DESCRIPTION OF CHANGE:
COP 19-Electrical Utility Plans
COP 21 -REP 5 -New POC for water main
COP 23 -RFI 020 -Receptacle attachment painting
COP 24 -REI 072 -FRP at mop sink
COP 25 -RFI 076 -South walk bridge landing location condition
COP 26 -HDPE Credit
COP 27 -RFI 090 Gate Valve
COP 28 -RFI 082 -Fiber Conduit Under Arena
Amount
$1 8,862.66
$65,165.15
$729.06
$732.31
$21,870.87
($12,655.02)
$3,981.32
$2,052.65
Total This Change Order:$100,739.00
Original Contract Sum
Net Amount of Previously Approved Changes:
Contract Sum Prior to This Change Order:
Contract Sum is increased by This Change Order:
Revised Contract Sum:
Original Contract Completion Date:
Previously Approved Increases in Time:
Completion Date Prior to This Change Order:
Contract time will be changed by
Calendar Days This Change Order
Revised Substantial Completion Date:
Revised Final Acceptance Date:
*Does not include State or Local Sales Tax
Date
Recommended By:
ALSC Architects,P.S.
By:
____
Date
_____________
Approved by Owner:
By:
____________
Date
Asc
CHANGE ORDER NO.6
PROJECT NAME:Ellensburg Rodeo Arena Completion
OWNER:Kittitas County
CONTRACTOR:Cascade Central Construction
PROJECT NO:2025-009 PAGE lot 23
$5,065,000.00 *
$1,212,260.35
Accepted by Contractor:
$6,277,260.35 By:
$100739.00
$6,377,999.35
11Z4
7/20/2026
7
7/23/2026
0
7/27/2026
8/22/2026
ALSC Architects
I
We bring our clients’stories to life.
PROPOSAL
P.O. Box 119
Wenatchee, WA. 98807-0119
Phone 509-662-7119
Fax 509-662-6380
To:PROJECT:Ellensburg Rodeo Arena Improvements
Kittitas County Comissioners COP#19
205 West 5th Ave, Suite 108 DATE:March 9, 2026
Ellensburg, WA 98926 TITLE:Electrical Utility Plans Rev.1
Date DESCRIPTION QUANITITY UOM UNIT PRICE AMOUNT
3/9/2026
1 LS 18,666.00$ $7,866.00
1 LS 33,366.00$ $7,814.00
940.80
16,620.80
3/9/2026
8 HR 128.18$ $1,025.44
0 WD 925.00$ $0.00
4 HR 161.54$ $646.16
4 HR 116.25$ $465.00
0 HR 63.08$ $0.00
0 HR 119.00$ $0.00
320.49
2,457.09
19,077.89
$181.24
$267.09
19,526.22
3/9/2026
-2 HR 81.78$ ($163.56)
-2 CY 250.00$ ($500.00)
(663.56)
18,862.66
MAKE CHECKS PAYABLE TO:
Cascade Central Construction, LLC
P.O Box 119
Wenatchee, WA. 98807-0119
THANK YOU FOR YOUR BUSINESS!
Subcontractor Cost
Earthwork Subcontractor - See attached Back-up
Electrical Subcontractor - See attached Back-up
General Contractor - Sub Total
Subcontractor - Sub Total
Cascade Central Construction Cost
Project Management & Coordination
Laborer
Carpenter
6% Mark-up
Supervision
General Conditions
15% Mark-up
Concrete Encasement Credit Per RFI 052 Response
Subtotal
Bond
B&O Tax
Project Engineer
Subtotal
TOTAL
Qualifications:
Included:
-Excavation and backfill for duct, vault, transformer, primary conductors, and trench from meter cabinet to to new transformer.
-Ecology Blocks
-Conduit and wire from meter cabinet to new transformer.
Excluded:
-By utility provider: All removal and demo. Supply and install of duct, vault, transformer, and primary conductors/conduit.
-Concrete encasement from meter cabinet to utility tranformer vault
-Utility fees.
Schedule impact: None. Excluding any potential lead times or scheduling associated with utility scope of work.
Cement Mason
Concrete
Subtotal
t
P.O. Box 119 Wenatchee, WA 98807
Phone: (509)662-7119 Fax: (509)662-4465
Bid Items Quantity Unit Unit Price Amount
1 Utility Trench Exc. & BF 40 LF 80.00$ $3,200.00
2 Vault Exc. & BF 1 EA 3,730.00$ $3,730.00
3 Furnish & Install Eco Blocks 4 EA 234.00$ $936.00
$7,866.00
$7,866.00
Qualifications: Please Read Carefully
1. Washington State Sales Tax has been not been included in proposal.
2. Prevailing Wage has been accounted for in proposal.
3. Any scope of work not specifically included as a line item in this proposal is excluded.
4.
5.
6.
Sincerely,
SELLAND CONSTRUCTION, INC.
James Flowers
(509) 881-0339
Subtotal
Actual quantities installed shall be tracked/measured and the basis of payment at the unit prices included in this proposal unless otherwise agreed.
