Loading...
HomeMy WebLinkAboutEXHIBIT A_Kittitas Public Health_Feasibility Study_MWA Scope and Fee_2025 11 04 (002) November 04, 2025 Scope of Services “Kittitas County Public Health Facility Feasibility Study” Cori McKean, D-ABMDI, Kittitas County Interim Coroner Kittitas County 507 N. Nanum Street, #113A Ellensburg, WA 98926 Dear Ms. McKean, Thank you for the opportunity to work on this project. Our project understanding is outlined below and is based on our proposal dated August 1, 2025 (attached). Following the project understanding is our scope; first by discipline followed by scope by task. The tasked scope numbering, and language directly coincide with tasks listed in our budget. This project will be invoiced monthly as tasks are completed, on a lump sum basis. Our schedule of values by task are listed with each task within this document. PROJECT UNDERSTANDING Kittitas County (County) needs a feasibility study for locating a new safety and health facility at Kittitas County Airport Property. This facility would enable the Kittitas County Coroner’s Office (Coroner’s Office) and Public Health Department (Public Health Department) to be moved to one location in partnership with Kittitas Valley Fire & Rescue (KVFR). Currently co-located within the approximately 100-year-old Morris Sorenson Building at 507 N. Nanum Street, Ellensburg, WA, the Coroner’s Office and Public Health Department have outgrown their facilities. Due to population growth, KVFR needs to develop an additional station. This project is within the City of Ellensburg jurisdiction and is subject to the 2021 (with amendments) Washington State Building Code and all other codes and regulations applicable to the concepts proposed. PROJECT SCOPE For architectural/interiors • Program (space planning) development and documentation for building and site. • Prepare a written basis of design architectural narrative for the proposed building including building and planning code analysis. 2 • For Feasibility Study, develop building massing studies and locate on site in collaboration with Basis of Design recommendations for cost effective development, local codes and regulations and FAA development criteria. • Facilitate development of criteria for building siting and alternative selection. For civil • Preliminary recommendations for civil and stormwater design, including site access, parking, setbacks, and identification of cost related design elements such as utility access. • Prepare a written basis of design civil narrative for the proposed building and site. For mechanical, fire protection, water conservation, and plumbing design • Preliminary recommendations for heating, cooling and ventilation systems with consideration to energy conservation. • Prepare a written basis of design mechanical, fire protection, and plumbing narrative for the proposed building and site. For electrical, lighting, security, data, audio-visual and fire alarm • Preliminary recommendations for electrical and lighting systems with consideration to energy conservation. • Prepare a written basis of design electrical and lighting narrative for the proposed building and site. Schedule: Complete by December 31, 2025 PROJECT TASKS 1. Project Management - $4,000 MWA shall manage prime contract related to this project. MWA will invoice monthly by completed Task in a lump sum invoice. This project is planned and budgeted for a six (6) week duration. The design team will meet bi-weekly to cover updates in scope, schedule, budget and coordination planning. Deliverables: Monthly invoice /reporting on a lump sum basis, kick-off meeting agenda and notes in collaboration with County Project Manager Meetings: One (1) Kick-off meeting. Weekly check-in with County Project Manager 2. Review Existing Information and Space Needs - $18,000 • Request to the County for existing information, personnel list and fleet data • Authority Having Jurisdiction (AHJ) outreach and permitting/regulatory matrix development 3 • Develop plan backgrounds and highlight development parameters in plan as preparation for Workflow and Space Needs Workshop • Prepare agenda and coordinate with County Project Manager for stakeholder attendance at Workflow and Space Needs Workshop • Develop criteria for site and building selection Deliverables: Meeting agenda and notes from Workflow and Space Needs Workshop; these notes will form the basis of design for the Feasibility Report. Meetings: Site visit, Workflow and Space Needs Workshop 3. Feasibility Report Development - $11,000 • Develop up to two massing studies for building; massing will be informed primarily by space needs confirmed in Task 2 • Develop one site security, circulation and parking study for each building study • Explore options for combining internal program needs • Prepare agenda and coordinate with County Project Manager for Feasibility Workshop Deliverables: Draft and Final Feasibility Report, Feasibility Workshop agenda and minutes Meetings: Feasibility Workshop 4. Planning Level Cost Estimates - $7,000 • Planning level cost estimate for preferred building massing and site layout o Total project costs, including permitting o Construction costs o Develop assumptions: approach to soft and hard costs, project delivery method • Cost estimate will follow the American Association of cost engineers Class 5 (planning) standard • Cost estimate assumptions memorandum • Assume one (1) meeting Deliverables: Draft planning level cost estimate and refined estimate for inclusion in Final Feasibility Report Meetings: One (1) meeting to review cost estimate Travel expenses in service of this project are included in the lump sum cost proposal under Task 2 to support the identified Site Visit. 4 Assumptions: Sustainability goals will follow County declared priorities; MWA will make recommendations. MWA will provide drawings using Autodesk Revit program and in PDF format for reviews. All drawings and exhibits provided are planning level in nature; they will be to scale digitally for cost estimating purposes and diagrammatic and require further development by a professional team licensed in Washington State prior to use in construction documentation. MWA will provide reports using MS Word and in PDF format for reviews. Document review comment periods by the County are ten (10) calendar days or less. All comments by the County stakeholders will be vetted by the County Project Manager. All comments that cannot be incorporated into the project documents will be adjudicated by the designated County Project Manager. The County will provide access to facilities for site investigations as needed. The County will provide a Project Manager for this project; copy them on all correspondence with other County personnel. All deliverables to be digital. Furniture, fixtures and equipment procurement excluded; space planning and recommendations for style/types of furniture included. No drawings will be provided by civil, mechanical or electrical subconsultants; their design input will be captured in the notes from the workflow and space needs workshop in the form of a basis of design narrative for cost and space planning purposes. No geotechnical engineering services are included; MWA will incorporate available geotechnical data readily available from the County in massing layouts and costs assumptions. No environmental engineering services are included; the County will share any known site contamination issue for inclusion in costs. No site survey is included; MWA will use existing readily available County-provided GIS data in lieu of survey if one is not available for the site. No traffic data or traffic engineering will be conducted as part of this study. CC: Leslee Randolph Statement of Qualifications Professional Architectural and Engineering Services Kittitas County Public Safety and Health Facility Table of Contents EXPERIENCE & QUALIFICATIONS MWA Architects & MWL Introductions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 Relevant Project Examples . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 PROJECT TEAM Organizational Chart . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11 Resumes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12 REFERENCES Reference Contact Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21 PROJECT UNDERSTANDING & APPROACH Project Understanding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22 SUPPORTING DATA No additional information at this time . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .25 01 02 03 04 05 SAN FRANCISCO PORTLAND MWA ARCHITECTS | 1 August 1, 2025 Kittitas County Board of County Commissioners Attention: Cori McKean 205 West 5th Ave, Suite 108, Ellensburg, WA 98926 re: request for qualifications professional architectural and engineering services, ellensburg, washington MWA’s mission is to serve the essential needs of every community we touch . Your project has the potential to provide Kittitas County residents with multiple essential public safety and health needs in one building . The needs analysis for the Kittitas County Coroner’s Office and Public Health Department will provide feasibility and cost information that will allow the County to prepare development funding for this project . To improve feasibility, the County is partnering with Kittitas Valley Fire & Rescue and Kittitas County Airport . By developing a facility at the Kittitas County Airport on County-owned land, the new safety and health facility development costs are reduced and service is expanded through airfield adjacency . Including fire facilities will improve airport and community resiliency — this project is a win-win-win for Kittitas County . a dedicated and experienced team MWA brings 37 years of experience serving the essential needs of the community through innovative, thoughtful, and respectful design . We have completed health, fire, and aviation facili- ties for agencies across the Pacific Northwest . Our portfolio includes projects with Yakima Air Terminal-McAllister Field, Spokane International Airport, and Portland International Airport, on multiple projects, including needs analysis and feasibility studies, renovations, adaptive re-use, tenant improvements, and new construction . Our fire and public health experience includes Portland Fire and Rescue, Ilwaco Fire Department, and the City of Portland Emergency Communications Center . bringing longstanding teaming relationships to your project MWA has longstanding relationships with our proposed teaming partners . DCI Engineers (struc- tural and civil), FSi Engineers (mechanical), Landis Engineering (electrical), and Sound NW Precon Services (construction cost estimating) are all currently working with MWA on aviation and health projects . We are pleased to include proposed Subject Matter Expert, MWL . MWL has been at the forefront of forensic science, forensic pathology, and public safety planning and design since its founding in 1995 . MWL specializes in forensic science laboratories, forensic pathology facilities, and police and public safety facilities . Each proposed team member brings knowledge and experience in needs analysis and feasibility studies on airport properties . When pursuing projects, MWA considers the overall workload and availability of our team and teaming partners . The individuals highlighted in our proposal are currently working in Central Washington and are available to begin this project and will stay involved throughout . Our proposed team is committed to making the Kittitas County Public Safety and Health Facility a success . Sincerely, Jean von Bargen Root AIA, LEED AP BD+C, NOMA, PMP, Assoc . DBIA | Principal jvonbargen@mwaarchitects .com | 503 .705 .0653 01. EXPERIENCE & QUALIFICATIONS 2 | MWA ARCHITECTS 1. Experience & Qualifications MWA ARCHITECTS MWA Architects seeks to serve the essential needs of the community through innovative, thoughtful, and respectful design. Founded in 1988, we are a West Coast-based firm that strives to create a legacy of beautiful and sustainable architecture . Each of our projects thoughtfully responds to site context and serves as a foundation for community growth . Over the last 37 years, MWA has completed health, fire, and aviation facilities for agencies across the Pacific Northwest . Our portfolio includes projects with Yakima Air Terminal-McAllister Field, Spokane International Airport, and Portland International Airport . Our fire and public health experience includes Portland Fire and Rescue, Ilwaco Fire Department, and the City of Portland Emergency Communications Center . Our staff is capable of adapting to your needs from our extensive experience with feasibility studies, programming, and new construction . MWA is a hands-on teaming partner that makes regular site visits. Project Manager Leslee Randolph will be your primary point of contact for day-to-day communications, acting as an extension of your team . MWA successfully facilitates meetings with multiple stakeholders, engi- neers, cities and municipal agencies . We are natural listeners, and utilize graphic tools to convey design and technical concepts . We make it our goal to understand your work process and needs, and generate design solutions that complement your needs and the surrounding environment . Our projects frequently include extensive planning efforts, public involvement and engagement, programming for essential adjacencies, and a variety of security needs . ADDRESS 501 SE 14th Avenue #103 Portland, OR 97214 OFFICES Portland, Oregon San Francisco, California NUMBER OF YEARS IN BUSINESS 37 STAFF DESIGNATED BY POSITION 48 Employees Firmwide 37 in the Portland Office 6 LEED AP, 2 WELL AP 20 Registered Architects 3 Interior Designers DMWESB CERTIFICATION MWA is Disadvantaged Business Enterprise, certified though the State of Washington Office of Minority and Women’s Business Enterprises . WA DBE #D2F0030516 CBE Application #0389489 82 Space Need Assessments 19 Aviation Projects 16 Fire Stations Pictured: Mel Leong Laboratory Testing and Administrative Facility at San Francisco International Airport, led by MWA . MWA ARCHITECTS | 3 MCCLAREN, WILSON & LAWRIE (MWL) subject matter expert MWL has been at the forefront of forensic science, forensic pathology, and public safety planning and design since its founding in 1995 . Specializing in forensic science laboratories, forensic pathology facilities, research institutions, educational spaces, and police and public safety facili- ties . MWL has established an international reputation for excellence . With a portfolio that includes 350 public safety facilities and 170 laboratory and medical examiner facilities, MWL is a trusted partner for city, county, state, and federal government clients across North America . mwl forensic & pathology projects map AREAS OF EXPERTISE Forensic Science Laboratories Forensic Pathology Facilities Public Health Laboratories Research Laboratories Biosafety 3 & 4 Containment University Laboratories Property & Evidence Facilities Police and Fire Headquarters Public Safety Training Facilities Firearms Proficiency Ranges 911/EOC Pictured: State of Oklahoma Medical Examiner’s Office, led by MWL . The following pages include relevant project examples from the proposed project team. 4 | MWA ARCHITECTS The City of Yakima is modernizing the existing passenger termi- nal at Yakima Air Terminal-McAllister Field in a multiphase construction process after years of deferred maintenance and chronic water intrusion throughout the terminal . The City started implementation of recommendations in February of 2025 . These multiphase investments will position Yakima as a leader in the Washington State economy and the Air Terminal as an important community asset . Major terminal improvements are seeking minimal disruption to passengers and flights . As the prime architect, MWA has conducted studies to inform each design phase . These include investigations covering elec- trical and mechanical triage and modernization with consideration to historic preservation, cultural resources, respectful rehabilitation, and working with the site when needed around SEPA . Currently, the comprehensive square foot area of the existing building is 36,000 SF . Looking to the future, the comprehensive area potential is 45-52,000 SF . Efficient program spaces, which are revenue generating, will be complemented by targeted airport-compatible revenue generating program uses, such as restaurant, vending café, conference/meeting space and related support spaces . key features »MWA applied for and was awarded approximated $4M in FAA grant funding »Space needs assessment »Working with Washington State when needed for SEPA and other regulatory permitting requirements project information Project Team: MWA Architects, DCI Engineers, FSi Engineers, Landis Consulting Project Type: Air Terminal Renovation Size: 36,000 SF Client: City of Yakima Yakima Air Terminal-McCallister Field yakima, wa MWA ARCHITECTS | 5 Ilwaco Fire Station ilwaco, wa MWA Architects designed the new 10,000 SF Ilwaco Fire Station to replace the previous station that was lost in a fire in 2007 . The building houses a volunteer fire department, chief’s office, small museum, 5 drive-through apparatus bays, shower room, a kitchen, public bathrooms, and community meeting room . The fire station is nestled in the heart of downtown Ilwaco along coastal Highway 101 . MWA worked closely with the city to provide a building that would address the current and future needs of the all volunteer staff and the other community