CHANGE ORDER NO. 8
PROJECT NAME:
OWNER:
CONTMCTOR:
PROJECT NO:
Ellensburg Rodeo Arena Completion
Kittitas County
Cascade Central Construction
2025-009
?*.1 !'.1']iV*tlrin(Jr{ln
spoxaNg
Srlir* 4L1{.}
:i;:)okr)r\*, v"',/{.
t9'.?$l
r $0'l].8ii8.S5{:lt
$ t$s{1t{: i"ril{}i:1t. c tliY}
PAGE 1 of 137
DESCRIPTION OF CHANGE:
COP 33 - Slructural Fill
COP 34 - RFP I BTC Scope Reduction
COP 35 - Chase Water Line
COP 36 - RFP 10 Post lndicator Valve Addition
COP 37 - Cast lron Credit
Arena Cleanup Parformed by Owner
Original Contract Sum
Net Amount of Previously Approved Changes:
Contract Sum Prior to This Change Order:
Contract Sum is llrcreased by This Change Order:
Revised Contract Sum:
Original Contract Completion Date:
Previously Approved lncreases in Time:
Completion Date Prior to This Change Order:
Gontract time will be changed bY
Calendar Days This Change Order
Revised Substantial Completion Date;
Revised Final Acceptance Date:
Amount
$178,668.66
($40,664.s3)
$4,335.30
$25,008.99
($6,s2.e7)
($21,e3e.70)
TotalThlsGhangeOrder: $138,865.75
,000.00 .Accepted by$5,065
$1,371,101.33
$6,436,101,33
8t2212026 (o lA lau
By:KC Carroll
$138,865.75 Date 5121/26
$6,57 4.967.08 Recommended By:
ALSC Architects, P.S.
7t20t2026
7
By:
Date
7n3t2426
Owner:
0
7n712A26 rtBy:
Date
tDoes not include State or Local Sales Tax ALSC Architecls lWe bring our clienls' stories to life.
c
P.O. Box 1{9
Wenatchee, WA. 98807-0{ 19
Phone 509-662-7119
Fax 509-662-6380
Coung Comissioners
05 West Sth Ave, Suite 108
, wA 98926
MAKE CHECKS PAYABLE TO:
Cascade Central Construction, LLC
P.O Box 119
Wsnatchee, WA. 98807-01 19
THANK YOU FOR YOUR BUS'IVESS/
PROPOSAL
PROJECT: Ellensburg Rodeo Arona lmprovements
coP# 33
DATE: April 20, 2026
TITLE: COP 33 - Over Excavation & Structural Fill
cfrsclBE
EEilTTfiL
OaL DESCRtPjIItON ouAr{Tlw uou UMI PRICE ATOUNI
4tzot2026 Subcontractor Cost
Earthwork Subcontractor - See attached Subcontractor Back-up 1 tS $164,645.24 $164,68s.24
$0.00
$0.00
6% Mark-uF 9_88't.11
Subcontractor - Sub Total '174.566.35
4t20t2026 Cascade Central Construction Cost
Supervision 0 HR $124.14 $0.00
General Conditions 0 WD $925.00 $0.00
Project Management & Coordinalion 0 HR $161.54 $0.00
Proiect Engineer HR $116.25 $0.00
Laborer o HR $63.0E $0.00
Carpenter o HR $1 19.00 $0.00
15olo Mark-up 0.00
General Contractor - Sub Total 0.00
subtotal 1 /4-5titt.35
HOnd s1 654 3a
ts&o I ax s2 443 93
Schedule lmpact: None, overtime utilized from COP 7.
Qualification: lncludes all overexcavation, haul off, and imporuplacement of
slructural fill at footings and utilities per direction from GeoEngineers, Baer
Testing, and RFI 050 - Utility Trench Backfill Requirements - Response.TOTAL 178.668.66
ftate #co#Amoun
Over Excavation & Structural Fill (December)$1 7,065.26
Fiil
Over
$49.783.49
Over Excavation & Structural Fill (March)$10,747.81
Over Excavation & Structural Fill-Offiaul 920.849.79
Utiliv Trench Sub Exc & Str. Fill in Hardscape Areas s1 7.149.81
Total $164.685.24
-
-JJ
-
-7sH }* L,A l\,I D
r:r i:r t{ sT r{ tJ rl"r I r: \t
Daily Report of Force Account Worked
Contract Number lDate
| ,tnnott lltem
Number Item Name
Footing Subexcavalion & Struclural Fill
Prime Contractor Subconhactor/Lower Tier Subcontractor
Selland Construction, Inc,Cascade Centrd Construction
Description of Work Performed
Footing Excavation & Structural Fill (December 2025)
I lme Worked Record
Workers and/or Equipment
Working Occupation of Workers or Equipment Size
Hours \lvorked
Reg. Rate O.T. Rate Amount
Req,o.T
Labor
1 Dylan Brown Foreman 24.0 8102.61 $2,462.64
2 Parker Betman Operator 9.0 8r00.07 $900.63
2 Operator $100.07 $0.00
4 Tony Sisco Operator 8.0 $100.07 $800.s6
5 Operator $100.07 $0.00
6 Operator $100.07 $0.00
7 Operator (Roller)$94.82 $0.00
8 Iosh Sampson Pipe Layer 23.5 $66.07 $1,552.65
9 Randy Ramos Pipe Layer 1.0 $66.07 866.07
10 General Laborer $62.4s $0.00
11 $0.00
Labor Subtotal $5,782.ss
l5t% Markup $867.38
Lahor Total 86,649.93
Equipment
12 238 Excavator 13.5 $137.12 81,851.12
13 138 Excavator 8124.46 $0.00
14 Loader 5.5 $84.33 $463.82
15 Mini Excavator 14.0 $s6.r0 $785.40
16 Skid Steer 880.18 80.00
17 Roller 82s.32 $0.00
't8 Pickup 24.0 $43.80 s1,051.20
19 1-Ton 8.0 $47.22 $377.76
Equipment Subtotal s4,529.30
15oh Markup $679.39
Equipment Tottrl $5,208.69
Materials
20 Base Cr.282.97 TN $r6.00 $4,s27.52
21 $0.00
22 $0.00
23 80.00
24 80.00
.E $0.00
26 $0.00
27 $0.00
28 $0.00
Materials Subtotal $4,s27.s2
I5'% Markup $679. r 3
Matefials Total 85,206.65
By By
Total $17,065.26
a
-S g l* LA l"\i C}t: f: l\ I*-rl? L,i |:Tt r: \i
Daily Report of Force Account Worked
Contract Number Date
lltem
Number
1/1/2026
Item Name
Footing Subexcavation & Structural Fill
Prime Contractor Subcontractor/Lower Tier Subcontractor
Selland Construction, Inc,Cascade Central Construction
Description of Work Performed
Footing Excavation & Stuaural Fill Qanuary 2026)
Time Worked Record
Workers and/or Equipment
Working Occupation of Workers or Equipment Size
Hours Worked
Reg. Rate O.T. Rate Amount
Req.o.T
Labor
1 Dylon Brown Foteman 45.0 4.5 8102.61 8102.61 $s,079.20
2 Iason Torres Operulor 39.75 $100.07 $100.07 83,977.78
3 Operator 8100.07 $100.07 $0.00
4 Tony Sisco Operator 38.0 8100.07 $100.07 $3,802.66
5 Operator $100.07 8100.07 80.00
6 Iesus Lopez Operator 10.5 $100.07 $100.07 $1,050.74
7 Operator (Roller)$94.82 $94.82 $0.00
8 Pipe Layer $66.07 $66.07 $0.00
o Randy Ramos Pipe Layer 9.5 866.07 $66.07 $627.67
10 General Laborer $62.45 $62.4s $0.00
11 90.00
Labor Subtotal $ 14,538.04
I5'% Markup $2,180.71
Labor Total $16,718.74
Equioment
12 238 Excavator 22.75 8137.12 $3,119.48
'13 138 Excavilor $124.46 80.00
14 Loader 33.0 $84.33 $2,782.89
15 Mini Excavator I2-5 $s6.r0 $701.25
16 Skid Steer $80.18 $0.00
17 Roller 1.0 $25.32 $2s.32
18 Pickap 45.0 $43.80 $1,971.00
19 l-Ton 26.5 $47.22 $1,251.33
Equipment Subtotal $9,8s t.27
l5'% Markup $ I,477.69
Equipment Total $11,328.96
Materials
20 Aggregate 733.01 TN 816.00 $t 1,728.16
21 Str. Fill 1004.29 TN 811.00 8I 1,047.19
22 $0.00
23 $0.00
24 $0.00
25 $0.00
26 $0.00
27 80.00
28 $0.00
Materials Subtotal $22,775.3s
15% Markup $3,4 16.30
Matefials Total 826,191.65
Calculated By loate Checked By lDate Total $54,239.36
'lr ,-
-
-
55 E L LA l*"1 C3nmN$TiilUn.1'iCll.,.l
Daily Report of Force Account Worked
Contract Number lDate lltem Number| ,trtorul
Item Name
Footing Subexcavalion & Slructurul Fill
Prime Contractor Subcontractor/Lower Tier Subcontractor
Sellsnd Construction, IncCascade Central Construction
Description of Work Performed
Footing Excavation & Structurul Fill (February 2026)
Time Worked Record
Workers and/or Equipment
Working Occupation of Workers or Equipment Size
Hours Worked
Reg, Rate O.T. Rate Amount
Req.o.T,
Labor
1 Dylan Brown Foreman 47.0 $102.61 $102.61 $4,822.67
2 Parker Berman Operator 3.00 $100.07 8100.07 8300.21
3 Ramiro Ramirez Operator 9.0 $r00.07 $100.07 $900.63
4 llill Green Operator 26.5 $100.07 $100.07 $2,6s1.86
5 Jacob Nemec Operator 16.0 $100.07 $r00.07 $1,601.12
o Jesas Lopez Operator 8100.07 $100.07 80.00
7 Operator (Roller)$94.82 $94.82 $0.00
8 Pipe Layer 866.07 $66.07 $0.00
o Randv Ramos Pipe Layer 49.5 $66.07 $66.07 s3,270.47
10 General Laborer 862.45 $62.45 $0.00
11 $0.00
Labor Subtotal $ 13,546.95
l5t% Murkup $2,032.04
Labor Total 8t 5,578.99
' Equipment
12 238 Excavator 11.00 $137.12 $1,508.32
13 138 Excavator 33.0 $124.46 $4,107.18
14 Loader 41.5 $84.33 83,499.70
15 Mini Excavator 4.0 856.10 $224.40
16 D6 Dozer 6.0 8140.10 $840.60
17 Roller 7.0 $25.32 $177.24
18 Pickup 47.0 $43.80 $2,058.60
19 1-Ton 26.5 847.22 $1,251.33
Equipment Subtotal $ r 3,667.i7
15% Markup s2,050. t0
Equipment Total $I5,717.47
Materials
20 $0.00
21 Str. Fill 1,252.92 TN $11.00 $13,782.12
22 Geotextile Fabric I ZS $1,179.72 81,179.72
z5 Export Spoils Trucking (Thayer 2/12/26)3 HR $170.00 $s10.00
24 $0.00
25 $0.00
26 $0.00
27 $0.00
28 s0.00
Materials Subtotal $1s,47t.84
)5o% Markup $2,320.78
Materials Total $17,792.62
Calculated By loate Checked By lDate Total $49,089.08
\Il\
5 HLLAF""I tr}rl c, N !:i -t" l: lJ N: -;* i c) Ni
Daily Report of Force Account Worked
Contract Number Date
3/t/2026
Item Number Item Name
Footing Sabexcavation & Structural Fill
Prime Contractor Subcontractor/Lower Tier Subcontractor
Selland Construction, Inc.Cascade Centrsl Construction
Description of Work Performed
Footing Excavation & Structural Fill (March 2026)
Time Worked Record
Workers and/or Equipment
Working Occupation of Workers or Equipment Size
Hours Worked
Reg. Rate O.T, Rate Amount
Req.o.T,
Labor
1 Dylan Brown Foreman 12.5 $r02.61 $102.61 $1,282.63
2 Levi Shinners Foreman 9.50 8102.61 $102.61 $974.80
a fason Torres Operator 8.00 $100.07 $100.07 $800.s6
4 $0.00
A 80.00
6 facob Nemec Operator 3.0 $100.07 $100.07 $300.21
7 Tucker Slabach Operator 6.0 $100.07 $100.07 $600.42
a $0.00
o Ramiro Ramirez Pipe Layer 3.0 866.07 $66.07 $198.21
10 Randy Romos Pipe Layer 3.0 $66.07 966.07 $198.21
11 $0.00
12 $0.00
Labor Subtotal $4,35s.03
15% Markup $653.25
Labor Total $s,008.28
Equipment
13 238 Excavalor 3.00 $137.12 8411.36
14 738 Excavator 6.5 $124.46 8808.99
15 Loader 20.5 884.33 $1,728.77
lb Mini Excavilor $s6.10 $0.00
lt D6 Dozer 8140.10 $0.00
18 Roller $2s.32 80.00
'19 Pickup 9.5 $43.80 $4r6.10
20 I-Ton 12.5 847.22 $s90.2s
Equipment Subtotal $ j,95s.47
15% Markup $s9i.i2
Equipment Total $4,548,78
Materials
21 Str. Fill 94.13 TN $1 1.00 $1,035.43
22 80.00
23 $0.00
24 $0.00
25 $0.00
26 $0.00
27 80.00
28 $0.00
29 $0.00
Materials Subtotal $ I ,03s.43
15% Markup $ts5.3t
Materials Total $1,190.74
Date By Date
Total $10,747.81
-'
-e
-
.-7
*ELL,&,NT3i: l:j hl E; I t.{ LJ {]-T I [:i r..t
Daily Report of Force Account Worked
3ontract Number Date
3/I/2026
Item Number Item Name
Footine Subexcovation & Slructural Fill
Prime Contractor Subcontractor/Lower Tier Subcontractor
Sellsnd Construction, Inc,Cascade Central Construction
Description of Work Performed
Offiaul Unsuitable
Worked Record
workers and/or Equipment
Working Occupation of Workers or Equipment Size
Hours Worked Reg. Rate O.T. Rate Amount
Req.o.T,
Labor
1 Foreman 10.0 $r02.61 $102.61 $r,026.10
2 Operator 13.5 $100.07 $100.07 81,350.95
3 Operator 8100.07 8100.07 $0.00
4 Operalor $100.07 $100.07 $0.00
5 Operator $100.07 $100.07 80.00
6 Operator $100.07 $100.07 $0,00
7 Operator (Roller)894.82 $94.82 $0.00
8 Pipe Lojer $66.07 866.07 $0.00
o Pipe LaJter $66.07 $66.07 $0.00
10 General Laborer 20.0 $62.4s 862.4s $r,249.00
11 Truck Driver 132.0 $0.00
Labor Subtotal $3,626.05
15% Irlarkup $543.91
Labor Total $4,169.9s
Equipment
12 238 Excavator $137.12 $0.00
13 138 Excnvalor $124.46 $0.00
14 Loader 13.5 $84.33 $1,138.46
15 Mini Excavutor $s6.r0 $0.00
16 D6 Dozer $r41.60 $0.00
17 Roller 825.s2 80.00
18 Solo Dump Truck $86.80 $0.00
40 Truck & Pup 49.5 8100.2s $4,962.38
20 Trsctor & Side Dump 82.5 $96.5s $7,965.38
21 Pickup 10.0 843.80 $438.00
22 I-Ton 0.0 $47.22 $0.00
Equipment Subtotal $ 14,504.21
15% h,Iorkup $2, I 7s.63
Equipment Total $16,679.84
Materials
$0.00
24 $0.00
25 $0.00
26 $0.00
27 $0.00
28 80.00
29 $0.00
30 $0.00
31 $0.00
Materials Subtotal $0.00
15% Markup $0.00
Materials Total $0.00
Calculated By Date By
Total $20,849.79
-75 HN_*LAhl f,){: r: N $-rsQ t,! {:fI {:l b{
Daily Report of Force Account Worked
Contract Number lDateI trrrrtoru
Item Number liem Name
(ltilities in HardscapeAreas Subexc & Structural Fill
Prime Contractor Subcontractor/Lower Tier Subcontractor
Selland Construction, IncCascade Central Construction
Description of Work Performed
Utilities in Hardscape Areas Subexc & Structurul Fill
Time Record
Workers and/or Equipment
Working Occupation of Workers or Equipment Size
Hours Worked
Reg. Rate O.T. Rate Amount
Reg.o.T
Labor
1 Dylon Brown Foreman 6.5 $102.61 8102.61 $666.97
2 Jason Tortes Operator 11.00 8100.07 8100.07 $1,100.77
3 lltill Green Operator 13.0 8100.07 $100.07 81,300.91
4 Tucker Slabach Operator 5.0 $100.07 $100.07 $500.35
E Parker Berman Operator 12.3 8100.07 8100.07 $1,225.86
A Jesus Lopez Operator 12.0 $100.07 $100.07 $I,200.84
7 Operator (Roller)$94.82 $94.82 $0.00
8 Pipe Layer $66.07 s66.07 80.00
o Randy Ramos Pipe Layer 7.0 866.07 $66.07 s462.49
10 Genersl Laborer $62.4s $62.4s $0.00
11 80.00
Labor Subtotal 86,458.I8
15% Itdarkup $968.7 3
Labor Total $7,426.91
12 238 Excavator 8.50 $137.12 81,165.52
13 138 Excavator 8.0 $124.46 $995.68
14 Looder I 5.5 $84.33 $1,307.12
15 Mini Excavator 9.0 $s6.10 $504.90
16 Skitl Steer $80.18 80.00
17 Roller 92s.32 80.00
18 Pickup 6.5 s43.80 $284.70
19 1-Ton 13.0 $47.22 $613.86
Equipment Subtotal $4,87 1.78
15% Markup $7 30.77
Eguipment Total $5,602.54
Materials
20 $0.00
21 Str. Fill 325.72 TN st 1.00 83,582.92
22 $0.00
23 $0.00
24 $0.00
25 $0.00
26 $0.00
27 $0.00
28 $0.00
Materials Subtotal 83,582.92
l5ol Markup 8537.44
Materials Total $4,120.36
Calculated By lDate Checked By lDate Total $17,149.81
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code:
Code
98-005
Cost Code Review
T&M: Overexc. & Rock Placement F TN
Job Code: 2550-30
Class Hours OT Hours Other Hours
Production Quantities: 10.000
2347 ANTONIO SISCO
8H356 2021 Kubota Exc
310 2.00
2.00
0.00
0.00
0.00
0.00
Labor Totals:
Equip Totals:
Hours -
Hours -
2.0
2.O
Matl-Sub-Exp Description Cost Type Units Received
2MCSBC Base Cr M TN 26.360
Note: This rock was delivered on site per rusty to have in anticipation of over excavating soft spots
Used
5.000
Company Note:
lndexes:
Inspector Note: 5x7x9 in depth and a 10x8 x 1 ft over excavation. both on the north east ramp location
Attendanc€/Non-Use Codes included in Hours: None / None
on:
Date:
03/052,026
Page 1
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30
Cost Code:
Code
98-005
Descrintion
Cost Code Review
T&M: Overexc. & Rock Placement F TN
Class Reg.Hours OT Ilours Other Hours
Production Quantities: 0.000
2582 RANDYRAMOS
2347 ANTONIO SISCO
8H356 2021 Kubota Exc
8H354 2021Komatsu PC238 Exc
2566 DYLAN BROWN
LD363 2012CAT 930H Loader
2566 DYIAN BROWN
8H356 2021 Kubota Exc
210
310
1.00
1.00
0.00
1.00
2.00
2.00
4.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
810
810
Labor Totals:
Equip Totals:
Hours -
Hours -
8.0
7.O
Matl-Suh-Exp
2MCSBC
Description
Base Cr
Cost Type
M
Units Received
103.110
Used
25.890TN
Company Note:
lndexes:
lnspector Note: 20 flx4.6 ft x 2.8ft build of base course build. We were instructed to take the mucky non yielding clay materiel down to a solid base
which in this case on the upper footing on the stadium arena seating in the southe@st corner had a hefty over excavation to it. With 6
in lifts were installed. ln the same area there was a tapered off of the previously noted build where the over excavation was not as
deep with a20 ftx 4.6ft x 1ft build. ln the case with the builds being so deep the 1 ft perimeter over build was slightly bigger to a 1.5ft
on the east side of the footing to account for edge sluffing off to create a solid base.
Attendancer/Non-Use Codes included in Hours: None / None
on:
Page 2
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code:
Cost Code Review
T&M: Overexc. & Rock Placement F
Class Res. Ilours OT Hours
Job Code: 2550-30
98-005
Descrintion
TN
Code Other Hours
Production Quantities: 0.000
2347 ANTONIO SISCO
BH356 2021 Kubota Exc
2541 PARKERBERMAN
BH356 2021 Kubota Exc
2541 PARKERBERMAN
1192 JOSHUASAMPSON
310
310
210
210
1.50
1.50
3.50
3.50
0.50
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Labor Totals:
Equip Totals:
Hours -
Hours -
9.5
5.0
Matl-Sub-Exp
2MCSBC
Description
Base Cr
CostType
M
Units Received
0.004
Used
52.220IN
Gompany Note:
lndexes:
lnspector Note: We had to over excavate a 12ftx4'6x2ft
45ftx4'6x8in.
45 ftx7ftx8 in.
And build back up to grade with base course in lifts to ensure compaction density with a non yielding prodding'
All over excavated bullds are built with a 1 foot over build around the perimeter for a solid base for the footing to be set on
AttendanceNon-Use Codes included in Hours: None / None
on:
Page 3
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30
Cost Code:
Code
98-00s
T)escrinfion
Cost Code Review
T&M: Overexc. & Rock Placement F TN
Class Res. Ifours OT Hours Other Ifours
Production Quantities: 0.000
2347 ANTONIO SISCO
LD363 2012CAT 930H Loader
1192 JOSHUA SAMPSON
2541 PARKERBERMAN
8H354 2O2l Komalsu PC238 Exc
8H356 2021 Kubota Exc
2566 DYLAN BROWN
z',t0
310
350 1.00
1.00
3.50
3.50
0.50
3.00
3.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00810
Labor Totals:
Equip Totals:
Hours -
Hours -
11.5
4.5
Gompany Note:
lndexes:
lnspector Note: Time for Tony and the loader removing excess dirt and hauling it off as well as bringing in the rock to build up the .75 up with rock
9ftx5ftx9in
14ftxSftx9in
1Sftx5ftx9in
1Oftx5ftx9in
All builds are extended past the footing roughly the one foot extension beyond footing edge for a sold base for the footing per the geo
request.
Attendance/Non-Use Codes included in Hours: None / None
Printed on:
Page 4
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code: 98-005
Code Descrintion
Cost Code Review
T&M: Overexc. & Rock Placement F
Class Reg. Hours OT Hours
Job Code: 2550-30
TN
Other Hours
Production Quantities: 0.000
2347 ANTONIO SISCO
1D363 2012CAT 930H Loader
1192 JOSHUASAMPSON
2541 PARKER BERMAN
BH354 2O2l Komalsu PC238 Exc
2566 DYLAN BROWN
0.50
0.50
1.50
1.s0
1.50
0.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
350
210
310
810
Labor Totals:
Equip Totals:
Hours -
Hours -
4.0
2.0
Company Note:
Inspector Note:
lndexes:
There was an engineering error on depths on an already dug footing the had already had a .5 over excavation don't in the spread
footing location. Wtfr wai already at the groundwater depth it was a f9.5 footing callout and the depth of bottle. Of footing was
1568.00 which was about .75 below the water table.
This build was an error on the engineers behalf and really should have been a bottom of footing at 1569.5.
This was all built up with base course and compacted in.
This task took a hour
The other half hour on this days T&M was the amount of time to over excavate the east building continues footing locations in
between the spread footings.
The continues footing on this building stays about .75 higher then the spread footings. ln this separations of elevations between the
two builds is the difference of the spiead footings being on a non yielding surface and the continues footing wall being on a yielding
surface beyond what would pass for a stable base. Over excavation is essential into getting our stable non yielding base to build on.
Attendance/Non-Use Codes included in Hours: None / None
on:
Date:
B/0sn126
Page 5
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code: 98-005
Code Descrintion
Cost Code Review
T&M: Overexc. & Rock Placement F TN
Class Reg. Hours OT Hours
Job Code: 2550-30
Other Hours
Production Quantities: 0.000
1192 JOSHUASAMPSON
2566 DYLAN BROWN
BH354 2O2l Komatsu PC238 Exc
210
810
6.00
6.00
5.00
0.00
0.00
0.00
Hours -
Hours -
0.00
0.00
0.00
12.0
5.0
Labor Totals
Equip Totals
Gompany Note:
lndexes:
Inspector Note: Northside of the east building over excavations and builds
11ftx4frx.75'
24f&4x.75'
18x4x.75'
11frx4ftx.75'
West end of the main east building.
29f*7x.75'
Attendance/Non-Use Codes included in Hours: None / None
Pinted on:
Page 6
10:49:34
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code:
Cost Code Review
T&M: Overexc. & Rock Placement F
Class Reg. Hours OT Hours
Job Code: 2550-30
Code
98-005
Descrintion
TN
Other Hours
Production Quantities: 0.000
2347 ANTONIO SISCO
LD363 2012CNf 930H Loader
1192 JOSHUASAMPSON
2566 DYLAN BROWN
8H354 2021Komalsu PC238 Exc
350 2.00
2.00
3.00
3.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
210
810
Labor Totals
Equip Totals
Hours -
Hours -
8.0
5.0
Company Note:
lndexes:
tnspector Note: Over ex builds 2ft wide continues footing around the concession stand.
