HomeMy WebLinkAbout2025-06-23-minutes-it-study-sessionCreated on 6/23/2025 8:29:14 AM
KITTITAS COUNTY COMMISSIONERS
IT Study Session
Regular Meeting
Monday June 23, 2025 - 11:00 AM
BOCC Conference Room
205 West 5th Room 108 - Ellensburg
1. Call to Order
2. Citizen Comments (1 min. time limit)
3. Request to Approve the Public Website Contract
4. Request to Approve Tiered Application Developer Positions I, II, and III
5. Executive Session - RCW 42.30.110 "(1)(g)To evaluate the qualifications of an applicant for
public employment or to review the performance of a public employee. However, subject to
RCW 42.30.140(4), discussion by a governing body of salaries, wages, and other conditions of
employment to be generally applied within the agency shall occur in a meeting open to the
public, and when a governing body elects to take final action hiring, setting the salary of an
individual employee or class of employees, or discharging or disciplining an employee, that
action shall be taken in a meeting open to the public"
6. Other Business - No Action to be taken
7. Concluded
6/23/2025 MINUTES 1
COMMISSIONERS' MINUTES
KITTITAS COUNTY, WASHINGTON
BOCC CONF. ROOM
REGULAR MEETING
MONDAY 11:00 A.M. June 23rd, 2025
Board members present: Vice-Chairman Cory Wright and Commissioner
Brett Wachsmith.
Board members absent: Chairman Laura Osiadacz
Others: IT Director Doug Fessler; Assistant IT Director Zane Kinney;
Admin Assistant Grant Shimada
REGULAR MEETING IT STUDY SESSION COMMISSIONERS
At 11:00 a.m. Vice-Chairman Cory Wright opened the Information
Technology Study Session.
CITIZEN COMMENTS
There were no citizen comments.
CONTRACT PUBLIC WEBSITE AND INTRANET IT
Assistant IT Director Zane Kinney is requesting Board approval for a
contract with a 3rd party website developer, Diagram, Inc. IT has
budgeted $100k in the Enterprise Technology Fund to help cover the 1st
year of expenses. PH will also be contributing a $50k Grant they were
awarded towards this project. Commissioner Brett Wachsmith moved to
approve the contract. Vice-Chairman Cory Wright seconded, motion
passed; 2:0.
The Board made a request for IT to put together a discovery packet
that goes over the process of creating a new County brand/seal.
REQUEST APPLICATION DEVELOPER POSITIONS I, II, AND III IT
Assistant IT Director Zane Kinney is requesting Board approval for a
new Application Developer tiered position system. IT has worked with
HR to create this new tiered system: Application Developer I, II, and
III. Current members of the application developer team will be placed
at tier I. Commissioner Brett Wachsmith moved to approve the new
Application Developer position tier system. Vice-Chairman Cory Wright
seconded, motion passed; 2:0.
6/23/2025 MINUTES 2
DISCUSSION EXECUTIVE SESSION IT
At 11:15 a.m. Vice-Chairman Wright announced the Board would recess
into an executive session for 10 min with Doug Fessler, IT Director,
under RCW 42.30.110 (1)(g) To evaluate the qualifications of an
applicant for public employment or to review the performance of a
public employee. However, subject to RCW 42.30.140(4), discussion by
a governing body of salaries, wages, and other conditions of employment
to be generally applied within the agency shall occur in a meeting
open to the public, and when a governing body elects to take final
action hiring, setting the salary of an individual employee or class
of employees, or discharging or disciplining an employee, that action
shall be taken in a meeting open to the public. No action anticipated.
At 11:25 a.m. the Board reconvened out of Executive Session. The Board
decided to extend Doug Fessler’s goal for training to the end of the
year.
OTHER BUSINESS COMMUNICATION FORM IT
Assistant IT Director Zane Kinney is working on a form that will be
used to assess what the County’s communication mission is.
OTHER BUSINESS BURN BAN GIS MAP IT
Commissioner Wright requested IT to develop a GIS map that illustrates
the different burn zones for public clarity. This map will allow users
to locate their zone by searching for their parcel number.
MEETING CONCLUSION COMMISSIONERS
At 11:38 a.m., Commissioner Wachsmith concluded the Information
Technology Study Session.
KITTITAS COUNTY COMMISSIONERS
IT Administrative Assistant KITTITAS COUNTY, WASHINGTON
________________________________ ________________________________
Grant Shimada Laura Osiadacz, Chairman
Page 1 of 2
Information Technology “Study Session Staff Report”, 6/23/2025
KITTITAS COUNTY
BOARD OF COUNTY COMMISSIONERS
STAFF REPORT FOR
STUDY SESSION
Information Technology
STUDY SESSION DATE: 6/23/2025
TOPIC: Request to Approve the New Public Website/Intranet Development
Contract
ACTION REQUESTED: Approval and Signature
LEAD STAFF: Zane Kinney
RECOMMENDATION:
IT recommends the approval and signing of Diagram, Inc’s contract.
BRIEFING SUMMARY: This item is intended to be a regular monthly update to the
Board on our intranet modernization initiative and the public website replacement
project, the current work being done, and the progress to the present.
BACKGROUND:
In 2023 the Board directed IT to work on modernizing CAMAS. Since that time, IT has
developed a project plan, and progress has been made to reach our goals. IT has
determined that a key dependency to replacing CAMAS is that a new public website will
need to be developed. This briefing has been expanded to include information on this
project as well.
DISCUSSION:
• IT has received Diagram, Inc’s contract that covers the project scope, timeline,
and cost as well as content data migration and staff training.
• This project will cost 162k with a 12 month timeline that starts when the project
begins.
• Funding sources for the public website have been determined. Informal bids have
been returned, and IT has selected their preferred vendor for the project.
• Replacing the public website is no small task and success with depend on early
planning, proper needs assessment and proper County staff involvement.
• CAMAS features currently being addressed are:
o District Financial Portal (nearly complete),
o Preliminary Site Analysis (in process),
o Purchasing & Vouchering (planning),
o Claim for Reduction of Assessment (in process),
o Telework Agreement (completed),
o Asset Management (in process).
Page 2 of 2
Information Technology “Study Session Staff Report”, 6/23/2025
FISCAL IMPACTS: 100k has been budgeted in the Enterprise Technology Fund to cover
the 1st year costs. Additionally, the PH department was awarded a 50k Grant that will
also be used to help fund this project.
ATTACHMENTS: Diagram, Inc. Contract for Public Website Replacement Project
Legal consultation? Yes. Contract Review
Finance consulted? Yes
Kittitas County Agreement for Services (rev. 5/14/25)
Page 1 of 26
KITTITAS COUNTY
AGREEMENT FOR SERVICES
This Agreement for Services (hereinafter “Agreement”) is entered into by and between Kittitas County
(hereinafter “County”), a political subdivision of the State of Washington, and Diagram, Inc. (hereinafter
“Contractor”).
The purpose of this Agreement is as follows: County Website Migration to a Scalable Cloud-Native CMS.
The term of this Agreement shall be from the date of execution through twelve (12) months from the
signing of this Agreement, unless the Agreement is terminated early or its term is extended as provided herein.
