HomeMy WebLinkAboutResolution_JUB TO_Taxilane Complex Phase IKITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
AGENDA SESSION STAFF REPORT
AGENDA SESSION DATE: September 16, 2025
ACTION REQUESTED: Request to Approve a Resolution authorizing the Chair's
signature on Task Order 2025-01 with J-U-B
Engineering to perform engineering services for the
Bowers Field Hangar Taxilane Complex — Phase 1
Design.
BACKGROUND: The Board of County Commissioners approved a
Resolution to award J-U-B Engineers the contract to be
the Bowers Field consultant on January 3, 2023,
providing general planning and engineering services.
INTERACTION:
Task Order No. 2025-01 for the design of the Hangar
Taxilane Complex project is being submitted for
consideration. J-U-B has submitted a task order in the
amount of $184,170.00. Concurrence has been made by
the FAA for the task fee for this project.
Project funding for Bowers Field design project
FAVAIP No. 3-53-0026-024-2025 has been awarded
and accepted by Resolution 2025-147. Funding requires
a 5% local match. Matching funds are available in the
Airport Fund.
Public Works
RECOMMENDATION: Approve a Resolution authorizing the Chair's signature
on Task Order 2025-01 with J-U-B Engineering to
perform engineering services for the Bowers Field
Hangar Taxilane Complex — Phase 1 Design.
HANDLING: Return one (1) original to Public Works
ATTACHMENTS: Resolution; Task Order 2025-01
LEAD STAFF: Josh Fredrickson, Public Works Director
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO.2025 -
AUTHORIZING THE CHAIR'S SIGNATURE ON J-U-B ENGINEERING TASK ORDER
2025-01 FOR THE BOWERS FIELD HANGAR TAXILANE PROJECT DESIGN
WHEREAS: J-U-B Engineers is currently the service provider to Public Works for projects at
Bowers Field selected from County procurement process in 2023; and
WHEREAS: J-U-B Engineering has submitted Task Order No. 2025-01 for the Hangar
Taxilane Project Design in the amount of $184,170.00; and
WHEREAS: Funding for Task Order 2025-01 is through Federal Aviation Administration
grant with a 5 percent County match.
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best
interest of the public, does hereby authorize the Chair's signature on J-U-B
Engineering Task Order No. 2025-01 for the Hangar Taxilane Project Design.
DATED on this 16th day of September 2025, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Laura Osiadacz, Chairman
Cory Wright, Vice -Chairman
Brett Wachsmith, Commissioner
TASK ORDER 2025-01
HANGAR TAXILANE COMPLEX PHASE 1 DESIGN
AI P-3-53-0026-024-2025
A MASTER AGREEMENT for Engineering Services entered into and effective on the 3rd day
of January 2023, shall be appended herein as Task Order No. 2025-01, made as of
day of September, 2025, by and between Kittitas County, 205 West 5th Avenue, Suite 108,
Ellensburg, Washington, hereinafter referred to as the OWNER, and J-U-B ENGINEERS, Inc.,
999 W. Riverside Ave. Suite 700, Spokane, Washington, hereinafter referred to as the
ENGINEER.
PROJECT OBJECTIVE
The County's objective in this agreement is to:
• Construct approximately 550 linear feet of Taxilane(s) for GA Aircraft and Hangar
Development adjacent to the main GA apron.
• Grade the Taxilane Safety and Object Free Areas to meet FAA Standards.
• Relocate approximately 1,000 linear feet of chain link airport perimeter fencing.
• Install utility sleeves as needed to avoid future pavement cuts to the paved
Taxilane.
• Improve drainage in the vicinity of the Taxilane. Work includes grading and
installation of catch basins and/or pipes to collect stormwater.
Included below is a depiction of the proposed project from the ELN Airport Layout Plan
(ALP).
AIRPORT BUILD67GNACIL" KEY
is ®^w.rce[wu,.
n.
;1f Eeun
:n [xx-
u[•
!M +.-
`E. em�meeew..�wue-wsuiwerRaw
vs
Yi. r.ea+.�rr�uamw�nn
EE xw*a«aax-.ra
arrs�uEwe
s em uau ..R.0
va•
' w+m..++ E...rwn
w
ffi n, x
wrnsrwn.n
s; aeurua. Raoexw,aR�emuo-Ew
nm
'sr w.*av� uovr.,R.Kw.ws..
