HomeMy WebLinkAboutChange Order 6 Fully ExecutedKITTITAS COTJNTY
Board of County Commissioners
AGENDA STAF'F REPORT
AGENDA DATE:March 17,2026
ACTION REQUESTED: Request Board of County Commissioners' approval to sign Change
Order No. 6 on the Rodeo Arena Improvement Project.
BACKGROT]ND:The County has been working on renovations and improvements to
the existing Kittitas County Rodeo Aren4 as part of the project with
have run into unknown conditions and to make other changes to
bccommodate operations of the facility.
This change order includes Electrical Utility changes, Water main
connect location change required by the city, changes to the landings
and ramps for the walk bridge, and a credit for changing on site
domestic water to HDPE from copper.
INTERACTION:ALSC Architects, Event Center Staff, and Maintenance.
RECOMMENDATION:Recommend Boards approval to for Chairs signature on Change
Order No. 6 for Kittitas County Rodeo Arena Improvement Project.
HANDLING:Original - Clerk of the Board
ATTACHMENTS:
LEAD STAFF:
Change Order 6
Patti Stacey
ti';' . i l, i, : j :.'i il .lii 'i ri':
F\L5{"-"
CHANGE ORDER NO. 6
PROJECT NAME:
OWNER:
CONTRACTOR:
PROJECT NO:
SPOKANE
:ii.l.l i.J t\/':.riir!r :iliar l
:,!-:li !: .1!)il
i;! i,-tk.ii :t:, !i,',.\
qil..i0 :
' :)i.lf . l:,i: tlir':)l-\
Elleneburg Rodeo Arena Complelion
Klttltae County
Cascadc Contral Constructlon
2028-O0S
,: ! ii;i;aa i i] rl..::i. a-'i ]I i ]
PAGElof 23
DESCRIPTIO}.I OF GHANGE:
COP 19 - Electrical Utili$ Plane
COP 2I - RFP 5 - New POC for water rnain
COP 23 - RFI 020 - Receptacle attachm€nt palntng
COP 24 - RFI 072 - FRP al mop sink
COP 25 - RFI 076 - South walk bridge landlng location condition
COP 26 - HDPE Credlt
COP 27 - RFI 090 Gate Valve
COP 28 - RFI 082 - Flber Conduit Under Arena
Original Contract Sum
Net Amount of Previously Approved Changes:
Contract Sum Priorto This Change Order:
Contract Sum is inoreased by This Ghange Order:
Revlsed Contract Sum:
Original Contract Completion Date:
Prevlously Approved lncreases in Time:
Completion Date Priorto Thie Change Order:
Contract time will be chanoed by
Calendar Days This Change Order
Revised Substantial Completlon Date:
Revised Final Acceptance Dale:
Amount
$18,862,66
s65,165.15
s729.06
$732.t1
$21,870.87
($12,655.02)
$3,981.32
02,052.65
Total Thlr Change Ordar: $100,739.00
$5,065,000.00 Accepted by Conlractor:t
$1,21 2,260.35 (c'.+c-*L
$6,277,260.38 By:
Dale$l .739.00 3 g e
$6,377,999.35 Recommended By:
ALSC Architects,P.S.
7t2012026 lra-TYrJ.,
7
By:
Date
IIL
7t23t2026
0
7127i2A26
Approved
By:
Date812212026 oolrt wb
'Does not include Stata or Local Sales Tax ALSC Archilects lWe bring our clients stories to life.
G
P.O. Box tto
Wenatchce, llVA. 08807{l l9
Phonr 60t.882.7'll9
Fax 00t{62.0380
County Comissioners
West Sth Ave, Suite 108
Ellensburg, WA 98926
MAKE CHECKS PAYABLE TO:
cascadc Ccntral Conslruction, LLC
P.O Box {{9
Wonaichcc, WA. 98807{ll 19
PROPOSAL
PROJECT: Ellcnsbulg Rod3o Aicna lmprorramrntE
coP# 19
DATE: Matah 9,2028
TITLE: Ehcrkd lftlllty Planc Rcv.l
CASCADE
CENTRAL
Ddt DB8CRIPNOI ouAt{tfllY uoil UM' PRICE Atoultr
ugt20m Suboontractor Coat
Earthuork Subcontraclor - See attached Back-up 1 LS $18,060,00 $7,806,00
Ebc'trical Subcontractor - soa attachsd Becl(-up 1 LS $33,306,00 $7,614.00
6% Mark-uF gdo 80
Subconlractor - Sub Total 16.820.80
gst20a Caccad. C.ntal Constuction Cost
Sup€rvision 6 HR $12E.'t6 s1,025.44
Ggnaral Conditions U wu $925.00 $o.oo
Prcject Managpmont & coordination 4 HR $191.54 $040.16
Projec-t Engineer 4 Ht<$114.25 $465.00
Labor6r 0 HR $03.08 $0.00
Carpentor 0 HR $1 19.00 $0.00
15% Mark-utr 320.45
G6n6ral Crntractor - 9Ub Total 2 457 09
ttumotat 19 077 a9
HOnd slal ,4
EtaT 09
'19 528 2?
uw20re Concrcir Enaccm.nt Crcdit Pal RFI 0t2 Rcspons.
Cemont Mason -2 HR $41./6 ($163.501
Concrete CY $250.00 ($500.001
(603.