65ftx3.5 ftx 9 in
39ft x 3.5x 1.25 in. The stairwell footing coming off the east building and onto the south side of the concession stand.
5x5x1ft
16x7x1ft
Aftendance/Non-Use Codes included in Hours: None/ None
Prtnbd on:
Page 7
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code:
Cost Code Review
T&M: Overexc. & Rock Placement F'
Class Res. Hours OT Hours
Job Code: 2550-30
98-005
T)escrinfion
TN
Code Other Ilours
Production Quantities: 0.000
1192 JOSHUASAMPSON
2566 DYI.AN BROWN
BH354 2021Komatsu PC238 Exc
210
810
5.50
5.00
2.50
0.00
0.00
0.00
0.00
0.00
0.00
Labor Totals:
. Equip Totals:
Hours -
Hours -
10.5
2.5
Matl-Sub-Exp
2MCSBC
Description
Base Cr
CostType
M
Units Received
24.990
Used
24.990TN
Gompany Note:
lndexes:
Inspector Note: 154 ft of the over excavated area that needed to be built back up got the second lift installed at a .5 build we ended up stretching the
overbuild from the 2 ft wide footing that we had built up at 3 feet to 3.5 feet wide to allow a stable base on the sides for a footing to be
placed on without the edges being scuffed off.
Although there was discrepancieJwith how hippy staked the footings out we did meet the correct elevation from top of footing with our
second lift.
Total Production Quantity: 10.000 TN
Aftendance/Non-Use Codes included in Hours: None / None
on:
Page I
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30
Cost Code:
Code
98-005
T)escrintion
Totals by individual items:
Cost Code Review
T&M: Overexc. & Rock Placement F'
Class Reg. Hours OT Hours
TN
Other Hours
2347
2541
2566
2582
ANTONIO SISCO
PARKER BERMAN
DYLAN BROWN
RANDY MMOS
Totals:
310 i 350
310 I 210
810
210
8.00
9.00
24.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
65.50 0.00 0.00
BH356
LD363
2021 Kubota Exc
2012 CAT 930H Loader
Totals:
14.00
5.50
0.00
0.00
0.00
0.00
33.00 0.00 0-00
Attendance/Non-Use Codes included in Hours: None / None
Pinted on:
Page 9
Date
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code: 98-005
Code Description
Cost Code Review
T&M: Overexc. & Rock Placement F TN
Class Reg. Hours OT Ilours
Job Code: 2550-30
Other llours
NOTE:
Filterc in effect:
AllForemen.
Gost Code = 98-005.
Dates >= 1AUD025 and Dates <= 1213112025.
Aftendance/Non-Use Codes included in Hours: None / None
on:
Date:
03/0&12026
Page 10
Selland Construction Prevailing
Job Name: EllensburgRodeo Arena Improvements
Cost Code: 98-005
Code Descrintion
Cost Code Review
T&M: Overexc. & Rock Placement F
Class Req. Ilours OT Hours
Job Code: 2550-30
TN
Other Hours
Production Quantities: 0.000
2347 ANTONIO SISCO
LD363 2012CAT 930H Loader
1136 JASONTORRESVARGAS
8H354 2021Komatsu PC238 Exc
1136 JASONTORRESVARGAS
2566 DYLAN BRO\A/N
350
310
210
810
1.50
1.50
2.00
2.00
4.00
5.50
0.00
0.00
0.00
0.00
0.00
0.50
0.00
0.00
0.00
0.00
0.00
0.00
13.5
3.5
Labor Totals:
Equip Totals:
Hours -
Hours -
Matl-Sub-Exp
2MCSBC
Description
Base Cr
CostType
M
Units Received
76.440
Used
25.480TN
Gompany Note:
lnspector Note:
lndexes:
So when we were digging out the stadium continues footing between the north and west buildings the layer of soil that was a load
bearing approved materiel per the geo was 1-2feel lower then most of the other areas. Which this day we had 2 6 in lifts done across
the total dig
Two 9x9xlft
40x7x1 continues footing between
15x7x1
All footings were built with an extra foot on each side for a stable build for the footing to be built on per cascade central. We still had to
add more materiel on the footing for the next lifts the next day.
Tony had time removing excess unsuitable materiel off the build area into the stockpile.1.5 hours
Attendance/Non-Use Codes included in Hours: None / None
on:
Page 1
10:59:28
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code: 98-005
Code Descrintion
Cost Code Review
T&M: Overexc. & Rock Placement F TN
Class Reg. Hours OT Hours
Job Code: 2550-30
Other Hours
Production Quantities: 0.000
2347 ANTONIO SISCO
1D363 2012CAT 930H Loader
1136 JASONTORRESVARGAS
8H354 2021Komalsu PC238 Exc
2566 DYLAN BROWN
2347 ANTONIO SISCO
LD363 2012CAT 930H Loader
1136 JASONTORRESVARGAS
8H354 2021 Komatsu PC238 Exc
1136 JASONTORRESVARGAS
2566 DYLAN BROWN
350
310
810
350
310
1.00
1.00
1.00
1.00
1.00
3.00
3.00
3.00
3.00
5.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17.0
8.0
210
810
Labor Totals:
Equip Totals:
Hours -
Hours -
Matl-Sub-Exp
2MCSBC
Description
Base Cr
Cost Type
M
Received
25.950
Used
50.960
Units
IN
Company Note:
lndexes:
lnspector Note: This was a portion of the 8x8x1 north east pad of the stage spread footing that needed to be over excavated and out with the over
excavation down the continuous footing 4.5 ft wide x5 ft native load bearing soilwas 1571.3
Slot: 4
Gompany Note:
Aftendancer/Non-Use Codes included in Hours: None / None Page 2
10:59:28
Date:
on:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code:
Cost Code Review
T&M: Overexc. & Rock Placement F
Class Res. Hours OT Hours
Job Code: 2550-30
98-005
Descrintion
TN
Code Other Hours
lndexes:
lnspector Note: 9x9x.5ft
9x9x2ft
40ftx7x1
15x7fl.ft
All of this was the next few lifts on the continuous footing from north building to the west building.
Tony had 3 hours moving the rest of the materiel as well as bringing bedding from the stockpile over to the bedding box
Production Quantities: 0.000
2347 ANTONIO SISCO
1D363 2012CAf 930H Loader
F8317 2023 DODGE RAM 35OO
2566 DYLAN BROWN
8H354 2021Komalsu PC238 Exc
2566 DYLAN BROWN
2347 ANTONIO SISCO
350
810
4.00
4.00
4.00
2.00
2.00
3.50
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.5
10.0
810
210
Labor Totals:
Equip Totals:
Hours -
Hours -
Gompany Note:
lndexes:
lnspector Note: Excavated footing on the new location of the stage,
We had to over excavate the entire footing area The spread footings that were 7x6 had to be over excavated including the concrete
forms Making the base for the footing a 9.-5 squared. And the continues footing that was 2.5 width was over built for forms at 4.5.
Footing builds
on: 03/05n026
Attendance/Non-Use Codes included in Hours: None / None Page 3
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code: 98-005
Code I)pccrinfion
Cost Code Review
T&M: Overexc. & Rock Placement F
Class Ree. Hours OT Hours
Job Code: 2550-30
TN
Other Hours
9.5x9.5x3ft
4.5x92ft
9.5x9.5r2ft
10x4.5x2ft
9ftx4.5x3ft
9.5x9.5f.5ft
8ftx4.6x3ft
9.5x9.5x1.6
All built of in 6 in lifts with base course
Time includes loader operator and removal of excess spoils. To stock pile.
Production Quantities: 0.000
2347 ANTONIO SISCO
LD363 2012CAT 930H Loader
F8317 2023 DODGE RAM 35OO
2566 DYLAN BROWN
8H354 2021Komatsu PC238 Exc
2566 DYLAN BROWN
350
810
810
3.00
3.00
3.00
1.00
1.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Labor Totals:
Equip Totals:
Hours -
Hours -
7.0
7.0
Production Quantities: 0.000
2347 ANTONIO SISCO 310
Attendance/Non-Use Codes included in Hours: None / None
on:
0.50 0.00 0.00
Date
0905n026
Page 4
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30
Cost Code:
Code
8H354
2347
1D363
2566
8H354
2566
2347
F8317
2347
R1329
98-00s
Descrintion
Cost Code Review
T&M: Overexc. & Rock Placement F
Class Reg. Hours OT Hours
0.50
4.00
2021Komatsu PC238 Exc
ANTONIO SISCO
2012 CAT 930H Loader
DYLAN BROWN
2021Komatsu PC238 Exc
DYLAN BROWN
ANTONIO SISCO
2023 DODGE RAM 35OO
ANTONIO SISCO
2008 CAT CS56 Roller
TN
350
810
810
210
210
4.00
1.00
1.00
3.00
0.00
4.00
1.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Other Hours
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Labor Totals:
Equip Totals:
Hours -
Hours -
9.5
10.5
Gompany Note:
lnspector Note:
lndexes:
North footing of the west building up until the northwest corner of the building
36 foot long by 2 foot builds by 4.5 feet wide built up in 6 inch lifts
Aftendance/Non-Use Codes included in Hours: None / None
on:
Page 5
Date:x
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30
Cost Code:
Code
98-00s
Descrintion
Cost Code Review
T&M: Overexc. & Rock Placement F
Class Res. Hours OT llours
TN
Other Hours
Production Quantities: 0.000
2347 ANTONIO SISCO
LD363 2012CAT 930H Loader
F8317 2023 DODGE RAM 35OO
2566 DYIAN BROWN
1136 JASONTORRESVARGAS
BH3il 2021Komalsu PC238 Exc
1136 JASONTORRESVARGAS
350 5.00
5.00
5.00
3.50
3.25
3.25
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15.7
13.2
810
310
210
Labor Totals:
Equip Totals:
Hours -
Hours -
Matl-Sub-Exp
2MCSBC
Description
Base Cr
Cost Type
M
Units Received
111.320
Used
0.000IN
Company Note:
lnspector Note:
Indexes:
We finished 36 ft build up with base course at 4.5 ft wide with a 1.2 build on the northside of the west building all the way to the nw
corner
We then started over at the stadium pad footing with plinths on the northside side of the west staircase that pad was a 8x8 so we dug
out at a 9x9 we hit the load bearing surface atlSOS.OSS. And had to get a 3.345 build of base course on the 9x9 stadium pad we
also had the same build on the continues footing that went from that spread footing Down to the center of the west building
At 7 ft wide x. X4.095
Attendance/Non-Use Codes included in Hours: None / None
on:
Date:
0y052,026
Page 6
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30
Cost Code Review
Code: 98-005 T&M: Overexc. & Rock Placement F TN
CIass Hours OT Hours Other Ifours
Production Quantities: 0.000
2347 ANTONIO SISCO
LD363 2012CAT 930H Loader
2347 ANTONIO SISCO
F8317 2023 DODGE RAM 35OO
2566 DYLAN BROWN
1136 JASONTORRESVARGAS
BH354 2O2l Komalsu PC238 Exc
1136 JASONTORRESVARGAS
350
210
810
310
210
8.00
8.00
1.00
9.50
10.00
5.00
5.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Labor Totals:
Equip Totals:
Hours -
Hours -
28.0
22,5
Matl-Sub-Exp
2MCSBC
Description
Base Cr
Cost Type
M
Units Received
207.773
Used
131.310TN
Company Note:
- lndexes:
lnspector Note: West building
We over excavated a7'x5'x4'
65'x4'x4.5 cont.
3 pad footings 4.6squared all threee were so close together we just excavated all 3 footings being so close together. 16.5' x 5.5'x4
Middle dividing footing of the west building
32'x6'x4.5
3 7x7 spread footings in the. Corral area
Bearing surface area is 1569.47 so we had to build back up with 1 foot of base course so excavating with concrete forms in mind met
Attendance/Non-Use Codes included in Hours: None / None
on:
Page 7
10:59:29
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code:
Cost Code Review
T&M: Overexc. & Rock Placement F TN
Class Res. Hours OT Hours
Job Code: 2550-30
Code
98-005
T)escrinfinn Other Hours
a 9'x9'x1'
Production Quantities: 0.000
2347 ANTONIO SISCO
1D363 2012CAT 930H Loader
2566 DYLAN BROWN
1136 JASONTORRESVARGAS
BH354 2021Komalsu PC238 Exc
1136 JASONTORRESVARGAS
2582 RANDY RAMOS
2545 JESUS LOPEZ
8H356 2021 Kubota Exc
2545 JESUS LOPEZ
350
210
810
310
210
210
310
3.00
3.00
4.50
3.00
3.00
4.00
6.50
5.50
5.50
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.5
11.5
Labor Totals:
Equip Totals:
Hours -
Hours -
Gompany Note:
lndexes:
tnspector Note: Excavated 3 footings that are 7x7 a|1569.5 to build back up with 1 foot of base coarse the excavations where over dug for concrete
form boards at 9x9
For the concours area for the f12 and l/ footing call outs The geo tech requested those footings be over excavated 2 feet with an
approved materiel. So being so low on grade anO to get the conect obvious of rock underneath the footing we are excavting footings
to build up rough between 10 inches we have 7 12x8 and27x7 finished
Attendance/Non-Use Codes included in Hours: None / None
Pinted on:
Page I
10:59:29
Date:
Selland Construction Prevailing
- Job Name: Ellensburg Rodeo Arena Improvements
Cost Code:
Cost Code Review
T&M: Overexc. & Rock Placement F
Class Res. Hours OT Hours
Job Code: 2550-30
98-005
Descrinfion
TN
Code Other Hours
Production Quantities: 0.000
2347 ANTONIO SISCO
1D363 2012CAT 930H Loader
2347 ANTONIO SISCO
F8317 2023 DODGE RAM 35OO
2566 DYLAN BROWN
1136 JASONTORRESVARGAS
BH354 2O2l Komalsu PC238 Exc
1136 JASONTORRESVARGAS
2582 RANDYRAMOS
2545 JESUS LOPEZ
8H356 2021 Kubota Exc
350
210
0.50
0.50
0.50
1.00
2.50
0.50
0.50
1.00
3.00
3.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.0
5.0
810
310
210
210
310
Labor Totals:
Equip Totals:
Hours -
Hours -
Company Note:
lndexes
lnspector Note: Over excavated a 13x7 spread footing in the corral area and put a 1 foot lift of'
And over excavated a continues footing of 12'x5ftx2' from 1569.5 built back up with base course to 1571.5
Another crew finished over extinguisne-O the interior pad footings in the concourse for when we do place materiel in there we already
have our over excavated 2 ft minimum of rock underneath the footings.
Attendance/Non-Use Codes included in Hours: None / None
Pinted on:
Page 9
10:59:29
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30
Cost Code:
Code Descriotion
98-005
Cost Code Review
T&M: Overexc. & Rock Placement F
Class Res. Hours OT Hours
TN
Other Hours
Production Quantities: 0.000
2566 DYLAN BROWN
8H354 2021Komatsu PC238 Exc
2566 DYLAN BROWN
2545 JESUS LOPEZ
0.50
0.50
1.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
810
810
210
Labor Totals:
Equip Totals:
Hours -
Hours -
2.5
0.5
Production Quantities: 0.000
2566 DYLAN BRO\AN
8H356 2021 Kubota Exc
Total Production Quantity: 0.000 TN
810 0.00
4.00
4.00
0.00
0.00
0.00
Labor Totals:
Equip Totals:
Hours -
Hours -
4.0
4.0
Attendance/Non-Use Codes included in Hours: None / None
on:
Page 10
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30
Cost Code:
Code
98-005
T)escrinfion
Totals by individual items:
Cost Code Review
T&M: Overexc. & Rock Placement F TN
Class Res. Hours OT Hours Other Hours
2347
2545
2566
2582
ANTONIO SISCO
JESUS LOPEZ
DYLAN BROWN
RANDY RAMOS
Totals
350t210131
310 I 210
810
210
38.00
10.50
45.00
9.50
0.00
0.00
4.50
0.00
0.00
0.00
0.00
0.00
142.75 4.50 0.00
BH356
F8317
LD363
R1329
2021 Kubota Exc
2023 DODGE RAM 35OO
2012 CAT 930H Loader
2008 CAT CS56 Roller
Totals:
12.50
26.50
33.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
95.75 0.00 0_00
Attendancey'Non-Use Codes included in Hours: None / None
Pinted on:
Page 11
0:59:29
Date:x
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30
Cost Code:
Code
98-005
Descrintion
Cost Code Review
T&M: Overexc. & Rock Placement F
Class Res. Hours OT Hours
TN
Other Hours
NOTE:
Filters in effect:
AllForemen.
Cost Code = 98-005.
Dates >= 0110112026 and Dates <= 0113112026
on: 03/0il2026
Attendance/Non-Use Codes included in Hours: None/ None Page 12
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code: 98-005
Code Description
Cost Code Review
T&M: Overexc. & Rock Placement F
Class Reg. Ilours OT Hours
Job Code: 2550-30
TN
Other Hours
Production Quantities: 0.000
2566 DYLAN BROWN
BH356 2021 Kubota Exc
810 2.00
2.00
0.00
0.00
0.00
0.00
Labor Totals:
Equip Totals:
Hourc -
Hours -
2.O
2.0
Production Quantities: 0.000
2566 DYLAN BROWN
2582 RANDYRAMOS
2453 JACOB NEMEC
D2362 2019 CAT D6KDozer
810
210
320
0.00
0.00
0.00
4.00
2.00
4.00
4.00
0.00
0.00
0.00
0.00
0.00
Labor Totals:
Equip Totals:
Hours -
Hours -
{0.0
4.0
Company Note:
lnspector Note:
lndexes:
Bladed of the concourse at a 1577.0 elevation so when we build up the area that below footings are all even with a two foot build of
structural compacted fill below footSngs.
This Weill save over excavating time when comes time to dig out footings on the concourse grade.
Attendance/Non-Use Codes included in Hours: None / None
Pinted on:
Page 1
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code: 98-005
Code Descriotion
Cost Code Review
T&M: Overexc. & Rock Placement X' TN
Class Reg. Hours OT Hours
Job Code: 2550-30
Other Hours
Production Quantities: 0.000
2566 DYLAN BROWN 810
2582 MNDY RAMOS 210
2566 DYLAN BROWN 810
RLD409 950 Loader
2453 JACOB NEMEC 310
8H354 2021Komatsu PC238 Exc
1867 RAMIRO RAMIREZ MUNOZ 350
1D363 2012CAT 930H Loader
1867 RAMIRO RAMIREZ MUNOZ 210
0.00
0.00
0.00
3.00
0.00
10.00
0.00
8.50
0.00
7.00
10.00
3.00
0.00
10.00
0.00
8.50
0.00
0.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Labor Totals:
Equip Totals:
Hours -
Hours -
39.0
2',1.5
Matl-Sub-Exp Description Cost Type Units
2MFILL Fill Mateial Purchase & Deliv M TN
Note: This 2 1/2 in structuralfill materiel came in from theyertrucking
Received
180.810
Used
160.000
Gompany Note:
lndexes:
lnspector Note: We over excavated 4 footing locations on the existing grade in the concourse l/ footing call outs the geo determined on Friday these-
footings had a tremendous load and on top of the over extinguished the two feet minus below footing he wanted these footings to be
built 2 feet wider on each side and down to a stable bearing layer which was 1571.4 and existing grade is 1576.7
4 holes 11x11x5.3' compacted 1 foot lifts in structural fill.
Attendanc€/Non-Use Codes included in Hours: None / None
Pinted on:
Page 2
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30
Cost Code:
Code
98-005
Descrintion
Cost Code Review
T&M: Overexc. & Rock Placement F
Class Res. Hours OT Hours
TN
Other Hours
Production Quantities: 0.000
2566 DYIAN BROWN
RBH400 CAT 313 GC Excavator
2582 RANDYRAMOS
2533 WLLIAM GREEN
RLD409 950 Loader
6.00
8.00
8.00
8.00
8.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
810
210
350
Labor Totals:
Equip Totals:
Hours -
Hours -
22,0
{6.0
Matl-Sub-Exp
2MCSBC
Description
Base Cr
CostType
M
Units Received
113.000
Used
113.000TN
Company Note:
lndexes:
lnspector Note: . The geo engineer determined The soft spots needed to be removed to build on top of
We nid one lt 65'x12' from 1574.21 back to the exhisting grade of 1576..5 this was behind the east bathrooms on the concourse deck
closest to the stadium wall 113tn 66.44cu yds
We then over excavated. A second and third muck spot in a location going out the west stairs with a cut of materiel split up into two
separate cut depths.
38x20 starting bearing surface elevation starting at 1574.568
This area was at the top of the stairwell covering a surface area
51'x16 down to1572.566 this was at the bas of the stairwell heading out towards the west alongside the south side of the west
bathroom
Attendance/Non-Use Codes included in Hours: None / None
on:
Page 3
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code: 98-005
Code Description
Cost Code Review
T&M: Overexc. & Rock Placement F
Class Res. Hours OT Hours
Job Code: 2550-30
TN
Other Hours
Production Quantities: 0.000
2566 DYLAN BROWN
RBH400 CAT 313 GC Excavator
2582 RANDYRAMOS
2533 WLLIAM GREEN
RLD409 950 Loader
6.00
5.00
5.50
1.00
1.00
0.00
0.00
0.00
0.00
0.00
810
210
3s0
0.00
0.00
0.00
0.00
0.00
Labor Totals:
Equip Totals:
Hours'
Hours -
12.5
6.0
Matl-Sub-Exp
2MFILL
Description
Fill Material Purchase & Deliv
Cost Type
M
Unifs
IN
Received
283.670
Used
283.670
Company Note:
lndexes:
lnspector Note: 38x 20x 2.5' soft muck area was backfilled from the over excavation the previous day
1574.5681o 1576.670 70 cy 119.6
A second spot was at the ada west ramp was at 51'x16'x2.6' up past the stairway to the deeper overexcavation of muck.
1572.566 lo1 57 5.037 7 1.93 42.31
2 separate 11x11r2-5 1571.5,bearing surface to top of exhisting grade prior to the muck spot which was 1576.5. l/ footing pads 30.47
17.93 cy
Aftendancer/Non-Use Codes included in Hours: None / None
on:
Page 4
11:00:50
Y Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30
Cost Code:
Code Descrinfinn
98-005
Cost Code Review
T&M: Overexc. & Rock Placement F
Class Res. Hours OT Hours
TN
Other Hours
Production Quantities: 0.000
2566 DYIAN BROWN
RBH400 CAT313 GC Excavator
2582 RANDY RAMOS
2533 WILLIAM GREEN
RLD409 950 Loader
2533 WILLIAM GREEN
810
210
350
210
10.00
10.00
10.00
6.50
10.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Labor Totals:
Equip Totals:
Hourc -
Hourc -
27.5
20.0
Matl-Sub-Exp
2MFILL
Description
Fill Mateial Purchase & Deliv
Cost Type
M
Units Received
312.340
Used
312.340TN
Company Note:
lndexes:
lnspector Note: Qty 7 11x16 ftg holes with a 1.Sbuild
50x11 x1.5
2 11x16x4'
211x'16y2.
