November 04, 2025
Scope of Services
“Kittitas County Public
Health Facility Feasibility
Study”
Cori McKean, D-ABMDI, Kittitas County Interim Coroner
Kittitas County
507 N. Nanum Street, #113A
Ellensburg, WA 98926
Dear Ms. McKean,
Thank you for the opportunity to work on this project. Our project understanding is outlined
below and is based on our proposal dated August 1, 2025 (attached). Following the project
understanding is our scope; first by discipline followed by scope by task. The tasked scope
numbering, and language directly coincide with tasks listed in our budget. This project will be
invoiced monthly as tasks are completed, on a lump sum basis. Our schedule of values by
task are listed with each task within this document.
PROJECT UNDERSTANDING
Kittitas County (County) needs a feasibility study for locating a new safety and health facility
at Kittitas County Airport Property. This facility would enable the Kittitas County Coroner’s
Office (Coroner’s Office) and Public Health Department (Public Health Department) to be
moved to one location in partnership with Kittitas Valley Fire & Rescue (KVFR).
Currently co-located within the approximately 100-year-old Morris Sorenson Building at 507
N. Nanum Street, Ellensburg, WA, the Coroner’s Office and Public Health Department have
outgrown their facilities. Due to population growth, KVFR needs to develop an additional
station.
This project is within the City of Ellensburg jurisdiction and is subject to the 2021 (with
amendments) Washington State Building Code and all other codes and regulations applicable
to the concepts proposed.
PROJECT SCOPE
For architectural/interiors
• Program (space planning) development and documentation for building and site.
• Prepare a written basis of design architectural narrative for the proposed building
including building and planning code analysis.
2
• For Feasibility Study, develop building massing studies and locate on site in
collaboration with Basis of Design recommendations for cost effective development,
local codes and regulations and FAA development criteria.
• Facilitate development of criteria for building siting and alternative selection.
For civil
• Preliminary recommendations for civil and stormwater design, including site access,
parking, setbacks, and identification of cost related design elements such as utility
access.
• Prepare a written basis of design civil narrative for the proposed building and site.
For mechanical, fire protection, water conservation, and plumbing design
• Preliminary recommendations for heating, cooling and ventilation systems with
consideration to energy conservation.
• Prepare a written basis of design mechanical, fire protection, and plumbing narrative
for the proposed building and site.
For electrical, lighting, security, data, audio-visual and fire alarm
• Preliminary recommendations for electrical and lighting systems with consideration
to energy conservation.
• Prepare a written basis of design electrical and lighting narrative for the proposed
building and site.
Schedule: Complete by December 31, 2025
PROJECT TASKS
1. Project Management - $4,000
MWA shall manage prime contract related to this project. MWA will invoice monthly by
completed Task in a lump sum invoice. This project is planned and budgeted for a six (6)
week duration. The design team will meet bi-weekly to cover updates in scope, schedule,
budget and coordination planning.
Deliverables: Monthly invoice /reporting on a lump sum basis, kick-off meeting agenda
and notes in collaboration with County Project Manager
Meetings: One (1) Kick-off meeting. Weekly check-in with County Project Manager
2. Review Existing Information and Space Needs - $18,000
• Request to the County for existing information, personnel list and fleet data
• Authority Having Jurisdiction (AHJ) outreach and permitting/regulatory matrix
development
3
• Develop plan backgrounds and highlight development parameters in plan as
preparation for Workflow and Space Needs Workshop
• Prepare agenda and coordinate with County Project Manager for stakeholder
attendance at Workflow and Space Needs Workshop
• Develop criteria for site and building selection
Deliverables: Meeting agenda and notes from Workflow and Space Needs Workshop;
these notes will form the basis of design for the Feasibility Report.
Meetings: Site visit, Workflow and Space Needs Workshop
3. Feasibility Report Development - $11,000
• Develop up to two massing studies for building; massing will be informed primarily by
space needs confirmed in Task 2
• Develop one site security, circulation and parking study for each building study
• Explore options for combining internal program needs
• Prepare agenda and coordinate with County Project Manager for Feasibility
Workshop
Deliverables: Draft and Final Feasibility Report, Feasibility Workshop agenda and
minutes
Meetings: Feasibility Workshop
4. Planning Level Cost Estimates - $7,000
• Planning level cost estimate for preferred building massing and site layout
o Total project costs, including permitting
o Construction costs
o Develop assumptions: approach to soft and hard costs, project delivery method
• Cost estimate will follow the American Association of cost engineers Class 5
(planning) standard
• Cost estimate assumptions memorandum
• Assume one (1) meeting
Deliverables: Draft planning level cost estimate and refined estimate for inclusion in
Final Feasibility Report
Meetings: One (1) meeting to review cost estimate
Travel expenses in service of this project are included in the lump sum cost proposal under
Task 2 to support the identified Site Visit.
4
Assumptions:
Sustainability goals will follow County declared priorities; MWA will make recommendations.
MWA will provide drawings using Autodesk Revit program and in PDF format for reviews.
All drawings and exhibits provided are planning level in nature; they will be to scale digitally
for cost estimating purposes and diagrammatic and require further development by a
professional team licensed in Washington State prior to use in construction documentation.
MWA will provide reports using MS Word and in PDF format for reviews.
Document review comment periods by the County are ten (10) calendar days or less.
All comments by the County stakeholders will be vetted by the County Project Manager.
All comments that cannot be incorporated into the project documents will be adjudicated by
the designated County Project Manager.
The County will provide access to facilities for site investigations as needed.
The County will provide a Project Manager for this project; copy them on all correspondence
with other County personnel.
All deliverables to be digital.
Furniture, fixtures and equipment procurement excluded; space planning and
recommendations for style/types of furniture included.
No drawings will be provided by civil, mechanical or electrical subconsultants; their design
input will be captured in the notes from the workflow and space needs workshop in the form
of a basis of design narrative for cost and space planning purposes.
No geotechnical engineering services are included; MWA will incorporate available
geotechnical data readily available from the County in massing layouts and costs
assumptions.
No environmental engineering services are included; the County will share any known site
contamination issue for inclusion in costs.
No site survey is included; MWA will use existing readily available County-provided GIS data
in lieu of survey if one is not available for the site.
No traffic data or traffic engineering will be conducted as part of this study.
CC: Leslee Randolph
Statement of Qualifications
Professional Architectural and Engineering Services
Kittitas County Public Safety and Health Facility
Table of Contents
EXPERIENCE & QUALIFICATIONS
MWA Architects & MWL Introductions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2
Relevant Project Examples . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
PROJECT TEAM
Organizational Chart . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11
Resumes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12
REFERENCES
Reference Contact Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21
PROJECT UNDERSTANDING & APPROACH
Project Understanding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22
SUPPORTING DATA
No additional information at this time . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .25
01
02
03
04
05
SAN FRANCISCO PORTLAND
MWA ARCHITECTS | 1
August 1, 2025
Kittitas County Board of County Commissioners
Attention: Cori McKean
205 West 5th Ave, Suite 108, Ellensburg, WA 98926
re: request for qualifications professional architectural and engineering services, ellensburg, washington
MWA’s mission is to serve the essential needs of every community we touch . Your project has
the potential to provide Kittitas County residents with multiple essential public safety and health
needs in one building . The needs analysis for the Kittitas County Coroner’s Office and Public
Health Department will provide feasibility and cost information that will allow the County to
prepare development funding for this project . To improve feasibility, the County is partnering with
Kittitas Valley Fire & Rescue and Kittitas County Airport . By developing a facility at the Kittitas
County Airport on County-owned land, the new safety and health facility development costs are
reduced and service is expanded through airfield adjacency . Including fire facilities will improve
airport and community resiliency — this project is a win-win-win for Kittitas County .
a dedicated and experienced team
MWA brings 37 years of experience serving the essential needs of the community through
innovative, thoughtful, and respectful design . We have completed health, fire, and aviation facili-
ties for agencies across the Pacific Northwest . Our portfolio includes projects with Yakima Air
Terminal-McAllister Field, Spokane International Airport, and Portland International Airport, on
multiple projects, including needs analysis and feasibility studies, renovations, adaptive re-use,
tenant improvements, and new construction . Our fire and public health experience includes
Portland Fire and Rescue, Ilwaco Fire Department, and the City of Portland Emergency
Communications Center .
bringing longstanding teaming relationships to your project
MWA has longstanding relationships with our proposed teaming partners . DCI Engineers (struc-
tural and civil), FSi Engineers (mechanical), Landis Engineering (electrical), and Sound NW
Precon Services (construction cost estimating) are all currently working with MWA on aviation
and health projects . We are pleased to include proposed Subject Matter Expert, MWL . MWL
has been at the forefront of forensic science, forensic pathology, and public safety planning and
design since its founding in 1995 . MWL specializes in forensic science laboratories, forensic
pathology facilities, and police and public safety facilities . Each proposed team member brings
knowledge and experience in needs analysis and feasibility studies on airport properties .
