HomeMy WebLinkAboutChange Order 06_ALSC SignedWe bring our clients es to life. SPOKANE 203 N Wushinqton Suite 00 Spokane.WA 9920 p 509.8388568 alscarchitecTs.corn DESCRIPTION OF CHANGE: COP 19-Electrical Utility Plans COP 21 -REP 5 -New POC for water main COP 23 -RFI 020 -Receptacle attachment painting COP 24 -REI 072 -FRP at mop sink COP 25 -RFI 076 -South walk bridge landing location condition COP 26 -HDPE Credit COP 27 -RFI 090 Gate Valve COP 28 -RFI 082 -Fiber Conduit Under Arena Amount $1 8,862.66 $65,165.15 $729.06 $732.31 $21,870.87 ($12,655.02) $3,981.32 $2,052.65 Total This Change Order:$100,739.00 Original Contract Sum Net Amount of Previously Approved Changes: Contract Sum Prior to This Change Order: Contract Sum is increased by This Change Order: Revised Contract Sum: Original Contract Completion Date: Previously Approved Increases in Time: Completion Date Prior to This Change Order: Contract time will be changed by Calendar Days This Change Order Revised Substantial Completion Date: Revised Final Acceptance Date: *Does not include State or Local Sales Tax Date Recommended By: ALSC Architects,P.S. By: ____ Date _____________ Approved by Owner: By: ____________ Date Asc CHANGE ORDER NO.6 PROJECT NAME:Ellensburg Rodeo Arena Completion OWNER:Kittitas County CONTRACTOR:Cascade Central Construction PROJECT NO:2025-009 PAGE lot 23 $5,065,000.00 * $1,212,260.35 Accepted by Contractor: $6,277,260.35 By: $100739.00 $6,377,999.35 11Z4 7/20/2026 7 7/23/2026 0 7/27/2026 8/22/2026 ALSC Architects I We bring our clients’stories to life. PROPOSAL P.O. Box 119 Wenatchee, WA. 98807-0119 Phone 509-662-7119 Fax 509-662-6380 To:PROJECT:Ellensburg Rodeo Arena Improvements Kittitas County Comissioners COP#19 205 West 5th Ave, Suite 108 DATE:March 9, 2026 Ellensburg, WA 98926 TITLE:Electrical Utility Plans Rev.1 Date DESCRIPTION QUANITITY UOM UNIT PRICE AMOUNT 3/9/2026 1 LS 18,666.00$ $7,866.00 1 LS 33,366.00$ $7,814.00 940.80 16,620.80 3/9/2026 8 HR 128.18$ $1,025.44 0 WD 925.00$ $0.00 4 HR 161.54$ $646.16 4 HR 116.25$ $465.00 0 HR 63.08$ $0.00 0 HR 119.00$ $0.00 320.49 2,457.09 19,077.89 $181.24 $267.09 19,526.22 3/9/2026 -2 HR 81.78$ ($163.56) -2 CY 250.00$ ($500.00) (663.56) 18,862.66 MAKE CHECKS PAYABLE TO: Cascade Central Construction, LLC P.O Box 119 Wenatchee, WA. 98807-0119 THANK YOU FOR YOUR BUSINESS! Subcontractor Cost Earthwork Subcontractor - See attached Back-up Electrical Subcontractor - See attached Back-up General Contractor - Sub Total Subcontractor - Sub Total Cascade Central Construction Cost Project Management & Coordination Laborer Carpenter 6% Mark-up Supervision General Conditions 15% Mark-up Concrete Encasement Credit Per RFI 052 Response Subtotal Bond B&O Tax Project Engineer Subtotal TOTAL Qualifications: Included: -Excavation and backfill for duct, vault, transformer, primary conductors, and trench from meter cabinet to to new transformer. -Ecology Blocks -Conduit and wire from meter cabinet to new transformer. Excluded: -By utility provider: All removal and demo. Supply and install of duct, vault, transformer, and primary conductors/conduit. -Concrete encasement from meter cabinet to utility tranformer vault -Utility fees. Schedule impact: None. Excluding any potential lead times or scheduling associated with utility scope of work. Cement Mason Concrete Subtotal t P.O. Box 119 Wenatchee, WA 98807 Phone: (509)662-7119 Fax: (509)662-4465 Bid Items Quantity Unit Unit Price Amount 1 Utility Trench Exc. & BF 40 LF 80.00$ $3,200.00 2 Vault Exc. & BF 1 EA 3,730.00$ $3,730.00 3 Furnish & Install Eco Blocks 4 EA 234.00$ $936.00 $7,866.00 $7,866.00 Qualifications: Please Read Carefully 1. Washington State Sales Tax has been not been included in proposal. 