HomeMy WebLinkAboutChange Order 6 Fully ExecutedKITTITAS COTJNTY Board of County Commissioners AGENDA STAF'F REPORT AGENDA DATE:March 17,2026 ACTION REQUESTED: Request Board of County Commissioners' approval to sign Change Order No. 6 on the Rodeo Arena Improvement Project. BACKGROT]ND:The County has been working on renovations and improvements to the existing Kittitas County Rodeo Aren4 as part of the project with have run into unknown conditions and to make other changes to bccommodate operations of the facility. This change order includes Electrical Utility changes, Water main connect location change required by the city, changes to the landings and ramps for the walk bridge, and a credit for changing on site domestic water to HDPE from copper. INTERACTION:ALSC Architects, Event Center Staff, and Maintenance. RECOMMENDATION:Recommend Boards approval to for Chairs signature on Change Order No. 6 for Kittitas County Rodeo Arena Improvement Project. HANDLING:Original - Clerk of the Board ATTACHMENTS: LEAD STAFF: Change Order 6 Patti Stacey ti';' . i l, i, : j :.'i il .lii 'i ri': F\L5{"-" CHANGE ORDER NO. 6 PROJECT NAME: OWNER: CONTRACTOR: PROJECT NO: SPOKANE :ii.l.l i.J t\/':.riir!r :iliar l :,!-:li !: .1!)il i;! i,-tk.ii :t:, !i,',.\ qil..i0 : ' :)i.lf . l:,i: tlir':)l-\ Elleneburg Rodeo Arena Complelion Klttltae County Cascadc Contral Constructlon 2028-O0S ,: ! ii;i;aa i i] rl..::i. a-'i ]I i ] PAGElof 23 DESCRIPTIO}.I OF GHANGE: COP 19 - Electrical Utili$ Plane COP 2I - RFP 5 - New POC for water rnain COP 23 - RFI 020 - Receptacle attachm€nt palntng COP 24 - RFI 072 - FRP al mop sink COP 25 - RFI 076 - South walk bridge landlng location condition COP 26 - HDPE Credlt COP 27 - RFI 090 Gate Valve COP 28 - RFI 082 - Flber Conduit Under Arena Original Contract Sum Net Amount of Previously Approved Changes: Contract Sum Priorto This Change Order: Contract Sum is inoreased by This Ghange Order: Revlsed Contract Sum: Original Contract Completion Date: Prevlously Approved lncreases in Time: Completion Date Priorto Thie Change Order: Contract time will be chanoed by Calendar Days This Change Order Revised Substantial Completlon Date: Revised Final Acceptance Dale: Amount $18,862,66 s65,165.15 s729.06 $732.t1 $21,870.87 ($12,655.02) $3,981.32 02,052.65 Total Thlr Change Ordar: $100,739.00 $5,065,000.00 Accepted by Conlractor:t $1,21 2,260.35 (c'.+c-*L $6,277,260.38 By: Dale$l .739.00 3 g e $6,377,999.35 Recommended By: ALSC Architects,P.S. 7t2012026 lra-TYrJ., 7 By: Date IIL 7t23t2026 0 7127i2A26 Approved By: Date812212026 oolrt wb 'Does not include Stata or Local Sales Tax ALSC Archilects lWe bring our clients stories to life. G P.O. Box tto Wenatchce, llVA. 08807{l l9 Phonr 60t.882.7'll9 Fax 00t{62.0380 County Comissioners West Sth Ave, Suite 108 Ellensburg, WA 98926 MAKE CHECKS PAYABLE TO: cascadc Ccntral Conslruction, LLC P.O Box {{9 Wonaichcc, WA. 98807{ll 19 PROPOSAL PROJECT: Ellcnsbulg Rod3o Aicna lmprorramrntE coP# 19 DATE: Matah 9,2028 TITLE: Ehcrkd lftlllty Planc Rcv.l CASCADE CENTRAL Ddt DB8CRIPNOI ouAt{tfllY uoil UM' PRICE Atoultr ugt20m Suboontractor Coat Earthuork Subcontraclor - See attached Back-up 1 LS $18,060,00 $7,806,00 Ebc'trical Subcontractor - soa attachsd Becl(-up 1 LS $33,306,00 $7,614.00 6% Mark-uF gdo 80 Subconlractor - Sub Total 16.820.80 gst20a Caccad. C.ntal Constuction Cost Sup€rvision 6 HR $12E.'t6 s1,025.44 Ggnaral Conditions U wu $925.00 $o.oo Prcject Managpmont & coordination 4 HR $191.54 $040.16 Projec-t Engineer 4 Ht<$114.25 $465.00 Labor6r 0 HR $03.08 $0.00 Carpentor 0 HR $1 19.00 $0.00 15% Mark-utr 320.45 G6n6ral Crntractor - 9Ub Total 2 457 09 ttumotat 19 077 a9 HOnd slal ,4 EtaT 09 '19 528 2? uw20re Concrcir Enaccm.nt Crcdit Pal RFI 0t2 Rcspons. Cemont Mason -2 HR $41./6 ($163.501 Concrete CY $250.00 ($500.001 (603. 