When pursuing projects, MWA considers the overall workload and availability of our team and
teaming partners . The individuals highlighted in our proposal are currently working in Central
Washington and are available to begin this project and will stay involved throughout . Our
proposed team is committed to making the Kittitas County Public Safety and Health Facility
a success .
Sincerely,
Jean von Bargen Root AIA, LEED AP BD+C, NOMA, PMP, Assoc . DBIA | Principal
jvonbargen@mwaarchitects .com | 503 .705 .0653
01.
EXPERIENCE &
QUALIFICATIONS
2 | MWA ARCHITECTS
1. Experience & Qualifications
MWA ARCHITECTS
MWA Architects seeks to serve the essential needs of the community through innovative,
thoughtful, and respectful design.
Founded in 1988, we are a West Coast-based firm that strives to create a legacy of beautiful and
sustainable architecture . Each of our projects thoughtfully responds to site context and serves
as a foundation for community growth .
Over the last 37 years, MWA has completed health, fire, and aviation facilities for agencies across
the Pacific Northwest . Our portfolio includes projects with Yakima Air Terminal-McAllister Field,
Spokane International Airport, and Portland International Airport . Our fire and public health
experience includes Portland Fire and Rescue, Ilwaco Fire Department, and the City of Portland
Emergency Communications Center . Our staff is capable of adapting to your needs from our
extensive experience with feasibility studies, programming, and new construction .
MWA is a hands-on teaming partner that makes regular site visits. Project Manager Leslee
Randolph will be your primary point of contact for day-to-day communications, acting as an
extension of your team . MWA successfully facilitates meetings with multiple stakeholders, engi-
neers, cities and municipal agencies . We are natural listeners, and utilize graphic tools to convey
design and technical concepts . We make it our goal to understand your work process and needs,
and generate design solutions that complement your needs and the surrounding environment .
Our projects frequently include extensive planning efforts, public involvement and engagement,
programming for essential adjacencies, and a variety of security needs .
ADDRESS
501 SE 14th Avenue #103
Portland, OR 97214
OFFICES
Portland, Oregon
San Francisco, California
NUMBER OF YEARS IN BUSINESS
37
STAFF DESIGNATED BY POSITION
48 Employees Firmwide
37 in the Portland Office
6 LEED AP, 2 WELL AP
20 Registered Architects
3 Interior Designers
DMWESB CERTIFICATION
MWA is Disadvantaged
Business Enterprise,
certified though the State of
Washington Office of
Minority and Women’s
Business Enterprises .
WA DBE #D2F0030516
CBE Application #0389489
82
Space Need
Assessments
19
Aviation
Projects
16
Fire
Stations
Pictured: Mel Leong Laboratory Testing and
Administrative Facility at San Francisco
International Airport, led by MWA .
MWA ARCHITECTS | 3
MCCLAREN, WILSON & LAWRIE (MWL)
subject matter expert
MWL has been at the forefront of forensic science, forensic pathology, and public safety planning
and design since its founding in 1995 . Specializing in forensic science laboratories, forensic
pathology facilities, research institutions, educational spaces, and police and public safety facili-
ties . MWL has established an international reputation for excellence . With a portfolio that
includes 350 public safety facilities and 170 laboratory and medical examiner facilities, MWL is
a trusted partner for city, county, state, and federal government clients across North America .
mwl forensic & pathology projects map
AREAS OF EXPERTISE
Forensic Science Laboratories
Forensic Pathology Facilities
Public Health Laboratories
Research Laboratories
Biosafety 3 & 4 Containment
University Laboratories
Property & Evidence Facilities
Police and Fire Headquarters
Public Safety Training Facilities
Firearms Proficiency Ranges
911/EOC
Pictured: State of Oklahoma Medical
Examiner’s Office, led by MWL .
The following pages
include relevant project
examples from the
proposed project team.
4 | MWA ARCHITECTS
The City of Yakima is modernizing the existing passenger termi-
nal at Yakima Air Terminal-McAllister Field in a multiphase
construction process after years of deferred maintenance and
chronic water intrusion throughout the terminal . The City started
implementation of recommendations in February of 2025 .
These multiphase investments will position Yakima as a leader
in the Washington State economy and the Air Terminal as an
important community asset . Major terminal improvements are
seeking minimal disruption to passengers and flights .
As the prime architect, MWA has conducted studies to inform
each design phase . These include investigations covering elec-
trical and mechanical triage and modernization with
consideration to historic preservation, cultural resources,
respectful rehabilitation, and working with the site when
needed around SEPA .
Currently, the comprehensive square foot area of the existing
building is 36,000 SF . Looking to the future, the comprehensive
area potential is 45-52,000 SF . Efficient program spaces, which
are revenue generating, will be complemented by targeted
airport-compatible revenue generating program uses, such as
restaurant, vending café, conference/meeting space and related
support spaces .
key features
»MWA applied for and was awarded approximated $4M in FAA grant funding
»Space needs assessment
»Working with Washington State when needed for SEPA and other regulatory permitting requirements
project information
Project Team: MWA Architects, DCI Engineers, FSi
Engineers, Landis Consulting
Project Type: Air Terminal Renovation
Size: 36,000 SF
Client: City of Yakima
Yakima Air Terminal-McCallister Field
yakima, wa
MWA ARCHITECTS | 5
Ilwaco Fire Station
ilwaco, wa
MWA Architects designed the new 10,000 SF Ilwaco Fire
Station to replace the previous station that was lost in a fire
in 2007 . The building houses a volunteer fire department,
chief’s office, small museum, 5 drive-through apparatus bays,
shower room, a kitchen, public bathrooms, and community
meeting room .
The fire station is nestled in the heart of downtown Ilwaco
along coastal Highway 101 . MWA worked closely with the city
to provide a building that would address the current and future
needs of the all volunteer staff and the other community func-
tions . These needs included providing adequate space for fire
and EMS apparatus, training facilities, community hall and a
fire museum . MWA designed the new building to fit into the
fabric of the current community while providing for future
expansion to a full time paid company with an unfinished,
upstairs volume that will serve as future bunk rooms .
The interior is organized to provide clean circulation path-
ways that connect the community, administration, and
response functions . The simple coastal building design’s
exterior is clad with a mix of cedar lap siding and board and
battens, highlighted by wood post and beam elements that
tie the building together .
key features
»New construction of fire station
»MWA coordinated the needs of multiple stakeholders
»Designed to serve present and future needs
project information
Project Team: MWA Architects
Project Type: New Fire Station
Size: 10,000 SF
Client: City of Ilwaco
6 | MWA ARCHITECTS
MWA performed a feasibility evaluation, provided space plan-
ning, full architectural design, and construction administration
services, and led the project through the City’s multi-phased
Civic Design Review process .
The building is comprised of a large laboratory, a locker room,
break room, conference/training room, and office spaces .
Ten-foot-tall ceilings, large windows, and light colors through-
out provide an uplifting space flooded with natural light . With
safety as the top priority for the lab, designers focused on
providing visual transparency and separation of workspaces .
Glass cabinet doors allow lab techs to see chemicals and
quickly access manuals easily . Separate lab modules are
designed to be open but limit contamination and tailored to
specific regulatory testing .