Attendance/Non-Use Codes included in Hours: None / None
Pinted on:
Page 5
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30
Cost Code Review
Cost Code: 98-005 T&M: Overexc. & Rock Placement F TN
Code Description Class Reg. Ilours OT Hours Other Hours
Production Quantities: 0.000
2566 DYIAN BROWN
RBH400 CAT 313 GC Excavator
2582 RANDYRAMOS
2582 RANDYRAMOS
R1329 2008 CAT CS56 Roller
2533 WLLIAM GREEN
RLD409 950 Loader
2541 PARKERBERMAN
RLD409 950 Loader
810
210
370
350
350
10.00
10.00
4.00
6.00
6.00
9.00
10.00
1.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Labor Totals:
Equip Totals:
Hours -
Hours -
30.0
27.0
Matl-Sub-Exp
2MFILL
Description
Fill MaterialPurchase & Deliv
Cost Type
M
Units
TN
Received
208.500
Used
208.500
Gompany Note:
lndexes:
lnspector Note: Ran into some issues with bear passing off our established subgrade from previous exhisting grade. We over excavated the area
5x52.1574.2 3.15 ton 1.85cy
1 8x1 0x4' 1572.44. 45.33tn 26.67
9x7x 3.5 1573.11 13.88tn 8.17cy
19x20x3.5 1573.11 83.74 ton 49.26 cu yds
20x10x3.5 1573.06 44.071n 25.93 curds
7x1 5x1 57 4.3 13.221n 7.78 curds
Pinted on: 03/05n026 11
Attendance/Non-Use Codes included in Hours: None / None Page 6
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code:
Cost Code Review
T&M: Overexc. & Rock Placement F TN
Class Res. Hours OT Hours
6x10x4 1572.7515.11tn 8.89 cu yds
Job Code: 2550-30
Code
98-005
T)esnrinfinn Other Hours
Production Quantities
2566
2582
2582
R1329
2533
BH354
2541
RBH44O
2453
D2362
0.000
DYLAN BROWN 810
RANDYRAMOS 210
RANDY RAMOS 370
2008 CAT GS56 Roller
WILLIAM GREEN 310
2021Komatsu PC238 Exc
PARKERBERMAN 310
JOHN DEER MINI EXCAVATO
JACOB NEMEC 320
2019 CAT D6K Dozer
0.00
0.00
0.00
1.00
0.00
1.00
2.OO
2.00
0.00
2.00
0.00
0.00
0.00
2.OO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
0.00
1.00
Labor Totals:
Equip Totals:
Hours -
Hours -
8.0
6.0
Matl-Sub-Exp
2MFILL
Description
Fill Mateial Purchase & Deliv
Cost Type
M
Units Received
128-000
Used
128.000IN
Gompany Note:
lndexes:
lnspector Note: 75x32 feet that was over excavated beginning elevation was 1576.80 this area as mucked out at 1575.95 to get rid of that muddy soft
surface to a non yielding surface
75.56 cy
Attendance/Non-Use Codes included in Hours: None / None
on:11 :O0:5
Date:
B/05n026
Page 7
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code: 98-005
Code Descrintion
128.4 tons
Total Production Quantity: 0.000 TN
Cost Code Review
T&M: Overexc. & Rock Placement F
Class Reg. Hours OT Hours
Job Code: 2550-30
TN
Other Hours
Attendance/Non-Use Codes included in Hours: None / None
on:11
Date:
Bn5n026
Page 8
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30
Cost Code:
Code
98-00s
T)eserintion
Totals by individual items:
Cost Code Review
T&M: Overexc. & Rock Placement F
Class Res. Ilours OT Ilours
TN
Other llours
2453
2533
2541
2566
2582
JACOB NEMEC
WILLIAM GREEN
PARKER BERMAN
DYISN BROWN
RANDY RAMOS
Totals
320 I 310
3501210131
350 / 310
810
210 I 370
0.00
25.50
3.00
34.00
33.50
96_00
16.00
1.00
0.00
13.00
16.00
55.00
0.00
0.00
0.00
0.00
0.00
0.00
8H356
D2362
LD363
RBH4OO
RBH44O
R1329
RLD4O9
2021 Kubota Exc
2019 CAT D6K Dozer
2012 CAT 930H Loader
CAT 313 GC Excavator
JOHN DEER MINI EXCAVA
2008 CAT CS56 Roller
950 Loader
Totals:
2.00
6.00
8.50
33.00
2.00
7.00
33.00
{02.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2MFILL Fill Material Purchase & Deliv M TN 1,113.320 1,092.510
Attendance/Non-Use Codes included in Hours: None / None
Printed on:
Page 9
11:00:51
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30
Cost Code:
Code
98-00s
Description
Cost Code Review
T&M: Overexc. & Rock Placement X' TN
Class Reg. Hours OT Hours Other Hours
NOTE:
Filters in effect:
AllForemen.
Cost Code = 98-005.
Dates >= 0210112026 and Dates <= 0212812026.
Aftendance/Non-Use Codes included in Hours: None / None
on:
Page 10
1
Date:x
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code: 98-005
Code Ilasnvinfinn
Cost Code Review
T&M: Overexc. & Rock Placement F TN
Class Res. Hours OT Hours
Job Code: 2550-30
Other Hours
Production Quantities: 0.000
2566 DYLAN BROWN
2453 JACOB NEMEC
8H354 2021Komatsu PC238 Exc
1867 RAMIRO RAMIREZ MUNOZ
810
310
3.00
2.00
3.00
2.00
0.00
1.00
0.00
1.00
0.00
0.00
0.00
0.00240
Labor Totals:
Equip Totals:
Hours -
Hours -
9.0
3.0
Matl-Sub-Exp
2MFILL
Description
Fill MateialPurchase & Deliv
Cost Type
M
Units Received
24.350
Used
24.350TN
Gompany Note:
lndexes:
lnspector Note: 17 ftx7'widex 3.25' deep continues ftg from the west building to the south wallAda ramp.
Attendanc€/Non-Use Codes included in Hours: None / None
on:
Date:
04/172,026
Page 1
Selland Construction Prevailing
Job Namo: Ellensburg Rodeo Arena lmprovements Job Code: 2550-30
Cost Code:
Code
98-005
Descrintion
Cost Code Review
T&M: Overexc. & Rock Placement f,'
Class Reg. Hours OT Hours
TN
Other Hours
Production Quantities: 0.000
2566 DYLAN BROWN 810 2.00 0.00 0.00
Labor Totals:
Equip Totals:
Hours -
Hours -
2.0
0.0
Production Quantities: 0.000
2559 TUCKERSLABACH
1D363 2012CAT 930H Loader
350 6.00
6.00
0.00
0.00
0.00
0.00
Labor Totals:
Equip Totals:
Hours -
Hours -
6.0
6.0
Production Quantities: 0.000
2499 LEVI SHINNERS
LD376 Komatsu WA380 Loader
810 9.50
9.50
0.00
0.00
0.00
0.00
Labor Totals:
Equip Totals:
Hours -
Hours -
9.5
9.5
Attendance/Non-Use Codes included in Hours: None / None
on:
Page 2
16:06:57
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code: 98-005
Code Ilacnr.infinn
Cost Code Review
T&M: Overexc. & Rock Placement F TN
Class Res. Ilours OT Hours
Job Code: 2550-30
Other Ifours
Production Quantities: 0.000
2566 DYISN BROWN 810
8H335 2015 Komatsu PC138 Exc(Yak)
3.50
3.50
0.00
0.00
0.00
0.00
Labor Totals:
Equip Totals:
Hours -
Hours -
3.5
3.5
Company Note:
lndexes:
lnspector Note: Pulled dirt away from fence on track and fixed the grade that the over saturated. Mud had the soil rufted out.
Attendance/Non-Use Codes included in Hours: None / None
Printed on:
Page 3
Date:x
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code: 98-005
Code T)osc#nfinn
Cost Code Review
T&M: Overexc. & Rock Placement F
Class Res. Hours OT Hours
Job Code: 2550-30
TN
Other Hours
Production Quantities: 0.000
2566 DYLAN BROWN 810
2582 RANDYRAMOS 210
1136 JASONTORRESVARGAS 310
8H335 2015 Komatsu PC138 Exc(Yak)
3.00
3.00
3.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Labor Totals
Equip Totals
Hours -
Hours -
9.0
3.0
Gompany Note:
lndexes:
lnspector Note: 42'x!2'
26.44 tns 15.56 cY
Load bearing surface 1569.27
Bottom of footing elevation 1571.250
Ftg is south side of the complex in the chutes area ftg wall
Attendance/Non-Use Codes included in Hours: None / None
on:
Page 4
Date:x
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code:
Code
98-005
Cost Code Review
T&M: Overexc. & Rock Placement F'
Class Res. Hours OT Hours
Job Code: 2550-30
TN
Dpscrinfinn Other Hours
Production Quantities: 0.000
2566 DYLAN BROWN 810
1136 JASONTORRESVARGAS 350
LD374 2020 Komatsu WA380 Loader
1.00
4.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
Labor Totals:
Equip Totals:
Hours -
Hours -
5.0
4.0
Gompany Note:
lndexes:
lnspector Note: Load out trucks with over ex material
Attendance/Non-Use Codes included in Hours: None / None
on:
Page 5
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30
Cost Code:
Code
98-005
Descrintion
Cost Code Review
T&M: Overexc. & Rock Placement F
Class Reg. Ilours OT Hours
TN
Other Hours
Production Quantities: 0.000
1136 JASONTORRESVARGAS 350
LD374 2020 Komatsu WA380 Loader
1 00
00
0.00
0.00
0.00
0.00
Labor Totals
Equip Totals
Hours -
Hours -
1.0
1.0
Company Note:
lndexes:
lnspector Note: Loaded out stockpiled over ex materiel in the arena
Total Production Quantity: 0.000 TN
Attendanc€/Non-Use Codes included in Hours: None/ None
on:
Page 6
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code: 98-005
Code Dasnr.infinn
Totals by individual items:
Cost Code Review
T&M: Overexc. & Rock Placement F TN
Class Res. Ilours OT Hours
Job Code: 2550-30
Other Hours
1867
2453
2499
2559
2566
2582
2.OO
2.00
9.50
6.00
12.50
3.00
43.00
0.00
0.00
0.00
0.00
0.00
0.00
RAMIRO RAMIREZ MUNOZ 240
JACOB NEMEC 310
LEVI SHINNERS 810
TUCKERSLABACH 350
DYLAN BRO\A/N 810
RANDYRAMOS 210
Totals:
1.00
1.00
0.00
0.00
0.00
0.00
2.00 0.00
8H354
LD363
LD374
1D376
2021Komatsu PC238 Exc
2O12CAT 930H Loader
2020 Komatsu WA380 Load
Komatsu WA380 Loader
Totals:
3.00
6.00
5.00
9.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00 0.00 0.00
Attendanc€/Non-Use Codes included in Hours: None / None
Pinted on:
Page 7
Y Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code:
Code
98-005
Cost Code Review
T&M: Overexc. & Rock Placement X' TN
Class Res. Hours OT Hours
Job Code: 2550-30
Other Hours
.'t.j'
NOTE:
Filters in effect:
AllForemen.
Cost Code = 98-005.
Dates >= 0310112026 and Dates <= 0313112026.
Attendance/Non-Use Codes included in Hours: None / None
Pinted on:
Page I
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Print records for all Diary and/or Cost Code Note Entries between 101612025 and 31412026
Date Foreman Cost Code Note Index Codes
12tO212025 2566 - DYLAN
12t11t2025 2566 - DYLAN
12t11t2025 9091 - NIC LOPEZ
12t12t2025 2566 - DYLAN
12t14t2025 2566 - DYLAN
12t15t2025 2566 - DYLAN
Job Code: 2550-30
Diary and Cost Code Notes and Indexes / Working Conditions
Attached lmages/Documents
Attached lmages/Documents
Attached lmages/Documents
98-005 T&M: Overexc. & Rock Placement Footings
10.000 TN
4Slot:
Company Note:
lnspector Note: 5x7x9 in depth and a 10x8 x 1 ft over excavation. both on the north east ramp location
Attached lmages/Documents
Dealing with adverse weather all week.
Parker was absent from work on this day
indicates Selection Choice
Asfersks Printed on:1850:26 Page 1A Bolded Note lndex
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Print records for all Diary and/or Cost Code Note Entries between 101612025 znd 3/412026
Date Foreman Cost Code Note Index Codes
12t1612025 2566 - DYLAN
12t16t2025 9091 - NIC LOPEZ
12t17t2025 2566 - DYLAN
Job Code: 2550-30
Diary and Cost Code Notes and Indexes / Working Conditions
98-005 T&M: Overexc. & Rock Placement Footings
0.000 TN
Slot: 3
Gompany Note:
Inspector Note:
98-005 T&M: Overexc. & Rock Placement Footings
0.000 TN
Slot 3
Gompany Note:
lnspector Note: We had to over excavate a 12ftx4'6xZft
45ftx4'6x8in.
45 fkTftxS in.
And build back up to grade with base course in lifts to ensure compaction density with a non yielding prodding.
All over excavated builds are built with a 1 foot over build around the perimeter for a solid base for the footing to be set on
Attached lmages/Documents
20 ft x 4.6 ft x 2.8ft build of base course build. We were instructed to take the mucky non yielding clay materiel down to a solid base which
case on the upper footing on the stadium arena seating in the southe@st corner had a hefty over excavation to it. Wth 6 in lifts were installt
the same area there was a tapered off of the previously noted build where the over excavation was not as deep with a 20 ft x 4.6ft x 1ft built
the case with the builds being so deep the 'l ft perimeter over build was slightly bigger to a 1.Sft on the east side of the footing to account fo
sluffing off to create a solid base.
Attached lmages/Documents
indicates Selection Choice
Pinted on:18:50:26 Page 2ANote lndex Code with Asfersks
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Print records for all Diary and/or Cost Code Note Entries between 10/612025 and 3/412026
Date Foreman Cost Code Note Index Codes
Attached lmages/Documents
98-005 T&M: Overexc. & Rock Placement Footings
0.000 TN
Slot: 2
Gompany Note:
Inspector Note:
12t18t2025 2566 - DYLAN
Job Code: 2550-30
Diary and Cost Code Notes and Indexes / Working Conditions
Time for Tony and the loader removing ex@ss dirt and hauling it off as well as bringing in the rock to build up the .75 up with rock
9fk5ftx9in
14ftx5f&9in
15ftx5fk9in
1Oftx5ftx9in
All builds are extended past the footing roughly the one foot extension beyond footing edge for a sold base for the footing per the g€o reQur
Site was wet and rainy. Time dedicated to ensuring the site was protected.
Parker was 30 min late today said his alarm never went off.
We also called it a day at 1 pm due to the adverse weather we were getting
T&M: Overexc. & Rock Placement Footings
0.000 TN
2
98-005
Slot:
Gompany Note:
Inspector Note:There was an engineering error on depths on an already dug footing the had already had a .5 over excavation don't in the spread footing
location. Wth was already at the groundwater depth it was a f9.5 footing callout and the depth of bottle. Of footing was 1568.00 which was
.75 below the water table.
This build was an error on the engineers behalf and really should have been a bottom of footing at 1569.5.
This was all built up with base course and compacted in.
This task took a hour
The other half hour on this days T&M was the amount of time to over excavate the east building continues footing locations in between the
spread footings.
The continues footing on this building stays about .75 higher then the spread footings. ln this separations of elevations between the two b
the difference of the spread footings being on a non yielding surface and the continues footing wall being on a yielding surface beyond wha
would pass for a stable base. Over excavation is essential into getting our stable non yielding base to build on.
A Bolded Note lndex Code
indicates Selection Choice
Printed on:18:50:27 Page 3
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Print records for all Diary and/or Cost Code Note Entries between 101612025 znd 3/412026
Date Foreman Cost Code Note Index Codes
1212212025 2566 - DYLAN
Attached lmages/Documents
98-005 T&M: Overexc. & Rock Placement Footings
0.000 TN
Slot: 2
Gompany Note:
Job Code: 2550-30
Diary and Cost Code Notes and Indexes / Working Conditions
12t2312025 2566 - DYLAN
Inspector Note:
98-005
Slot:
Company Note:
Inspector Note:
Northside of the east building over excavations and builds
r lv4fa'75'
24f84x.75'
18x4x.75'
i1l'.4la'75'
West end of the main east building.
291il7x.75'
T&M: Overexc. & Rock Placement Footings
0.000 TN
2
Over ex builds 2ft wide continues footing around the concession stand.
65ftx3.5 fbx 9 in
39ft x 3.5x '1.25 in
The stairwell footing coming off the east building and onto the south side of the concession stand
5x5x1ft
16x7x1ft
indicates Selection Choice
Printed on: 03/04/2026 18:50:27 Page 4Alndex Code with Asterisks
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Print records for all Diary and/or Cost Code Note Entries between L01612025 and 31412026
Date Foreman Cost Code Note Index Codes
12t29t202s 2s66 - DYLAN
98-005 T&M: Overexc. & Rock Placement Footings
0.000 TN
Slot: 2
Company Note:
Inspector Note:
1A30t2025 2566 - DYLAN
12t30t2025 9091 - NIC LOPEZ
12t31t2025 2566 - DYLAN
01t05t2026 2566 - DYLAN
01t0612026 2566 - DYLAN
01t07t2026 2566 - DYLAN
Job Code: 2550-30
Diary and Cost Code Notes and Indexes / Working Conditions
154 ft of the over excavated area that needed to be built back up got the second lift installed at a .5 build we ended up stretching the overb
from the 2 ft wide footing that we had built up at 3 feet to 3.5 feet wide to allow a stable base on the sides for a footing to be placed on with<
edges being scuffed off.
Although there was discrepancies with how hippy staked the footings out we did meet the correct elevation from top of footing with our secr
Attached lmages/Documents
Attached lmages/Documents
Attached lmages/Documents
Attached lmages/Documents
Attached lmages/Documents
indicates Se/ecfion Choice
Asferlsks Printed on: 03/04/2026 18:A Bolded Note Index 5
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Print records for all Diary and/or Cost Code Note Entries between 10/612025 and 31412026
Date Foreman Cost Code Note Index Codes
Attached lmages/Documents
98-005 T&M: Overexc. & Rock Placement Footings
0.000 TN
3Slot:
Company Note:
lnspector Note:
01t08t2026 2566 - DYLAN
98-005 T&M: Overexc. & Rock Placement Footings
0.000 TN
Slot 2
Company Note:
Inspector Note:
Job Code: 2550-30
Diary and Cost Code Notes and Indexes / Working Conditions
So when we were digging out the stadium continues footing between the north and west buildings the layer of soil that was a load bearing
approved materiel per the geo was 1-2 feet lower then most of the other areas. \A/hich this day we had 2 6 in lifts done across the total dig
Two 9x9x1ft
4Ox7x1 continues footing between
15x7x1
All footings were built with an extra foot on each side for a stable build for the footing to be built on per cascade central. We still had to add
materiel on the footing for the next lifts the next day.
Tony had time removing excess unsuitable materiel off the build area into the stockpile.1.5 hours
Attached lmages/Documents
This was a portion of the 8x8x1 north east pad of the stage spread footing that needed to be over excavated and out with the over excavatit
down the continuous footing 4.5 ft wide x5 ft native load bearing soil was 1571.3
indicates Selection Choice
Printed on: 03/04/2026 18:50:Page 6AIndex Code wfh Asferisks 7
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Print records for all Diary and/or Cost Code Note Entries between 101612025 and31412026
Date Foreman Cost Code Note Index Codes
98-005 T&M: Overexc. & Rock Placement Footings
0.000 TN
Slot: 4
Company Note:
lnspector Note:
01t12t2026 2566 - DYLAN
98-005 T&M: Overexc. & Rock Placement Footings
0.000 TN
Slot; 2
Company Note:
Inspector Note
Job Code: 2550-30
Diary and Cost Code Notes and Indexes / Working Conditions
9x9x.5ft
9x9x2ft
40fV7x1
15x7fl.tt
All of this was the next few lifts on the continuous footing from north building to the west building.
Tony had 3 hours moving the rest of the materiel as well as bringing bedding from the stockpile over to the bedding box
Attached lmages/Documents
Excavated footing on the new location ofthe stage,
We had to over excavate the entire footing area The spread footings that were 7x6 had to be over excavated including the concrete formr
Making the base for the footing a 9.5 squared. And the continues footing that was 2.5 width was over built for forms at 4.5.
Footing builds
9.5x9.5x3ft
4.5x9x2ft
9.5x9.5x2ft
10x4.5x2ft
9ffi4.5x3ft
9.5x9.5x2.5ft
8ftx4.6x3ft
9.5x9.5x1.6
All built of in 6 in lifts with base course
Time includes loader operator and removal of excess spoils. To stock pile.
indicates Selection Choice
with Asterisks Printed on: 03/04/2026 Page 7A Bolded Note Index
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Print records for all Diary and/or Cost Code Note Entries between 101612025 and 3/412026
Date Foreman Cost Code Note Index Codes
01t13t2026 2566 - DYLAN
Attached lmages/Documents
01t14t2026 2566 - DYLAN
Attached lmages/Documents
98-005 T&M: Overexc. & Rock Placement Footings
0.000 TN
Slot 1
Company Note:
Job Code: 2550-30
Diary and Cost Code Notes and Indexes / Working Conditions
lnspector Note:
98-005 T&M: Overexc. & Rock Placement Footings
0.000 TN
Slot: 1
Company Note:
lnspector Note
North footing of the west building up until the northwest corner of the building.
36 foot long by 2 foot builds by 4.5 feet wide built up in 6 inch lifts
Attached lmages/Documents
o1t15t2026 2566 - DYLAN
o1t19t2026 2566 - DYLAN
We finished 36 ft build up with base course at 4.5 ft wide with a 1.2 build on the northside of the west building all the way to the nw corner
We then started over at the stadium pad footing with plinths on the northside side of the west staircase that pad was a 8x8 so we dug out a
we hit the load bearing surface at 1569.655. And had to get a 3.345 build of base course on the 9x9 stadium pad we also had the same b
the continues footing that went from that spread footing Down to the center of the west building
At 7 ft wide x. X4.095
Attached lmages/Documents
Pinted on:A Bolded Note Index Code with
indicates Selection Choice
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Print records for all Diary and/or Cost Code Note Entries between 101612025 and'31412026
Date Foreman Cost Code Note Index Codes
98-005 T&M: Overexc. & Rock Placement Footings
0.000 TN
1Slot:
Company Note:
lnspector Note:
01t20t2026 2566 - DYLAN
98-005 T&M: Overexc. & Rock Placement Footings
0.000 TN
Slot: 1
Company Note:
lnspector Note
Job Code: 2550-30
Diary and Cost Code Notes and Indexes / Working Conditions
West building
We over excavated a7'x5'x4'
65'x4'x4.5 cont.
3 pad footings 4.6squared all threee were so close together we just excavated all 3 footings being so close together. 16.5' x 5.5'x4
Middle dividing footing of the west building
32'x6'x4.5
3 7x7 spread footings in the. Corral area
Bearing surface area is 1569.47 so we had to build back up with 1 foot of base course so excavating with concrete forms in mind met a 9'x!
Attached lmages/Documents
Excavated 3 footings that are 7x7 at 1569.5 to build back up with 1 foot of base coarse the excavations where over dug for concrete form br
at 9x9
For the concours area for the f12 and f7 footing call outs The geo tech requested those footings be over excavated 2 feet with an approved
mate6el. So being so low on grade and to get the correct obvious of rock underneath the footing we are excavting footings to build up roug
between 10 inches we have 7 12xB and27x7 finished
indicates Se/ecfion Choice
on: 03/04/2026 18:50:27Alndex Code wtfh Asfer'sks 9
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Print records for all Diary and/or Cost Code Note Entries between L01612025 and 31412026
Date Foreman Cost Code Note Index Codes
01t21t2026 2566 - DYLAN
98-005 T&M: Overexc. & Rock Placement Footings
0.000 TN
Slot: 1
Company Note:
lnspector Note:
01t22t2026 2566 - DYLAN
01t26t2026 2566 - DYLAN
o1t28t2026 9091 - NIC LOPEZ
01t29t2026 2566 - DYLAN
02t0212026 2566 - DYLAN
Job Code: 2550-30
Diary and Cost Code Notes and Indexes / Working Conditions
Over excavated a 13x7 spread footing in the corral area and put a 1 foot lift of
And over excavated a continues footing of 12'x5f&2'from 1569.5 built back up with base course to 1571.5
Another crew finished over extinguished the interior pad footings in the concourse for when we do place materiel in there we already have ,
over excavated 2 ft minimum of rock underneath the footings.
Bear testing was on site testing concrete on this day so we went ahead and had them proof roll the north buildings first lift. I do believe it is 1
be easing placing conduit on the 1.5 ft minus from finish and backfill the remainder of the buildSng after the plumbing and elenctrical is ins'
Attached lmages/Documents
Attached lmages/Documents
Attached lmages/Documents
Attached lmages/Documents
indicates Selection Choice
wiff Asfer'sks Printed on:18:50:27 Page 10A Bolded Note Index
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Print records for all Diary and/or Cost Code Note Entries between 101612025 and31412026
Date Foreman Cost Code Note Index Codes
a2t06t2026 2566 - DYLAN
98-005 T&M: Overexc. & Rock Placement Footings
0.000 TN
Slot: 6
Gompany Note:
lnspector Note:
0210612026 9093 - RYAN PARTHEMER
02t07t2026 2566 - DYLAN
98-005 T&M: Overexc. & Rock Placement Footings
0.000 TN
Slotr 6
Company Note:
lnspector Note:
0209t2026 2566 - DYLAN
Job Code: 2550-30
Diary and Cost Code Notes and Indexes / Working Conditions
Bladed of the concourse at a 1577.0 elevation so when we build up the area that below footings are all even with a two foot build of structt
compacted fill below footSngs.
This Weill save over excavating time when comes time to dig out footings on the concourse grade.
Attached lmages/Documents
We over excavated 4 footing locations on the existing grade in the concourse f/ footing call outs the geo determined on Friday these footi
had a tremendous load and on top of the over extinguished the two feet minus below footing he wanted these footings to be built 2 feet wid
each side and down to a stable bearing layer which was 1571 .4 and existing grade is '1 576.7
4 holes 11x1 1x5.3' compacted 1 foot lifts in structural fill.
Attached lmages/Documents
indicates Selection Choice
Printed on:8:50:27 Page 11AIndex Code with Asterisks
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Print records for all Diary and/or Cost Code Note Entries between 101612025 znd 31412026
Date Foreman Cost Code Note Index Codes
98-005 T&M. Overexc. & Rock Placement Footings
0.000 TN
Slot: 4
Company Note:
lnspector Note:
02fi0t2026 2566 - DYLAN
98-005 T&M: Overexc. & Rock Placement Footings
0.000 TN
Slot 4
Gompany Note:
lnspector Note:
02t11t2026 2566 - DYLAN
98-005 T&M: Overexc. & Rock Placement Footings
0.000 TN
Slot: 4
Gompany Note:
lnspector Note:Qty 7 11x16 ftg holes with a 1.Sbuild
50x11 x1.5
2 11x16x4'
2 11x16x2
Job Code: 2550-30
Diary and Cost Code Notes and Indexes / Working Conditions
. The geo engineer determined The soft spots needed to be removed to build on top of
We had one at 65'x12' ftom 1574.21 back to the exhisting grade of 1576..5 this was behind the east bathrooms on the concourse deck clos
the stadium wall 113tn 66.44cu yds
We then over excavated. A second and third muck spot in a location going out the west stairs with a cut of materiel split up into two separa
depths.