1U.UgZ.tst
Qualificatiom:
lnclud.d:
-Excavation and backfill for duc,t, vault, tansformgr, primary conductoF, and trench from metgr oatinst to io now transfiormsr
-Ecology Blocks
€onduit and Wra frpm mater cabinEt to nstvtransformer
Excludcd:
.gy utility provider: All removal and domo. Supply and install of duct, vault, transformer, and primary conductors/conduit.
Concrete oncasemgrt from metor cakinot to utility tranformar vault
.Utility tee6.
Sch.dulc impecl: Nons. Excluding any potential lead tim€s or schaduling a$ociatsd with utility scop€ of rcrk.
TH ANK YOU FC'R YOUR AUS"VESSI
(Y/A|S7 Rr( "t',tOh',
l,.Jir ''
SELLAND P.O. Box 119 Wonatqhos, WA98807
?hors: (509)662-?119 Tax: (5@)66.}'4465
Bld Datel
Ellensburr Rodeo Arena lmorovements. CIW Electrlcal Trenchlnr & BF COP
lanuary26,2026
lrli;i;l;rr,1 .ctrr \rrl
Ouallflcatlons: Pleai€ Read Carafullv
1. washlngton State Sahs Tax has been not been lncluded ln proposal.
2. Prevalllng wage ha$ been accounted for ln proposal,
3. Any scope of work not speclflcally lncluded as a llne kem ln thls proposal ls exclud€d'
4. Actual quantltles lnstalled shall be tracked/meagured and the basls of payment at the unlt prlces lncluded ln thls proposal unless otherwlsa agreed'
S. Due to global supply chaln dlsruptlons and market volatlllty we reserve the excluslve rlght to adjust our proposal for materlal oscalatlon'
6. Proposal ls valld for 30 days. Thls proposal shall be made part of any subconract.
lf you have any questlons or need addhlonal lnformatlon wlth regard to our proposal please glve us a call.
Slncerely,
sErrAND CONSTRUCT]OU rNC.
3?-*
James Flowers
(509) 881-0339
Page 1 of I
McGann Electric CCC
Contractor Breakdown Summary
Project Name:
Project No.
Contractor:
Description:
CRAFT LABOR COSTS
Direct Labor Costs:
a. crew (apprentices, journeymen, & laborers)
b. foreman
c. superintendent
Ellensburg Rodeo Arena lmprovements Additional Utility Service Requirer
Source Documents: Jack McGann
coP-t4R
Date:
Contractor Ref. No.
3t9t2026
McGann Electric
Cost includel labor and materials required for the further relocation of utilty meter cabinet per response to RFI 005.Cost to
expedite utiltiy metercabinet. Exclusions: additional trenching, backfill, backfill material, ecology blocks, any and all utility
fees associated with utiltiy plan.
Itemize all costs on attached COP Cost Breakdown form.
Supervision:
d. direct supervision (NTE 15% of 1al
e. safety (NTE 2% of lines 1a, b, & c)
2. MATERIAL COSTS
a. material costs
b. freight costs (itemize)
3. EQUIPMENTCOSTS
a. owned equipment (per spec approved source)
b. rental equipment (per invoices attached)
4. SMALLTOOLS
a. small tools (NTE 5% of 1a & b)
5. OVERHEAD & PROFIT
NTE 15% portion of '1, 2,3, & 4 up to $50,000
6. SUB.SUBCONTRACTORS
7. OVERHEAD & PROFIT ON SUB.SUBCONTRACTORS
a. NTE 15% of Line 6 up to $50,000 for each sub
8. INSURANCE
$ 1,711.24
$
DIRECTLABORSUBTOTAL $ 1 711.20
0.15 % ol 1
0.25 % ot 1-7
$34.22
1. CRAFT LABOR COSTS $ 1,745.00
$ 4,885.20
2. MATERTAL COSTS $ 4,885.00
$
3. EQUIPMENTCOSTS $
$87.25
4. SMALL TOOLS $87.00
SUBTOTAL 1 thru
$ 1,074.72
$
5. OVERHEAD & PROFIT $ 1,075,00
6. SUB-SUBCONTRACTORS $
$
$
7. OVERHEAD & PROFIT ON SUB-SUBCONTRACTORS $
$2.62
$19.48 8. INSURANCE $22.10
9. BOND $
TOTAL
Electric/2025 Ellensburg Rodeo 9.30/COPs/COP14 Additional
lssued 3/9/2026
$
a.
b.
a.
b.
c.
d.$
a. payroll driven liability insurance
b. volume driven liability insurance
9. BOND
a. bond 0.03 % of 1-8
https://mcgannelectric-my.sharepoint.com/personaUjackmcgann-mcgannelectric-com/Documents/McGann
Service Enlrance/Ellensburg Rodeo Arena COP-14 Additional Utiity - Copy Summary
$71
814.00
Cost Breakdown
Project Name: Rodeo Arena lmprovments additional Utility Service
Project No.
Contractor: McGannElectric
coP-t4R
3t9t2026Date:
Contractor Ref. No.