1U.UgZ.tst Qualificatiom: lnclud.d: -Excavation and backfill for duc,t, vault, tansformgr, primary conductoF, and trench from metgr oatinst to io now transfiormsr -Ecology Blocks €onduit and Wra frpm mater cabinEt to nstvtransformer Excludcd: .gy utility provider: All removal and domo. Supply and install of duct, vault, transformer, and primary conductors/conduit. Concrete oncasemgrt from metor cakinot to utility tranformar vault .Utility tee6. Sch.dulc impecl: Nons. Excluding any potential lead tim€s or schaduling a$ociatsd with utility scop€ of rcrk. TH ANK YOU FC'R YOUR AUS"VESSI (Y/A|S7 Rr( "t',tOh', l,.Jir '' SELLAND P.O. Box 119 Wonatqhos, WA98807 ?hors: (509)662-?119 Tax: (5@)66.}'4465 Bld Datel Ellensburr Rodeo Arena lmorovements. CIW Electrlcal Trenchlnr & BF COP lanuary26,2026 lrli;i;l;rr,1 .ctrr \rrl Ouallflcatlons: Pleai€ Read Carafullv 1. washlngton State Sahs Tax has been not been lncluded ln proposal. 2. Prevalllng wage ha$ been accounted for ln proposal, 3. Any scope of work not speclflcally lncluded as a llne kem ln thls proposal ls exclud€d' 4. Actual quantltles lnstalled shall be tracked/meagured and the basls of payment at the unlt prlces lncluded ln thls proposal unless otherwlsa agreed' S. Due to global supply chaln dlsruptlons and market volatlllty we reserve the excluslve rlght to adjust our proposal for materlal oscalatlon' 6. Proposal ls valld for 30 days. Thls proposal shall be made part of any subconract. lf you have any questlons or need addhlonal lnformatlon wlth regard to our proposal please glve us a call. Slncerely, sErrAND CONSTRUCT]OU rNC. 3?-* James Flowers (509) 881-0339 Page 1 of I McGann Electric CCC Contractor Breakdown Summary Project Name: Project No. Contractor: Description: CRAFT LABOR COSTS Direct Labor Costs: a. crew (apprentices, journeymen, & laborers) b. foreman c. superintendent Ellensburg Rodeo Arena lmprovements Additional Utility Service Requirer Source Documents: Jack McGann coP-t4R Date: Contractor Ref. No. 3t9t2026 McGann Electric Cost includel labor and materials required for the further relocation of utilty meter cabinet per response to RFI 005.Cost to expedite utiltiy metercabinet. Exclusions: additional trenching, backfill, backfill material, ecology blocks, any and all utility fees associated with utiltiy plan. Itemize all costs on attached COP Cost Breakdown form. Supervision: d. direct supervision (NTE 15% of 1al e. safety (NTE 2% of lines 1a, b, & c) 2. MATERIAL COSTS a. material costs b. freight costs (itemize) 3. EQUIPMENTCOSTS a. owned equipment (per spec approved source) b. rental equipment (per invoices attached) 4. SMALLTOOLS a. small tools (NTE 5% of 1a & b) 5. OVERHEAD & PROFIT NTE 15% portion of '1, 2,3, & 4 up to $50,000 6. SUB.SUBCONTRACTORS 7. OVERHEAD & PROFIT ON SUB.SUBCONTRACTORS a. NTE 15% of Line 6 up to $50,000 for each sub 8. INSURANCE $ 1,711.24 $ DIRECTLABORSUBTOTAL $ 1 711.20 0.15 % ol 1 0.25 % ot 1-7 $34.22 1. CRAFT LABOR COSTS $ 1,745.00 $ 4,885.20 2. MATERTAL COSTS $ 4,885.00 $ 3. EQUIPMENTCOSTS $ $87.25 4. SMALL TOOLS $87.00 SUBTOTAL 1 thru $ 1,074.72 $ 5. OVERHEAD & PROFIT $ 1,075,00 6. SUB-SUBCONTRACTORS $ $ $ 7. OVERHEAD & PROFIT ON SUB-SUBCONTRACTORS $ $2.62 $19.48 8. INSURANCE $22.10 9. BOND $ TOTAL Electric/2025 Ellensburg Rodeo 9.30/COPs/COP14 Additional lssued 3/9/2026 $ a. b. a. b. c. d.