HomeMy WebLinkAboutChange Order 03PROJECT NAME: Ellensburg Rodeo Arena Completion OWNER: Kittitas County CONTRACTOR: Cascade Central Construction PROJECT NO: 2025-009 Amount $7,573.49 $65,888.37 $41,806.43 Total This Change Order:$115,268.29 $5,065,000.00 * $221,986.49 $5,286,986.49 By: $115,268.29 Date $5,402,254.78 7/20/2026 By: 3 Date 7/20/2026 7/23/2026 By: 8/22/2026 Date COP 11 - RFI 028 - Buckaroo Seating Switch Previously Approved Increases in Time: Completion Date Prior to This Change Order: Accepted by Contractor: Revised Contract Sum: COP 12 - RFP 02 - Hydrant Adds & Concourse Revisions Revised Final Acceptance Date: Approved by Owner: ALSC Architects, P.S. Net Amount of Previously Approved Changes: Revised Substantial Completion Date: CHANGE ORDER NO. 3 PAGE 1 of 12 DESCRIPTION OF CHANGE: Contract Sum is increased by This Change Order: Contract Sum Prior to This Change Order: Original Contract Sum COP 17 - RFP 04 - Civil City Comments *Does not include State or Local Sales Tax ALSC Architects | We bring our clients’ stories to life. Recommended By: Original Contract Completion Date: Contract time will be changed by 0 Calendar Days This Change Order PROPOSAL P.O. Box 119 Wenatchee, WA. 98807-0119 Phone 509-662-7119 Fax 509-662-6380 To:PROJECT:Ellensburg Rodeo Arena Improvements Kittitas County Commissioners COP#11 205 West 5th Ave, Suite 108 DATE:January 27, 2026 Ellensburg, WA 98926 TITLE:RFI 028 - Buckaroo Seating Switch Rev.1 Date DESCRIPTION QUANITITY UOM UNIT PRICE AMOUNT 1/27/2026 1 LS 12,313.00$ $6,378.00 $382.68 6,760.68 1/27/2026 0 HR 128.18$ $0.00 2 HR 161.54$ $323.08 2 HR 116.25$ $232.50 0 HR 210.00$ $0.00 $83.34 638.92 7,399.60 $70.30 $103.59 TOTAL $7,573.49 MAKE CHECKS PAYABLE TO: Cascade Central Construction, LLC P.O Box 119 Wenatchee, WA. 98807-0119 THANK YOU FOR YOUR BUSINESS! Schedule Impact: None if approved by 1/9/25. General Contractor - Sub Total Subtotal Bond B&O Tax 15% Mark-up Project Engineer Surveyor Cascade Central Construction Cost Project Management & Coordination Supervision Subcontractor Cost Electrical Subcontractor - See attached Back-up Subcontractor - Sub Total 6% Mark-up None if approved by 2/6/26 Project Name:COP-12R1 Project No.1/27/2026 Description: a.2,780.70$ b.-$ c.-$ DIRECT LABOR SUBTOTAL 2,780.70$ d. e.55.61$ 2,836.00$ a.2,502.70$ b. 2,503.00$ a.-$ b. -$ a.141.80$ 142.00$ 5,481.00$ a.876.96$ b.-$ 877.00$ a. b. c. d.-$ -$ a.-$ -$ -$ a.0.15 % of 1 4.25$ b.0.25 % of 1-7 15.90$ 20.15$ a.0.03 % of 1-8 -$ 6,378.00$ Form Revised 04/25/15 6. SUB-SUBCONTRACTORS TOTAL COST bond payroll driven liability insurance volume driven liability insurance 8. INSURANCE 9. BOND 9. BOND small tools (NTE 5% of 1a & b) 7. OVERHEAD & PROFIT ON SUB-SUBCONTRACTORS NTE 15% of Line 6 up to $50,000 for each sub 8. INSURANCE 5. OVERHEAD & PROFIT 6. SUB-SUBCONTRACTORS SUBTOTAL 1 thru 4 7. OVERHEAD & PROFIT ON SUB-SUBCONTRACTORS owned equipment (per spec approved source) 5. OVERHEAD & PROFIT 4. SMALL TOOLS rental equipment (per invoices attached) 2. MATERIAL COSTS 3. EQUIPMENT COSTS 4. SMALL TOOLS material costs Jack McGann Contractor: Ellensburg Rodeo Arena Improvements RFI-028 McGann Electric Source Documents: Provide and install 1 - 1.5" UG conduit from MDPL to 100A event switch location at buckaroo seating section.Only requesting length from MDPL to L1TB. Provide and install 100A added breaker in panel MDPL. Provide and install 100A added feeder without Neutral in updated one-line drawing and MDPL panel schedule per RFI-028 response. All conduit, fittings, supports, hardware, wire, disconnect switch, fuses included. Exclusions: trenching and backfill. Itemize all costs on attached COP Cost Breakdown form. crew (apprentices, journeymen, & laborers) foreman superintendent Direct Labor Costs: 1. CRAFT LABOR COSTS safety (NTE 2% of lines 1a, b, & c) direct supervision (NTE 15% of 1a) Supervision: 1. CRAFT LABOR COSTS 3. EQUIPMENT COSTS NTE 15% portion of 1, 2, 3, & 4 up to $50,000 CCC Contractor Breakdown Summary McGann Electric freight costs (itemize) 