Total
Cost
$
$
$ 1.711.20
$
$
$
$
$
$ 440.40
$ 1,804.80
$
$
$
$
$ 2,640.00
$
$
$
$
$
$
$
$
$
$
$
$ 6,596.40
ripment
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Unit $
Material
Cost
$
$
$
$
$
$
$
$
$ 440.40
$ 1,804.80
$
$
$
$
$ 2,640.00
$
$
$
$
$
$
$
$
$
$
$
$ 4,EEs.ZO
Unit $
$3.67
$3.76
$2,640.00
Labor
Cost
$
$
1,711.20
$
$
$
$
$
$
$
$
$
$
$
$
$
1.711.20
$
$
$
Unit $
$106.95
Unit
Tvpe
HR
FT
FT
LT
2t2017
Quantity
16
120
480
I
Description
Electrician Labor
4" pvc sch40
5OO AL
EATON E>pedite fee
Labor Subtotal
Subtotal Cost of Work
Utiity - Copy Cost Breakdown lssued 3/9/2026
AF,,P.
REQUEST FOR PROPOSAL NO: 05
Project Name: Ellensburg Rodeo Arena Completion
Owner: Kittitas County
Contractor: Cascade Central Construction
Job Number: 2025-009
$POKAt{l
?C3 N Wcrshrnglor
Sull* 400
Spoko.e. wA
t920 I
r ii09.838.8568
elsccrclliects. corrr
Page 1 ot2
TO: Cascade Central Construction, Contractor, please furnish your proposal for performing the changes outlined
below and/or detailed on the attachments referred to:
Revisions to Civit drawings per City of Etlensburg direction for new connection point to 12" main instead
of 8" line previousty noted.
Reconnection of existing water [ines from the east to the new water service.
ALSC P.S_By Todd Date:_2/0826
PROPOSAL:
To the Owner: We propose to perform all changes described in the above request for a total ADDlTlON/nlE U€lt{€l+
(cross out one) to the contract sum of:
Sixtv-Five Thousand One Hundred Sixtv-Five and 15i100 Dollars 65,165.15
(not including Sales Tax)
We have attached cost estimate detail sheets, and the foregoing amount covers all direct and indirect costs related to
this proposal and to the
remain in fullforce and
calendar days because
after this date.
effect of the proposal on the remainder of the project. All other provisions of the contract
effect. We request the completion date be EXTENDED/REDUCED (cross one out)0
of this work. The Contractor agrees to be bound to quotation for sixty (60) days
Cascade Central Construction KC Carroll Date 31512026
Contractor
RECOMMENDATION:
TO: Owner, we have examined the foregoing proposal and find it to be appropriate for the request. We recommend
its acceptance.
ALSC itects- P-S-Date:_
PROPOSAL AGGEPTANCE:
The Owner hereby accepts the foregoing proposal. This instrument, when signed below, constitutes the conditions
upon which a Change Order will be issued.
Date-
a
a
Owner
ALSC Architects \\We bring our clients' stoties lo life.
c0ltsTRutTlsilcCASCADE
CEI{TRIL PROPOSAL
F.O. Box ll9
Wenatchee, WA, 98807{l{9
Phon! !09€82.7119
Fex !09{624t80
To:
Kittltas County Comissioners
205 West Sth Ave, Suite 108
Ellensburg, WA 98926
MAKE CHECKS PAYABLE TO:
CascadG Ccntral Comtruction, LLC
P.O Box l{9
Wcnatchcc, WA 98807{1119
THANK YOU rcR YOUR SUS,,VESS'
PROJECT: Ellenrburg Rodco Arcna lmprovcmcntt
@P#21,
DATE: tilarch t,2028
TITLE: Ncw PoG for Wfi. ll,hin Rcv.2
DEI.OEgCiIPflON OI,AMTIW uoltl UNlt PruCI atoljl{t
3t5t20',6 Subcorlractol C6t
Civil Subcontractor - Se6 attached back-up 1 LS $54,922.77 $54,522,27
Concrete Suboontractor - see attached baok-up 1 LS $2,123.t3 $2,123.7n
$0.00
o% Marl(-utr 3.422.76
Suboontractor - Sub Total 60 d68 78
3t5t202f Cascad. C.naal Consltuction Cost
Supevlsion B HR $128.18 $1,025.44
General Conditions 0 WD $925.00 $0.00
Projsot Management & Coordinatlon I HR $101.54 $1,292.3?
Projsct Engine3r 4 HR $110.25 $465.00
Laborer 0 HR $69.08 $0.00
Carponter 0 HR $1 19.00 $0.00
15% Mark-ur 417.41
GeneEl Contractor - Sub Total 3.200.'t7s 63.668.93
s604.85
$89't.37
Schcdulc lmpact:
TOTAL 3 65.165.15
q .ffi
Str- i LAi."l{.-"e
ti t_: t\l ti I r{t-il 1I.Jt-l
Daily Report of Force Account lVorked
lontrac't Number Date
3/4/2026
Item Number
Ittem
Name
RFP 05 - l4tater Revisions pq Citt Comments
Contrac'tor Tier Subcontractor
C as c ade Cenl r sl C onstracti on Sellund Inc.