2. Prevailing Wage has been accounted for in proposal. 3. Any scope of work not specifically included as a line item in this proposal is excluded. 4. 5. 6. Sincerely, SELLAND CONSTRUCTION, INC. James Flowers (509) 881-0339 Subtotal Actual quantities installed shall be tracked/measured and the basis of payment at the unit prices included in this proposal unless otherwise agreed. Due to global supply chain disruptions and market volatility we reserve the exclusive right to adjust our proposal for material escalation. Proposal is valid for 30 days. This proposal shall be made part of any subcontract. Total If you have any questions or need additional information with regard to our proposal please give us a call. Bid Date: January 26, 2026 Ellensburg Rodeo Arena Improvements - City Electrical Trenching & BF COP SELLAND INC. CONSTRUCTION General Contractors Page 1 of 1 Project Name:COP-14R Project No.3/9/2026 Description: a.1,711.20$ b.-$ c.-$ DIRECT LABOR SUBTOTAL 1,711.20$ d. e.34.22$ 1,745.00$ a.4,885.20$ b. 4,885.00$ a.-$ b. -$ a.87.25$ 87.00$ 6,717.00$ a.1,074.72$ b.-$ 1,075.00$ a. b. c. d.-$ -$ a.-$ -$ -$ a.0.15 % of 1 2.62$ b.0.25 % of 1-7 19.48$ 22.10$ a.0.03 % of 1-8 -$ 7,814.00$ Form Revised 04/25/15 6. SUB-SUBCONTRACTORS TOTAL COST bond payroll driven liability insurance volume driven liability insurance 8. INSURANCE 9. BOND 9. BOND small tools (NTE 5% of 1a & b) 7. OVERHEAD & PROFIT ON SUB-SUBCONTRACTORS NTE 15% of Line 6 up to $50,000 for each sub 8. INSURANCE 5. OVERHEAD & PROFIT 6. SUB-SUBCONTRACTORS SUBTOTAL 1 thru 4 7. OVERHEAD & PROFIT ON SUB-SUBCONTRACTORS owned equipment (per spec approved source) 5. OVERHEAD & PROFIT 4. SMALL TOOLS rental equipment (per invoices attached) 2. MATERIAL COSTS 3. EQUIPMENT COSTS 4. SMALL TOOLS material costs Jack McGann Contractor: Ellensburg Rodeo Arena Improvements Additional Utility Service Requirem McGann Electric Source Documents: Cost includel labor and materials required for the further relocation of utilty meter cabinet per response to RFI 005.Cost to expedite utiltiy meter cabinet. Exclusions: additional trenching, backfill, backfill material, ecology blocks, any and all utility fees associated with utiltiy plan. Itemize all costs on attached COP Cost Breakdown form. crew (apprentices, journeymen, & laborers) foreman superintendent Direct Labor Costs: 1. CRAFT LABOR COSTS safety (NTE 2% of lines 1a, b, & c) direct supervision (NTE 15% of 1a) Supervision: 1. CRAFT LABOR COSTS 3. EQUIPMENT COSTS NTE 15% portion of 1, 2, 3, & 4 up to $50,000 CCC Contractor Breakdown Summary McGann Electric freight costs (itemize) 2. MATERIAL COSTS Date: Contractor Ref. No. https://mcgannelectric-my.sharepoint.com/personal/jackmcgann_mcgannelectric_com/Documents/McGann Electric/2025 Ellensburg Rodeo 9.30/COPs/COP14 Additional Service Entrance/Ellensburg Rodeo Arena COP-14 Additional Utiity - Copy Summary Issued 3/9/2026 Project Name:COP-14R Project No.3/9/2026 Contractor: Unit Labor Material Equipment Total Description Quantity Type Unit $Cost Unit $Cost Unit $Cost Cost -$ -$ -$ -$ -$ -$ -$ -$ Electrician Labor 16 HR $106.95 1,711.20$ -$ -$ 1,711.20$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 4" pvc sch40 120 FT -$ $3.67 440.40$ -$ 440.40$ 500 AL 480 FT -$ $3.76 1,804.80$ -$ 1,804.80$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ EATON Expedite fee 1 LT -$ $2,640.00 2,640.00$ -$ 2,640.