The parties’ addresses and points of contact for the administration of this Agreement are as follows:
COUNTY
205 W 5th Ave
Ellensburg, WA 98926
Zane Kinney
Assitant Director
Information Technology
zane.kinney@co.kittitas.wa.us
509-933-8281
CONTRACTOR
55 S. Main St., Suite 230
Naperville, IL 60565
Bill Casey
CEO
bcasey@wearediagram.com
630.375.6833
This Agreement includes the following, which are attached hereto and hereby incorporated by this
reference:
Attachment “A”: Scope of Work
Attachment “B”: Compensation
Attachment “C”: Insurance Requirements
Attachment “D”: General Terms and Conditions
Attachment “E”: W-9 (Contractor must complete and return to the County for payment)
Attachment “F”: Retirement Status Form (Contractor must complete and return to the County
for payment if Contractor is an individual, as opposed to a corporate business
entity)
Docusign Envelope ID: 8DF81FA1-7578-4F97-AB0F-AA8EA07D50EE
Bill Casey
CEO
6/23/2025
Kittitas County Agreement for Services (rev. 5/14/25)
Page 3 of 26
ATTACHMENT “A”
SCOPE OF WORK SCOPE OF SERVICES
Diagram will perform the following services within this Scope of Services:
PROJECT DISCOVERY
Service Service Description
Pre-Discovery Activities
Component Audit Prior to the discovery, the Diagram team will perform a component audit. A successful website
rebuild and integration strategy requires a thorough inventory of the types of content and
modules currently in place. This audit is intended to identify all the moving pieces that will need
to be accounted for.
Deliverable(s)
• After evaluation of existing components, Diagram subject matter experts will prepare
questions for discussion during the discovery workshops.
Discovery Workshop Activities
Outcomes and Objectives In this session we will prioritize the high-level business objectives of the project, mapping them
to organizational goals. We will also discuss the criteria for success and identify any obstacles
that we will need to overcome. The goal is to leave with a shared vision of project outcomes.
Current Site and Existing
Designs
In order to design and build a better website, we will need a shared understanding of the
current website. In this session, we will explore the pain points and limitations of the current
implementation. Insights from this session will inform the discussion on technical strategy and
architecture.
Design and Branding Discussion Diagram will work with the Kittitas County team to:
• Define all technical requirements, including what, if any, third-party software
integrations will be available at go-live utilizing the Umbraco platform.
• Conduct collaborative design workshops to help both the Kittitas County and Diagram
teams get aligned on design direction, content strategy, and inspiration.
Technical Architecture
Discussion
During this session, we will meet with technical stakeholders to discuss Umbraco, its
capabilities, and how we can balance extensibility and composability to streamline workflows
for site admins. We will dive into integration strategy and identify how best to make use of
available APIs and web services. Lastly, we will cover your Azure infrastructure, security, and
what to expect integrating with and deploying to Umbraco Cloud. The goal of this session is to
build a shared vision for a sustainable technical architecture.
Discovery Workshop Deliverables
Kittitas County Agreement for Services (rev. 5/14/25)
Page 4 of 26
Service Service Description
Discovery Deliverables Diagram creates a project plan and scope of work for website redesign and platform migration.
This includes:
• Confirmation of refined functional scope (key requirements, components, functionality).
• Project schedule/timeline.
• The Kittitas County team will be made available for one (1) day of virtual workshops
with the Diagram Project Team.
Assumptions Diagram assumes the following:
• Kittitas County will identify stakeholders who will participate in the workshops.
• All stakeholders will be available for interviewing during the planned sessions so that
all requirements and viewpoints can be taken into account.
• Any documentation about the current website and processes should be provided to
Diagram in advance of the virtual meetings to assist with preparation.
AGILE IMPLEMENTATION: DESIGN + BUILD + TEST
Service Service Description
Agile Design and Development
Sprints
Project work and activities will be planned and organized into two-week sprint cycles. During
each two-week sprint cycle, Diagram will make visible, measurable progress designing and
developing your website. Within each sprint, Diagram will:
• Create or refine detailed visual and functional specifications for upcoming work.
• Implement new CMS functionality that will be ready to demo for feedback.
• Incorporate feedback on previously demoed site elements.
• Refine the website UI design and content.
• Conduct Quality Assurance (QA) and accessibility testing.
Demos and Planning Sessions Diagram will meet with the Kittitas County team on a weekly basis, alternating between
planning/project-update sessions and demos of work completed.
Demos
Demos will occur every other week throughout the design + development cycle. Collecting
feedback continuously throughout the project maintains alignment across teams and allows us
to course correct or pivot direction as needed. We will coordinate with your core project team
to plan which stakeholders should be included in each demo.
Planning Sessions
In the off weeks when no demo is scheduled, Diagram’s team will meet with the Kittitas County
core project team or project coordinator to:
• Confirm feedback received in or after demos.
• Discuss work-in-progress and confirm or clarify expectations as needed.
• Collaborate on plans for future work, validating our understanding of Site/CMS admin
needs and granular functional requirements.
• Review work-completed vs. work-remaining, upcoming milestones, and deliverable
dates.
Kittitas County Agreement for Services (rev. 5/14/25)
Page 5 of 26
Service Service Description
Design Exploration Diagram will produce a series of design vignettes (style prototypes) showcasing
options for how design elements, colors, and typography can combine to produce a
brand-aligned look and feel for the website. These options will be informed by the
wireframes and expand upon any existing initial designs to explore overall art direction
for the website. Multiple options are shown to compare and contrast, with each
representing a viable visual treatment based on what is learned through previous
workshops and conversations. The design choices we align on will set the initial
foundation for the website Style Guide and Design System.
Deliverable(s)
• Two (2) style prototypes.
• One (1) round of iteration is included to further refine the visual design direction.
Content Strategy and Planning Diagram will coordinate with the Kittitas County team to strategize, gather, and
prioritize content for key areas of the website. This content will then be used to create
content models for key pages and structured content types. The content models inform
the implementation strategy and structured content creation in the CMS. It will also
provide a working foundation for the site’s information architecture.
Deliverable(s)
• Content models for up to ten (10) key pages or content types.
Technical/Design Planning and
Specifications
Diagram will coordinate with the Kittitas County team to regularly review, refine, and
adapt technical and design specifications throughout the duration of the project, to
ensure that components and features work in ways that support the project goals and
user stories .
Kittitas County Agreement for Services (rev. 5/14/25)
Page 6 of 26
Service Service Description
CMS Implementation Diagram will implement the Umbraco platform as part of this project scope, including CMS
configuration, all C# programming required to render content managed in Umbraco, and any
CMS functionality as outlined in the project charter. This implementation occurs within the
design and development sprints below.
Included Templates and Blocks
The proposal includes up to ten (10) page templates. Examples provided below are illustrative;
final selections will be confirmed during discovery:
1. Homepage
2. Flexible Interior Page – Supports multiple layouts, including rows and customizable
columns (e.g., 100% width, 50%/50%, 33%/33%/33%).
3. News / Press Release
4. Meeting Agenda
5. Site Search Results
Website Blocks (Widgets):
The proposal includes twenty (20) widgets (blocks) for curating content.