Due to global supply chain disruptions and market volatility we reserve the exclusive right to adjust our proposal for material escalation.
Proposal is valid for 30 days. This proposal shall be made part of any subcontract.
Total
If you have any questions or need additional information with regard to our proposal please give us a call.
Bid Date: January 26, 2026
Ellensburg Rodeo Arena Improvements - City Electrical Trenching & BF COP
SELLAND
INC.
CONSTRUCTION
General Contractors
Page 1 of 1
Project Name:COP-14R
Project No.3/9/2026
Description:
a.1,711.20$
b.-$
c.-$
DIRECT LABOR SUBTOTAL 1,711.20$
d.
e.34.22$
1,745.00$
a.4,885.20$
b.
4,885.00$
a.-$
b.
-$
a.87.25$
87.00$
6,717.00$
a.1,074.72$
b.-$
1,075.00$
a.
b.
c.
d.-$
-$
a.-$
-$
-$
a.0.15 % of 1 2.62$
b.0.25 % of 1-7 19.48$ 22.10$
a.0.03 % of 1-8 -$
7,814.00$ Form Revised 04/25/15
6. SUB-SUBCONTRACTORS
TOTAL COST
bond
payroll driven liability insurance
volume driven liability insurance 8. INSURANCE
9. BOND
9. BOND
small tools (NTE 5% of 1a & b)
7. OVERHEAD & PROFIT ON SUB-SUBCONTRACTORS
NTE 15% of Line 6 up to $50,000 for each sub
8. INSURANCE
5. OVERHEAD & PROFIT
6. SUB-SUBCONTRACTORS
SUBTOTAL 1 thru 4
7. OVERHEAD & PROFIT ON SUB-SUBCONTRACTORS
owned equipment (per spec approved source)
5. OVERHEAD & PROFIT
4. SMALL TOOLS
rental equipment (per invoices attached)
2. MATERIAL COSTS
3. EQUIPMENT COSTS
4. SMALL TOOLS
material costs
Jack McGann
Contractor:
Ellensburg Rodeo Arena Improvements Additional Utility Service Requirem
McGann Electric
Source Documents:
Cost includel labor and materials required for the further relocation of utilty meter cabinet per response to RFI 005.Cost to
expedite utiltiy meter cabinet. Exclusions: additional trenching, backfill, backfill material, ecology blocks, any and all utility
fees associated with utiltiy plan.
Itemize all costs on attached COP Cost Breakdown form.
crew (apprentices, journeymen, & laborers)
foreman
superintendent
Direct Labor Costs:
1. CRAFT LABOR COSTS
safety (NTE 2% of lines 1a, b, & c)
direct supervision (NTE 15% of 1a)
Supervision:
1. CRAFT LABOR COSTS
3. EQUIPMENT COSTS
NTE 15% portion of 1, 2, 3, & 4 up to $50,000
CCC
Contractor Breakdown Summary
McGann Electric
freight costs (itemize)
2. MATERIAL COSTS
Date:
Contractor Ref. No.
https://mcgannelectric-my.sharepoint.com/personal/jackmcgann_mcgannelectric_com/Documents/McGann Electric/2025 Ellensburg Rodeo 9.30/COPs/COP14 Additional
Service Entrance/Ellensburg Rodeo Arena COP-14 Additional Utiity - Copy Summary Issued 3/9/2026
Project Name:COP-14R
Project No.3/9/2026
Contractor:
Unit Labor Material Equipment Total
Description Quantity Type Unit $Cost Unit $Cost Unit $Cost Cost
-$ -$ -$ -$
-$ -$ -$ -$
Electrician Labor 16 HR $106.95 1,711.20$ -$ -$ 1,711.20$
-$ -$ -$ -$
-$ -$ -$ -$
-$ -$ -$ -$
-$ -$ -$ -$
-$ -$ -$ -$
4" pvc sch40 120 FT -$ $3.67 440.40$ -$ 440.40$
500 AL 480 FT -$ $3.76 1,804.80$ -$ 1,804.80$
-$ -$ -$ -$
-$ -$ -$ -$
-$ -$ -$ -$
-$ -$ -$ -$
EATON Expedite fee 1 LT -$ $2,640.00 2,640.00$ -$ 2,640.00$
-$ -$ -$ -$
-$ -$ -$ -$
-$ -$ -$ -$
-$ -$ -$ -$
-$ -$ -$ -$
-$ -$ -$ -$
-$ -$ -$ -$
-$ -$ -$ -$
Labor Subtotal 1,711.20$
-$ -$ -$ -$
-$ -$ -$ -$
-$ -$ -$ -$
1,711.20$ 4,885.20$ -$ 6,596.40$
Cost Breakdown
McGann Electric
2/1/2017
Contractor Ref. No.
Date:
Subtotal Cost of Work
Rodeo Arena Improvments additional Utility Service
https://mcgannelectric-my.sharepoint.com/personal/jackmcgann_mcgannelectric_com/Documents/McGann Electric/2025 Ellensburg Rodeo 9.30/COPs/COP14 Additional Service Entrance/Ellensburg Rodeo Arena COP-14 Additional
Utiity - Copy Cost Breakdown Issued 3/9/2026
ALSC Architects \\ We bring our clients’ stories to life.