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Labor Subtotal 1,711.20$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 1,711.20$ 4,885.20$ -$ 6,596.40$ Cost Breakdown McGann Electric 2/1/2017 Contractor Ref. No. Date: Subtotal Cost of Work Rodeo Arena Improvments additional Utility Service https://mcgannelectric-my.sharepoint.com/personal/jackmcgann_mcgannelectric_com/Documents/McGann Electric/2025 Ellensburg Rodeo 9.30/COPs/COP14 Additional Service Entrance/Ellensburg Rodeo Arena COP-14 Additional Utiity - Copy Cost Breakdown Issued 3/9/2026 ALSC Architects \\ We bring our clients’ stories to life. REQUEST FOR PROPOSAL NO: 05 Project Name: Ellensburg Rodeo Arena Completion Owner: Kittitas County Contractor: Cascade Central Construction Job Number: 2025-009 Page 1 of 2 TO: Cascade Central Construction, Contractor, please furnish your proposal for performing the changes outlined below and/or detailed on the attachments referred to: • Revisions to Civil drawings per City of Ellensburg direction for new connection point to 12” main instead of 8” line previously noted. • Reconnection of existing water lines from the east to the new water service. ALSC Architects, P.S. By Todd Keller Date: 2/09/26 PROPOSAL: To the Owner: We propose to perform all changes described in the above request for a total ADDITION/DEDUCTION (cross out one) to the contract sum of: $ (not including Sales Tax) We have attached cost estimate detail sheets, and the foregoing amount covers all direct and indirect costs related to this proposal and to the effect of the proposal on the remainder of the project. All other provisions of the contract remain in full force and effect. We request the completion date be EXTENDED/REDUCED (cross one out) ________ calendar days because of this work. The Contractor agrees to be bound to this proposal quotation for sixty (60) days after this date. By Date Contractor RECOMMENDATION: TO: Owner, we have examined the foregoing proposal and find it to be appropriate for the request. We recommend its acceptance. ALSC Architects, P.S. By Date: PROPOSAL ACCEPTANCE: The Owner hereby accepts the foregoing proposal. This instrument, when signed below, constitutes the conditions upon which a Change Order will be issued. By Date Owner 0 For Review02/12/2026 8:07:05 AM Cascade Central Construction KC Carroll 3/5/2026 Sixty-Five Thousand One Hundred Sixty-Five and 15/100 Dollars 65,165.15 PROPOSAL P.O. Box 119 Wenatchee, WA. 98807-0119 Phone 509-662-7119 Fax 509-662-6380 To:PROJECT:Ellensburg Rodeo Arena Improvements Kittitas County Comissioners COP#21 205 West 5th Ave, Suite 108 DATE:March 5, 2026 Ellensburg, WA 98926 TITLE:New POC for Water Main Rev.2 Date DESCRIPTION QUANITITY UOM UNIT PRICE AMOUNT 3/5/2026 1 LS 54,922.27$ $54,922.27 1 LS 2,123.73$ $2,123.73 $0.00 3,422.76 60,468.76 3/5/2026 8 HR 128.18$ $1,025.44 0 WD 925.00$ $0.00 8 HR 161.54$ $1,292.32 4 HR 116.25$ $465.00 0 HR 63.08$ $0.00 0 HR 119.00$ $0.00 417.41 3,200.17 63,668.93$ $604.85 $891.37 TOTAL 65,165.15$ MAKE CHECKS PAYABLE TO: Cascade Central Construction, LLC P.O Box 119 Wenatchee, WA. 98807-0119 THANK YOU FOR YOUR BUSINESS! Subtotal Bond B&O Tax Project Engineer Schedule Impact: General Contractor - Sub Total Subcontractor Cost Civil Subcontractor - See attached back-up Concrete Subcontractor - see attached back-up 6% Mark-up Supervision General Conditions 15% Mark-up Subcontractor - Sub Total Cascade Central Construction Cost Project Management & Coordination Laborer Carpenter Date Item Number 3/4/2026 Reg. O.T. 1 30.0 $102.61 $3,078.30 2 20.0 $100.07 $2,001.40 3 20.0 $100.07 $2,001.40 4 12.0 $100.07 $1,200.84 5 15.0 $100.07 $1,501.05 6 20.0 $100.07 $2,001.40 7 2.0 $94.82 $189.64 8 30.0 $66.07 $1,982.10 9 30.0 $66.07 $1,982.10 10 20.0 $62.45 $1,249.00 11 $0.00 15% Markup 12 20.0 $137.12 $2,742.40 13 20.0 $124.46 $2,489.20 14 12.0 $84.33 $1,011.96 15 15.0 $56.10 $841.50 16 20.0 $80.18 $1,603.60 17 2.0 $25.32 $50.64 18 30.0 $43.80 $1,314.00 19 40.0 $47.22 $1,888.80 