1. Rich Text
2. Accordion
3. Callout
4. Stats
5. Embed
6. Content Listing – Displays paginated content from selected folders or categories.
7. Text with Image
8. Header Navigation (Structural)
9. Header Navigation (Utility)
10. Footer Navigation
11. Breadcrumbs
12. News / Press Release Listing
13. Forms
14. Interior Page Navigation
15. Hero Banner with Rotator
16. Tabs
17. Global Alert Banners
18. Section-Specific Alert Banners
19. Grid-Based Dynamic Content Listings
20. Membership Logins (assumes Umbraco membership authentication only)
Design System Implementation Diagram will develop a collection of reusable Web components and clear standards that can
be assembled together to build any number of page layouts by the site admin team. This will
provide a sustainable way to provide flexibility for site admins, while maintaining visual
consistency across different areas of the site.
Kittitas County Agreement for Services (rev. 5/14/25)
Page 7 of 26
MIGRATION ASSISTANCE, TRAINING, AND DEPLOYMENT PREP
Service Service Description
Migration Assistance Diagram will assist Kittitas County in their content migration by providing:
• Migration spreadsheet template.
• Content admin support.
• Sample pages to reference for key content types.
Virtual Training Diagram will conduct four (4) hours of virtual training with the Kittitas County web team.
Quality Assurance and Testing Diagram takes a multi-faceted approach to quality assurance, testing continuously throughout the project
and not just at the end.
• QA specialists are a part of your cross-functional agile team and involved in all design
and technical planning activities.
• QA testing occurs alongside feature development each sprint.
• Regression testing occurs at key milestones and prior to site launch/release.
QA testing includes, but is not limited to:
• Functional testing to identify defects or issues with functionality.
• Thorough WCAG 2.2 accessibility testing, including testing for screen reader and
keyboard usability.
• Advocating for usability of CMS editor experience and admin usability.
• Testing to ensure that the responsive website will offer support for modern browsers using
modern Operating Systems. Modern browsers include Google Chrome, Mozilla Firefox, Safari
- Mac only, and Microsoft Edge.
Assumptions Diagram assumes the following:
• The Kittitas County website will be developed and hosted on Umbraco Cloud. Kittitas County
will procure an Umbraco Cloud account separately from this agreement.
• The Kittitas County website will utilize Umbraco Engage Analytics. Kittitas County will procure
an Umbraco Engage license separately from this agreement.
• Diagram will work with the Kittitas County Information Technology team to identify the
appropriate TTL for the DNS cutover.
• Diagram will assist Kittitas County in updating all of the appropriate DNS records required
to launch the new website on the CMS platform.
• Diagram will configure the SSL for the new website.
• Diagram will configure the www and https redirects for the new website.
• Kittitas County will migrate all required content to the new Umbraco website.
The following items are considered out of scope:
• Resolution of issues caused by or related to CMS software defects.
• Any other work items not specifically defined within this scope of services.
Kittitas County Agreement for Services (rev. 5/14/25)
Page 8 of 26
ATTACHMENT “B”
COMPENSATION
THE COUNTY WILL NOT PROCESS PAYMENT FOR SERVICES RENDERED UNDER THIS AGREEMENT UNTIL
CONTRACTOR SUBMITS A COMPLETED W-9 (SEE ATTACHMENT “E”).
As full compensation for satisfactory performance of the work described in Attachment “A”, and within
thirty (30) days of receiving Contractor’s itemized invoice, the County shall pay Contractor the following amount(s)
plus any applicable taxes as detailed in Contractor’s invoice: $ 162,011.00.
Unless otherwise provided herein, Contractor shall be solely responsible for Contractor’s travel and
related expenses.
TERMS
Diagram will schedule the start of services after receipt of all signed contracts and payment of initial invoice. The
estimated duration will be twelve (12) months after the start of services. The start of services may be delayed
due to delays in executing this Agreement, receipt of initial payment, or receipt of materials and files needed from
Client to begin services. The delivery date may be extended due to extension, expansion, or changes to the
Agreement or to delays in approvals, payments, or the sending of needed files and materials by Client.
Payment terms are Net 30 days unless otherwise indicated below. Diagram's standard business hours are
Monday through Friday, 8:30am CT - 5:30pm CT.
PRICING AND PAYMENT SCHEDULE
Client shall pay to Diagram, a total of $162,011.00 billed hourly at a blended rate of $180.00 per hour in accordance
with the following schedule:
• An initial payment of twenty percent (20%) of the total Agreement cost is due upon receipt of invoice $32,402.00
and prior to start of services.
• The remainder of the balance will be invoiced at the end of each month for work performed. $129,609.00
The project cost is based on the anticipated effort needed to fulfill design and functional requirements described in
the scope of services. Should additional effort be required due to previously unknown factors or additional Client
requests received after the execution of this Agreement, additional funding approval will be required prior to
commencement of work.
Pricing Notes:
• Client must be current on project payments in order to avoid delays in the project timeline.
• This fee does not include any expenses or other costs that may be required to complete your project. Examples of
expenses include licensing fees, stock or original photography, font or media licensing, online services, and similar
costs. Diagram will obtain your consent before incurring costs on your behalf. Once approved, Diagram may
advance such costs on your behalf and include the amount on your invoice. Alternatively, Diagram may require that
Kittitas County Agreement for Services (rev. 5/14/25)
Page 9 of 26
you advance such costs before they are incurred or that you contract directly with the vendor.
• Enhancements or changes to the original specifications or to the approved project scope are managed with Change
Orders and are billable.
Kittitas County Agreement for Services (rev. 5/14/25)
Page 10 of 26
ATTACHMENT “C”
INSURANCE REQUIREMENTS
Contractor shall secure and maintain in effect at all times during performance of work under this
Agreement such insurance as will protect Contractor, its employees, and agents from all claims, losses, harm,
costs, liabilities, damages and expenses arising out of Contractor’s performance under this Agreement, including
but not limited to personal injury (including death) or property damage.
All insurance shall be issued by companies admitted to do business in the State of Washington and have
a rating of A-, Class VII or better in the most recently published edition of Best’s Reports unless otherwise approved
by the County. If an insurer is not admitted, all insurance policies and procedures for issuing the insurance policies
must comply with Chapter 48.15 RCW and 284-15 WAC.
At a minimum, Contractor shall maintain and provide proof of the following selected options:
☒ Commercial General Liability Insurance
Coverage limits not less than:
• $1,000,000 per occurrence, for all covered losses
• $2,000,000 general aggregate
• $1,000,000 products & completed operations aggregate
• $1,000,000 personal and advertising injury, each offense
The policy must be endorsed to include the County and its officials, employees and agents
as additional insureds.
☐ Excess or Umbrella Liability
Contractor shall provide Excess or Umbrella Liability coverage of $5,000,000. This Excess
or Umbrella Liability coverage shall apply, at a minimum, to both the Commercial General
and Automobile Insurance policy coverages. If used to meet limit requirements, coverage
must be at least as broad as specified for underlying coverages, and must cover those
insured in the underlying policies.
This requirement may alternatively be satisfied through Contractor’s primary Commercial
General and Automobile Liability coverage, or any combination thereof.
The policy must be endorsed to include the County and its officials, employees and agents
as additional insureds.