2. MATERIAL COSTS Date: Contractor Ref. No. https://mcgannelectric-my.sharepoint.com/personal/jackmcgann_mcgannelectric_com/Documents/McGann Electric/2025 Ellensburg Rodeo 9.30/COPs/COP 12 100amp feeder added rfi 28/Ellensburg Rodeo Arena COP-12 - Copy Summary Issued 1/27/2026 Project Name:COP-12R1 Project No.1/27/2026 Contractor: Unit Labor Material Equipment Total Description Quantity Type Unit $Cost Unit $Cost Unit $Cost Cost -$ -$ -$ -$ -$ -$ -$ -$ Electrician Labor 26 HR $106.95 2,780.70$ -$ -$ 2,780.70$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 100A 3P PDD23G0100 breaker 1 EA -$ $1,490.00 1,490.00$ -$ 1,490.00$ 100A 3pole MDPL provisions 1 LT -$ $300.00 300.00$ -$ 300.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 1.5" PVC 70 EA -$ $1.12 78.40$ -$ 78.40$ 1.5" PVC coupling 7 EA -$ $2.10 14.70$ -$ 14.70$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ #1 thwn 200 FT -$ $2.65 530.00$ -$ 530.00$ #6 thwn 80 FT -$ $1.12 89.60$ -$ 89.60$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Labor Subtotal 2,780.70$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2,780.70$ 2,502.70$ -$ 5,283.40$ Subtotal Cost of Work Ellensburg Rodeo Arena Improvments RFI-028 Cost Breakdown McGann Electric 2/1/2017 Contractor Ref. No. Date: https://mcgannelectric-my.sharepoint.com/personal/jackmcgann_mcgannelectric_com/Documents/McGann Electric/2025 Ellensburg Rodeo 9.30/COPs/COP 12 100amp feeder added rfi 28/Ellensburg Rodeo Arena COP-12 - CopyCost Breakdown Issued 1/27/2026 83 ,5 , 5 +: +: + -  /7% (9(1732:(5 &211(&7,2132,17 &:),%(5)255()((' 2)$5(1$),%(55,1*72 *5$1'67$1'6 35(66%2; '(0$5&32,17$1'&)25 )$&211(&7,2172 $1181&,$725,135(66%2; %8&.$522 6 ($7,1* 6(&7,21 7($1$:$< 807$180+$//+,6725,&0$,1*5$1'67$1' 6287+($67 $5(1$6($7,1* *2/' %8&./( &/8% 3(16 *5$9(/3$7,2 1257+($67$5(1$6($7,1* %8&.,1*&+87(6 &21&(66,216 52'(2$5(1$ *1( 1(:3$)86(' 6:,7&+ (9(17$9 (  8*)(('(5)25 (9(17$96:,7&+ The event switch was not shown on the 1line nor panel schedules originally- thus we interpreted this drawing to depict the event switch being fed via L1TB and not MDPL- that is why we are requesting some feeder costs. ALSC Architects \\ We bring our clients’ stories to life. REQUEST FOR PROPOSAL NO: 01 Project Name: Ellensburg Rodeo Arena Completion Owner: Kittitas County Contractor: Cascade Central Construction Job Number: 2025-009 Page 1 of 10 TO: Cascade Central Construction, Contractor, please furnish your proposal for performing the changes outlined below and/or detailed on the attachments referred to: • Addition of 3 yard hydrants for RV/ Vendor spots. • Revision to concourse slabs at stadia stairs. ALSC Architects, P.S. By Todd Keller Date: 12/11/25 PROPOSAL: To the Owner: We propose to perform all changes described in the above request for a total ADDITION/DEDUCTION (cross out one) to the contract sum of: $ (not including Sales Tax) We have attached cost estimate detail sheets, and the foregoing amount covers all direct and indirect costs related to this proposal and to the effect of the proposal on the remainder of the project. All other provisions of the contract remain in full force and effect. We request the completion date be EXTENDED/REDUCED (cross one out) ________ calendar days because of this work. The Contractor agrees to be bound to this proposal quotation for sixty (60) days after this date. By Date Contractor RECOMMENDATION: TO: Owner, we have examined the foregoing proposal and find it to be appropriate for the request. We recommend its acceptance. ALSC Architects, P.S. By Date: PROPOSAL ACCEPTANCE: The Owner hereby accepts the foregoing proposal. This instrument, when signed below, constitutes the conditions upon which a Change Order will be issued. By Date Owner 02 Sixty Five Thousand Eight Hundred Eighty-Eight Five and 37/100 Dollars 0 See attached proposal for conditions. KC Carroll 1/27/26Cascade Central Construction, LLC. $65,888.37 PROPOSAL P.O. Box 119 Wenatchee, WA. 98807-0119 Phone 509-662-7119 Fax 509-662-6380 To:PROJECT:Ellensburg Rodeo Arena Improvements Kittitas County