The building envelope and systems provide increased sound
and vibration isolation from aircraft takeoff and protection from
the corrosive bay environment . Specialized seismic control
joints allow building movement and foundation settling without
impacting structural integrity or operations . In anticipation of
rising sea levels, the project included a raised floor slab and
designers integrated an elevated outdoor seating area acces-
sible by ADA-compliant ramps .
key features
»Located on airport property
»Daylit laboratory facilities
»Robust sound insulation designed into building envelope system
»MWA coordinated the needs of multiple stakeholders
project information
Project Team: MWA Architects
Project Type: Laboratory on airport property
Size: 8,800 SF
Sustainable Elements: LEED Silver Equivalent
Client: Carollo Engineers, San Francisco International Airport
SFO Mel Leong Testing & Admin Facility
san francisco, ca
MWA ARCHITECTS | 7
Oak Harbor Clean Water Facility
oak harbor, wa
MWA was the Architect for this new, sustainable, and innova-
tive Clean Water Facility in a rural community in Washington .
Located within a commercial district on the waterfront, directly
adjacent to the celebrated Windjammer Park, the new labora-
tory facility serves as a civic asset woven into the community
fabric . This project provides a groundbreaking approach to inte-
grating economic development, recreational uses, and critical
public infrastructure into a sensitive community environment .
Incorporating green building technology, the facility engages
and contributes to its urban site, while addressing requirements
of Washington State’s energy code . The Administration and
Maintenance buildings are LEED Silver certified . Harvesting the
heating and cooling from the plant processes, the team
designed a sustainable system that increases the mechanical
efficiency of the buildings and reducing operations costs .
To foster inclusiveness, MWA coordinated with the City of Oak
Harbor and teaming partners to conduct a multi-year public
involvement process . As a result, MWA co-facilitated numer-
ous community outreach meetings, established a large
Community Advisory Group and a project website to inform
and communicate the overall design .
key features
»MWA coordinated the needs of multiple stakeholders Naturally lit and tall ceiling laboratory facilities
»Integration of wastewater treatment into urban environment
»MWA coordinated the needs of multiple stakeholders
project information
Project Team: MWA Architects
Project Type: Laboratory, operations, and maintenance
building on large campus
Size: 3 .25 acres | Building: 68,605 SF
Sustainable Elements: LEED Silver Administration Building
Client: Carollo Engineers
8 | MWA ARCHITECTS
The Emergency Coordination Center is a critical public building
that allows the City of Portland to provide continuity of opera-
tion and management during an emergency . This 30,000 SF
LEED Gold facility is designed to meet Essential Facility stan-
dards and provides flexible office, training, and coordination
space for a number of the City’s emergency management and
security entities . It can also be used as a temporary location for
the City Council .
Most importantly, the ECC reflects the values and commitment
of the City to its citizens . An intense land use process engaged
the public in neighborhood meetings . MWA supported this
outreach effort by gathering feedback from architectural and
landscape preference surveys and producing 3D visuals to
allow the public to envision this project .
The nature of the building requires it to have a high level of self-
sufficiency, allowing for immediate operation during emergency
situations . Onsite resources are integrated into the design to
enable the facility to operate in a ‘stand alone’ condition if utili-
ties, communication, and other infrastructure are not
available .
The ECC was designed with efforts to maximize passive and
sustainable strategies for building operation while minimizing
its impact on local natural processes . Interior daylighting and
efficient insulation design reduce operating costs and the need
to rely on off-site resources . Extensive landscaping and 100%
onsite stormwater infiltration promotes efficient water
management, reduces heat-island effect, and presents a refined
appearance to both the neighbors and adjacent public park .
key features
»MWA coordinated the needs of multiple stakeholders
»Essential facility providing emergency management and high security
»Rainwater harvesting, native low-water landscaping, onsite stormwater infiltration
project information
Project Team: MWA Architects
Project Type: Emergency Coordination Center
Size: 30,000 SF
Sustainable Elements: LEED Gold
Client: City of Portland
Emergency Coordination Center
portland, or
MWA ARCHITECTS | 9
MWA is currently providing tenant improvements for multiple
therapy, clinic, and office spaces at the recently purchased
OHSU Crossings Campus . These facilities are designed to meet
the needs of vulnerable communities . Two clinics and several
infrastructure modernization projects are complete at this time .
MWA is working with diverse stakeholder groups to meet
OHSU’s institutional goals and interior design standards from
space needs and design development through bid, permitting,
and construction administration . Our design approach is
anchored in a collaborative process of engagement where all
voices are heard and valued . Our design team is leading interac-
tive workshops to vet design progress, actively evaluate cost
impact to design solutions from all disciplines, and drive deci-
sion-making to maintain forward progress .
MWA is working closely with OHSU’s IT group and electrical
consultants on low voltage systems such as security and
communications with attention to acoustical privacy to meet
the needs of these specialized user groups .
Featured image from Property Manager Colliers website,
colliers .com
key features
»MWA coordinated the needs of multiple stakeholders
»Architectural programming, space planning, and workflow assessment for medical facilities
»Design of medical clinic space
project information
Project Team: MWA Architects, Landis Consulting
Project Type: Clinic, offices, therapy spaces
Size: 192,047 SF
Sustainable Elements: Design for daylighting; employee
wellness room programming and design; space planning for
building reuse .
Client: Oregon Health & Science University (OHSU)
OHSU Crossings Campus Tenant Improvements
portland, or
10 | MWA ARCHITECTS
The new medical examiner’s (ME) office provides state-of-the
art forensic essential services to many communities in the
Eastern Washington, Northern Idaho, Montana and Oregon
regions . Situated near the south edge of the University District,
the project called for renovation and expansion of an existing
building . The design process included projecting the needs of
the medical examiner’s office for 50 years and ensured the final
design would support the region’s growth in that time .
There was not sufficient room in the existing building footprint
to accommodate the 50-year program that the facility required .
Therefore, a second floor was added to the rear third of the
building . This affords year-round protection for the dual HVAC
systems and a generator capable of supplying all building elec-
trical requirements in an emergency .
The facility has three rooms with multiple tables for conducting
autopsies, quiet spaces to record observations, office spaces,
storage rooms and a room where families of the deceased can
have a private discussion .
The slabs in the ME exhibited sub-surface settling and needed
to be replaced with a new 4-inch slab for under-floor ducts,
new plumbing piping and autopsy floors sloped to drain .
There is an enclosed sallyport to afford a safe, secure and
weatherproof area for staff to transport from vehicles to the
building . There are specially designed spaces for collection and
refuse pickup of hazardous materials, chemical waste, and
soiled laundry .
The facility has the capability of storing up to 100 bodies and a
provision to move two 40-foot self-contained cooler modules
on site for disaster preparedness .
key features
»New construction of Medical Examiner’s Office
»Designed to serve present and future needs
»The building features a Lodox machine, which can rapidly complete full-body X-ray scans .
project information
Project Team: McClaren, Wilson & Lawrie (MWL)
Project Type: Medical Examiner’s Office
Size: 24,000 SF
Client: Spokane County
Spokane County Medical Examiner’s Office
spokane, washington
02.
PROJECT TEAM
11 | MWA ARCHITECTS
2. Project Team
Our approach to team is to balance local knowledge with industry experts . MWA and MWL will
work side-by-side to clarify the needs of the fire and public health programs . We will layer technical
regulatory requirements for a coroner’s suite of spaces and development on an FAA regulated site .
As a service-based firm that prioritizes our clients needs, MWA makes regular site visits.
Project Manager Leslee Randolph will be your primary point of contact for day-to-day commu-
nications, acting as an extension of your team . MWA is partnering with DCI Engineers for Civil
and Structural Engineering, bringing extensive knowledge and working relationships with Kittitas
County to our team . MWA will lean on our past experience working with DCI to provide you with
prompt communication and service .
When pursuing projects, MWA considers our firm’s and teaming partner’s overall workload and
availability . Each identified team member brings critical strengths to your project, is available to
begin this project, and will stay involved throughout . Full team member resumes are on the
following pages.
KITTITAS COUNTY
SUBCONSULTANTS
FSI ENGINEERS
MECHANICAL
Rick Himmel
DCI ENGINEERS
CIVIL & STRUCTURAL
Matt Gibb
LANDIS CONSULTING
ELECTRICAL
Ben Perry
SOUND NORTHWEST
PRECON SERVICES
COST ESTIMATING
Dan Deymonaz
MWL
LAB/CORONER DESIGN
SUBJECT MATTER EXPERT
Bonnie Carver
PRIME CONSULTANT
MWA ARCHITECTS
Jean von Bargen Root
Principal-in-Charge
Project Architect
Leslee Randolph
Project Manager
Programming Lead
Allison Plass
Interior Environments
Lead
Pictured: Lab/Coroner
Design Subject Matter
Expert MWL’s recently
completed Forensic
Biology Lab and Forensic
Chemistry-Trace
Instrument Room .