15% Markup 20 164.25 LF $46.62 $7,657.34 21 9 EA $165.58 $1,490.22 22 130 LF $34.25 $4,452.50 23 1 LS $500.00 $500.00 24 -1 LS $1,756.39 -$1,756.39 25 150 LF $0.28 $41.33 26 270 LF $0.03 $9.17 27 3,000 SF $0.50 $1,500.00 28 20 TN $18.00 $360.00 29 175 TN $25.00 $4,375.00 15% Markup Date Checked By Date $18,629.16 $2,794.37 Materials Total $21,423.54 Calculated By Total $54,922.27 Scare Tape Sod Crushed Rock Pipe Bedding (Pea Gravel) Materials Subtotal Materials 8" DI Pipe Field Lok Gaskets 2.5" Copper Pipe Copper Fittings for Connections Tracer Wire HDPE vs Copper Credit 1-Ton Equipment Subtotal $11,942.10 $1,791.32 Equipment Total $13,733.42 Skid Steer Roller Pickup 138 Excavator Loader Mini Excavator $17,187.23 $2,578.08 Labor Total $19,765.31 Equipment 238 Excavator General Laborer Labor Subtotal Operator (Roller) Pipe Layer Pipe Layer (Topman) Operator (Loader) Operator (Mini Exc) Operator (Skid Steer) Labor Foreman Operator (238 Excavator) Operator (138 Excavator) Time Worked Record Workers and/or Equipment Working Occupation of Workers or Equipment Size Hours Worked Reg. Rate O.T. Rate Amount Prime Contractor Subcontractor/Lower Tier Subcontractor Cascade Central Construction Selland Construction, Inc. Description of Work Performed Extend 8" Ductile Iron Water (150 LF) to the connection, 2.5" Copper Service (120 LF), Credit to HDPE Daily Report of Force Account Worked Contract Number Item Name RFP 05 - Water Revisions per City Comments Item Class Quantity Unit Unit Price 1 Material 5 CY 255.75$ 2 Material 1 EA 108.00$ 3 Labor 7 HR 65.71$ 1,846.72$ 15.00% 277.01 2,123.73$ Washington Amount (US $) 1,278.75$ 459.97$ ATTN: General Contractor Concrete Estimate - RFP 05 Estimate Date: 2/12/2026 Project Location Ellensburg, Project Ellensburg Rodeo Improvements Sub Total TOTAL 541-861-8060 O&P Markup Jones Concrete & Excavation Estimator - Carson Chester Rebar Not Included 2x4x16 Forms, Stakes, Screws, Small Tools, Exp Joint 108.00$ Work Description Ready Mix Concrete (Min Order QTY) Cement Mason Includes: Maximum of 15ft x 5ft Concrete Sidewalk Forming, Pouring of Concrete Sidewalk Customer: Authorized Signature:____________________ Name:___________________________ Date of Acceptance:________________ www.JonesConcrete.pro 1/1 PROPOSAL P.O. Box 119 Wenatchee, WA. 98807-0119 Phone 509-662-7119 Fax 509-662-6380 To:PROJECT:Ellensburg Rodeo Arena Improvements Kittitas County Comissioners COP#23 205 West 5th Ave, Suite 108 DATE:February 19, 2026 Ellensburg, WA 98926 TITLE:COP 23 - RFI 020 Receptacle Attachment Painting Date DESCRIPTION QUANITITY UOM UNIT PRICE AMOUNT 2/19/2026 1 LS 672.00$ $672.00 $0.00 $0.00 40.32 712.32 2/19/2026 0 HR 128.18$ $0.00 0 WD 925.00$ $0.00 0 HR 161.54$ $0.00 0 HR 116.25$ $0.00 0 HR 63.08$ $0.00 0 HR 119.00$ $0.00 0.00 0.00 712.32 $6.77 $9.97 TOTAL 729.06 MAKE CHECKS PAYABLE TO: Cascade Central Construction, LLC P.O Box 119 Wenatchee, WA. 98807-0119 THANK YOU FOR YOUR BUSINESS! 6% Mark-up Supervision General Conditions 15% Mark-up Subcontractor - Sub Total Cascade Central Construction Cost Project Management & Coordination Laborer Carpenter Subcontractor Cost Paint Subcontractor - See attached Back-up Subtotal Bond B&O Tax Project Engineer Schedule Impact: General Contractor - Sub Total 1 Carley Gangle From:Philipp Buterbaugh <specialtycoating@hotmail.com> Sent:Wednesday, February 18, 2026 4:22 PM To:Carley Gangle Subject:Ellensburg rfi 020 Pricing for the condutand electrical boxes labor/material to paint the 6 stubouts labor/material $672.00 Philipp Buterbaugh Coating Specialty LLC Po box 4049 Wenatchee 98807 specialtycoating@hotmail.com (509)679-8714 PROPOSAL P.O. Box 119 Wenatchee, WA. 98807-0119 Phone 509-662-7119 Fax 