SCS Engineers
BY:- -^yWXAr**f,_=-
Michelle P. Leonard
Na
TITLE . Senior Vice President
SCS Engineers
Attention: Tom Parker, PE, Project Director
240514A1h Ave. NE Suite 107
Bellevue, WA 98005
RE: Amendment No.3 to ProfessionalSeruice Agreement
This Amendment is for construction phase engineering support services for the new lower valley
transfer station, to be billed at time and malerials.
Orig inal P rofessional Service Agree ment Amendments 1 -2
Amendment 3 Construction Phase engineering support
Tasked out lined in Table 1 of letter dated
September 30,2024.
Not to Exceed
$1,051,944
Total Adjust Service Contract Amount
Please sign and return a copy of ihe amendment.
$ 438.479
$1,490,414
Chair
BY
')fi4
TITLE:
DATE: 0712412026_
SCS EHGIHEERS Environmenlol Consultonts & Coniroctors
September 30, 2A24
Project No. A L222292.0O
PattiStacey, Director
Kittitas Cou nty Sol id Waste/ Faci lity Ma intena nce Director
925 lndustrialWay
Ellensburg, WA 98926
Subjec8 Project- Kittitas County LowerVaileyTransfershtion
Reguest far a Qontract Amendment No. 3
Dear Patti:
SCS Engineers (SCS) is requesting a contract amendment to provide engineering seruices during
construction for the Lower Valley Transfer Station project in Ellensburg, WA. This amendment
request also includes additional design work, project management, and additional services during
the bidding phase as noted below.
I.O CONSTRUCTION PHASE ENGINTERING SUPPORT SERVICES
SCS will provide Kittitas County (County) construction phase support services including reviewing
shop drawings, responding to Request For lnfornration (RFl's), preparing design changes, providing
geotechnlcal engineering support, participation during project meetings, specialty inspection
services, geotechnical engineering, asbuilts, and participation in a final project walkthrough.
I .l Project Mcnogemenf
SCS will provide project management services including subconsultant coordination, preparation of
monthly invoices, and participation in monthly check-in calls with the county.
Assurnptions
. Project Management Services for a 1S-month period.o 2 hours per month for scs PM and 2 hours per month for Lead Engineer* Fifteen monthly invoices and check-in calls (30 mins each).
1.2 Submittol Review/RFl Responses/Deslgn Chcnge Notices
SCS will perform review of contractor submittals. SCS will prepare responses utilizing Qwner
provided software (Trimble Project Sight). The estimated number of submittals by discipline is shown
below:
r Civilr Structuralr Architectural
o MEP
r Total
56
10
57
24
147 Submittals
Kittitos County Lower Volley Tronsfer Station
September 3A,2A24
Poge 2
SCS will review and provide responses to an estimated 130 Request For lnformation (RFl) and
prepare an estimated 30 Design Change Notices.
Assumptlbns
t 147 Submittal Reviews (Estimated 2.5 hours persubmittal)
. Respond to 130 RFls (Estimated 4 hours per RFI)r Develop 30 Design Change Notices (Estimated 14 hours per DCN)
1 .3 Projecf Meeiings ond Speciolty lnspections
One SCS staff will participate in 30 - l--hour progress meetings remotely throughout the 15- month
project duration.
The SCS team will provide approximately 20 specialty inspections of project components throughout
the project duration. Each inspection will include 4-hours of onsite time and travel time from either
Seattle of Spokane.
Assumpfions
o Attendance of one SCS staff at 30 - 1-hour project meetings (remotely)
o 20 Specialty lnspections- 4-hours onsite
1.4 Geotechnicol Engineering Support
SCS's subconsultant will provide approximately 60 hours of engineering services providing the Owner
with support during construction on an as needed basis.
Assumptions
r 60 Hours of Geotechnical Engineering Support
I .5 As-Builts ond Project Closeout
SCS will prepare as-built drawings utilizing contractor provided markups. Four (4) SCS team staff will
participate in a substantial completion walkthrough and will provide the Owner with a final punch list
of items to be corrected by the contractor,
The number of asbuilt drawings to be prepared by discipline
r Civil 34o Architectural 59o Structural 27r MEP 46
r Total l-66 Asbuilt Drawings
Assumptions
r Preparation of 1-66 As-Built Drawings
Kittitos County Lower Volley Tronsfer Stotion
September 30,2024
Poge 3
r Attendance of 4 SCS Team Staff on Final Substantial Completion lnspectionr Each scs staff (4 total) to be onsite for L2 hours for the final inspection
2.A ADDITIONAL ENGINEERING SERVICES
2.1 Compost Pond Re-Design
SCS will redesign the compost area contact water ponds to account for high groundwater elevations
The design will be based on the highest groundwater encountered during the recent irrigation
season. The Owner will provide recent groundwater depths. The design will be submitted to
Department of Ecology for review and approval and SCS will submit the revised drawings to the
contractor. Drawingsc-58,c-6,c-17,andc-2gwillberevisedandre-submitted.
Assurnptions
o Revise Drawings C-58, C-6, C-17, and C-29r One Submittalto Department of Ecologyo One Submittal to Contractor
2.2 Additionol Supporf During Bidding phase
SCS will provide additional engineering support ciuring the bidding phase including utilizing and
revising Owner requested AIA upfront documents, preparation of final contract documents, and
development of conformed set of contract documents and drawings. Documents revised include:
r Standard Form of Agreement (AlA 101-20 L7l - 6 pagesr GeneralConditions of the Contract (AlA 2OL-2OLT)- 3g pagesr lnstruction to Bidders (AlA TAL - 2ALT) - 8 pages. Supplementary lnstruction to Bidders - 1 Page. Supplementary General Conditions of the Contract - 24 pagesr Conformed Set of Upfront Documents - 2OO pagesr Conformed Set of Technical Specifications - Bb8 pages
r Conformed Set of Drawings - l_68 Drawings
2.3 Owner Requested Services
SCS will provide additional engineering services as requested by the OWNER during the 15-month
project duration. Services may include responding to regulatory agency questions/comments,
additional construction administration support, and other requests by the Owner. The Owner will
provide written authorization to SCS for work performed under this task. Work will be invoiced on a
Time and Material basis in accordance with the standard unit rate sheet.
ADDITIONAL BUDGFT
The estimated cost for the additional work described in this Amendment 3 is $438,470. The terms
and conditions for this added scope of work will remain the same as those listed in the executed
contract.
Kiititos County Lower Volley Jrqnsfer Stsiion
September 30,2024
Poge 4
Toble l. Proposed Fees for Amendment 3
Tcsk Tosk Descriplion Estimoled Cost Billing Type
1-.L Project Management $24,t64 Time and Materials
t.2 Submittal Reviel/RFl Response/
Design Changes Notices $211,896
Time and Materials
1,.3 Project Meetings and Specialty
lnspections $43,955
Time and Materials
t.4 Geotechnical Engineering Su pport $12,BOO Time and Materlals
1.5 Project Closeout and As-Builts $69,045 Time and Materials
2.L Cornpost Pond Re-Design $18,200 Lump Sum
2.2 Additional Support During the
Bidding Phase $39,910 Lump Sum
2.3 Owner Requested Services $18,500 Time and Materials
Total $438,470
CLOSING
SCS appreciates the opportunity to assist you on this important project. We will continue to work
closely with you and your staff to ensure that responsive and efficient services are provided. We look
fonvard to working with you further on this project. Please do not hesitate to contact us if you have
any questions or comments,
Sincerely,
t'.
il
Thomas D. Parker, P,E., BCEE
Project Director
SCS Engineers
Michelle P. Leonard
Senior Vice President
SCS Engineers