38x20 starting bearing surface elevation starting at 1574.568
This area was at the top of the stairwell covering a surface area
51'x16 down to1572.566 this was at the bas of the stairwell heading out towards the west alongside the south side of the west bathroom
38x 20x 2.5' soft muck area was backfilled from the over excavation the previous day
1574.5681o 1576.670 70 cy 119.6
A second spot was at the ada west ramp was at 51'x16'x2.6' up past the stairway to the deeper overexcavation of muck.
1 57 2.566 1o1 575. 037 7 1.93 42.31
2 separate 11x11x2.51571 .5 bearing surface to top of exhisting grade priorto the muck spotwhich was 1576.5. f7 footing pads 30-47 17.9
indicates Selection Choice
on: 03/04/2026 18:Page 12Alndex Code with
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Print records for all Diary and/or Cost Code Note Entries between 101612025 and31412026
Date Foreman Cost Code Note Index Codes
02t12t2026 2566 - DYLAN
Attached lmages/Documents
98-005 T&M: Overexc. & Rock Placement Footings
0.000 TN
3Slot:
Company Note:
lnspector Note
02t13t2026 2566 - DYLAN
98-005 T&M: Overexc. & Rock Placement Footings
0.000 TN
2Slot:
Company Note:
Inspector Note:
o2t16t2026 2566 - DYLAN
Job Code: 2550-30
Diary and Cost Code Notes and Indexes / Working Conditions
Ran into some issues with bear passing off our established subgrade from previous exhisting grade. We over excavated the area
5x5v21574.2 3.15 ton 1.85cy
1 8x1 0x4' 1572.44. 45.33tn 26.67
9x7x 3.5 1573.1113.881n 8.17cy
19x20x3.5 1573.11 83.74 ton 49.26 cu yds
20x10x3.5 1573.06 44.07tn 25.93 curds
7 x1 5x1 57 4.3 13.22tn 7.78 curds
6x10x4 1572.75 15.11tn 8.89 cu yds
75x32 feet that was over excavated beginning elevation was 1576.80 this area as mucked out at 1575.95 to get rid of that muddy soft surfa'
non yielding surface
75.56 cy
128.4 tons
Attached lmages/Documents
indicates Selection Choice
with Asterisks Printed on:18:50:27 PageA Bolded Note lndex
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Print records for all Diary and/or Cost Code Note Entries between L01612025 and31412026
Date Foreman Cost Code Note Index Codes
02t2312026 2566 - DYLAN
Attached lmages/Documents
02t24t2026 2566 - DYLAN
Attached lmages/Documents
02t27t2026 2566 - DYLAN
Attached lmages/Documents
03t02t2026 2566 - DYLAN
Attached lmages/Documents
NOTE:
Filters in effect:
Dates >= 1010612025 and Dates <= 0310412026.
All Foremen.
Print : Working Conditions.
Print: Daily Diary Notes.
Print : Cost Code Notes.
All Note lndexes.
Gost Code = 98-005.
Job Code: 2550-30
Diary and Cost Code Notes and Indexes / Working Conditions
indicates Selection Choice
Asferlsks Printed on:18:50:27 Page 14A Bolded Note Index
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30
Cost Code:
Code
98-021
Descrintion
Cost Code Review
T&M: Trench Backfill Hardscape Ar
Class Reg. Hours OT Hours Other Hours
Production Quantities: 81.000
2566 DYLAN BRO\AN
8H354 2021 Komatsu PC238 Exc
2582 RANDYRAMOS
2533 WLLIAM GREEN
1D363 2O12CAT 930H Loader
2.00
1.00
2.00
1.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
310
210
350
Labor Totals:
Equip Totals:
Hours -
Hours -
5.0
2.0
Company Note:
lndexes:
lnspector Note: Brought in materiel and placed structural fill in hard scape areas northside of the north build from the east side of the clean out
closest to the concessions building to the east
And the sewer run that runs parallel to the north side of the east building
Attendance/Non-Use Codes included in Hours: None / None
Pinted on:
Page 1
13:zM:26
Date:
Selland Construction Prevailing
Job Name: EllensburgRodeo Arena Improvements Job Code: 2550-30
Cost Code:
Code
98-021
Descrintion
Cost Code Review
T&M: Trench Backfill Hardscape Ar
Class Reg. Hours OT Hours Other Hours
Production Quantities: 0.000
2533 WILLIAM GREEN
1D363 2O12CAT 930H Loader
350 0.50
0.50
0.00
0.00
0.00
0.00
Labor Totals:
Equip Totals:
Hours -
Hours -
0.5
0.5
Production Quantities: 0.000
2566 DYLAN BROWN
BH354 2021Komalsu PC238 Exc
2533 WLLIAM GREEN
2533 WLLIAM GREEN
1D363 2012CAT 930H Loader
810 2.00
1.00
1.00
1.00
1.00
0.00
0.00
0.00
0.00
0.00
210
350
0.00
0,00
0.00
0.00
0.00
Labor Totals:
Equip Totals:
Hours -
Hours -
4.0
2.0
Gompany Note:
lndexes:
lnspector Note: 30 x5x3.5 ft conduit bank running down the center of the east building 4 4 in conduits built up in 3 lifts compacted with the heavy duty
dieselPlate
Attendance/Non-Use Codes included in Hours: None / None
Pinted on:
Page 2
13:z14:26
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30
Cost Code:
Code
98-021
Descriotion
Cost Code Review
T&M: Trench Backfill Hardscape Ar
Class Reg. Ilours OT Hours Other llours
Production Quantities: 0.000
2566 DYLAN BROWN
BH356 2021 Kubota Exc
2582 RANDYRAMOS
2533 WLLIAM GREEN
RLD409 950 Loader
810
210
350
0.50
0.50
1.00
0.50
0.50
0.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Labor Totals:
Equip Totals:
Hours -
Hours -
2.5
1.0
Production Quantities: 0.000
2559 TUCKERSLABACH 350
LD363 2012CAT 930H Loader
2541 PARKERBERMAN 310
RBH44O JOHN DEER MINIEXCAVATO
3.00
3.00
2.00
3.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
Labor Totals:
Equip Totals:
Hours -
Hours -
6.0
6.0
Company Note:
lndexes:
Inspector Note: Export of spoils pile for 109 feet of open excavation conduit bank
Pfinted on: 03/16f2026
Page 3Attendanc€/Non-Use Codes included in Hours: None / None
13:44:27
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code: 98-021
Code flacavinlian
Cost Code Review
T&M: Trench BackfiIl Hardscape Ar
Class Reo- Ilnrrrs OT Hours
Job Code: 2550-30
Other Hours
Production Quantities: 0.000
2533 WLLIAM GREEN
RLD409 950 Loader
0.00
1.00
1.00
0.00
350 0.00
0.00
Labor Totals:
Equip Totals:
Hours -
Hours -
{.0
1.0
Company Note:
lndexes:
lnspector Note: Export of unsuitable backfill materiel from the east building bathroom 109 feet of conduit trench
Production Quantities: 0.000
2533 WLLIAM GREEN 210
FB323 2024 RAM 3500 Flatbed
2541 PARKERBERMAN 310
RBH44O JOHN DEER MINI EXCAVATO
8H354 2021Komalsu PC238 Exc
2541 PARKER BERMAN 210
1.00
1.00
1.00
0.50
0.50
0.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Labor Totals:
Equip Totals:
Hours -
Hours -
Attendance/Non-Use Codes included in Hours: None / None
on:
Page 4
2.5
2.0
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code:
Cost Code Review
T&M: Trench Backfill Hardscape Ar
Class Reg. Ilours OT Hours
Job Code: 2550-30
Code
98-021
Descrintion Other Hours
Company Note:
lndexes:
lnspector Note: Excavate spoils out of east building utility closet sleeves that come underneath the footing and sweep up into the utility closet.
Production Quantities: 0.000
2545 JESUS LOPEZ 240
1136 JASONTORRESVARGAS 310
BH335 2015 Komatsu PC'138 Exc(Yak)
2559 TUCKER SIABACH 210
2559 TUCKERSLABACH 350
1D363 2012CAT 930H Loader
2.00
2.00
2.04
1.00
1.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Labor Totals
Equip Totals
Hours -
Hours -
6.0
3.0
Production Quantities: 0.000
2545 JESUS LOPEZ 240
1136 JASONTORRESVARGAS 310
8H335 2015 Komatsu PC138 Exc(Yak)
Labor Totals:
Equip Totals:
0.00
0.00
0.00
0.00
0.00
0.00
5.00
5.00
5.00
Hours -
Hours -
Pinted on: 03/16f2026
Page 5Aftendance/Non-Use Codes included in Hours: None / None
13:zl4:27
10.0
5.0
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30
Cost Code:
Code
98-021
Deserinfion
Cost Code Review
T&M: Trench Backfill Hardscape Ar
Class Res. Hours 0T Hours Other Hours
Production Quantities: 0.000
2582 RANDY RAMOS 210
2533 WILLIAM GREEN 350
1D363 2012CAT 930H Loader
2533 WLLIAM GREEN 310
8H335 2015 Komatsu PC138 Exc(Yak)
2541 PARKER BERMAN 310
RBH44O JOHN DEER MINI EXCAVATO
2.00
1.00
1.00
1.00
1.00
2.75
2.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Labor Totals:
Equip Totals:
Hours -
Hours -
6.7
4.7
Gompany Note:
lndexes:
lnspector Note: Started backfilling all the spoils the conduit banks trenched through the east bathroom east side 15x33
Starting elevation was 1575.6 finish subgrade elevation is 1576.83
Bn6n026
Page 6Attendance/Non-Use Codes included in Hours: None/ None
Printed on:13:44:27
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code: 98-021
Code Descrintion
Cost Code Review
T&M: Trench Backfill Hardscape Ar
Class Reg. Hours OT Hours
Job Code: 2550-30
Other Hours
Production Quantities: 0.000
2533 WLLIAM GREEN
1D363 2012CAT 930H Loader
2533 WLLIAM GREEN
2541 PARKERBERMAN
8H354 2021Komalsu PC238 Exc
2541 PARKERBERMAN
1.00
1.00
2.OO
0.50
2.00
0.00
0.00
0.00
0.00
1.50
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
350
210
310
210
Labor Totals:
Equip Totals:
Hours -
Hours -
6.0
3.0
Matl-Sub-Exp
2MFILL
Description
Fill Mateial Purchase & Deliv
CostType
M
Units Received
34.280
Used
34.280TN
Gompany Note:
Inspector Note:
lndexes:
Started backfilling all the spoils the conduit banks trenched through the east bathroom east side 15x33
Starting elevation was 1575.6 finish subgrade elevation is 1576.83
Adjusted elevation for pipe bedding to cover mainly 1- inch conduits as well as the footing edges were- not bacKilled since the
numerous electrical sleeves coming out of the cmu wall were on a separate cost code for footing backfill.
Compacted area
Aftendancer/Non-Use Codes included in Hours: None / None
on:
Date:
B/16n026
Page 7
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code:
Cost Code Review
T&M: Trench Backfill Hardscape Ar
Class Reg. Hours OT llours
Job Code: 2550-30
Code
98-02L
Descrintion Other Hours
Production Quantities: 0.000
2566 DYIAN BROWN
2582 RANDYRAMOS
2533 WLLIAM GREEN
LD363 2012CAT 930H Loader
2533 WLLIAM GREEN
2541 PARKERBERMAN
BH354 2021 Komatsu PC238 Exc
810
210
350
1.00
2.00
1.50
1.50
0.50
2.00
2.OO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
214
310
Labor Totals:
Equip Totals:
Hours -
Hours -
7.0
3-5
Matl-Suh-Exp
2MFILL
Description
Fill Material Purchase & Deliv
CostType
M
Units Received
56.190
Used
56.190TN
Gompany Note:
lnspector Note:
lndexes:
Backfilled the west half of the east restroom utility conduit runs with structural fill since the trench materiel was not suitable.17ftx35 ft
from top of footing height 1575.5 to subgrade 1576.92
We had to remove out materiel across the whole building pad for allthe conduits coming in All directions to the po\,ver utili$ room.
56.19 tns
33.06cy
AttendanceNon-Use Codes included in Hours: None / None
Pdnted on:
Page I
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code:
Cost Code Review
T&M: Trench Backfill Hardscape Ar
Class Reg. Ifours OT Hours
Job Code: 2550-30
Code
98-021
Descrintion Other Hours
Production Quantities: 0.000
2545 JESUS LOPEZ
2545 JESUS LOPEZ
RLD409 950 Loader
1136 JASONTORRESVARGAS
8H391 2024Kubola MiniExcavator
240
350
310
1.00
2.OO
2.00
2.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Labor Totals:
Equip Totals:
Hours -
Hours -
5.0
4.0
-q\iq ]
Matl-Sub-Exp
2MFILL
Description
Fill Mateial Purchase & Deliv
Cost Type
M
Units Received
62.810
Used
62.810IN
Gompany Note:
lndexes:
tnspector Note: Grid line 7 from grid line a to just north of grid line 6' Across the western most slab from the west Ada ramp to across the west side of the west bathroom water service line
95ftx3 feet
1571.8 finish 1576
3.5 feet to finish subgrade
62.81 tons
36.97cY
Attendance/Non-Use Codes included in Hours: Ngne / None
on:
Date:
rc/l6n026
,Page I
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code: 98-021
Code Description
Cost Code Review
T&M: Trench Backfill Hardscape Ar
Class Reg. Hours OT llours
Job Code: 2550-30
Other Hours
Production Quantities: 0.000
2566 DYLAN BRO\A/N
2545 JESUS LOPEZ
RLD409 950 Loader
1136 JASONTORRESVARGAS
8H354 2021Komalsu PC238 Exc
810
350
310
0.00
2.00
2.00
2.00
2.OO
0.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0,00
Labor Totals:
Equip Totals:
Hours -
Hours -
4.5
4.0
Matl-Sub-Exp
2MFILL
Description
Fill Material Purchase & Deliv
Cost Type
M
Units Received
70.960
Used
70.960TN
Company Note:
lndexes:
Inspector Note: Trench backfill in a hardscape area starting elevation of trench is 1573.5 built back up with 57 ft long 3.5 ft wide x4 ft 43.96 ton 25'86
cy
East Ada ramp where the water runs under the side walk down grid line land k to grid line 1 and h
Grid line f and north of grid line 1 to west of grid line d and north of grid line 1 the slab on the northside of the bar building 35ftx3.5x3'5
27tn 15.88cy
Total cubic yards is 41.74
Totaltns is70.96
Total Production Quantity: 81.000
Attendance/Non-Use Codes included in Hours: None / None
on:
Page 10
13:44:28
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30
Cost Code:
Code
98-021
Descrintion
Totals by individual items
Cost Code Review
T&M: Trench Backfill Hardscape Ar
Class Res. Hours OT Hours Other Hours
2533
2541
2545
2559
2566
2582
WLLIAM GREEN
PARKER BERMAN
JESUS LOPEZ
TUCKER SLABACH
DYLAN BRO\A/N
RANDY RAMOS
Totals:
350t210131
310 I 210
240 I 350
350 I 210
310 / 810
210
12.00
8.75
12.00
5.00
5.50
7.00
61.25
1.00
3.50
0.00
0.00
1.00
0.00
5.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
BH354
BH356
8H391
F8323
LD363
RBH44O
RLD4O9
2021Komalsu PC238 Exc
2021 Kubota Exc
2024 Kubota Mini Excavator
2024 RAM 3500 Flatbed
2012 CAT 930H Loader
JOHN DEER MINI EXCAVA
950 Loader
Totals:
8.50
0.50
2.00
1.00
,10.00
6.25
5.50
41.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Aftendance/Non-Use Codes included in Hours: None / None
on:
Page 11
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Cost Code: 98-021
Code Description
Cost Code Review
T&M: Trench Backfill Hardscape Ar
Class Reg. Hours OT Hours
Job Code: 2550-30
Other Hours
NOTE:
Filters in effect:
AllForemen.
Cost Code = 98-021.
Dates >= 1AC1./2025 and Dates <= Q311612026.
N/16n026
Page 12Aftendance/Non-Use Codes included in Hours: None / None
Pinted on:
Date:
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Print records for all Diary and/or Cost Code Note Entries between L2lll2025 and 311612026
Date Foreman Cost Code Note Index Codes
12t02t2025 2566 - DYLAN
Attached lmages/Documents
12t11t2025 2566 - DYLAN
Attached lmages/Documents
1U11t2025 9091 - NIC LOPEZ
Attached lmages/Documents
12t14t2025 2566 - DYLAN
Attached lmages/Documents
12fi512025 2566 - DYLAN
Job Code: 2550-30
Diary and Cost Code Notes and Indexes / \Morking Conditions
12t16t2025 2566 - DYLAN
12t16t2025 9091 - NIC LOPEZ
1211712025 2566 - DYLAN
Dealing with adverse weather all week.
Parker was absent from work on this day
Attached lmages/Documents
Attached lmages/Documents
Attached lmages/Documents
indicates Selection Choice
with Asteisks Printed on: 03/16/2026 13:49:43 Page 1A Bolded Note
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Print records for all Diary and/or Cost Code Note Entries betwe en l2lll2025 and 311612026
Date Foreman Cost Code Note Index Codes
12t18t2025 2566 - DYLAN
Job Code: 2550-30
Diary and Cost Code Notes and Indexes / Working Conditions
12t22t2025 2566 - DYLAN
12t30t2025 2566 - DYLAN
12t30t2025 9091 - NIC LOPEZ
12t31t2025 2566 - DYLAN
01t05t2026 2566 - DYLAN
01t06t2026 2566 - DYLAN
o1t07t2026 2566 - DYLAN
01t08t2026 2566 - DYLAN
Site was wet and rainy. Time dedicated to ensuring the site was protected.
Parker was 30 min late today said his alarm never went off.
We also called it a day at 1 pm due to the adverse weather we were gefting
Attached lmages/Documents
Attached lmages/Documents
Attached lmages/Documents
Attached lmages/Documents
Attached lmages/Documents
Attached lmages/Documents
Attached Images/Documents
indicates Selection Choice
on: 03/16/2026 13:49:43Bolded Note Index Code with
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Print records for all Diary and/or Cost Code Note Entries between l2lll2025 znd 311612026
Date Foreman Cost Code Note Index Codes
01t12t2026 2566 - DYLAN
01t13t2026 2566 - DYLAN
01t14t2026 2566 - DYLAN
01t15t2026 2566 - DYLAN
01t19t2026 2566 - DYLAN
01120t2026 2566 - DYLAN
01t2212026 2566 - DYLAN
01t26t2026 2566 - DYLAN
A Bolded Note Index
Job Code: 2550-30
Diary and Cost Code Notes and Indexes / Working Conditions
Attached lmages/Documents
Attached lmages/Documents
Attached lmages/Documents
Attached lmages/Documents
Attached lmages/Documents
Attached lmages/Documents
Attached lmages/Documents
Bear testing was on site testing concrete on this day so we went ahead and had them proof roll the north buildings first lift. I do
believe it is gonn be easing placing conduit on the 1.5 ft minus from finish and backfill the remainder of the buildSng after the
plumbing and elenctrical is installed
Attached lmages/Documents
indicates Selection Choice
Pinted on:6/2026 13:49:44 Page 3
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Print records for atl Diary and/or Cost Code Note Entries between l2lll2025 and311612026
Date Foreman Cost Code Note Index Codes
01t28t2026 9091 - NIC LOPEZ
Attached lmages/Documents
01t29t2026 2566 - DYLAN
Attached lmages/Documents
98-021 T&M: Trench Backfill Hardscape Areas
81.000
Slot 5
Gompany Note:
lnspector Note:
0a02t2026 2566 - DYLAN
02t03t2026 2566 - DYLAN
98-02'1 T&M: Trench Backfill Hardscape Areas
0.000
Slot: 3
Company Note:
lnspector Note
0210612026 9093 - RYAN PARTHEMER
02t0912026 2566 - DYLAN
Job Code: 2550-30
Diary and Cost Code Notes and Indexes / Working Conditions
Brought in materiel and placed structural fill in hard scape areas northside of the north build from the east side of the clean out
closest to the concessions building to the east
And the sewer run that runs parallel to the north side of the east building
Attached lmages/Documents
30 x5x3.5 ft conduit bank running down the center of the east building 4 4 in conduits built up in 3 lifts compacted with the heavy duty
diesel plate
Attached lmages/Documents
indicates Selection Choice
Asfen'sks Printed on:13:49:44 Page 4A Bolded Note Index
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Print records for all Diary and/or Cost Code Note Entries between l2/ll2025 and 311612026
Date Foreman Cost Code Note Index Codes
02t12t2026 2566 - DYLAN
02t13t2026 2566 - DYLAN
02t1612026 2566 - DYLAN
Job Code: 2550-30
Diary and Cost Code Notes and Indexes / Working Conditions
Attached lmages/Documents
Attached lmages/Documents
98-021 T&M: Trench Backfill Hardscape Areas
0.000
Slot: 8
Gompany Note:
lnspector Note: Export of spoils pile for 109 feet of open excavation conduit bank
98-021 T&M: Trench Backfill Hardscape Areas
0.000
Slot: 7
Gompany Note:
lnspector Note: Export of unsuitable backfill materiel from the east building bathroom 109 feet of conduit trench
Attached lmages/Documents
98-021 T&M: Trench Backfill Hardscape Areas
0.000
Slot 6
Company Note:
Inspector Note: Excavate spoils out of east building utility closet sleeves that come underneath the footing and sweep up into the utility closet.
indicates Selection Choice
with Asterisks Prtnbd on:13:49:44 Page 5A Bolded Note lndex
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Print records for all Diary and/or Cost Code Note Entries between l2lll2025 and 311612026
Date Foreman Cost Code Note Index Codes
02t19t2026 2566 - DYLAN
98-021 T&M: Trench Backfill Hardscape Areas
0.000
Slot: 5
Company Note:
Inspector Note:
o2t20t2026 2566 - DYLAN
98-021 T&M: Trench Backfill Hardscape Areas
0.000
Slot: 5
Company Note:
lnspector Note:
02t23t2026 2566 - DYLAN
02t24t2026 2566 - DYLAN
Job Code: 2550-30
Diary and Cost Code Notes and Indexes / Working Conditions
Started backfilling all the spoils the conduit banks trenched through the east bathroom east side 15x33
Starting elevation was 1575.6 finish subgrade elevation is 1576.83
Started backfilling all the spoils the conduit banks trenched through the east bathroom east side 15x33
Starting elevation was 1575.6 finish subgrade elevation is 1576.83
Adjusted elevation for pipe bedding to cover mainly 1- inch conduits as well as the footing edges were not backfilled since the
numerous electrical sleeves coming out of the cmu wall were on a separate cost code for footing backfill.
Compacted area
Attached lmages/Documents
Attached lmages/Documents
indicates Selection Choice
Printed on: 0U16/2026Note lndex Code with Asfer'sks
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Print records for all Diary and/or Cost Code Note Entries between l2lll2025 and 311612026
Date Foreman Cost Code Note Index Codes
02t25t2026 2566 - DYLAN
98-021 T&M: Trench Backfill Hardscape Areas
0.000
Slot: 4
Gompany Note:
lnspector Note:
0a26t2026 2566 - DYLAN
98-021 T&M: Trench Backfill Hardscape Areas
0.000
Slot: 4
Gompany Note:
Inspector Note:
02t27t2026 2566 - DYLAN
Job Code: 2550-30
Diary and Cost Code Notes and Indexes / Working Conditions
Backfilled the west half of the east restroom utility conduit runs with structural fill since the trench materiel was not suitable.17ftx35 ft
from top of footing height 1575.5 to subgrade 1576.92
We had to remove out materiel across the whole building pad for all the conduits coming in All directions to the power utility room.
56.19 tns
33.06cy
Grid line 7 from grid line a to just north of grid line 6
Across the western most slab from the west Ada ramp to across the west side of the west bathroom water service line
95fbx3 feet
1571.8 finish 1576
3.5 feet to finish subgrade
62.81 tons
36.97cy
Attached lmages/Documents
indicates Selection Choice
Printed on:Page 7A Bolded Note lndex
Selland Construction Prevailing
Job Name: Ellensburg Rodeo Arena Improvements
Print records for all Diary and/or Cost Code Note Entries between L2lln025 and 311612026
Date Foreman Cost Code Note Index Codes
98-021 T&M: Trench Backfill Hardscape Areas
0.000
Slot: 3
Gompany Note:
lnspector Note:
03t02t2026 2566 - DYLAN
03t09t2026 2566 - DYLAN
03fi612026 2566 - DYLAN
NOTE:
Filters in effect:
Dates >= 1210112025 and Dates <= 0311612026
All Foremen.
Print : Working Conditions.
Print: Daily Diary Notes.
Print: Cost Code Notes.
All Note lndexes.
Cost Code = 98-021.