MWA ARCHITECTS | 12
education
Master of Architecture,
University of Oregon, 2002
Bachelor of Arts in
Architecture, University of
Washington, 1995
Real Estate Development
Certificate, Portland State
University, 2002
Project Management
Certificate, University of
California, Berkeley, 1997
licenses
Registered Architect:
Oregon: #4830
Washington: #9668
National Council of
Architectural Registration
Boards: No . 90374
LEED Accredited
Professional Building Design
+ Construction #10056836
Project Management
Professional: #2039391
affiliations
National Organization
of Minority Architects
(NOMA)
International Living Future
Institute
fellowships
Energy Trust of Oregon Net
Zero Fellowship, 2022
JEAN VON BARGEN ROOT, AIA, LEED AP BD+C, NOMA, PMP,
ASSOC. DBIA principal-in-charge
Jean has been practicing architecture in the Pacific Northwest for over 20 years . As Principal and
Director of Sustainability, she leads MWA’s efforts in resilient design with a focus on materials,
energy, and water . Understanding community facility design as an integrated process, Jean estab-
lishes clear lines of communication between the client/owner, its staff, the design team, and the
contractor while providing technical oversight of the design documents .
relevant experience
• OHSU Crossing Campus Tenant Improvements, Portland, OR
Tenant improvements to multiple therapy, clinic, and office spaces as part of OHSU’s
Behavioral Health Initiative, 15,450 SF, estimated completion ranging from 2025-2027
»OHSU Avel Gordly Center for Healing, Portland, OR
»OHSU Intercultural Psychiatric Program, Portland, OR
»OHSU Resident Faculty Wellness Program, Portland, OR
• Yakima Air Terminal-McAllister Field Modernization, Yakima, WA
Multi-phase modernization of 52,000 SF terminal, estimated construction cost $60M, esti-
mated completion in 2028
• Spokane International Airport Administrative Building, Spokane, WA
New construction of 25,000 SF of office space and 20,000 SF of parking garage, estimated
construction cost of $15 .6M, estimated completion in 2026
• SFO Mel Leong Lab Testing and Administration Facility, San Francisco CA
Renovation to existing 8,800 SF facility, construction cost of $13 .3M, completed in 2020
• Port of Portland On-Call Projects, Portland International Airport, Portland, OR
»Terminal Restroom Modifications
»International Arrivals Canopies
»Hangar 7909 Design/CA
»P1 & P2 Parking Modifications
»Revenue Control Relocation
»Terminal Enplaning Curtainwall Rehabilitation Project
• MWMC Operations & Maintenance Laboratory Building, Eugene, OR
Renovation of 25,000 SF laboratory buildings, construction cost of $16 .5M, completed in 2019
• SFO Ground Transportation Unit Relocation, San Francisco, CA
New construction of 14,000 SF facility, construction cost of $32M, completed in 2018
• Oak Harbor Clean Water Facility (LEED Silver), Oak Harbor, WA
New construction of 3-acre facility, construction cost of $119M, completed in 2018
• City of Portland Emergency Coordination Center, Portland, OR, LEED Gold
New construction of 30,000 SF LEED Gold facility, 12 .3M, completed in 2014
13 | MWA ARCHITECTS
education
Bachelor of Science in
Architecture, Portland State
University, 2005
volunteer
Volunteer, International
Code Council Conference–
Portland, 2011 & 2012
Member, League of Women
Designers, 2010 to 2023
affiliations
American Institute of
Architects Associate (AIA)
contact
503 .416 .8004
lrandolph@
mwaarchitects .com
LESLEE RANDOLPH, ASSOC. AIA
project manager
Leslee has 20 years of professional experience, from the space needs analysis phase through
construction administration . She possesses a keen understanding of spatial relationships and
always considers inspired design, the program, client wishes, budgetary constraints, and code
requirements when approaching her projects . Leslee has a deep understanding of code research,
interpretation, and implementation; extensive knowledge of organizing construction documenta-
tion for larger and smaller scaled projects; and experience with contract preparation .
relevant experience
• Yakima Air Terminal-McAllister Field Modernization, Yakima, WA
Modernization of 52,000 SF terminal, estimated construction cost $60M, estimated comple-
tion in 2030
• Spokane Felts Field Terminal Remodel, Spokane, WA
Rehabilitation of historic terminal after fire damages, 7,500 SF, estimated completion in 2026
• Spokane International Airport Administrative Building, Spokane, WA
New construction of 25,000 SF of office space and 20,000 SF of parking garage, estimated
construction cost of $15 .6M, estimated completion in 2026
• Port of Portland On-Call Projects, Portland International Airport, Portland, OR
»P1 & P2 Parking Modifications
Modifications of two parking garages, $3 .2 million, completed in 2023
»Port of Portland Navigation Building Renovation, Portland, OR
Renovation of an office facility for Port and Army Corp of Engineers, $225,000, completed
in 2017
»Terminal Restroom Modifications
Renovation of 10 airport restrooms, average size of 1,050 SF, construction cost of $3 .5M,
completed in 2020
• Port of Portland TCORE C3 Restroom Upgrades, Portland Itnl Airport, Portland, OR
Renovation of one airport restroom, 1,000 SF, to serve terminal core upgrades, construction
cost of $235,000, completed in 2022
• San Luis Obispo Water Resource Center, San Luis Obispo, CA
Design for new 30,700 SF facility, construction cost of $10 .7M, completed in 2021
• Clean Water Services Operations & Maintenance Building Renovations, Tigard, OR
Renovation and addition to 35,000 SF facility, construction cost of $10M, completed in 2019
• Portland Water Bureau Interstate Renovation Project, Portland, OR, LEED Gold
Renovation of 78,000 SF facility, construction cost of $36M, completed 2016
MWA ARCHITECTS | 14
education
Bachelor of Science in
Graphic Design; Bachelor of
Science in Arts & Letters;
Minor in Architecture,
Portland State University,
2006
affiliations
Society for Experiential
Graphic Design (SEGD)
Member
volunteer
Cascadia Clusters, Tiny
House on Wheels, Graphic
Designer Volunteer, 2020
Design Week Portland,
Good Neighbors Event,
Graphic Designer Volunteer,
2020
SOLVE Oregon, Marketing
Committee Member and
Graphic Designer Volunteer,
2013-2019
Vibe of Portland, Art
Teacher Assistant and
Graphic Designer Volunteer,
2015-2017
contact
503 .416 .8125
aplass@
mwaarchitects .com
ALLISON PLASS
project manager, interior environments lead
Allison is a skilled listener and communicator with a background in visual communications . She
leads MWA’s Interior Environments Studio, weaving creativity into her process when managing
project teams . Allison is passionate about collaborating with clients, consultants, and stakehold-
ers to inspire creative problem solving and produce exceptional work . Her portfolio includes over
fifteen years of experiential graphic design and project management .