$ a. payroll driven liability insurance b. volume driven liability insurance 9. BOND a. bond 0.03 % of 1-8 https://mcgannelectric-my.sharepoint.com/personaUjackmcgann-mcgannelectric-com/Documents/McGann Service Enlrance/Ellensburg Rodeo Arena COP-14 Additional Utiity - Copy Summary $71 814.00 Cost Breakdown Project Name: Rodeo Arena lmprovments additional Utility Service Project No. Contractor: McGannElectric coP-t4R 3t9t2026Date: Contractor Ref. No. Total Cost $ $ $ 1.711.20 $ $ $ $ $ $ 440.40 $ 1,804.80 $ $ $ $ $ 2,640.00 $ $ $ $ $ $ $ $ $ $ $ $ 6,596.40 ripment Cost $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Unit $ Material Cost $ $ $ $ $ $ $ $ $ 440.40 $ 1,804.80 $ $ $ $ $ 2,640.00 $ $ $ $ $ $ $ $ $ $ $ $ 4,EEs.ZO Unit $ $3.67 $3.76 $2,640.00 Labor Cost $ $ 1,711.20 $ $ $ $ $ $ $ $ $ $ $ $ $ 1.711.20 $ $ $ Unit $ $106.95 Unit Tvpe HR FT FT LT 2t2017 Quantity 16 120 480 I Description Electrician Labor 4" pvc sch40 5OO AL EATON E>pedite fee Labor Subtotal Subtotal Cost of Work Utiity - Copy Cost Breakdown lssued 3/9/2026 AF,,P. REQUEST FOR PROPOSAL NO: 05 Project Name: Ellensburg Rodeo Arena Completion Owner: Kittitas County Contractor: Cascade Central Construction Job Number: 2025-009 $POKAt{l ?C3 N Wcrshrnglor Sull* 400 Spoko.e. wA t920 I r ii09.838.8568 elsccrclliects. corrr Page 1 ot2 TO: Cascade Central Construction, Contractor, please furnish your proposal for performing the changes outlined below and/or detailed on the attachments referred to: Revisions to Civit drawings per City of Etlensburg direction for new connection point to 12" main instead of 8" line previousty noted. Reconnection of existing water [ines from the east to the new water service. ALSC P.S_By Todd Date:_2/0826 PROPOSAL: To the Owner: We propose to perform all changes described in the above request for a total ADDlTlON/nlE U€lt{€l+ (cross out one) to the contract sum of: Sixtv-Five Thousand One Hundred Sixtv-Five and 15i100 Dollars 65,165.15 (not including Sales Tax) We have attached cost estimate detail sheets, and the foregoing amount covers all direct and indirect costs related to this proposal and to the remain in fullforce and calendar days because after this date. effect of the proposal on the remainder of the project. All other provisions of the contract effect. We request the completion date be EXTENDED/REDUCED (cross one out)0 of this work. The Contractor agrees to be bound to quotation for sixty (60) days Cascade Central Construction KC Carroll Date 31512026 Contractor RECOMMENDATION: TO: Owner, we have examined the foregoing proposal and find it to be appropriate for the request. We recommend its acceptance. ALSC itects- P-S-Date:_ PROPOSAL AGGEPTANCE: The Owner hereby accepts the foregoing proposal. This instrument, when signed below, constitutes the conditions upon which a Change Order will be issued. Date- a a Owner ALSC Architects \\We bring our clients' stoties lo life. c0ltsTRutTlsilcCASCADE CEI{TRIL PROPOSAL F.O. Box ll9 Wenatchee, WA, 98807{l{9 Phon! !09€82.7119 Fex !09{624t80 To: Kittltas County Comissioners 205 West Sth Ave, Suite 108 Ellensburg, WA 98926 MAKE CHECKS PAYABLE TO: CascadG Ccntral Comtruction, LLC P.O Box l{9 Wcnatchcc, WA 98807{1119 THANK YOU rcR YOUR SUS,,VESS' PROJECT: Ellenrburg Rodco Arcna lmprovcmcntt @P#21, DATE: tilarch t,2028 TITLE: Ncw PoG for Wfi. ll,hin Rcv.2 DEI.OEgCiIPflON OI,AMTIW uoltl UNlt PruCI atoljl{t 3t5t20',6 Subcorlractol C6t Civil Subcontractor - Se6 attached back-up 1 LS $54,922.77 $54,522,27 Concrete Suboontractor - see attached baok-up 1 LS $2,123.t3 $2,123.7n $0.00 o% Marl(-utr 3.422.76 Suboontractor - Sub Total 60 d68 78 3t5t202f Cascad. C.naal Consltuction Cost Supevlsion B HR $128.18 $1,025.44 General Conditions 0 WD $925.00 $0.00 Projsot Management & Coordinatlon I HR $101.54 $1,292.3? Projsct Engine3r 4 HR $110.25 $465.00 Laborer 0 HR $69.08 $0.00 Carponter 0 HR $1 19.00 $0.00 15% Mark-ur 417.41 GeneEl Contractor - Sub Total 3.200.'t7s 63.668.93 s604.85 $89't.37 Schcdulc lmpact: TOTAL 3 65.165.15 q .ffi Str- i LAi."l{.