Job Code: 2550-30
Diary and Cost Code Notes and Indexes / Working Conditions
Trench backfill in a hardscape area starting elevation of trench is 1573.5 built back up with 57 ft long 3.5 ft wide x4 ft 43.96 ton 25.86
cy
East Ada ramp where the water runs under the side walk down grid line land k to grid line 1 and h
Grid line f and north of grid line 1 to west of grid line d and north of grid line 1 the slab on the northside of the bar building 35ftx3.5x3^5
27tn 15.88cy
Total cubic yards is 41.74
Total tns is70.96
Attached lmages/Documents
Attached lmages/Documents
Attached lmages/Documents
indicates Selection Choice
Printed on:lndex Code with Asterisks I
#5TARTTIME &jl-
tr"i."
STOPTI s
^{)
Beginning Odometer
Ending
Accident: Yes
-
No
-
Selland Construction, Inc.
TCITAL
Galtons of Fuel; On-Hwy
-
Off*lwY-.-
tfAccidentwasTruck/Trailerl-oaded: Yes.**** No-*
AnrErnployee f
Employee Name
DATE
(s)tr) (w) (rH) (F) (sA)
bi\,
NNTVER'S DAILY TTME CAfiD
DOWN
T'ME
'i.i1.i " t ;..r
j:-:.- i,r..
;.:,'-..:: -. '
--'r,,i; . ,
.;:i\-. -.
'':".:'"ij'.'
,;,. ;...:'''i .:. . l
,:".
DfrIVING
![*i,, ,
; . lili. "
''-.:'' 11 . .
': i. .. .!.r1..
.:,r.''.:'-,iii
',i" r. :r.,, t.j
II
tRA[.gR
{I^d),
'NACIOR
-{k3{
lrtl:,oiir''in
l,:< 7. : ':,:r','
! '..j., .., t- l.1i-..: ;- rr.i i'
,j1r, ,j :.'; l '. j:l
i .r-'...i".
i:, :,rri'. ,, :
, r'... -.
:,1.. - : \:
^I;5..1 ,1.. . .. .
r:'
,f i,'ij '.- .:l' .:
TOISL
ttouRs
''.
"i
-"-''
' ,,4i:-., .l
',' 1-r.;.': -,..::,
'iilii 1 ,.
:,.:.. -:..J .;. . . .::
PAY N,ATE
lU-t
IOADS
tk{
MATENALNAULED
t Air$ +> t$&r
.^.:'|..'llt-..'
:1:i 4;i.;':ilc..
dtr::,.t';', lr :r . .1:i .
:r ":i:,' 'i-irr ;
)i' :'-...r .
:r.; ', :;r .'ri: ;;..:;1.:..'-
,i'r+.,
...ir.'_,.:;
rr': .:r:'. i;
'OBNAME
r\1vt
JOg t
K:-R
Employee 5ignature Foreman Approval
frS .1 t:Emplcyee *
fmployee Name
OATE
(s)
5TARTTIME
fw'?t]rl"
r-JSelland Construction, Inc'
(M)(w) trH) {F) (sA}
Beginnlng
Ending
Accident Yes- No---
GallonsofFuel: on** 115 0ff-Hwy
lf AccidentwasTruck/Trailerloaded: Yes- No-
TOTAL
DAWN
T'ME
'...}:.:;';'; .'-i ;i i;','.:',
'; "j :-.::.ii,.:, a "i.-r
' !:.i l-:
, :.1.- :
:'.:.r:;'- l1''..j" ri". "l
DRIVING
4\-ss
TRA'LEfr
ALffi
raAt(
TRAc'OA
lt:i:ffi
r;;tt'
:1,:i::i'..",.
,.t, r.:- .i .r-.'. 1:.i 1'. :
:j 'li.r i"r,li:rj
TOTAL
HCURS
i-. .:.i:r.i!.1.1..'
i;;iiil*,i:
',i:ti:1".
.'li :i::i '.: ij'r.
.,-. ,j j.. ., ::,
.,. :.a ."+li::
i. .,:: .,r : .'.;_. ..
'r l'.'f',',.*:t''t:
. 'lri,/:1 . .g
:r .r'i:., ":;.:;;.jj{':''" '
'ii';;:liii ,. i
....,.1,,.-,.. .,
: iiti',',-,i.,i.'.!!1,: i - 1 -:rr,
PAYRA'E
L
;1
LOADS
w+1
rft I
m* ort,tk{Y6t
AIAIENMLTIAULED
fiiffi
l+.-i, ,il;l
"?'r'. :'. ({;.:;;;1;!;3; ;r
, l..r.l;:,:.i-:,,
:;i-i.;^..}i:,.:r:lri:i:il
:-1:,'...1+'
1J,.:: - .:;1 .:j i
i !':\ I ar
i.;}-r',:i.ii
1."'i,:ij,'jiir{i-:-.}:.':
' i'ieii
f':t:.1;-j.l: ''jj
r:11 ,;'., :
,::.i -lr;:rt,
.f..tt.,:j-:i:,,
'^'ri ! ..lt:.: "
ii'..li:iii
'CxvT,t Vee
JOBNA'/'EJOE #
ffi>k
Employee 5ignature Foreman APproval
Ernployee #Z{1 a Selland Construction, Inc.stxw'vr6: '/5.STOP TI :lt
Ernployee Name (*b Ao,A
DATE e /4 /26
(s) @ rn w) (TH) (F) (sA]
TOTAL
Beginnlng 'L Gallons of Fuel: on-nwyal( .Tc/off-Hwv --
Ending 114 460
Accident yes_ No X lfAccidentwasTruck/TrailerLoaded: Yes- r.ro X-
Comments: ..
DNIVER'S DAILY TI]UIE CARD
DOWN
TIME
!L
DBIV'NG
$+,-Qq
., ' i,;.;.',.liil;;i'
i'-.:i;'ii.....,.:r
-==---
.,1 1.':,,;;.. ::,:.'i:t.
, iir..I,t:.1:- ';'
-:;-....i:r. ir, -
',tiji+,:i:iii:+_'q:..1::.ljirtt .
.: .i . 1...i -_ .
::+iii '"i r:
- . i ti ' ;, ; :': .: :i
TRAILERTRACTOR
Tza
TOTAL
HOU85
''i'!.n.- i.rJr.;. 1-: .:j .:11...
. r.. --.!,.- ,t it ia. .l
tr_:17.'..:..: .:. ?.:
i;it
t- i :i: '-;-'. .,
!:j.'-.1 '1; . !..'
;'.;r':.'::J.1:'- -:
;.s:;r;l'li;.:,,i1
PAY RAIE
l;' .1t:i j
-..:'.: .. ' '
.:ri.;,;1-i'il':1:: .
;:i'ii...fir1i;
' ';i':-r.'{+,.:;:.
, ,.r..{;j::, i r it
-
iiili1;1,;1';'
*+ .
:;.:jli".+:4irr''
.1..: :.. r:...i:, .1,'i
,, i. a.;.- ..'ij :1,,,:.::r;L-,J!j,ri ir ;.i
i',,r'-'.iir,.i !:.i...::i 'ril
;i1;":'r*
LOADS
lo
JOBNAME MATERIALHAULED
' fr u ,l*et r rl
.:.
tog#
Ttro -7
EmploYee Signature Foreman Approval Jr
Employee #L{4o
Employee Name C6W
DATf o /cb
(s) (Ml €p twt $H) (F) tsA)
Beginnlng 7*7 V 450
Ending a1 s lbb
Accident Yes- t'to {
Selland Construction, Inc.
TOTAL
3o'6
Gallonsof Fuel: On-Hwy 41. I off-Hwy--*
STANTTIME STOP6 :jb,15
1l
lfAccidentwasTrucklTrailerloadeck \Gs-* uo K -
",36
DOyyN
r,ME
. t. .; ,i ;
r.4,., ,.,
....t' :. '
'-'. ':, ",.1't-
:. '..'l'.: l '-
DstvrN6
. ...":;"':.
t.
.1,.. ..i, .
' .i;:- '
' -..! r :.!.
. gQulpft€A,tfJouns
Tsnrlgn
>t,3oz
TRACIOR
Wa
rir: I ' -;',1:'
I r: ,. ' .:'i.,.
,,it.l- !.,':,'t..
i. .. .., r:'".' :,.., ,_,...;: .-j
):' . t..-j- .
rorrL
,JOUfiS
.. ..:' .
t. -:.'
': '-.r'i':,.-:
PAYNAT6
'i'.',-..":..j
, ': ..',. .
loAoS
{
MATEN$LHAULED
b*on.4 3,.+
v
'.1ir: r' i..
'.,'-;r.i 'rj:
''ti-.:;'.'1;;""
i:)+.. ii i;,
t,t-'.'-'-!-:r'i'.;
' ''' '.'., ';.
,i ;:". .: ' , .''
'r: r'r.. .1 .!.
;.-i,:..n'
frnlo,-
JOg NAfu'IEtoBc
Llla4o
Ernployee Signature Foreman Appr*rval -\ttr
Ernployee #LSqo
Employee Name %h qAzrC
DATT /r a /<.9
($ t@ {r) (w) (rH} {F) tsA)
Beginnlns odomerc, iaf La f
Endingodom eterili L(h
-
Accident; Yes-_ N" X
Gallons of Fuel; On-Hwy 9-_ Off-HwY-
lfAccidentwasTruckllrailerLoaded: Yes- f'lo X
Selland Constmction, Inc.srnnrlue?)?D rroprrvr€!199
TOTAL
DAI tN
T',ME
'i;.: .. ; i-' .,',:i. i..'.;...'
-,:... :,1.....
_ .. ,,. :. .'.
a,-,,. : l
'. .j.. ..,. ; .'
. EQUIPMEI,ITHOUfi5.
DntvwG
t't"P
.: ::r 1r'. ., - -
lrt*
TNA'LE8
: EQU,PMENi '
fnAcTo$
frme
.-rif',ar_rj;.:
, ; '.',1 .,; .''
;l<-lt. i..;;l,ty.l.:
' - 11.
'. i!.1-l ,. ; ..jr
' , I t:.:'
;. :r "
:,,.-
r,'i'. - . l;
rorrl
$oues
',ii;,io
.l'' 8
.: . -ii l'1..,i":
;-:ir'..,i::i l. :,,i.\ l " r: r
:' -"." rij ' j,..' t.
: ..d::,.i.'
; ,., : .r.,
- -,. -... . .,: : .
'I !.,{' :.':...,'
:'s i:.,.:"
,,1'-:,,' ,
.. '.'L; '.'.
, .1*-: i -^i.....!; .:.
ptvfArrloros
fob
fu'?.4o6<,oo ** T?'r)
A&roAe
V
MNEfr'AL',AULED
.-.;;,.i,r: i-.-...
'i;;);i;,' li.
:-'; ".'j:ir.'.r'*:..,i4.+.',
:., . .xr'J, ."
'i. I :.\'.'ii, .'- :i -..-r. .t -
',-'iii;.-i-:"
:,:'., .-;.,."':i'",'i..i :, I
fro d,e,
tAENAMEJOg #
?A{64a
Employee Signalure (-"lc €.'t^A foreman Approval
Employee f -L5ala
[mployee Name {gQ* 7Ir^ d
DATE z lt? /zG
(s) (M) @ twt frH) {r} (sA}
Beginning 375 L6g
Ending i1< etqz
Accident Yes-.- No K
Selland Construction, Inc.
E?:3 TOIAL
Gallonsof Fuel: on-Hwy ?l' lC2 off'Hwy-
STARTTIM e 6:uo srOp rTb
xlf Accident was Truck/Trailer l-oaded: 'Gs
-
No
nRIVnn'S DAILY Wil'IE CCFD
DOWN
NME
',:;.::: .
at;;.'r i.l. .
- :t: .i-
' .', -:.:, .. i'...,-
.,'.':::i:i ':
) ... ,,
' ':-, r.1: 1. 1:.
:-. 'i'..
DF'V'N6
h;*o
INA'tffi
,y@
EQU.IPMEt{t
IRA€ION
ILt77.6
. 'ii...r';1r ,r,
2 :': r" ,t'.-'::
,:<_?, .. .-:_i_ts-''
'; '.
I'
..'t.... .:'.'.1'
r ir'i'" .i'-t '
'lti1e
:-..-' l,:." . ..: -
rotAt
HOUnS
1..-, !r:-l':." j
'. '_/.;. ! t.---
".. t.!:- .' ..:
' ', .' : .'; r:1:,:
. ?.;l .i! i -
.:. ! ;: . ;1j
:.,1;{' ri;..;,:
!..r.r-. -:.
PAYRAIE
.-.; t,....- ..."': . :
".
t"l.'
LAAAS
({
MATTR|,ALH^OLED
€ynot* p,r4
Y
Hi..i.:+,
l"r- . r'"lr;..r..'.1.
fto deo
Iti:#,,
ll t*;i;,
l'.:- : ,'.; "'l:i.',i.":-i"'
l'j--i r J..',
JOBNAMEJAg *
z16p-ro
Emplcyee Signature 'c Foreman Approval
Ll qb
Ernployee f
Employee Name (-{* *r-, d,
DATE i/raltt
{s) tM) {r) (w (TH] (F] (sA]
Beginning
Ending
j-? 5 66t,
Accidenr Yes-- No D('lfAccidentwasTruck/TrailerLoaded: Yes.- No
$elland Construction, Inc.srnnrrrrur 6l&STOP LoO
TATAL
lq,6
Gallons of Fuel: on-uv4, A ' 6 off-Hwy
-X
NFJVER,S DAILY Tltr/ffi CARD
DOWN
TIME
:.,..
''.':.'. '-t- l- '
.,: j.: r1 . ;.r,:
;I.-{:.:i,'i-
DN'VINGtfinn€R
5?Ad'
fsm
rv7?6
EqVIT
TSACTQlt
j'.itl. r-"'.r'1;:t. t1l .;. :"ta'.
iz.'t-:;.r1".tt.,.,
q"
1 .'.'..i'. .i
^-; r .i
r.i ,li :
...:....:.... ,.:'
,.. -r,:i r,. .'r' . 1'. I 'r.'r,r-'
TOTAL
HOURS
i ir
',i.'," it'
:l ,.J l
':ii:
i' .;,j ;+ ;,
,;:r!: 14,,'
,.J , !,
..,,i: .1.
;..:.1:- :.
?AYAA?E
q
t04DsMATTB'AL'IAULED
E t zr,-\ P,r4l,i o,( voltrt, lt*& Pelaec
ii.*:;..."i::'.-,:-,ii i
.- ..t:-,
l ''. ' .'
:,1:r,
,
;.j 'Ji-.. .
#.i-:r.;l:.;:'
'. :,'1. ;: ''.
'.r '.;-': :i..-:':'' .' :"
JOSNAME
fr" Cep
JAB #
z.fto 4e
Employee 5ignalure d Foreman Approval
Emptoyee #a94o
Ernployee Name
DA'IE IQ
(s) (M) ffl (w)(F) (sA)
Begin nlng sb
Ending adr^rrc, 753tJ-
Accidens Yes-* No {
Selland Construction, Inc.srnnrrruu d-rQP
TOTAL
I t-:7
Gallonsof Fueh on-Hwy J*,? Off-HwY
tfAccidentwasTruck/Trailerloaded: Yes-* tlo X -
STOPT oo
DOWN
T'ME
HOURS
i...-: -: : J
: .:.'
.. ,r..,..:j,,,,:
';,, .:
..'.';1. '
oBwtN6
9mz
TRAILERfiACJA&
THvt6
ti.:
'.!. i,
'";i-
"t
t
''' --...: r.r ,t.
it-t. i:.: f.i:l:
:-j;'.t.:.'-"
::l:..-'.,::
TOIAL
ltouFs
....i .
i,{ i; ,
-.,.1." t, ".
':: ':.' i
PAYRATE
:.i 1.' .. ' .
,.., .i !.,... tl. - -lr-
loA05MATg,frIALHAULTO
C*a".| Dtr*
kaSo /{r*t e4"
.1.:,;...,1.-,;,
:'". ..J
l;': :i':n:'"i:::.;',1.:,"
j.r ; . .:i.
:":'.1'.Ii','..'
iil*,.,-:l?
',i1 .;i...:: .
"
t./: ij': rr
JOsNAMEtoB #
1t5p-76
Employee Signature ( at.*. '{k^ A Foreman Approval
Ernployee #
Employee Name
Selland Constmction, Inc.STARTTIME
'vTrt
m
saSTOP T
DATE
r$ tM) (rt (w)(F) (sA)
Beginning
Ending
Accidentr Yes.- No-
TATAL
Gallons of Fuel: On-Hwy- Off-HwY-
lfAccidentwasTruck/TrailerLoaded: \fus- No-
,5
DOMV
TIME
::.:i...ir:.'; j;.i
....:,'1,,.jl .: ;"
,. i.,:,..,':.,:1
'.;I',.r" -
n';; j .r1: :., ...'.'.'-:fj;:
, 1:..r:;:.- :. :.
""'-:'- i;'.',
' .': : ;:'1." {, +;
_ !... . .:.
t:'-i:..t;'1 j
'. r.. :r' ,. .'- '
i., r;,.i.'.. ,.
DF'V'NG
n
tu3(
TNNL€N
+G13
Lvt31
fnAcIon
ltsst
WA\
il;E. i
',r..,1 :.:..r..''.:,,t -+-_:, -
^rl
-' ' :.1 r: ' ri
:::,:i&i.**
,;l r-.;1r:-*:
:iii*.':.,{ii,l:., -t-J
:-,";i i.'';;:. '.:
;i:.'r:-.. .. i. !
;;;r:d-j
'.rt:: rr 'r' r
. ,':i' i-':,j ',
r.-: . ,.ir1i ,-..; ',ri]i
-{';s
^..t,...,-,j
rorAt
HOURS
,1-..,.i;r, {i..; ri
,4uiilt;iir:i
. .l'. j .:r r,
' . -!:'J .. i i'..
. {: --ii;. . .{
."..,ir1'; l'.'
'i;#il'"'
'' tJ)''-;i-1';"r.
,:l :ii'.l ri i.r:',
PAYNATE
.:i t.r .:.-:;.'.':. . :
I
r\ \r
LAADS
t
md.\l.({r
W-m
MATEfr//ALHAULED
.tt
'\fY1r"f,t W
di6- 1ty {uc<
Jrn
.q wd(b
-rt
{ Mb nd'f,
I
)OENAME
)4 {\fi1)
Jq'sD
JAB #
^ffi
rS5n-
Employee Signatura Foreman Approval
Selland Constmctionn fnc.,ro.rr,*, ?'rD ,roor,t, &_l?Employee #
Employee Name
DATE
(s)(T) (w) trH) {F} (sA)
Eeginning
Ending
Accident Yes
-
No ...*-
Pnqffb4
TOTAL
$&Gallons of Fuel: 0n'Hwy Off-Hwy_-
lfAccidentwasTrucklTrallerLoaded: Yes-- No-
DOWN
TIME
'.*.l.i'1.';:.'
r'! :. r j. . j.,,
ri{i:1i:l
....11 :,'.11 ,;
' 1,4:".i
..".: '-1.1
r: ! .1:. ..
It
| . . .'i
i ,,-' ..'ir. -
_. . 1,..J:. --r
- -'i: ._a '.':.
HOUflt
DN'VN6TNNLEp.
4L>r\
tsActo&
,:",J
-'vl:'.' .: '1a,,.
;;:li'riii.iiir.t. J1 -.r::ir:1i
f a!. !.. ,.::
l;1;,1:j; i,,
i'.:'.,,,i.::. '
ii ii+,::r
--,. i ir, :. -r:r' ':q. ':,1
,ji .r\.i q ,
. .:'. !r'
'*' .'!'1.:
::.tt1"..'
TOTAL
HOUfrS
l'-. ,.ji.l !"i..,.':t{::'ffi
,,-l''i,.'. ".'
.r i i '.J;,iri..;
. ;11-: i '-. .
-.:... ..t ! :;. .'" .:.,
-'.1 l.:,;:;'; :-...'' :l'iIr: j',t:
.7'1.. '-.i';:;' ': '
| 4 t.:r'., ':n
Ii ' .1,''j':: j'''' .C':", 1: .!' . ':.
' ,"':t '. '" "'.
-:; "r-;i ,: i -:l ,.
PAYAffE
i$Ul',,
LAADS
t^ffi
MATER'ALHAULED
r(\1 +
;' i
.a\i' : ".::':,;
4ii.ii.,.t/4*,
tl;r;
1',iiii;,
PHAsE
. a:.:
td;,_--_: '
'.:.'.' ra
.'' :r,1,i::{r-
JAENAME
\5
JAB #
EmploYee Signature ForemanApproval
t-
Employee #
Employee Name
DATE
{s} tM) rrt (rH) tF) (sA)
Construction, Inc.
TATAL
Gallons of Fuel; On-HwY- Off-HwY-*
lfAccidentwasTrucfi/TrailerLoaded: Yes-- No-
srnnrfl*e ulr.l')
A^^
5T0pTr
*1
Beginnlng
Ending
Accident Yes- No--
DOWN
trl{f
':.,':'tl.:'
':;:..-, T,t..'
1.'.i 4! - tl. !t ..:jr ' j,"
.1,..'i::..-1i
tJl
' ir.;,..:
if.;".' , .-'
'1i w:.'^'.-
'1:'.1'.
r' ,.''.:
: -; !:, ) -..:
:j'j-'.'.'i'.'\
]: ::,'f i1i;1
ofr,v,N6
: . .. .i,. -.j,.a r,..1._.'
tb
p{ 3l(
TNAILER
Lr>g
fxAcToR
rlSz^t
11".:;i;:,i:'::1 "i
,1,-,.1, l;;.. ,.1 :t:.'
r.F.: . ,-i.J.
i-.'1 ;,-1.;1, , ..1rr;r.ti.t.-.:
i.i.,rl. r.. 1... i..:.i.1- :':kt i'
i1i:t'i'i:r :;
!r,....-.'i,..
" . :l'.\ ' .
"i-:':'r" a:
.!.. i, .Jt_.. :,. !..i:' l.': .'i -l:
tirffi:
.:. ,.ti.::-:.i.1'.;: 'i ''
1i j -.'r, ,.r
TOTAL
,{otr85
: -,1;:.r ":,..' .;
". .-,;,:,.
,1;;.,i:1;.i:,11'1
. ,.:,.. . i.. .,
j',.u,''',l.j
;'iii;iir;;
,t:i..i.:,: i;
': .t "rl :i:;.i
,1..i.,;;ir.;. .:.',
'J''., i:':.'..: r.
,:;1;.'.1;r;;-1;'
' '.1, \'....- .'t:'. -r..:. -) ' :
i,.',::-J;j-. .',:'
PAY NATE
t....,\ -:. '
i . .- --'.
:r rr. t'..,.r,:..'
... ,.--. r'..r:i jj
A
I
LAADS
\)Kr*k
\,:Udt'n'tk>
MAIER'AL'IAULED
ir..i-
i:.
":i'
:l'_l-:;
r-.
To ArobdJ
ft{,d)
JOENAFIiE
ifms
JOg #
*6501
Employee Signature Foreman Approval
Employee #
Employee Name
DATE
(s) (M) (r) (w)(r)
Beginning
Ending
Accident Yes
-
No*.*_
1,'rp_ srop
ftivl
Selland Construction, Inc.STABTTIME t'*r E,- Qt
Pvn
C'\al<-1 db i-{k+ n rorAL
Gallonsof Fuet, on-u*y
t' DDoff-Hwy-
lfAccidentwa:TrucklTrailerLoaded: Yes- No-.
DOWf'J
flMr
J...i. ; .., .,.;-
-r,,-,.:t .:
.j..,"-.. .::.i'.i
,:i.'l'::t,..'
. :;t- i ^:'-l
:: {.j. i.i ; .,,:
_;:;t! ?.. i -
oftlvtNG
i :.:^.rj;:r :.:.
, r..il;,.1;l:r
5rF)
n
TRAILER
S b3D:
r*F37
Lb37
*usr
fnAfion
4\t 33a
{p 3}b
;5iirr,.l.:;
.::: ''. . ''",i
iiin#
':;::,;.4';i:1 .tl ;j.?,f
'a i.'_ .^r i
'. i! l'". ,-. ': I
-r..- ..- ' \'
''5-\-,1i'i;'li.:,'i.
f:'i,..0
rJ.... +r j.. . 1:
-.'i!.- .'a '
l,Fir$,
IATAL
,lOUBS
..,.,\ .r. .,, i. ij
".'.:; 1 .;';
:. j .:": {il I': ,-r t::., .'.i. r'
-. r?-: ,:t,
t:':', ', ";l
. .: :i..: t: ,!
)...:lr)..: ,,r;'
:. r, ..1.. ."- " ,
:.li : ,t,.il':;. i::'Iii :,i'i
,i'.,1i.e .:r
'' . :'.lil
, Ji..;, i-l li i "
--...|...'-,1:'
'.;J:j"i:ir:j'i1.1'';:r1,..''.
-- .:. i..; ; ,.;.;';'... ,.:'r',
PAYfrATE
:..... r'
..11.1,:-i..'.'; ;:
r ltf
LOA,.S
tJdk$/ 4vrAL fr v^
i r+A
\oor{ diP
hn0b
o)ffsr1\nrr, \-\-
\
MfiEN$LHAULED
Oua.rn-r fioa,l lE
J
j{1, ,:. r"'
, ;1..r,1't.: -'
.--'.r.!-5:.j'
i;iir'ir
;ri.;.1:j:i;
i.,:.'1i,::,.: r'
-'+., ..:-lr'
'r.'l; ;-r:.-:'
r.1.1 -'i,t.-.i':.'