func- tions . These needs included providing adequate space for fire and EMS apparatus, training facilities, community hall and a fire museum . MWA designed the new building to fit into the fabric of the current community while providing for future expansion to a full time paid company with an unfinished, upstairs volume that will serve as future bunk rooms . The interior is organized to provide clean circulation path- ways that connect the community, administration, and response functions . The simple coastal building design’s exterior is clad with a mix of cedar lap siding and board and battens, highlighted by wood post and beam elements that tie the building together . key features »New construction of fire station »MWA coordinated the needs of multiple stakeholders »Designed to serve present and future needs project information Project Team: MWA Architects Project Type: New Fire Station Size: 10,000 SF Client: City of Ilwaco 6 | MWA ARCHITECTS MWA performed a feasibility evaluation, provided space plan- ning, full architectural design, and construction administration services, and led the project through the City’s multi-phased Civic Design Review process . The building is comprised of a large laboratory, a locker room, break room, conference/training room, and office spaces . Ten-foot-tall ceilings, large windows, and light colors through- out provide an uplifting space flooded with natural light . With safety as the top priority for the lab, designers focused on providing visual transparency and separation of workspaces . Glass cabinet doors allow lab techs to see chemicals and quickly access manuals easily . Separate lab modules are designed to be open but limit contamination and tailored to specific regulatory testing . The building envelope and systems provide increased sound and vibration isolation from aircraft takeoff and protection from the corrosive bay environment . Specialized seismic control joints allow building movement and foundation settling without impacting structural integrity or operations . In anticipation of rising sea levels, the project included a raised floor slab and designers integrated an elevated outdoor seating area acces- sible by ADA-compliant ramps . key features »Located on airport property »Daylit laboratory facilities »Robust sound insulation designed into building envelope system »MWA coordinated the needs of multiple stakeholders project information Project Team: MWA Architects Project Type: Laboratory on airport property Size: 8,800 SF Sustainable Elements: LEED Silver Equivalent Client: Carollo Engineers, San Francisco International Airport SFO Mel Leong Testing & Admin Facility san francisco, ca MWA ARCHITECTS | 7 Oak Harbor Clean Water Facility oak harbor, wa MWA was the Architect for this new, sustainable, and innova- tive Clean Water Facility in a rural community in Washington . Located within a commercial district on the waterfront, directly adjacent to the celebrated Windjammer Park, the new labora- tory facility serves as a civic asset woven into the community fabric . This project provides a groundbreaking approach to inte- grating economic development, recreational uses, and critical public infrastructure into a sensitive community environment . Incorporating green building technology, the facility engages and contributes to its urban site, while addressing requirements of Washington State’s energy code . The Administration and Maintenance buildings are LEED Silver certified . Harvesting the heating and cooling from the plant processes, the team designed a sustainable system that increases the mechanical efficiency of the buildings and reducing operations costs . To foster inclusiveness, MWA coordinated with the City of Oak Harbor and teaming partners to conduct a multi-year public involvement process . As a result, MWA co-facilitated numer- ous community outreach meetings, established a large Community Advisory Group and a project website to inform and communicate the overall design . key features »MWA coordinated the needs of multiple stakeholders Naturally lit and tall ceiling laboratory facilities »Integration of wastewater treatment into urban environment »MWA coordinated the needs of multiple stakeholders project information Project Team: MWA Architects Project Type: Laboratory, operations, and maintenance building on large campus Size: 3 .25 acres | Building: 68,605 SF Sustainable Elements: LEED Silver Administration Building Client: Carollo Engineers 8 | MWA ARCHITECTS The Emergency Coordination Center is a critical public building that allows the City of Portland to provide continuity of opera- tion and management during an emergency . This 30,000 SF LEED Gold facility is designed to meet Essential Facility stan- dards and provides flexible office, training, and coordination space for a number of the City’s emergency management and security entities . It can also be used as a temporary location for the City Council . Most importantly, the ECC reflects the values and commitment of the City to its citizens . An intense land use process engaged the public in neighborhood meetings . MWA supported this outreach effort by gathering feedback from architectural and landscape preference surveys and producing 3D visuals to allow the public to envision this project . The nature of the building requires it to have a high level of self- sufficiency, allowing for immediate operation during emergency situations . Onsite resources are integrated into the design to enable the facility to operate in a ‘stand alone’ condition if utili- ties, communication, and other infrastructure are not available . The ECC was designed with efforts to maximize passive and sustainable strategies for building operation while minimizing its impact on local natural processes . Interior daylighting and efficient insulation design reduce operating costs and the need to rely on off-site resources . Extensive landscaping and 100% onsite stormwater infiltration promotes efficient water management, reduces heat-island effect, and presents a refined appearance to both the neighbors and adjacent public park . key features »MWA coordinated the needs of multiple stakeholders »Essential facility providing emergency management and high security »Rainwater harvesting, native low-water landscaping, onsite stormwater infiltration project information Project Team: MWA Architects Project Type: Emergency Coordination Center Size: 30,000 SF Sustainable Elements: LEED Gold Client: City of Portland Emergency Coordination Center portland, or MWA ARCHITECTS | 9 MWA is currently providing tenant improvements for multiple therapy, clinic, and office spaces at the recently purchased OHSU Crossings Campus . These facilities are designed to meet the needs of vulnerable communities . Two clinics and several infrastructure modernization projects are complete at this time . MWA is working with diverse stakeholder groups to meet OHSU’s institutional goals and interior design standards from space needs and design development through bid, permitting, and construction administration . Our design approach is anchored in a collaborative process of engagement where all voices are heard and valued . Our design team is leading interac- tive workshops to vet design progress, actively evaluate cost impact to design solutions from all disciplines, and drive deci- sion-making to maintain forward progress . MWA is working closely with OHSU’s IT group and electrical consultants on low voltage systems such as security and communications with attention to acoustical privacy to meet the needs of these specialized user groups . Featured image from Property Manager Colliers website, colliers .com key features »MWA coordinated the needs of multiple stakeholders »Architectural programming, space planning, and workflow assessment for medical facilities »Design of medical clinic space project information Project Team: MWA Architects, Landis Consulting Project Type: Clinic, offices, therapy spaces Size: 192,047 SF Sustainable Elements: Design for daylighting; employee wellness room programming and design; space planning for building reuse . Client: Oregon Health & Science University (OHSU) OHSU Crossings Campus Tenant Improvements portland, or 10 | MWA ARCHITECTS The new medical examiner’s (ME) office provides state-of-the art forensic essential services to many communities in the Eastern Washington, Northern Idaho, Montana and Oregon regions . Situated near the south edge of the University District, the project called for renovation and expansion of an existing building . The design process included projecting the needs of the medical examiner’s office for 50 years and ensured the final design would support the region’s growth in that time . There was not sufficient room