Coverage shall be “pay on behalf”, with defense costs payable in addition to policy limits.
There shall be no cross liability exclusion precluding coverage for claims or suits by one
insured against another.
☒ Workers’ Compensation & Employer’s Liability
Contractor shall provide Workers Compensation and Employer’s Liability insurance on a
state-approved policy form providing benefits as required by law with employer’s liability
limits no less than $1,000,000 per accident or disease.
☐ Professional Liability / Errors and Omissions Liability
Coverage limits not less than:
• $1,000,000 each claim
Kittitas County Agreement for Services (rev. 5/14/25)
Page 11 of 26
Contractor must provide evidence of this coverage on a policy form appropriate to
Contractor’s profession.
☐ [ Other insurance coverage as deemed appropriate by either the County Risk Manager or the
assigned Deputy Prosecuting Attorney. Additional insurance types which the County may need to require (non-
exhaustive list): Cyber, Pollution, Aircraft, Watercraft, Liquor, Crime/Fidelity, Sexual Abuse & Molestation, Jones
Act, Longshoremen/Harborworkers, Marine. ]
Contractor shall furnish to the County a Certificate of Insurance, with endorsement where required above,
as evidence that policies providing insurance required by this Agreement are in full force and effect. Contractor’s
insurance policies required above must apply on a primary non-contributing basis in relation to any other
insurance or self-insurance available to the County.
Contractor agrees to provide notice to the County at least thirty (30) days prior to cancellation, or any
material alteration or non-renewal, of any of the above-required insurance coverages.
Contractor shall assume full responsibility for all loss or damage from any cause whatsoever to any tools,
machinery, equipment, or motor vehicles owned or utilized by Contractor, or Contractor’s agents, employees,
suppliers or contractors, as well as to any temporary structures, scaffolding and/or protective fences.
Contractor shall have sole responsibility for ensuring the insurance coverage and limits required herein
are also obtained by any subcontractors.
NOTE: Notwithstanding any other provision(s) of this Agreement, no contract shall form under this Agreement
until and unless the following are provided to the County: (1) a copy of the Certificate(s) of Insurance with all
required endorsements, properly completed and in the amounts required, and (2) where requested by the County,
a copy of the required insurance policies, including all required endorsements.
Kittitas County Agreement for Services (rev. 5/14/25)
Page 12 of 26
ATTACHMENT “D”
GENERAL TERMS AND CONDITIONS
1. Scope of Contractor’s Services: Contractor agrees to provide to the County services as set forth in
Attachment “A”. No materials, labor, or facilities will be furnished by the County, unless otherwise provided
herein. All work performed under this Agreement shall comply with applicable laws and regulations.
2. Accounting and Payment: Compensation to Contractor for services rendered under this Agreement
shall be as set forth in Attachment "B". Where Attachment "B" requires payment(s) by the County, payment shall
be based upon billings, supported unless provided otherwise in Attachment "B", by documentation of units of
work actually performed and amounts earned, including, where appropriate, the total number of hours for the
month and the total dollar payment requested. Unless specifically stated in Attachment "B", the County will not
reimburse Contractor for any costs or expenses incurred by Contractor in performance of this Agreement. Where
required, the County shall, upon receipt of appropriate documentation, compensate Contractor, no more often
than monthly, through the County voucher system, for Contractor’s services pursuant to the fee schedule set forth
in Attachment "B". In the event Contractor fails to perform any of its obligations under this Agreement within the
time specified herein, then the County may withhold all monies due and payable to Contractor until such failure
to perform is cured or otherwise adjudicated. The County will not process payment for services rendered under
this Agreement until Contractor submits a completed W-9 (See Attachment “E”).
3. Taxes: Contractor understands and acknowledges that the County will not withhold Federal or State
income taxes from payments made to Contractor. Where required by State or Federal law, Contractor authorizes
the County to make withholding for any taxes other than income taxes (e.g., Medicare). All compensation received
by Contractor will be reported to the Internal Revenue Service at the end of the calendar year in accordance with
applicable IRS regulations. It is the responsibility of Contractor to make its necessary estimated tax payments
throughout the year, if any, and Contractor is solely liable for any tax obligation arising from Contractor’s
performance of this Agreement.
The County will pay sales and use taxes imposed on goods or services acquired hereunder as required by
law. Contractor must pay all other taxes, including but not limited to: business and occupation tax; or taxes based
on (1) Contractor’s gross or net income, or (2) personal property to which the County does not hold title. The
County is exempt from federal excise tax.
4. Independent Contractor: Contractor’s services shall be furnished by Contractor as an independent
contractor, and nothing stated herein shall be construed to create a relationship of employer-employee or a
guarantee of future employment. Contractor acknowledges that its entire compensation under this Agreement
is specified in Attachment "B", and that Contractor is not entitled to any County benefits, including but not limited
to: vacation pay, holiday pay, sick leave pay, medical, dental, or other insurance benefits, or any other rights or
privileges afforded to Kittitas County employees.
5. Assignment and Subcontracting: This Agreement may not be assigned or subcontracted in whole or
in part without the express prior written approval of the County.
6. Right to Review; Maintenance of Records: This Agreement is subject to review by any Federal or State
auditor. The County or its designee shall have the right to review and monitor the financial and service
components of the work performed under this Agreement by whatever means are deemed expedient by the
County. Such review may occur with or without notice, and may include, without limitation, on-site inspection,
inspection of all records or other materials which the County deems pertinent, and any and all communications
with or evaluation by service recipients under this Agreement. Contractor shall preserve and maintain all records
Kittitas County Agreement for Services (rev. 5/14/25)
Page 13 of 26
relating to this Agreement for six (6) years after termination or expiration of the Agreement, and upon request
shall make them available for review by any Federal or State auditor, the County, and/or any persons authorized
by the County.
7. Modification
7.1. This Agreement may be amended by mutual agreement of the parties. Any such amendment
shall be in writing and signed by both parties.
7.2 The County may unilaterally amend this Agreement at any time by written notice (“Change
Notice”) to Contractor, to modify the work to be performed under this Agreement, within the general scope of
the Agreement. Such changes may include, but are not limited to, changes in the exact scope of work to be
performed (including modification, substitution, addition, or deletion of required tasks) and changes to the
schedule of performance. If any such Change Notice causes an increase or decrease to Contractor’s cost of, or the
time required for, performance of the work, an equitable adjustment in the compensation to Contractor and/or
in the schedule for the performance of the work shall be made by the County to reflect such an increase or
decrease. Notwithstanding any dispute or delay in arriving at a mutually acceptable equitable adjustment,
Contractor shall proceed in accordance with all Change Notices. Within thirty (30) days after receipt of any Change
Notice which, in Contractor’s opinion, lacks an adequate adjustment, Contractor must submit to the County a
written statement requesting a modified adjustment; otherwise, Contractor will forfeit its right to any such
modified adjustment. The County retains the final right to determine adjustments hereunder.
8. Termination
8.1 This Agreement may be terminated at any time by mutual written agreement of the parties.
8.2 The County, by giving written notice, may terminate this Agreement at any time without cause
and without further obligation to Contractor except for payment due for deliverables provided and/or services
performed prior to the effective date of termination. An equitable adjustment in the contracted price for partially
completed tasks will be made by the County, but such adjustment shall not include compensation for loss of
anticipated profit on uncompleted work.