Commissioners COP#12 205 West 5th Ave, Suite 108 DATE:January 27, 2026 Ellensburg, WA 98926 TITLE:RFP 02 Hydrant Adds & Concourse SOG Rev. Rev.2 Date DESCRIPTION QUANITITY UOM UNIT PRICE AMOUNT 1/27/2026 1 LS 24,850.00$ $24,850.00 1 LS 24,850.00$ $32,900.00 3,465.00 61,215.00 1/27/2026 4 HR 128.18$ $512.72 2 HR 161.54$ $323.08 2 HR 116.25$ $232.50 8 HR 210.00$ $1,680.00 412.25 3,160.55 64,375.55 $611.57 $901.26 TOTAL $65,888.37 MAKE CHECKS PAYABLE TO: Cascade Central Construction, LLC P.O Box 119 Wenatchee, WA. 98807-0119 THANK YOU FOR YOUR BUSINESS! Schedule Impact: None if approved by 2/2/26. General Contractor - Sub Total Subtotal Bond B&O Tax Subcontractor Cost Earthwork Subcontractor - See attached Back-up Concrete Subcontractor - See attached Back-up Subcontractor - Sub Total 6% Mark-up 15% Mark-up Project Engineer Surveyor - hydrants only Cascade Central Construction Cost Project Management & Coordination Supervision CCC's surveyor will give Concrete subcontractor the slab points but concrete subcontractor has additional time setting forms to the extra elevation points. t P.O. Box 119 Wenatchee, WA 98807 Phone: (509)662-7119 Fax: (509)662-4465 Bid Items Quantity Unit Unit Price Amount 1 RFP 02 - 1" Copper Water Service Piping & 3 Yard Hydrants 110 LF 175.00$ $19,250.00 RFP 02 - Flat Stair Pads 8 EA 1,400.00$ $11,200.00 $30,450.00 $30,450.00 Qualifications: Please Read Carefully 1. Washington State Sales Tax has been not been included in proposal. 2. Prevailing Wage has been accounted for in proposal. 3. 4. 5. Excludes Water System Support. 6. Exludes Construction Survey. 7. Engineering & Professional Surveying Services are Excluded. 8. 9. 10. 11. 12. 13. Any scope of work not specifically included as a line item in this proposal is excluded. 14. 15. 16. Sincerely, SELLAND CONSTRUCTION, INC. Ron Zerr III (509) 961-7825 Bid Date: January 13, 2026 Ellensburg Rodeo Arena Improvements - RFP 02 COP Erosion Control Inspections, Reporting, Monitoring & Maintenance are Excluded. Stormwater Permit by others. Rock excavation (i.e. Solid Rock, Caliche, Hard Pan, Cemented Soils and/or Boulders larger than 1 Cubic Yard) have not been included. Price Negotiation will be required if these materials are encountered. Subtotal Over Excavation of Unsuitable Material has not been accounted for, price negotiation will be required if these materials are encountered. Actual quantities installed shall be tracked/measured and the basis of payment at the unit prices included in this proposal unless otherwise agreed. Due to global supply chain disruptions and market volatility we reserve the exclusive right to adjust our proposal for material escalation. Proposal is valid for 30 days. This proposal shall be made part of any subcontract. Total If you have any questions or need additional information with regard to our proposal please give us a call. Dust control has been provided while we are actively working the site. No permanent or sustained dust control or mitigation has been included. Fees for Utilities, County, City, Etc. are not included. Cultural Resource Services are not covered in our scope. Hazardous Materials Abatement, Removal, Handling, Disposal, etc. are not expected onsite and are therefore Excluded. Watering & Dust Control are Included for Selland's scope of work and duration only. No OT Dust Control or beyond our work. SELLAND INC. CONSTRUCTION General Contractors Page 1 of 1 Where is this coming from? Flatwork shall conform to the requirements of the specifications with regard to tolerance. Would be more cost effective to pour extra concrete at landings with gravel grading consistent through out. Revise Regarding Flat Stair Pads: Because the stadium contractor needs each of the stair pad ares to be perfectly flat with no allowable variance, the added cost is for laborers to hand grade each pad area and ensure they are perfectly flat. This is going to take more time and labor throughout the concourse slab than originally anticipated from the bid documents. revise this to 8 EA