KITTITAS COT]NTY
Board of County Commissioners
AGEI\DA STAFF REPORT
AGEI\DA DATE:December 16,2025
ACTION REQUESTED: Request approval of chairs signature on AIA Document G701 - 2017,
Change Order 005. For an additional3,100 SF/LF of fagade repair.
BACKGROTIhID The Jail concrete repair has been completed. During repairs the
damage was discovered to be more extensive than thought. Because
of this, an additional 3,100 SF/LF of facade repair was required. The
board has been made aware of this additional work along the way.
Belsaas and Smith's unit price was reduced for this additional work to
$85.50 per SF/LF resulting in a net increase of $265,050.
INTERACTION:Ifuit Architects, Belsaas & Smith, and Maintenance have reviewed
documents.
RECOMMEI\DATION: Approval of Chairs Signature of AIA Document G70t-2017 Change
OrderNumber 005
IIAI\DLING:Original - Clerk of the Board
Copy - Auditor
ATTACHMENTS:
LEAD STAtr'f,':
AIA DocumentGT0l-2017 Change OrderNumber 005
Cody Cupp, Assistant Maintenance Director
Docusign Envelope lD: 43D1 DOFS-24F6-48D6-A9D74C4CFDF79909
Change Order
PROJECT: lNane od atuess)
230076 Kinftas Comty Jail Facilities
Rgrovation Task I
205 West s&Aveoue
Elle6burg, WA 98926
OtVt{ER (Noneadd&ess)
Kittitas Comty
2205 Wcst sthAveaue
Elloshrrg; WA 98926
CONIRAGT IilFORIIATDN:
Contract For: Reoovation
Date:04-3G2025
ARGHITEGT: (Nane and ad*ess)
KMT
7826 Leary Way NE #200
Redmor4 WA98052
CHAilCE ORDER II{FORTATIOII:
Change orderNumbec 005
Dral.c:12-45-2025
CONTRACTOR (Name and ad&ess)
Belsaas & Smith Conshrc,tion Inc.
103 East 4th Aveque, Ste: 209
98926
N{E GOflRACT IS CIIAIIGED AS FOILO{US:
(Iwert a detailed desc@tion af tlu change and, if applicable, dtach or reference specfic q.libits. Also ittclude agreed upon
djusnnatts Arifuttabb to qecated Cottstractian Clwnge Direcu'\es.)
This chmge order includes Geoeral Contractot's change orderproposals coP #9 Reril 2
2,457.000.00
876,400.93
3,333,400.93
265.050.00
3,598,450.93
The Cotract Time will be urchangedby zero (0) days.
The aew dato of Substatial Completion will be Unchanged
I()TE: This Change Order does not include adjustnreuts to the Cotrtract Sum or Guaranteed ldaximum Price, or the Co{rtract Tiee,
&at have beeo authorized by Cmstructioo Chaage Directive rmtil the cost ad time have been agreedupon by both the O'srns aod
Cootractor, in which case a Change Order is execriled to sryersede tbe Cmstruction Charye Directive.
}IOT VATID UT{TIL SIGIIED BY THE ARCHITECT, COilTRACTOR AiID OIVNER
BY: John Aaderson, Principal BY: Scoft Carlson, ProjectMaaager F.Y: [gRV Wn'nfur
The original Confract Sumwas
Tbc rct change by prwious$ au&orized Change Orders
The Cmtract Sumpdc to this Change orderwas
The C@tract Sumwill be ircrased by this Change Order in the amormt of
The new Cmlract Sum inchding this Chage Oder vdll be
(Printed naml title, Md license
ntntber freryired)
-OeuSignldt$
;signcdby: Z r/Z
I Ut* frwlrnow [ "'* c-'{so1 PC"q d*c*
\_oc^saa^.e.ss,.s -
-
L;Y4/
ARCHECT $tglatve) COil|RACTOR (sisnsnre) (-olilll1Ffi.(Signmtre)
(Printed nante and title)
12t5t2025 12t5t2025 rkLa-rw-b4f 1t4,2o25
Dde Ddte Dqte
/tlA Dooment G701 -2017. Cop)rdght O 1979, lS7, 20@ , 2001 and 2017. All dghts reserved- The Aneri:an lnstihrte of Architects," "Arnerican lrs{itute of
Ar$itects,i "A!\' the AIA Logp, drd 'AlA Conmcf DoornenG' are fadelllarks of The Amerir:an lnstitrrte of Ardulects- This dooment was produced at 09:40:22
PST on 12l(F/2025 lrder Subscri*ion l.10.2024([lS396 rvhicfi erpires m 12f26f2925, is not br resab, is lhnsed for one-tirne use only, ard rnay only be used
in accordance with ttle AIA Cd$"act Docrirnenbe Terms of Service. To report copyriglrl violalionq e-mail dcinf@aiacontracb.com.
tlrrr lrloos: (693316b11158873a03c4e4fn
(Prinnd nute imd tittq W& V iCe-C hui Y
1
Docusign Envelope lD: 43D1 D6F8-24F6-48DGA9D7-4C4CFDF/9909
P.O. BOX 926 / 103 EAST 4rH AVE, SUITE 209
EIIENSBURG, WA 98926
oz 56t-925-97 47 C: 519-278-8554
scottc@belsmith.com
BELSIttGlO:t3oll
December 4,2025
Re: Fagade Repair- COP #09
The concrete repair work to the exterior of the building is complete with an additional 3,100
SF/LF of fagade repaired. Belsaas and Smith's unit price was reduced for this additional work to
585.50 per SF/LF, resulting in a net increase of 5265,050.