8.3 If Contractor defaults by failing to perform any of its obligations under this Agreement, or
becomes insolvent, is declared bankrupt or commits any act of bankruptcy or insolvency, or makes an assignment
for the benefit of creditors, the County may, by written notice to Contractor, terminate the Agreement, and at
the County's option, obtain performance of the work elsewhere. If the Agreement is terminated under this
paragraph, Contractor shall not be entitled to receive any further payments under this Agreement until all of its
obligations hereunder have been fully performed, and any extra cost or damage to the County shall be deducted
from any money due or coming due to Contractor. Furthermore, in the event of termination under this paragraph,
Contractor shall bear the costs of any extra expenses incurred by the County in completing the work, and all
damages sustained, or which may be sustained, by the County.
8.4 Termination of this Agreement by any means provided herein shall not excuse any party’s
performance of its obligations hereunder through the effective date of termination, except that the County shall
not be obligated to pay for services that have not been performed or deliverables that have not been provided.
9. Indemnification
9.1 To the fullest extent permitted by law, Contractor agrees to indemnify, defend and hold the
County and its departments, elected and appointed officials, employees, agents and volunteers, harmless from
Kittitas County Agreement for Services (rev. 5/14/25)
Page 14 of 26
and against any and all claims, damages, losses and expenses, including but not limited to court costs, attorney's
fees and alternative dispute resolution costs, for any personal or bodily injury, sickness, disease or death, for any
damage to or destruction of any property (including the loss of use resulting therefrom), and for any other claims,
damages, losses, and expenses sustained by the County, which (1) are caused in whole or in part by any act or
omission, negligent or otherwise, of Contractor, its employees, agents or volunteers, or Contractor’s
subcontractors, their employees, agents or volunteers; or (2) are directly or indirectly arising out of, resulting
from, or otherwise connected with the performance of this Agreement; or (3) are based upon Contractor’s or its
subcontractors’ use of, presence upon or proximity to the property of the County. This indemnification obligation
of Contractor shall not apply in the limited circumstance where the claim, damage, loss or expense is caused by
the sole negligence of the County. This indemnification obligation of Contractor shall not be limited in any way by
the Washington State Industrial Insurance Act, RCW Title 51, or by application of any other workmen's
compensation act, disability benefit act or other employee benefit act, and Contractor hereby expressly waives
any immunity afforded by such acts. The foregoing indemnification obligations of Contractor are a material
inducement to the County to enter into this Agreement, are reflected in Contractor’s compensation, and have
been mutually negotiated by the parties.
9.2 The County reserves the right, but not the obligation, to participate in the defense of any claim
for damages, losses or expenses, and such participation shall not constitute a waiver of Contractor’s indemnity
obligations contained in any section of this Agreement.
9.3 In the event Contractor enters into subcontracts to the extent allowed under this Agreement,
each such subcontractor shall indemnify the County on a basis equal to or exceeding Contractor’s indemnity
obligations to the County.
10. Venue and Choice of Law: In the event that any litigation should arise concerning this Agreement,
the venue for such action shall be in the Superior Court of the State of Washington in and for the County of Kittitas.
This Agreement shall be governed by the laws of the State of Washington.
11. Non-Appropriation of Funds: If the County does not appropriate sufficient funding for this Agreement
for any future fiscal period, the County will not be obligated to make payments for services performed after the
end of the last fiscal period for which sufficient funding was appropriated. No penalty or expense shall accrue to
the County in the event this provision applies.
12. Contractor Commitments, Warranties, and Representations: Contractor represents and warrants as
follows:
12.1 Contractor is duly incorporated, validly existing and in good standing under the laws of the State
of Washington, and has all requisite corporate power and authority to enter into and to perform its obligations
under this Agreement.
12.2 Contractor has the authority to execute this Agreement, to make the representations and
warranties set forth herein, and to perform its obligations hereunder.
12.3 This Agreement has been validly executed by an authorized representative of Contractor and
constitutes a valid and legally binding and enforceable obligation of Contractor.
12.4 Contractor holds, or will obtain prior to commencing work under this Agreement, such licenses,
permits and other authorizations from federal, state and local governmental authorities, or from any applicable
industrial or professional certification or licensing bodies, as are necessary for the lawful performance of its
obligations under this Agreement, and will maintain such throughout the term of this Agreement.
Kittitas County Agreement for Services (rev. 5/14/25)
Page 15 of 26
12.5 Contractor is not in violation of any applicable law, ordinance or regulation the consequence of
which will or may materially affect Contractor's ability to perform its obligations under this Agreement. Contractor
is not subject to any order or judgment of any court, tribunal or governmental agency which materially and
adversely affects its operations or assets in the State of Washington, or its ability to perform its obligations under
this Agreement.
12.6 Contractor is not presently debarred, suspended, proposed for debarment, declared ineligible or
voluntarily excluded from covered transactions by any Federal or State department or agency.
12.7 None of the representations or warranties in this Agreement, and none of the documents,
statements, certificates or schedules furnished by Contractor in connection with the performance of the
obligations contemplated under this Agreement, contains or will contain any untrue statement of a material fact
or omits or will omit a material fact necessary to make the statements of fact contained therein not misleading.
13. Ownership of Items Produced: All writings, programs, data, reports, films, recordings, or other
materials prepared by Contractor and/or its consultants or subcontractors, in connection with the performance
of this Agreement, shall be the sole and absolute property of the County. The County will have all rights of
ownership therein, including but not limited to the right to use, copyright, trademark, and/or patent, and the
ability to transfer any or all ownership rights.
14. Intellectual Property Infringement: Contractor will defend and indemnify the County from any
claimed action, cause or demand brought against the County, to the extent such action is based on the claim that
information and/or materials supplied by Contractor infringe any intellectual property rights of any third
party(ies). Contractor will pay all costs and damages attributable to any such claims finally awarded against the
County in any action. Such defense and payments are conditioned upon the following: (1) Contractor shall be
notified promptly in writing by the County of any notice of such claim; and (2) Contractor shall have the right
hereunder, at its option and expense, to obtain for the County the right to continue using the information and/or
materials that are the subject of such claim, provided no reduction in performance or loss results to the County.
15. Use of County Name and Logo: Contractor may not use the County’s name, logo(s), trademark(s), or
other identifying information, or identify the County as a current or former client, on its website or in any
marketing or promotional materials without the prior written consent of the County.
16. Disputes: Any dispute between the parties arising under or relating to this Agreement shall be
resolved informally if possible. However, in the event such a dispute cannot be so resolved, it shall be adjudicated
by a dispute board (“Dispute Board”) in the following manner: Each party shall appoint one member to the Dispute
Board, the members so appointed shall jointly appoint an additional member to the Dispute Board, and the
Dispute Board will evaluate the facts, Agreement terms, and all applicable statutes and rules, and make a
determination as to the proper resolution of the dispute. Such determination shall be final and binding on both
parties. The cost of resolution will be borne as allocated by the Dispute Board. Alternatively, if agreed to in writing
by both parties, the parties may forego the option of establishing a Dispute Board to adjudicate the dispute, and
instead pursue arbitration, jointly selecting an arbitrator acceptable to both parties. In the event the parties
choose to pursue arbitration, the parties agree that: (1) the fees and expenses of the arbitrator shall be shared
equally by both parties to this Agreement, (2) each party shall bear its own costs and attorney fees, (3) arbitration
shall be conducted according to the commercial arbitration procedures of the American Arbitration Association,
and (4) the arbitrator’s decision or award shall be final and binding on both parties.
