HomeMy WebLinkAboutChange order0 KITTITAS COT]NTY Board of County Commissioners AGEI\DA STAFF REPORT AGEI\DA DATE:December 16,2025 ACTION REQUESTED: Request approval of chairs signature on AIA Document G701 - 2017, Change Order 005. For an additional3,100 SF/LF of fagade repair. BACKGROTIhID The Jail concrete repair has been completed. During repairs the damage was discovered to be more extensive than thought. Because of this, an additional 3,100 SF/LF of facade repair was required. The board has been made aware of this additional work along the way. Belsaas and Smith's unit price was reduced for this additional work to $85.50 per SF/LF resulting in a net increase of $265,050. INTERACTION:Ifuit Architects, Belsaas & Smith, and Maintenance have reviewed documents. RECOMMEI\DATION: Approval of Chairs Signature of AIA Document G70t-2017 Change OrderNumber 005 IIAI\DLING:Original - Clerk of the Board Copy - Auditor ATTACHMENTS: LEAD STAtr'f,': AIA DocumentGT0l-2017 Change OrderNumber 005 Cody Cupp, Assistant Maintenance Director Docusign Envelope lD: 43D1 DOFS-24F6-48D6-A9D74C4CFDF79909 Change Order PROJECT: lNane od atuess) 230076 Kinftas Comty Jail Facilities Rgrovation Task I 205 West s&Aveoue Elle6burg, WA 98926 OtVt{ER (Noneadd&ess) Kittitas Comty 2205 Wcst sthAveaue Elloshrrg; WA 98926 CONIRAGT IilFORIIATDN: Contract For: Reoovation Date:04-3G2025 ARGHITEGT: (Nane and ad*ess) KMT 7826 Leary Way NE #200 Redmor4 WA98052 CHAilCE ORDER II{FORTATIOII: Change orderNumbec 005 Dral.c:12-45-2025 CONTRACTOR (Name and ad&ess) Belsaas & Smith Conshrc,tion Inc. 103 East 4th Aveque, Ste: 209 98926 N{E GOflRACT IS CIIAIIGED AS FOILO{US: (Iwert a detailed desc@tion af tlu change and, if applicable, dtach or reference specfic q.libits. Also ittclude agreed upon djusnnatts Arifuttabb to qecated Cottstractian Clwnge Direcu'\es.) This chmge order includes Geoeral Contractot's change orderproposals coP #9 Reril 2 2,457.000.00 876,400.93 3,333,400.93 265.050.00 3,598,450.93 The Cotract Time will be urchangedby zero (0) days. The aew dato of Substatial Completion will be Unchanged I()TE: This Change Order does not include adjustnreuts to the Cotrtract Sum or Guaranteed ldaximum Price, or the Co{rtract Tiee, &at have beeo authorized by Cmstructioo Chaage Directive rmtil the cost ad time have been agreedupon by both the O'srns aod Cootractor, in which case a Change Order is execriled to sryersede tbe Cmstruction Charye Directive. }IOT VATID UT{TIL SIGIIED BY THE ARCHITECT, COilTRACTOR AiID OIVNER BY: John Aaderson, Principal BY: Scoft Carlson, ProjectMaaager F.Y: [gRV Wn'nfur The original Confract Sumwas Tbc rct change by prwious$ au&orized Change Orders The Cmtract Sumpdc to this Change orderwas The C@tract Sumwill be ircrased by this Change Order in the amormt of The new Cmlract Sum inchding this Chage Oder vdll be (Printed naml title, Md license ntntber freryired) -OeuSignldt$ ;signcdby: Z r/Z I Ut* frwlrnow [ "'* c-'{so1 PC"q d*c* \_oc^saa^.e.ss,.s - - L;Y4/ ARCHECT $tglatve) COil|RACTOR (sisnsnre) (-olilll1Ffi.(Signmtre) (Printed nante and title) 12t5t2025 12t5t2025 rkLa-rw-b4f 1t4,2o25 Dde Ddte Dqte /tlA Dooment G701 -2017. Cop)rdght O 1979, lS7, 20@ , 2001 and 2017. All dghts reserved- The Aneri:an lnstihrte of Architects," "Arnerican lrs{itute of Ar$itects,i "A!