions/comments, additional construction administration support, and other requests by the Owner. The Owner will provide written authorization to SCS for work performed under this task. Work will be invoiced on a Time and Material basis in accordance with the standard unit rate sheet. ADDITIONAL BUDGFT The estimated cost for the additional work described in this Amendment 3 is $438,470. The terms and conditions for this added scope of work will remain the same as those listed in the executed contract. Kiititos County Lower Volley Jrqnsfer Stsiion September 30,2024 Poge 4 Toble l. Proposed Fees for Amendment 3 Tcsk Tosk Descriplion Estimoled Cost Billing Type 1-.L Project Management $24,t64 Time and Materials t.2 Submittal Reviel/RFl Response/ Design Changes Notices $211,896 Time and Materials 1,.3 Project Meetings and Specialty lnspections $43,955 Time and Materials t.4 Geotechnical Engineering Su pport $12,BOO Time and Materlals 1.5 Project Closeout and As-Builts $69,045 Time and Materials 2.L Cornpost Pond Re-Design $18,200 Lump Sum 2.2 Additional Support During the Bidding Phase $39,910 Lump Sum 2.3 Owner Requested Services $18,500 Time and Materials Total $438,470 CLOSING SCS appreciates the opportunity to assist you on this important project. We will continue to work closely with you and your staff to ensure that responsive and efficient services are provided. We look fonvard to working with you further on this project. Please do not hesitate to contact us if you have any questions or comments, Sincerely, t'. il Thomas D. Parker, P,E., BCEE Project Director SCS Engineers Michelle P. Leonard Senior Vice President SCS Engineers