Descrlptlon of Work Performed
Extend 8" Ductile Iron Water (150 LD to the connection, 2,5tt Copper Semice (120 Ln' Oedit to HDPE
Time Worked Record
Hours Worl(ed
O.T. Rate AmountOccupation of Workers or Equipment Size Req,o.T.Reg, RateWorkera and/or Equipment
Working
Labor
$3,078.3030,0 $102.611Foreman
20.0 $100.07 82,001.402Operator (23 8 Excavator)
82,001.4020.0 $100.073Operal or ( I 3 I Excaval o0
$100.07 81,200.8412,04Operator (Loader)
15.0 $100.07 $1,501.05AOperator (Mini Exc)
$2,001.4020.0 $100.076Operolor (Skid Steer)
$94.82 8189.647Operalor (Roller)2.0
30.0 $66.07 $1,982.108Pipe Lqter
81,982. l030.0 866.07oPipe Layer (Topman)
862.45 $1,249.0020.010General Laborcr
$0.0011
Labor Subtotal $17,187.23
l5%o Markup $2,578.08
$19,765.31Labor Total
Equipment
20.0 $137.12 $2,742.40't2 238 Excavator
$124.46 $2,489.2020.013138 Excmtalor
12.0 $84.33 $1,011.9614Loader
15.0 $56.10 $841.5015Mini Excavalor
880.18 $1,603.6020.016Skid Steer
2.0 $25.32 850.64't7 Rollzr
30.0 $43.80 $1,314.0018Hckup
40.0 $47.22 $1,888.8019I-Ton
Equipment Subtotal $t r,942.10
$I,791.3215% Markup
Equipment Total $13,733.42
Materlals
164.25 LF 846.62 $7,657.34208" DI PiPE
$1,490.22IEA$16s.5821FieM Lok Gaskets
LF $34.25 $4,452.502.5" Copper Pipe 13022
I LS 8500.00 8500.0023Copper Fittings for Connections
-$1,756.39-1 LS $1,756.3924HDPE vs Copper Credit
LF $0.28 $41.3325Tracer Mre 150
270 LF $0.03 $9.1726Scare Tape
$1,500.003,000 SF 80.s027Sod
20 TN 518.M $360.0028Crushed Rock
TN 82s.00 M,375.00Pipe Beddine (Pea GraveD 17529
Materials Subtotal $18,629.16
15% Markup $2,794.37
Matefials Total $21,423.54
Total $54,922.27
By By
I
ATTN: General Contractor
Concrete Estimate - RFP 05
Estimate Date:
ProJect
Ellensbure Rodeo lmprovements
Project Location
Ellensburg,
Washington
Item Work Descrlptlon Clars qurntlty unlt Unh Prlce Amount (US $l
1
2
3
Rcady Mlx Concrctc {Mln Ordcr QTY}
2x4x16 Formr, Stakcs, Scrcws, Small Tools, Erp Jolnt
Ccmcnt Mason
Materlal
Matsrlal
Labor
lncludcsr
Maxlmum of 15ft x 5ft Concrete Sidewalk
ForminS, Pouring of Concrete Sidewalk
Rebar Not lncluded
5
1
7
CY
EA
HR
s
s
s
255.75
108.00
65.7t
s
s
s
L,278.75
108.00
459.97
Customer:
Authorized Signature
Date of Acceptance:-
tones Concrete & Excovation
Estlmator - Carson Chester
s41-861-8060
Sub Total 1,846.72
O&P Markup t5,0O%277.Ot
TOTAL s 2,t29,73
www.Jo nesConcrete.pro tlt
c
P.O. Box 110
Wenatchee, llVA. 98807{1{9
Frx !09-682d380
Toi
Klttltas CounW Comisslonors
205 West Sth Ave, $uite 108
Ellensburg, WA 98926
MAXE GHECKS PAYABLE TO:
Cascade Cantral Conttruciion, LLC
P.O Box ll9
Wcnatchcc, WA 88807{1119
THANK YOU rcR YOUR AUS'N'ESS'
PROPOSAL
PROJECT: Ell.nrburg Rodeo Arcna lmprovcmcnts
coP# 23
DATE: Fcbruary t9,2023
TITLE: COP 23 . RFI 020 Roctptaclc Attachmcnt Painting
CASCADE
CENTRAL
Dd.DI'CRIPTION ouAl,lflw uott UIOT PRICE AITOUNT
2t19nO2A Subconlractor Cosi
Paint Subcontractor - Ss€ attached Back-up LS $672.00 $672.00
$0.00
$0.00
6% Mark-ur ao32
Subconiractor - Sub Total 712.52
2t1gt202a Cascad. Ccntsal Contouction Coat
$upervlslon o HR $126.16 $0.00
Gen€ral Conditions 0 WD $925.00 $o.00
Project Management & Coordinatlon o HR $101.54 $0,00
Project Engineer o HR $1 16.25 $0.00
Laborer o HR $69.0E $0.00
Carpent6r o HR $1 19.00 $0.00
15% Mark-utr o00
Gensral Contractor - Sub Total o.00