\' the AIA Logp, drd 'AlA Conmcf DoornenG' are fadelllarks of The Amerir:an lnstitrrte of Ardulects- This dooment was produced at 09:40:22 PST on 12l(F/2025 lrder Subscri*ion l.10.2024([lS396 rvhicfi erpires m 12f26f2925, is not br resab, is lhnsed for one-tirne use only, ard rnay only be used in accordance with ttle AIA Cd$"act Docrirnenbe Terms of Service. To report copyriglrl violalionq e-mail dcinf@aiacontracb.com. tlrrr lrloos: (693316b11158873a03c4e4fn (Prinnd nute imd tittq W& V iCe-C hui Y 1 Docusign Envelope lD: 43D1 D6F8-24F6-48DGA9D7-4C4CFDF/9909 P.O. BOX 926 / 103 EAST 4rH AVE, SUITE 209 EIIENSBURG, WA 98926 oz 56t-925-97 47 C: 519-278-8554 scottc@belsmith.com BELSIttGlO:t3oll December 4,2025 Re: Fagade Repair- COP #09 The concrete repair work to the exterior of the building is complete with an additional 3,100 SF/LF of fagade repaired. Belsaas and Smith's unit price was reduced for this additional work to 585.50 per SF/LF, resulting in a net increase of 5265,050. Total cost of proposal: Two Hundred Sixty-Five Thousand Fifty Dollars 5265,050.00 + WSST Time extension required:0 days Sincerely, Reviewed John Anderson,12l5l25 Scott Carlson, Belsaas & Smith Construction Docusign Envelope lD: 43Dl DOFS-24F6-48DGA9D7-4C4CFDF79909 Out 7.30.25 7.29.25 7.28.25 7.24.25 7.23.25 7-22-25 7.21.25 !.r7.25 7.L6.25 7.75.25 7-14.25 7.10.25 7.9.25 7.8.25 7.7.25 7.3.25 7.2.25 7.7-25 6.30.25 6.26.25 6.25.25 6.24-25 6.23.2s 6.19.25 6.18.25 6.L7.25 6.16.25 s.21.25 s.20.25 5.19.25 Contract Totals Date 28 194 150 419 296 378 152 200 80 95 !25 200 150 200 250 280 200 5627 LF Cautking 86 64 74 67 68 77 138 50 100 500 sF Patching 28 24 25 133 150 75 52 118 !29 236 307 270 60 !25 2AO 160 300 200 200 50 60 2700 LF/SF Route and Patch 99 36 30 65 65 70 50 50 60 25 50 75 75 75 75 25 1500 LF lnlection 7.30.25 7.29.25 7.28.25 7.24.25 7.23.25 7.22.25 7.2L.25 !.L7.25 7.76.25 7.L5.25 7.74-25 7.10.25 739.25 7.8.25 7.7.25 7.3.25 7.2.25 7.7.25 6.30.25 6.26.25 6.25.25 6.24.25 6-23.25 6.19.25 6.18.25 6.77.25 6.16.25 5.2L.25 5.20.25 5.19.25 Contract Totats Date 160 168 8 70 200 259 247 190 5627 tF GaulkinE 28 57 103 10 5OO SF Patching 722 125 99 797 150 150 130 20 65 47 62 68 15 100 9 27OO LFISF Route and Patch 195 200 150 100 105 100 75 1500 LF lniection Docusign Envelope lD: 43D1 D6F8-24F648DGA9D7-4g|CFDF79909 10.15.25 10.14.25 10.13.25 10.9.25 10.8.25 L0.7.25 10.6.2s !0.2.25 10.1.25 9.30.25 9.29.25 9.25.26 9.24.25 9.23.25 9.22.25 9.!7.25 9.16.25 9.15.25 4.24.25 8.27.25 8.26.2s 8.25.25 8.2r.25 8.20.25 8.19.25 8.18.25 a-14.25 8.13.25 4.12.25 8.11.25 8.7.25 8.6.25 8.5.25 8.4.25 180 L42 193 74 200 235 311 161 770 t76 24 50 100 126 r52 250 168 794 6 2 2 2 50 4 85 25 25 10 42 12 6 44 48 56 52 100 24r 159 66 333 266 373 97 662 198 163 30 30 10.15.25 1o.t4.25 10.13.25 10.9.25 10.8.25 70.7.25 10.6.25 70.2.25 70.L.25 9.30.25 9.29.25 9.25.26 9.24.25 9.23.25 9.22.25 9.77.25 9.16.25 9.15.25 4.24.25 8.27.25 8.26.25 8.25.25 8.2L.25 8.20.25 8.19.25 8.18.25 a.14.25 8.13.25 8.72.25 8.11.25 8.7.25 8.6.25 8.5.25 8.4.25 130 742 304 348 320 200 200 285 235 110 265 327 243 277 742 96 589 240 2AO 6 44 38 33 4 20 4 55 10 55 6 18 44 12 6 45 10 82 80 79 5 22 160 20 55 16 8 100 247 159 307 100 420 164 257 724 206 180 65 347 156 35 752 39 742 85 52 165 225 189 270 78 35 10 60 Docusign Envelope lD: 43D1 D6F8-24F6-48DGA9D74C4CFDF79909 to make equal RemainlnETotats Job Totals ContractTotats 70.20.25 10.16.25 -972 6599 5627 296 -635 1135 500 -2980 5680 2700 40 515 985 1500 RemaininETotats Job Totals Contract Totats t0.20.25 10.16.25 0 -972 6599 5627 200 296 0 €35 1135 500 0 -2980 5680 2700 40 0 515 985 1500