HomeMy WebLinkAboutResolution_CRP_Corridor ImprovementsKITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
AGENDA STAFF REPORT
AGENDA DATE: January 20, 2026
ACTION REQUESTED: Request to Approve a Resolution initiating County Road
Project designated as CRP NO: 323-26, Corridor
Improvements Countywide
BACKGROUND: Kittitas County has been selected to receive $1,290,000 from
the Highway Safety Improvement Program (HSIP) for the
Corridor Improvements Countywide Project. Eight road
segments have been identified as high risk by the 2025
Safety Plan as well as past safety plans. To better prevent
future fatal and serious injury accidents, Kittitas County
plans to design and install improvements including
embedded LED markers, guideposts and edge line rumble
strips on portions of the identified roadways.
HSIP funding is administered through the Washington State
Department of Transportation (WSDOT). The award does
not require matching local funds if all phases are authorized
prior to April 30, 2028.
To meet the requirements of the program the project needs
to be initiated as a county road project and needs to be added
to the WSDOT Statewide Transportation Improvement
Program.
INTERACTION: Public Works
RECOMMENDATION: Approve a Resolution initiating County Road Project
designated as CRP NO. 323-26, Corridor Improvements
Countywide.
HANDLING: Return one (1) original to Public Works
ATTACHMENTS: Resolution
LEAD STAFF: Josh Fredrickson, Public Works Director
RESOLUTION NO.
BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter
of initiating a county road project designated as:
CRP NO: 323-26 JOB NO: RC2301
IT IS HEREBY RESOLVED that the Corridor Improvements Countywide be improved as follows:
The project will install delineation (embedded LED markers and/or guideposts) and edge line rumble strips on portions of
County Roads.
RURAL X
MAJOR COLLECTOR X
MINOR COLLECTOR X
This project is hereby declared to be a public necessity, and the County Engineer is hereby ordered and authorized to report and
proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070).
IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County
Engineers estimate, is hereby made in the amounts and for the purposes shown:
PURPOSE
AMOUNT
TOTALS
PRELMINARY ENGINEERING
$ 140,000
CONSTRUCTION ENGINEERING
$ 91,000
RIGHT-OF-WAY ACQUISITION
$
SUB -TOTAL
$ 231,000
County Forces CONSTRUCTION
$
CONTRACT CONSTRUCTION
$ 999,000
SUB -TOTAL
$ 999,000
TOTAL PROJECT COST
$ 1,230,000
GRANT OR OTHER FUNDS
$ 1,230,000
Grant Source: HSIP
TOTAL COUNTY ROAD FUND ALLOCATION
$ 0
Joshua Fredrickson, P.E.
Public Works Director
❑ THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2026 ANNUAL ROAD PROGRAM AS
ITEM NO.
® THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM PROJECT 8 IN
ACCORDANCE WITH RCW 36.81.130
IT IS FURTHER RESOLVED THAT:
® THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ.
❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND
WAC 136-18.
Attest:
ADOPTED this 20th day of January, 2026.
BOARD OF COUNTY COMMISSIONERS I Clerk of the Board
KITTITAS COUNTY, WASHINGTON
Cory Wright, Chair Brett Wachsmith, Vice -Chair Laura Osiadacz, Commissioner
g:\base\forms\eng\crp-frm 1 /8/2026