7't? 32
s6 77
!T9 97
SchGdulc lmpact:
TOTAL 729.06
Carley Gangle
From:
Sent:
To:
Philipp Buterbaugh <specialtycoating@hotmail.com>
Wednesday, February 18,2026 4:22PM
Carley Gangle
Ellensburg rti 020SubJect:
Pricing for the condutand etectricaI boxes [abor/material, to paint the 6 stubouts tabor/materiat $672.00
Phitipp Buterbaugh
Coating Speciatty LLC
Po box4049
Wenatchee
98807
s p eci a ttycoati n g@ h ot m ai [. com
(50e)67e-8714
G
P.O. Box ltg
Wenatchee, WA, 98807{ll9
Phonc !09{02J'll9
Fax t09'882{t80
Kiftitas County Comissloners
205 West Sth Ave, Suite 108
Ellensburg, WA 98926
MAXE CHECKS PAYABLE TO:
Casaad. Ccntral Con.lruction, LLC
P.O Box ll9
W.nalchcc, Wid 98807{t'l 19
THANK YOU FOR YOUR AUS'JVESs'
PROPOSAL
PROJECT: Ell.ntburg Rod.o Atcna lmprovcm.nts
@P#24
DATE: Fcbruary {9, 2028
TITLE; COP 24 - RFI 072 FRP at MoP Sink
CASCADE
CEI{TRAL
5!f.DESCRIP'ION OUANMW uot UNII FNlcE A[OUNt
2t19t2026 Subconlracbr Cost
Labor and Material to ingtall FRP behind Mop sink - seo attached Elack-up 1 LS $075.00 $675.00
$0.00
$0.00
6q Mark-utr 40.50
Subcontraotor - Sub Total 715 50
2t1St202A Ca3cadr CGntal Construction Cost
Supervislon 0 HR $'128.18 $0.00
Genoral Conditions 0 WD $925.00 $0.00
Prcject Managoment & Coordlnation 0 HR $141.54 $0.00
Projact Engineer o HR $116.25 $0.00
Laborer 0 HR $63.08 $0.00
Carpenter 0 HR $119.00 $0.00
15% Mark-ut 0.00
G€naral Contractor - Sub Total 0.00
715.50
$6.80
$10.02
Schedule lmpact:
TOTAl 7t2.ll
Carley Gangle
From:
Sent:
To:
Subject:
Philipp Buterbau gh < specialtycoating @hotmail.com>
Wednesday, February 18,2026 4:30 PM
Carley Gangle
Ellensburg frp
Labor and materiaI to insta[t frp behind mop sink$ 675.00
Phitipp Buterbaugh
Coating Speciatty LLC
Po box 4049
Wenatchee
98807
s peci a ltyco ati n g@h ot m a i t. c o m
(50e)67e-8714
1
G
P,O. Box'll9
Wenatchee, WA. 98807.0119
Fax t09-682{380
County Comlssioners
West Slh Ave, Suite 108
wA98926
MAKE CHECKS PAYABLE TO:
Caecadc Gcntral Conslruction, LLC
P.O Box ll9
THNIK YOU FOR YOUR AUS,,VESS'
PROPOSAL
PROJECT: Ell.nrbulg nodco Attna lmprovcmGnt8
coP# 25
DATE: Fcbruary26,2026
TITLE: RFI 076 - South lAhlk Brldgc Landing Condidonc
EASCAOE
CEI{TRAL
Drtr DESCRIPflOI,I OUAMfllA uo*t UNI? PRICS Atttoul'll
2/26t2026 Subco$tracbr Cost
Earthuerk Subcontractor - See attached Back-up LS $1 1,433.53 $11,433.53
Concrete Subcontractor - Sse attachde Back-up LS $4,407.62 66,407.62
6% Mark-utr I O70 A7
Subcontractor - Sub Total 18.911.62
2r2At202A Cascadc Canltal Constuction Cost
Supervlsion a HR $126.18 $1,025.44
Goneml Conditions o WD $925.00 $0.00
Project Management & Coordlnation 4 HR $101.54 $646.16
Project Engineer 4 HR $1 16.25 $405,00
Laborer 0 HR $63.06 $0.00
Carpenter 0 HR $1 19.00 $0.00
15% Mark-utr 320.49
Gonoral Contractor - Sub Toial 2 AA7.O9
21.364.71
EOnd $?o3 00
s?gc t 6
Schrdulc lmpact:
None if approvod by 227126.
TOTAl'21-870-47
'-.=
=ELLAN.l tf
-
Y
t.i fl L{ l::i 1 t:l LJ il -f I f-.} N
Daily Report of Force Account Worked
Contract Number Date
2/21/2026
Item Number
lltem
Name
RFI 076 S, Bridee Landins
Prime Contractor ubcontractor/Lorrrler Tier Subcontractor
C ascade C entr al C on struction Selland Inc.
Description of Work Performed
Remove and dispose concrcte planter box and asphalh Preptbr concrde knding.