in the existing building footprint to accommodate the 50-year program that the facility required . Therefore, a second floor was added to the rear third of the building . This affords year-round protection for the dual HVAC systems and a generator capable of supplying all building elec- trical requirements in an emergency . The facility has three rooms with multiple tables for conducting autopsies, quiet spaces to record observations, office spaces, storage rooms and a room where families of the deceased can have a private discussion . The slabs in the ME exhibited sub-surface settling and needed to be replaced with a new 4-inch slab for under-floor ducts, new plumbing piping and autopsy floors sloped to drain . There is an enclosed sallyport to afford a safe, secure and weatherproof area for staff to transport from vehicles to the building . There are specially designed spaces for collection and refuse pickup of hazardous materials, chemical waste, and soiled laundry . The facility has the capability of storing up to 100 bodies and a provision to move two 40-foot self-contained cooler modules on site for disaster preparedness . key features »New construction of Medical Examiner’s Office »Designed to serve present and future needs »The building features a Lodox machine, which can rapidly complete full-body X-ray scans . project information Project Team: McClaren, Wilson & Lawrie (MWL) Project Type: Medical Examiner’s Office Size: 24,000 SF Client: Spokane County Spokane County Medical Examiner’s Office spokane, washington 02. PROJECT TEAM 11 | MWA ARCHITECTS 2. Project Team Our approach to team is to balance local knowledge with industry experts . MWA and MWL will work side-by-side to clarify the needs of the fire and public health programs . We will layer technical regulatory requirements for a coroner’s suite of spaces and development on an FAA regulated site . As a service-based firm that prioritizes our clients needs, MWA makes regular site visits. Project Manager Leslee Randolph will be your primary point of contact for day-to-day commu- nications, acting as an extension of your team . MWA is partnering with DCI Engineers for Civil and Structural Engineering, bringing extensive knowledge and working relationships with Kittitas County to our team . MWA will lean on our past experience working with DCI to provide you with prompt communication and service . When pursuing projects, MWA considers our firm’s and teaming partner’s overall workload and availability . Each identified team member brings critical strengths to your project, is available to begin this project, and will stay involved throughout . Full team member resumes are on the following pages. KITTITAS COUNTY SUBCONSULTANTS FSI ENGINEERS MECHANICAL Rick Himmel DCI ENGINEERS CIVIL & STRUCTURAL Matt Gibb LANDIS CONSULTING ELECTRICAL Ben Perry SOUND NORTHWEST PRECON SERVICES COST ESTIMATING Dan Deymonaz MWL LAB/CORONER DESIGN SUBJECT MATTER EXPERT Bonnie Carver PRIME CONSULTANT MWA ARCHITECTS Jean von Bargen Root Principal-in-Charge Project Architect Leslee Randolph Project Manager Programming Lead Allison Plass Interior Environments Lead Pictured: Lab/Coroner Design Subject Matter Expert MWL’s recently completed Forensic Biology Lab and Forensic Chemistry-Trace Instrument Room . MWA ARCHITECTS | 12 education Master of Architecture, University of Oregon, 2002 Bachelor of Arts in Architecture, University of Washington, 1995 Real Estate Development Certificate, Portland State University, 2002 Project Management Certificate, University of California, Berkeley, 1997 licenses Registered Architect: Oregon: #4830 Washington: #9668 National Council of Architectural Registration Boards: No . 90374 LEED Accredited Professional Building Design + Construction #10056836 Project Management Professional: #2039391 affiliations National Organization of Minority Architects (NOMA) International Living Future Institute fellowships Energy Trust of Oregon Net Zero Fellowship, 2022 JEAN VON BARGEN ROOT, AIA, LEED AP BD+C, NOMA, PMP, ASSOC. DBIA principal-in-charge Jean has been practicing architecture in the Pacific Northwest for over 20 years . As Principal and Director of Sustainability, she leads MWA’s efforts in resilient design with a focus on materials, energy, and water . Understanding community facility design as an integrated process, Jean estab- lishes clear lines of communication between the client/owner, its staff, the design team, and the contractor while providing technical oversight of the design documents . relevant experience • OHSU Crossing Campus Tenant Improvements, Portland, OR Tenant improvements to multiple therapy, clinic, and office spaces as part of OHSU’s Behavioral Health Initiative, 15,450 SF, estimated completion ranging from 2025-2027 »OHSU Avel Gordly Center for Healing, Portland, OR »OHSU Intercultural Psychiatric Program, Portland, OR »OHSU Resident Faculty Wellness Program, Portland, OR • Yakima Air Terminal-McAllister Field Modernization, Yakima, WA Multi-phase modernization of 52,000 SF terminal, estimated construction cost $60M, esti- mated completion in 2028 • Spokane International Airport Administrative Building, Spokane, WA New construction of 25,000 SF of office space and 20,000 SF of parking garage, estimated construction cost of $15 .6M, estimated completion in 2026 • SFO Mel Leong Lab Testing and Administration Facility, San Francisco CA Renovation to existing 8,800 SF facility, construction cost of $13 .3M, completed in 2020 • Port of Portland On-Call Projects, Portland International Airport, Portland, OR »Terminal Restroom Modifications »International Arrivals Canopies »Hangar 7909 Design/CA »P1 & P2 Parking Modifications »Revenue Control Relocation »Terminal Enplaning Curtainwall Rehabilitation Project • MWMC Operations & Maintenance Laboratory Building, Eugene, OR Renovation of 25,000 SF laboratory buildings, construction cost of $16 .5M, completed in 2019 • SFO Ground Transportation Unit Relocation, San Francisco, CA New construction of 14,000 SF facility, construction cost of $32M, completed in 2018 • Oak Harbor Clean Water Facility (LEED Silver), Oak Harbor, WA New construction of 3-acre facility, construction cost of $119M, completed in 2018 • City of Portland Emergency Coordination Center, Portland, OR, LEED Gold New construction of 30,000 SF LEED Gold facility, 12 .3M, completed in 2014 13 | MWA ARCHITECTS education Bachelor of Science in Architecture, Portland State University, 2005 volunteer Volunteer, International Code Council Conference– Portland, 2011 & 2012 Member, League of Women Designers, 2010 to 2023 affiliations American Institute of Architects Associate (AIA) contact 503 .416 .8004 lrandolph@ mwaarchitects .com LESLEE RANDOLPH, ASSOC. AIA project manager Leslee has 20 years of professional experience, from the space needs analysis phase through construction administration . She possesses a keen understanding of spatial relationships and always considers inspired design, the program, client wishes, budgetary constraints, and code requirements when approaching her projects . Leslee has a deep understanding of code research, interpretation, and implementation; extensive knowledge of organizing construction documenta- tion for larger and smaller scaled projects; and experience with contract preparation . relevant experience • Yakima Air Terminal-McAllister Field Modernization, Yakima, WA Modernization of 52,000 SF terminal, estimated construction cost $60M, estimated comple- tion in 2030 • Spokane Felts Field Terminal Remodel, Spokane, WA Rehabilitation of historic terminal after fire damages, 7,500 SF, estimated completion in 2026 • Spokane International Airport Administrative Building, Spokane, WA New construction of 25,000 SF of office space and 20,000 SF of parking garage, estimated construction cost of $15 .6M, estimated completion in 2026 • Port of Portland On-Call Projects, Portland International Airport, Portland, OR »P1 & P2 Parking Modifications Modifications of two parking garages, $3 .2 million, completed in 2023 »Port of Portland Navigation Building Renovation, Portland, OR Renovation of an office facility for Port and Army Corp of Engineers, $225,000, completed in 2017 »Terminal Restroom Modifications Renovation of 10 airport restrooms, average size of 1,050 SF, construction cost of $3 .5M, completed in 2020 • Port of Portland TCORE C3 Restroom Upgrades, Portland Itnl Airport, Portland, OR Renovation of one airport restroom, 1,000 SF, to serve terminal core upgrades, construction cost of $235,000, completed in 2022 • San Luis Obispo Water Resource Center, San Luis Obispo, CA Design for new 30,700 SF facility, construction cost of $10 .7M, completed in 2021 • Clean Water Services Operations & Maintenance Building Renovations, Tigard, OR