:''^, '-(?i :.1
-}],.'.,1.i: i
.:,'.':' .. .
.'-.i 'l ':i:':' :..ii..:i 4,.:rj..,
r':.1''j".i.'
il'-i;,.'#
ii'i,$i,
;' :ri', 'ri':. i: ,1
:.!. l:;:' ,i.-'
.r -:;.ri.?:.:ir.
1;'1 .-" _;:j"-.;:.
J
',
\ /a.{ &
&hl^"r, noclt0\c
I
*> €-U Ltn'uuJ*|
JOg NAIIIE
J
Jm
frInfff\,
toB #
Employee Signature Foreman Approval
Ak>
3?s
uru*rr,** 7'& sropW
5
Employee #
Employee Name
DATE
(s) (M) fr)(rH) (F) (sA)
Beginnlng
Ending
Accident Yes
-
l{o-
Selland Constmetion, Ins.
TOTAL
Gallonssf Fuel; On-Hwy- Off-Hwy-
lf AccidentwasTruck/IrailerLoaded: Yes..--"--_ No--
fv\
,&
\,3e
DOWN
TIME
ri.:i.-.1 i" jl
:ylt:.tji.;i..
.1j'-.' i..t.:
.;:r;+. ijt:. .]..'_.
.'r.i.,,.1.,:1ii.
t" r' ji ' ':
.. '-"-:' . -,.;i
' """ i r"-;. t,'
_,".' :'.:1r.:,:
,'.''.;''''.. *:) .' ,- .
g, )":-j
DfrNINC
.a.:,j_i.,.-..
. :.-. {i:. : :- "t.:t. .".*; .'i:i:-i:',i,,.
, S03
t
IRNLE&
in3oi
*s.sBL
TEAfiOA
\(K4
uaSv
liirffi
z ',.-..;.. :...i
r i:....'- .J .i ;"
..a.; \.,-,:
"_.!; :i r: ...r j:', ii:
:...; 1 i..:
ii{6i,
r5
rotAl
HAURS
"pi.l6i;,,, ,
I::.'- .1:.
',...i(r',':'.-
:: i.-.",i:.:i l-. ::i'"" -'r ,l'l ..-;
..,.',.'i.I
'rt i.i.i'1 r.',"
, ..,.,:.- , "t i .
."-.irr':!.1'
.:: rlj.:.: t.- r .t';'
..'* . .-'t.:
, 1. r ...- ..
, :,itJ...ir,i; . '
'5'^-:- ]-1'".
..i!a-:j '..
ir: . .'..f ,".,. ,'. :1
FAYg.Erc
|'t'..:t'\.:: '"
.. . .1,..:l'..r...,1..:_. -
\1 \\
\
tOilDs
1M rftru*
ftIJryxt 5oc,\\ 3
\;\
MATEBIALHIULED
AW? {at[&
lrrttn bed'{/
li:1'..i;^-; r
I'iiffi:ih Hnn t*b
I
liffii
l''...i*:,i:1,
liliri'.1'::,;
Itii.li.
li.l .;i :i..-;
l;";t;"ri,3b 6",ra {br.r4>l*ri*
li?ffiit
l, i.
lrili'*t',
JAENAME
3n e-bi"'q :
t
1ffi,."
),fr.
to& fl
affi"
3$Sc'*
Employee Signature Foreman Approval
Employee #
Employee Narne
JS'tO
3-
Selland Construction, Inc.,ro*rr,r, J l0c
STOPTIM ,.5)tP
hnt f\^4
(s)(r) (w) (rH) (F)
Beginning Odometer
Ending
Accident: Yes
-
No -_..-
Employee Signature e(flKW
TOTAL
Gallons of Fuel: On-Hwy
-
Off-Hwy
-
lfAccidentwasTrucUTrailerLoaded: Yes- No-
Foreman Approval
DRIVER'S DAILY TIME CAND
DOWN
TIME
E0UFMENrHOURS
DRIVIN6
)?
rRAILER
5rl-?r
U
EQUIPMENI
TRACrON
2t-ffi,1
hj1
fOTAL
ffouns
L()
PAY NATE
I
,l
LOADS
rth{-+.rra{
MATERIALHAULED
{ZLf/V4
.MI
\,
PHASE
I WdrZo
JOB NAME
b 'De'{o
)o8 f
115:*
e53c
Thayer Excavating,LLC
DBA Riverbottom Rock
2131 Riverbottom Rd
Ellensburg, WA98926
sx%* lft.$ 'u'
tt"rrru
*n.*C
lnvoice
Date lnvoice #
t2t3l/2025 2614
(s09) e2s-s4s7
thaye rexc av atin gllc @gma i l. c o m
RIVERBOTTOM ROCK
EttEtlSSUR6.lVA I RSRor.com
BillTo
Selland Construction Inc
1285 S Wenatchee Ave
Wenatchee, WA 98807
TERMS: Cash. A late payment charge of up to l.5olo per month from the date of invotce.
WHICH IS A TRUE ANNUAL RATE OF l8% will be paid by the customer on the unpaid
balance. Ifapplicable state laws require a lessor charge, the max rate will apply. IfThayer
Excavating LLC is required to place this invoice in the hands ofan attorney for collection,
the customer promises to pay seller's reasonable attorney fees and collection costs even
though no suit or action is filed hereon. Ifa suit or action is brought to collect all or any part
ofthe invoice balance the amount ofsuch reasonable attomey's fees shall be fixed by the
court which the suit or action, including any appeal therein, is tried, heard or decided.
P.O. No.Terms Project
Cascade Central Ro...
Description Quantity Rate Amount
1 l/4"- Base Cowse l2ll2/25
I l/4"- Base Course 12/15/25
26.36
t03.77
16.00
16.00
flH4
421.76
1,660.32
dY
1,223.04
822.56
399.84q;QDt
-lHE
##
I l/4"- Base Course 72117125
I l/4"- Base Course 12122125
I l/4"- Base Course 12129125
76.44
51.41
24.99
16.00
16.00
r6.00
Subtotal $10,575.04
Sales Tax (8.4%)$0.00
Total $10,575.04
Thayer ExcavatingrLLC
DBA Riverbottom Rock
2131 Riverbottom Rd
Ellensburg, WA 98926
s*:t%
m lft-$'"'
to"r*o
nnr**S
lnvoice
RIVERB(ITTIIM ROCK
Date lnvoice #
lt3t/2026 2646
(s09) 92s-s4s7
thayerexc av atingllc @gmai l. c om
Bill To
Selland Construction Inc
1285 S Wenatchee Ave
Wenatchee, WA 98807
TERMS: Cash. A late payment charge of up to 1.5% per month from the date of invorce.
WHICH IS A TRUE ANNUAL RATE OF 18% will be paid by the customer on the unpaid
balance. Ifapplicable state laws require a lessor charge, the max rate will apply' IfThayer
Excavating LLC is required to place this invoice in the hands ofan attorney for collection,
the customer promises to pay seller's reasonable attorney fees and collection costs even
though no suit or action is filed hereon. Ifa suit or action is brought to collect all or any part
ofthe invoice balance the amount ofsuch reasonable attorney's fees shall be fixed by the
court which the suit or action, including any appeal therein, is tried, heard or decided.
Terms ProjectP.O. No.
2550-30
AmountQuantityRateDescription
24.69 I1.00
101.95
25.95
25.65
16.00
16.00
l 1.00
I1.00
16.00
62.96
87.59
16.0063.95
I 1.00t79.46
I l/4"- Base Cowse 117126
I l/4"- Base Course l/8/26
2" Minus 118126
71.78 TN Base Bid 107.68 TN Ftg. Str Fill
2" Minlus 115/26
I l/4"- Base Course 1-13-26
2" Minus l-14-26
2" Minus l-12-26
1 l/4'L Base Course l-12-26
16.00
I1.00
16.00
lll.32
346.13
233.92
50.47 11.00
271.59
ffifr#l
1,631.20
415.20
282.15rrrrrEF'tc
692.s6
1,401.44
4F[
1,023.20
-;m
1,974.06
G
1,781.r2
3,807.43
3,742.72
555.17
2,906.53264.23 I 1.00
w
I 1/4"- Base Course l-15-26
2" Minus l-15-26
I l/4"- Base Course 1-19-26
2" Minus l-29-26
2" Minus l-30-26
Subtotal $30,103.75
Sales Tax (8.4%)$0.00
Total $30,103.75
m
Thayer Excavating'LLC
DBA Riverbottom Rock
2131 Riverbottom Rd
Ellensburg, WA 98926
sH%
wr ift.$ '":
*'**u
*n *.C
lnvoice
Date lnvoice #
2/2812026 2667' (s09) 92s-5457
thayerexcav atingllc@gma i l. com
RIVERBOTTOM ROCK
fltEllSgUR0. l{A I R0Ror.com
BillTo
Selland Construction Inc
1285 S Wenatchee Ave
Wenatchee, WA 98807
TERMS: Cash. A late payment charge of up to 1.5%o per month from the date of invorce.
WHICH IS A TRUE ANNUAL RATE OF 18% will be paid by the customer on the unpaid
balance. Ifapplicable state laws require a lessor charge, the max rate will apply' IfThayer
Excavating LLC is required to place this invoice in the hands ofan attomey for collection,
the customer promises to pay seller's reasonable attorney fees and collection costs even
though no suit or action is filed hereon. Ifa suit or action is brought to collect all or any part
ofthe invoice balance the amount ofsuch reasonable attorney's fees shall be fixed by the
court which the suit or action, including any appeal therein, is tried, heard or decided.
Terms ProjectP.O. No.
2550-30
Quantity Rate AmountDescription
205.9
225.37
I 1.00
I 1.00
I 1.0020s.04
127.28 11.00
224.95
3
528.76
r 1.00
170.00
I1.00
11.00996.82
I 1.00268.27
#
2,264.90
2,479.07
rrrff)
2,255.44
-|t!
1,400.08
ffi
2,474.45
dHO
d*ffi
510.00
5,816.36qlDe
q
rr4t
ffid
10,965.024rrrr-l!ffi
-Flu
d
2,950.97
-fm
d
2" Minus 2-ll-26
Export Spoils 2/12/26
2"Minus 2-12-26 264.38 TN Base Bid 264.38 TN Ftg. Str Fill
2" Minus 2-19-26 956.12 TN Base Bid 40.70 TN Ftg. Str Fill
73.35 TN Base Bid 194.92 TN Ftg. Str Fill
2" Minus2-9-26
2" Minus 2-10-26
2" Minus 2-23-26
2" Minus2-4-26
2" Mints2-6-26
Subtotal $76,862.03
Sales Tax (8.6%)$0.00
Total $76,862.03
-
'l'hayer Sxcav*ilng, LLC
DBA Rivrrbottom Rock
3.1 ] I Rivcrbottorrr l(d
Ellensburg, WA 98926
(509) 925-5457
thaycrexcava til gl lc@gmail.con
*$"X'"%
'*&"o Data lnvolca #
3'3U:O:6 t687slnvoice
t%*,"*,rJ nffERE0TToH r08l(
BtF nila tl I ,rtr rrr
SnlTo
Sclhnd Con$ru{rioo he
l38i S lvfnarclrec Arr
lYcnseht* 1YA 98S07
thc ruton*r pmmisc to pay rcllc/* rrannltrle atnmcy fsn end collettion ct*s cr co
&ougb nc *rlt cr acticr i* filcd hcrcon, lfa ruft or sctior ir brauglrt to eollcr nlt or rny part
ol rbc invoie'c blllmc thc annunt of sucb rssonobls rttarnqlts fccr rhall bc fhcd by tltt
co*n *fibh dre *uit or octio[ incloding uny tppcal thcrrh, i* nied, hcrrd or dcsitlcd
P.O. No.Temg Projesl
355{r-10
Osacrlpton OuanUU Rsc Anouot
2' },linur l-2€6 9rl.l3 I 1.00 t.015.43nlll|If
d
dNI
Subtotal s6Jt7.8l
Salas Tax t8.6%l t0.00
Total 56Jt?,$]
&rt.g,
REQUEST FOR PROPOSAL NO: 08
Project Name: Ellensburg Rodeo Arena Completion
Owner: Kittitas County
Contractor: Cascade Central Construction
Job Number: 2025-009
$$SKANT
283 N washingt0n
Suito 400
$pokane, WA
9920 I
v 509.838.$568
al3corchltecis-com
Page 1 of9
TO: Cascade Central Construction, Contractor, please furnish your proposal for performing the changes outlined
below and/or detailed on the attachments referred to:
C.121 - CIVIL SITE PLAN
o Revised: Concrete sidewatk areas
C.l31 . GRADING PLAN
o Revised: Grading
C.151 . UTILITY PLAN
o Deleted: Frost free hydrants.
o Added: Water vatve at tie in to existing note 26.
A.1OO - OVERALL FLOOR PLAN - BEHIND THE CHUTES
o Deleted: Owner provided fence
o Deleted: Outer piece of curved sidewatk atong fence.
o Added: Sidewatk around stage
A-600 - DOOR SCHEDULE - FRAME AND PANELTYPES - Sheet not printed
e Deteted: gates 265A, 2658, 265C and associated hardware.
e.lrta,attrtrDAl I A tl DEIJTIIFT TLIE '\IJI ITEC EI I.I'ID A tl EI EATEIIAAI .
o Deleted: (8)fence mount duptex receptactes opposite the stage.
o Deleted: Fence receptacte annotation, 'CONVENIENCE POWER, LOCATE APPROXIMATELY 20' ON
CENTER ALONG FENCE LINE".
o Deteted: Circuiting border and associated annotation, "CIRCUlTTO PANEL L3A UNLESS NOTED
OTHERWISE".
r Added: Conduit raceway from Panel L3A at the stage to an area opposite the stage, near future fence
[ocation with cal,tout to read, 'PROVIDE (4)1" CO TO SERVE AS RACEWAY FOR CIRCUITS FROM PANEL
L3A TO FUTURE FENCE RECEPTACLES AND LIGHT FXTURES".
E-601 - SCHEDULES - ELECTRICAL,
Panel L3A Schedute:
o Revised: Circuits 1 , 3, 5, 7 , g, 11 , 19, 15 to read, "Spare (Future Fence Rec Ckt)" with zero load
o Revised: Circuit 17 to read, "Lighting, Stage (Future Fence Ltg).
ALSC Architects \\ We bring our clients' stories to life'
Alts*,
EL.101 - SITE PLAN. LICHTING
o Deteted: (4) Type EX tight fixtures atong the fence [ine.
o Deleted: (6)Type X2 tight fixtures atong the fence [ine'
o Deteted: Circuiting border and associated annotation, "CIRCUITTO PANEL L3A, CIRCUIT 17"
ALSC Architects. P.S. BY Todd Keller Date: 3111126
PROPOSAL:
To the Owner: We propose to perform all changes described in the above request for a totalrttEEfflOltt/DEDUCTION
(cross out one) to the contract sum of:
FORry THOU SAND SIX HUNDRED SIXTY-FOUR AND OO/1OO DOLLARS q 40,664.53
(not including Sales Tax)
We have attached cost estimate detail sheets, and the foregoing amount covers all direct and indirect costs related to
this proposal and to the
remain in fullforce and
calendar days because
after this date
oate 4125126
Contractor
RECOMMENDATION:
TO: Owner, we have examined the foregoing proposal and find it to be appropriate for the request. We recommend
its acceptance.
ALSC ifacfs P -s_Date
PROPOSAL ACGEPTANCE:
The Owner hereby accepts the foregoing proposal. This instrument, when signed below, constitutes the conditions
upon which a Change Order will be issued.
By Date-
Owner
effect of the proposal on the remainder of the project. All other provisions of the contract
effect. We request the completion date be EXFENDEUREDUCED (cross one out) 0
of this work. The Contractor agrees to be bound to this proposal quotation for sixty (60) days
ALSG Architects \\ We bring our clients'storie$ to life.
c
P.O. Box 119
Wenatchee, WA. 98807-01 19
Phone 509-662-71'19
Fax 509-662-6360
Kittitas County Comissioners
205 West Sth Ave, Suite 108
Ellensburg, WA 98926
MAKE CHECKS PAYABLE TO:
Cascade Central Construction, LLC
P.O Box 119
Wenatchee, WA. 98807-0119
THANK YOU FOR YOUR BUS'iVESS/
PROPOSAL
PROJECT: Ellcnsburg Rodeo Arena lmprovements
coP# 34
DATE: April 25, 2026
TITLE: RFP I BTC Scope Reduction
cAscAItE
CENTRAL
Dat6 DESCRIPTION OUANITITY uoM UMTPRICE Altot Nl
4t2512026 Subcontractor Cost
Earthwork Subcontractor - See attached Back-up -'l LS $21,500.00 ($21,s00.ool
Concrete Subconlractor - See attached Back-up -1 LS $2,183.94 ($2,183.94)
ElCclrical Subcontractor - See attached Back-up -1 LS $13,798.00 ($13,798.00)
6% Mafl(-Up (2 244.92\,
Subcontractor -{39.730.86}
4t25t2026 cascade csntral consttuction cost
Supervision 0 HR $128.14 $0.00
General Conditions 0 WIJ $925.00 $0.o0
Proiect Management & Coordination 0 HR $161.54 $0.00
Project Engineer 0 HR $116.25 $0.00
Laborer 0 HR $63.08 $0.00
Carpenler 0 HR $1 19.00 $0.00
15Yo MarK-uP 0.00
General Contractor - sub Total 0.00
(39.730
($377.4'
($556.23
Schedule lmpact:
TOTAL (40,664.531
SELLAND P.O. Box 119 Wenatchee, WA 98807
Phone: (509)662-7119 Fu: (509)6624465
Bid Date: April 20,2026
EE"-EleeattrgaL"-
Ellensburg Rodeo Arena lmprovements - RFP 08 COP
Qualifications: Please Read carefullv
1. Washington State sales Tax has been not been included in proposal.
2. Prevailing Wage has been accounted for in proposal.
3. Rock excavation (i.e. Solid Rock, Caliche, Hard Pan, Cemented Soils and/or Boulders larger than 1 Cubic Yard) have not been included. Price Negotiation will be
required if these materials are encountered.
4. Over Excavation of U nsuitable Material has not been accou nted for, price negotiation will be req ui red if these materials are encountered.
5. Excludes Water System SupPort.
6. Exludes Construction Survey.
7. Engineering & Professional 5urveying Services are Excluded.
8. Fees for Utilities, County, City, Etc. are not included, Cultural Resource Services are not covered in our scope.
9. Hazardous Materials Abatement, Removal, Handling, Disposal, etc. are not expected onsite and are therefore Excluded'
10. Watering & Dust Control are lncluded for Selland's scope of work and duration only. No OT Dust Control or beyond our work.
11. Erosion Control lnspections, Reporting, Monitoring & Maintenance are Excluded, Stormwater Permit by others.
12. Dust control has been provided while we are actively working the site. No permanent or sustained dust control or mitigation has been included'
13. Any scope of work not specifically included as a line item in this proposal is excluded.
14. Actual quantities installed shall be tracked/measured and the basis of payment at the unit prices included in this proposal unless otherwise agreed.
15. Duetoglobalsupplychaindisruptionsandmarketvolatilitywereservetheexclusiverighttoadiustourproposalformaterialescalation.
16. Proposalisvalidfor30days.Thisproposalshallbemadepartofanysubcontract.
lfyou have any questions or need additional information with regard to our proposal please give us a call.
Sincerely,
SEttAND CONSTRUCTION, INC.
James Flowers
(sos) 881-0339
2,250.00
175.00
5o.oo
{1101 LF $
& BF Llght Pole Bases
2 RFP 08 - Yard Hydrants Deduct
Page 1 of 1
McGann Electric ccc
Contractor Breakdown Summary
Description:
CMFT LABOR COSTS
Direct Labor Costs:
a. crew (apprentices, journeymen, & laborers)
b. foreman
c. superintendent
Project Name:
Project No.
Contractor:
8. INSURANCE
a. payroll driven liability insurance
b. volume driven liability insurance
9. BOND
a. bond
Forh Revlsed 04125/15
Ellensburg Rodeo Arena RFP 08 scope reduction
Source Documents: Jack Mccann
McGann Electric
Eliminate 8 rec€ptacles along fence line, 3 (EX) fixtures, and 6 ()e) fi)dures. Add t hand hole at future fence line for spare
receptacle and lighting conduits. Delete 1 light pole base added per RFP-03. Exclusions: trenching, backfill, pole base
installation.
Itemize all costs on aftached COP Cost Breakdown form
Date:
Contractor Ref. No.
RFP.OSR
4t23t2026
$ (13,798.00)
$ (4,278.00)
$
$
Supervision:
d. direct supervision (NTE 15o/o ol 1al
e. safety (NTE 2% of lines 1a, b, & c)
2. MATERIAL COSTS
a. material costs
b. freight costs (itemize)
3. EQUIPMENTCOSTS
a. owned equipment (per spec approved source)
b. rental equipment (per invoices attached)
4. SMALLTOOLS
a. small tools (NTE 5% of la & b)
5. OVERHEAD & PROFIT
NTE l5% portion of 1,2,3,&4 upto$50,000
6. SUB-SUBCONTR,ACTORS
7. OVERHEAD & PROFIT ON SUB.SUBCONTMCTORS
a. NTE 15% of Line 6 up to $50,000 for each sub
DIRECT LABOR SUBTOTAL $ (4,278.00\
0.15 % of 1
0.25 olo of 1'7
0.03 % of 'l-B
1. CRAFT LABOR COSTS $ (4,278.00)
$ (9,520.43)
2. MATERTAL COSTS $ (9,520.00)
$
3. EQUIPMENT COSTS $
4. SMALL TOOLS $
SUBTOTAL'l thru 4
$
5. OVERHEAD &PROFIT $
6. SUB.SUBCONTRACTORS $
$
7. OVERHEAD & PROFIT ON SUB.SUBCONTMCTORS $
8, INSURANCE $
9. BOND $
TOTAL
a.
b.
a.
b.
c,
d.$
$
https://mcgannelectric-my.sharepoint.com/personaUjackmcgann_mcganneleclric_com/Documents/McGann Elec7ticl2025 Ellensburg Rodeo 9.30/COPs/RFP-08 scope
reduction/Revised/Ellensburg Rodeo Arena RFP-08 scope reduction REVISED Summary lssued 4/2312026
Cost Breakdown
Project Name: Ellensburg Rodeo Arena lmprovments RFP 08
Project No.
Contractor: McGannElectric
Date:
Contractor Ref. No.
RFP.O8R
4t2312026
Total
Cost
$
$
$ (4,278.00)
$
$
$ (e9.20)
$
$('t0.92)
$
$ (1 15.74)
$
$
$
$ (805.00)
$(4.721
$ (22.80)
$ (275.00)
s (89.50)
$
$ 490.45
$ (550.00)
$ (8,028.00)
$
s
$
$
$
$
$
$
$ (13,798.43)
Equipment
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
s
$
s
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Unit $
Material
Cost
$
$
$
$
$
$(99.20)
$
$(10.92)
$
$ (115.74)
$
$
s
$ (805.00)
$ (14.72)
$Q2.80\
$ (275.00)
$(89.50)
$
$ 490.45
$ (550.00)
$ (8,028.00)
$
$
$
$
$
$
$
$
$ (e,520.43)
Unit $
-$0.62
-$0.91
-s19.29
-$3.50
-$3.68
-$11.40
-$0.25
-$8.95
$490.45
-$550.00
-$8,028.00
Labor
Cost
$
$
$ (4,278.00)
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$ (4.278.00)
$
$
$
$ (4,278.00)
Unit $
-$106.95
Unit
Type
HR
FT
EA
EA
FT
EA
EA
FT
EA
EA
EA
LT
2t1t2017
Quantity
40
160
12
6
230
4
2
1 100
10
1
1
1
Description
Electrician Labor
1" PVC
1'PVC FA
l" Riqid 90
3/4" Riqid
3/4" Risid coupling
3/4" Riqid 90
#12 thhn solid
Bell box
hand hole
lioht pole base
6 (x2) 3 (EX)
Labor Subtotal
Subtotal Cost of Work
reduction REVISED - Cost Breakdowl lssued4l23n026
ATTN: General Contractor
RFP #8 - Btc Scope Reduction
RFP 8 - Concrete Estimate
Estimate Date| 3 I 29 I 2026
Project
Ellensburg Rodeo lmprovements
Project Location
Ellensburg,
Washington
Item Work Description Class Quantity Unit Unit Price Amount (US $)
t
2
3
4
5
5
Ready Mix Concrete - 4500PS1 llncludes 10% Spillagel
#4 Rebar - Stock 20' length
Screws, Saw Blades, Nails, Bits, Rebar Tie Wire, MAX
Rebar Tie Gun, Sprayer, Curing Compound, Form Oil,
lmpact Gun, Skill Saw, Etc.
lronworker
Cement Mason
Per Diem & Lodging
Material
Material
Tools
Labor
Labor
Labor
4.5
16
7
2
8
1
CY
EA
LS
HR
HR
EA
-$210.7s
-s11.86
-s122.00
-s86.s6
-Sss.zr
-$22s.00
-$948.38
-s189.76
-s122.00
-5773.r2
-ss2s.68
-$22s.00
Customer:
Authorized Signature:_
Name:
Date of Acceptance:_
tones Concrete & Excavdtion
Estimator - Corson Chester
s47-861-8060
Sub Total -$2,183.94
O&P Markup So.oo
TOTAL -s2,183.94
www.JonesCon crete. pro t/L
c0IsTnucTl0llG
P.O. Box 119
l,Venatchee, WA" 98807-{l{ I 9
Phone 509-662-7119
Fax 509-662-6380
Td
Kittitas County Comissioners
205 West Sth Ave, Suite 108
Ellensburg, WA 98926
MAKE CHECKS PAYABLE TO:
Cascade Central Constructlon, LLC
P.O Box 119
wenatchee, wA, 98807-0119
THANK YOU FOR YOUR BUS/A/ESS/
PROPOSAL
PROJECT: Ellensburg Rodeo Arena lmprovements
coP# 3s
DATE: Aprll 29, 2026
TITLE: RFI 115 ChaseWater Line
CASCADE
CENTRAL
Dst DESCRIPTION OUAN|TITY UOM UNTT PRICE AII'IOUiTT
4t29t2026 Subcontractor Cost
Plumbing Subconlractor - See attached Back-up - Additional piping is required
lo route up and over the access vvhile maintaining lhe ability to properly drain
the system during winter conditions, as opposed to Delail2lP-702. See revised
delail on nade 2
1 LS $3,996.00 $ 3,996.00
6% MarK-up $ 239.76
Subcontrac{or - Sub Total s 4.235.76
4t29t2026 Cascade Central Construction Cost
Supervision 0 HR $128.1E $
General Conditions 0 WD $925.00 $
Project Management & Coordination 0 HR s 161.54 $
Project Engineer 0 HR $'116.25 $
Laborer 0 HR $63.0E $
Carpenter 0 HR $'I 19.00 $
15% Mark-up $
General Conlractor - Sub Total $
Subtota $ 4.235.76
Bond $40.24
ts&O Ta($59.30
Schedule lmpact:
TOTAL s 4.335.30
Lp
r ,.-t r.-
,l f'
h g)} e
t_c
'i,* * !: t-et:
f
i
Ball Valves wl Hose
Connections Already in
Place at End of Runs
For DraininglBlow Down.