Time Worked Record
Workers and/or Equipment
Working Occupation of Workere or Equipment Size
Hours Worked
Reg. Rate O.T, Rate Amount
Res.o.T
1 Foremnn 20.0 $102,61 82,052.20
2 Operator (2 3 I Excavator)fi100.07 $0.00
3 Operatu (1 3 I Excavator)$100.07 80.00
4 Operator (Loader)3.0 8100.07 $300.21
5 Operalor (Mini Exc)20.0 8100.07 $2,001.40
6 Operator (Skitl Steer)8r00.0/s0.00
7 Operstor (Roller)$94.82 $0.00
8 Pipe Layer 866.07 $0.00
9 Pipe Lajer (Topman)$66.07 80.00
10 General Laborer 20.0 $62.4s $1,249.00
11 80.00
Labor Subtotal $5,602.81
l|ok Marlcup $840.42
Labor Total 86,443.23
12 238 Excavolor $137.12 80.00
13 138 F-xcavalor $124.46 $0.00
14 Loader 3.0 884.33 $252.99
15 Mini Excavator 20.0 $56.10 $1,122.00
't6 Skid Steer $80.18 80,00
't7 Roller $2s.s2 $0.00
18 Pickup 20.0 $43.80 8876.00
19 1-Ton 20.0 $47.22 8944.40
Equipment Subtotal 83,195.39
1596 Marlary $479.31
Equipment Total 83,674.70
20 $0.00
21 $0.00
22 Concrete & Asphah Disposal I t^t $1,000.00 $1,000.00
23 Crushed Rock I TN $18.00 8144.00
24 80.00
Materials Subtotal 81,144.00
15ok Markup $ r71.60
Maturtals Total $1,315.60
Calculated By lDate Checked By lDate Total $11,433.53
ATTN: General Contractor
Concrete Estimate - RFP 06
Estlmatc Datf : 21 25 | 2026
Project Location
Ellensburg,
Washington
Rodeo I mentsEI
Itom Work Deacrlptlon Clesc quantlty unlt unlt Prlco Amount (US $)
1
2
3
4
5
Forms, Stakcs, Small Tools, Exp Jolnt,
Rcedy Mlx Concr.tc
ilrt Rcbar & fi5 Rebar Dolt&ls
Cemcnt Mason
lronwprkcr
Mat€rlal
Materlal
Materlal
Labor
Labor
lncludcsr
397sf of 6in Thick Concrete Sidewalk
Forming, Pourlng of Concrete Sidewalk
#4 Rebar @18in OC EW
#5 Smooth Rebar Dowels @24in OC Per Detail 10/5-201
1
8
I
36
7
EA
CY
EA
HR
HR
s
s
$
s
$
312.56
255.75
241,.80
65,71
86.56
$
s
s
s
s
3t2.55
2,046.00
241.80
2,365,56
60s.92
Customer:
Authorized Signature:-
Date of
tones Concrete & Excavation
Estimator - Carson Chester
s41-861-8060
Sub Total $ s,szt,gc
O&P Markup 15.00%835.78
TOTAL $ 6,&7.62
www.JonesConcrete.pro llt
c
P,O. Box lto
W.natche6, VltA, 98807{ll9
Phonr 509{62-711t
Fax 509t82{3t0
Klttltas County Comlssioners
205 West Sth Ave, Suite 108
Ellensburg, WA 98926
MAKE CHECKS PAYABLE TO:
Carcad. Ccntml Corctruction, LLC
P.O Box llg
l Lnatchcr, Wiq. 98807{rl'19
THANK YOU rcR YOUR AUS,,I'ESS'
PROPOSAL
PROJECT: EllGnsburg Rod.o Arcna lmprovtmonts
coP# 26
DATE: March 0,2026
TITLE: COP 25 - HDPE Crcdit
CASCADE
EEI{TRAL
Odr DESCitFltON ouAl,lfllY Ltot UNIT PiICE AfoultT
3t5t20x Subcontractor Co6t
Civil Subcontractor - Ses attached Back-up LS $(12,055.02)($12,055,02)
606 Mark-u[000
Subcontractor - Sub Toial {12.655.021
3t5t20m Cascadc Ccntal Conatsuction Co.t
Superuislon 0 HR $'lzE.1E $0.00
General Conditions 0 WO $925.00 $0.00
Proioct Management & Coordinstlon o HR $101,54 $0.00
Project Englneer o HR $1 16,25 $0.00
Laborer o HR $63.0E $0.00
Carpgnter o HR $1 19.00 $0.00
15% Mark-utr o00
Gensral Contractor - Sub Toial 000
I't7 655 rJ21
lTO 0t)
sn oo
Schcdulc lmpact:
TOTAL n2.6Ar-n2l
SEIIAND P.O. Box ll9 Womiohes, WA 98807
Phonp: (509)662-7119 Fu: (509)662-4,165
Bld Date:March 4,2026dr'^l;;;;Tffi
Ellensburr Rodeo Arena lmorovements -HDPE vs Conoer Credlt
Ouallflcatlons: Please Read Carefullv
1. washlngton State Sales Tax has been not been lncluded ln proposal.
2. Prevalllng wage has been accounted for ln proposal.
3. Rock €xcavatlon (1,e. Solld Rock, Callche, Hard Pan, Cemented Solls and/or Boulders larger than 1 Cublc Yard) have not been lncluded, Prlce Negotlatlon wlll be
requlred lfthese matealals a.e encountered,
4. Over Excavatlon of Unsuhable Material has not been accounted for, price negotlatlon wlll be requlred lfthese materlals are encountered.
5, Excludes Water System Support.
6. Exludes Constructlon Survey.
?, Englneerlng & Professlonal Surveylng Servlces are Excluded.
8, Fees for Utllhles, County, Ot% Etc. are not lncluded, Cuhural Resource Servlces are not covered in our scope,
9, Hazardous Materlals Abatement, Removal, Handllng, Dlsposal, etc, ar€ not expected onslte and are therefore Excluded,
10. waterlng & Dust Control are lncluded for Selland's scope of work and duratlon only, No OT Dust Control or beyond our work.
11. Eroslon Control lnspectlons, Reportlng, Monltoring & Malntenance are Excluded. Stormwater Permlt by others.
12, Dust control has been provlded while we are actlvely worklng the slt€. No permanent or sustalned dust control or mltlgatlon has been lncluded.
13, Any scope ofwork not speclflcally lncluded as a llne ltem ln thls proposal ls excluded.