REQUEST FOR PROPOSAL NO: 05
Project Name: Ellensburg Rodeo Arena Completion
Owner: Kittitas County
Contractor: Cascade Central Construction
Job Number: 2025-009
Page 1 of 2
TO: Cascade Central Construction, Contractor, please furnish your proposal for performing the changes outlined
below and/or detailed on the attachments referred to:
• Revisions to Civil drawings per City of Ellensburg direction for new connection point to 12” main instead
of 8” line previously noted.
• Reconnection of existing water lines from the east to the new water service.
ALSC Architects, P.S. By Todd Keller Date: 2/09/26
PROPOSAL:
To the Owner: We propose to perform all changes described in the above request for a total ADDITION/DEDUCTION
(cross out one) to the contract sum of:
$
(not including Sales Tax)
We have attached cost estimate detail sheets, and the foregoing amount covers all direct and indirect costs related to
this proposal and to the effect of the proposal on the remainder of the project. All other provisions of the contract
remain in full force and effect. We request the completion date be EXTENDED/REDUCED (cross one out) ________
calendar days because of this work. The Contractor agrees to be bound to this proposal quotation for sixty (60) days
after this date.
By Date
Contractor
RECOMMENDATION:
TO: Owner, we have examined the foregoing proposal and find it to be appropriate for the request. We recommend
its acceptance.
ALSC Architects, P.S. By Date:
PROPOSAL ACCEPTANCE:
The Owner hereby accepts the foregoing proposal. This instrument, when signed below, constitutes the conditions
upon which a Change Order will be issued.
By Date
Owner
0
For Review02/12/2026 8:07:05 AM
Cascade Central Construction KC Carroll 3/5/2026
Sixty-Five Thousand One Hundred Sixty-Five and 15/100 Dollars 65,165.15
PROPOSAL
P.O. Box 119
Wenatchee, WA. 98807-0119
Phone 509-662-7119
Fax 509-662-6380
To:PROJECT:Ellensburg Rodeo Arena Improvements
Kittitas County Comissioners COP#21
205 West 5th Ave, Suite 108 DATE:March 5, 2026
Ellensburg, WA 98926 TITLE:New POC for Water Main Rev.2
Date DESCRIPTION QUANITITY UOM UNIT PRICE AMOUNT
3/5/2026
1 LS 54,922.27$ $54,922.27
1 LS 2,123.73$ $2,123.73
$0.00
3,422.76
60,468.76
3/5/2026
8 HR 128.18$ $1,025.44
0 WD 925.00$ $0.00
8 HR 161.54$ $1,292.32
4 HR 116.25$ $465.00
0 HR 63.08$ $0.00
0 HR 119.00$ $0.00
417.41
3,200.17
63,668.93$
$604.85
$891.37
TOTAL 65,165.15$
MAKE CHECKS PAYABLE TO:
Cascade Central Construction, LLC
P.O Box 119
Wenatchee, WA. 98807-0119
THANK YOU FOR YOUR BUSINESS!
Subtotal
Bond
B&O Tax
Project Engineer
Schedule Impact:
General Contractor - Sub Total
Subcontractor Cost
Civil Subcontractor - See attached back-up
Concrete Subcontractor - see attached back-up
6% Mark-up
Supervision
General Conditions
15% Mark-up
Subcontractor - Sub Total
Cascade Central Construction Cost
Project Management & Coordination
Laborer
Carpenter
Date Item Number
3/4/2026
Reg. O.T.
1 30.0 $102.61 $3,078.30
2 20.0 $100.07 $2,001.40
3 20.0 $100.07 $2,001.40
4 12.0 $100.07 $1,200.84
5 15.0 $100.07 $1,501.05
6 20.0 $100.07 $2,001.40
7 2.0 $94.82 $189.64
8 30.0 $66.07 $1,982.10
9 30.0 $66.07 $1,982.10
10 20.0 $62.45 $1,249.00
11 $0.00
15% Markup
12 20.0 $137.12 $2,742.40
13 20.0 $124.46 $2,489.20
14 12.0 $84.33 $1,011.96
15 15.0 $56.10 $841.50
16 20.0 $80.18 $1,603.60
17 2.0 $25.32 $50.64
18 30.0 $43.80 $1,314.00
19 40.0 $47.22 $1,888.80
15% Markup
20 164.25 LF $46.62 $7,657.34
21 9 EA $165.58 $1,490.22
22 130 LF $34.25 $4,452.50
23 1 LS $500.00 $500.00
24 -1 LS $1,756.39 -$1,756.39
25 150 LF $0.28 $41.33
26 270 LF $0.03 $9.17
27 3,000 SF $0.50 $1,500.00
28 20 TN $18.00 $360.00
29 175 TN $25.00 $4,375.00
15% Markup
Date Checked By Date
$18,629.16
$2,794.37
Materials Total $21,423.54
Calculated By
Total $54,922.27
Scare Tape
Sod
Crushed Rock
Pipe Bedding (Pea Gravel)
Materials Subtotal
Materials
8" DI Pipe
Field Lok Gaskets
2.5" Copper Pipe
Copper Fittings for Connections
Tracer Wire
HDPE vs Copper Credit
1-Ton
Equipment Subtotal $11,942.10
$1,791.32
Equipment Total $13,733.42
Skid Steer
Roller
Pickup
138 Excavator
Loader
Mini Excavator
$17,187.23
$2,578.08
Labor Total $19,765.31
Equipment
238 Excavator
General Laborer
Labor Subtotal
Operator (Roller)
Pipe Layer
Pipe Layer (Topman)
Operator (Loader)
Operator (Mini Exc)
Operator (Skid Steer)
Labor
Foreman
Operator (238 Excavator)
Operator (138 Excavator)
Time Worked Record
Workers and/or Equipment
Working Occupation of Workers or Equipment Size
Hours Worked
Reg. Rate O.T. Rate Amount
Prime Contractor Subcontractor/Lower Tier Subcontractor
Cascade Central Construction Selland Construction, Inc.