509-662-6380 To:PROJECT:Ellensburg Rodeo Arena Improvements Kittitas County Comissioners COP#24 205 West 5th Ave, Suite 108 DATE:February 19, 2026 Ellensburg, WA 98926 TITLE:COP 24 - RFI 072 FRP at Mop Sink Date DESCRIPTION QUANITITY UOM UNIT PRICE AMOUNT 2/19/2026 1 LS 675.00$ $675.00 $0.00 $0.00 40.50 715.50 2/19/2026 0 HR 128.18$ $0.00 0 WD 925.00$ $0.00 0 HR 161.54$ $0.00 0 HR 116.25$ $0.00 0 HR 63.08$ $0.00 0 HR 119.00$ $0.00 0.00 0.00 715.50 $6.80 $10.02 TOTAL 732.31 MAKE CHECKS PAYABLE TO: Cascade Central Construction, LLC P.O Box 119 Wenatchee, WA. 98807-0119 THANK YOU FOR YOUR BUSINESS! 6% Mark-up Supervision General Conditions 15% Mark-up Subcontractor - Sub Total Cascade Central Construction Cost Project Management & Coordination Laborer Carpenter Subcontractor Cost Labor and Material to install FRP behind Mop Sink - See attached Back-up Subtotal Bond B&O Tax Project Engineer Schedule Impact: General Contractor - Sub Total 1 Carley Gangle From:Philipp Buterbaugh <specialtycoating@hotmail.com> Sent:Wednesday, February 18, 2026 4:30 PM To:Carley Gangle Subject:Ellensburg frp Labor and material to install frp behind mop sink$ 675.00 Philipp Buterbaugh Coating Specialty LLC Po box 4049 Wenatchee 98807 specialtycoating@hotmail.com (509)679-8714 PROPOSAL P.O. Box 119 Wenatchee, WA. 98807-0119 Phone 509-662-7119 Fax 509-662-6380 To:PROJECT:Ellensburg Rodeo Arena Improvements Kittitas County Comissioners COP#25 205 West 5th Ave, Suite 108 DATE:February 26, 2026 Ellensburg, WA 98926 TITLE:RFI 076 - South Walk Bridge Landing Conditions Date DESCRIPTION QUANITITY UOM UNIT PRICE AMOUNT 2/26/2026 1 LS 11,433.53$ $11,433.53 1 LS 6,407.62$ $6,407.62 1,070.47 18,911.62 2/26/2026 8 HR 128.18$ $1,025.44 0 WD 925.00$ $0.00 4 HR 161.54$ $646.16 4 HR 116.25$ $465.00 0 HR 63.08$ $0.00 0 HR 119.00$ $0.00 320.49 2,457.09 21,368.71 $203.00 $299.16 TOTAL 21,870.87 MAKE CHECKS PAYABLE TO: Cascade Central Construction, LLC P.O Box 119 Wenatchee, WA. 98807-0119 THANK YOU FOR YOUR BUSINESS! Schedule Impact: None if approved by 2/27/26. Subcontractor Cost Earthwork Subcontractor - See attached Back-up Concrete Subcontractor - See attachde Back-up General Contractor - Sub Total Subcontractor - Sub Total Cascade Central Construction Cost Project Management & Coordination Laborer Carpenter 6% Mark-up Supervision General Conditions 15% Mark-up Subtotal Bond B&O Tax Project Engineer Date Item Number 2/21/2026 Reg. O.T. 1 20.0 $102.61 $2,052.20 2 $100.07 $0.00 3 $100.07 $0.00 4 3.0 $100.07 $300.21 5 20.0 $100.07 $2,001.40 6 $100.07 $0.00 7 $94.82 $0.00 8 $66.07 $0.00 9 $66.07 $0.00 10 20.0 $62.45 $1,249.00 11 $0.00 15% Markup 12 $137.12 $0.00 13 $124.46 $0.00 14 3.0 $84.33 $252.99 15 20.0 $56.10 $1,122.00 16 $80.18 $0.00 17 $25.32 $0.00 18 20.0 $43.80 $876.00 19 20.0 $47.22 $944.40 15% Markup 20 $0.00 21 $0.00 22 1 LS $1,000.00 $1,000.00 23 8 TN $18.00 $144.00 24 $0.00 15% Markup Date Checked By Date Daily Report of Force Account Worked Contract Number Item Name RFI 076 S. Bridge Landing Prime Contractor Subcontractor/Lower Tier Subcontractor Cascade Central Construction Selland Construction, Inc. Description of Work Performed Remove and dispose concrete planter box and asphalt. Prep for concrete landing. Time Worked Record Workers and/or Equipment Working Occupation of Workers or Equipment Size Hours Worked Reg. Rate O.T. Rate Amount Labor Foreman Operator (238 Excavator) Operator (138 Excavator) Operator (Loader) Operator (Mini Exc) Operator (Skid Steer) Operator (Roller) Pipe Layer Pipe Layer (Topman) General Laborer Labor Subtotal Loader $5,602.81 $840.42 Labor Total $6,443.23 Equipment 238 Excavator Pickup 138 Excavator Equipment Subtotal $3,195.39 $479.31 Equipment