Change Order
'WAIA Document GToi " - 2017
PROJECT: (Name and address)
Kittitas County tail Facilities Renovation
Task I
205 West sthAvenuo
EUersburg, wA 98926
OWl'lER (Name and addressl
Kittitas Coutrty
205 West 5" Avenue
CONTRACI INFORMATION:
ContractFor: Renovation
Date:04-30-2025
ARCHIIECT: (Name arul addres$
thir
7826 Leary Way. Ste. 200
CHANGE ORDER INFORIIAflON:
Change Order Number: 015
Date: 06-30-26
C0I{TRACTOR: (Name and addressl
Belsaas & Smith Cooshrction, Inc.
103 East 46 Aveuue. suite 209
Ellensburs. WA 98926Ellensburbe. WA Redrnond. WA
THE CONTRACT IS CHANGED AS FOLLOWS:
(nsen a detailed description olthe change and, ifapplicable, attach or reference specitic ethibits' Also include agreed upon
adjustmews anributable to q,eculed consfillction Change DirectivesJ
This change order includes a cost adjustmeut related to the added Scop of Work ideutifiedin COP#24
The origiaal Contract Sumrvas
The net change by previously authorized Change Orders
The ConEact Sum prior to rhis Change Order rvas
The Conuact Sum rvill be unchanged by this Change order in the amount of
Tho nerv Contract Sum including this Charye Order will be
2.457,000.00
1,71 1,519.89
4,168,519.89
9.919.17
4,178-439_06
Tbe Coffract Tim€ will be unchanged by ( ) days.
The trew date of Substantial Completion rvill be
l,lorE;
This Change Order does not include adjustrnents to the Contract Sum or Guaranteed Maximum Price, or the
Contract TIme, that have been authoriz;d by Construction Change Directive until the cost and time have been
agreed upon by both the Owner and Contractor. in which case a Change Order is executed to supersede the
Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, COT{TRACTOR AND OWNER.
Ooouslgned by:by:
bl^n ilwh*uw Sdt Wsow
BY: Iobn Aoderson, Principal BY: Scott Carlsor, Project Ntanager BY: Kittitas County
(Printed name, title, and license
nwfuer if required)
7tlt2026
@rinred nante and ritle)(h'inted name and title)
7t1t2026
Date Date
,l
Docusign Envelope lD: A8A88714-EAE8-8064-8123-71oDBlF2CD3C
p.o. Box926 | 700 EAST MOUNTAIN VIEW AVE, SUIIE 504
ELLENSBURG, WA 98926
O: 509-925-9747 C| 6t9'278-8554
scottc@belsmith.com
arLtatcotaon
Junet7,2026
Re: Walk-off Mat and Vestibule Outlet
per your request, we are pleased to offer the following change order proposal #25 (COP 25).
lf approved, Belsaas and Smith's onsite team will order and install the specified walk-off mat
after the existing floor has been prepped and install an outlet on the east wall of the vestibule
at the staffs desired height.
Total cost of proposal: Nine Thousand Four Hundred Forty-Nine Dollars 59,9L9.L7 + WSST
Time Extension Required: 98 Days - Walk-off Mat Lead Time 12 Weeks
Sincerely,
Scott Carlson
Belsaas & Smith Construction
Docusign Envelope lD: A8Ag8714-EAE8-8064€123-71 ODBl F2CD3C
BELSAAS & SMITH CONSTRUCTION
CHANGE ORDER PROPOSAL BREAKDOWN SHEET
SHEET 1 of 2 c.o.P. #25
s
$
$
$
S
$
$
s
$
$
$
$
$
$
$
$
$
$
s
$
$
$
$ 1.020.00
$ 1.020.00
$
$
$
$
$
$
$
LABOR
COST
s
$
$
$
$
s
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
MATERIAL
cosT
$ 7,605.40
$
$
$
$
$
$
$
$
s 580.40
$
s
$
$
$
$
$
$
$
$
$
$
$
$
$
SUB
cosr
$ 6.925.00
$
$
$
$
s
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
s
$
$
$
s
$
$
EOUIP
cosr
s
$
102.00
LABOREQUIP
UNIT COSTS
Mat.