14, Actual quantltlas lnstalled shall be tracked/measured and the basis of payment at the unlt prices included ln thls proposal unless otherwlse agreed.
15, Due to global supply chaln dlsruptlons and mark€t volatlllty we res€rve the exclusive rlght to adjust our proposal for materlal escalatlon.
16. Proposal ls valld for 30 days. Thls proposal shall be made part of any subcontract.
lf you have any questlons or need addltlonal lnformatlon wlth regard to our proposal please glve us a call,
Slncerely,
sEu.AND coNsrRucnoN, rNc.
c,-:V*a-./ '/
James Flowerg
(s09) 881-0339
tI HDPE
Page 1 of 1
c CASCADE
CEI{TRAL PROPOSAL
F.O. Box ll9
Wenatchoc, WA, 08807{l'10
Fax !09-802"8380
To:
Kittltas County Comissioners
205 West Sth Ave, Suite 108
Ellensburg, WA 98926
MAKE CHECKS PAYABLE TO;
Cascadc Ccntral Constluction, LLC
P.O Bor {10
wcnatchca, wA. 98807{tl {9
THANK YOU FO R YOUR AUS,,IIESS'
PRoJECT: Ellcnsburg Rodoo Arcna lmprovcmcnls
cnP#27
DATE: March 6,2026
TITLE: RFl090 - Buckaroo Scating Gqt6 Valv. Addition
Dait DESCntiltON OUANITITY uox!UIIIT PRICE Atttoul{T
3t5t2026 Subaontractor Coat
Earth\,tork Subcontractor - Soe attachod Back-up 1 LS $3,649.72 $3,669.72
6% Mark-uF 220.18
Subcontrsctor - Sub Total 3 889 90
3tg20m Cascedc Ccntal Constucdon Coat
Superyision 0 HR $128.18 $0.00
Gsnsral Conditions o WO $925.00 $0.00
Proisct Management & Coordination o HR $161.54 $0.00
Pmjoct Englneer 0 HR $'t10.25 $0.00
Labo16r 0 HR $63.08 $0.00
CaryeniBr o HR $t'19.00 $0.00
15% Mark-uF ooo
Gsnoral Conlrector - Sub Total 0.00
3.889.90
$36.95
$54.46
SchGdub lmpact:
TOTAL 3 eal 32
. .. aMrc"-r
Er I L:__l\ tr< f]{t I i Nt s 1-!? II l:;'} ; iui t.l
Dally Report of Force Account Workod
3ontract Number lDate lltem NumberI wnozal
Item Name
3' Gste Valve Assembl!
trime Conlracior
Cas csde Cenlrul Cowtruction
Subconlractor/Lower Tlor Subconlractor
Selhnd Construction, Inc.
)escriplion of Worfi Performed
3' Gate Valve ossembly
Workers and/or Equlpment
WorklnE Occupation of Workers or Equlpment Slze
Houra vorked
Reg, Rate O.T. Rate Amount
Reo-o.T.
I Foreman 2.0 $102.61 8205.22
2 0perator (2 3 I Excavator)$100.07 $0,00
3 Op er ator ( 1 3 I Exc avato r)4.0 8100.07 M00.28
4 Operator (Loader)8100.07 80.00
5 Operalor Mini Exc)$100.07 s0.00
6 0peralor (Skid Steer)$100.07 80.00
7 Operalor (Rollcr)$94.82 $0.00
8 Pipe Layer 4.0 $6607 $264.28
o Pipe Layer (Topman)4.0 $6607 $264.28
10 General Loborer 862.45 80.00
't'l $0.00
Labor Subtotal $1,134.06
15% Markup $170.1 I
Labor Total $1,304.17
12 238 Excantor s|37.12 80.00
13 138 Excwator 4.0 8124.46 $497.84
14 [-oader $84.33 $0.00
15 Mini Excavator $5610 $0.00
16 Skid Steer $80.18 80.00
17 Roller 825.32 80.00
18 Plckup 2.0 843.80 887.60
19 l-Ton 4.0 M7.22 $188.88
Subtotal $774.32
1595 Markup 8r 16.ls
Equipmenl Total $890.47
Materials
20 Gate Valve I s763.84 $763.84
21 Gaghets ,$12.42 824.84
22 F'Iange Adapter 2 819.71 839.42
23 BakupNng t 810.80 $21.60
24 Bolt Kil 2 86.13 812.26
25 Saddle 3x$/4n 1 $178.33 $178.33
26 3/4u -1/2' Bushing 1 $4.03 $4.03
27 I/2" Valve I $36.28 83628
28 Valve Box I $107.00 $107.00
29 Valve Top I $64.80 864.80
30 Valve Box Lid 1 830.28 $30.28
Materials Subtotal $1,282.68
15oh Markup $192.40
Materials Total $1,475.08
By
Total $3,669.72
c
P.O, Box ll0
Wcnatchoo, llVA. 08807{{l9
Phonr t09{82-7{19
F x t09462{3t0
Kltlltas County Comissioners
West Sth Ave, Suite 108
Ellensburg, WA 98926
MAKE CHECKS PAYABLE TO:
Cascad. Ccrdral Construction, LLC
P.O Box ll9
\,lLnatchcG, WA 98807{l{'19
THANK YOU rcR YOUR AUS"VESS'
PROPOSAL
PROJECT: Ellcneburg Rodco Arcna lmprovcmcnte
coP# 28
DATE: March t,2026
TITLE: RFI 082 - Exioting Fibcr Conduit Und.r Arcna
cAscADE
CEl{TRAL
0d.oESCRtpilOt{OUANIfl?Y UOIN UNII PRICE AIIOUN?
