HomeMy WebLinkAboutResolution_CRP_Corridor ImprovementsKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: January 20, 2026 ACTION REQUESTED: Request to Approve a Resolution initiating County Road Project designated as CRP NO: 323-26, Corridor Improvements Countywide BACKGROUND: Kittitas County has been selected to receive $1,290,000 from the Highway Safety Improvement Program (HSIP) for the Corridor Improvements Countywide Project. Eight road segments have been identified as high risk by the 2025 Safety Plan as well as past safety plans. To better prevent future fatal and serious injury accidents, Kittitas County plans to design and install improvements including embedded LED markers, guideposts and edge line rumble strips on portions of the identified roadways. HSIP funding is administered through the Washington State Department of Transportation (WSDOT). The award does not require matching local funds if all phases are authorized prior to April 30, 2028. To meet the requirements of the program the project needs to be initiated as a county road project and needs to be added to the WSDOT Statewide Transportation Improvement Program. INTERACTION: Public Works RECOMMENDATION: Approve a Resolution initiating County Road Project designated as CRP NO. 323-26, Corridor Improvements Countywide. HANDLING: Return one (1) original to Public Works ATTACHMENTS: Resolution LEAD STAFF: Josh Fredrickson, Public Works Director RESOLUTION NO. BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter of initiating a county road project designated as: CRP NO: 323-26 JOB NO: RC2301 IT IS HEREBY RESOLVED that the Corridor Improvements Countywide be improved as follows: The project will install delineation (embedded LED markers and/or guideposts) and edge line rumble strips on portions of County Roads. RURAL X MAJOR COLLECTOR X MINOR COLLECTOR X This project is hereby declared to be a public necessity, and the County Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County Engineers estimate, is hereby made in the amounts and for the purposes shown: PURPOSE AMOUNT TOTALS PRELMINARY ENGINEERING $ 140,000 CONSTRUCTION ENGINEERING $ 91,000 RIGHT-OF-WAY ACQUISITION $ SUB -TOTAL $ 231,000 County Forces CONSTRUCTION $ CONTRACT CONSTRUCTION $ 999,000 SUB -TOTAL $ 999,000 TOTAL PROJECT COST $ 1,230,000 GRANT OR OTHER FUNDS $ 1,230,000 Grant Source: HSIP TOTAL COUNTY ROAD FUND ALLOCATION $ 0 Joshua Fredrickson, P.E. Public Works Director ❑ THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2026 ANNUAL ROAD PROGRAM AS ITEM NO. ® THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM PROJECT 8 IN ACCORDANCE WITH RCW 36.81.130 IT IS FURTHER RESOLVED THAT: ® THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ. ❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND WAC 136-18. Attest: ADOPTED this 20th day of January, 2026. BOARD OF COUNTY COMMISSIONERS I Clerk of the Board KITTITAS COUNTY, WASHINGTON Cory Wright, Chair Brett Wachsmith, Vice -Chair Laura Osiadacz, Commissioner g:\base\forms\eng\crp-frm 1 /8/2026