17. Confidentiality: Contractor, its employees, agents and volunteers, and any of Contractor’s
subcontractors and their employees, agents and volunteers, shall maintain the confidentiality of all information
Kittitas County Agreement for Services (rev. 5/14/25)
Page 16 of 26
provided by the County or acquired by Contractor in performance of this Agreement, except upon the prior
written consent of the Kittitas County Prosecuting Attorney or an order entered by a court after having acquired
jurisdiction over the County. Contractor shall immediately provide the County notice of any judicial proceedings
seeking disclosure of such information. Contractor agrees to indemnify, defend and hold harmless the County
and its departments, elected and appointed officials, employees, agents and volunteers from all loss or expense,
including but not limited to settlements, judgments, setoffs, attorneys' fees and costs resulting from Contractor’s
breach of this provision. Notwithstanding the foregoing, and to the extent that any information obtained by the
Contractor hereunder is required to be shared with others by the explicit terms of the Scope of Work, this
provision shall not be construed as prohibiting such sharing, provided there are no applicable laws or regulations
prohibiting same.
18. Notices: Written notices required or permitted to be provided by one party to the other party under
this Agreement may be provided by personal delivery, legal courier service, or certified mail, postage prepaid and
return receipt requested. Notice may be provided by regular first class mail if simultaneous notice is provided by
email. Notices given by Contractor shall be provided to the County’s point of contact listed on page 1 of this
Agreement, at the address there listed, and to the department head of the county department for which services
under this Agreement are rendered. Notices given by the County shall be provided to Contractor at Contractor’s
address listed on page 1 of this Agreement.
19. Prevailing Wage: Where labor to be performed under this Agreement is considered “public work” as
defined in RCW 39.04.010, Contractor shall pay the prevailing rate of wages to all workers, laborers, or mechanics
employed in the performance of work under this Agreement in accordance with RCW 39.12 and the rules and
regulations of the Washington State Department of Labor and Industries. The schedule of prevailing wage rates
for the applicable locality or localities is determined by the Industrial Statistician of the Department of Labor and
Industries. It is Contractor's responsibility to verify the applicable prevailing wage rate. It is understood that
Contractor is responsible for obtaining and completing all required government forms relating to prevailing wage
and submitting same to the proper authorities. Disputes regarding prevailing wage rates shall be referred for
arbitration to the Director of the Department of Labor and Industries. The arbitration decision shall be final and
conclusive and binding on all parties involved in the dispute as provided for in RCW 39.12.060.
20. Standard of Care: Contractor shall perform its duties hereunder in a manner consistent with that
degree of care and skill ordinarily exercised by members of the same profession or industry as Contractor currently
practicing or working under similar circumstances. Contractor shall, without additional compensation, correct any
of its services not meeting such a standard.
21. Nondiscrimination
21.1 In the performance of this Agreement, Contractor will not discriminate against any employee or
applicant for employment on the grounds of age, race, creed, color, national origin, citizenship or immigration
status, sex, sexual orientation, marital status, honorably discharged veteran or military status, or the presence of
any sensory, mental or physical disability or the use of a trained dog guide or service animal by a person with a
disability; provided that the prohibition against discrimination because of such disability shall not apply if the
particular disability prevents the proper performance of the particular worker involved. Contractor shall ensure
that applicants are employed, and that employees are treated during employment, without discrimination
because of their age, race, creed, color, national origin, citizenship or immigration status, sex, sexual orientation,
marital status, honorably discharged veteran or military status, or the presence of any sensory, mental or physical
disability or the use of a trained dog guide or service animal by a person with a disability. Such requirements
apply, without limitation, to the following: employment, promotion, demotion, transfer, recruitment or
recruitment advertising, layoff or termination, rates of pay or other forms of compensation, and programs for
Kittitas County Agreement for Services (rev. 5/14/25)
Page 17 of 26
training, including apprenticeships. Contractor shall take such action with respect to this Agreement as may be
required to ensure full compliance with local, state and federal laws prohibiting discrimination in employment.
21.2 Contractor will not discriminate against any recipient of any services or benefits provided for
under this Agreement on the grounds of age, race, creed, color, national origin, citizenship or immigration status,
sex, sexual orientation, marital status, honorably discharged veteran or military status, or the presence of any
sensory, mental or physical disability or the use of a trained dog guide or service animal by a person with a
disability.
21.3 If any assignment and/or subcontracting has been authorized by the County, said assignment or
subcontract shall include appropriate safeguards against discrimination.
22. Waiver: The waiver of any default or breach of this Agreement, or the failure of a party to enforce
any provision hereof or to exercise any right or privilege hereunder, shall not be deemed to waive any prior or
subsequent default or breach, the enforcement of any provision hereof, or the exercise of any right or privilege
hereunder, unless otherwise stated in a writing, signed by the parties hereto.
23. Headings: The headings of sections and paragraphs of this Agreement are for convenience of
reference only and are not intended to restrict, affect, or be of any weight in the interpretation or construction of
the provisions of such sections or paragraphs.
24. Survival: The provisions of paragraphs 2, 3, 4, 6, 8, 9, 10, 13, 14, 15, 16, 17, 19, 20, 22, 24, and 28 of
these General Terms and Conditions shall survive the completion, expiration, termination or cancellation of this
Agreement for any reason.
25. Complete Agreement: This Agreement constitutes the entire agreement between the parties and
supersedes any and all other agreements, understandings, negotiations and discussions, oral or written, express
or implied, regarding the work to be performed hereunder. The parties agree that no other representations,
inducements, promises, agreements, or warranties relating to this Agreement, oral or otherwise, have been made
between the parties. Except as provided elsewhere in this Agreement, no modification or waiver of this
Agreement shall be valid or binding unless in writing and signed by the parties.
26. Severability: If any term or condition of this Agreement or the application thereof to any person(s)
or circumstances is held invalid, such invalidity shall not affect other terms, conditions or applications which can
be given effect without the invalid term, condition or application. To this end, the terms and conditions of this
Agreement are declared to be severable.
27. Time: Time is of the essence in the performance of this Agreement unless otherwise agreed between
the parties in a signed writing.
28. Construction: This Agreement has been mutually reviewed and negotiated by the parties, and should
not be construed against the drafter.
29. Agreement Not for Benefit of Third Parties: This Agreement is entered into solely for the benefit of
the parties hereto and vests no rights in, nor is it enforceable by, any third parties.
