Loading...
HomeMy WebLinkAbout2026-058 Fully ExecutedKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA DATE: ACTION REQUESTED: AGENDA STAFF REPORT March 17,2026 Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the Horizontal Curve Safety Project CRP 3t9-23. BACKGROUND:The Horizontal Curve Safety Project was selected to receive Federal Funding through the Highway Safety Improvement Program (HSIP). Kittitas County Public Works has inventoried horizontal curves countywide and selected ten (10) roadway segments for implementation of improved roadside signing, including advisory speeds, chevron affow signs, and the addition of flexible guideposts to increase driver awareness. All the improvements are focused on helping reduce accidents and injuries on the road system. This project is eligible for one hundred percent (100%) Federal Funding for all phases authorized prior to April 30, 2026. This Project Prospectus covers the Federal Funding for the Construction phase of the project. Public Works is finalizing construction documents targeting a May 21,2026, advertisement. INTERACTION:Public Works RECOMMENDATION: Approve the Resolution Authorizingthe Chair's signature on the Local Agency Federal Aid Project Prospectus for the Horizontal Curve Safety Project CRP 319-23. HANDLING: ATTACHMENTS: LEAD STAFF: Return one original to Public Works Resolution, Local Agency Federal Aid Project Prospectus Josh Fredrickson, Public Works Director BOARD OF COI.]NTY COMMISSIONERS COUI\TY OF KITTITAS STATE OT'WASHINGTON RESOLUTION NO. 2026 -o58 AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL AID PROJECT PROSPECTUS CONSTRUCTION PHASE FOR THE HORIZONTAL CURVE SAFETY PROJECT CRP 319-23 WIIEREAS: The Horizontal Curve Safety Project was awarded Federal Funding through the 2023Highway Safety Improvement Program; and WIIEREAS: The Funding will be used for the construction phase to implement the improvements on ten (10) identified roadway segments chosen; and WHEREAS: In preparation to begin work, Kittitas County Public Works is requesting the Washington State Department of Transportation release the Federal Funds for construction; and WHEREAS:A Local Agency Federal Aid Project Prospectus must be executed by the Chair of the Board of County Commissioners acknowledging the project has been reviewed and is consistent with the County's comprehensive plan for community development;and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby approve the Chair's signature on the Local Agency Federal Aid Project Prospectus for the Horizontal Curve Safety Project cRP 319-23. DATED on this 17th day of March 2026, at Ellensburg, Washington. BOARD OF COTINTY COMMISSIONERS KITTITAS TON of the Board- Julie Kjorsvik ice-Chairman n Deputy Clerk of the,Board- Mandy Buchholz o Commissioner Prefix Route ) FederalAid Proiect Number HSIP 000s 678 Local Agency Project Number RC 2298 ^-W Ys;llffitlli ?l"*i.n "oorrarion Local Agency Project Federal Aid Prospectus WSDOT 0nlyUse ) Date 0310212026 DUNS Number 0r-020-2547 Federal Employer Tax lD Number 9r-601349 Federal Program Title Vza.zos X otner CAAgency [Z Yes ! ruo Agency Kittitas County Public Works Start Longitude W -120.954167 w -120.012574End Lonqitude Start Latitude n 47 .1817 26 End Latitude rt47.165419 Project Title Horizontal Curve Safety Project Project Zip Code (+4) 98926-7989 Nearest City Name Ellensburg Project Termini From-To countywide countywide Award Type M t-ocat! tocat Forces f, state ! Railroad Length of Project countywide End Mile Post countywide Begin Mile Post countywide County Name Kittitas County Number 19 End Mile Point countywide City NumberRoute lD Begin Mile Point countywide Urban Area NumberCongressional District(s) 8 Legislative District(s) 13 WSDOT Region South Central Region Phase Total Estimated Cost (Nearest Hundred Dollar) Local Agency Funding (Nearest Hundred Dollad Federal Funds (Nearest Hundred Dollar) Phase Start Date Month Year P.E.125,000.00 125,000.00 November 2023 R^/v Const.543,000.00 543,000.00 Apm2026 Total 668,000.00 668,000.00 of Existing Facil (Existing Design and Present Condition)Descri Number of Lanes varies Roadway Width varies Many roads havehazardous curves and non standard or non-existent delineation. Descri on of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary) Collect data and instal[upgrade signing for horizontal curves (such as advisory speeds, chevrons, delineation). Local Agency Contact Person Darren Case Title Construction Manager Phone 509-962-70r9 Mailing Address 411 N. Ruby, Suite I City Ellensburg State WA Zip Code 98926 By Project Prospectus T1s Director, Public Works Date Revised 0112022 Previous Editions Obsolete Agency Kittitas County Public Works Project Title Horizontal Curve Safety Project Date 0310212026 Type of Proposed Work Project Type (Check all that Apply) ! t tew Construction n Path / Trail n g-n ! Reconstruction ! Pedestrian / Facilities n Z-n I Railroao ! Parking Z otner ! arioge Roadway Width varies Number of Lanes varies Geometric Design Data Description Through Route Grossroad Federal Functional Classification M uroan M Rural n ruHs I PrincipalArterial Z Minor Arterial f, collector f tr,talor Collector M tvtinor Collector M Local Access Z urnan f, Rural E runs n PrincipalArterial f, MinorArterial E Collector Z tvtajor Collector M Vtinor Collector f, Local Access Terrain n rt"t Roll Mountain flrtut nnott nMountain Posted Speed varles Design Speed varles Existing ADT vanes Design YearADT Design Year Design Hourly Volume (DHV) Performance of Work Preliminary Engineering Will Be Performed By County Others otto Agency 100 o/o Conshuction Will Be Performed By Contract Contract 100 % Agency otto Environmental Classification ! Ctass I - Environmental lmpact Statement (ElS) n Project lnvolves NEPA/SEPA Section 404 lnteragency Agreement n Ctass lll - EnvironmentalAssessment (EA) I Project lnvolves NEPA/SEPA Section 404 I nteragency Ag reements Z Class ll - Categorically Excluded (CE) ! Projects Requiring Documentation (Documented CE) Environmental Considerations Revised 0112022 Previous Editions Obsolete Agency Kittitas County Public Works Project Title Horizontal Curue Safety Project Date 0310212026 Right of Way Z No Right of Way Needed * All construction required by the contract can be accomplished within the existing right of way. n night of Way Needed flruo Relocation n Relocation Required Utilities Railroad Z llo utility work required tr nl utility work will be completed prior to the start of the construction contract nrut utility work will be completed in coordination with the construction contract Z No railroad work required n rut railroad work will be completed prior to the start of the construction contract f] rut the railroad work will be completed in coordination with the construction contract Description of Utility Relocation or Adjustments and Existing Major Structures lnvolved in the Project Utilities will be located and if conflicts are identified, Kittitas County will require relocation prior to the construction project. FAA lnvolvement ls any airport located within 3.2 kilometers (2 miles) of the proposed project? n Yes Z ruo Remarks This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehens Agency Date obltTlpu DOT Form 140-101 Revised O1l2O22 By Previous Editions Obsolete n for community development. Page 3