u5t20x)Subcomractor Cost
El€ctrloal Subcontrac-tor - See attached Back-up 1 LS $1,892.00 $1,892.00
6% Mark-ut 113 A2
Subcontrsctor - Sub Total 2.005.52
3t5l20x Cascada C.ntral Consl'ucdon Cost
Superuision 0 HR $128.18 $0.00
General Conditlons 0 WD $925.00 $0.00
Projsct Managemont & Coordination n HR $161.54 $0.00
Pojsct Enginoer 0 HR $1 16.25 $0.00
Laborer o HR $63.08 $o.oo
Carponter o HR $1 19.00 $o.u)
'15% Mark-utr o.00
Gen€ral Contractor - Sub Total o.00
Subtota 2 005.52
Bonc $19 (15
s2a oa
Schcdula lmpaet:
TOTAL 2.052.65
McGann Electric ccc
Contractor Breakdown Summary
Project Name:
Project No.
Contractor:
Description:
Ellensburg Rodeo Arena lmprovements RFI 082 Costs
Source Documents: Jack McGann
McGann COPIS
Date:
Contractor Ref, No.
3t5t2026
McGann Electric
Provide additional 2" pvc conduit, handhole, and fttings required to connect video board fiber location to new fiber vault and
pathway system per RFI 082 response. Exclusions: trenching, backfill, backfill materials
Itemize all costs on attached COP Cost Breakdown form.
Supervision:
d. direct supervision (NTE 15o/o ol 1al
e. safety (NTE 2% of lines 1a, b, & c)
2. MATERIAL COSTS
a, material costs
b. freight costs (itemize)
3. EQUIPMENT COSTS
a. owned equipment (per spec approved source)
b. rental equipment (per invoices attached)
4. SMALL TOOLS
a. small tools (NTE 5% of 1a & b)
5, OVERHEAD & PROFIT
NTE 15% portion of 1,2,3, & 4 up to $50,000
6. SUB-SUBCONTRACTORS
7. OVERHEAD & PROFIT ON SUB-SUBCONTRACTORS
a. NTE 15% of Line 6 up to $50,000 for each sub
$17.11
l.CRAFTLABORCOSTS $873.00
$709.45
2. MATERIAL COSTS $709.00
$
3. EQUIPMENT COSTS $
$43.65
4. SMALLTOOLS $44.00
SUBTOTAL,I thru
$260.1 6
$
5, OVERHEAD & PROFIT $260.00
6. SUB-SUBCONTRACTORS $
$
$
7. OVERHEAD & PROFIT ON SUB.SUBCONTRACTORS $
$1.31
$4.72 8. INSURANCE $6.02
9. BOND $
$1.892.00
CRAFT LABOR COSTS
Direct Labor Costs:
a. crew (apprentices, journeymen, & laborers)
b. foreman
c. superintendent
$855.60
$
$
DIRECTLABORSUBTOTAL $855.60
_!!!%or1
0.25 % ot 1-7
0.03 % of 1-8
a.
b.
a,
b.
c.
d.$
8. INSURANCE
a. payroll driven liability insurance
b. volume driven liability insurance
9. BOND
a. bond
Fom Revised 04/25115 TOTAL GOST
https://mcgannelectric-my-sharepoint.com/personal/jackmcgann-mcgannelectric-com/Documents/McGann Electric/2025 Ellensburg Rodeo 9.30/COPs/C9f .1l-^
Fiber ConduiVMcGann coP15 video board fiber conduit 3.5 Summary lssued 3/5/2026
1
Cost Breakdown
Project Name: Ellensburg Rodeo Arena Video Board Fiber RFI 082
Project No.
Contractor: McGannElectric
Date:
Gontractor Ref. No.
Mccann COP15
3t5t2026
19.00$
$
$
45.60
6.24
$
$
$ {,565.05
$
$ 855.60
$
5.20$
$
19.36$
$ 88.60
$
$ 490.45
35.00$
$
$
$
Total
Cost
$
$
$
uipment
$
$
$
$
$
$
$
$
$
$
$
$
$
Cost
$
$
$
$
$
$
$
$
Unit $
$
$
5.20$
88.60$
$ 490.45
$
19.00$
35.00$
$
$
$
$
$
$
709.45$
Cost
$
$
$
$
45.60$
6.24$
$
19.36$
$
$490.45
$35.00
Material
Unit $
s1.14
$1.30
$1.56
$9.68
$11.85
$44.30
$0.38
$
$ 8s5.60
$
$
$
$
855.60$
$ 855.60
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Cost
$
$
Labor
Unit $
$106.9sHR
FT
EA
EA
EA
EA
FT
EA
LT
Unit
Tvpe
1
z1no17
Quantity
I
40
4
4
2
2
50
1
Labor Subtotal
Description
Electrician Labor
2" PVC
2. PVC couplinq
2'' PVC FA
2" PVC bell end
2" Riqid 90
#10 trace wire
Handhole'l 1x1 8x'l 2 concrete
qlue, tape, markinq tape, corrosion
Subtotal Cost of Work
II
II IIIII