Total $3,674.70 1-Ton Concrete & Asphalt Disposal Crushed Rock Materials Subtotal Materials $1,144.00 $171.60 Materials Total $1,315.60 Calculated By Total $11,433.53 Mini Excavator Skid Steer Roller Item Class Quantity Unit Unit Price 1 Material 1 EA 312.56$ 2 Material 8 CY 255.75$ 3 Material 1 EA 241.80$ 4 Labor 36 HR 65.71$ 5 Labor 7 HR 86.56$ 397sf of 6in Thick Concrete Sidewalk Forming, Pouring of Concrete Sidewalk #4 Rebar @18in OC EW #5 Smooth Rebar Dowels @24in OC Per Detail 10 /S-201 5,571.84$ 15.00% 835.78 6,407.62$ Washington Amount (US $) 2,365.56$ 605.92$ 241.80$ 2,046.00$ ATTN: General Contractor Concrete Estimate - RFP 06 Estimate Date: 2/25/2026 Project Location Ellensburg, Project Ellensburg Rodeo Improvements Sub Total TOTAL 541-861-8060 O&P Markup Jones Concrete & Excavation Estimator - Carson Chester Forms, Stakes, Small Tools, Exp Joint,312.56$ Work Description Cement Mason Ironworker #4 Rebar & #5 Rebar Dowels Ready Mix Concrete Includes: Customer: Authorized Signature:____________________ Name:___________________________ Date of Acceptance:________________ www.JonesConcrete.pro 1/1 PROPOSAL P.O. Box 119 Wenatchee, WA. 98807-0119 Phone 509-662-7119 Fax 509-662-6380 To:PROJECT:Ellensburg Rodeo Arena Improvements Kittitas County Comissioners COP#26 205 West 5th Ave, Suite 108 DATE:March 5, 2026 Ellensburg, WA 98926 TITLE:COP 26 - HDPE Credit Date DESCRIPTION QUANITITY UOM UNIT PRICE AMOUNT 3/5/2026 1 LS (12,655.02)$ ($12,655.02) 0.00 (12,655.02) 3/5/2026 0 HR 128.18$ $0.00 0 WD 925.00$ $0.00 0 HR 161.54$ $0.00 0 HR 116.25$ $0.00 0 HR 63.08$ $0.00 0 HR 119.00$ $0.00 0.00 0.00 (12,655.02) $0.00 $0.00 TOTAL (12,655.02) MAKE CHECKS PAYABLE TO: Cascade Central Construction, LLC P.O Box 119 Wenatchee, WA. 98807-0119 THANK YOU FOR YOUR BUSINESS! Bond B&O Tax Project Engineer Schedule Impact: Subcontractor Cost Civil Subcontractor - See attached Back-up General Contractor - Sub Total Subcontractor - Sub Total Cascade Central Construction Cost Project Management & Coordination Laborer Carpenter 6% Mark-up Supervision General Conditions 15% Mark-up Subtotal t P.O. Box 119 Wenatchee, WA 98807 Phone: (509)662-7119 Fax: (509)662-4465 Bid Items Quantity Unit Unit Price Amount 1 HDPE Credit 1 LS 12,655.02$ $12,655.02 $0.00 $0.00 $0.00 $0.00 $12,655.02 $12,655.02 Qualifications: Please Read Carefully 1. Washington State Sales Tax has been not been included in proposal. 2. Prevailing Wage has been accounted for in proposal. 3. 4. 5. Excludes Water System Support. 6. Exludes Construction Survey. 7. Engineering & Professional Surveying Services are Excluded. 8. 9. 10. 11. 12. 13. Any scope of work not specifically included as a line item in this proposal is excluded. 14. 15. 16. Sincerely, SELLAND CONSTRUCTION, INC. James Flowers (509) 881-0339 Bid Date: March 4, 2026 Erosion Control Inspections, Reporting, Monitoring & Maintenance are Excluded. Stormwater Permit by others. Rock excavation (i.e. Solid Rock, Caliche, Hard Pan, Cemented Soils and/or Boulders larger than 1 Cubic Yard) have not been included. Price Negotiation will be required if these materials are encountered. Subtotal Over Excavation of Unsuitable Material has not been accounted for, price negotiation will be required if these materials are encountered. Ellensburg Rodeo Arena Improvements -HDPE vs Copper Credit Actual quantities installed shall be tracked/measured and the basis of payment at the unit prices included in this proposal unless otherwise agreed. Due to global supply chain disruptions and market volatility we reserve the exclusive right to adjust our proposal for material escalation. Proposal is valid for 30 days. This proposal shall be made part of any subcontract. Total