Total cost of proposal: Two Hundred Sixty-Five Thousand Fifty Dollars 5265,050.00 + WSST
Time extension required:0 days
Sincerely,
Reviewed
John Anderson,12l5l25
Scott Carlson,
Belsaas & Smith Construction
Docusign Envelope lD: 43Dl DOFS-24F6-48DGA9D7-4C4CFDF79909
Out
7.30.25
7.29.25
7.28.25
7.24.25
7.23.25
7-22-25
7.21.25
!.r7.25
7.L6.25
7.75.25
7-14.25
7.10.25
7.9.25
7.8.25
7.7.25
7.3.25
7.2.25
7.7-25
6.30.25
6.26.25
6.25.25
6.24-25
6.23.2s
6.19.25
6.18.25
6.L7.25
6.16.25
s.21.25
s.20.25
5.19.25
Contract Totals
Date
28
194
150
419
296
378
152
200
80
95
!25
200
150
200
250
280
200
5627 LF
Cautking
86
64
74
67
68
77
138
50
100
500 sF
Patching
28
24
25
133
150
75
52
118
!29
236
307
270
60
!25
2AO
160
300
200
200
50
60
2700 LF/SF
Route and Patch
99
36
30
65
65
70
50
50
60
25
50
75
75
75
75
25
1500 LF
lnlection
7.30.25
7.29.25
7.28.25
7.24.25
7.23.25
7.22.25
7.2L.25
!.L7.25
7.76.25
7.L5.25
7.74-25
7.10.25
739.25
7.8.25
7.7.25
7.3.25
7.2.25
7.7.25
6.30.25
6.26.25
6.25.25
6.24.25
6-23.25
6.19.25
6.18.25
6.77.25
6.16.25
5.2L.25
5.20.25
5.19.25
Contract Totats
Date
160
168
8
70
200
259
247
190
5627 tF
GaulkinE
28
57
103
10
5OO SF
Patching
722
125
99
797
150
150
130
20
65
47
62
68
15
100
9
27OO LFISF
Route and Patch
195
200
150
100
105
100
75
1500 LF
lniection
Docusign Envelope lD: 43D1 D6F8-24F648DGA9D7-4g|CFDF79909
10.15.25
10.14.25
10.13.25
10.9.25
10.8.25
L0.7.25
10.6.2s
!0.2.25
10.1.25
9.30.25
9.29.25
9.25.26
9.24.25
9.23.25
9.22.25
9.!7.25
9.16.25
9.15.25
4.24.25
8.27.25
8.26.2s
8.25.25
8.2r.25
8.20.25
8.19.25
8.18.25
a-14.25
8.13.25
4.12.25
8.11.25
8.7.25
8.6.25
8.5.25
8.4.25
180
L42
193
74
200
235
311
161
770
t76
24
50
100
126
r52
250
168
794
6
2
2
2
50
4
85
25
25
10
42
12
6
44
48
56
52
100
24r
159
66
333
266
373
97
662
198
163
30
30
10.15.25
1o.t4.25
10.13.25
10.9.25
10.8.25
70.7.25
10.6.25
70.2.25
70.L.25
9.30.25
9.29.25
9.25.26
9.24.25
9.23.25
9.22.25
9.77.25
9.16.25
9.15.25
4.24.25
8.27.25
8.26.25
8.25.25
8.2L.25
8.20.25
8.19.25
8.18.25
a.14.25
8.13.25
8.72.25
8.11.25
8.7.25
8.6.25
8.5.25
8.4.25
130
742
304
348
320
200
200
285
235
110
265
327
243
277
742
96
589
240
2AO
6
44
38
33
4
20
4
55
10
55
6
18
44
12
6
45
10
82
80
79
5
22
160
20
55
16
8
100
247
159
307
100
420
164
257
724
206
180
65
347
156
35
752
39
742
85
52
165
225
189
270
78
35
10
60
Docusign Envelope lD: 43D1 D6F8-24F6-48DGA9D74C4CFDF79909
to make equal
RemainlnETotats
Job Totals
ContractTotats
70.20.25
10.16.25
-972
6599
5627
296
-635
1135
500
-2980
5680
2700
40
515
985
1500
RemaininETotats
Job Totals
Contract Totats
t0.20.25
10.16.25
0
-972
6599
5627
200
296
0
€35
1135
500
0
-2980
5680
2700
40
0
515
985
1500