Description of Work Performed
Extend 8" Ductile Iron Water (150 LF) to the connection, 2.5" Copper Service (120 LF), Credit to HDPE
Daily Report of Force Account Worked
Contract Number Item Name
RFP 05 - Water Revisions per City Comments
Item Class Quantity Unit Unit Price
1 Material 5 CY 255.75$
2 Material 1 EA 108.00$
3 Labor 7 HR 65.71$
1,846.72$
15.00% 277.01
2,123.73$
Washington
Amount (US $)
1,278.75$
459.97$
ATTN: General Contractor
Concrete Estimate - RFP 05
Estimate Date: 2/12/2026
Project Location
Ellensburg,
Project
Ellensburg Rodeo Improvements
Sub Total
TOTAL
541-861-8060
O&P Markup
Jones Concrete & Excavation
Estimator - Carson Chester
Rebar Not Included
2x4x16 Forms, Stakes, Screws, Small Tools, Exp Joint 108.00$
Work Description
Ready Mix Concrete (Min Order QTY)
Cement Mason
Includes:
Maximum of 15ft x 5ft Concrete Sidewalk
Forming, Pouring of Concrete Sidewalk
Customer:
Authorized Signature:____________________
Name:___________________________
Date of Acceptance:________________
www.JonesConcrete.pro 1/1
PROPOSAL
P.O. Box 119
Wenatchee, WA. 98807-0119
Phone 509-662-7119
Fax 509-662-6380
To:PROJECT:Ellensburg Rodeo Arena Improvements
Kittitas County Comissioners COP#23
205 West 5th Ave, Suite 108 DATE:February 19, 2026
Ellensburg, WA 98926 TITLE:COP 23 - RFI 020 Receptacle Attachment Painting
Date DESCRIPTION QUANITITY UOM UNIT PRICE AMOUNT
2/19/2026
1 LS 672.00$ $672.00
$0.00
$0.00
40.32
712.32
2/19/2026
0 HR 128.18$ $0.00
0 WD 925.00$ $0.00
0 HR 161.54$ $0.00
0 HR 116.25$ $0.00
0 HR 63.08$ $0.00
0 HR 119.00$ $0.00
0.00
0.00
712.32
$6.77
$9.97
TOTAL 729.06
MAKE CHECKS PAYABLE TO:
Cascade Central Construction, LLC
P.O Box 119
Wenatchee, WA. 98807-0119
THANK YOU FOR YOUR BUSINESS!
6% Mark-up
Supervision
General Conditions
15% Mark-up
Subcontractor - Sub Total
Cascade Central Construction Cost
Project Management & Coordination
Laborer
Carpenter
Subcontractor Cost
Paint Subcontractor - See attached Back-up
Subtotal
Bond
B&O Tax
Project Engineer
Schedule Impact:
General Contractor - Sub Total
1
Carley Gangle
From:Philipp Buterbaugh <specialtycoating@hotmail.com>
Sent:Wednesday, February 18, 2026 4:22 PM
To:Carley Gangle
Subject:Ellensburg rfi 020
Pricing for the condutand electrical boxes labor/material to paint the 6 stubouts labor/material $672.00
Philipp Buterbaugh
Coating Specialty LLC
Po box 4049
Wenatchee
98807
specialtycoating@hotmail.com
(509)679-8714
PROPOSAL
P.O. Box 119
Wenatchee, WA. 98807-0119
Phone 509-662-7119
Fax 509-662-6380
To:PROJECT:Ellensburg Rodeo Arena Improvements
Kittitas County Comissioners COP#24
205 West 5th Ave, Suite 108 DATE:February 19, 2026
Ellensburg, WA 98926 TITLE:COP 24 - RFI 072 FRP at Mop Sink
Date DESCRIPTION QUANITITY UOM UNIT PRICE AMOUNT
2/19/2026
1 LS 675.00$ $675.00
$0.00
$0.00
40.50
715.50
2/19/2026
0 HR 128.18$ $0.00
0 WD 925.00$ $0.00
0 HR 161.54$ $0.00
0 HR 116.25$ $0.00
0 HR 63.08$ $0.00
0 HR 119.00$ $0.00
0.00
0.00
715.50
$6.80
$10.02
TOTAL 732.31
MAKE CHECKS PAYABLE TO:
Cascade Central Construction, LLC
P.O Box 119
Wenatchee, WA. 98807-0119
THANK YOU FOR YOUR BUSINESS!
