AGENDA STAFF REPORT
AGENDA DATE: March 17, 2026
ACTION REQUESTED: Request to Approve a Resolution Authorizing the Chair's
Signature on the Local Agency Federal Aid Project
Prospectus for the Horizontal Curve Safety Project CRP
319-23.
BACKGROUND: The Horizontal Curve Safety Project was selected to
receive Federal Funding through the Highway Safety
Improvement Program (HSIP). Kittitas County Public
Works has inventoried horizontal curves countywide and
selected ten (10) roadway segments for implementation of
improved roadside signing, including advisory speeds,
chevron arrow signs, and the addition of flexible guideposts
to increase driver awareness. All the improvements are
focused on helping reduce accidents and injuries on the
road system.
This project is eligible for one hundred percent (100%)
Federal Funding for all phases authorized prior to April 30,
2026. This Project Prospectus covers the Federal Funding
for the Construction phase of the project.
Public Works is finalizing construction documents
targeting a May 21, 2026, advertisement.
INTERACTION: Public Works
RECOMMENDATION: Approve the Resolution Authorizing the Chair's signature
on the Local Agency Federal Aid Project Prospectus for the
Horizontal Curve Safety Project CRP 319-23.
HANDLING: Return one original to Public Works
ATTACHMENTS: Resolution, Local Agency Federal Aid Project Prospectus
LEAD STAFF: Josh Fredrickson, Public Works Director
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO.2026 -
AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL
AID PROJECT PROSPECTUS CONSTRUCTION PHASE FOR THE HORIZONTAL
CURVE SAFETY PROJECT CRP 319-23
WHEREAS: The Horizontal Curve Safety Project was awarded Federal Funding through the
2023 Highway Safety Improvement Program; and
WHEREAS: The Funding will be used for the construction phase to implement the
improvements on ten (10) identified roadway segments chosen; and
WHEREAS: In preparation to begin work, Kittitas County Public Works is requesting the
Washington State Department of Transportation release the Federal Funds for
construction; and
WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair
of the Board of County Commissioners acknowledging the project has been
reviewed and is consistent with the County's comprehensive plan for community
development; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best
interest of the public, does hereby approve the Chair's signature on the Local
Agency Federal Aid Project Prospectus for the Horizontal Curve Safety Project
CRP 319-23.
DATED on this 17th day of March 2026, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Cory Wright, Chairman
Brett Wachsmith, Vice -Chairman
Laura Osiadacz, Commissioner
Aft Washington State
Department of Transportation
Local Agency Federal Aid
Project Prospectus
Prefix
HSIP
Route ( ) Date 03/02/2026
000S 678 DUNS Number 01-020-2547
Federal Aid
Project Number
r WSDOT Federal Employer 91-601349
Use Only Tax ID Number
Local Agency
RC 2298
Project Number
`
Agency CAAgency
Federal Program Title
Kittitas County Public Works Yes ❑ No
❑✓ 20.205 ❑ Other
Project Title
Start Latitude N 47.181726
Start Longitude W-120.954167
Horizontal Curve Safety Project
End Latitude N 47.165419
End Longitude W-120.012574
Project Termini From -To
Nearest City Name
Project Zip Code (+4)
countywide countywide
Ellensburg
98926-7989
Begin Mile Post
End Mile Post
Length of Project
Award Type
❑✓ ❑ Local Forces ❑ State ❑ Railroad
countywide
countywide
countywide
.Local
Route ID
Begin Mile Point
End Mile Point
City Number
County Number
County Name
countywide
countywide
19
Kittitas
WSDOT Region
Legislative District(s)
Congressional District(s)
Urban Area Number
South Central Region
13
8
Total
Local Agency
Federal Funds
Phase Start
Phase
Estimated Cost
Funding
Date
Hundred Dollar
(Nearest125,000.00
Nearest Hundred Dollar
Nearest Hundred Dollar
Month Year
P.E.
125,000.00
November 2023
RIW
Const.
543,000.00
543,000.00
April 2026
Total 668,000.00 668,000.00
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width
Number of Lanes
varies
varies
Many roads have hazardous curves and non standard or non-existent delineation.
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)
Collect data and install/upgrade signing for horizontal curves (such as advisory speeds, chevrons, delineation).
o I Agency Contact Person Title Phone
Darren Case Construction Manager 509-962-7019
Mailing Address
City
State
Zip Code
411 N. Ruby, Suite 1
Ellensburg
WA
98926
By _
Approving Authority
Project Prospectus
Title Director, Public Works Date
Page 1
-- n__..:_.._ �,,:•:....., nti....i,.+,.
DOT Form 140-101
Revised 01/2022 1 """"'0
Agency
Project Title
Date
Kittitas County Public Works
Horizontal Curve Safety Project
03/02/2026
Type of Proposed Work
Roadway Width
Number of Lanes
Project Type (Check all that Apply)
❑ New Construction ❑ Path / Trail
❑ 3-R
varies
varies
❑ Reconstruction ❑ Pedestrian / Facilities
❑ 2-R
❑ Railroad ❑ Parking
❑✓ Other
❑ Bridge
Geometric Design Data
Description
Through Route
Crossroad
❑ Principal Arterial
❑ Principal Arterial
Federal
❑✓ Urban
0✓ MinorArterial
� Collector
� Urban
❑✓ Minor Arterial
� Collector
Functional
❑✓ Rural
❑✓ Major Collector
�✓ Rural
� Major Collector
Classification
❑NHS
0✓ Minor Collector
❑NHS
0✓ Minor Collector
❑✓ Local Access
0 Local Access
Terrain
❑ Flat ❑ Roll ❑ Mountain
[:]Flat [:]Roll ❑ Mountain
Posted Speed
varies
Design Speed
varies
Existing ADT
varies
Design Year ADT
Design Year
Design Hourly Volume (DHV)
Performance of Work
Preliminary Engineering Will Be Performed By
Others
Agency
County
%
100 %
Construction Will Be Performed By
Contract Agency
Contract
100 %
Environmental Classification
_
❑ Class I - Environmental Impact Statement (EIS)
❑✓ Class II - Categorically Excluded (CE)
❑ Project Involves NEPA/SEPA Section 404
❑ Projects Requiring Documentation
Interagency Agreement
(Documented CE)
❑ Class III - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency A reements
9 Y
Environmental Considerations
i
DOT Form 140-101
Revised 01/2022 Previous Editions Obsolete Page 2
Agency
Kittitas County Public Works
of Way
✓❑ No Right of Way Needed
* All construction required by the
contract can be accomplished
within the existing right of way.
Project Title
Horizontal Curve Safety Project
❑ Right of Way Needed
❑ No Relocation ❑Relocation R
Utilities Railroad
❑✓ No utility work required ❑✓ No railroad work required
❑ All utility work will be completed prior to the start ❑ All railroad work will be completed prior to the start of
of the construction contract the construction contract
❑ All utility work will be completed in coordination ❑ All the railroad work will be completed in coordination
with the construction contract with the construction contract
Date
03/02/2026
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
Utilities will be located and if conflicts are identified, Kittitas County will require relocation prior to the
construction project.
rFAA Involvement
Ic anv airnnrt located within 3.2 kilometers (2 miles) of the proposed
n YPS n No
This project has been reviewed by the legislative aoay oT ine aammistraufln aytn wy ui ciyul mica, v, IL
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Date
Agency
By
Mayor/Chairperson
DOT Form 140-101 Page 3
Revised 01/2022 Previous Editions Obsolete