Loading...
HomeMy WebLinkAbout230076_Kittitas_County_G701_009_22626_Docusign Envelope ID: 26606B8A-3971-4833-8797-9B3D812FDC06 3/9/20263/10/2026 P.O. BOX 926 / 700 EAST MOUNTAIN VIEW AVE, SUITE 504 ELLENSBURG, WA 98926 O: 509-925-9747 C: 619-278-8554 scottc@belsmith.com February 19, 2026 Re: Commissioners Office Per your request, we are pleased to offer the following change order proposal #17 (COP 17). If approved, Belsaas and Smith’s onsite team will renovate the Commissioners Office and prepare it for the Probation Department. This will include: •Constructing two walls in the front entry space •Installing two transaction windows •Replacing the glass in the existing front counter with MDF and staining to match •Replacing the countertop in the existing front counter •Installing a locking door into the Probation space Total cost of proposal: Twenty-Eight Thousand Four Hundred Eighty-Two Dollars $28,482.39 + WSST Time extension required: 0 days Sincerely, Scott Carlson Belsaas & Smith Construction Docusign Envelope ID: 26606B8A-3971-4833-8797-9B3D812FDC06 BELSAAS & SMITH CONSTRUCTION SHEET 1 of 2 C.O.P. #17 CHANGE ORDER PROPOSAL BREAKDOWN SHEET UNIT COSTS EQUIP SUB MATERIAL LABOR #DESCRIPTION QUAN.UNIT Mat.EQUIP LABOR COST COST COST COST Probabtion Office General Conditions 1 LS 3,500.00 -$ -$ -$ 3,500.00$ -$ -$ -$ -$ Demo and Dispoal 1 LS 1,200.00 -$ -$ -$ 1,200.00$ -$ -$ -$ -$ Framing 1 LS 3,500.00 -$ -$ -$ 3,500.00$ -$ -$ -$ -$ Drywall 1 LS 2,500.00 -$ -$ -$ 2,500.00$ -$ -$ -$ -$ Paint 1 LS 2,750.00 -$ -$ -$ 2,750.00$ -$ -$ -$ -$ Insulation 1 LS 200.00 -$ -$ 200.00$ -$ -$ -$ -$ -$ Doors and Hardware 1 LS 2,200.00 850.00 -$ -$ 2,200.00$ 850.00$ -$ -$ -$ -$ Door and Trim Stain 1 LS 1,800.00 -$ -$ -$ 1,800.00$ -$ -$ -$ -$ Security Glass 1 LS 2,891.00 -$ -$ 2,891.00$ -$ -$ -$ -$ -$ Carpentry 1 LS -$ 2,626.40$ -$ -$ -$ -$ -$ -$ Cleaning 1 LS 750.00 -$ -$ -$ 750.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ *TOTALS -$ 2,626.40$ 5,291.00$ 16,850.00$ Docusign Envelope ID: 26606B8A-3971-4833-8797-9B3D812FDC06 BELSAAS & SMITH CONSTRUCTION SHEET 2 of 2 C.O.P. #17 CHANGE ORDER PROPOSAL BREAKDOWN SHEET EQUIP SUB MATERIAL LABOR COST COST COST COST TOTALS FROM PREVIOUS PAGE -$ 2,626.40$ 5,291.00$ 16,850.00$ OVERHEAD 3%-$ 78.79$ 158.73$ 505.50$ PROFIT 10%-$ 270.52$ 544.97$ 1,735.55$ BONDING 1.5%-$ 44.64$ 89.92$ 286.37$ SUB TOTAL -$ 3,020.35$ 6,084.62$ 19,377.42$ SUB TOTAL -$ 3,020.35$ 6,084.62$ 19,377.42$ LABOR 19,377.42$ MATERIAL 6,084.62$ EQUIPMENT -$ SUBCONTRACTORS 3,020.35$ SUB TOTAL SUB TOTAL 28,482.39$ PREVIOUS CO ALLOWANCE GRAND TOTAL TOTAL 28,482.39$ TIME EXTENTION REQUIRED: NOTICE TO PROCEED REQUIRED BY: WE RESERVE OUR RIGHTS UNDER THE CONTRACT TO ACCESS THIS CHANGE CUMULATIVELY AS IT AFFECTS TIME AND AMOUNT. Docusign Envelope ID: 26606B8A-3971-4833-8797-9B3D812FDC06