at $700 each for total of $5,600.00 TOTAL: $24,850 Yes, thank you. Pricing revised to reflect this.Confrimed. Item Quantity Unit Unit Price 1 180 HR 94.00$ 132 HR 94.00$ 1 EA 3,572.00$ 32,900.00$ 0.00% 0.00 32,900.00$ Additional 11 Hours x 12 Guys x 1 Additional Pour 12,408.00$ Additional 5 Hours x 12 Guys x 3 Original Pours (Additional Time for Hand Screed)16,920.00$ Jones Concrete & Excavation Estimator - Carson Chester Sub Total TOTAL 541-861-8060 SALES TAX Ellensburg, Project Ellensburg Rodeo Improvements ATTN: General Contractor Concrete Proposal - RFP #2 Date: 1/19/2026 Project Location Washington Amount (US $)Work Description 3,572.00$ Flat Stair Pads Below Grandstands to Include: Concrete Pump Truck for Additional Pour Customer: Authorized Signature:____________________ Name:___________________________ Date of Acceptance:________________ Includes additional time to identify stair locationsusing provided survey points, maintain boundries of flatness & additional finishing time to confirm proper elevations at each stair pad location. A roller screed provides flat concrete with less labor. There are too many elevations to be met for a roller screed to be practical. Originally, there was a ridge along the seating-retaining wall, 5 catch basins to meet, & forms along the outside of the slab. This has added 32 elevation points that must be met within the center of the slab. This was not a small change. www.JonesConcrete.pro 1/1 Originally Jones was planning to roller screed the entire slab but these flattened areas are too small to roller screed and must be done by hand. Please review last comments and proposal as well. Concrete proposal specified switch from roller screed to hand screed, not the other way around which seems like was a misunderstanding during the last review comments. The first item captures additional manpower required due to the change in screed styles for the crew as a whole. Screeding by hand requires an additional pour. Screeding by hand will increase truck spacing, pour out time, and screed time for all pours at the concourse slab. The second item captures additional finishing time at each stair location. The third item is associated with the pump truck for the separate pour. Concrete contractor time to layout flat boundaries is in addition to the survey time. CCC survey will locate the corners of each flat area but concrete subcontractor will still need to do the work of setting up forms, setting up string lines, set grade rods, and confirm exact elevations. ALSC Architects \\ We bring our clients’ stories to life. REQUEST FOR PROPOSAL NO: 04 Project Name: Ellensburg Rodeo Arena Completion Owner: Kittitas County Contractor: Cascade Central Construction Job Number: 2025-009 Page 1 of 11 TO: Cascade Central Construction, Contractor, please furnish your proposal for performing the changes outlined below and/or detailed on the attachments referred to: • Revisions to Civil drawings per City review comments. ALSC Architects, P.S. By Todd Keller Date: 1/21/26 PROPOSAL: To the Owner: We propose to perform all changes described in the above request for a total ADDITION/DEDUCTION (cross out one) to the contract sum of: $ (not including Sales Tax) We have attached cost estimate detail sheets, and the foregoing amount covers all direct and indirect costs related to this proposal and to the effect of the proposal on the remainder of the project. All other provisions of the contract remain in full force and effect. We request the completion date be EXTENDED/REDUCED (cross one out) ________ calendar days because of this work. The Contractor agrees to be bound to this proposal quotation for sixty (60) days after this date. By Date Contractor RECOMMENDATION: TO: Owner, we have examined the foregoing proposal and find it to be appropriate for the request. We recommend its acceptance. ALSC Architects, P.S. By Date: PROPOSAL ACCEPTANCE: The Owner hereby accepts the foregoing proposal. This instrument, when signed below, constitutes the conditions upon which a Change Order