relevant experience
• OHSU Crossing Campus Tenant Improvements, Portland, OR
Tenant improvements to multiple therapy, clinic, and office spaces as part of OHSU’s
Behavioral Health Initiative, 15,450 SF, estimated completion ranging from 2025-2027
»OHSU Avel Gordly Center for Healing, Portland, OR
Tenant improvements to therapy and office space as part of OHSU’s Behavioral Health
Initiative, 3,975 SF, estimated completion in 2026
»OHSU Intercultural Psychiatric Program, Portland, OR
Tenant improvements to therapy and office space as part of OHSU’s Behavioral Health
Initiative, 7,475 SF, estimated completion in 2025
»OHSU Resident Faculty Wellness Program, Portland, OR
Tenant improvements to therapy and office space as part of OHSU’s Behavioral Health
Initiative, 2,285 SF, estimated completion in 2026
»OHSU Information Technology Group / Revenue Cycle, Portland, OR
Tenant improvements to office space, 19,900 SF, estimated completion in 2027
• Spokane Felts Field Terminal Remodel, Spokane, WA
Rehabilitation of historic terminal after fire damages, 7,500 SF, estimated completion in 2026
• Spokane International Airport Administrative Building, Spokane, WA
New construction of 25,000 SF of office space and 20,000 SF of parking garage, estimated
construction cost of $15 .6M, estimated completion in 2026
• OHSU Crossing Campus Telecom Rooms, Portland, OR
Design and MEP coordination of 12 new telecom rooms that will provide power and data to
the entire campus, 1,740 SF (145 SF each), estimated completion in 2026
• OHSU Crossings Campus Facilities Permit Program Facilitation, Portland, OR
Development of FLS plans and facilitation of registration into the City of Portland’s Facilities
Permit Program (FPP), completed in 2025
• Oak Harbor Clean Water Facility, Oak Harbor, WA, LEED Silver
Construction of 3-acre facility containing operations and maintenance, solids, secondary treat-
ment, headworks, and electrical buildings, construction cost of $119M, completed in 2018
15 | MWA ARCHITECTS
Bonnie J. Carver
AIA, NCARB
Senior Principal
EXPERTISE
Forensic Science Laboratories
Forensic Pathology Facilities
Public Health Laboratories
High-Containment Laboratories
Research Laboratories
University Laboratories
SERVICES PROVIDED
Master Planning
Space Needs Assessments
Programming
Design
Construction Administration
REGISTERED ARCHITECT
Alabama
Arkansas
Delaware
Florida
Kentucky
Louisiana
Maine
Maryland
Missouri
Pennsylvania
Rhode Island
Virginia
EDUCATION
Bachelor of Architecture
Virginia Tech – 1997
PROFESSIONAL AFFILIATIONS
National Council of Architectural
Registration Boards (NCARB)
American Institute of Architects (AIA)
Bonnie brings over 25 years of architectural expertise, specializing in
the planning and design of forensic science laboratories and forensic
pathology facilities. Throughout her career, she has successfully
balanced design intent with project budgets, ensuring seamless
continuity from initial concept through construction administration.
Renowned for her meticulous attention to detail, Bonnie instills a high
level of confidence in her clients, assuring them that every aspect of
the project is executed with precision from the outset. Her diverse and
extensive background equips her with technical expertise to manage
and deliver innovative solutions for complex, high-stakes projects. A
testament to her skill and leadership, she played a key role in the
design of the award-winning 665,000-square-foot Forensic Services
and Coroner’s Complex in Toronto, Canada.
Bonnie’s in-depth knowledge of forensic science laboratories and
forensic pathology facilities is further evidenced by her involvement in
numerous renovation and new construction projects of various sizes
across the country.
Representative Project Experience:
Medical Examiner’s Office - Jefferson County -Birmingham, Alabama
Scientific Detection Laboratory – State of Alaska-Anchorage
Crime Laboratory – State of Arkansas-Little Rock
Crime Laboratory - City of Long Beach, California
Coroner’s Office - San Mateo County-San Mateo, California
Office of Chief Medical Examiner – City & County of San Francisco,
California
District 7 Office of the Medical Examiner - Volusia County-Daytona
Beach, Florida
Medical Examiner Facility - St. Lucie County -Fort Pierce, Florida
District 1 Medical Examiner’s Office - Santa Rosa County -Milton, Florida
Medical Examiner’s Office - Georgia Bureau of Investigation -Decatur
Medical Examiner’s Office - Cobb County -Marietta, Georgia
Medical Examiner - State of Iowa -Ankeny, Iowa
Forensic Science Laboratory - Kansas Bureau of Investigation -Topeka
Coroner’s Office - Calcasieu Parish -Lake Charles, Louisiana
Eastern Regional Forensic Laboratory - Maryland State Police -Berlin
Forensic Laboratory, District Headquarters - Michigan State Police -
Grand Rapids
Regional Medical Examiner’s Office - Hennepin County -Minnetonka,
Minnesota
Crime Laboratory - Jefferson County -Hillsboro, Missouri
Clarkson Campus Regional Medical Examiner Facility - Atrium Health
Wake Forest Baptist -Winston Salem, North Carolina
Forensic Science Center - Franklin County -Columbus, Ohio
Office of the Chief Medical Examiner - State of Oklahoma -Oklahoma
City
Forensic Services Building - City of Charleston, South Carolina
Crime Laboratory Consolidated Facility - Tennessee Bureau of
Investigation -Jackson
Forensics Laboratory, Office of the Chief Medical Examiner -Central
District - Commonwealth of Virginia -Mechanicsville
Consolidated State Laboratory - State of West Virginia -Charleston
MWA ARCHITECTS | 16
Russell H. McElroy
AIA NCARB
Senior Principal
EXPERTISE
Forensic Science Laboratories
Forensic Pathology Facilities
Public Health Laboratories
High-Containment Laboratories
Research Laboratories
University Laboratories
SERVICES PROVIDED
Master Planning
Space Needs Assessments
Programming
Design
Construction Administration
REGISTERED ARCHITECT
Arkansas
Georgia
Indiana
Kansas
Louisiana
Maryland
Nebraska
New Hampshire
Ohio
Oklahoma
South Carolina
Texas
Virginia
EDUCATION
Bachelor of Architecture
Virginia Tech – 1992
PROFESSIONAL AFFILIATIONS
National Council of Architectural
Registration Boards (NCARB)
American Institute of Architects (AIA)
National Fire Protection Association
(NFPA)
Russell is a highly skilled architect with over 30 years of expertise
dedicated to the planning and design of forensic science laboratories
and forensic pathology facilities. He has successfully led projects
through all phases, from pre-design assessments and programming
to construction administration. With experience spanning facilities
from 1,500 to 665,000 square feet, Russell is a trusted advisor
renowned for helping clients optimize their forensic environments to
meet specific operational needs.
Areas of Expertise:
Forensic Science Laboratories:
In-depth expertise in designing diverse analytical laboratories,
including: DNA, drug chemistry, toxicology/breath/blood, latent print,
firearms, digital/computer, trace evidence, evidence control, police
identification, and shared lab support systems.
Forensic Pathology Facilities
Designed the first autopsy suite in the U.S. to pursue BSL3
certification with the CDC/NIH. Led the development of Canada’s
first CL3 autopsy suite, setting benchmarks in high-containment
forensic pathology design. He is the only architect to patent an all-
new design autopsy table product.
High-Containment Laboratories
Specialized in BSL3 and BSL4 laboratory design, including: The
Haitian National Laboratory’s first public health BSL3 laboratory.
Specialized Laboratories
Extensive experience designing facilities tailored to unique scientific
and operational needs, such as: public health laboratories, high-
hazard chemical containment, cold rooms, and nuclear clean rooms
(ISO 5 and EU Class A), nanotechnology, TEM, laser, blood and
water testing facilities, molecular labs, and microbiology labs.
Representative Project Experience:
Medical Examiner’s Office - Jefferson County-Birmingham, Alabama
Crime Laboratory - City of Long Beach, California
Coroner’s Office - Placer County-Roseville, California
Medical Examiner’s Office - Georgia Bureau of Investigation-Decatur
Medical Examiner - State of Iowa-Ankeny
Forensic Science Laboratory - Kansas Bureau of Investigation-Topeka
Eastern Regional Forensic Laboratory - Maryland State Police-Berlin
Forensic Laboratory, District Headquarters -- Michigan State Police-
Grand Rapids
Regional Medical Examiner’s Office - Hennepin County-Minnetonka,
Minnesota
Crime Laboratory - Jefferson County-Hillsboro, Missouri
Regional Medical Examiner's Office - Washoe County-Reno, Nevada
Clarkson Campus Regional Medical Examiner Facility - Atrium Health
Wake Forest Baptist-Winston Salem, North Carolina
Forensic Science Center - Franklin County-Columbus, Ohio
Donald Betz STEM Research & Learning Center - University of Central
Oklahoma-Edmond
DNA Laboratory - Pennsylvania State Police-Greensburg
Forensic Services Laboratory – SLED-Columbia, South Carolina
Crime Laboratory Consolidated Facility - Tennessee Bureau of
Investigation-Jackson
Holcombe Laboratory Expansion – City of Houston, Texas
Unified State Laboratory - State of Utah-Salt Lake City
17 | MWA ARCHITECTS
Rick Himmel
PE, LEED AP | Principal
Rick is a professional mechanical engineer with 40 years of experience. He
has been the mechanical project manager for facilities such as hospitals,
fire stations, and city hall/police stations. Rick delivers a fundamental and
intuitive grasp of mechanical systems coupled with excellent customer service.
