Laserfiche WebLink
We bring our clients es to life. <br />SPOKANE <br />203 N Wushinqton <br />Suite 00 <br />Spokane.WA <br />9920 <br />p 509.8388568 <br />alscarchitecTs.corn <br />DESCRIPTION OF CHANGE: <br />COP 19-Electrical Utility Plans <br />COP 21 -REP 5 -New POC for water main <br />COP 23 -RFI 020 -Receptacle attachment painting <br />COP 24 -REI 072 -FRP at mop sink <br />COP 25 -RFI 076 -South walk bridge landing location condition <br />COP 26 -HDPE Credit <br />COP 27 -RFI 090 Gate Valve <br />COP 28 -RFI 082 -Fiber Conduit Under Arena <br />Amount <br />$1 8,862.66 <br />$65,165.15 <br />$729.06 <br />$732.31 <br />$21,870.87 <br />($12,655.02) <br />$3,981.32 <br />$2,052.65 <br />Total This Change Order:$100,739.00 <br />Original Contract Sum <br />Net Amount of Previously Approved Changes: <br />Contract Sum Prior to This Change Order: <br />Contract Sum is increased by This Change Order: <br />Revised Contract Sum: <br />Original Contract Completion Date: <br />Previously Approved Increases in Time: <br />Completion Date Prior to This Change Order: <br />Contract time will be changed by <br />Calendar Days This Change Order <br />Revised Substantial Completion Date: <br />Revised Final Acceptance Date: <br />*Does not include State or Local Sales Tax <br />Date <br />Recommended By: <br />ALSC Architects,P.S. <br />By: <br />____ <br />Date <br />_____________ <br />Approved by Owner: <br />By: <br />____________ <br />Date <br />Asc <br />CHANGE ORDER NO.6 <br />PROJECT NAME:Ellensburg Rodeo Arena Completion <br />OWNER:Kittitas County <br />CONTRACTOR:Cascade Central Construction <br />PROJECT NO:2025-009 PAGE lot 23 <br />$5,065,000.00 * <br />$1,212,260.35 <br />Accepted by Contractor: <br />$6,277,260.35 By: <br />$100739.00 <br />$6,377,999.35 <br />11Z4 <br />7/20/2026 <br />7 <br />7/23/2026 <br />0 <br />7/27/2026 <br />8/22/2026 <br />ALSC Architects <br />I <br />We bring our clients’stories to life.