-"e ti t_: t\l ti I r{t-il 1I.Jt-l Daily Report of Force Account lVorked lontrac't Number Date 3/4/2026 Item Number Ittem Name RFP 05 - l4tater Revisions pq Citt Comments Contrac'tor Tier Subcontractor C as c ade Cenl r sl C onstracti on Sellund Inc. Descrlptlon of Work Performed Extend 8" Ductile Iron Water (150 LD to the connection, 2,5tt Copper Semice (120 Ln' Oedit to HDPE Time Worked Record Hours Worl(ed O.T. Rate AmountOccupation of Workers or Equipment Size Req,o.T.Reg, RateWorkera and/or Equipment Working Labor $3,078.3030,0 $102.611Foreman 20.0 $100.07 82,001.402Operator (23 8 Excavator) 82,001.4020.0 $100.073Operal or ( I 3 I Excaval o0 $100.07 81,200.8412,04Operator (Loader) 15.0 $100.07 $1,501.05AOperator (Mini Exc) $2,001.4020.0 $100.076Operolor (Skid Steer) $94.82 8189.647Operalor (Roller)2.0 30.0 $66.07 $1,982.108Pipe Lqter 81,982. l030.0 866.07oPipe Layer (Topman) 862.45 $1,249.0020.010General Laborcr $0.0011 Labor Subtotal $17,187.23 l5%o Markup $2,578.08 $19,765.31Labor Total Equipment 20.0 $137.12 $2,742.40't2 238 Excavator $124.46 $2,489.2020.013138 Excmtalor 12.0 $84.33 $1,011.9614Loader 15.0 $56.10 $841.5015Mini Excavalor 880.18 $1,603.6020.016Skid Steer 2.0 $25.32 850.64't7 Rollzr 30.0 $43.80 $1,314.0018Hckup 40.0 $47.22 $1,888.8019I-Ton Equipment Subtotal $t r,942.10 $I,791.3215% Markup Equipment Total $13,733.42 Materlals 164.25 LF 846.62 $7,657.34208" DI PiPE $1,490.22IEA$16s.5821FieM Lok Gaskets LF $34.25 $4,452.502.5" Copper Pipe 13022 I LS 8500.00 8500.0023Copper Fittings for Connections -$1,756.39-1 LS $1,756.3924HDPE vs Copper Credit LF $0.28 $41.3325Tracer Mre 150 270 LF $0.03 $9.1726Scare Tape $1,500.003,000 SF 80.s027Sod 20 TN 518.M $360.0028Crushed Rock TN 82s.00 M,375.00Pipe Beddine (Pea GraveD 17529 Materials Subtotal $18,629.16 15% Markup $2,794.37 Matefials Total $21,423.54 Total $54,922.27 By By I ATTN: General Contractor Concrete Estimate - RFP 05 Estimate Date: ProJect Ellensbure Rodeo lmprovements Project Location Ellensburg, Washington Item Work Descrlptlon Clars qurntlty unlt Unh Prlce Amount (US $l 1 2 3 Rcady Mlx Concrctc {Mln Ordcr QTY} 2x4x16 Formr, Stakcs, Scrcws, Small Tools, Erp Jolnt Ccmcnt Mason Materlal Matsrlal Labor lncludcsr Maxlmum of 15ft x 5ft Concrete Sidewalk ForminS, Pouring of Concrete Sidewalk Rebar Not lncluded 5 1 7 CY EA HR s s s 255.75 108.00 65.7t s s s L,278.75 108.00 459.97 Customer: Authorized Signature Date of Acceptance:- tones Concrete & Excovation Estlmator - Carson Chester s41-861-8060 Sub Total 1,846.72 O&P Markup t5,0O%277.Ot TOTAL s 2,t29,73 www.Jo nesConcrete.pro tlt c P.O. Box 110 Wenatchee, llVA. 98807{1{9 Frx !09-682d380 Toi Klttltas CounW Comisslonors 205 West Sth Ave, $uite 108 Ellensburg, WA 98926 MAXE GHECKS PAYABLE TO: Cascade Cantral Conttruciion, LLC P.O Box ll9 Wcnatchcc, WA 88807{1119 THANK YOU rcR YOUR AUS'N'ESS' PROPOSAL PROJECT: Ell.nrburg Rodeo Arcna lmprovcmcnts coP# 23 DATE: Fcbruary t9,2023 TITLE: COP 23 . RFI 020 Roctptaclc Attachmcnt Painting CASCADE CENTRAL Dd.DI'CRIPTION ouAl,lflw uott UIOT PRICE AITOUNT 2t19nO2A Subconlractor Cosi Paint Subcontractor - Ss€ attached Back-up LS $672.00 $672.00 $0.00 $0.00 6% Mark-ur ao32 Subconiractor - Sub Total 712.52 2t1gt202a Cascad. Ccntsal Contouction Coat $upervlslon o HR $126.16 $0.00 Gen€ral Conditions 0 WD $925.00 $o.00 Project Management & Coordinatlon o HR $101.54 $0,00 Project Engineer o HR $1 16.25 $0.00 Laborer o HR $69.0E $0.00 Carpent6r o HR $1 19.00 $0.00 15% Mark-utr o00 Gensral Contractor - Sub Total o.00 7't? 32 s6 77 !T9 97 SchGdulc lmpact: TOTAL 729.06 Carley Gangle From: Sent: To: Philipp Buterbaugh <specialtycoating@hotmail.com> Wednesday, February 18,2026 4:22PM Carley Gangle Ellensburg rti 020SubJect: Pricing for the condutand etectricaI boxes [abor/material, to paint the 6 stubouts tabor/materiat $672.00 Phitipp Buterbaugh Coating Speciatty LLC Po box4049 Wenatchee 98807 s p eci a ttycoati n g@ h ot m ai [. com (50e)67e-8714 G P.O. Box ltg Wenatchee, WA, 98807{ll9 Phonc !09{02J'll9 Fax t09'882{t80 Kiftitas County Comissloners 205 West Sth Ave, Suite 108 Ellensburg, WA 98926 MAXE CHECKS PAYABLE TO: Casaad. Ccntral Con.lruction, LLC P.O Box ll9 W.nalchcc, Wid 98807{t'l 19 THANK YOU FOR YOUR AUS'JVESs' PROPOSAL PROJECT: Ell.ntburg Rod.o Atcna lmprovcm.nts @P#24 DATE: Fcbruary {9, 2028 TITLE; COP 24 - RFI 072 FRP at MoP Sink CASCADE CEI{TRAL 5!f.DESCRIP'ION OUANMW uot UNII FNlcE A[OUNt 2t19t2026 Subconlracbr Cost Labor and Material to ingtall FRP behind Mop sink - seo attached Elack-up 1 LS $075.00 $675.00 $0.00 $0.00 6q Mark-utr 40.50 Subcontraotor - Sub Total 715 50 2t1St202A Ca3cadr CGntal Construction Cost Supervislon 0 HR $'128.18 $0.00 Genoral Conditions 0 WD $925.00 $0.00 Prcject Managoment & Coordlnation 0 HR $141.54 $0.00 Projact Engineer o HR $116.25 $0.00 Laborer 0 HR $63.08 $0.00 Carpenter 0 HR $119.00 $0.00 15% Mark-ut 0.00 G€naral Contractor - Sub Total 0.00 715.50 $6.80 $10.02 Schedule lmpact: TOTAl 7t2.ll Carley Gangle From: Sent: To: Subject: Philipp Buterbau gh < specialtycoating @hotmail.com> Wednesday, February 18,2026 4:30 PM Carley Gangle Ellensburg frp Labor and materiaI to insta[t frp behind mop sink$ 675.00 Phitipp Buterbaugh Coating Speciatty LLC Po box 4049 Wenatchee 98807 s peci a ltyco ati n g@h ot m a i t. c o m (50e)67e-8714 1 G P,O. Box'll9 Wenatchee, WA. 98807.0119 Fax t09-682{380 County Comlssioners West Slh Ave, Suite 108 wA98926 MAKE CHECKS PAYABLE TO: Caecadc Gcntral Conslruction, LLC P.O Box ll9 THNIK YOU FOR YOUR AUS,,VESS' PROPOSAL PROJECT: Ell.nrbulg nodco Attna lmprovcmGnt8 coP# 25 DATE: Fcbruary26,2026 TITLE: RFI 076 - South lAhlk Brldgc Landing Condidonc EASCAOE CEI{TRAL Drtr DESCRIPflOI,I OUAMfllA uo*t UNI? PRICS Atttoul'll 2/26t2026 Subco$tracbr Cost Earthuerk Subcontractor - See attached Back-up LS $1 1,433.53 $11,433.53 Concrete Subcontractor - Sse attachde Back-up LS $4,407.62 66,407.62 6% Mark-utr I O70 A7 Subcontractor - Sub Total 18.911.62 2r2At202A Cascadc Canltal Constuction Cost Supervlsion a HR $126.18 $1,025.44 Goneml Conditions o WD $925.00 $0.00 Project Management & Coordlnation 4 HR $101.54 $646.16 Project Engineer 4 HR $1 16.25 $405,00 Laborer 0 HR $63.06 $0.00 Carpenter 0 HR $1 19.00 $0.00 15% Mark-utr 320.49 Gonoral Contractor - Sub Toial 2 AA7.O9 21.364.71 EOnd $?o3 00 s?gc t 6 Schrdulc lmpact: None if approvod by 227126. TOTAl'21-870-47 '-.= =ELLAN.l tf - Y t.i fl L{ l::i 1 t:l LJ il -f I f-.} N Daily Report of Force Account Worked Contract Number Date 2/21/2026 Item Number lltem Name RFI 076 S, Bridee Landins Prime Contractor ubcontractor/Lorrrler Tier Subcontractor C ascade C entr al C on struction Selland Inc. Description of Work Performed Remove and dispose concrcte planter box and asphalh Preptbr concrde knding. Time Worked Record Workers and/or Equipment Working Occupation of Workere or Equipment Size Hours Worked Reg. Rate O.T, Rate Amount Res.o.T 1 Foremnn 20.0 $102,61 82,052.20 2 Operator (2 3 I Excavator)fi100.07 $0.00 3 Operatu (1 3 I Excavator)$100.07 80.00 4 Operator (Loader)3.0 8100.07 $300.21 5 Operalor (Mini Exc)20.0 8100.07 $2,001.40 6 Operator (Skitl Steer)8r00.0/s0.00 7 Operstor (Roller)$94.82 $0.00 8 Pipe Layer 866.07 $0.00 9 Pipe Lajer (Topman)$66.07 