6% Mark-up
Supervision
General Conditions
15% Mark-up
Subcontractor - Sub Total
Cascade Central Construction Cost
Project Management & Coordination
Laborer
Carpenter
Subcontractor Cost
Labor and Material to install FRP behind Mop Sink - See attached Back-up
Subtotal
Bond
B&O Tax
Project Engineer
Schedule Impact:
General Contractor - Sub Total
1
Carley Gangle
From:Philipp Buterbaugh <specialtycoating@hotmail.com>
Sent:Wednesday, February 18, 2026 4:30 PM
To:Carley Gangle
Subject:Ellensburg frp
Labor and material to install frp behind mop sink$ 675.00
Philipp Buterbaugh
Coating Specialty LLC
Po box 4049
Wenatchee
98807
specialtycoating@hotmail.com
(509)679-8714
PROPOSAL
P.O. Box 119
Wenatchee, WA. 98807-0119
Phone 509-662-7119
Fax 509-662-6380
To:PROJECT:Ellensburg Rodeo Arena Improvements
Kittitas County Comissioners COP#25
205 West 5th Ave, Suite 108 DATE:February 26, 2026
Ellensburg, WA 98926 TITLE:RFI 076 - South Walk Bridge Landing Conditions
Date DESCRIPTION QUANITITY UOM UNIT PRICE AMOUNT
2/26/2026
1 LS 11,433.53$ $11,433.53
1 LS 6,407.62$ $6,407.62
1,070.47
18,911.62
2/26/2026
8 HR 128.18$ $1,025.44
0 WD 925.00$ $0.00
4 HR 161.54$ $646.16
4 HR 116.25$ $465.00
0 HR 63.08$ $0.00
0 HR 119.00$ $0.00
320.49
2,457.09
21,368.71
$203.00
$299.16
TOTAL 21,870.87
MAKE CHECKS PAYABLE TO:
Cascade Central Construction, LLC
P.O Box 119
Wenatchee, WA. 98807-0119
THANK YOU FOR YOUR BUSINESS!
Schedule Impact:
None if approved by 2/27/26.
Subcontractor Cost
Earthwork Subcontractor - See attached Back-up
Concrete Subcontractor - See attachde Back-up
General Contractor - Sub Total
Subcontractor - Sub Total
Cascade Central Construction Cost
Project Management & Coordination
Laborer
Carpenter
6% Mark-up
Supervision
General Conditions
15% Mark-up
Subtotal
Bond
B&O Tax
Project Engineer
Date Item Number
2/21/2026
Reg. O.T.
1 20.0 $102.61 $2,052.20
2 $100.07 $0.00
3 $100.07 $0.00
4 3.0 $100.07 $300.21
5 20.0 $100.07 $2,001.40
6 $100.07 $0.00
7 $94.82 $0.00
8 $66.07 $0.00
9 $66.07 $0.00
10 20.0 $62.45 $1,249.00
11 $0.00
15% Markup
12 $137.12 $0.00
13 $124.46 $0.00
14 3.0 $84.33 $252.99
15 20.0 $56.10 $1,122.00
16 $80.18 $0.00
17 $25.32 $0.00
18 20.0 $43.80 $876.00
19 20.0 $47.22 $944.40
15% Markup
20 $0.00
21 $0.00
22 1 LS $1,000.00 $1,000.00
23 8 TN $18.00 $144.00
24 $0.00
15% Markup
Date Checked By Date
Daily Report of Force Account Worked
Contract Number Item Name
RFI 076 S. Bridge Landing
Prime Contractor Subcontractor/Lower Tier Subcontractor
Cascade Central Construction Selland Construction, Inc.
Description of Work Performed
Remove and dispose concrete planter box and asphalt. Prep for concrete landing.
