Loading...
HomeMy WebLinkAbout1_StaffReport_Amend_IF_Contract KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: May 19, 2026 ACTION REQUESTED: Request to Approve the Resolution to Authorize Chair Signature on Amendment No. 3 to Professional Services Agreement with Inter-Fluve, Inc. for Lower Kittitas Reach Floodplain Reconnection Project Restoration Engineering, Design, and Permitting Services. ___________________________________________________________________________________ BACKGROUND: Resolution 2024-155 selected Inter-Fluve, Inc. for restoration engineering, design, and permitting services for the Lower Kittitas Reach Floodplain Reconnection Project and authorized the Public Works Water Resource Manager to negotiate and execute the professional services agreement. During the April 27, 2026, Public Works Study Session, staff briefed the Board of County Commissioners on the need to implement Amendment No. 3 to Professional Services Agreement with Inter-Fluve, Inc. and received direction to prepare enabling documents. INTERACTION: Public Works. RECOMMENDATION: Approve the Resolution to Authorize Chair Signature on Amendment No. 3 to Professional Services Agreement with Inter-Fluve, Inc. for Lower Kittitas Reach Floodplain Reconnection Project Restoration Engineering, Design, and Permitting Services. HANDLING: Return two (2) originals to Public Works. ATTACHMENTS: Resolution and Amendment No. 3 LEAD STAFF: Arden Thomas, Water Resource Program Manager. BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. ______________ RESOLUTION TO AUTHORIZE CHAIR SIGNATURE ON AMENDMENT NO. 3 TO PROFESSIONAL SERVICES AGREEMENT WITH INTER-FLUVE, INC. FOR LOWER KITTITAS REACH FLOODPLAIN RECONNECTION PROJECT RESTORATION ENGINEERING, DESIGN, AND PERMITTING SERVICES WHEREAS: Resolution 2024-155 selected Inter-Fluve, Inc. for restoration engineering, design, and permitting services for the Lower Kittitas Reach Floodplain Reconnection Project and authorized the Public Works Water Resource Manager to negotiate and execute the professional services agreement; and WHEREAS: Section 12 of the General Conditions of the contract authorizes modifications that are in writing and signed by each of the parties; and WHEREAS: Amendment No. 3 to Professional Services Agreement with Inter-Fluve, Inc. for Lower Kittitas Reach Floodplain Reconnection Project Restoration Engineering, Design, and Permitting Services is attached hereto and incorporated herein by this reference. NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners finds it in the best interest of the public to authorize Chair Signature on Amendment No. 3 to Professional Services Agreement with Inter-Fluve, Inc. for Lower Kittitas Reach Floodplain Reconnection Project Restoration Engineering, Design, and Permitting Services. DATED this 19th day of May 2026, at Ellensburg, Washington. BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON ________________________________ Cory Wright, Chairman Attest: ☐ Clerk of the Board- Julie Kjorsvik ________________________________ Brett Wachsmith, Vice-Chairman ☐ Deputy Clerk of the Board- Mandy Buchholz _______________________________ ________________________________ Laura Osiadacz, Commissioner Professional Services Agreement Amendment No. 3 – Lower Kittitas Reach Floodplain Project Page 1 AMENDMENT NO. 3 TO PROFESSIONAL SERVICES AGREEMENT WITH INTER-FLUVE, INC. FOR LOWER KITTITAS REACH FLOODPLAIN RECONNECTION PROJECT RESTORATION ENGINEERING, DESIGN, AND PERMTTING SERVICES The terms and provisions of the Agreement for Professional Services executed on September 13, 2024 apply herein unless otherwise specifically revised. Amendment to Project Scope Inter-fluve, Inc. will assist Mid-Columbia Fisheries in the production of technical specifications and typical drawings to support the revegetation plan development. Amendment to Project Budget The budget is increased by $108,415, from $875,769.10 to $984,184.10. The increased budget includes the additional cost needed to complete the scope of the contract and shown in the budget detail in Exhibit A ($108,335) plus an $80 discrepancy between the original contract amount and the original budget exhibit. Reason for Amendment: Additional funding is needed to complete the project scope due to design refinements necessary to ensure the project meets habitat restoration and agricultural land use objectives. At the 60 percent design stage, revisions are needed to address site hydrology and optimize project performance. Additionally, additional time will be needed to coordinate with Mid-Columbia Fisheries on the revegetation component. APPROVED: Inter-Fluve, Inc. Kittitas County Signature of Signatory Date __________ Date_______________ Print Name of Signatory Print Name of Signatory Lower Kittitas Floodplain Reconnection | Kittitas County Public Works E S T I M A T E D H O U R S D I R E C T C O S T S BY RESOURCE BY ITEM BY COST Principal Technical Principal Senior Staff Staff Technical Staff Admin. Support Total POV Mileage (2026 fed rate) Per diem (2025 fed rate)POV Mileage Per diem Supplies IFI Total Floyd-Snider NHC HRA 2026 Rates $315 $240 $220 $184 $143 $99 $0.725 $178 Task 1: Project Management, Coordination, and Meetings per hour per hour per hour per hour per hour per hour per mile per person/day 1.1 Kick-off meeting and site tour -------$ ---$ -$ -$ -$ -$ -$ -$ 1.2 Recurring meetings -14 24 -12 -10,356$ ---$ -$ -$ -$ -$ -$ -$ 1.3 Ongoing management, communications, and reporting -20 20 -20 12 13,248$ ---$ -$ -$ -$ -$ -$ -$ 1.4 Stakeholder/Landowner engagement -5 10 -5 2 4,313$ ---$ -$ -$ -$ -$ -$ -$ SUB TOTAL - 39 54 - 37 14 - - -$ -$ -$ Task 1 IFI Estimate 27,917$ IFI Hours Total 144 IFI Labor Total 27,917$ IFI Direct Cost Total -$ Task 1 Subs Estimate -$ Subs Task Estimates -$ -$ -$ Task 1 Total Estimate 27,917$ Task 4. 60% Design 4.1 Follow-up survey -------$ ---$ -$ -$ -$ -$ -$ -$ 4.2 Modeling and analysis -5 20 -6 -6,458$ ---$ -$ -$ -$ -$ -$ -$ 4.3 60% Design package 2 20 20 -8 -10,974$ ---$ -$ -$ -$ -$ -$ -$ 4.4 60% Design - on-site review meeting -12 12 --1 5,619$ 400 2 319$ 392$ -$ 711$ -$ -$ -$ 4.5 60% Design - Technical Advisory Group meeting -3 3 ---1,380$ ---$ -$ -$ -$ -$ -$ -$ 4.6 60% Design - planting plan coordination with MCFEG 4 132 -36 35,148$ SUB TOTAL 2 40 55 - 14 1 400 2 319$ 392$ -$ Task 4 IFI Estimate 60,290$ IFI Hours Total 112 IFI Labor Total 59,579$ IFI Direct Cost Total 711$ Task 4 Subs Estimate -$ Subs Task Estimates -$ -$ -$ Task 4 Total Estimate 60,290$ Task 5: Final Design 5.1 Modeling and analysis -----$ ---$ -$ -$ -$ -$ -$ -$ 5.2 Draft Final Design package (aka 90%)-------$ ---$ -$ -$ -$ -$ -$ -$ 5.3 Draft Final Design - Technical Advisory Group meeting -------$ ---$ -$ -$ -$ -$ -$ -$ 5.4 Final Design package (100%)------$ ---$ -$ -$ -$ -$ -$ -$ 5.5 Draft Final & Final Design - planting plan coordination with MCFEG 12 68 -16 20,128$ SUB TOTAL - 12 68 - 16 - - - -$ -$ -$ Task 5 IFI Estimate 20,128$ IFI Hours Total 96 IFI Labor Total 20,128$ IFI Direct Cost Total -$ Task 5 Subs Estimate -$ Subs Task Estimates -$ -$ -$ Task 5 Total Estimate 20,128$ TOTAL IFI ESTIMATE 108,335$ IFI LABOR TOTAL 107,624$ IFI DIRECT COST TOTAL 711$ TOTAL SUBS ESTIMATE -$ SUBS ESTIMATE TOTALS (incl 10% markup)-$ -$ -$ TOTAL ESTIMATE 108,335$ 60% Design through Final Designs - Amendment SubcontractorsOffices Nationwide 501 Portway Avenue, Suite 101, Hood River, Oregon 97031 541.386.9003 www.interfluve.com