80.00 10 General Laborer 20.0 $62.4s $1,249.00 11 80.00 Labor Subtotal $5,602.81 l|ok Marlcup $840.42 Labor Total 86,443.23 12 238 Excavolor $137.12 80.00 13 138 F-xcavalor $124.46 $0.00 14 Loader 3.0 884.33 $252.99 15 Mini Excavator 20.0 $56.10 $1,122.00 't6 Skid Steer $80.18 80,00 't7 Roller $2s.s2 $0.00 18 Pickup 20.0 $43.80 8876.00 19 1-Ton 20.0 $47.22 8944.40 Equipment Subtotal 83,195.39 1596 Marlary $479.31 Equipment Total 83,674.70 20 $0.00 21 $0.00 22 Concrete & Asphah Disposal I t^t $1,000.00 $1,000.00 23 Crushed Rock I TN $18.00 8144.00 24 80.00 Materials Subtotal 81,144.00 15ok Markup $ r71.60 Maturtals Total $1,315.60 Calculated By lDate Checked By lDate Total $11,433.53 ATTN: General Contractor Concrete Estimate - RFP 06 Estlmatc Datf : 21 25 | 2026 Project Location Ellensburg, Washington Rodeo I mentsEI Itom Work Deacrlptlon Clesc quantlty unlt unlt Prlco Amount (US $) 1 2 3 4 5 Forms, Stakcs, Small Tools, Exp Jolnt, Rcedy Mlx Concr.tc ilrt Rcbar & fi5 Rebar Dolt&ls Cemcnt Mason lronwprkcr Mat€rlal Materlal Materlal Labor Labor lncludcsr 397sf of 6in Thick Concrete Sidewalk Forming, Pourlng of Concrete Sidewalk #4 Rebar @18in OC EW #5 Smooth Rebar Dowels @24in OC Per Detail 10/5-201 1 8 I 36 7 EA CY EA HR HR s s $ s $ 312.56 255.75 241,.80 65,71 86.56 $ s s s s 3t2.55 2,046.00 241.80 2,365,56 60s.92 Customer: Authorized Signature:- Date of tones Concrete & Excavation Estimator - Carson Chester s41-861-8060 Sub Total $ s,szt,gc O&P Markup 15.00%835.78 TOTAL $ 6,&7.62 www.JonesConcrete.pro llt c P,O. Box lto W.natche6, VltA, 98807{ll9 Phonr 509{62-711t Fax 509t82{3t0 Klttltas County Comlssioners 205 West Sth Ave, Suite 108 Ellensburg, WA 98926 MAKE CHECKS PAYABLE TO: Carcad. Ccntml Corctruction, LLC P.O Box llg l Lnatchcr, Wiq. 98807{rl'19 THANK YOU rcR YOUR AUS,,I'ESS' PROPOSAL PROJECT: EllGnsburg Rod.o Arcna lmprovtmonts coP# 26 DATE: March 0,2026 TITLE: COP 25 - HDPE Crcdit CASCADE EEI{TRAL Odr DESCitFltON ouAl,lfllY Ltot UNIT PiICE AfoultT 3t5t20x Subcontractor Co6t Civil Subcontractor - Ses attached Back-up LS $(12,055.02)($12,055,02) 606 Mark-u[000 Subcontractor - Sub Toial {12.655.021 3t5t20m Cascadc Ccntal Conatsuction Co.t Superuislon 0 HR $'lzE.1E $0.00 General Conditions 0 WO $925.00 $0.00 Proioct Management & Coordinstlon o HR $101,54 $0.00 Project Englneer o HR $1 16,25 $0.00 Laborer o HR $63.0E $0.00 Carpgnter o HR $1 19.00 $0.00 15% Mark-utr o00 Gensral Contractor - Sub Toial 000 I't7 655 rJ21 lTO 0t) sn oo Schcdulc lmpact: TOTAL n2.6Ar-n2l SEIIAND P.O. Box ll9 Womiohes, WA 98807 Phonp: (509)662-7119 Fu: (509)662-4,165 Bld Date:March 4,2026dr'^l;;;;Tffi Ellensburr Rodeo Arena lmorovements -HDPE vs Conoer Credlt Ouallflcatlons: Please Read Carefullv 1. washlngton State Sales Tax has been not been lncluded ln proposal. 2. Prevalllng wage has been accounted for ln proposal. 3. Rock €xcavatlon (1,e. Solld Rock, Callche, Hard Pan, Cemented Solls and/or Boulders larger than 1 Cublc Yard) have not been lncluded, Prlce Negotlatlon wlll be requlred lfthese matealals a.e encountered, 4. Over Excavatlon of Unsuhable Material has not been accounted for, price negotlatlon wlll be requlred lfthese materlals are encountered. 5, Excludes Water System Support. 6. Exludes Constructlon Survey. ?, Englneerlng & Professlonal Surveylng Servlces are Excluded. 8, Fees for Utllhles, County, Ot% Etc. are not lncluded, Cuhural Resource Servlces are not covered in our scope, 9, Hazardous Materlals Abatement, Removal, Handllng, Dlsposal, etc, ar€ not expected onslte and are therefore Excluded, 10. waterlng & Dust Control are lncluded for Selland's scope of work and duratlon only, No OT Dust Control or beyond our work. 11. Eroslon Control lnspectlons, Reportlng, Monltoring & Malntenance are Excluded. Stormwater Permlt by others. 