Time Worked Record
Workers and/or Equipment
Working Occupation of Workers or Equipment Size
Hours Worked
Reg. Rate O.T. Rate Amount
Labor
Foreman
Operator (238 Excavator)
Operator (138 Excavator)
Operator (Loader)
Operator (Mini Exc)
Operator (Skid Steer)
Operator (Roller)
Pipe Layer
Pipe Layer (Topman)
General Laborer
Labor Subtotal
Loader
$5,602.81
$840.42
Labor Total $6,443.23
Equipment
238 Excavator
Pickup
138 Excavator
Equipment Subtotal $3,195.39
$479.31
Equipment Total $3,674.70
1-Ton
Concrete & Asphalt Disposal
Crushed Rock
Materials Subtotal
Materials
$1,144.00
$171.60
Materials Total $1,315.60
Calculated By
Total $11,433.53
Mini Excavator
Skid Steer
Roller
Item Class Quantity Unit Unit Price
1 Material 1 EA 312.56$
2 Material 8 CY 255.75$
3 Material 1 EA 241.80$
4 Labor 36 HR 65.71$
5 Labor 7 HR 86.56$
397sf of 6in Thick Concrete Sidewalk
Forming, Pouring of Concrete Sidewalk
#4 Rebar @18in OC EW
#5 Smooth Rebar Dowels @24in OC Per Detail 10 /S-201
5,571.84$
15.00% 835.78
6,407.62$
Washington
Amount (US $)
2,365.56$
605.92$
241.80$
2,046.00$
ATTN: General Contractor
Concrete Estimate - RFP 06
Estimate Date: 2/25/2026
Project Location
Ellensburg,
Project
Ellensburg Rodeo Improvements
Sub Total
TOTAL
541-861-8060
O&P Markup
Jones Concrete & Excavation
Estimator - Carson Chester
Forms, Stakes, Small Tools, Exp Joint,312.56$
Work Description
Cement Mason
Ironworker
#4 Rebar & #5 Rebar Dowels
Ready Mix Concrete
Includes:
Customer:
Authorized Signature:____________________
Name:___________________________
Date of Acceptance:________________
www.JonesConcrete.pro 1/1
PROPOSAL
P.O. Box 119
Wenatchee, WA. 98807-0119
Phone 509-662-7119
Fax 509-662-6380
To:PROJECT:Ellensburg Rodeo Arena Improvements
Kittitas County Comissioners COP#26
205 West 5th Ave, Suite 108 DATE:March 5, 2026
Ellensburg, WA 98926 TITLE:COP 26 - HDPE Credit
Date DESCRIPTION QUANITITY UOM UNIT PRICE AMOUNT
3/5/2026
1 LS (12,655.02)$ ($12,655.02)
0.00
(12,655.02)
3/5/2026
0 HR 128.18$ $0.00
0 WD 925.00$ $0.00
0 HR 161.54$ $0.00
0 HR 116.25$ $0.00
0 HR 63.08$ $0.00
0 HR 119.00$ $0.00
0.00
0.00
(12,655.02)
$0.00
$0.00
TOTAL (12,655.02)
MAKE CHECKS PAYABLE TO:
Cascade Central Construction, LLC
P.O Box 119
Wenatchee, WA. 98807-0119
THANK YOU FOR YOUR BUSINESS!
Bond
B&O Tax
Project Engineer
Schedule Impact:
Subcontractor Cost
Civil Subcontractor - See attached Back-up
General Contractor - Sub Total
Subcontractor - Sub Total
Cascade Central Construction Cost
Project Management & Coordination
Laborer
Carpenter
6% Mark-up
Supervision
General Conditions
15% Mark-up
Subtotal
t
P.O. Box 119 Wenatchee, WA 98807
Phone: (509)662-7119 Fax: (509)662-4465
Bid Items Quantity Unit Unit Price Amount
1 HDPE Credit 1 LS 12,655.02$ $12,655.02
$0.00
$0.00
$0.00
$0.00
$12,655.02
$12,655.02
Qualifications: Please Read Carefully
1. Washington State Sales Tax has been not been included in proposal.
2. Prevailing Wage has been accounted for in proposal.
3.
4.
5. Excludes Water System Support.
6. Exludes Construction Survey.
7. Engineering & Professional Surveying Services are Excluded.
8.
9.
10.
11.
12.
13. Any scope of work not specifically included as a line item in this proposal is excluded.
14.
15.
16.
Sincerely,
SELLAND CONSTRUCTION, INC.
James Flowers
(509) 881-0339
Bid Date: March 4, 2026
Erosion Control Inspections, Reporting, Monitoring & Maintenance are Excluded. Stormwater Permit by others.
Rock excavation (i.e. Solid Rock, Caliche, Hard Pan, Cemented Soils and/or Boulders larger than 1 Cubic Yard) have not been included. Price Negotiation will be
required if these materials are encountered.
Subtotal
Over Excavation of Unsuitable Material has not been accounted for, price negotiation will be required if these materials are encountered.
Ellensburg Rodeo Arena Improvements -HDPE vs Copper Credit
Actual quantities installed shall be tracked/measured and the basis of payment at the unit prices included in this proposal unless otherwise agreed.
Due to global supply chain disruptions and market volatility we reserve the exclusive right to adjust our proposal for material escalation.
Proposal is valid for 30 days. This proposal shall be made part of any subcontract.
Total
If you have any questions or need additional information with regard to our proposal please give us a call.
Dust control has been provided while we are actively working the site. No permanent or sustained dust control or mitigation has been included.
Fees for Utilities, County, City, Etc. are not included. Cultural Resource Services are not covered in our scope.
Hazardous Materials Abatement, Removal, Handling, Disposal, etc. are not expected onsite and are therefore Excluded.