� �E�'E
sar
•wer.n
's �eEoeusaaEnvnns
m
`b , wox.�...rnrrina
mr
'. e..e,...-u.re...m..�Ewn m�•w.i
yr
w.�s.w.eewRn.v,
-I' a.xenWAKWi'uuRE�R rnvn
DS
jd CYNr
At:
:)Q W1NM��P,s6WYY1RY
f11P
`M m�uw IdetllMel
9� ewwtwEN uaruai-teYO+N
ifY
[' NY0..V[ pnwstlM.
IEE'
fY ANNL�eEbEaw•�n.ei
;u. ,:r.aws
:
w
1i .. a�E.nnE
,rr
:w uw.eMah.MME.i ^..e,
,tea...
,�
r •w w.o[..[�awa.w.w�n
•b �,., .mP
-
.0
;ty r�
yr
za. ,
mr
;i Ne xasro�;
•
.
�
—
[9YtotWr i/isa
_ _—_
-
jb )
Cwi,llaY.
-
I
,nL u
o. Al
�. RillIGfFO
�1
---.—_ _---------
-------
-------
4itjAso�rrruwxa �.
_s oran
.
I
t6
g
B. j nrcamEsmirsawnvai.
�.. uuurtEeumuc
wA—
ciT8tAN91.
\\ ub.com\Central\Clients\WA\KittitasCounty\Projects\45-25-
022_BowersField_HangarTxln_PhaselDsgn\ProjMgmt\Agreements\Old\TO 2025_01_Rev5ept2025.docx
1
TASK ORDER 2025-01
HANGAR TAXILANE COMPLEX PHASE 1 DESIGN
AI P-3-53-0026-024-2025
SCOPE OF SERVICES
J-U-B's Services under this agreement are limited to the following tasks:
TASKS
Task 001: Project Formulation Phase
1. Conduct a Pre -Design meeting with CLIENT and FAA at the Airport. The meeting
will be held to determine the planning and study issues that will need to be
addressed during the design of the project. The FAA Predesign Conference
Checklist will be the guide for project discussions. Minutes of the Predesign
meeting will be compiled and forwarded to the FAA and CLIENT.
2. Assist the CLIENT with Project Scope development and formulation. J-U-B will
prepare a Scope of Services narrative and detailed description of all work tasks for
CLIENT and FAA review and approval. Discuss review comments and revise
accordingly.
3. Prepare a listing of work tasks in a spreadsheet with person -hours, hourly rates,
expenses, and costs based on the Scope of Services. This spreadsheet will be used
for both J-U-B and the Independent Fee estimate. J-U-B shall prepare a detailed
cost proposal on the spreadsheet, based on estimates of work to accomplish the
Scope of Services.
4. Provide the CLIENT and the Independent Fee Estimator (IFE) with a blank person -
hour spreadsheet, Scope of Services, Project Layout Map, and overall project
estimate.
5. Prepare an Agreement for Professional Services for submittal and review by the
CLIENT and FAA, including the FAA Professional Service Agreement Checklist. The
Agreement shall be comprehensive in description of services and responsibilities
of all contract parties.
6. Assist CLIENT with preparation and submittal of a FAA Grant Application for Federal
Assistance for the project, including estimated project costs, drawings, and a
schedule for FAA submittal prior to beginning of the project.
7. Assist CLIENT in the submittal of FAA Sponsor Certifications. These include the
"Selection of Consultants", "Project Plans and Specifications", "Drug Free
Workplace", "Equipment/Construction Contracts", "Disclosure Regarding Potential
Conflicts" and "Construction Project Final Acceptance".
8. Provide the following services related to Federal Disadvantaged Business
Enterprise requirements (DBE).
a. Redevelop sponsor's DBE Program Plan in accordance with the
Disadvantaged Business Enterprise (DBE) Programs Final Rule dated April
9, 2024 and submit to FAA Civil Rights for review and approval.
\\jub.com\Central\CI ients\WA\KittitasCou my\Projects\4S-25-
022_BowersField_HangarTxln_PhaselDsgn\ProjMgmt\Agreements\Old\TO 2025_01_RevSept2025.docx
2
TASK ORDER 2025-01
HANGAR TAXILANE COMPLEX PHASE 1 DESIGN
AI P-3-53-0026-024-2025
9. Provide the following services related to Federal Title VI of the Civil Rights Act of
1964.
a. Develop scope and fee for requesting design amendment to develop
documents related to Title VI.
b. Develop a Title VI Program Plan for the Airport based on the FAA provided
direction and Title VI plan template. This document will be customized for
the sole use of the Owner and includes but is not limited to the following:
Work with the City and Airport to identify the Civil Rights
Coordinator and their responsibilities.
ii. Assist with coordinators access to Civil Rights Connect if not
already established.
iii. Identify and document plans for required posting distribution
iv. Analysis of potential or known community impacts
V. Analysis of community statistics
vi. Limited English Proficiency (LEP) access planning and
implementation
vii. Identification of minority business
viii. Identification of additional training for staff and new employee
onboarding
ix. Identification of Title VI compliant procedures
X. Create draft Title VI Plan document for review by the Owner
xi. Revise Title VI Plan based on comments received and submit
final draft to FAA Civil Rights.
c. Assist Title VI Coordinator with annual data collection and demographic
data
d. Develop a Community Participation Plan (CPP) for the Owner based on the
FAA provided direction and CPP template
i. Identify communication efforts
ii. Identify key community representatives
iii. Create draft CPP document for review by the Owner
iv. Revise CPP based on comments received and submit final draft
to FAA Civil Rights.
e. Create language assistance plan if required by Title VI
10. Prepare and submit four (4) FAA Quarterly Performance Reports and two (2) Fiscal
Year End Financial FAA 271 and 425 forms throughout the project.
11. Attend eight (8) meetings with the Airport Advisory Committee and/or County
during the project in order to keep Airport personnel and management abreast of
\\ ub.com\Central\Clients\WA\KittitasCounty\Projects\4S-25-
022_BowersFie ld_H angarTxln_Phase1Dsgn\ProjMgmt\Agreements\Old\TO 2025_01_RevSept2025.docx
3
TASK ORDER 2025-01
HANGAR TAXILANE COMPLEX PHASE 1 DESIGN
AI P-3-53-0026-024-2025
the progress of the projects. Discussions will include project phasing, budget and
schedule updates.
12. Assist CLIENT in preparation and processing of monthly Request for
Reimbursement (RFR) by submitting data as described. It is anticipated that the
CLIENT will prepare and process eight (8) monthly sets of RFR 'packages' for this
project. J-U-B will provide documentation of costs for the CLIENT's use in
performing the Request for Reimbursements including consultant invoices,
reimbursement spreadsheet and Standard Form 271.
13. Project is within the Urban Growth Area (UGA) of the City of Ellensburg. Anticipate
to meet once with the City of Ellensburg representatives to verify requirements of
the City. The County has an interlocal agreement in place with regard to
development within the UGA.
Task 002: Preliminary Design Phase
1. Investigate the proposed job site at the Airport. Allow civil design personnel to
become familiar with the proposed job site. Take photographs, perform a visual
survey of the pavement areas, and otherwise document findings of visit.
2. Provide or obtain field surveys, which include detailed topographic and cross
section information of improvement areas for design purposes. Coordinate with
surveyors to verify that design survey is performed as required. This will include
one (1) on -site meeting with surveyors to review project location and safety. The
general scope of the survey work will include the following:
The primary area to be surveyed is approximately 650-ft by 250-ft and
encompasses the proposed taxilane, associated safety areas, and adjacent
structures. The pavement and shoulder surfaces within this area shall be section
surveyed on 20-ft stations. The infield and grass surfaces within this area shall be
surveyed on a 50-ft by 50-ft grid. All topographical features within all of these areas
shall be surveyed including but not limited to: grade breaks, pavement markings,
tie -downs, building corners, fence, drainage structures (invert elevations, pipes
sizes, & rim elevations), pavement markings, utility markers, edge of pavements,
and lighting and electrical components.
Existing control monuments shall be used for the survey control and will need to
be tied together to check for accuracy. The survey will have to be coordinated with
the Airport Manager for airport access and optimum time to minimize disruption
to air traffic. The airfield pavements and runway will be open to aircraft, surveyors
will have to monitor the local frequency and move out of safety areas for aircraft.
The survey shall be conducted in accordance to FAA AC 150/5370-2G safety
guidelines. Vertical datum should be in accordance to NAVD 88, and horizontal
datum should be in accordance to NAD 83. Vertical tolerances shall be +0.02-feet
for paved surfaces and +0.05-feet for unpaved surfaces. Horizontal tolerances shall
be +0.03-feet.
\\jub.com\Central\Clients\WA\KittitasCou my\Projects\45-25-
022_BowersFie ld_H angarTxln_PhaselDsgn\ProjMgmt\Agreements\Old\TO 2025_01_RevSept2025.docx
4
TASK ORDER 2025-01
HANGAR TAXILANE COMPLEX PHASE 1 DESIGN
AI P-3-53-0026-024-2025
The collected data shall be provided on a compact disk to the Engineer with the
following information: point number, description, northing, easting, and elevation
along with paper copies of any pertinent field notes. No map or drawing will be
required.
3. Administer design Geotechnical Subconsultant contract and coordinate delivery of
work product. Provide quality control review of work products. This will include
one (1) on -site meeting with geotechnical Subconsultant to review project location
and safety. The geotechnical laboratory work will be performed utilizing the
services of a Subconsultant. The general scope of the geotechnical work will be
the following:
Administer three (3) cores/bore logs on the proposed taxilane alignment to a depth
of 6-feet or refusal.
The geotechnical engineer shall immediately patch all pavement core holes with
an approved asphalt cold mix or similar product. Data shall be collected on the
soil type, existing asphalt condition, and depths and categorized according to the
Unified Soil Classification System (USCS) including Moisture Content, Atterberg
Limits, Grain Size Distribution. A sieve analysis shall be performed on both the
base course and subbase for each core/bore location. The sieve analysis for base
course should include the following classifications: percentage by weight passing
sieves of 1-inch, 3/4-inch, No. 4, No. 40, No. 200, and 0.02 mm. The sieve analysis
for subbase course should include the following classifications: percentage by
weight passing sieves of 3-inch, No. 10, No. 40, No. 200, and 0.02 mm. Ground
water depth shall be recorded if encountered. Three California Bearing Ratio (CBR)
test shall be performed on the bore log samples at a depth of 24-inches which is
the anticipated depth of subgrade.
The geotechnical engineer shall coordinate with the Engineer to determine exact
core/bore log locations. The geotechnical work shall be conducted in accordance
to FAA AC 150/5370-2G safety guidelines. The geotechnical engineer shall be
responsible for a utility locate prior to work. It should be anticipated that the
cores/bore logs shall be taken during nighttime hours. The geotechnical firm will
need to coordinate with the Airport Manager and the Engineer personal for closure
time and date.
The geotechnical firm shall submit 3 copies of the final geotechnical report
including all required information as mentioned above to the Engineer within three
weeks upon finishing field work. The firm shall submit a draft copy for review prior
to finalizing the report and its findings.
This line item shall include the coordination and contracting with Subconsultant.
The Subconsultant fees shall be addressed in the Expenses-Subconsultant Section.
\\jub.com\Central\Clients\WA\KittitasCou my\Projects\45-25-
022_BowersFie ld_H angarTxln_PhaselDsgn\ProjMgmt\Agreements\Old\TO 2025_01_RevSept2025.docx
5
TASK ORDER 2025-01
HANGAR TAXILANE COMPLEX PHASE 1 DESIGN
AI P-3-53-0026-024-2025
4. Analyze the geotechnical testing data to determine the most cost-effective form
of new construction. Analyze the performance and stability of existing asphalt
section. Rehabilitation methods may include full depth reconstruction in
designated select locations, pavement removal and replacement, or pavement
overlay depending on test results. Hold a meeting with the CLIENT and FAA at the
Airport to present findings of the Geotechnical Testing and analysis of existing
pavement. Determine rehabilitation/reconstruction method best suited for the
pavement surfaces.
5. Define critical aircraft for the pavement design of the project and develop
pavement design section. Pavement design criteria shall be in accordance with the
FAA Advisory Circular (AC) 150/5320-6G. This will include calculating and reporting
the Airport Pavement Strength- PCR.
6. Perform analysis of existing geometric layout of Taxiway/Runway fillets and radii
to determine compliance with current FAA AC requirements. Present findings to
CLIENT and FAA for review and comments.
7. Review existing storm water drainage within the project boundary. Evaluate
existing drainage patterns and systems. J-U-B shall conduct a required analysis for
the design of drainage improvements associated with the project in accordance
with the FAA AC 150/S320-5D, Surface Drainage Design. Any necessary drainage
improvements will be sized to accommodate local drainage standards. This
drainage effort is intended to integrate with previously established drainage
designs (specifically the Parallel Taxiway).
8. Address subsurface drainage requirements for the runway and determine
appropriate methods for compliance with the FAA Northwest Mountain Region
policy on subsurface pavement drainage and edge underdrains. Location of
underdrain outlets will be a significant portion of this study.
9. Perform analysis of existing Runway and Taxiway Shoulders, Safety Area and Object
Free Area grading adjacent to project area to determine proposed taxilane
compliance with current FAA AC 1 S0/S300-13B requirements.
10. Determine the operational and phasing effects of closing portions of adjacent
apron pavement areas. Closing the runway will impact the airport users, FBO's and
transient aircraft during the construction period. Study the effects of the various
alternatives including night construction, temporary displaced thresholds, using
parallel taxiway as temporary runway, or phased construction. Complete a cost
analysis on all alternatives to present to CLIENT. Two meetings at the Airport will
be needed to present preliminary alternatives and phasing plan to the CLIENT and
stakeholders.
11. Prepare and submit a State Environmental Policy Act (SEPA) Environmental
Checklist in accordance with Title 15 of Kittitas County Code. Environmental work
\\ ub.com\Central\Clients\WA\KittitasCounty\Projects\45-25-
022_BowersField_HangarTxln_PhaselDsgn\ProjMgmt\Agreements\Old\TO 2025_01_RevSept202S.docx
6
TASK ORDER 2025-01
HANGAR TAXILANE COMPLEX PHASE 1 DESIGN
AI P-3-53-0026-024-2025
beyond that described will be considered additional work and may require a
contract modification.
12. Assemble base data and base maps for the project work area from the design
survey, previous projects undertaken, and available aerial data.
13. Prepare preliminary Design Plans (60% complete) for review and discussion with
the CLIENT and FAA. Resubmit to CLIENT and FAA at 90% complete. It is
anticipated that the project design will require sixteen (16) plan sheets including:
Sheet 1 — Cover
Sheet 2 — Construction Layout Plan
Sheet 3 — Operation & Safety Plan - Phase 1
Sheet 4 — Operation & Safety Plan - Phase 2
Sheet 5 — Demolition/Modification Plan
Sheet 6 — Grading & Drainage Plan - Sheet 1
Sheet 7 — Grading & Drainage Plan — Sheet 2
Sheet 8 — Plan & Profile Taxilane — Sheet 1
Sheet 9 — Plan & Profile Taxilane — Sheet 2
Sheet 10 — Pavement Marking Plan
Sheet 11 — Perimeter Fencing Plan
Sheet 12 — Pavement Marking Details
Sheet 13 — Fencing Details
Sheet 14 — Typical Sections
Sheet 15 — Civil Details
Sheet 16 - Civil Details
14. Prepare preliminary Bidding and Construction Contract Documents and Technical
Specifications (60% and 90% complete intervals) based on latest version of FAA AC
150/5370-10 "Standards for Specifying Construction on Airports" including the
current Regional Notice published by the FAA Airports Districts Office.
15. Prepare a preliminary Engineer's Opinion of Probable Construction Cost Estimate
based on construction cost estimates, phasing into workable portions for
constructability, budget, and construction schedule and advise the CLIENT as to
budget status.
16. Prepare a preliminary Construction Safety and Phasing Plan according to AC
150/5370-2G for evaluation by the CLIENT, Airport, FBO, airport users and
agencies. An electronic copy will be submitted to the FAA Airport District Office
for coordination, review, and approval with other FAA lines of business using the
airspace process.
17. Prepare the preliminary Engineer's Design Report in conformance with FAA
guidelines. The report shall include a Summary of the Project and its specific design
issues, Project Schedule, reference to the Construction Safety and Phasing Plan,
Modification of Standards, Design Analysis, Pavement Analysis, Geotechnical
\\jub.com\Central\CI ients\WA\KittitasCou my\Projects\45-25-
022_BowersFie ld_HangarTxln_PhaselDsgn\ProjMgmt\Agreements\Old\TO 2025_01_RevSept2025.docx
7
TASK ORDER 2025-01
HANGAR TAXILANE COMPLEX PHASE 1 DESIGN
AI P-3-53-0026-024-2025
Investigation Report, Concept Taxilane Layout, and Construction Cost Estimate and
Schedule.
18. Conduct in-house quality control/quality assurance review of preliminary design
documents.
19. Participate in a preliminary design review meeting with the CLIENT. Anticipate one
(1) review meeting with the CLIENT at the Airport, attendance by the Project
Manager and Airport Engineer. Review design philosophy, preliminary design
drawings, design analysis and project schedules with the CLIENT.
20. Prepare and submit one (1) FAA Form 7460 to airspace the project construction
equipment and permanent taxiway geometry.
21. Submit preliminary documents to FAA (1 copy) and CLIENT (2 copies) for approval.
Task 003: Final Design Phase
1. Finalize Bidding and Construction Contract Documents and Technical
Specifications based on Peer, CLIENT, and FAA Reviews.
2. Finalize Design Plans based on Peer, CLIENT, and FAA Reviews.
3. Prepare final Construction Safety and Phasing Plan to accommodate varying work
components that need to meet prescribed schedules.
4. Complete final quantity calculations and prepare Final Engineer's Opinion of
Probable Construction Cost Estimate.
5. Prepare final Engineer's Design Report based on Peer, CLIENT, and FAA Reviews.
6. Submit final documents to FAA (1 copy) and CLIENT (2 copies) for approval.
Task 004: Bidding Phase
1. Administer the public bid advertisement process including bid document
reproduction and distribution of documents to plan rooms, contractors and
suppliers. Submit advertisements to appropriate newspaper(s) and trade
magazines as required for publication. Maintain a "bidders list" and distribute
plans as requested. Fees for Plan & Specification Reproduction shall be reflected
in the "Printing" line below.
2. Provide Pre -Bid Conference coordination to familiarize bidders and interested
parties with the construction project scope and requirements. Prepare a detailed
agenda and displays, prepare and issue conference minutes. It is anticipated that
J-U-B will conduct this meeting at the Airport.
3. Prepare Bid Addendums. Addenda are normally required in response to Contractor
questions and/or design changes initiated by the CLIENT and/or the FAA.
Engineering estimate includes costs for the preparation of two Addendums.
\\j u b. com\Centra I\C I ie nts\W A\Kittitascou my\P rojects\45-25-
022_BowersFie ld_H angarTxln_PhaselDsgn\ProjMgmt\Agreements\Old\TO 2025_01_RevSept2025.docx
8
TASK ORDER 2025-01
HANGAR TAXILANE COMPLEX PHASE 1 DESIGN
AIP-3-53-0026-024-2025
4. Respond to questions that arise during the Contractor's or supplier's bid
preparation process.
5. Assist the CLIENT in conducting the project Bid Opening as required, including
preparation of a Project Bid Summary. It is anticipated that J-U-B will coordinate
and attend this meeting at Kittitas County Public Works Office.
6. Prepare detailed Bid Tabulations documenting bid results and submit to CLIENT
and the FAA.
7. Assist the CLIENT with review and analysis of bids received. J-U-B will determine
his opinion on "responsiveness" of bid submittal. Provide letter of
recommendation of award along with price/cost analysis in accordance with FAA
Order 5100.38D-Appendix U to CLIENT. Advise the CLIENT of possible action in
cases where bids exceed budget for the work to be performed by the Contractor.
Task 005: Project Closeout Phase
1. Prepare the final project report and close-out documents according to FAA
requirements and submit to CLIENT and FAA.
2. Prepare an Airport Layout Plan Set (ALP) Revision to document improvements. A
draft copy of the revised ALP will be submitted to the FAA and CLIENT for review.
Upon review and comment changes, copies with be distributed to the FAA and
CLIENT for signatures.
3. Report Disadvantaged Business Enterprise (DBE) project participation to FAA dbE-
Connect including all calculations and background information for review and
approval.
4. Assist and coordinate with independent auditors in locating appropriate
documents for performing A-133 (Single Audit) annual audit. In addition to finding
appropriate project files, answer questions as required.
5. Provide assistance to the CLIENT in assessing, costing, and updating the five-year
Capital Improvement Plan for submittal to State Division of Aeronautics.
ASSUMPTIONS
• No SMS plan is required on this project during the design or other portions of the
project.
No initial AGIS survey is required for this project.
• This project has been determined to be environmentally cleared through a
previous Environmental Assessment (EA). Further environmental efforts beyond
completing a Kittitas County SEPA will be considered additional work and may
require a contract modification.
\\j u b. co m\Centra I\C I i e nts\W A\KittitasCou my\Prof ects\45-25-
022_BowersFie ld_H angarTxln_PhaseIDsgn\ProjMgmt\Agreements\Old\TO 2025_01_RevSept2025.docx
9
TASK ORDER 2025-01
HANGAR TAXILANE COMPLEX PHASE 1 DESIGN
AIP-3-53-0026-024-2025
SCHEDULE OF SERVICES
J-U-B will perform all services according to the following schedule:
April 1', 2025 to June 30t'', 2026
This Agreement shall be in effect from April 1, 2025 to September 30, 2026. In the
event the services described shall not be completed during the term of this Agreement,
the Agreement shall be amended.
This schedule shall be equitably adjusted as the PROJECT progresses, allowing for
changes in scope, character or size of the PROJECT requested by the CLIENT or for
delays or other causes beyond J-U-B`s control.
COMPENSATION
CLIENT shall pay J-U-B for the identified Services in PART 1 as follows:
Preliminary and Final Design Phase. The CLIENT shall compensate J-U-B on
the basis of a lump sum amount One Hundred Eighty -Four Thousand, One
Hundred Seventy Dollars and No Cents ($184,170.00). See Attachment 1 B
for a detailed cost breakdown.
This Task Order No. 2025-01 will become part of the referenced AGREEMENT when
executed by both parties. IN WITNESS WHEREOF, the parties execute below:
For the Owner, Kittitas County, Washington
Dated this day of 2025,
By:
Name
For the ENGINEER, J-U-B ENGINEERS, Inc.
Dated this I- day of - 2025,
By:
161-1=1-
Title
Title
\\j u b.com\Central\Clients\WA\KittitasCounty\Projects\45-25-
022_BowersField_HangarTzln_PhaselDsgn\ProjMgmt\Agreements\Old\TO 2025_01_RevSept2025.docx
Group Man
10
T
ob
a
C n
C"
Oz
y�'
ro
roM
ro
d
Nceb
a,
roCD
a:"�-
ro
d
b
b
b
b
ro
ro
nA
yo
ZCD
p
C
(CD
CD
CD
dO
O
'Uro
Oax
O.3
'roNO
'croN1
'LroNS
'iroN7
'roNO
'Z3
'roN
C:d
C
O
.O0
OO.
O
`'C
C
p
CD
C
C
CD
ORID
CD
S'
y
CD
CD
CD
CD
CD
CY
CD
CD
F-ry
Rrp
ID
�.
CD
0
i-t
0
CD
ID
CD
CD
M
..�
n
n
nCD
M
a
y
n
ni
CD
c�`*D
a
O
Cj
o
o
'AID
b
►r1
Ciy7 ►y,
F•~•
o
'�'
b'
'
N
h
°�,
M
M.
�•
a
a
N
o
!'3
(,D"
H
S
Cy"
('D
CCD D
w°
CDCD
y
b
to
w
CD
CD
ID
Ell
w
N.
o
x
n
b
a
c
CDP
CD
CD
r
CD
C.
CD
C�
rb
p
�
CD
(D
.C-.
CD
n
n,
C.CD
CD
Fy
N
bQ
El
"
W
VG
:iQ
CD
d
CD
CD
V]
CD
ac
�%
aQ
•�
aq
hj
rn
ro
w;
w
CDCD
1'r
CD
au
d
o
w
CD
a
CD
CD
CD
G
41
A
N
00 '7•
ll
A VI e� R
N n n
0
o
N
o
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
O
O
O
O
N
0
�
o a
N OQ m
to `C
ro
CD K
0
0
0
Cl
0
0—
�-'
O
o mrD
0
O R
N
oo
O
N
N?
W
ON
N
N
l.D
N
A
N
N
O
W
00
O\
01
•P
O
A
?
A
N
ON
N
w
69 .r�,�
fD
a arc feD
a
a1
00
O
O
D1
00
Cl
O
A
N
N
W
w
N
a\
•P
A
V,
w
w
w
O
w
O
W
N
N
O
O
O
O
O
O
N
NeD
O CD
65 d
o CD d
0
0
0
0
w
O
Cl
O
W
O
A
A
O
A
_
01
0
Cl
Cl
0
0
0
0
0
0
0
0
0
0
0
0
Cl
Cl
0
O R
p
CD
<
r0
0
0
0
0
0
0
Cl
0
0
W
0
0
0
0
0
0
0
0
Cl
0
0
O
O
ClO
O
O
O
O
O
O
O
O
Cl
O R
V1
b
N R t
r"
ro
W
O .Z
O
O
O
O
O
O
O
O
O
O
O
O
O
O
CD
O
CD
O
A
O
0
0
0
0
0
0
0
0
0
0
0
0
0
N
N
EA�
n a
T
G
CD
JO A -1
N
A
O �!ebp
N
0
0
0
0
0
0
0
0
0
0
0
0
Cl
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
O '~'
N
a
fA
00 �.
O
O
O
w
N
0
0
w
0
0
0
O
O
O
O
O
O
O
O
O
O
CDO
O
O
A
O
O
N
-P
N
N
O
i3.
