Loading...
HomeMy WebLinkAbout230076_Kittitas_County_Jail_Facilities_Renovation_701_CO-12Docusign Envelope ID: C25FA4F8-E33D-86B7-827D-CBC596D54968 4/21/20264/21/2026 P.O. BOX 926 / 700 EAST MOUNTAIN VIEW AVE, SUITE 504 ELLENSBURG, WA 98926 O: 509-925-9747 C: 619-278-8554 scottc@belsmith.com April 15, 2026 Re: J Mod Modifications Per your request, we are pleased to offer the following change order proposal #19 (COP 19). If approved, Belsaas and Smith’s onsite team will make the requested upgrades to the J Mod space. This will include: •Installing a new porcelain wall-hung toilet in the restroom •Cleaning and sealing the floor tile grout in the restroom •Installing a new 3/0 x 7/0 18ga flush door and associated hardware •Cutting and grinding the supports for the tables and seating and patching the flooring smooth •Installing the selected carpet squares throughout the entire room •Making all the requested electrical modifications •Painting all the walls and the new door to the restroom Total cost of proposal: Forty-One Thousand Four Hundred Seventy-Nine Dollars $41,479.32 + WSST *Note: Door lead time is 8 weeks from change order approval unless a wood or spare door is approved Sincerely, Scott Carlson Belsaas & Smith Construction Docusign Envelope ID: C25FA4F8-E33D-86B7-827D-CBC596D54968 BELSAAS & SMITH CONSTRUCTION SHEET 1 of 2 C.O.P. #19 CHANGE ORDER PROPOSAL BREAKDOWN SHEET UNIT COSTS EQUIP SUB MATERIAL LABOR #DESCRIPTION QUAN.UNIT Mat.EQUIP LABOR COST COST COST COST J Mod Modifications Project Management 20 HRS 102.00 -$ -$ -$ 2,040.00$ -$ -$ -$ -$ Demo (2 Carpenters x 8 Hrs @ $102)16 HRS 102.00 -$ -$ -$ 1,632.00$ -$ -$ -$ -$ Grout 10 EA 20.00 -$ -$ 200.00$ -$ -$ -$ -$ -$ Flooring 1 LS 3,959.00 -$ 3,959.00$ -$ -$ -$ -$ -$ -$ Electrical 1 LS 1,360.00 18,272.00 -$ 19,632.00$ -$ -$ -$ -$ -$ -$ Paint 1 LS 4,500.00 -$ 4,500.00$ -$ -$ -$ -$ -$ -$ Door and Door Hardware 1 LS 2,383.00 -$ -$ 2,383.00$ -$ -$ -$ -$ -$ Door Installation 4 HRS 102.00 -$ -$ -$ 408.00$ -$ -$ -$ -$ Dump Fees and Trailer 1 LS 200.00 200.00$ -$ -$ -$ -$ -$ -$ -$ Tile Grout 2 HRS 102.00 -$ -$ -$ 204.00$ -$ -$ -$ -$ Toilet (Kohler 84325)1 LS 180.00 731.13 -$ -$ 180.00$ 731.13$ -$ -$ -$ -$ New Flush Valve w/Sensor - add $347 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ *TOTALS 200.00$ 28,091.00$ 2,763.00$ 5,015.13$ Docusign Envelope ID: C25FA4F8-E33D-86B7-827D-CBC596D54968 BELSAAS & SMITH CONSTRUCTION SHEET 2 of 2 C.O.P. #18 CHANGE ORDER PROPOSAL BREAKDOWN SHEET EQUIP SUB MATERIAL LABOR COST COST COST COST TOTALS FROM PREVIOUS PAGE 200.00$ 28,091.00$ 2,763.00$ 5,015.13$ OVERHEAD 3%6.00$ 842.73$ 82.89$ 150.45$ PROFIT 10%20.60$ 2,893.37$ 284.59$ 516.56$ BONDING 1.5%3.40$ 477.41$ 46.96$ 85.23$ SUB TOTAL 230.00$ 32,304.51$ 3,177.44$ 5,767.37$ SUB TOTAL 230.00$ 32,304.51$ 3,177.44$ 5,767.37$ LABOR 5,767.37$ MATERIAL 3,177.44$ EQUIPMENT 230.00$ SUBCONTRACTORS 32,304.51$ SUB TOTAL SUB TOTAL 41,479.32$ PREVIOUS CO ALLOWANCE GRAND TOTAL TOTAL 41,479.32$ TIME EXTENTION REQUIRED: NOTICE TO PROCEED REQUIRED BY: WE RESERVE OUR RIGHTS UNDER THE CONTRACT TO ACCESS THIS CHANGE CUMULATIVELY AS IT AFFECTS TIME AND AMOUNT. 4/21/26 Reviewed Docusign Envelope ID: C25FA4F8-E33D-86B7-827D-CBC596D54968