Watering & Dust Control are Included for Selland's scope of work and duration only. No OT Dust Control or beyond our work.
SELLAND
INC.
CONSTRUCTION
General Contractors
Page 1 of 1
PROPOSAL
P.O. Box 119
Wenatchee, WA. 98807-0119
Phone 509-662-7119
Fax 509-662-6380
To:PROJECT:Ellensburg Rodeo Arena Improvements
Kittitas County Comissioners COP#27
205 West 5th Ave, Suite 108 DATE:March 5, 2026
Ellensburg, WA 98926 TITLE:RFI 090 - Buckaroo Seating Gate Valve Addition
Date DESCRIPTION QUANITITY UOM UNIT PRICE AMOUNT
3/5/2026
1 LS 3,669.72$ $3,669.72
220.18
3,889.90
3/5/2026
0 HR 128.18$ $0.00
0 WD 925.00$ $0.00
0 HR 161.54$ $0.00
0 HR 116.25$ $0.00
0 HR 63.08$ $0.00
0 HR 119.00$ $0.00
0.00
0.00
3,889.90
$36.95
$54.46
TOTAL 3,981.32
MAKE CHECKS PAYABLE TO:
Cascade Central Construction, LLC
P.O Box 119
Wenatchee, WA. 98807-0119
THANK YOU FOR YOUR BUSINESS!
Bond
B&O Tax
Project Engineer
Schedule Impact:
Subcontractor Cost
Earthwork Subcontractor - See attached Back-up
General Contractor - Sub Total
Subcontractor - Sub Total
Cascade Central Construction Cost
Project Management & Coordination
Laborer
Carpenter
6% Mark-up
Supervision
General Conditions
15% Mark-up
Subtotal
Date Item Number
3/4/2026
Reg. O.T.
1 2.0 $102.61 $205.22
2 $100.07 $0.00
3 4.0 $100.07 $400.28
4 $100.07 $0.00
5 $100.07 $0.00
6 $100.07 $0.00
7 $94.82 $0.00
8 4.0 $66.07 $264.28
9 4.0 $66.07 $264.28
10 $62.45 $0.00
11 $0.00
15% Markup
12 $137.12 $0.00
13 4.0 $124.46 $497.84
14 $84.33 $0.00
15 $56.10 $0.00
16 $80.18 $0.00
17 $25.32 $0.00
18 2.0 $43.80 $87.60
19 4.0 $47.22 $188.88
15% Markup
20 Gate Valve 1 $763.84 $763.84
21 Gaskets 2 $12.42 $24.84
22 Flange Adapter 2 $19.71 $39.42
23 Bakup Ring 2 $10.80 $21.60
24 Bolt Kit 2 $6.13 $12.26
25 Saddle 3"x3/4"1 $178.33 $178.33
26 3/4"-1/2" Bushing 1 $4.03 $4.03
27 1/2" Valve 1 $36.28 $36.28
28 Valve Box 1 $107.00 $107.00
29 Valve Top 1 $64.80 $64.80
30 Valve Box Lid 1 $30.28 $30.28
15% Markup
Date Checked By Date
Materials Subtotal $1,282.68
$192.40
Materials Total $1,475.08
Calculated By
Total $3,669.72
Materials
1-Ton
Equipment Subtotal $774.32
$116.15
Equipment Total $890.47
Skid Steer
Roller
Pickup
138 Excavator
Loader
Mini Excavator
$1,134.06
$170.11
Labor Total $1,304.17
Equipment
238 Excavator
General Laborer
Labor Subtotal
Operator (Roller)
Pipe Layer
Pipe Layer (Topman)
Operator (Loader)
Operator (Mini Exc)
Operator (Skid Steer)
Labor
Foreman
Operator (238 Excavator)
Operator (138 Excavator)
Time Worked Record
Workers and/or Equipment
Working Occupation of Workers or Equipment Size
Hours Worked
Reg. Rate O.T. Rate Amount
Prime Contractor Subcontractor/Lower Tier Subcontractor
Cascade Central Construction Selland Construction, Inc.
Description of Work Performed
3" Gate Valve assembly
Daily Report of Force Account Worked
Contract Number Item Name
3" Gate Valve Assembly
PROPOSAL
P.O. Box 119
Wenatchee, WA. 98807-0119
Phone 509-662-7119
Fax 509-662-6380
To:PROJECT:Ellensburg Rodeo Arena Improvements
Kittitas County Comissioners COP#28
205 West 5th Ave, Suite 108 DATE:March 5, 2026
Ellensburg, WA 98926 TITLE:RFI 082 - Existing Fiber Conduit Under Arena
Date DESCRIPTION QUANITITY UOM UNIT PRICE AMOUNT
3/5/2026
1 LS 1,892.00$ $1,892.00
113.52
2,005.52
3/5/2026
0 HR 128.18$ $0.00
0 WD 925.00$ $0.00
0 HR 161.54$ $0.00
0 HR 116.25$ $0.00
0 HR 63.08$ $0.00
0 HR 119.00$ $0.00
0.00
0.00
2,005.52
$19.05
$28.08
TOTAL 2,052.65
MAKE CHECKS PAYABLE TO:
Cascade Central Construction, LLC
P.O Box 119
Wenatchee, WA. 98807-0119
THANK YOU FOR YOUR BUSINESS!