Renovation and addition to 35,000 SF facility, construction cost of $10M, completed in 2019 • Portland Water Bureau Interstate Renovation Project, Portland, OR, LEED Gold Renovation of 78,000 SF facility, construction cost of $36M, completed 2016 MWA ARCHITECTS | 14 education Bachelor of Science in Graphic Design; Bachelor of Science in Arts & Letters; Minor in Architecture, Portland State University, 2006 affiliations Society for Experiential Graphic Design (SEGD) Member volunteer Cascadia Clusters, Tiny House on Wheels, Graphic Designer Volunteer, 2020 Design Week Portland, Good Neighbors Event, Graphic Designer Volunteer, 2020 SOLVE Oregon, Marketing Committee Member and Graphic Designer Volunteer, 2013-2019 Vibe of Portland, Art Teacher Assistant and Graphic Designer Volunteer, 2015-2017 contact 503 .416 .8125 aplass@ mwaarchitects .com ALLISON PLASS project manager, interior environments lead Allison is a skilled listener and communicator with a background in visual communications . She leads MWA’s Interior Environments Studio, weaving creativity into her process when managing project teams . Allison is passionate about collaborating with clients, consultants, and stakehold- ers to inspire creative problem solving and produce exceptional work . Her portfolio includes over fifteen years of experiential graphic design and project management . relevant experience • OHSU Crossing Campus Tenant Improvements, Portland, OR Tenant improvements to multiple therapy, clinic, and office spaces as part of OHSU’s Behavioral Health Initiative, 15,450 SF, estimated completion ranging from 2025-2027 »OHSU Avel Gordly Center for Healing, Portland, OR Tenant improvements to therapy and office space as part of OHSU’s Behavioral Health Initiative, 3,975 SF, estimated completion in 2026 »OHSU Intercultural Psychiatric Program, Portland, OR Tenant improvements to therapy and office space as part of OHSU’s Behavioral Health Initiative, 7,475 SF, estimated completion in 2025 »OHSU Resident Faculty Wellness Program, Portland, OR Tenant improvements to therapy and office space as part of OHSU’s Behavioral Health Initiative, 2,285 SF, estimated completion in 2026 »OHSU Information Technology Group / Revenue Cycle, Portland, OR Tenant improvements to office space, 19,900 SF, estimated completion in 2027 • Spokane Felts Field Terminal Remodel, Spokane, WA Rehabilitation of historic terminal after fire damages, 7,500 SF, estimated completion in 2026 • Spokane International Airport Administrative Building, Spokane, WA New construction of 25,000 SF of office space and 20,000 SF of parking garage, estimated construction cost of $15 .6M, estimated completion in 2026 • OHSU Crossing Campus Telecom Rooms, Portland, OR Design and MEP coordination of 12 new telecom rooms that will provide power and data to the entire campus, 1,740 SF (145 SF each), estimated completion in 2026 • OHSU Crossings Campus Facilities Permit Program Facilitation, Portland, OR Development of FLS plans and facilitation of registration into the City of Portland’s Facilities Permit Program (FPP), completed in 2025 • Oak Harbor Clean Water Facility, Oak Harbor, WA, LEED Silver Construction of 3-acre facility containing operations and maintenance, solids, secondary treat- ment, headworks, and electrical buildings, construction cost of $119M, completed in 2018 15 | MWA ARCHITECTS Bonnie J. Carver AIA, NCARB Senior Principal EXPERTISE Forensic Science Laboratories Forensic Pathology Facilities Public Health Laboratories High-Containment Laboratories Research Laboratories University Laboratories SERVICES PROVIDED Master Planning Space Needs Assessments Programming Design Construction Administration REGISTERED ARCHITECT Alabama Arkansas Delaware Florida Kentucky Louisiana Maine Maryland Missouri Pennsylvania Rhode Island Virginia EDUCATION Bachelor of Architecture Virginia Tech – 1997 PROFESSIONAL AFFILIATIONS National Council of Architectural Registration Boards (NCARB) American Institute of Architects (AIA) Bonnie brings over 25 years of architectural expertise, specializing in the planning and design of forensic science laboratories and forensic pathology facilities. Throughout her career, she has successfully balanced design intent with project budgets, ensuring seamless continuity from initial concept through construction administration. Renowned for her meticulous attention to detail, Bonnie instills a high level of confidence in her clients, assuring them that every aspect of the project is executed with precision from the outset. Her diverse and extensive background equips her with technical expertise to manage and deliver innovative solutions for complex, high-stakes projects. A testament to her skill and leadership, she played a key role in the design of the award-winning 665,000-square-foot Forensic Services and Coroner’s Complex in Toronto, Canada. Bonnie’s in-depth knowledge of forensic science laboratories and forensic pathology facilities is further evidenced by her involvement in numerous renovation and new construction projects of various sizes across the country. Representative Project Experience: Medical Examiner’s Office - Jefferson County -Birmingham, Alabama Scientific Detection Laboratory – State of Alaska-Anchorage Crime Laboratory – State of Arkansas-Little Rock Crime Laboratory - City of Long Beach, California Coroner’s Office - San Mateo County-San Mateo, California Office of Chief Medical Examiner – City & County of San Francisco, California District 7 Office of the Medical Examiner - Volusia County-Daytona Beach, Florida Medical Examiner Facility - St. Lucie County -Fort Pierce, Florida District 1 Medical Examiner’s Office - Santa Rosa County -Milton, Florida Medical Examiner’s Office - Georgia Bureau of Investigation -Decatur Medical Examiner’s Office - Cobb County -Marietta, Georgia Medical Examiner - State of Iowa -Ankeny, Iowa Forensic Science Laboratory - Kansas Bureau of Investigation -Topeka Coroner’s Office - Calcasieu Parish -Lake Charles, Louisiana Eastern Regional Forensic Laboratory - Maryland State Police -Berlin Forensic Laboratory, District Headquarters - Michigan State Police - Grand Rapids Regional Medical Examiner’s Office - Hennepin County -Minnetonka, Minnesota Crime Laboratory - Jefferson County -Hillsboro, Missouri Clarkson Campus Regional Medical Examiner Facility - Atrium Health Wake Forest Baptist -Winston Salem, North Carolina Forensic Science Center - Franklin County -Columbus, Ohio Office of the Chief Medical Examiner - State of Oklahoma -Oklahoma City Forensic Services Building - City of Charleston, South Carolina Crime Laboratory Consolidated Facility - Tennessee Bureau of Investigation -Jackson Forensics Laboratory, Office of the Chief Medical Examiner -Central District - Commonwealth of Virginia -Mechanicsville Consolidated State Laboratory - State of West Virginia -Charleston MWA ARCHITECTS | 16 Russell H. McElroy AIA NCARB Senior Principal EXPERTISE Forensic Science Laboratories Forensic Pathology Facilities Public Health Laboratories High-Containment Laboratories Research Laboratories University Laboratories SERVICES PROVIDED Master Planning Space Needs Assessments Programming Design Construction Administration REGISTERED ARCHITECT Arkansas Georgia Indiana Kansas Louisiana Maryland Nebraska New Hampshire Ohio Oklahoma South Carolina Texas Virginia EDUCATION Bachelor of Architecture Virginia Tech – 1992 PROFESSIONAL AFFILIATIONS National Council of Architectural Registration Boards (NCARB) American Institute of Architects (AIA) National Fire Protection Association (NFPA) Russell is a highly skilled architect with over 30 years of expertise dedicated to the planning and design of forensic science laboratories and forensic pathology facilities. He has successfully led projects through all phases, from pre-design assessments and programming to construction administration. With experience spanning facilities from 1,500 to 665,000 square feet, Russell is a trusted advisor renowned for helping clients optimize their forensic environments to meet specific operational needs. Areas of Expertise: Forensic Science Laboratories: In-depth expertise in designing diverse analytical laboratories, including: DNA, drug chemistry, toxicology/breath/blood, latent print, firearms, digital/computer, trace evidence, evidence control, police identification, and shared lab support systems. Forensic Pathology Facilities Designed the first autopsy suite in the U.S. to pursue BSL3 certification with the CDC/NIH. Led the development of Canada’s first CL3 autopsy suite, setting benchmarks in high-containment forensic pathology design. He is the only architect to patent an all- new design autopsy table product. High-Containment Laboratories Specialized in BSL3 and BSL4 