Hrs
UNIT
LS
LS
OUAN.
1
1
10Floor Prep (2 Carpenter x 5 Hrs @$102)
TOTALS
Outlet
DESCRIPTION
Walk Off Mat and Outlet - Vestibule
Walk Off Mat
#
Docusign Envelope lD: ABAB8714-EAE8-8064-8123-710D8'l F2CD3C
BELSAAS & SMITH CONSTRUCTION
CHANGE ORDER PROPOSAL BREAKDOWN SHEET
TIME EXTENTION REQUIRED:98 DaYs
NOTICE TO PROCEED REQUIRED BY:
SHEET 2 of 2 c.o.P. #25
WE RESERVE OUR RIGHTS UNDER THE CONTMCT TO ACCESS THIS CHANGE
CUMULATIVELY AS IT AFFECTS TIME AND AMOUNT.
$ 1.172.99
$ 1.172.99
$
$ 9.9
$ 105.06
$ 17.33
$ 1.172.99
$ 1.020.00
$
s 8.746.17
$ 9.919.17
LABOR
cosT
30.60$
$
$
$
$
$
MATERIAL
cosr
s
$ 7.605.40E 22A.16
E 8.746.17
TOTAL
s 783.36s 129.25s 8.746.17
SUB TOTAL
SUB
COST
$
$
EQUIP
COST
$
$
$
$
TOTALS FROM PREVIOUS PAGE
PREVIOUS CO ALLOWANCE
SUB TOTAL
MATERIAL
VERHEAD 3%
iOUIPMENT
GMND TOTAL
BONDING 1.5olo
SUB TOTAL
LABOR
SUBCONTRACTORS
SUB TOTAL
PROFIT 10o/o
Docusign Envelope lD: A8A88714-EAE8-8064-8123-71 ODBl F2CD3C
-Il-.TTTAN Project: Kittitas Jait
205 W SthAve
Ellensburg, WA 98926ET.ECTIiIICAL
U
POTENTIAL GHANGE ORDER
TO:
contractor
Scott Carlson
Belsaas and Smith
FROM:
Subcontractor
Charles Espinoza
Titan Electricat LLC
Date:
Change #
Amount:
lnitiated By:
Reason:
Type:
6t1112026
I
$eeo.ao
Titan EtectricaI
Unforeseen Conditions
Additive - Lump Sum
PCOS Added in Vestibute E109E TITLE
THIS CONTRACTWILL BE MODIFIED AS FOLLOWS:
lnstatt (1) duptex receptacle in vestibute E109 from nearest existing power in ceil,ing space
Cost Breakdown This Change
Labor
Material
Other
o&P
Totat
$500.00
$67.00
$o
$113.40
$680.40
Authorized By:
Signature:
Print Name:
Titte:
Date:
CONTRACTOR
Accepted By:
Signature:
Print Name:
Titl.e:
Date:
SUBCONTRACTOR
Page 1 of 1
Docusign Envelope lD: ABA8B714-EAE8-8064-81 23-71 0DB1 F2CD3C
NABTHWEST
Customer
Name
Address
KITTITAS FACILITIES CARPET ENTRY WALK OFF
City
Phone
ELLENSBURG WA
98926
2501 River Road
Yakima WA 98902
509-620-4372
Misc
Date
S/M
Rep
Mat. Only
BID
5t28t2026
Rtco
Address
City
Phone
State zip
Qtv Unit Price TOTAL
1 ALL 8FT 2 INCHES X12FT
CS PEDIMENT MODEL MlMWNG RECESSED MAT WITH RUBBER
INSERT IN 8501 BLACK MILL FINISH RECESSED TAPERED ANGLE
FRAME MILL FINISH
DOES NOT INCLUDE DEMO OF EXISTING
DOES NOT INCLUDE UNFORSEEN FLOOR DAMAGE
DOES NOT INCLUDE3 FURNITURE R AND R
INSTALL DURING REGULAR BUSINESS HOURS
$6,925.00 $ 6,925.00
$ 6,925.00
0.00o/o $
$ 6,925.00Comments
Name
cc#
Expires
Tax Rate(s)
SubTotal
Shipping
TOTAL
lnvoice Due Date