He specializes in HVAC, plumbing and medical gas systems design & pre-
construction for healthcare, underfloor HVAC systems, office building and
public facility HVAC and plumbing, and biotechnology & chemistry laboratories
HVAC systems.
Project Examples
King County Harborview Medical Center Facility Assessment &
Strategic Facility Master Plan
Lead Project Engineer for the development of a strategic facilities plan for
King County and Harborview Medical Center to meet the needs of the mission
population while successfully addressing identified facilities needs. The project
also included assessing and advising the County on City of Seattle regulatory
requirement and providing costing information and assessment of options.
Whatcom County Way Station
Mechanical Project Engineer for TI for the new Way Station. The project
renovated Whatcom County’s 1500 N. State Street building in Bellingham. The
Way Station includes medical and behavioral clinic, county medical examiner,
coroner’s office, and other County offices.
Seattle Children’s Hospital Odessa Brown Clinic
Mechanical Engineer for a new 35,000 sf pediatric healthcare clinic owned
by Seattle Children’s Hospital. The project takes the SEOC Building C and fills
the lower two floors with this clinic. The mechanical scope included HVAC,
plumbing, piping, and fire protection.
City of Issaquah Pickering Barn Air Conditioning Addition
Mechanical Principal in Charge for the addition of air conditioning to a 12,000
sf event venue owned by the City of Issaquah. The facility was built in 1906
as a dairy barn and is now on the National Register of Historic Places. FSi
provided mechanical and electrical engineering for the project.
North Mason Regional Fire Authority New HQ
Mechanical Principal in Charge for a a new design-build 20,000 sf fire
station headquarters with four apparatus bays, training rooms for up to 30
people, dormitory sleeping quarters with common areas, fitness rooms, and
administration offices, and other support spaces. Our scope included HVAC
and plumbing for the facility. The engineering team worked closely with the
architect to design concealed systems that allowed the facility to benefit from
the high cupola windows and their natural light.
Education
University of Washington,
BSME, 1984
Licenses & Registrations
PE, Mechanical: WA, 1989
Affiliations
Member, ACEC, AIA, DBIA
Key qualifications
40 years of experience
HVAC, plumbing, and
fire protection expertise
Proven healthcare
knowledge
Extensive experience in
critical 24/7 facilities
Rick is currently partnering with MWA Architects on the Yakima Air Terminal-
McAllister Field Modernization project .
MWA ARCHITECTS | 18
1
DCI ENGINEERS
PROFESSIONAL TITLE:
Principal
EDUCATION:
B.S., Civil Engineering,
University of Idaho, 1997
REGISTRATION:
Civil & Structural: Washington
PROFESSIONAL SOCIETIES:
Structural Engineers Association
of Washington – Spokane Chapter
(SEAW)
American Institute of Architects –
Spokane Chapter (AIA)
Society of American Military
Engineers
DAVID GIORDANO, PE, SE, LEED® AP
SPOKANE, WASHINGTON
With over twenty-five years of design experience, David Giordano has a
proven track record of delivering innovative solutions for complex projects
throughout the United States. His expertise spans across various sectors
including medical, commercial, residential, educational, municipal, and indus-
trial. David has a reputation for managing large-scale projects from con-
ception through completion, consistently meeting client expectations while
adhering to stringent quality standards. He excels at leading and managing
teams to deliver high-quality engineering solutions. He believes in fostering
collaboration among team members and stakeholders to achieve project
goals efficiently and effectively.
SPOKANE INTERNATIONAL AIRPORT ADMINISTRATION BUILDING,
Spokane, WA, MWA Architects
YAKIMA AIR TERMINAL, Yakima, WA, MWA Architects
FELTS FIELD TERMINAL RENOVATION, Spokane, WA, MWA Architects
STEVENS COUNTY COURTHOUSE, Colville, WA, ALSC Architects
SPOKANE COUNTY SHERIFF’S OFFICE SMALL ARMS RANGE & TRAINING
FACILITY, Spokane, WA, ClarkNexsen
NORTH MASON FIRE DISTRICT AUTHORITY HEADQUARTERS,
Belfair, WA, Architects West
SPOKANE FIRE DEPARTMENT TRAINING CENTER, Spokane, WA,
ALSC Architects
FIRE STATION 4, Lewiston, ID, Architects West
SPOKANE COUNTY FIRE DISTRICT #8 - STATION 81, Spokane, WA,
Denny Christenson & Associates
FAIRCHILD AIR FORCE BASE FIRE STATION ADDITION, Fairchild AFB, WA,
Denall Contractors
MILLWOOD FIRE STATION, Millwood, WA, Denny Christenson & Associates
CITY OF SPOKANE VALLEY CITY HALL, Spokane Valley, WA, Architects West
COLVILLE TRIBAL GOVERNMENT CENTER, Colville, WA, Architects West
FRONTIER BEHAVIORAL HEALTH - HILLYARD, Spokane, WA,
Herath & Associates
FRONTIER BEHAVIORAL HEALTH - 1ST AVE, Spokane, WA,
Herath & Associates
VA MEDICAL CENTER ENDOSCOPY & SPD ADDITIONS, Spokane, WA,
NAC Architecture
19 | MWA ARCHITECTS
BEN PERRY, P.E.
PRESIDENT, ENGINEER OF RECORD
YEARS OF EXPERIENCE
18
LICENSES
Professional Engineer:
2026 / Oregon / No. 86683
2025 / Washington / No. 51868
2026 / California / No. 20963
2026 / Arizona / No. 58937
EDUCATION
BSEE / 2007 /
Electrical Engineering
Grove City College,
Grove City PA
VOLUNTEER
Marion Polk Food Share –
Board of Directors (Finance Committee)
CONTACT INFORMATION
Phone: (503)-584-1576
Cell: (503)-580-9600
Fax: NA
Email: ben_perry@landisconsulting.com
Website: landisconsulting.com
Ben Perry's is the Engineer of Record for Landis Consulting. He manages projects for the
public works agencies and cities, municipal water and wastewater industries, K-12 and
healthcare projects in the AEC Industry. His designs are clear, simple, and practical. They
weave together cost-efficiency, constructability, and technical expertise. Ben Perry and
Landis Consulting have earned a reputation in the AEC industry for client service,
thoughtful designs, creativity, constructability, and minimal change orders.
Key Project Experience
Yakima Airport Modernization (McAllister Field) (Yakima, WA). Remodel and
modernization of existing two-story airport, including sterile areas, non-sterile
areas, baggage claim, waiting areas, and support spaces. Design is in multiple
phases and project currently has completed Phase 1 design and we are in Phase
II design.
Port of Portland, Portland International Airport – On Call (Portland, OR). On-
call work for Port of Portland, including modernization of enplaning doors,
chiller upgrades, maintenance shop improvements, HVAC system
improvements, escalator and elevator modernizations, signage improvements,
retail tenant fit out, restroom modernizations, and baggage claim upgrades.
Troutdale Airport – Control Tower Improvements (Troutdale, OR). Electrical
service, power distribution, and HVAC upgrades for control tower. Design
included developing construction sequencing plans to limit down time.
Hillsboro Airport – Security Camera Upgrades, (Hillsboro, OR). New security
cameras for regional airport.
New Porsche Dealership (Lynwood, WA). New 60,000 SF (approx.) dealership
with showrooms, maintenance shop, and significant EV charging infrastructure.
New Lincoln Phase II Affordable Housing (Vancouver, WA). New 40,000 SF
(approx.) multi-story affordable housing complex.
Portland Water Bureau Ground Water Pump Station Electrical Renovations
(Portland, OR). Landis is the prime consultant and has provided the design for
replacement of seven 5kV medium voltage motor control centers. Additionally,
the design included complete replacement and upgrade of the control system
wiring.
Portland Water Bureau – Washington Park Reservoir Improvements (Portland,
OR). Power and control systems for reservoir improvements project. Design
included landscape lighting, security surveillance cameras, and electronic gate
access control systems.