"a{T
3
lt
Ball Valve w/Hose
Connectlon for
DraininglBlow
Down.
\
\
a
X,s cent */e c fraruicaf an[ cpturtff*g Inc
TO:KC Garroll
Cascade Central Construction
COST CHANGE PROPOSAL
Phone: 509-662-71 10
nls
Date: 27-Apr-26
1 285 SD. Wenatchee Ave.Request No:
Fax No:
Our Job No.:
Our CCP No:
Wenatchee, WA 99807-01 19
Project:Ellensburq Rodeo Arena I 352
003
tl
Scope of Work:
T&M
Chase Water Reroute
Cost Plus Fixed PriceX
LaborHours 5.91 hours @ _g 15091- perhour = E
Sick Leave Mhours @ $ -
Labor Burden
lnsurance Jhours @ $ - Perhour= E
Travel Time 0.00 Hr x Rate $ - per hour =
Total Labor Cost:
Materials & Supplies $
Anticipated Escalation 0o/o
Small Tools
Welder hours @ $ 40.00 Per hour = E
Tool & Equipment Rentals
Total Material & Equipment Cost:
Estimation, Manager Review & Administrative Costs ( $108.91 / hr)
Supervision Labor Costs (15% of labor) ( ) OYo
WTSHA OYo
Small Tools 0o/o
Warranty 0o/o
Consumables 0o/o
Shop Drawings
Subcontractors:
Total Miscellaneous Gost:
Total Estimated Direct Cost:
Profit
Overhead
Total Cost:
lnsulation
0.00
0.00
0.00
Sub-Total S ubcontractor Cost:
Ascent Mechanical Overhead & Profit @
Total Subcontractor Cost:
Sub-Total:
lnsurance:
Bond:
CAT Tax @
TOTAL Amount:
Submitted by:
Date:
890.11
222.53
$1 112.63
$ 2,098.23
$
$ 3,210.86
12o/o 385.30
12%385.30
$ 3,981.47
s81.47
0.37o/o
0.00%
0.00%
14.73
$3.996
Scott Turk
April2T,2026
5o/ochange required time extension of
Pricing void/subject to revision after 5 Days
costs presented in this change include only those costs
be identified at this time. No impaci or delay costs
Should ii be determined that the project is impacted at
date by multiple changes, delays or other causes, we
those costs at lhat time. Work will commence upon
by authorized representative only.
assume work will start on
by
and be
P.O. Box 38 Rathdrum, ld 83858 PH: 208-4746-6331 F: 208-687-9198
As cent futec franiraf anf Qtumfiing Inc
COST ESTIMATE DETAIL SHEET
Ellensburg Rodeo Arena lmprovements
P.O. Box 38 Rathdrum, lD 83858
Date: _4p€9_
Page2ot2
CHANGE PROPOSAL NUMBER:
Chase Water Reroute
CONTRACTOR /
TOTAL
MATERTAL I ro"on Hns TOTALITFMSizelorvl uni,l*n
UNIT COST
TERIALI LABORDESCRIPTION
MAT'L
2 09A235912.O98.23 5.91I2.098.23IChase Water Pioino
0.002
0.003
0004
0005
0.006
0.007
0.008
0.00I
0.0010
00011
00012
0.0013
0.0014
0.0015
0.0016
0.0017
0.0018
0.0019
0.0020
0.0021
0.0022
00023
0.0024
0.0025
0.0026
5.91 s 2.098.23
CREDIT:
27
0.0028
0.0029
0.0030
00031
0.00 $Total:
RS
00
000e2
00034
0.0035
0.00 $Subcontractor Total:
5.91Labor Total
$ 2.098.23Material Total
EXCLUSIONS:
JoB 401 20255-022: Kittitas Coun..
ESTIMATE 3 20255-022: Chase 261 ...
DAtrA SET 5 SCOTT T 1-24-2024
USER NAME
NOTES
1. Section Breakout Report
(Companv Name)
(CompanyAddress 1)
(Company Address 2)
(Companv Address 3)
(Company Phone) / (Companv Fax)
scott.t@ascentm echanicalinc.com
PR|NTED 412812026 6:10:24 AM
MATERIAL Primary
LABOR Primary
Fld ExtUOMMat Unit MatAdjl Mat Extl Fld unitl FbAdjSizeItem Desc otyCategory
Section : Section 011: DW-A/G - DOMESTIC WATER A/G
Subtotals for Section : Section 011: DW-A/G - DOMESTIC WATER A/G 5.90822,098.23
2,098.23Grand Totals
COPPER KLM- PRO P,.,2-112"
COPPER KLM- PRO P...2.112"
COPPER KLM- PRO P...2-1/2"
coPPER KLM- PRO P...2-1/2" X314"
COPPER KLM- PRO P...2-1/2"
COPPER KLM- PRO P...314"
HANGERS & CLAMPS.. . 3-1 12'
HANGERS & CLAMPS... 1/2"
HANGERS & CLAMPS... 1/2"
HANGER-R.CLAMP-E... 1 /2'
HANGER-R.CLAMP-E... 1/2'
HANGER-R.CLAMP.E... 44
3/4" FIPxHOSE THRE...
HOSE CAP
L-HARD TUBE
CU-90 ELBOW PxP-...
CU. TEE PxPxP-- CT300
REDUCING COUPLING
CU. COUPLING /w ST...
BRZ. MALE ADAPTER...
#260 ADJ. CLEVIS H...
#146ALLTHREAD R...
#941-1/4" JAW TOP 8...
FIG.165H-HEX NUTS
FIG. 1 O3-WASH ER--F1...
INSULATION SHIELD
1.00 ea
1.00 ea
20.00'
2.00 ea
1.00 ea
1.00 ea
1.00 ea
1.00 ea
3.00 ea
10.00'
3.00 ea
9.00 ea
9.00 ea
3.00 spec
83.07
1.91
46.21
207,18
260.89
243.24
102.24
9.45
4.04
1.50
2.13
0.13
0.14
7.63
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
83.07
1.91
924.20
414.36
260.89
243.24
102.24
9.45
12.11
15.05
6.39
1.13
1.30
22.89
0.2500
0.0000
2.0800
0.7776
0.5832
0.3888
0.3888
0.1648
0.9750
0.0000
0.3000
0.0s00
0.0000
n nnnn
0.2500 1.0000
Manual 1.0000
0.1300 0.8000
0.4860 0.8000
0.7290 0.8000
0.4860 0.8000
0.4860 0.8000
0.2060 0.8000
0.6500 0.5000
Skip 1.0000
0.2000 0.5000
Skip 1.0000
Skip 1.0000
0.0820 0.0000
Page 1 of 1
tr il llllllililll I lllllllll lll
Quotation&, Industrial
P.O. Box 13250
Spokane, WA99213-3250
.1&..,
QUOTE TO:SHIP TO:
ASCENT MECHANICAL
POBOX3S
MTHDRUM, ID 83858-0038
ASCENT MECHANICAL
ELLENSBURG RODEO IMPROVMENTS
101O E 8TH AVE
ELLENSBURG, WA 98926
EXPIRATION DATE OUOTE NUMBER
0512812026 s100637812
Branch:
M & L SUPPLY CO., INC.
41 14 E. FERRY AVE.
SPOKANE, WA 99202
509-5354774
Fax 509-534-6596
PAGE NO-
1of 2
CUSTOMER NUMBER CUSTOMER PO NUMBER JOB NAME / RELEASE NUMBER SALESPERSON
14066 CCP-3 DW AG NORTH IDAHO
WRITER SHIP VIA TERMS SHIP DATE FREIGHT ALLOWED
RYAN WESTERMAN 2o/o 10lh Net 25th 04t27t2026 No
ORDER QTY DESCRIPTION UNIT PRICE EXT PRICE
1ea
1ea
20ft
2ea
1ea
1ea
1ea
1ea
MVO 34UPBAIOOH
3/4" UPBA1OOH FNPT X HOSE WCAP &
CHAIN DOM FULL PORT BALL VLV, LOW
LEAD
POO 2152
3/4'FHT HOSE CAP WMASHER
PDO 212LHRD
2.112" X2O'L HARD COP TUBE
R01 212607PP
VIEGA PROPRESS 2-112" P X P XLC
coP 90 ELL, 20623
RO1 212611PP
VIEGA PROPRESS 2-112" P X P X P
XLC COP TEE, 20683
R01 212112600RPP
VIEGA PROPRESS 2.112" X1-112" P X
P RED,20695
R01 112346002PP
VIEGA PROPRESS 1.112" X 3/4" FTG X
P COP REDUCER, 14543
R01 212600PP
VIEGA PROPRESS 2-112" P X P XLC
COP CPLG WSTOP, 20728
83.066/EA
1.9121E4
4620.5301ft
207.1811ea
26O.887|ea
218.5621ea
24.6751ea
102.2431ea
83.07
1.91
924.11
414.36
260.89
218.56
24.68
102.24
Subtotal
S&H Charges
Amount Due
on
Print€d 8y: RYANW on 4/2712026 1;46:54 PM
il I l] il illlil Illl I lllll ll II lll
Quotation& Industrinl Supply
P.O. Box 13250
$pokane, W499213-3250
,vtr *
QUOTE TO:
ASCENT MECHANICAL
POBOX38
MTHDRUM, ID 83858-0038
QUOTES DO NOT INCLUDE TAX!
SHIP TO:
ASCENT MECHANICAL
ELLENSBURG RODEO IMPROVMENTS
1O1O E 8TH AVE
ELLENSBURG, WA 98926
EXPIRATION DATE OUOTE NUMBER
05t28t2026 s100637812
Branch:
M & L SUPPLY CO., INC.
41 14 E. FERRY AVE.
SPOKANE, WA 99202
509-5354774
Fax 509-534-6596
PAGE NO
2of 2
CUSTOMER NUMBER CUSTOMER PO NUMBER JOB NAME / RELEASE NUMBER SALESPERSON
14066 CCP-3 DW AG NORTH IDAHO
WRITER SHIP VIA TERMS SHIP DATE FREIGHT ALLOWED
RYAN WESTERMAN 2Yo lOth Net 25th 0412712026 No
ORDER QTY DESCRIPTION UNIT PRICE EXT PRICE
1ea
3ea
1oft
3ea
9ea
9ea
3ea
R01 34604PP-NL
VIEGA PROPRESS 314" P X MIP BRZ
ADPT 79230 LOW LEAD
PH1 312260
3-112" #260 BLK CLEVIS HANGER
PH2 12146P
112" X10'PLATED ALL THRD ROD
PH1 1292
1t2" 92 BEAM CLAMP BRKT (350)
EMO EMOT
112" ZINC STD HEX HEAD NUT GRADE 2
EMO EMOS
112" ZINC STD FLAT WASHER GRADE 2
-PH1 167-GAV-4A
ANVIL 167 4AGAL STL INSULATION
SHIELD
9.45o/EA
4.0381ea
1.505/ft
2.1311ea
O.125lea
O.144lea
7.630/EA
9.45
12.11
15.05
6.39
1.13
1.30
22.89
Subtotal
S&H Charges
2098.14
0.00
Amount Due 2098.14
Printed By: RYANW on 4/2712026 1:46:54 PM
A\tg,
REQUEST FOR PROPOSAL NO: 10
Project Name: Ellensburg Rodeo Arena Completion
Owner: Kittitas County
Contractor: Cascade Central Construction
Job Number: 2025-009
SP*NANg
203 N Wcshington
3uile 400
Spokone, WA
. 9920r
r 50?.838.$568
clsc0rchiiocts.com
Page 1 of3
TO: Cascade Central Construction, Contractor, please furnish your proposal for performing the changes outlined
below and/or detailed on the attachments referred to:
C.151 - UTILITY PLAN
o Added: Provide Post-lndicator vatve per city of Ettensburg standards.
ALSC itects. P-S.By Todd Date: 4121
PROPOSAL:
To the Owner: We propose to perform all changes described in the above request for a tota|ADDITIONIEEEUGFI€)N
(cross out one) to the contract sum of:
Twentv Five Thousand E ioht and 99/100 Dollars $25,008.99
(not including Sales Tax)
We have attached cost estimate detail sheets, and the foregoing amount covers all direct and indirect costs related to
this proposal and to the effect of the proposal on the remainder of the project. All other provisions of the contract
remain in fullforce and effect. We request the completion date be EXTENDED/REDU€ED(cross one out) 0 , ,
calendar days because of this work. The Contractor agrees to be bound to this proposal quotation for sixty (60) days
after this date.
Cascade Central Construction KC Carroll D afo 514126
Contractor
RECOMMENDATION:
TO: Owner, we have examined the foregoing proposal and find it to be appropriate for the request. We recommend
its acceptance.
ALSC A ifccts P-S-Date:
PROPOSAL AGGEPTANCE:
By
ALSC Architects \ We bring our clients'stories to life
Aw,
The Owner hereby accepts the foregoing proposal. This instrument, when signed below, constitutes the conditions
upon which a Change Order will be issued.
Date-
Owner
ALSC Archltects \\ We bring our clients' $tories to life'
EAST STII AVENUE
- " ?,'-
3
I
Q)iii
REFERENCE NOTES:
oMwa$$msrm
@MwffiEffiBF['F3.
6ffibssa'Effu@ufi
OME*ffigFF$rmsF&
OFeHtuEmNffi
\\.''*i, *-'\
\
6l TDffiSEffi EffiUD
@MadffitffisEffi
@ffiwf @*mmR
@MEffiE6'ffi.ffitrrB
@ffiEtffimran
(oM@ yA
\iiffiEm"*m-*m
6MEru5Etrn
loffibmffiswaIdmffi
6F*@csEusfrcM
offiEidnft6mqffi
OnmffircsEflfisEm66llE#$s5ils.5He.&@
Mff^rmnmr6&5.
EAST TTII
AYENUE ,):,\ r+.-)
@ffiedqEr€r6fiG--)a
oE{DffidsrffiffK
o
cRfEc scM
tF#i.{
Arls,
-:lil:..ffiw
:I\-l:lJrEIantrntlit
sffiwsNfidMl
ELLENSBURG
RODEO ARENA
SEATING
KITflTAS
COUNTY
ffi
ffi
ffi
UTILITY
PLAN
c-151
c
P.O. Box 119
Wenatchee, WA, 98807-01 l9
Phone 509{62-71'19
Fax 509-662-6380
County Comissioners
West sth Ave, Suite 108
Ellensburg, WA 98926
MAKE CHECKS PAYABLE TO:
Cascade Central Construction, LLC
P.O Box 119
Wenatchee, WA, 98807-0l 19
THANKYOU FOR YOUR AUS'IVESS'
PROPOSAL
PROJECT: Ellensburg Rodeo Arena lmprovements
coP# 36
DATE; May 4, 2026
TITLE: RFP 10 Post lndicator Valve Addition
CASCADE
CENTRAL
Pricing includes installing PIV at the preferred alternate location per
attached response to RFI 116.
DatG OESCRIPTION auaMnw uot,UNTT PRICE AIIOUNT
5t4t2026 Subcontractor Cost
Civil Subeontrator - See attached Back-up LS $18,158.67 $1 8,1 5E.67
Eleciri€l Subconlractor - See attached Back-up 1 LS $4,893.00 $4,893.00
6% Mark-up 1.383.10
Subconfactor - Sub Total 24,434.77
5t4t2026 Cascade Central Construction Cost
Supervision o HR 124.14 $0.00
General Conditions o WD $925.00 $0.00
Proiec{ Management & Coordination o HR $161.54 $0.00
Project Engineer o HR $1 16.25 $0.00
Laborer 0 HR $63.0E $0.00
Carpenter 0 HR $1 19.00 $0.00
15% Mark-up 0.00
General Contractor - Sub Total 0.00
24.434.t I
s232.13
s342.09
Schedule lmpact:
None if approved by 5/1 1/26.
TOTAT 25.008.99
c cAscAllE
CENTRAL
REQUEST FOR INFORMATION
TO:
Todd Keller (ALSC Architects)
203 North Washinston, Suite 400
Spokane, WA 99201
Date:4t27t2026 RFt 116
Project Ellensburg Rodeo Arena lmprovements
1 01 0 East 8th Ave.
Ellensburq, WA 98926
Section
Division
Title PIV Layout Clarification
Requested
Respond by Date:
RFI DESCRIPTION
The attached SK-1 '16.1 reflects the layout required by the Fire Marshal, which includes maintaining 3 feet of clear spacing on all sides with
bollards due to potential vehicle and trailer traffic.
As shown, this configuration occupies approximately half of the sidewalk and with multiple underground utilities, making excavation in this
area challenging.
A more suitable location would be near the hydrant. Additionally, local code does not require the PIV to be connected to the fire alarm
system. Please confirm whether the Plv is required to be tied into the fire alarm system.
lf a connection is not required, relocating the PIV near the hydrant would be a more cost-effective solution. lf a connection is required, it
would necessitate trenching across the iite again; however, this alternative location would still be more practical from a constructability
standpoint.
lmpact: Pending response, TBD
Reference Sketch:sK-116.1
Reference Sheets ASlOO
RESPONSE TO RFI
Let us know if moving it to the east if feasible. This would be more out of the way but understand it
extends the line. Kady does not want it to be by the fire hydrant as it will be an obstruction for concert
events etc. Keeping ii off the track and BTC area is preferred. See notes below for tie in to the fire
alarm.
Todd Keller ALSC 4128126
RESPONSE BY:DATE:
COPY TO :Andrew Leeper (ALSC Architects)SIGNED Carkl Sa6e[ra
Cascade Central Construction
Project Engineer
RESPONSE TO RFI
MW Electrical Comment:
It is recommended io utilize the fire alarm system to provide supervision of the Post lndicator Valve (PlV). lt is not necessarily required to be
tied into the fire alarm system however, per trlFpR 13, Section 16.9.3.3.1 it is required to be supervised to prevent accidental shutoff'
Acceptable methods of supervision are identified below:
1, Electronically: Monitored by a central station, proprietary, or remote station signaling service.
2. Local Alarm: A local signaling service that notifies building occupants of a valve closure.
3. Locking: Valves are locked in the open posilion.
4. Sealinj': Valves are sealed within fenced enclosures under control ol the owner, with inspections conducted weekly.
RESPONSE BY: Aaron Lanegan oATEz 04-28-2026
{
.1*1
t:\
I
"*
.-' ;*0:'.,
I\Et
H
uEt{TtilL
a,
.--"1
l,
c9rSTnuCTl0r
00REFERENCE SHEETS:
H: 116.1
t26DAT
Ellensburg Rodeo Arena lm
A-210 A-211
258
t-
,-
-
)-O:
a.
231
a
232
a
\
:00
,E1 \
*-\"--l*.\
j.o-€
arl|-,
JrJ '
I
*a
t t"t.l *
Poss alternate
Preferred alternate
location.
\
\
\
t
\l?
I
I
$
.tre
9
rn! ,q\-"r7s a L L,A 1".'J f)
t: {-.} N Ei '|- l-l LJ Cj I- I lJ l".l
Daily Report of Force Account Worked
Contract Number lDateI ononozo
Item Number
lltem
Name
RFP TO PU
Prime Contractor Tier Subcontractor
Selland Construclion, IneC ascode Centrol C o n strucli o n
Description of Work Performed
Post Indicator Valve
Time Worked Record
Workers and/or Equipment
Working Occupation of Workers or Equipment Size
Hours Worked
Reg. Rate O.T. Rate Amount
Reg.o.T,
Labor
1 Foreman 20.0 $102.61 8102.61 $2,052.20
2 Operutor 20.0 $100.07 $100.07 $2,001.40
3 Operator $100.07 8100.07 $0.00
4 Operator $100.07 s100.07 80.00
5 Operator $100.07 8100.07 $0.00
b Operator $100.07 $100.07 $0.00
7 Operator (Roller)$94.82 $94.82 $0.00
8 Pipe Layer 20.0 $66.07 $66.07 $1,321.40
9 Pipe Layer $66.07 $66.07 $0.00
10 General Laborer $62.4s $62.4s $0.00
11 $0.00
Labor Subtotal $5,37s.00
15% Markup $806.25
Labor Total $6,181.25
Equipment
12 238 Excuvalor $137.12 $0.00
13 138 Excavator 20.0 8124.46 $2,489.20
14 Loader 10.0 884.33 $843.30
15 Mini Excavator $s6.10 $0.00
16 Skid Steer $80.18 $0.00
17 Roller $25.32 $0.00
18 Pickup 843.80 $0.00
19 1-Ton 20.0 $47.22 $944.40
Equipment Subtotal 84,276.90
15% Markup 8641.54
Equipment Total $4,918.44
Materials
20 Valve, Fittings & Appertences (Ferguson Quote)I L.S $3,378.25 83,378.25
21 Crushed Rock 10 TN 8r6.00 $160.00
22 Steel Pipe Bollards )EA $s00.00 il,000.00
23 Concrete 4 CY $225.00 8900.00
24 Plustic Bollard Covers 7 EA 8250.00 s500.00
25 Disinfection Supplies I ZS $200.00 8200.00
26 $0.00
27 $0.00
28 $0.00
Materials Subtotal $6,138.25
1596 Markup $920.74
Moterials Total $7,058.99
Calculated By loate Checked By lDate Total $18,158.67
McGann Electric ccc
Contractor Breakdown Summary
CMFT LABOR COSTS
Direct Labor Costs:
a, crew (apprentices, journeymen, & laborers)
b. foreman
c, superintendent
Project Name:
ProJect No.
Contractor:
Description:
8. INSURANCE
a. payroll driven liability insurance
b. volume driven liability insurance
$ 2,139.00
$
$
DIRECT LABOR SUBTOTAL $ 2,139.00
Ellensburg Rodeo Arena lmprovements PIV VALVE CONNECTION
Source Documents: Jack McGann
coP-r6
Date:
Contractor Ref. No,
5t1t2026
McGann Electric
Provide labor, conduit, wire, fittings, junction boxes, lire alarm programming, fire alarm wire, and monitoring module
requlred for the supervisory connection of the PIV vafue to the FACP, including labor to pretest and test the tamper valve
switch. Calibration of thetamper switch supplied by others to be performed by others so that tamper switch signals within 2
revolutions of PIV valve handle. Exclusions: cut patch, paint.
Itemlze al! costs on attached COP Cost Breakdown form.
Supervision:
d. direct supervision (NTE 15o/o ol 1al
e. safety (NTE 2% of lines 1a, b, & c)
2. MATERIALCOSTS
a. material costs
b. freight costs (itemize)
3. EQUIPMENTCOSTS
a, owned equipment (per spec approved source)
b, rental equipment (per invoices attached)
4. SMALL TOOLS
a. small tools (NTE 5% of la & b)
5. OVERHEAD & PROFIT
a. NTE 15% portion ol 1,2,3, & 4 up to $50,000
b.