If you have any questions or need additional information with regard to our proposal please give us a call. Dust control has been provided while we are actively working the site. No permanent or sustained dust control or mitigation has been included. Fees for Utilities, County, City, Etc. are not included. Cultural Resource Services are not covered in our scope. Hazardous Materials Abatement, Removal, Handling, Disposal, etc. are not expected onsite and are therefore Excluded. Watering & Dust Control are Included for Selland's scope of work and duration only. No OT Dust Control or beyond our work. SELLAND INC. CONSTRUCTION General Contractors Page 1 of 1 PROPOSAL P.O. Box 119 Wenatchee, WA. 98807-0119 Phone 509-662-7119 Fax 509-662-6380 To:PROJECT:Ellensburg Rodeo Arena Improvements Kittitas County Comissioners COP#27 205 West 5th Ave, Suite 108 DATE:March 5, 2026 Ellensburg, WA 98926 TITLE:RFI 090 - Buckaroo Seating Gate Valve Addition Date DESCRIPTION QUANITITY UOM UNIT PRICE AMOUNT 3/5/2026 1 LS 3,669.72$ $3,669.72 220.18 3,889.90 3/5/2026 0 HR 128.18$ $0.00 0 WD 925.00$ $0.00 0 HR 161.54$ $0.00 0 HR 116.25$ $0.00 0 HR 63.08$ $0.00 0 HR 119.00$ $0.00 0.00 0.00 3,889.90 $36.95 $54.46 TOTAL 3,981.32 MAKE CHECKS PAYABLE TO: Cascade Central Construction, LLC P.O Box 119 Wenatchee, WA. 98807-0119 THANK YOU FOR YOUR BUSINESS! Bond B&O Tax Project Engineer Schedule Impact: Subcontractor Cost Earthwork Subcontractor - See attached Back-up General Contractor - Sub Total Subcontractor - Sub Total Cascade Central Construction Cost Project Management & Coordination Laborer Carpenter 6% Mark-up Supervision General Conditions 15% Mark-up Subtotal Date Item Number 3/4/2026 Reg. O.T. 1 2.0 $102.61 $205.22 2 $100.07 $0.00 3 4.0 $100.07 $400.28 4 $100.07 $0.00 5 $100.07 $0.00 6 $100.07 $0.00 7 $94.82 $0.00 8 4.0 $66.07 $264.28 9 4.0 $66.07 $264.28 10 $62.45 $0.00 11 $0.00 15% Markup 12 $137.12 $0.00 13 4.0 $124.46 $497.84 14 $84.33 $0.00 15 $56.10 $0.00 16 $80.18 $0.00 17 $25.32 $0.00 18 2.0 $43.80 $87.60 19 4.0 $47.22 $188.88 15% Markup 20 Gate Valve 1 $763.84 $763.84 21 Gaskets 2 $12.42 $24.84 22 Flange Adapter 2 $19.71 $39.42 23 Bakup Ring 2 $10.80 $21.60 24 Bolt Kit 2 $6.13 $12.26 25 Saddle 3"x3/4"1 $178.33 $178.33 26 3/4"-1/2" Bushing 1 $4.03 $4.03 27 1/2" Valve 1 $36.28 $36.28 28 Valve Box 1 $107.00 $107.00 29 Valve Top 1 $64.80 $64.80 30 Valve Box Lid 1 $30.28 $30.28 15% Markup Date Checked By Date Materials Subtotal $1,282.68 $192.40 Materials Total $1,475.08 Calculated By Total $3,669.72 Materials 1-Ton Equipment Subtotal $774.32 $116.15 Equipment Total $890.47 Skid Steer Roller Pickup 138 Excavator Loader Mini Excavator $1,134.06 $170.11 Labor Total $1,304.17 Equipment 238 Excavator General Laborer Labor Subtotal Operator (Roller) Pipe Layer Pipe Layer (Topman) Operator (Loader) Operator (Mini Exc) Operator (Skid Steer) Labor Foreman Operator (238 Excavator) Operator (138 Excavator) Time Worked Record Workers and/or Equipment Working Occupation of Workers or Equipment Size Hours Worked Reg. Rate O.T. Rate Amount Prime Contractor Subcontractor/Lower Tier Subcontractor Cascade Central Construction Selland Construction, Inc. Description of Work Performed 3" Gate Valve assembly Daily Report of Force Account Worked Contract Number Item Name 3" Gate Valve Assembly PROPOSAL P.O. Box 119 Wenatchee, WA. 98807-0119 Phone 509-662-7119 Fax 509-662-6380 To:PROJECT:Ellensburg Rodeo Arena Improvements Kittitas County Comissioners COP#28 205 West 5th Ave, Suite 108 DATE:March 5, 2026 Ellensburg, WA 98926 TITLE:RFI 082 - Existing Fiber Conduit Under Arena Date DESCRIPTION QUANITITY UOM UNIT PRICE AMOUNT 3/5/2026 1 LS 1,892.00$ $1,892.00 113.52 2,005.52 3/5/2026 0 HR 128.18$ $0.00 0 WD 925.00$ $0.00 0 HR 161.54$ $0.00 0 HR 116.25$ $0.00 0 HR 63.08$ $0.00 0 HR 119.00$ $0.00 0.00 0.00 2,005.52 $19.05 $28.08 TOTAL 2,052.65 MAKE CHECKS PAYABLE TO: Cascade Central Construction, LLC P.O Box 119 Wenatchee, WA. 98807-0119 THANK YOU FOR YOUR BUSINESS! 