Kittitas County Agreement for Services (rev. 5/14/25)
Page 18 of 26
ATTACHMENT “E”
Kittitas County Agreement for Services (rev. 5/14/25)
Page 19 of 26
Kittitas County Agreement for Services (rev. 5/14/25)
Page 20 of 26
Kittitas County Agreement for Services (rev. 5/14/25)
Page 21 of 26
Kittitas County Agreement for Services (rev. 5/14/25)
Page 22 of 26
Kittitas County Agreement for Services (rev. 5/14/25)
Page 23 of 26
Kittitas County Agreement for Services (rev. 5/14/25)
Page 24 of 26
Kittitas County Agreement for Services (rev. 5/14/25)
Page 25 of 26
Kittitas County Agreement for Services (rev. 5/14/25)
Page 26 of 26
ATTACHMENT “F”
RETIREMENT STATUS FORM
** All Contractors who are individuals must complete and sign **
SECTION 1: CONTRACTOR COMPLETES THIS SECTION:
Did you retire from one of the State of Washington Retirement Systems? __ Yes __ No
Did you retire before age 65 using the 2008 early retirement factors (ERF)? __ Yes __ No
Will you be receiving direct compensation for these services? __ Yes __ No
Will you be receiving indirect compensation for these services? __ Yes __ No
CONTRACTOR (Full name of contractor as in DRS filings-Please Print):__________________________
Signature:_____________________________ Last Four Digits of Social Security No.____________________
Date:_____________________
SECTION 1: COUNTY COMPLETES THIS SECTION:
[Use Member Reporting Verification (MRV) to verify the past retirement membership and document below]
1. Has Contractor been a member of a Washington State Retirement System? __ Yes __ No
If yes, which system and plan?
__ Teachers’ Retirement System (TRS) __ Plan 1 __ Plan 2 __ Plan 3
__ School Employees’ Retirement System (SERS) __ Plan 2 __ Plan 3
__ Public Employees’ Retirement Systems (PERS) __ Plan 1 __ Plan 2 __ Plan 3
__ Public Safety Employees’ Retirement System (PSERS) __ Plan 2
__ Law Enforcement Officers’ & Fire Fighters’ Retirement System (LEOFF) __ Plan 1 __ Plan 2
__ Washington State Patrol Retirement System (WSPRS) __ Plan 1 __ Plan 2
__ Judicial Retirement System (JRS)
2. Is Contractor a retiree of a Washington State Retirement System? __ Yes __ No
3. Did Contractor retire before age 65 using the 2008 ERF? __ Yes __ No
I have verified the information above using MRV or by contacting DRS.
COUNTY REPRESENTATIVE (Please Print):______________________________
Signature:____________________________ Date:_____________________
COUNTY RETAINS THIS FORM
Page 1 of 2
Information Technology “Study Session Staff Report”, 6/23/2025
KITTITAS COUNTY
BOARD OF COUNTY COMMISSIONERS
STAFF REPORT FOR
STUDY SESSION
Information Technology Department
STUDY SESSION DATE: 6/23/2025
TOPIC: Request to Approve Tiered Application Developer Positions I, II, and III
ACTION REQUESTED: ☒ Approve the classification of a new position
☒ Approve the reclassification of a current position
LEAD STAFF:
Zane Kinney
RECOMMENDATION:
Approve the creation of a tiered Application Developer structure by reclassifying the
current Application Developer to an Application Developer I and creating the positions of
Application Developer II and III.
BRIEFING SUMMARY:
• IT seeks to implement the same tiered position structure within the Business
Application Services division that has already been established in the
Infrastructure division.
• This request does not involve any changes that would impact the 2025 budget.
• IT believes that adopting this structure supports the County’s goals of retaining
experienced employees by creating professional development opportunities. It
also promotes parity between divisions within the department and enhances our
ability to recruit qualified and experienced candidates in the event of future
vacancies.
BACKGROUND:
IT created the tiered positions for the Network and System Administrator positions in
2023. It has always been our intention of duplicating this structure for the Application
Developer position as well. This would be permanent change to our department staffing.
DISCUSSION:
• These positions would exist solely within the IT department and would be non-
union.
• Retaining application developers with deep knowledge of our systems and the
unique business processes of our organization benefits all departments and
offices.
• While this request will result in the creation of vacant positions, IT does not
intend to increase staffing levels by hiring additional employees. Instead, the goal
is to provide opportunities for internal promotion. In the event of staff turnover,
Page 2 of 2
Information Technology “Study Session Staff Report”, 6/23/2025
these positions would offer greater flexibility to recruit qualified candidates into
critical roles.
• Wages are based on the most recent Wage Survey completed which resulted in
the current Application Developer position being placed at Pay Grade 21 ($78,492
– $95,652.00)
The two new tiers would be placed a Pay Grade 23 ($84,900.00 – $103,428.00)
and Pay Grade 25 ($91,824 – $111,864.00).
FISCAL IMPACTS:
Funding Source(s) for Request
☐ New revenue
☐ Departmental savings
☐ Budget amendment
☒ Other: No budget impact at this time.
Provide details regarding the selection above: We are not intending to fill or promote into
these positions at this time.
Budget Impact
Total cost of request: No impact to the 2025 budget.
ATTACHMENTS:
☒ Job description(s)
☒ Updated organization chart
☐ MOU with Union (for union positions only)
☐ Other:
Legal consultation? No LRS #
Finance consulted? No
COUNTY COMMISSIONES
1340, 1341, 1342 / 31
Elected Official
Benefited / DRS Eligible
COUNTY COMMISSIONES
1340, 1341, 1342 / 31
Elected Official
Benefited / DRS Eligible
IT DIRECTOR
1309 / 30
Exempt / FTE 1.0
Benefited / PERS
IT DIRECTOR
1309 / 30
Exempt / FTE 1.0
Benefited / PERS
ASSISTANT IT DIRECTOR
1325 / 30
Exempt / FTE 1.0
Benefited / PERS
ASSISTANT IT DIRECTOR
1325 / 30
Exempt / FTE 1.0
Benefited / PERS
ADMINISTRATIVE ASSISTANT
3446 / 40
Non-Exempt / FTE 1.0
Benefited / PERS
ADMINISTRATIVE ASSISTANT
3446 / 40
Non-Exempt / FTE 1.0
Benefited / PERS
0017 – INFORMATION TECHNOLOGY
Organizational Chart
Updated 6/20/2025
INFRASTRUCTURE MANAGER
2348 / 30
Exempt / FTE 1.0
Benefited / PERS
INFRASTRUCTURE MANAGER
2348 / 30
Exempt / FTE 1.0
Benefited / PERS
NETWORK/SYS. ADMIN. I – III (2)
2341, 2342, 2343 / 30
Exempt / FTE 1.0
Benefited / PERS
NETWORK/SYS. ADMIN. I – III (2)
2341, 2342, 2343 / 30
Exempt / FTE 1.0
Benefited / PERS
SUPPORT TECHNICIAN (2)
2451 / 40
Non-Exempt / FTE 1.0
Benefited / PERS
SUPPORT TECHNICIAN (2)
2451 / 40
Non-Exempt / FTE 1.0
Benefited / PERS
GIS ANALYST
2309 / 30
Exempt / FTE 1.0
Benefited / PERS
GIS ANALYST
2309 / 30
Exempt / FTE 1.0
Benefited / PERS
APPLICATION DEVELOPER I - III (3)
2365, XXXX, XXXX / 30
Exempt / FTE 1.0
Benefited / PERS
APPLICATION DEVELOPER I - III (3)
2365, XXXX, XXXX / 30
Exempt / FTE 1.0
Benefited / PERS
GIS TECHNICIAN
2428 / 40
Non-Exempt / FTE 1.0
Benefited / PERS
GIS TECHNICIAN
2428 / 40
Non-Exempt / FTE 1.0
Benefited / PERS
INFRASTRUCTURE ADMINISTRATION / DEVELOPMENT
LEAD SUPPORT TECHNICIAN
2452 / 40
Non-Exempt / FTE 1.0
Benefited / PERS
LEAD SUPPORT TECHNICIAN
2452 / 40
Non-Exempt / FTE 1.0
Benefited / PERS
Page 1 | 4
Kittitas County, Washington
Job Description
POSITION TITLE: APPLICATION DEVELOPER I – III ☐ REVIEWED / ☒ MODIFIED: 6/23/2025
REPORTS TO: ASSISTANT IT DIRECTOR
DEPARTMENT: INFORMATION TECHNOLOGY (IT)
JOB SUMMARY: The Application Developer I, II, and III are responsible for developing and
maintaining the County’s application portfolio and databases, including the
Laserfiche records management system, public website, intranet site,
selected third-party applications, and console applications. Must maintain
courteous and cooperative working relationships with administrative and
other County personnel, public agencies, and the general public, and work
under the guidance of Local/State/Federal regulations and County
policies/procedures.