laboratory design, including: The Haitian National Laboratory’s first public health BSL3 laboratory. Specialized Laboratories Extensive experience designing facilities tailored to unique scientific and operational needs, such as: public health laboratories, high- hazard chemical containment, cold rooms, and nuclear clean rooms (ISO 5 and EU Class A), nanotechnology, TEM, laser, blood and water testing facilities, molecular labs, and microbiology labs. Representative Project Experience: Medical Examiner’s Office - Jefferson County-Birmingham, Alabama Crime Laboratory - City of Long Beach, California Coroner’s Office - Placer County-Roseville, California Medical Examiner’s Office - Georgia Bureau of Investigation-Decatur Medical Examiner - State of Iowa-Ankeny Forensic Science Laboratory - Kansas Bureau of Investigation-Topeka Eastern Regional Forensic Laboratory - Maryland State Police-Berlin Forensic Laboratory, District Headquarters -- Michigan State Police- Grand Rapids Regional Medical Examiner’s Office - Hennepin County-Minnetonka, Minnesota Crime Laboratory - Jefferson County-Hillsboro, Missouri Regional Medical Examiner's Office - Washoe County-Reno, Nevada Clarkson Campus Regional Medical Examiner Facility - Atrium Health Wake Forest Baptist-Winston Salem, North Carolina Forensic Science Center - Franklin County-Columbus, Ohio Donald Betz STEM Research & Learning Center - University of Central Oklahoma-Edmond DNA Laboratory - Pennsylvania State Police-Greensburg Forensic Services Laboratory – SLED-Columbia, South Carolina Crime Laboratory Consolidated Facility - Tennessee Bureau of Investigation-Jackson Holcombe Laboratory Expansion – City of Houston, Texas Unified State Laboratory - State of Utah-Salt Lake City 17 | MWA ARCHITECTS Rick Himmel PE, LEED AP | Principal Rick is a professional mechanical engineer with 40 years of experience. He has been the mechanical project manager for facilities such as hospitals, fire stations, and city hall/police stations. Rick delivers a fundamental and intuitive grasp of mechanical systems coupled with excellent customer service. He specializes in HVAC, plumbing and medical gas systems design & pre- construction for healthcare, underfloor HVAC systems, office building and public facility HVAC and plumbing, and biotechnology & chemistry laboratories HVAC systems. Project Examples King County Harborview Medical Center Facility Assessment & Strategic Facility Master Plan Lead Project Engineer for the development of a strategic facilities plan for King County and Harborview Medical Center to meet the needs of the mission population while successfully addressing identified facilities needs. The project also included assessing and advising the County on City of Seattle regulatory requirement and providing costing information and assessment of options. Whatcom County Way Station Mechanical Project Engineer for TI for the new Way Station. The project renovated Whatcom County’s 1500 N. State Street building in Bellingham. The Way Station includes medical and behavioral clinic, county medical examiner, coroner’s office, and other County offices. Seattle Children’s Hospital Odessa Brown Clinic Mechanical Engineer for a new 35,000 sf pediatric healthcare clinic owned by Seattle Children’s Hospital. The project takes the SEOC Building C and fills the lower two floors with this clinic. The mechanical scope included HVAC, plumbing, piping, and fire protection. City of Issaquah Pickering Barn Air Conditioning Addition Mechanical Principal in Charge for the addition of air conditioning to a 12,000 sf event venue owned by the City of Issaquah. The facility was built in 1906 as a dairy barn and is now on the National Register of Historic Places. FSi provided mechanical and electrical engineering for the project. North Mason Regional Fire Authority New HQ Mechanical Principal in Charge for a a new design-build 20,000 sf fire station headquarters with four apparatus bays, training rooms for up to 30 people, dormitory sleeping quarters with common areas, fitness rooms, and administration offices, and other support spaces. Our scope included HVAC and plumbing for the facility. The engineering team worked closely with the architect to design concealed systems that allowed the facility to benefit from the high cupola windows and their natural light. Education University of Washington, BSME, 1984 Licenses & Registrations PE, Mechanical: WA, 1989 Affiliations Member, ACEC, AIA, DBIA Key qualifications ƒ40 years of experience ƒHVAC, plumbing, and fire protection expertise ƒProven healthcare knowledge ƒExtensive experience in critical 24/7 facilities Rick is currently partnering with MWA Architects on the Yakima Air Terminal- McAllister Field Modernization project . MWA ARCHITECTS | 18 1 DCI ENGINEERS PROFESSIONAL TITLE: Principal EDUCATION: B.S., Civil Engineering, University of Idaho, 1997 REGISTRATION: Civil & Structural: Washington PROFESSIONAL SOCIETIES: Structural Engineers Association of Washington – Spokane Chapter (SEAW) American Institute of Architects – Spokane Chapter (AIA) Society of American Military Engineers DAVID GIORDANO, PE, SE, LEED® AP SPOKANE, WASHINGTON With over twenty-five years of design experience, David Giordano has a proven track record of delivering innovative solutions for complex projects throughout the United States. His expertise spans across various sectors including medical, commercial, residential, educational, municipal, and indus- trial. David has a reputation for managing large-scale projects from con- ception through completion, consistently meeting client expectations while adhering to stringent quality standards. He excels at leading and managing teams to deliver high-quality engineering solutions. He believes in fostering collaboration among team members and stakeholders to achieve project goals efficiently and effectively. SPOKANE INTERNATIONAL AIRPORT ADMINISTRATION BUILDING, Spokane, WA, MWA Architects YAKIMA AIR TERMINAL, Yakima, WA, MWA Architects FELTS FIELD TERMINAL RENOVATION, Spokane, WA, MWA Architects STEVENS COUNTY COURTHOUSE, Colville, WA, ALSC Architects SPOKANE COUNTY SHERIFF’S OFFICE SMALL ARMS RANGE & TRAINING FACILITY, Spokane, WA, ClarkNexsen NORTH MASON FIRE DISTRICT AUTHORITY HEADQUARTERS, Belfair, WA, Architects West SPOKANE FIRE DEPARTMENT TRAINING CENTER, Spokane, WA, ALSC Architects FIRE STATION 4, Lewiston, ID, Architects West SPOKANE COUNTY FIRE DISTRICT #8 - STATION 81, Spokane, WA, Denny Christenson & Associates FAIRCHILD AIR FORCE BASE FIRE STATION ADDITION, Fairchild AFB, WA, Denall Contractors MILLWOOD FIRE STATION, Millwood, WA, Denny Christenson & Associates CITY OF SPOKANE VALLEY CITY HALL, Spokane Valley, WA, Architects West COLVILLE TRIBAL GOVERNMENT CENTER, Colville, WA, Architects West FRONTIER BEHAVIORAL HEALTH - HILLYARD, Spokane, WA, Herath & Associates FRONTIER BEHAVIORAL HEALTH - 1ST AVE, Spokane, WA, Herath & Associates VA MEDICAL CENTER ENDOSCOPY & SPD ADDITIONS, Spokane, WA, NAC Architecture 19 | MWA ARCHITECTS BEN PERRY, P.E. PRESIDENT, ENGINEER OF RECORD YEARS OF EXPERIENCE 18 LICENSES Professional Engineer: 2026 / Oregon / No. 86683 2025 / Washington / No. 51868 2026 / California / No. 20963 2026 / Arizona / No. 58937 EDUCATION BSEE / 2007 / Electrical Engineering Grove City College, Grove City PA VOLUNTEER Marion Polk Food Share – Board of Directors (Finance Committee) CONTACT INFORMATION Phone: (503)-584-1576 Cell: (503)-580-9600 Fax: NA Email: ben_perry@landisconsulting.com Website: landisconsulting.com Ben Perry's is the Engineer of Record for Landis Consulting. He manages projects for the public works agencies and cities, municipal water and wastewater industries, K-12 and healthcare projects in the AEC Industry. His designs are clear, simple, and practical. They weave together cost-efficiency, constructability, and technical expertise. Ben Perry and Landis Consulting have earned a reputation in the AEC industry for client service, thoughtful designs, creativity, constructability, and minimal change orders. Key Project Experience  Yakima Airport Modernization (McAllister Field) (Yakima, WA). Remodel and modernization of existing two-story airport, including sterile areas, non-sterile areas, baggage claim, waiting areas, and support spaces. Design is in multiple phases and project currently has completed Phase 1 design and we are in Phase II design.  Port of Portland, Portland International Airport – On Call (Portland, OR). On- call work for Port of Portland, including modernization of enplaning doors, chiller upgrades, maintenance shop improvements, HVAC system improvements, escalator and elevator modernizations, signage improvements, retail tenant fit out, restroom modernizations, and baggage claim upgrades.  