15% Mark-up Subtotal Bond B&O Tax Project Engineer Schedule Impact: Subcontractor Cost Electrical Subcontractor - See attached Back-up General Contractor - Sub Total Subcontractor - Sub Total Cascade Central Construction Cost Project Management & Coordination Laborer Carpenter 6% Mark-up Supervision General Conditions Project Name:McGann COP15 Project No.3/5/2026 Description: a.855.60$ b.-$ c.-$ DIRECT LABOR SUBTOTAL 855.60$ d. e.17.11$ 873.00$ a.709.45$ b. 709.00$ a.-$ b. -$ a.43.65$ 44.00$ 1,626.00$ a.260.16$ b.-$ 260.00$ a. b. c. d.-$ -$ a.-$ -$ -$ a.0.15 % of 1 1.31$ b.0.25 % of 1-7 4.72$ 6.02$ a.0.03 % of 1-8 -$ 1,892.00$ CCC Contractor Breakdown Summary McGann Electric freight costs (itemize) 2. MATERIAL COSTS Date: Contractor Ref. No. safety (NTE 2% of lines 1a, b, & c) direct supervision (NTE 15% of 1a) Supervision: 1. CRAFT LABOR COSTS 3. EQUIPMENT COSTS NTE 15% portion of 1, 2, 3, & 4 up to $50,000 crew (apprentices, journeymen, & laborers) foreman superintendent Direct Labor Costs: 1. CRAFT LABOR COSTS Jack McGann Contractor: Ellensburg Rodeo Arena Improvements RFI 082 Costs McGann Electric Source Documents: Provide additional 2" pvc conduit, handhole, and fittings required to connect video board fiber location to new fiber vault and pathway system per RFI 082 response. Exclusions: trenching, backfill, backfill materials Itemize all costs on attached COP Cost Breakdown form. 2. MATERIAL COSTS 3. EQUIPMENT COSTS 4. SMALL TOOLS material costs SUBTOTAL 1 thru 4 7. OVERHEAD & PROFIT ON SUB-SUBCONTRACTORS owned equipment (per spec approved source) 5. OVERHEAD & PROFIT 4. SMALL TOOLS rental equipment (per invoices attached) 8. INSURANCE 5. OVERHEAD & PROFIT 6. SUB-SUBCONTRACTORS 9. BOND 9. BOND small tools (NTE 5% of 1a & b) 7. OVERHEAD & PROFIT ON SUB-SUBCONTRACTORS NTE 15% of Line 6 up to $50,000 for each sub Form Revised 04/25/15 6. SUB-SUBCONTRACTORS TOTAL COST bond payroll driven liability insurance volume driven liability insurance 8. INSURANCE https://mcgannelectric-my.sharepoint.com/personal/jackmcgann_mcgannelectric_com/Documents/McGann Electric/2025 Ellensburg Rodeo 9.30/COPs/COP 15 Fiber Conduit/McGann COP15 video board fiber conduit 3.5 Summary Issued 3/5/2026 Project Name:McGann COP15 Project No.3/5/2026 Contractor: Unit Labor Material Equipment Total Description Quantity Type Unit $Cost Unit $Cost Unit $Cost Cost -$ -$ -$ -$ -$ -$ -$ -$ Electrician Labor 8 HR $106.95 855.60$ -$ -$ 855.60$ -$ -$ -$ -$ -$ -$ -$ -$ 2" PVC 40 FT -$ $1.14 45.60$ -$ 45.60$ 2" PVC coupling 4 EA -$ $1.30 5.20$ -$ 5.20$ 2" PVC FA 4 EA -$ $1.56 6.24$ -$ 6.24$ -$ -$ -$ -$ 2" PVC bell end 2 EA -$ $9.68 19.36$ -$ 19.36$ -$ $11.85 -$ -$ -$ 2" Rigid 90 2 EA -$ $44.30 88.60$ -$ 88.60$ -$ -$ -$ -$ #10 trace wire 50 FT -$ $0.38 19.00$ -$ 19.00$ Handhole 11x18x12 concrete 1 EA -$ $490.45 490.45$ -$ 490.45$ glue, tape, marking tape, corrosion 1 LT -$ $35.00 35.00$ -$ 35.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Labor Subtotal 855.60$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 855.60$ 709.45$ -$ 1,565.05$ Subtotal Cost of Work Ellensburg Rodeo Arena Video Board Fiber RFI 082 Cost Breakdown McGann Electric 2/1/2017 Contractor Ref. No. Date: https://mcgannelectric-my.sharepoint.com/personal/jackmcgann_mcgannelectric_com/Documents/McGann Electric/2025 Ellensburg Rodeo 9.30/COPs/COP 15 Fiber Conduit/McGann COP15 video board fiber conduit 3.5Cost Breakdown Issued 3/5/2026