6. SUB.SUBCONTRACTORS
JCI/simplex
7, OVERHEAD & PROFIT ON SUB.SUBCONTMCTORS
a. NTE {5% of Line 6 up to $50,000 foreach sub
$42.78
1. CRAFT LABOR COSTS $ 2,182.00
$680.30
2. MATERIAL COSTS $680.00
s
3. EQUIPMENTCOSTS $
109.10
4. SMALL TOdLS $ 109.00
SUBTOTAL I thru
$475.36
$
5. OVERHEAD & PROFIT $475.00
s 1.?44.71
6. SUB-SUBCONTRACTORS $ 1,24s.00
$186.75
$
7. OVE RHEAD & PROFIT ON SUB-SUBCONTMCTORS $
$ 3.27
$ 't2.20
$
a.
b.
c,
d.$
't 87.00
_..1!.!!% of 1
0.25 o/" ol 1-7 8. INSURANCE $ 15.47
9, BOND
a. bond 0.03 % of 1-8 9. BOND $
TOTAL
https://mcgannelectric-my.sharepoint.com/personal/jackmc{ann-mcgannelectric-com/Documents/McGann Eleclilcl2025 Ellensburg Rodeo 9.30/COPs/COP 16-P_lV
Vaive connection/Ellensburg Rodeo Arena COP-2 - Summary lssued 5/1/2026
COP Rates
Project Name:
Project No:
Contractor:
Ellensburg Rodeo Arena lmprov
ERAI
Mccann Electric
s
$
$
$
$
$
$
$
s
$
$
s
$
s
$
$
$
$
$
$
$
s
$
$
$
$
$
$
$
$
s
s
$
$
s
s
$
$
$
$
$
$
ELECTRICIAN
SUPERINTENDENT
10t25125
3 106.00
$106.00
$106.00
$0.85
$6.57
$1.U
$5.09
$1.90
$5.09
$0.5't
$127.55
ELECTRICITAN
FOREMAN
10t25t25
$ 97.17
$ s7.17
$ 97.{7
s 0.78
$6.02
$1.41
s 4.66
$1.85
$4.75
$0.49
s 117.14
ELECTRICIAN
JOURNEYMAN
10125125
s 88.34
$ 88.34
$ 88.34
$ 0.71
$5.48
$1.28
o 4.24
$1.80
a 4.63
c 0.47
$ 106.95
Rate
0.80%
6.20o/o
1.45o/o
4.80%
1.9502
5o/.
o.500/"
Trade &
Position
Date*
1. Hourlv Waoe Rate
SUBTOTAL
3.FUl %of1
4. FICA % of 1
5. MEDICARE % of 1
6. SUI % of 1 (insert correct % to right)
7. WC (insert $ amount per hour)
8.lRA retirement
9. WPFM leave
TOTAL {incl. Davroll taxes)
NOTES: * Rate schedule date is the date of the Dept. of Labor & Industries Prevailing Wage Rate used or the Union Agreement.
a. for items 3 thru 5, the Federal rates do not vary by firm, and the percentages are already locked into this form.
b. for item 6, the actual rate is determined by the State Employment Security Dept. and varies by firm. lt shall be verified by the contractor at the start of the project.
c. for item 7, the rate is based on L & I classification. The hourly dollar amount is specific to the firrn/trade and shall be verified by the contractor at the start of the pmject'
d. definitions
f. items 1 & 2 are basic wages and benefits (see general conditions 7.02 8.7.a(1))
2. item 3, FUI is Federal Unemployment Tax Act (see general conditions 7.02 B.7.a(3))
3. item 4, FICA is Federal lnsurance Compensation AcUSocial Security (see general conditions 7.02B.7(3))
4. item 5, Medicare is FICA medical aid (see general conditions 7.02 8.7.a(3))
5. item 6, SUI is State Unemployment Compensation Act (see general conditions 7.02 8.7 .a(3))
6. item 7, WC is industrial insurance/workers' compensation (see general conditions 7.02 8.7.a(2))
7. item 8, AD is additional mmpensation for education, dental, vision, entertainment, vehicles
lssued 5/12026
c$t{slgurllBllG
P.O. Box 119
Wenatchee, WA. 9880741 19
Phone 509-662-7'119
Fax 509-662-6380
Kittitas County Comissioners
West 5th Ave, Suite 108
Ellensburg, WA 98926
MAKE CHECKS PAYABLE TO:
Cascade Central Construction, LLC
P.O Box 119
Wenatchee, WA, 98807-0119
THANKYOU FOR YOUR BUS"VESS'
PROPOSAL
PROJECT: Ellensburg Rodeo Arena lmprovements
coP# 37
DATE: May 11, 2026
TITLE: Cast lron Credit
CASCADE
CET{TRAL
oft DESCRIPT|ON OUAI'lftllY uoll I'NITPRICE AUOtnlt
5t11t2026 Subcontractor Cost
Plumbing Subcontrator - See attached Back-up ,|LS $(6,542.971 ($6,s42.97)
6% Mark-uF 0.00
Subcontractor - Sub Total (6.542.97)
5t11t2026 cascade Central Construction Cost
Supervision 0 HR $128.14 $0.00
General Conditions 0 WD $925.00 $0.00
Prcject Management & Coordination 0 HR $161.54 $0.00
Project Engineer 0 HR u 116.25 $0.00
Laborer 0 HR $63.08 $0.00
Carpenler 0 HR $119.00 $0.00
'15% Mark-up 0.00
General Contractor - Sub Total 0.00
(6,542.97)
$0.00
$0.00
Schedule lmpact:
TOTAL (6,542.97)
Ascent *lechan:icaf on[ gfuntbing Inc
COST CHANGE PROPOSAL
TO:KC Carroll Date: 11-May-26
Cascade Central Gonstruction
1285 SD. Wenatchee Ave,
Wenatchee, WA 99807-0119 Phone: 509-662-71 10
Project:Ellensburo Rodeo Arena nts
Request No
Fax No
Our Job No.
Our CCP No
509-662-6380
352
Fixed Price
004
E
Scope of Work:
T&M
Cast kon Credit
Cost Plus X
LaborHours -12.66 hours @ _$ 100.,11- perhour = E
Sickleave @hours @ _L-
Labor Burden
lnsurance Jhours @ -$- Perhour = g
Travel Time 0.00 Hr x Rate $ - per hour =
Total Labor Cost:
Materials & Supplies $
Anticipated Escalation 0o/o
Small Tools
Welder hours @ $ 40.00 Per hour = E
Tool & Equipment Rentals
Total Material & Equipment Gost:
Estimation, Manager Review & Administrative Costs ( $108.91 / hr)
Supervision Labor Costs (15% of labor) ( ) 0%
WISHA Oo/o
Small Tools Oo/o
Warranty 0%
Consumables 0o/o
Shop Drawings
Total Miscellaneous Cost:
Total Estimated Direct Cost:
Profit
Overhead
Subcontractors: Total cost:
$
lnsulation
0.00
0.00
0.00
Su b-Total S ubcontractor Cost:
Ascent Mechanical Overhead & Profit @
Total Subcontractor Cost:
Sub-Total:
lnsurance:
Bond:
(1 ,271.19)
(317.80)
$ (1,588.ee)
.60)
$ (3,687.60)
$
$ __(5,274!9I
12Vo 19)
12o/o (633.1 e)
$ (6,542.s7)
5%$
$--
$ (6,542.e7)
0.37% $(24.21)
0.00% $
CATTax@ 0.007o
TOTAL Amount:$(6,567)
Submitted byt_
Scott Turk
Date:May 11 ,2026
This change required time extension of
days. Pricing void/subjeci to revision after 5 Days
The costs presented in this change include only those costs which
can be identified at this time. No impact or delay @sts are
included. Should il be determined that the project is impacted at a
later date by multiple changes, delays or other causes, we will
submit those costs at that time. Work will commence upon signed
aeeplance by authorized representative only.
We assume work will start on and be
completed by
P.O. Box 38 Rathdrum, ld 83858 PH: 208-4746-6331 F: 208-687-9198
As cent fuIec fianicaf an[ ePfumfiing Inc
COST ESTIMATE DETAIL SHEET
Ellensburg Rodeo Arena lmprovements
Gontract Cha
P.O. Box 38 Rathdrum, lD 83858
Date: 11-May-26
Page 2 of 2
CHANGE PROPOSAL NUMBER:
Cast hon Aedit
4
CONTRACTOR / NUMBER:
TOTAL
MATFRTAT l,o"n***"TOTALSize
MAT'L UNIT COST
lot"l unir |ror.*'o.l uro*DFSCRIPTIONITEM
-62 ?A (6 80S 83)-62.20 (6.809.83)1 Cl Credit 1 -6.809.83
3'122 23 49 54 3.122.23PVC Pricind 1 3.122.23 49.542
0003
0.004
0.005
0.006
0.007
0.008
000I
0.0010
0.0011
0.0012
0.0013
0.0014
00015
0.0016
0.0017
0.0018
0.0019
0.0020
0.0021
00022
0.0023
0.0024
0.0025
00026
-12.66 $ (3,687.60)
0.00
0.00?a
00029
00030
0.0031
0.00 $Total:
SUBCONTRACTORS
32
EA 0.0033
0.0034
0.0035
0.00 $Subcontractor Total:
Labor Total -12.66
$ (3,687.60)Material Total
EXCLUSIONS:
JoB 401 20255-022: Kittitas Coun...
ESTIMATE 4 20255-022: Cast lron for ..
DATA SET 5 SCOTT T 1 -24-2024
USER NAME
NOTES
1. Section Breakout Report
(Companv Name)
(CompanvAddress 1)
(Company Address 2)
(Companv Address 3)
(Company Phone) / (Company Fax)
scott.t@ascentm echanicalinc.com
PRINTED 511112026 9:03:23 AM
MATERIAL Primary
LABOR Primary
Mat EXt Frd unitl FH Adjl Fld ExtQtyUOMMat Unit MalAdjCategorySizeItem Desc
Section : Section 007: SAN/AG - SANITARY A/G
Subtotals for Section : Section 007: SAl,l/AG - SANITARYA/G
Grand Totals
c.t. sorl No HUB-HV... 2'
c.t. soll No HUB-HV... 4'
c.t. sotl No HUB-HV... 4"
C,I. SOIL NO HUB-HV... 2"
c.t. soll No HUB-HV... 4"
C.l. SOIL NO HUB-HV... 2" x1-112"
c.l. sorl No HUB-HV... 2'
c.t. sotl No HUB-HV... 4'
HANGERS & CLAMPS...2"
HANGERS & CLAMPS...4"
MATERIALTOTAL 1.00 ea
P|PE--C.|. NO HUB PE... 80.00 '
P|PE--C.|. NO HUB PE...100.00 '
1/4 BEND-NHA 10.00 ea
HVY DUTY N.H. COU... 80.00 ea
HVY DUTY N.H. COU... 90.00 ea
TAPPED SANITARYT... 20.00 ea
TESTTEE--LESS PLU... 20.00 ea
TESTTEE--LESS PLU... 6.00 ea
#260 ADJ. CLEVIS H... 16.00 ea
#260 ADJ. CLEVIS H... 20.00 ea
6809.83
Manual
Manual
Manual
Manual
Manual
Manual
Manual
Manual
Manual
Manual
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
6,809.83
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Manual
0.0600
0.0800
0.8000
Skip
Skip
0.9000
0.9000
1.2000
0.5000
0.7000
1.0000
0.8000
0.8000
0.8000
0.0000
0.0000
0.8000
0.8000
0.8000
0.5000
0.5000
0.0000
3.8400
6.4000
6.4000
0.0000
0.8000
14.4000
14.400S
5.7000
4.0000
7.0000
Page 1 ol 1
JoB 401 20255-022: KittitasCoun..
ESTTMATE 5 20255-022: PVC for Cl ...
DATASET 5 SCOTT T 1 -24-2024
USER NAME
NOTES
1. Section Breakout Report
(Companv Name)
(CompanvAddress 1)
(Company Address 2)
(Companv Address 3)
(Company Phone) / (Company Fax)
scott.t@ascentmechanicalinc.com
PRINTED 51 11 12026 9:04:42 AM
MATERIAL Primary
LABOR Primary
Frd Adj FId EXtUOMMatMalMat Ext FtdItem DescSize
Section : Section 007: SAN/AG - SANITARYA/G
49.53603,122.23Subtotals for Section : Section 007: SAN/AG - SANITARYA/G
49.53603,122.23Grand Totals
PVC SCH 4O--DWV 2"
PVC SCH 4O--DWV 4"
PVC SCH 4O--DWV 4"
PVC SCH 4O-.DWV 2"
PVC SCH 4O--DWV 4"
PVC SCH 40--DWV 2" x1-112"
HANGERS & CLAMPS...2-
HANGERS & CLAMPS...4-
MATERIALTOTAL
2'' CI>PVC SHIELDED..
4'' CI>PVC SHIELDED..
PIPE-SCH 40 PVC D...
PIPE-SCH 40 PVC D..,
1/4 BEND - HxH-300
TESTTEE & PLUG--H..
TESTTEE & PLUG.-H..
RED SAN TEE-ALL H...
#260 ADJ. CLEVIS H...
#260 ADJ. CLEVIS H...
1.00 ea
80.00 ea
90.00 ea
80.00 '
100.00'
10.00 ea
20.00 ea
6.00 ea
20.00 ea
14.00 ea
14.00 ea
3122.23
Manual
Manual
Manual
Manual
Manual
Manual
Manual
Manual
Manual
Manual
3,',|22.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Manual 1.0000
Manual 1.0000
Manual 1.0000
0.0400 0.8000
0.0800 0.8000
0.8100 0.8000
0.6200 0.8000
1.2200 0.8000
0.6200 0.8000
0.5000 0.5000
0.7000 0.5000
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.0000
0.0000
0.0000
2.5600
8.4000
6.4800
9.9200
5.85S0
9.9200
3.5000
4.9000
Page 1 of 1
ilt ilr mlllllllll lll illll ll lll
Quotation& Industrial Supply
P.O. Box 13250
Spokane, W499213-3250
.H.",
QUOTE TO:
ASCENT MECHANICAL
POBOX3S
RATHDRUM, ID 83858-0038
QUOTES DO NOT INCLUDE TAX!
SHIP TO:
ASCENT MECHANICAL
ELLENSBURG RODEO IM PROVMENTS
101O E 8TH AVE
ELLENSBURG, WA 98926
EXPIRATION DATE QUOTE NUMBER
o6t1112026 s100639223
Branch
M & L SUPPLY CO., INC.
41 14 E. FERRY AVE.
SPOKANE, WA 99202
509-5354774
Fax 509-534-6596
PAGE NO
1of 1
CUSTOMER NUMBER CUSTOMER PO NUMBER JOB NAME / RELEASE NUMBER SALESPERSON
14066 CI SAN AG NORTH IDAHO
WRITER SHIP VIA TERMS SHIP DATE FREIGHT ALLOWED
RYAN WESTERMAN 2o/o 10th Net 25th 05t11t2026 No
ORDEROTY DESCRIPTION UNIT PRICE EXT PRICE
8oft
1 00ft
1Oea
80ea
90ea
2Oea
2Oea
6ea
16ea
2Oea
T00 006770
2" X10'NH Ct PIPE
T00 006794
4'X 1O'NH CI PIPE
T00 006879
4" NH 1/4 BEND
TO4 22006
2" 2006 ANACO HUSKY HEAVY DUTY
WIDE BODY NH CPLG
r04 42010
4" 2O1O ANACO HUSKY HEAVY DUTY
WIDE BODY NH CPLG
T00 007999
2" X 1.112" NH TAP SAN TEE
T00 009429
2'NH TEST TEE WOUT PLUG
T00 009443
4'NH TEST TEE WOUT PLUG
PH1 2260
2" 260 BLK CLEVIS HANGER (450)
PH14260
4" 260 BLK CLEVTS HANGER (450)
1184.7651ft
2126.2351ft
36.106/ea
9.648/ea
12.9551ea
26.335/ea
21.8061ea
62.8941ea
1.550/ea
3.600/ea
947.81
2126.24
361.06
771.82
1165.91
526.71
436.12
377.36
24.80
72.00
Subtotal
S&H Charges
6809.83
0.00
Amount Due 6809.83
Printed By: RYANW on 5/11/2026 8:08:51 AM
ilr llt [ilillllll llllllllll lll
Quotation& Industrial Supply
P.O. Box 13250
Spokane, WA 99213-3250
,iln.-,.
QUOTE TO:
ASCENT MECHANICAL
POBOX3S
RATHDRUM, ID 83858-0038
QUOTES DO NOT INCLUDE TAX!
SHIP TO
ASCENT MECHANICAL
ELLENSBURG RODEO IMPROVMENTS
1O1O E 8TH AVE
ELLENSBURG, WA 98926
EXPIMTION DATE QUOTE NUMBER
o6t11t2026 s100639224
Branch:
M & L SUPPLY CO,, INC.
41,I4 E. FERRY AVE.
SPOKANE, WA 99202
50s-535-4774
Fax 509-534-6596
PAGE NO.
1ol1
CUSTOMER NUMBER CUSTOMER PO NUMBER JOB NAME / RELEASE NUMBER SALESPERSON
14066 PVC SAN AG NORTH IDAHO
WRITER SHIP VIA TERMS SHIP DATE FREIGHT ALLOWED
RYAN WESTERMAN 2o/o l}lh Net 25th 05t1112026 No
ORDER QTY DESCRIPTION UNIT PRICE EXT PRICE
80ea
90ea
8oft
100ft
1Oea
20ea
6ea
20ea
14ea
14ea
FC13000-22
FERNCO PROFLEX 2" X2" CI/PL CPLG
FC1 3000-44
FERNCO PROFLEX 4" X4" CI/PL CPLG
PV2 2PVCDWVSOLID
2" X2O'PVC DWV SCH4O SOLID CORE
PE PIPE
PV2 4PVCDWVSOLID
4" X2O'PVC DWV SCH4O SOLID CORE
PE PIPE
RGo 44807
4'PVCDWVHXH90ELL
RGo 24814
2" PVC DWV H X H X C/O TEE W/ PLUG
RGo 44814
4' PVC DWV H X H X C/O TEE WPLUG
RGo 221 124811
2" X2" X 1-112" PVC DWV H X H X H
SAN TEE
PH1 2260
2" 260 BLK CLEVIS HANGER (450)
PH1 4260
4" 260 BLK CLEVIS HANGER (450)
9.656/ea
16.1251ea
95.833/ft
287.3611ft
11.905/ea
6.687/ea
22.O7Olea
2.957|ea
1.937|ea
4.500/ea
772.48
1451.25
76.67
287.36
1 19.05
133.74
132.42
59.14
27.12
63.00
Subtotal
S&H Charges
3122.23
0.00
Amount Due 3122.23
Printed By: RYANW on 5/1'112026 8:09:01 AM
D ate s : 4/27/26-4/30/26
OT Hours MT 1
OT Hours MT 2
OT Hours MT 3
Totat OT Hours
O pe rator with Eq ui p ment Rate: $725/hou r
Management Hours
Labor Rate: $75/hour
Labor Cost
Tractor Rental
Rock Picker Rentat
Loss of Event Revenue
$
$
$
$
$
55.68
30.55
25.91
7L2.1.4
26
15,967.50
2,389.20
3,258.00
325.00
TotaI for reimbursement 21,939.70
[nvoieeXoto
KVEC posted rate schedute for [abor with equipment is $125lhour (rate since 2018)
KVEC posted rate schedute for generat tabor is $ZSlhour (rate since 2022)
Not charging for any of the volunteer hours
lnvoices for equipment rentaI attached
INVOICE
Bitt Lowe
1030 Nicotai Rd, Etlensburg, WA 98926
Phone: 509-929-3548
CUSTOMER:
Kittitas Vattey Event Center
901 ETth Ave, Eltensburg, WA 98926
COMMENTS OR SPECIAL INSTRUCTIONS:
KVEC witt pick up and return rental equipment.
|NVOICE # 2026-1
DATE: 511126
QUANTITY DESCRIPTION PRICE PER DAY TOTAL
4 Rental of Rock Picker 750.00 3,000.00
3,000.00
258.00
0.00
3,258.00
Subtotat
Tax
Shipping and handting
TOTAL DUE
nncnrilERY
RUN DATE: 05105
oPEN DATE: 04124
SHIP DATE: A4/24
RENTAL INVOICE
TNVOICE NO:690005200
BILLING DATE: 5/05/26BRANCH: 69PAGE: 1
/2026
/2026
/2026
Psp6lr,i.dlmry, hs. PO 80x t05zl, Eugsre, OR 97440
CONTACT:
PO NUMBER;
SALESMAN: O UNASSIGNED
6906 ANDREW MEYER
** CUSTOMER ** ** SHIP TO **
34725A KITTITAS VALLEY EVENT (JD) KITTITAS VALLEY EVE
CENTER 9O]. EAST 7TH AVE SUITE#I
9O]- E 7TH AVE
ELLENSBURG WA 98926 EIIENSBURG WA 98926
SHIP VIA: PAPEI MACHINERY
CONFIRM #: 6900052
=:====::::::::=:=::::===::::=:=::::===:::=::::::=-*==€*F=*=:==========e==:Ee=:==:ORDER#STARTENDQTYRATED]SCEXTENDED=
::====::::::::=:==:::==:::::::=:::::==:::::::=::-:::::===:::===-=--:=E5g==e=-H
N6012759 04/24/26 0s/0s/26
Seria1 #- l-P06135ECN60t2759 -00 JD 6135E
TRACTOR| 6l-35
l-.00 2,2A0.A0 2,2oA.OA
REMIT TO: PAPf MACHINERY
PO BOX 35144 #5077
SEATT],E, WA 98124-5L44
TELEPHONE : 509-494-8808
TOTAL AMOUNT2 2,200.00
STATE/LOCAL TAX: ].89.20
INVOICE TOTAL z 2,389 -2A
*** TERMS: PAYMENT DUE 05/15/2026 ***
Payment should be by cash, check or ACH/wire transfer
Thk rcnlalls subjectto pap6,8 Rental Terms and condlllons efrf}caive on lhe dale hg,Tf,,l,which arc tn(f,,ryonled tn futl by lhk nfercnce' fhe Re''',,l
Tems and Condialo,rs arc avaltabte et Vwuetoe.conlllllw., and wlll alsp be sent by nall ot Flnatl lo lhe Purchaset upon rcquesL
1.004 caNlroN RoAD
TASIIIIITBY BIJIJENSBtrRG, wA 98925 Short-Term Re ntaUDe mo Agreement
ship To: (irD) KrrrrTAs VALLEY EVE
Phone#: 509-952'7539
(,ID) KITTITAS VAITLEY EVE
901 EAST TTII A1IE SUITE#I
ELITENSBURG wA 98926
Contact:
DESC
HoURS: Standard usage is g hrs, per dav, 40 hrs' p€r reek, or 100 hrs. per 4 weki
HEREBY EXPRESSLY OISCI.AIM
coNsiQuE.rfiAt D MA6EI
ALL WARRANTIE' EITHER OR A PARTICULAR PURPOSE ANO SHALL NOT BE LIABLETO LESSE€ FORAI.JY
OAMAGE$ TO FROPENTY,OAMAGE5'
Lc$*e har ra.d rild undairrandr rh€lewtomc{ lnlai3ls}
LO55 DAMAGE WAIVER: Unless yry prdlde sufficient of plrysical damage iniuranca on the Equipment, you are p.ovided with and charged for the L6s OamaBe waiver {LOW, to caver your r€iponslbiiity fot any los, dest.uction or
damage {Losss} to the Equlpment.YOU REMAIN RESPONSIBLE FOR THE FIRST S1,OOO PER INCIOENT OF ANY LOSsESTO THE EQUIPMENT, NORMAL WEAR AND TEAR EXCEPIED, WHILE IT IS IN YOUR POSS€SsION OR CONTROL, If ANY
Losses result from ab$, grss negligence or other willful mi*onduc, yo a.e.esponsible forthe full amount of Losse: even ifthe LDW lsln ef€cL LDW isnot mandatory and yi have tie opuon of not paying for ltifyou Prdide, lN
ADVANCE OF RENTAL OFSQU'PMENT,
insuaance.
Le5see/Recelved BtE Date:4.27.26 Lessd:Corporate Rental Manage.
Egodtqc dcdgnoa.t crPeSt Tdms@dCoaditl#.fi.ctlv.nth.a&.hcrco!,whlchtclncqpeot.dinf/,lbvchlcrefuorcc-TlvRctrto,TanaendCildlalo*q.@ef/l.bt dw.E&a@l!!g4tendwril
do b rrovl/cd by mdl q emall uPa ..qu3.t- L.*.
atily eA it noe rq Fread' lenlly o hcwchcld w.
347250
Phone# so9-962-7639
Bill ro: KrrrrrAs VArJTJEY Evglrr
CE}TTER
901 E TTII AVE
EI,LENSBURG WA 98925
Customer Number
59 00052
1013
AprLL 24, 2025
AprLl 24, 2026
'''ay
OL, 2026
Contrac{ Number
Jobsite #
Guslomer P.O. No.
DelMery Date
Rental Start Date
Contract Est. Return Date
Called Off By
ir--,-i------
Sabsman: UNASSIGNED Agreed Value: gO . 00
$s, s00 . 00$2,200.00$440.00
Orderecl Byl
Descrlption 4 wk/100 hrg (oT)nlc/40 bre (or)Ratee: Oay/8 brg (OT)
RenlalTerm:F Ship Via: PAPE t MACHINE Hauling Rate:
Qty ltkluodgl SeriaL *
1 JD,/61358 1P06135ECN601-2759 TRACTOR,6135
s/N: 1P061358CN6012759
Meter Hours Out: 309
ac*fir cuch
''nr
nd eknwlcdil* ,ccclpa 4 6 ax.ec.d .opy of thi' AEr.emcut. L.$. r.prenae ond warrcdac lhdt ahc Eqnpme^t lE 6f:tlq rcnced lv ,fltstrnw ptrpea