PUBLIC WORKS STUDY SESSION MINUTES
COMMISSIONERS' AUDITORIUM, 205 WEST 5TH ROOM 109
Regular Meeting
MONDAY 1:30 PM November 10, 2025
Board members present: Chairman Laura Osiadacz, Vice -Chairman Cory
Wright, and Commissioner Brett Wachsmith.
Others: Josh Fredrickson, Lisa Godden, Arden Thomas, Public Works;
Christa Stream, Ryan Baker, City of Kittitas.
At 1:30PM Chairman Laura Osiadacz opened the Public Works Study
Session.
NO CITIZEN COMMENTS
EXTENSION LETTER RE: FEMA FLOOD MAP REVISIONS
Arden Thomas briefed the Board of County Commissioners that FEMA had
reached out to Kittitas County and indicated that they were
interested in re -mapping. Arden Thomas informed the Board of County
Commissioners that drafted maps were received earlier this summer
with FEMA's proposed new mapping and the County of Kittitas met with
FEMA's consultant, the Star II Team, to walk through their study
along with the proposed mappings. Arden Thomas stated that at the
meeting it was learned that there is a 30-day comment period to
submit comments regarding the proposed maps. Arden Thomas stated
that the next opportunity to weigh-in regarding the re -mapping is
within the Appeal period. Arden Thomas continued that the
recommendation is for Kittitas County to provide comment regarding
the proposed re -mapping and that Kittitas County has requested from
FEMA, two technical reports and the hydraulic model associated with
the Kittitas Valley study area. Arden Thomas added that no response
has been received from FEMA regarding this request. Arden Thomas
commented that she learned that FEMA and the Star II team have been
directed to have no external communications during the government
shut down. Arden Thomas recommended that a notice be sent to FEMA
for an extension of the comment period in order receive the requested
materials and to provide comments to FEMA. Arden Thomas requested
direction from the Board of County Commissioners regarding the
Extension Letter, and additionally, wanted to invite the City of
Kittitas to join the Extension Letter for submittal.
Vice -Chairman Cory Wright asked for clarification of which Creeks the
proposed re -mapping would impact. Vice -Chairman Cory Wright then
inquired if the letter presented would be re -drafted to include the
Mayor of the City of Kittitas. Arden Thomas agreed to adjust the
letter to include the Mayor of the City of Kittitas' signature.
11/10/25 MINUTES
Chairman Laura Osiadacz asked if the members present from the City of
Kittitas had anything additional to add. No further comment was
made.
Vice -Chairman Cory Wright motioned to approve the letter under the
Chair's signature and offering the Mayor of the City of Kittitas the
option to sign.
Commissioner Brett Wachsmith seconded the Motion.
Motion passed.
OTHER BUSINESS
Josh Fredrickson discussed the approved Resolution acknowledging
November as Flood Awareness Month, which was posted on the Board of
County Commissioners Facebook page. Josh Frederickson stated that
there was a comment within that Facebook posting that someone
mentioned a culvert on Salmon La Sac Road. Josh Fredrickson informed
the Board that Public Works did see the post and is taking care of
it.
Meeting concluded at 1:43 PM
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Lisa Godden, Adm' istrative Laura Osiadacz, Chairman
Assistant
11/10/25 MINUTES
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: November 10, 2025
TOPIC: Extension Letter RE: FEMA flood map revisions
ACTION REQUESTED: Finalize comment letter and invite City of
Kittitas to sign
LEAD STAFF:
Arden Thomas
RECOMMENDATION:
Finalize extension letter regarding FEMA flood map revisions and invite the City of
Kittitas to sign the comment letter.
BRIEFING SUMMARY:
• At the March 25, 2024 Public Works Study Session, the Board of County
Commissioners (BOCC) directed staff to remain engaged in the Federal
Emergency Management Agency's (FEMA) ongoing efforts to improve flood risk
modeling and mapping, and to provide periodic updates regarding the status of
this initiative.
• The FEMA study area includes land located just east of Cle Elum and several
streams on the eastern side of the Kittitas Valley —areas where County staff have
concerns that current FEMA mapping does not adequately assess flood risk.
• Draft maps have been shared with the County, and we were informed that
comments on the draft maps may be submitted until November 24, 2025.
• Proposed mapping in the Kittitas Valley area significantly expands the mapped
floodplain area.
• Kittitas County staff recommend a more in-depth technical review of the
modeling and mapping work conducted in the Kittitas Valley study area and
propose to utilize our on -call Hydraulic and Hydrologic (H&H) contractor to
conduct this review.
• Our H&H contractor has not yet been able to complete the review,because the
necessary technical documents have not been provided.
• Staff recommend that the BOCC submit a formal comment letter requesting an
extension of the review period, as FEMA has not provided the requested technical
information.
Page 1 of 4
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
BACKGROUND:
Many of the mapped floodplains within Kittitas County were assessed for flood risk in
the late 1970s using approximate mapping techniques. In 2024, FEMA proposed new
flood studies for several streams on the east side of the Kittitas Valley, including within
the City of Kittitas, and for an area east of Cle Elum. These studies will ultimately update
the regulatory maps.