SUPERVISORY DUTIES: The Application Developer III may act as a lead for other division staff, at the
direction of the Assistant IT Director.
CATEGORY: Full-Time OCCUPATION CODE: 2365
UNION AFFILIATION: None HOURS/WEEK: 40
FLSA STATUS:
BACKGROUND CHECK LEVEL:
Exempt
High
DRS ELIGIBILITY:
PROBATIONARY PERIOD:
PERS
12 Months
ESSENTIAL FUNCTIONS:
• Create workflows, forms, and reports in an enterprise records management and business process
software, Laserfiche.
• Develop, implement, and maintain the county’s Internet and intranet sites.
• Program using ASP.Net, ASP.CORE, C#, Python, HTML, CSS, JavaScript and SQL databases; review code
with team.
• Work with Department Heads, Elected Officials, and their designees to develop applications that
improve efficiencies, accuracy of data, and help them meet their legal requirements.
• Administer and configure various enterprise third party applications.
• Support the County’s Internet site by developing features, modules and controls to present data to the
public that cannot be published by content authors directly.
• Ensure the operation and security of all web environments, internally built applications and database
solutions; audit and maintain security consistent with the county policies.
• Document all aspects of the position’s essential functions.
• Improve knowledge as necessary.
• Document all work performed and communication with employees on projects and problems.
• Work with team to develop applications and integrations to meet user requirements.
• Create and maintain technical documentation of processes and custom applications as well as user
guides for County staff.
• Research third party applications for County department use; review coding and design technologies for
potential use.
• Cross-train and support other Business Applications Services Division staff.
• Work with the Infrastructure Division staff on joint projects.
Page 2 | 4
OTHER FUNCTIONS:
Project Management Duties (Application Developer II and III)
• Act as project manager for medium-to-large application development and implementation projects. This
includes planning and overseeing project discovery, planning, scheduling, developing SOWs, QA, and
documentation and training.
Personnel Management Duties (Application Developer III only)
• Coordinate and lead the work of the Business Applications Division Staff.
• Provide staff with coaching, training, and assistance.
This job description is a summary of the primary functions and expectations for this position. Additional
department-related duties may be assigned as required.
MINIMUM QUALIFICATIONS:
All Positions
• High School Diploma, GED, or higher education.
• Valid Washington State driver’s license.
• Experience with some or all of the following: web design/maintenance, desktop application
development, API development, HTML, CSS, JavaScript, creating and managing SQL database objects
such as tables, views, queries, stored procedures.
• A criminal history and background check will be performed to include fingerprinting on qualified
candidates. Convictions may preclude candidates from employment in certain circumstances. Factors
such as relativity to the position, age at time of the offense, seriousness and nature of the violation, and
rehabilitation will be considered.
Application Developer I
• Two (2) years of relevant work experience in application/website development and database
management.
• Demonstrate basic understanding of the concepts listed in the All Positions minimum qualifications
section.
• Other relevant training, education, certification, or experience may be considered at the discretion of
the IT Director or their designee.
Application Developer II
• Four (5) years of relevant work experience in application/website development and database
management.
• Demonstrate intermediate understanding of the concepts listed in the All Positions minimum
qualifications section.
• Other relevant training, education, certification, or experience may be considered at the discretion of
the IT Director or their designee.
Application Developer III
• Six (8) years of relevant work experience in application/website development and database
management.
• Demonstrate advanced understanding of the concepts listed in the All Positions minimum qualifications
section.
• Other relevant training, education, certification, or experience may be considered at the discretion of
the IT Director or their designee.
Page 3 | 4
REQUIRED KNOWLEDGE/SKILLS/ABILITIES:
• Self-starter with strong self-management skills.
• Ability to handle high-stress situations while maintaining a high level of customer service.
• Ability to organize and manage multiple priorities.
• Excellent problem solving and research skills.
• Excellent oral and written, technical and non-technical communication and presentation skills.
• Ability to maintain confidentiality.
• Ability to work well independently and with others.
• Motivated to improve the application portfolio.
PREFERRED QUALIFICATIONS:
• Associate’s or Bachelor’s degree in Computer Science or Information Services.
• Experience with C#, ASP.NET, ASP. NET Core, MVC, Blazor, REST API Web Service, and SQL, database
design and maintenance.
• Experience in Entity Framework and LINQ.
• Experience with Laserfiche administration or process development, or similar low-code-no-code
platforms.
• Experience with responsive web design using Bootstrap.
• Experience working in a local government environment.
• Experience working in a multi-department enterprise.
WORKING CONDITIONS:
Work is generally performed in an office environment with potential exposure to dusty conditions. Travel
to all County office locations is required to service computer systems, with occasional travel necessary to
attend mandatory training opportunities. Must have the ability to safely operate a motor vehicle in all types
of weather and all levels of light. Sustained posture in a seated position and prolonged periods of computer
operation; use of standard office equipment; strength to lift, pull, push and/or carry up to 50 pounds
(possibly more with assistance); vision to read printed materials, a computer screen, and allow installation
of equipment in all lighting conditions; and hearing and speech to communicate clearly in person or over
the telephone. Must be able to reach with arms, grasp, sit, kneel, stoop, bend, squat, twist, crawl under
office furniture, climb a ladder and stairs. Safety rules and regulations must be adhered to at all times.
Reliable attendance and punctuality are required and expected Monday – Friday from 8:00 AM to 5:00 PM;
however, exempt/management positions are expected to work the number of hours required to complete
the duties of the position and may have to respond to emergency situations.
Reasonable accommodations may be made to enable individuals with disabilities to perform the essential
functions.
Prepared and Reviewed By:
Must be completed with all revisions of the job description.
Supervisor Name Title Date
Page 4 | 4
HR Representative Name Title Date
Employee Acknowledgement
I understand the job duties and responsibilities contained in this job description and as described by the
immediate supervisor.
Employee Printed Name Signature Date