My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_PE Prospectus_WSDOT_Corridor Improvements
>
Meetings
>
2026
>
03. March
>
2026-03-03 10:00 AM - Commissioners' Agenda
>
Resolution_PE Prospectus_WSDOT_Corridor Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 1:28:13 PM
Creation date
2/26/2026 1:27:24 PM
Metadata
Fields
Template:
Meeting
Date
3/3/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution Authorizing Chair Signature on the Local Agency Federal Aid Project Prospectus for the Corridor Improvements Countywide Project CRP 323-26
Order
13
Placement
Consent Agenda
Row ID
142099
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />AGENDA STAFF REPORT <br />AGENDA DATE: March 3, 2026 <br />ACTION REQUESTED: Request to Approve a Resolution Authorizing the Chair's <br />Signature on the Local Agency Federal Aid Project <br />Prospectus for the Corridor Improvements Countywide <br />Project CRP 323-26. <br />BACKGROUND: The Corridor Improvements Countywide Project was <br />selected to receive Federal Funding through the Highway <br />Safety Improvement Program (HSIP). HSIP funding is <br />administered through the Washington State Department of <br />Transportation (WSDOT). Eight road segments have been <br />identified as high risk by the 2025 Safety Plan as well as <br />past safety plans. To better prevent future fatal and serious <br />injury accidents, Kittitas County plans to design and install <br />improvements including embedded LED markers, <br />guideposts and edge line rumble strips on portions of the <br />identified roadways. <br />This project is eligible for 100% Federal Funding for all <br />phases authorized prior to April 30, 2028. <br />This Project Prospectus covers the Federal Funding for the <br />Preliminary Engineering phase of the project. <br />Public Works is preparing to perform the preliminary <br />engineering with County staff, including survey, <br />environmental permitting, and design. <br />INTERACTION: Public Works <br />RECOMMENDATION: Approve the Resolution Authorizing the Chair's signature <br />on the Local Agency Federal Aid Project Prospectus for the <br />Corridor Improvements Countywide Project CRP 323-26. <br />HANDLING: Return one original to Public Works <br />ATTACHMENTS: Resolution, Local Agency Federal Aid Project Prospectus <br />LEAD STAFF: Josh Fredrickson, Public Works Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.