will be issued. By Date Owner 41,806.43Forty-One Thousand Eight Hundred Six and 43/100 Dollars 0 See attached proposal for qualifications. Cascade Central Construction KC Carroll 1/25/26 See attached proposal for qualifications. Todd Keller 1/28/26 PROPOSAL P.O. Box 119 Wenatchee, WA. 98807-0119 Phone 509-662-7119 Fax 509-662-6380 To:PROJECT:Ellensburg Rodeo Arena Improvements Kittitas County Comissioners COP#17 205 West 5th Ave, Suite 108 DATE:January 25, 2026 Ellensburg, WA 98926 TITLE:COP 17 - RFP 04 - Civil City Comments Approved Set Date DESCRIPTION QUANITITY UOM UNIT PRICE AMOUNT 1/25/2026 1 LS 38,534.47$ $38,534.47 2,312.07 40,846.54 1/25/2026 0 HR 128.18$ $0.00 0 WD 925.00$ $0.00 0 HR 161.54$ $0.00 0 HR 116.25$ $0.00 0 HR 63.08$ $0.00 0 HR 119.00$ $0.00 0.00 0.00 40,846.54 $388.04 $571.85 TOTAL 41,806.43 MAKE CHECKS PAYABLE TO: Cascade Central Construction, LLC P.O Box 119 Wenatchee, WA. 98807-0119 THANK YOU FOR YOUR BUSINESS! Schedule Impact: None if approved by 1/28. Water utility installation is scheduled to begin 2/2/26 and we need time to order materials. Qualifications: Pricing assumes existing fire line can be abandoned in place per RFI 053. Subcontractor Cost Civil Subcontractor - See attached back-up General Contractor - Sub Total Subcontractor - Sub Total Cascade Central Construction Cost Project Management & Coordination Laborer Carpenter 6% Mark-up Supervision General Conditions 15% Mark-up Subtotal Bond B&O Tax Project Engineer t P.O. Box 119 Wenatchee, WA 98807 Phone: (509)662-7119 Fax: (509)662-4465 Bid Items Quantity Unit Unit Price Amount 1 RFP 04 - Utility Changes -Production Adjustment for 8" C900 to 8" DI Pipe (Bid @ $61.35/LF, Now @ $88.08)225 LF 26.73$ $6,014.25 -Production Adjustment for 4" C900 to 4" DI Pipe (Bid @ $59.31/LF, Now @ $86.04)214 LF 26.73$ $5,720.22 -Material Cost Difference: C900 Water to Ductile Iron 1 LS 19,000.00$ $19,000.00 -Furnish & Install Catch Basins 3 EA 2,600.00$ $7,800.00 $38,534.47 $38,534.47 Qualifications: Please Read Carefully 1. Washington State Sales Tax has been not been included in proposal. 2. Prevailing Wage has been accounted for in proposal. 3. 4. 5. Excludes Water System Support. 6. Exludes Construction Survey. 7. Engineering & Professional Surveying Services are Excluded. 8. 9. 10. 11. 12. 13. Any scope of work not specifically included as a line item in this proposal is excluded. 14. 15. 16. Sincerely, SELLAND CONSTRUCTION, INC. Ron Zerr III (509) 961-7825 Bid Date: January 22, 2026 Ellensburg Rodeo Arena Improvements - RFP 04 COP Erosion Control Inspections, Reporting, Monitoring & Maintenance are Excluded. Stormwater Permit by others. Rock excavation (i.e. Solid Rock, Caliche, Hard Pan, Cemented Soils and/or Boulders larger than 1 Cubic Yard) have not been included. Price Negotiation will be required if these materials are encountered. Subtotal Over Excavation of Unsuitable Material has not been accounted for, price negotiation will be required if these materials are encountered. Actual quantities installed shall be tracked/measured and the basis of payment at the unit prices included in this proposal unless otherwise agreed. Due to global supply chain disruptions and market volatility we reserve the exclusive right to adjust our proposal for material escalation. Proposal is valid for 30 days. This proposal shall be made part of any subcontract. Total If you have any questions or need additional information with regard to our proposal please give us a call. Dust control has been provided while we are actively working the site. No permanent or sustained dust control or mitigation has been included. Fees for Utilities, County, City, Etc. are not included. Cultural Resource Services are not covered in our scope. Hazardous Materials Abatement, Removal, Handling, Disposal, etc. are not expected onsite and are therefore Excluded. Watering & Dust Control are Included for Selland's scope of work and duration only. No OT Dust Control or beyond our work. SELLAND INC. CONSTRUCTION General Contractors Page 1 of 1