Troutdale Airport – Control Tower Improvements (Troutdale, OR). Electrical service, power distribution, and HVAC upgrades for control tower. Design included developing construction sequencing plans to limit down time.  Hillsboro Airport – Security Camera Upgrades, (Hillsboro, OR). New security cameras for regional airport.  New Porsche Dealership (Lynwood, WA). New 60,000 SF (approx.) dealership with showrooms, maintenance shop, and significant EV charging infrastructure.  New Lincoln Phase II Affordable Housing (Vancouver, WA). New 40,000 SF (approx.) multi-story affordable housing complex.  Portland Water Bureau Ground Water Pump Station Electrical Renovations (Portland, OR). Landis is the prime consultant and has provided the design for replacement of seven 5kV medium voltage motor control centers. Additionally, the design included complete replacement and upgrade of the control system wiring.  Portland Water Bureau – Washington Park Reservoir Improvements (Portland, OR). Power and control systems for reservoir improvements project. Design included landscape lighting, security surveillance cameras, and electronic gate access control systems.  Salem Keizer School District Security System Upgrades (Salem, OR). Security, electronic access control, and intrusion system design for multiple schools. Ben is currently partnering with MWA Architects on the Yakima Air Terminal- McAllister Field Modernization project and the OHSU Crossing Campus Tenant Improvements project . MWA ARCHITECTS | 20 DAN DEYMONAZ Owner / Senior Cost Estimator With over 35 years of industry experience, I have partnered with all project members to provide reliable, meaningful, and accurate cost estimating services. I have collaborated with owners, stakeholders, and designers to assist project teams with understanding and managing construction costs. My focus as the owner of Sound Northwest Precon Services, is to provide collaborative and selfless leadership to the clients and stakeholders I serve. EDUCATION Eastern Washington University - General Physics, Mathematics Cheney, WA SELECT EXPERIENCE NorthStar CG, Fall City, Washington Employment – 12yrs. Roles included Sr. Project Manager, Sr. Estimator, and Chief Estimator. NorthStar CG is the #1 Demolition and Remediation Contractor in the USA (ENR-2020). Over $5 billion of projects successfully completed since 1986. NorthStar CG is a full-service emergency and disaster response team. • Dayton, TN Silo Fire • Griffin Wheel Plant – Winnipeg, CA o Catastrophic Fire Restoration & Reconstruction • www.northstar.com Spokane International Airport, Pre-Design through CD Cost Est. $36MM 40,288 sf Airport Administration Building with an 8,351 sf Pre-Manufactured Parking Structure and 123,560 sf of site work. This project is currently under construction with an 18-month duration. Sound Northwest Precon Services was hired by the Design Team to provide side by side estimates with the awarded GC of the project. SNW Precon Services provided cost estimates from Conceptual Pre-Design through GMP. 03. REFERENCES MWA ARCHITECTS | 21 3. References ROBERT HODGMAN Airport Director, Yakima Air Terminal 3106 West Washington Avenue, Yakima, Washington, 98903 robert .hodgman@yakimawa .gov | (509) 575-6260 Modernization and expansion of 52,000 SF air terminal to a total of 80,000 SF, estimated construction cost $68M, estimated completion in 2028 . LISA CORCORAN Chief Development Officer, Spokane International Airport, Felts Field & Airport Business Park 9000 West Airport Drive, Suite #204, Spokane, WA 99224 lcorcoran@spokaneairports .net | (509) 808-6577 New construction of 25,000 SF of office space and 20,000 SF of parking garage, estimated construction cost of $15 .6M, estimated completion in 2026 . HALLIE ERVIN Construction Project Manager, Design and Construction, Research and Education, Oregon Health & Science University (OHSU) 3930 S Macadam Ave, Portland, OR 97239 ervinh@ohsu .edu | (503) 475-9757 Tenant improvements to multiple therapy, clinic, and office spaces as part of OHSU’s Behavioral Health Initiative, 15,450 SF, estimated completion ranging from 2025-2027 . MWA Architects are excellent collaborators . They listened to our needs, input, and feedback every step of the way . They developed and adjusted concepts according to the comments of staff . Their insights and experience helped us to meet our end goals . They always wanted what was best for us and our project and worked towards that end with outstanding knowledge and skill .” - Robert Pyle, Former Facilities Manager, BES, City of Portland 04. PROJECT UNDERSTANDING & APPROACH MWA ARCHITECTS | 22 4. Project Understanding & Approach Kittitas County (County) is seeking architectural and engineering services to conduct a needs analysis and feasibility study for locating a new safety and health facility on Kittitas County Airport Property . This facility would enable the Kittitas County Coroner’s Office (Coroner’s Office) and Public Health Department (Public Health Department) to be moved to one location in partnership with Kittitas Valley Fire & Rescue (KVFR) . With 1301 .03 acres of county land on the airport prop- erty, it is sensible to construct a new facility on land that does not require further purchase . The County is experiencing growth, particularly to the north, prompting the development of a 20-year comprehensive plan . The 2021 Kittitas County Comprehensive Plan states that, “Kittitas County addresses challenges of future growth in a direct manner . Coordinated planning and suitable density patterns ensure that rural areas, natural areas, and working lands are sustained for the benefit of current and future generations .” The City of Ellensburg is the County seat and as such fosters the future planning of the County to support the growing populations with critical services such as fire response, public health services, coroner services, water, wastewater, and public works . Currently co-located within the approximately 100-year-old Morris Sorenson Building at 507 N Nanum Street, Ellensburg, WA, the Coroner’s Office and Public Health Department have outgrown their facilities . The Coroner’s Office relies on both local funeral homes for morgue related services to support Coroner’s Office duties . The Public Health Department currently serves the public from limited space and with limited amenities . Due to the population growth, KVFR needs to develop an additional station . To efficiently perform the duties of the Coroner’s Office, Public Health Department, and KVFR, a new, modern facility is required . The interconnected relationship between the duties of the Public Health Department and Coroner’s Office are providing data sources such as: • Issuing death certificates to track mortality rates • Identifying specific types of deaths to track emerging trends in infectious diseases, drug over-doses, fire-arm related deaths and other potential public health concerns • At times, requiring joint investigations between the department and the Coroner’s Office to identify environmental or disease related deaths Pictured: Bowers Field as captured by pilot . Dougherty, Pete, “Bowers Field”, Google Reviews, 2020 23 | MWA ARCHITECTS By co-locating with the KVFR, the County will improve fire response, Coroner’s Office and Public Health Department ability to serve, and the potential for State of Washington and federal funding sources to offset funding from the County. In addition, by providing a new facil- ity on the existing underdeveloped County owned property at Bowers Field, this can also serve as an Aircraft Rescue and Fire Fighting Station (ARFF), providing immediate response to both airport needs while acting as a fire station for the growing community . mwa supports our clients in securing project funding MWA understands and has experience coordinating with the Federal Aviation Administration (FAA) during design and development of greenfield sites within airport campuses, and is familiar with regulations and requirements . MWA will implement our Program Roadmap exercise while creating the feasibility study . MWA’s Roadmap identifies and documents phases of project devel- opment, including researching, applying, and ultimately securing federal grant funding . Through this Road Mapping, we provide timelines and available funding sources and align this with project development scope . Examples of projects that MWA secured funding for and the associated funding agencies are listed below: • Department of Energy (DOE) - Pendleton Bus Barn (Transit) • Department of Transportation (DOT) - Pendleton Bus Barn (Transit) • FAA and DOT - Yakima Air Terminal-McAllister Field (Aviation and Air Cargo) • FAA - Port of Portland (Aviation) • DOT - Sandy Operations Center Expansion (Transit and Public works) MWA supports