Salem Keizer School District Security System Upgrades (Salem, OR). Security,
electronic access control, and intrusion system design for multiple schools.
Ben is currently partnering with MWA Architects on the Yakima Air Terminal-
McAllister Field Modernization project and the OHSU Crossing Campus
Tenant Improvements project .
MWA ARCHITECTS | 20
DAN DEYMONAZ
Owner / Senior Cost Estimator
With over 35 years of industry experience, I have partnered with all project
members to provide reliable, meaningful, and accurate cost estimating
services. I have collaborated with owners, stakeholders, and designers to
assist project teams with understanding and managing construction costs. My
focus as the owner of Sound Northwest Precon Services, is to provide
collaborative and selfless leadership to the clients and stakeholders I serve.
EDUCATION
Eastern Washington University - General Physics, Mathematics Cheney, WA
SELECT EXPERIENCE
NorthStar CG, Fall City, Washington
Employment – 12yrs. Roles included Sr. Project Manager, Sr. Estimator, and Chief Estimator.
NorthStar CG is the #1 Demolition and Remediation Contractor in the USA (ENR-2020). Over $5 billion of
projects successfully completed since 1986. NorthStar CG is a full-service emergency and disaster
response team.
• Dayton, TN Silo Fire
• Griffin Wheel Plant – Winnipeg, CA
o Catastrophic Fire Restoration & Reconstruction
• www.northstar.com
Spokane International Airport,
Pre-Design through CD Cost Est. $36MM
40,288 sf Airport Administration Building with an 8,351 sf Pre-Manufactured Parking Structure and 123,560
sf of site work. This project is currently under construction with an 18-month duration. Sound Northwest
Precon Services was hired by the Design Team to provide side by side estimates with the awarded GC of
the project. SNW Precon Services provided cost estimates from Conceptual Pre-Design through GMP.
03.
REFERENCES
MWA ARCHITECTS | 21
3. References
ROBERT HODGMAN
Airport Director, Yakima Air Terminal
3106 West Washington Avenue, Yakima, Washington, 98903
robert .hodgman@yakimawa .gov | (509) 575-6260
Modernization and expansion of 52,000 SF air terminal to a total of 80,000 SF, estimated
construction cost $68M, estimated completion in 2028 .
LISA CORCORAN
Chief Development Officer, Spokane International Airport, Felts Field & Airport Business Park
9000 West Airport Drive, Suite #204, Spokane, WA 99224
lcorcoran@spokaneairports .net | (509) 808-6577
New construction of 25,000 SF of office space and 20,000 SF of parking garage, estimated
construction cost of $15 .6M, estimated completion in 2026 .
HALLIE ERVIN
Construction Project Manager, Design and Construction, Research and Education, Oregon
Health & Science University (OHSU)
3930 S Macadam Ave, Portland, OR 97239
ervinh@ohsu .edu | (503) 475-9757
Tenant improvements to multiple therapy, clinic, and office spaces as part of OHSU’s
Behavioral Health Initiative, 15,450 SF, estimated completion ranging from 2025-2027 .
MWA Architects are excellent collaborators . They listened to our needs, input,
and feedback every step of the way . They developed and adjusted concepts
according to the comments of staff . Their insights and experience helped us to
meet our end goals . They always wanted what was best for us and our project
and worked towards that end with outstanding knowledge and skill .”
- Robert Pyle, Former Facilities Manager, BES, City of Portland
04.
PROJECT
UNDERSTANDING
& APPROACH
MWA ARCHITECTS | 22
4. Project Understanding & Approach
Kittitas County (County) is seeking architectural and engineering services to conduct a needs
analysis and feasibility study for locating a new safety and health facility on Kittitas County Airport
Property . This facility would enable the Kittitas County Coroner’s Office (Coroner’s Office) and
Public Health Department (Public Health Department) to be moved to one location in partnership
with Kittitas Valley Fire & Rescue (KVFR) . With 1301 .03 acres of county land on the airport prop-
erty, it is sensible to construct a new facility on land that does not require further purchase .
The County is experiencing growth, particularly to the north, prompting the development of a
20-year comprehensive plan . The 2021 Kittitas County Comprehensive Plan states that, “Kittitas
County addresses challenges of future growth in a direct manner . Coordinated planning and
suitable density patterns ensure that rural areas, natural areas, and working lands are sustained
for the benefit of current and future generations .” The City of Ellensburg is the County seat and
as such fosters the future planning of the County to support the growing populations with critical
services such as fire response, public health services, coroner services, water, wastewater, and
public works .
Currently co-located within the approximately 100-year-old Morris Sorenson Building at 507 N
Nanum Street, Ellensburg, WA, the Coroner’s Office and Public Health Department have
outgrown their facilities . The Coroner’s Office relies on both local funeral homes for morgue
related services to support Coroner’s Office duties . The Public Health Department currently serves
the public from limited space and with limited amenities . Due to the population growth, KVFR
needs to develop an additional station . To efficiently perform the duties of the Coroner’s Office,
Public Health Department, and KVFR, a new, modern facility is required .
The interconnected relationship between the duties of the Public Health Department and
Coroner’s Office are providing data sources such as:
• Issuing death certificates to track mortality rates
• Identifying specific types of deaths to track emerging trends in infectious diseases, drug over-doses, fire-arm related deaths and other potential public health concerns
• At times, requiring joint investigations between the department and the Coroner’s Office to identify environmental or disease related deaths
Pictured: Bowers Field as
captured by pilot .
Dougherty, Pete, “Bowers
Field”, Google Reviews, 2020
23 | MWA ARCHITECTS
By co-locating with the KVFR, the County will improve fire response, Coroner’s Office and
Public Health Department ability to serve, and the potential for State of Washington and
federal funding sources to offset funding from the County. In addition, by providing a new facil-
ity on the existing underdeveloped County owned property at Bowers Field, this can also serve
as an Aircraft Rescue and Fire Fighting Station (ARFF), providing immediate response to both
airport needs while acting as a fire station for the growing community .
mwa supports our clients in securing project funding
MWA understands and has experience coordinating with the Federal Aviation Administration
(FAA) during design and development of greenfield sites within airport campuses, and is familiar
with regulations and requirements . MWA will implement our Program Roadmap exercise while
creating the feasibility study . MWA’s Roadmap identifies and documents phases of project devel-
opment, including researching, applying, and ultimately securing federal grant funding . Through
this Road Mapping, we provide timelines and available funding sources and align this with project
development scope . Examples of projects that MWA secured funding for and the associated
funding agencies are listed below:
• Department of Energy (DOE) - Pendleton Bus Barn (Transit)
• Department of Transportation (DOT) - Pendleton Bus Barn (Transit)
• FAA and DOT - Yakima Air Terminal-McAllister Field (Aviation and Air Cargo)
• FAA - Port of Portland (Aviation)
• DOT - Sandy Operations Center Expansion (Transit and Public works)
MWA supports local governments throughout Washington and Oregon in researching, applying
and securing grant funding . By utilizing a capital improvement program Roadmap exercise, MWA
helps our clients find supplemental funding for projects that may otherwise have limited funds
allocated within city and county capital improvement budgets . Overall, the program Roadmap
aids the County stakeholders in utilizing existing public funds .
The County is performing its due diligence to provide the most economical solution to these
identified needs by requesting a feasibility study . The approach of coupling the Coroner’s Office
and the Public Health Department needs with KVFR needs, simultaneously increases the likeli-
hood of voter support for a future bond and lessens the cost burden from the County budget .
MWA will use our past experience supporting and procuring grant money to assist the County
in bringing their vision to life.
MWA shall support this feasibility study by providing space needs and programming interviews
and workshop, a site and systems selection workshop, and a site and personnel workflow analysis
to look for spatial and programming overlaps . This allows us to right size the new facility while
providing the much-needed program elements for the different stakeholder groups . MWA regu-
larly coordinates with stakeholder groups across departments and agencies, sometimes with
conflicting or contradictory needs, to provide beautiful, economically responsible design solutions .
MWA’s design solution will support the end users and the greater Kittitas County community .
Our programming process to quickly right-size and optimize site infrastructure and location
within Bowers Field is outlined in the diagram below.
