Loading...
HomeMy WebLinkAboutResolution_FedAidProspectus_Horizontal Curve ProjectKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: March 17, 2026 ACTION REQUESTED: Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the Horizontal Curve Safety Project CRP 319-23. BACKGROUND: The Horizontal Curve Safety Project was selected to receive Federal Funding through the Highway Safety Improvement Program (HSIP). Kittitas County Public Works has inventoried horizontal curves countywide and selected ten (10) roadway segments for implementation of improved roadside signing, including advisory speeds, chevron arrow signs, and the addition of flexible guideposts to increase driver awareness. All the improvements are focused on helping reduce accidents and injuries on the road system. This project is eligible for one hundred percent (100%) Federal Funding for all phases authorized prior to April 30, 2026. This Project Prospectus covers the Federal Funding for the Construction phase of the project. Public Works is finalizing construction documents targeting a May 21, 2026, advertisement. INTERACTION: Public Works RECOMMENDATION: Approve the Resolution Authorizing the Chair's signature on the Local Agency Federal Aid Project Prospectus for the Horizontal Curve Safety Project CRP 319-23. HANDLING: Return one original to Public Works ATTACHMENTS: Resolution, Local Agency Federal Aid Project Prospectus LEAD STAFF: Josh Fredrickson, Public Works Director BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO.2026 - AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL AID PROJECT PROSPECTUS CONSTRUCTION PHASE FOR THE HORIZONTAL CURVE SAFETY PROJECT CRP 319-23 WHEREAS: The Horizontal Curve Safety Project was awarded Federal Funding through the 2023 Highway Safety Improvement Program; and WHEREAS: The Funding will be used for the construction phase to implement the improvements on ten (10) identified roadway segments chosen; and WHEREAS: In preparation to begin work, Kittitas County Public Works is requesting the Washington State Department of Transportation release the Federal Funds for construction; and WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair of the Board of County Commissioners acknowledging the project has been reviewed and is consistent with the County's comprehensive plan for community development; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby approve the Chair's signature on the Local Agency Federal Aid Project Prospectus for the Horizontal Curve Safety Project CRP 319-23. DATED on this 17th day of March 2026, at Ellensburg, Washington. Attest: ❑ Clerk of the Board- Julie Kjorsvik ❑ Deputy Clerk of the Board- Mandy Buchholz BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Cory Wright, Chairman Brett Wachsmith, Vice -Chairman Laura Osiadacz, Commissioner Aft Washington State Department of Transportation Local Agency Federal Aid Project Prospectus Prefix HSIP Route ( ) Date 03/02/2026 000S 678 DUNS Number 01-020-2547 Federal Aid Project Number r WSDOT Federal Employer 91-601349 Use Only Tax ID Number Local Agency RC 2298 Project Number ` Agency CAAgency Federal Program Title Kittitas County Public Works Yes ❑ No ❑✓ 20.205 ❑ Other Project Title Start Latitude N 47.181726 Start Longitude W-120.954167 Horizontal Curve Safety Project End Latitude N 47.165419 End Longitude W-120.012574 Project Termini From -To Nearest City Name Project Zip Code (+4) countywide countywide Ellensburg 98926-7989 Begin Mile Post End Mile Post Length of Project Award Type ❑✓ ❑ Local Forces ❑ State ❑ Railroad countywide countywide countywide .Local Route ID Begin Mile Point End Mile Point City Number County Number County Name countywide countywide 19 Kittitas WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number South Central Region 13 8 Total Local Agency Federal Funds Phase Start Phase Estimated Cost Funding Date Hundred Dollar (Nearest125,000.00 Nearest Hundred Dollar Nearest Hundred Dollar Month Year P.E. 125,000.00 November 2023 RIW Const. 543,000.00 543,000.00 April 2026 Total 668,000.00 668,000.00 Description of Existing Facility (Existing Design and Present Condition) Roadway Width Number of Lanes varies varies Many roads have hazardous curves and non standard or non-existent delineation. Description of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary) Collect data and install/upgrade signing for horizontal curves (such as advisory speeds, chevrons, delineation). o I Agency Contact Person Title Phone Darren Case Construction Manager 509-962-7019 Mailing Address City State Zip Code 411 N. Ruby, Suite 1 Ellensburg WA 98926 By _ Approving Authority Project Prospectus Title Director, Public Works Date Page 1 -- n__..:_.._ �,,:•:....., nti....i,.+,. DOT Form 140-101 Revised 01/2022 1 """"'0 Agency Project Title Date Kittitas County Public Works Horizontal Curve Safety Project 03/02/2026 Type of Proposed Work Roadway Width Number of Lanes Project Type (Check all that Apply) ❑ New Construction ❑ Path / Trail ❑ 3-R varies varies ❑ Reconstruction ❑ Pedestrian / Facilities ❑ 2-R ❑ Railroad ❑ Parking ❑✓ Other ❑ Bridge Geometric Design Data Description Through Route Crossroad ❑ Principal Arterial ❑ Principal Arterial Federal ❑✓ Urban 0✓ MinorArterial � Collector � Urban ❑✓ Minor Arterial � Collector Functional ❑✓ Rural ❑✓ Major Collector �✓ Rural � Major Collector Classification ❑NHS 0✓ Minor Collector ❑NHS 0✓ Minor Collector ❑✓ Local Access 0 Local Access Terrain ❑ Flat ❑ Roll ❑ Mountain [:]Flat [:]Roll ❑ Mountain Posted Speed varies Design Speed varies Existing ADT varies Design Year ADT Design Year Design Hourly Volume (DHV) Performance of Work Preliminary Engineering Will Be Performed By Others Agency County % 100 % Construction Will Be Performed By Contract Agency Contract 100 % Environmental Classification _ ❑ Class I - Environmental Impact Statement (EIS) ❑✓ Class II - Categorically Excluded (CE) ❑ Project Involves NEPA/SEPA Section 404 ❑ Projects Requiring Documentation Interagency Agreement (Documented CE) ❑ Class III - Environmental Assessment (EA) ❑ Project Involves NEPA/SEPA Section 404 Interagency A reements 9 Y Environmental Considerations i DOT Form 140-101 Revised 01/2022 Previous Editions Obsolete Page 2 Agency Kittitas County Public Works of Way ✓❑ No Right of Way Needed * All construction required by the contract can be accomplished within the existing right of way. Project Title Horizontal Curve Safety Project ❑ Right of Way Needed ❑ No Relocation ❑Relocation R Utilities Railroad ❑✓ No utility work required ❑✓ No railroad work required ❑ All utility work will be completed prior to the start ❑ All railroad work will be completed prior to the start of of the construction contract the construction contract ❑ All utility work will be completed in coordination ❑ All the railroad work will be completed in coordination with the construction contract with the construction contract Date 03/02/2026 Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project Utilities will be located and if conflicts are identified, Kittitas County will require relocation prior to the construction project. rFAA Involvement Ic anv airnnrt located within 3.2 kilometers (2 miles) of the proposed n YPS n No This project has been reviewed by the legislative aoay oT ine aammistraufln aytn wy ui ciyul mica, v, IL designee, and is not inconsistent with the agency's comprehensive plan for community development. Date Agency By Mayor/Chairperson DOT Form 140-101 Page 3 Revised 01/2022 Previous Editions Obsolete