local governments throughout Washington and Oregon in researching, applying and securing grant funding . By utilizing a capital improvement program Roadmap exercise, MWA helps our clients find supplemental funding for projects that may otherwise have limited funds allocated within city and county capital improvement budgets . Overall, the program Roadmap aids the County stakeholders in utilizing existing public funds . The County is performing its due diligence to provide the most economical solution to these identified needs by requesting a feasibility study . The approach of coupling the Coroner’s Office and the Public Health Department needs with KVFR needs, simultaneously increases the likeli- hood of voter support for a future bond and lessens the cost burden from the County budget . MWA will use our past experience supporting and procuring grant money to assist the County in bringing their vision to life. MWA shall support this feasibility study by providing space needs and programming interviews and workshop, a site and systems selection workshop, and a site and personnel workflow analysis to look for spatial and programming overlaps . This allows us to right size the new facility while providing the much-needed program elements for the different stakeholder groups . MWA regu- larly coordinates with stakeholder groups across departments and agencies, sometimes with conflicting or contradictory needs, to provide beautiful, economically responsible design solutions . MWA’s design solution will support the end users and the greater Kittitas County community . Our programming process to quickly right-size and optimize site infrastructure and location within Bowers Field is outlined in the diagram below. MWA designed Pendleton Bus Barn to be built in phases as it receives funding . After securing DOE and DOT funding, phase one is complete (pictured above) . LISTENINGDESIGN . ITERATION . REFINE . SHARELISTENING Discovery Identify Stakeholders Standards + Best Practice Management Verification Architectural Program/ Space Needs Massing Studies/ Alternatives Development Refine Alternatives + Cost Development Precedents Campus/Site Alternatives Workshop Site + Workflow Analysis Client Input Refine preferred alternative to 15% + refine cost for final report MWA ARCHITECTS | 24 Once space planning is complete, we will develop a rough order of magnitude cost estimate for each preferred alternative . By the end of the feasibility study, the County will have enough documentation to move forward with FAA required submittals like 7460-1 Notice of Proposed Construction and National and State Environmental Policy Acts (NEPA/SEPA) if they choose to continue with the development process . a dedicated and experienced team It is recognized by the County Commissioners that it is efficient to maintain co-location of these departments/offices while providing additional space, improved program elements, and improved building infrastructure . This includes mechanical, electrical, plumbing and modern code compliant laboratory space(s) which include areas for refrigeration, autopsies, indigent cremation services, and laboratories appropriate to the Coroner’s Office and Public Health needs . MWA’s proposed team includes all disciplines for a successful feasibility study: Civil, Structural, Mechanical, Electrical, Plumbing, Security, Data, Information Technology, and Cost Estimator . Each teaming partner is experienced the central and east side of Washington State . MWA is also teaming with Subject Matter Expert McClaren, Wilson & Lawrie (MWL), who has 25 years of experience with design focused on forensic, medical examiner and coroner’s facilities, and public health labo- ratories and facilities. MWL recently completed the medical examiner’s office for Spokane County, which is highlighted in this proposal . POTENTIAL CHALLENGES MWA’S MITIGATION TECHNIQUE Identifying and coordinating multiple stakeholder groups needs . This project will need to adhere with the Kittitas County Airport property requirements while serving the needs of multiple agencies . MWA will provide time in the schedule to meet with each stakeholder to understand their needs . This iterative process requires the appropriate time to create design techniques that gain consensus from all user groups . The preferred location zoning may or may not allow by right for this use . Should the preferred location not allow by right for this use, MWA would bring in a land use planning consultant after the feasibility study is complete . When designing something to be built on an airport site, siting it for FAA requirements . MWA would coordinate FAA inclusion and predesign requirements . Potentially need to update the Airport Layout Plan FAA (ALP) . Confirm if required and include next steps and timeline required to update in feasibility conclusions . Airplane fuel is historically leaded . This may trigger environmental concerns . MWA would bring in an environmental teammate to conduct environmental investigations of preferred site . 05. SUPPORTING DATA MWA has included all information in the prior pages of the proposal and has no additional information to share at this time . Thank You MWA Architects 501 SE 14th Avenue #103, Portland, OR 97214 Phone: 503 .973 .5151 Email: jvonbargen@mwaarchitects .com November 04, 2025 Rate Tables “Kittitas County Public Health and Safety Facility” MWA Architects, Inc. 2025 2026 2027 Principal/SME $260.00 $278.20 $297.67 Project Manager $205.00 $219.35 $234.70 Project Architect $200.00 $214.00 $228.98 Designer 4 $176.00 $188.32 $201.50 Designer 2 $137.00 $146.59 $156.85 Designer 1 $118.00 $126.26 $135.10 FSi Engineers 2025 2026 2027 Principal $ 310.00 $ 331.70 $ 354.92 Mechanical Principal Engineer $ 285.00 $ 304.95 $ 326.30 Electrical Principal Engineer $ 285.00 $ 304.95 $ 326.30 Fire Protection Engineer $ 285.00 $ 304.95 $ 326.30 Project Manager A $ 205.00 $ 219.35 $ 234.70 Project Manager B $ 180.00 $ 192.60 $ 206.08 Mechanical Engineer Level 7 $ 200.00 $ 214.00 $ 228.98 Electrical Engineer Level 7 $ 200.00 $ 214.00 $ 228.98 Mechanical Engineer Level 6 $ 180.00 $ 192.60 $ 206.08 Electrical Engineer Level 6 $ 180.00 $ 192.60 $ 206.08 Mechanical Engineer Level 5 $ 170.00 $ 181.90 $ 194.63 Electrical Engineer Level 5 $ 170.00 $ 181.90 $ 194.63 Mechanical Engineer Level 4 $ 150.00 $ 160.50 $ 171.74 Electrical Engineer Level 4 $ 150.00 $ 160.50 $ 171.74 Mechanical Engineer Level 3 $ 140.00 $ 149.80 $ 160.29 Electrical Engineer Level 3 $ 140.00 $ 149.80 $ 160.29 Mechanical Engineer Level 2 $ 130.00 $ 139.10 $ 148.84 Electrical Engineer Level 2 $ 130.00 $ 139.10 $ 148.84 Mechanical Engineer Level 1 $ 120.00 $ 128.40 $ 137.39 Electrical Engineer Level 1 $ 120.00 $ 128.40 $ 137.39 Engineering Intern $ 100.00 $ 107.00 $ 114.49 CAD Manager $ 175.00 $ 187.25 $ 200.36 CAD Drafter A $ 130.00 $ 139.10 $ 148.84 CAD Drafter B $ 120.00 $ 128.40 $ 137.39 Project Accountant $ 145.00 $ 155.15 $ 166.01 Project Administration $ 115.00 $ 123.05 $ 131.66 Project Coordinator $ 120.00 $ 128.40 $ 137.39 Commissioning Lead $ 175.00 $ 187.25 $ 200.36 Commissioning $ 155.00 $ 165.85 $ 177.46 DCI - Civil 2 2025 2026 2027 Principal $ 228.00 $243.96 $261.04 Associate Principal $ 208.00 $222.56 $238.14 Associate $ 187.20 $200.30 $214.33 Senior Project Manager $ 187.20 $200.30 $214.33 Project Manager $ 166.40 $178.05 $190.51 Senior Project Engineer $ 145.60 $155.79 $166.70 Project Engineer $ 145.60 $155.79 $166.70 Senior Technical Designer $ 166.40 $178.05 $190.51 Project Accountant $ 166.40 $178.05 $190.51 DCI - Structural 2025 2026 2027 Principal $260.00 $278.20 $297.67 Associate Principal $228.00 $243.96 $261.04 Associate $208.00 $222.56 $238.14 Senior Project Manager $187.20 $200.30 $214.33 Project Manager $166.40 $178.05 $190.51 Senior Project Engineer $145.60 $155.79 $166.70 Project Engineer $124.80 $133.54 $142.88 Clerical and Admin $104.00 $111.28 $119.07 Senior Technical Designer $145.60 $155.79 $166.70 Technical Designer $104.00 $111.28 $119.07 Sound NW Precon Services 2025 2026 2027 Lead Estimator $ 165.00 $ 176.55 $ 188.91 Senior Estimator $ 165.00 $ 176.55 $ 188.91 Mechanical $ 215.00 $ 230.05 $ 246.15 Electrical $ 175.00 $ 187.25 $ 200.36 MWL Architects 2025 2026 2027 Senior Principal $ 305.00 $ 326.35 $ 349.19 Principal $ 265.00 $ 283.55 $ 303.40 Associate $ 235.00 $ 251.45 $ 269.05 Junior Associate $ 215.00 $ 230.05 $ 246.15 Senior Architect/Lab Planner $ 205.00 $ 219.35 $ 234.70 Architect $ 175.00 $ 187.25 $ 200.36 Project Manager/Lab Planner/BIM Manager $ 175.00 $ 187.25 $ 200.36 Technical Staff $ 125.00 $ 133.75 $ 143.11 Landis Consulting Engineers 2025 2026 2027 3 Principal $ 225.00 $ 240.75 $ 257.60 Electrical Engineer $ 180.00 $ 192.60 $ 206.08 Electrical Designer $ 110.00 $ 117.70 $ 125.94