15% Mark-up
Subtotal
Bond
B&O Tax
Project Engineer
Schedule Impact:
Subcontractor Cost
Electrical Subcontractor - See attached Back-up
General Contractor - Sub Total
Subcontractor - Sub Total
Cascade Central Construction Cost
Project Management & Coordination
Laborer
Carpenter
6% Mark-up
Supervision
General Conditions
Project Name:McGann COP15
Project No.3/5/2026
Description:
a.855.60$
b.-$
c.-$
DIRECT LABOR SUBTOTAL 855.60$
d.
e.17.11$
873.00$
a.709.45$
b.
709.00$
a.-$
b.
-$
a.43.65$
44.00$
1,626.00$
a.260.16$
b.-$
260.00$
a.
b.
c.
d.-$
-$
a.-$
-$
-$
a.0.15 % of 1 1.31$
b.0.25 % of 1-7 4.72$ 6.02$
a.0.03 % of 1-8 -$
1,892.00$
CCC
Contractor Breakdown Summary
McGann Electric
freight costs (itemize)
2. MATERIAL COSTS
Date:
Contractor Ref. No.
safety (NTE 2% of lines 1a, b, & c)
direct supervision (NTE 15% of 1a)
Supervision:
1. CRAFT LABOR COSTS
3. EQUIPMENT COSTS
NTE 15% portion of 1, 2, 3, & 4 up to $50,000
crew (apprentices, journeymen, & laborers)
foreman
superintendent
Direct Labor Costs:
1. CRAFT LABOR COSTS
Jack McGann
Contractor:
Ellensburg Rodeo Arena Improvements RFI 082 Costs
McGann Electric
Source Documents:
Provide additional 2" pvc conduit, handhole, and fittings required to connect video board fiber location to new fiber vault and
pathway system per RFI 082 response. Exclusions: trenching, backfill, backfill materials
Itemize all costs on attached COP Cost Breakdown form.
2. MATERIAL COSTS
3. EQUIPMENT COSTS
4. SMALL TOOLS
material costs
SUBTOTAL 1 thru 4
7. OVERHEAD & PROFIT ON SUB-SUBCONTRACTORS
owned equipment (per spec approved source)
5. OVERHEAD & PROFIT
4. SMALL TOOLS
rental equipment (per invoices attached)
8. INSURANCE
5. OVERHEAD & PROFIT
6. SUB-SUBCONTRACTORS
9. BOND
9. BOND
small tools (NTE 5% of 1a & b)
7. OVERHEAD & PROFIT ON SUB-SUBCONTRACTORS
NTE 15% of Line 6 up to $50,000 for each sub
Form Revised 04/25/15
6. SUB-SUBCONTRACTORS
TOTAL COST
bond
payroll driven liability insurance
volume driven liability insurance 8. INSURANCE
https://mcgannelectric-my.sharepoint.com/personal/jackmcgann_mcgannelectric_com/Documents/McGann Electric/2025 Ellensburg Rodeo 9.30/COPs/COP 15
Fiber Conduit/McGann COP15 video board fiber conduit 3.5 Summary Issued 3/5/2026
Project Name:McGann COP15
Project No.3/5/2026
Contractor:
Unit Labor Material Equipment Total
Description Quantity Type Unit $Cost Unit $Cost Unit $Cost Cost
-$ -$ -$ -$
-$ -$ -$ -$
Electrician Labor 8 HR $106.95 855.60$ -$ -$ 855.60$
-$ -$ -$ -$
-$ -$ -$ -$
2" PVC 40 FT -$ $1.14 45.60$ -$ 45.60$
2" PVC coupling 4 EA -$ $1.30 5.20$ -$ 5.20$
2" PVC FA 4 EA -$ $1.56 6.24$ -$ 6.24$
-$ -$ -$ -$
2" PVC bell end 2 EA -$ $9.68 19.36$ -$ 19.36$
-$ $11.85 -$ -$ -$
2" Rigid 90 2 EA -$ $44.30 88.60$ -$ 88.60$
-$ -$ -$ -$
#10 trace wire 50 FT -$ $0.38 19.00$ -$ 19.00$
Handhole 11x18x12 concrete 1 EA -$ $490.45 490.45$ -$ 490.45$
glue, tape, marking tape, corrosion 1 LT -$ $35.00 35.00$ -$ 35.00$
-$ -$ -$ -$
-$ -$ -$ -$
-$ -$ -$ -$
-$ -$ -$ -$
Labor Subtotal 855.60$
-$ -$ -$ -$
-$ -$ -$ -$
-$ -$ -$ -$
855.60$ 709.45$ -$ 1,565.05$ Subtotal Cost of Work
Ellensburg Rodeo Arena Video Board Fiber RFI 082
Cost Breakdown
McGann Electric
2/1/2017
Contractor Ref. No.
Date: