My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Conduct PHearing_Flood Mitigation_Whiskey Creek
>
Meetings
>
2025
>
10. October
>
2025-10-21 2:00 PM - 2:00pm Public Hearing
>
Conduct PHearing_Flood Mitigation_Whiskey Creek
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2025 1:29:39 PM
Creation date
10/16/2025 1:27:42 PM
Metadata
Fields
Template:
Meeting
Date
10/21/2025
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Public Hearing to consider the Exercise of Condemnation Authority Under RCW 8.08.010 for the Acquisition of Right of Way and a Temporary Construction Easement for Flood Mitigation on Whiskey Creek, RE Parcel Numbers 962710 and 962712.
Order
1
Placement
2:00pm Public Hearing
Row ID
136885
Type
Hold Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />AGENDA DATE: <br />ACTION REQUESTED: <br />AGENDA STAFF REPORT <br />October 21, 2025 <br />Conduct a Public Hearing on October 21, 2025, at <br />2:00 pm local time to consider the Exercise of <br />Condemnation Authority Under RCW 8.08.010 for <br />the Acquisition of Right of Way and a Temporary <br />Construction Easement for Flood Mitigation on <br />Whiskey Creek, RE Parcel Numbers 962710 and <br />962712. <br />BACKGROUND: The Whiskey Creek at Ellensburg Water Company <br />Siphon Project is identified in the Flood Control <br />Zone District Capital Improvement Plan. This <br />project aims to reduce flooding impacts from <br />Whiskey Creek at Bender Road and the Ellensburg <br />Water Company (EWC) canal crossing by <br />increasing flood conveyance capacity along <br />Whiskey Creek. <br />INTERACTION: <br />The project requires a temporary construction <br />easement for 24,501 square feet of property on <br />parcels 962710 and 962712, as well as a right-of- <br />way acquisition for 9,230 square feet on parcel <br />962710. The right-of-way acquisition is necessary <br />for the flood mitigation siphon project to ensure that <br />the Ellensburg Water Company retains its current <br />ability to conduct operational spills at this location. <br />Kittitas County has submitted two written offers to <br />the property owner but has not been able to reach a <br />voluntary agreement. <br />Public Works; Prosecuting Attorney <br />RECOMMENDATION: Conduct a Public Hearing on October 21, 2025, at <br />2:00 pm local time to consider the Exercise of <br />Eminent Domain Authority Under RCW 8.08.010 <br />for the Acquisition of Right of Way and a <br />Temporary Construction Easement for Flood <br />Mitigation on Whiskey Creek, RE Parcel Numbers <br />962710 and 962712. <br />
The URL can be used to link to this page
Your browser does not support the video tag.