MWA designed Pendleton Bus
Barn to be built in phases as it
receives funding . After securing
DOE and DOT funding, phase one
is complete (pictured above) .
LISTENINGDESIGN . ITERATION . REFINE . SHARELISTENING
Discovery Identify
Stakeholders
Standards +
Best Practice
Management
Verification
Architectural
Program/
Space Needs
Massing
Studies/
Alternatives
Development
Refine
Alternatives +
Cost
Development
Precedents Campus/Site
Alternatives
Workshop
Site +
Workflow
Analysis
Client Input Refine preferred
alternative to
15% + refine cost
for final report
MWA ARCHITECTS | 24
Once space planning is complete, we will develop a rough order of magnitude cost estimate for
each preferred alternative . By the end of the feasibility study, the County will have enough
documentation to move forward with FAA required submittals like 7460-1 Notice of Proposed
Construction and National and State Environmental Policy Acts (NEPA/SEPA) if they choose to
continue with the development process .
a dedicated and experienced team
It is recognized by the County Commissioners that it is efficient to maintain co-location of these
departments/offices while providing additional space, improved program elements, and improved
building infrastructure . This includes mechanical, electrical, plumbing and modern code compliant
laboratory space(s) which include areas for refrigeration, autopsies, indigent cremation services,
and laboratories appropriate to the Coroner’s Office and Public Health needs . MWA’s proposed
team includes all disciplines for a successful feasibility study: Civil, Structural, Mechanical,
Electrical, Plumbing, Security, Data, Information Technology, and Cost Estimator . Each teaming
partner is experienced the central and east side of Washington State . MWA is also teaming with
Subject Matter Expert McClaren, Wilson & Lawrie (MWL), who has 25 years of experience with
design focused on forensic, medical examiner and coroner’s facilities, and public health labo-
ratories and facilities. MWL recently completed the medical examiner’s office for Spokane
County, which is highlighted in this proposal .
POTENTIAL CHALLENGES MWA’S MITIGATION TECHNIQUE
Identifying and coordinating multiple stakeholder groups
needs . This project will need to adhere with the Kittitas
County Airport property requirements while serving the
needs of multiple agencies .
MWA will provide time in the schedule to meet with each
stakeholder to understand their needs . This iterative process
requires the appropriate time to create design techniques that
gain consensus from all user groups .
The preferred location zoning may or may not allow by
right for this use .
Should the preferred location not allow by right for this use,
MWA would bring in a land use planning consultant after the
feasibility study is complete .
When designing something to be built on an airport site,
siting it for FAA requirements .
MWA would coordinate FAA inclusion and predesign
requirements .
Potentially need to update the Airport Layout Plan FAA
(ALP) .
Confirm if required and include next steps and timeline
required to update in feasibility conclusions .
Airplane fuel is historically leaded . This may trigger
environmental concerns .
MWA would bring in an environmental teammate to conduct
environmental investigations of preferred site .
05.
SUPPORTING DATA
MWA has included all information in the prior pages
of the proposal and has no additional information to
share at this time .
Thank You
MWA Architects
501 SE 14th Avenue #103, Portland, OR 97214
Phone: 503 .973 .5151
Email: jvonbargen@mwaarchitects .com
November 04, 2025
Rate Tables
“Kittitas County Public Health and Safety Facility”
MWA Architects, Inc.
2025 2026 2027
Principal/SME $260.00 $278.20 $297.67
Project Manager $205.00 $219.35 $234.70
Project Architect $200.00 $214.00 $228.98
Designer 4 $176.00 $188.32 $201.50
Designer 2 $137.00 $146.59 $156.85
Designer 1 $118.00 $126.26 $135.10
FSi Engineers
2025 2026 2027
Principal $ 310.00 $ 331.70 $ 354.92
Mechanical Principal Engineer $ 285.00 $ 304.95 $ 326.30
Electrical Principal Engineer $ 285.00 $ 304.95 $ 326.30
Fire Protection Engineer $ 285.00 $ 304.95 $ 326.30
Project Manager A $ 205.00 $ 219.35 $ 234.70
Project Manager B $ 180.00 $ 192.60 $ 206.08
Mechanical Engineer Level 7 $ 200.00 $ 214.00 $ 228.98
Electrical Engineer Level 7 $ 200.00 $ 214.00 $ 228.98
Mechanical Engineer Level 6 $ 180.00 $ 192.60 $ 206.08
Electrical Engineer Level 6 $ 180.00 $ 192.60 $ 206.08
Mechanical Engineer Level 5 $ 170.00 $ 181.90 $ 194.63
Electrical Engineer Level 5 $ 170.00 $ 181.90 $ 194.63
Mechanical Engineer Level 4 $ 150.00 $ 160.50 $ 171.74
Electrical Engineer Level 4 $ 150.00 $ 160.50 $ 171.74
Mechanical Engineer Level 3 $ 140.00 $ 149.80 $ 160.29
Electrical Engineer Level 3 $ 140.00 $ 149.80 $ 160.29
Mechanical Engineer Level 2 $ 130.00 $ 139.10 $ 148.84
Electrical Engineer Level 2 $ 130.00 $ 139.10 $ 148.84
Mechanical Engineer Level 1 $ 120.00 $ 128.40 $ 137.39
Electrical Engineer Level 1 $ 120.00 $ 128.40 $ 137.39
Engineering Intern $ 100.00 $ 107.00 $ 114.49
CAD Manager $ 175.00 $ 187.25 $ 200.36
CAD Drafter A $ 130.00 $ 139.10 $ 148.84
CAD Drafter B $ 120.00 $ 128.40 $ 137.39
Project Accountant $ 145.00 $ 155.15 $ 166.01
Project Administration $ 115.00 $ 123.05 $ 131.66
Project Coordinator $ 120.00 $ 128.40 $ 137.39
Commissioning Lead $ 175.00 $ 187.25 $ 200.36
Commissioning $ 155.00 $ 165.85 $ 177.46
DCI - Civil
2
2025 2026 2027
Principal $ 228.00 $243.96 $261.04
Associate Principal $ 208.00 $222.56 $238.14
Associate $ 187.20 $200.30 $214.33
Senior Project Manager $ 187.20 $200.30 $214.33
Project Manager $ 166.40 $178.05 $190.51
Senior Project Engineer $ 145.60 $155.79 $166.70
Project Engineer $ 145.60 $155.79 $166.70
Senior Technical Designer $ 166.40 $178.05 $190.51
Project Accountant $ 166.40 $178.05 $190.51
DCI - Structural
2025 2026 2027
Principal $260.00 $278.20 $297.67
Associate Principal $228.00 $243.96 $261.04
Associate $208.00 $222.56 $238.14
Senior Project Manager $187.20 $200.30 $214.33
Project Manager $166.40 $178.05 $190.51
Senior Project Engineer $145.60 $155.79 $166.70
Project Engineer $124.80 $133.54 $142.88
Clerical and Admin $104.00 $111.28 $119.07
Senior Technical Designer $145.60 $155.79 $166.70
Technical Designer $104.00 $111.28 $119.07
Sound NW Precon Services
2025 2026 2027
Lead Estimator $ 165.00 $ 176.55 $ 188.91
Senior Estimator $ 165.00 $ 176.55 $ 188.91
Mechanical $ 215.00 $ 230.05 $ 246.15
Electrical $ 175.00 $ 187.25 $ 200.36
MWL Architects
2025 2026 2027
Senior Principal $ 305.00 $ 326.35 $ 349.19
Principal $ 265.00 $ 283.55 $ 303.40
Associate $ 235.00 $ 251.45 $ 269.05
Junior Associate $ 215.00 $ 230.05 $ 246.15
Senior Architect/Lab Planner $ 205.00 $ 219.35 $ 234.70
Architect $ 175.00 $ 187.25 $ 200.36
Project Manager/Lab Planner/BIM
Manager
$ 175.00 $ 187.25 $ 200.36
Technical Staff $ 125.00 $ 133.75 $ 143.11
Landis Consulting Engineers
2025 2026 2027
3
Principal $ 225.00 $ 240.75 $ 257.60
Electrical Engineer $ 180.00 $ 192.60 $ 206.08
Electrical Designer $ 110.00 $ 117.70 $ 125.94