Do
N
y
O
00
In
Vt
O1
N
T
41
W
A
00
A
Vi
c.n
01
C
J
N
O1
O1
O1
A
.P
01
A
Cl
(.A
nd�69
69
69
69
69
A
b9
N
69
oo
N
6)
b9
Is69
69
69
w
b9
U
69
.-
69
—
69
.�
69
?
N
65
N
69
N
69
A
E„ y
ff3
oo
b9
w
f�
69
.-
69
.-
69
69
69
?
b,y
O
C/j Uj
N
00
00
00
vA
-j
O
O
O
IJ
W
�O
N
41
00
01
i-A
01
ut
O
Ut
O
N
?
Q\
00
o0
00
W
00
O\
A
00
w
00
O
J
O
A
00
'A
�O
�l
00
Vi
N
v
N
O
�O
J>
y n
Vl y
C1
00
.-
w
0
00
T
O
00
N
A
p
W
W
W
W
W
UA
00
00
00
O
00
O
O
O
�c
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
O
0
O
0
O
0
O
0
O
0
0
0
O
0
O
0
O
0
O
0
O
0
O
0
O
e
o
e
N
z y
C• 1n.1 t roy
yy�Cro�dbro�zbby'�bnb��,��
ay
c
oID
Z
tr
C°
i
i
0
i
o
CD
o
o
'ZI
co
co
C
y
y
a
pID
G
coo
o
a
g
,p
R•
ro
bID
CD
CDCD
a
�•
�•
y
o
�
C7
w
ua•
c
00
CA n
n
."r.'
t�i
c e
P
NeD
0
0
0
0
0
O
O
O
O
O
O
O
69
�
O W i
N
o�
O
?
4A
N
O�
A
N
N
00
N
•P
00
41
N
—
N
N
N
y
69 d
A
��
y
a
O
W
O
G
N
•P
ao
N
O
N
A
W
0�
00
00
C�
Cl
AC,
41
�n
Q
y
O d
CD
A
Cl
O
O
N
O
0
0
0
000
0
0
0
0
0
O�
O
O
O R
5
G
A
b
_N A
O O
n
w
0
0
Cl
0
0
0
O
O
o
0
0
0
0
Cn
ro
N c
r.w
ro
O R
A
0
0
0
0
0
0
0
0
Cl
0
0
0
0
Cl
0
0
0
0
O
p
N
N
NnG "o
�
O
O
O
O
O
O
O
O
O
O
O
O
O
0
0
0
0
0
0
a
0
o p
C
0
0
0
00
N
O
O41
O
A
N
O
O
O
O
O
N
O
�
a1
"y�
�isti
N
O1
00
O
O
N
Vi
00
m
-P,
?
to
00
�o
ndy
69
69
Hi
N
�i
bol)N
69
W
N
N
69
69
69
N
O
W
�7
D1
?
.A
4U
O
N
`0
00
C>
O
rf
00
o0
N
0o
Cl
O
00
oo
O
�1
�'
vi
oo
00
W
w
A
vi
W
00
00
00
DD
�>
\O
N
•P
0Cl�0
o0
0o
O,
�O
00
00
vi
a\
?
oo
a1
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
0
O
0
O
0
O
0
O
0
O
0
O
O
O
d
Goo bG� r `V
w
°z
1y=dt�y O
O vzi Ei, CC6 P- n t i
cn
Y UO a N C
+
CC
. z CD
C7
r
c �
O
ca
�
y
o
y
+
a
C
CD
y Cn Cn Cn
ti
7 A
�1 fi
C C W b9 69 69 E 01 CryroD (�
N
�O O O C",
U. n
C
b 7 O N 0 0 0 0
N O O
N
o
�' � a
d o a
c,
u
O fD
fD
W
RrD
O
N
fD
ro
rD a
+
o D
o
N
W
ono
x
O O
d
CD
k
..
00
A
O R
r
ro
A
41
W (D
O
6s 6s cNli v,
W
y
ro
; ro
ro
W
_Nft
N
N
�
O
O
O
O O O CD O O O O O'O
O
tA
FA
pyp
00 C.
J
O 7
�
O
y
R
b
xo
N
J
�
A
O
A A v A i w
ice+ N (n w N w 41 w
w
C7
�l Vl w -A 69 69 l!i O 6s Ess 6s
0 0 O, O T 0 0 0
�O
O O N O Cl O O O W O
O Cloo a)O O ClO O, O O N O
O
O