12, Dust control has been provlded while we are actlvely worklng the slt€. No permanent or sustalned dust control or mltlgatlon has been lncluded. 13, Any scope ofwork not speclflcally lncluded as a llne ltem ln thls proposal ls excluded. 14, Actual quantltlas lnstalled shall be tracked/measured and the basis of payment at the unlt prices included ln thls proposal unless otherwlse agreed. 15, Due to global supply chaln dlsruptlons and mark€t volatlllty we res€rve the exclusive rlght to adjust our proposal for materlal escalatlon. 16. Proposal ls valld for 30 days. Thls proposal shall be made part of any subcontract. lf you have any questlons or need addltlonal lnformatlon wlth regard to our proposal please glve us a call, Slncerely, sEu.AND coNsrRucnoN, rNc. c,-:V*a-./ '/ James Flowerg (s09) 881-0339 tI HDPE Page 1 of 1 c CASCADE CEI{TRAL PROPOSAL F.O. Box ll9 Wenatchoc, WA, 08807{l'10 Fax !09-802"8380 To: Kittltas County Comissioners 205 West Sth Ave, Suite 108 Ellensburg, WA 98926 MAKE CHECKS PAYABLE TO; Cascadc Ccntral Constluction, LLC P.O Bor {10 wcnatchca, wA. 98807{tl {9 THANK YOU FO R YOUR AUS,,IIESS' PRoJECT: Ellcnsburg Rodoo Arcna lmprovcmcnls cnP#27 DATE: March 6,2026 TITLE: RFl090 - Buckaroo Scating Gqt6 Valv. Addition Dait DESCntiltON OUANITITY uox!UIIIT PRICE Atttoul{T 3t5t2026 Subaontractor Coat Earth\,tork Subcontractor - Soe attachod Back-up 1 LS $3,649.72 $3,669.72 6% Mark-uF 220.18 Subcontrsctor - Sub Total 3 889 90 3tg20m Cascedc Ccntal Constucdon Coat Superyision 0 HR $128.18 $0.00 Gsnsral Conditions o WO $925.00 $0.00 Proisct Management & Coordination o HR $161.54 $0.00 Pmjoct Englneer 0 HR $'t10.25 $0.00 Labo16r 0 HR $63.08 $0.00 CaryeniBr o HR $t'19.00 $0.00 15% Mark-uF ooo Gsnoral Conlrector - Sub Total 0.00 3.889.90 $36.95 $54.46 SchGdub lmpact: TOTAL 3 eal 32 . .. aMrc"-r Er I L:__l\ tr< f]{t I i Nt s 1-!? II l:;'} ; iui t.l Dally Report of Force Account Workod 3ontract Number lDate lltem NumberI wnozal Item Name 3' Gste Valve Assembl! trime Conlracior Cas csde Cenlrul Cowtruction Subconlractor/Lower Tlor Subconlractor Selhnd Construction, Inc. )escriplion of Worfi Performed 3' Gate Valve ossembly Workers and/or Equlpment WorklnE Occupation of Workers or Equlpment Slze Houra vorked Reg, Rate O.T. Rate Amount Reo-o.T. I Foreman 2.0 $102.61 8205.22 2 0perator (2 3 I Excavator)$100.07 $0,00 3 Op er ator ( 1 3 I Exc avato r)4.0 8100.07 M00.28 4 Operator (Loader)8100.07 80.00 5 Operalor Mini Exc)$100.07 s0.00 6 0peralor (Skid Steer)$100.07 80.00 7 Operalor (Rollcr)$94.82 $0.00 8 Pipe Layer 4.0 $6607 $264.28 o Pipe Layer (Topman)4.0 $6607 $264.28 10 General Loborer 862.45 80.00 't'l $0.00 Labor Subtotal $1,134.06 15% Markup $170.1 I Labor Total $1,304.17 12 238 Excantor s|37.12 80.00 13 138 Excwator 4.0 8124.46 $497.84 14 [-oader $84.33 $0.00 15 Mini Excavator $5610 $0.00 16 Skid Steer $80.18 80.00 17 Roller 825.32 80.00 18 Plckup 2.0 843.80 887.60 19 l-Ton 4.0 M7.22 $188.88 Subtotal $774.32 1595 Markup 8r 16.ls Equipmenl Total $890.47 Materials 20 Gate Valve I s763.84 $763.84 21 Gaghets ,$12.42 824.84 22 F'Iange Adapter 2 819.71 839.42 23 BakupNng t 810.80 $21.60 24 Bolt Kil 2 86.13 812.26 25 Saddle 3x$/4n 1 $178.33 $178.33 26 3/4u -1/2' Bushing 1 $4.03 $4.03 27 I/2" Valve I $36.28 83628 28 Valve Box I $107.00 $107.00 29 Valve Top I $64.80 864.80 30 Valve Box Lid 1 830.28 $30.28 Materials Subtotal $1,282.68 15oh Markup $192.40 Materials Total $1,475.08 By Total $3,669.72 c P.O, Box ll0 Wcnatchoo, llVA. 08807{{l9 Phonr t09{82-7{19 F x t09462{3t0 Kltlltas County Comissioners West Sth Ave, Suite 