FEMA conducted surveys in 2024 and recently shared draft versions of the proposed
regulatory maps. On October 23, 2025, FEMA's mapping partner, STAR II, hosted a
Flood Risk Review meeting to present the modeling work and mapping outcomes.
During this meeting, we were informed that comments on the draft maps are due by
November 24, 2025.
DISCUSSION:
During and following the October 23, 2025, Flood Risk Review meeting, County staff
requested two technical reports and the associated hydraulic model to support a
comprehensive technical review of FEMA's work. To date, these materials have not been
received. It appears that FEMA's lack of response may be related to the ongoing federal
government shutdown.
Given the absence of the required technical information, staff recommend that the BOCC
formally request an extension of the public comment period to ensure adequate time for
technical evaluation once the data have been provided. Given the magnitude of the
changes between the current effective maps and the proposed draft maps in the Kittitas
Valley area, allowing adequate time for local review is essential to ensuring confidence in
the final outcomes of this process.
FISCAL IMPACTS:
Staff time and consultant costs associated with the technical review will be funded
through existing Flood Control Zone District resources. No budget amendment is
anticipated to be necessary at this time.
ATTACHMENTS:
Exhibit 1: Draft Extension Letter
Exhibit 2: Example maps illustrating changes between existing and proposed mapping in
the Cle Elum and City of Kittitas vicinities.
Page 2 of 4
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
EXHIBIT 1: Draft Extension Letter
Page 3 of 4
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
SSA
till-fITAS COl N7`�
November 10, 2025
Wendy L. Shaw, P.E.
Risk Analysis Branch Chief
Mitigation Division
FEMA Region 10
Kittitas County, Washington
BOARD OF COUNTY COMMISSIONERS
District One District Two District Three
Cory Wright Laura Osiadacz Brett Wachsmith
RE: Extension Request for Flood Risk Review Comment Period
Dear Ms. Shaw
On Thursday, October 23, 2025, Kittitas County staff met with representatives from FEMA's
mapping partner, STAR II, for a Flood Risk Review (FRR) meeting. During this meeting, the STAR
II team presented the results of newly restudied areas outside the City of Cle Elum and multiple
creeks within the Kittitas Valley area, encompassing both unincorporated Kittitas County and the
City of Cle Elum.
At the FRR meeting, we were informed that comments from local jurisdictions on the presented
materials are due by November 24, 2025. To date, we have not received formal written notification
regarding this comment period. During the meeting, and subsequently by email, Kittitas County
requested additional technical documentation to facilitate our review and preparation of comments.
Specifically, we requested two technical reports and the hydraulic model associated with the Kittitas
Valley study area. We have not received the requested materials. This lack of response appears to be
associated with the ongoing federal government shutdown.
Given that the requested documentation has not been made available and is necessary to conduct a
complete and technically sound review, Kittitas County respectfully requests an extension of the
comment period to at least thirty (30) days following receipt of the requested materials.
Kittitas County fully supports FEMA's stated objective of developing useful, credible data through a
fair and transparent process that enables informed decision -making regarding flood risk in our
communities. Your correspondence dated March 13, 2024, regarding this study effort, emphasized
FEMA's reliance on local "feedback, partnership, and knowledge." Consistent with that principle,
our preliminary review of the materials presented indicates that the Kittitas Valley Creek study
should include a model run utilizing unsteady modeling techniques, in addition to the quasi -unsteady
model employed. We further recommend that predicted flooding extents be compared with observed
flood extents from past events to ensure the study's validity.
We also request the opportunity to review model outputs in addition to the mapped flood hazard
areas presented. Regarding the restudied area in the vicinity of Cle Elum, we specifically request that
the "Zone A" Special Flood Hazard Area located north of Airport Road be updated through a
Floodplain Refinement process to more accurately align with existing topography. This requested
Kittitas County Courthouse • 205 West 51e Avenue, STE 108 -Ellensburg, WA 98926
(509) 962-7508 •FAX (509) 962-7679
www.co.kittitasma.us
revision is on FIRM Panel 53037C0685D, which is subject to revision under the new study. For all
restudied areas, we additionally request that any Letters of Map Revision (LOMRs) be revalidated.
While these comments represent our preliminary feedback, we emphasize the importance of being
afforded sufficient opportunity, prior to the initiation of the appeal period, to conduct a
comprehensive technical review upon receipt of the requested documentation. We anticipate that we
may have additional or more refined comments after conducting a more detailed technical review.
Given the magnitude of the changes between the current effective maps and the proposed draft maps,
allowing adequate time for local review is essential to ensuring confidence in the final outcomes of
this process.
Respectfully,
KITTITAS COUNTY
By:
Ms. Laura Osiadacz
Chair, Kittitas County Board of Commissioners
Kittitas County Courthouse • 205 West 5111 Avenue, STE 108 • Ellensburg, WA 98926
(509) 962-7508 •FAX (509) 962-7679
www.co.kittitas.wa.us
EXHIBIT 2: Example maps illustrating changes between existing and proposed mapping
in the Cle Elum and City of Kittitas vicinities.
Page 4 of 4
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
A 1,
Q
m
a�n
c�
N
N
N
L
00
N
a
°
L
7
°
C
91
c
'n U_
m a
C
m caY
° U
rna
U v
U
� UEL ZK`
ZLL
�
M
m
O
it
y.
LL
U