108 Ellensburg, WA 98926 MAKE CHECKS PAYABLE TO: Cascad. Ccrdral Construction, LLC P.O Box ll9 \,lLnatchcG, WA 98807{l{'19 THANK YOU rcR YOUR AUS"VESS' PROPOSAL PROJECT: Ellcneburg Rodco Arcna lmprovcmcnte coP# 28 DATE: March t,2026 TITLE: RFI 082 - Exioting Fibcr Conduit Und.r Arcna cAscADE CEl{TRAL 0d.oESCRtpilOt{OUANIfl?Y UOIN UNII PRICE AIIOUN? u5t20x)Subcomractor Cost El€ctrloal Subcontrac-tor - See attached Back-up 1 LS $1,892.00 $1,892.00 6% Mark-ut 113 A2 Subcontrsctor - Sub Total 2.005.52 3t5l20x Cascada C.ntral Consl'ucdon Cost Superuision 0 HR $128.18 $0.00 General Conditlons 0 WD $925.00 $0.00 Projsct Managemont & Coordination n HR $161.54 $0.00 Pojsct Enginoer 0 HR $1 16.25 $0.00 Laborer o HR $63.08 $o.oo Carponter o HR $1 19.00 $o.u) '15% Mark-utr o.00 Gen€ral Contractor - Sub Total o.00 Subtota 2 005.52 Bonc $19 (15 s2a oa Schcdula lmpaet: TOTAL 2.052.65 McGann Electric ccc Contractor Breakdown Summary Project Name: Project No. Contractor: Description: Ellensburg Rodeo Arena lmprovements RFI 082 Costs Source Documents: Jack McGann McGann COPIS Date: Contractor Ref, No. 3t5t2026 McGann Electric Provide additional 2" pvc conduit, handhole, and fttings required to connect video board fiber location to new fiber vault and pathway system per RFI 082 response. Exclusions: trenching, backfill, backfill materials Itemize all costs on attached COP Cost Breakdown form. Supervision: d. direct supervision (NTE 15o/o ol 1al e. safety (NTE 2% of lines 1a, b, & c) 2. MATERIAL COSTS a, material costs b. freight costs (itemize) 3. EQUIPMENT COSTS a. owned equipment (per spec approved source) b. rental equipment (per invoices attached) 4. SMALL TOOLS a. small tools (NTE 5% of 1a & b) 5, OVERHEAD & PROFIT NTE 15% portion of 1,2,3, & 4 up to $50,000 6. SUB-SUBCONTRACTORS 7. OVERHEAD & PROFIT ON SUB-SUBCONTRACTORS a. NTE 15% of Line 6 up to $50,000 for each sub $17.11 l.CRAFTLABORCOSTS $873.00 $709.45 2. MATERIAL COSTS $709.00 $ 3. EQUIPMENT COSTS $ $43.65 4. SMALLTOOLS $44.00 SUBTOTAL,I thru $260.1 6 $ 5, OVERHEAD & PROFIT $260.00 6. SUB-SUBCONTRACTORS $ $ $ 7. OVERHEAD & PROFIT ON SUB.SUBCONTRACTORS $ $1.31 $4.72 8. INSURANCE $6.02 9. BOND $ $1.892.00 CRAFT LABOR COSTS Direct Labor Costs: a. crew (apprentices, journeymen, & laborers) b. foreman c. superintendent $855.60 $ $ DIRECTLABORSUBTOTAL $855.60 _!!!%or1 0.25 % ot 1-7 0.03 % of 1-8 a. b. a, b. c. d.$ 8. INSURANCE a. payroll driven liability insurance b. volume driven liability insurance 9. BOND a. bond Fom Revised 04/25115 TOTAL GOST https://mcgannelectric-my-sharepoint.com/personal/jackmcgann-mcgannelectric-com/Documents/McGann Electric/2025 Ellensburg Rodeo 9.30/COPs/C9f .1l-^ Fiber ConduiVMcGann coP15 video board fiber conduit 3.5 Summary lssued 3/5/2026 1 Cost Breakdown Project Name: Ellensburg Rodeo Arena Video Board Fiber RFI 082 Project No. Contractor: McGannElectric Date: Gontractor Ref. No. Mccann COP15 3t5t2026 19.00$ $ $ 45.60 6.24 $ $ $ {,565.05 $ $ 855.60 $ 5.20$ $ 19.36$ $ 88.60 $ $ 490.45 35.00$ $ $ $ Total Cost $ $ $ uipment $ $ $ $ $ $ $ $ $ $ $ $ $ Cost $ $ $ $ $ $ $ $ Unit $ $ $ 5.20$ 88.60$ $ 490.45 $ 19.00$ 35.00$ $ $ $ $ $ $ 709.45$ Cost $ $ $ $ 45.60$ 6.24$ $ 19.36$ $ $490.45 $35.00 Material Unit $ s1.14 $1.30 $1.56 $9.68 $11.85 $44.30 $0.38 $ $ 8s5.60 $ $ $ $ 855.60$ $ 855.60 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Cost $ $ Labor Unit $ $106.9sHR FT EA EA EA EA FT EA LT Unit Tvpe 1 z1no17 Quantity I 40 4 4 2 2 50 1 Labor Subtotal Description Electrician Labor 2" PVC 2. PVC couplinq 2'' PVC FA 2" PVC bell end 2" Riqid 90 #10 trace wire Handhole'l 1x1 8x'l 2 concrete qlue, tape, markinq tape, corrosion Subtotal Cost of Work II II IIIII