HomeMy WebLinkAbout2025-08-25-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS
Public Works Study Session
Regular Meeting
Monday August 25, 2025 -1:30 PM
BoCC Auditorium
205 West 5th Room 109 - Ellensburg
1. Call to Order
2. Citizen Comments (1 min. time limit)
3. Request to Approve a Resolution accepting Federal Aviation Administration grant funds for
the design phase of the Hangar Taxilane Complex project
4. Request to Approve a Resolution designating interim acting County Engineer, Not to
exceed six months
5. Conference of Government - Economic Development
6. FEMA Map Changes -Yakima River Easton Reach
7. Other Business - No Action to be taken
8. Concluded
Created on 8/21/2025 10:55:49 AM
KITTITAS COUNTY
PUBLIC WORKS STUDY SESSION MINUTES
COMMISSIONERS' AUDITORIUM, 205 WEST 5TH ROOM 109
Regular Meeting
MONDAY 1:30 PM August 25, 2025
Board members present: Chairman Laura Osiadacz, Vice -Chairman Cory
Wright, and Commissioner Brett Wachsmith.
Others: Josh Fredrickson, Arden Thomas, Lisa Godden, Public Works;
Kelle Vanderberg, City of Ellensburg; Amy McGuffin, Kittitas County
Chamber of Commerce; and Rob Ogburn, Central Washington University.
At 1:31PM Chairman Laura Osiadacz opened the Public Works Study
Session.
NO CITIZEN COMMENTS
REQUEST TO APPROVE A RESOLUTION ACCEPTING FEDERAL AVIATION
ADMINISTRATION GRANT FUNDS FOR THE DESIGN PHASE OF THE HANGAR
TAXILANE COMPLEX PROJECT
Josh Fredrickson briefed the Board of County Commissioners of the
grant offered by the Federal Aviation Administration (FAA) for the
Hangar Taxilane Complex Project which is one of the projects listed
in the Airport Layout Plan. The FAA grant offer is 950 of the full
design or $183,986.00. The local match is 50 or $9,683.00, which is
budgeted within Airport Fund 101. Josh Frederickson requested
approval of the resolution to accept funding from the FAA for the
Hangar Taxilane Complex.
Vice Chairman Cory Wright moved to approve Resolution 2025-147 and
Commissioner Brett Wachsmith seconded the motion. Resolution 2025-147
approved.
REQUEST TO APPROVE A RESOLUTION DESIGNATING INTERIM ACTING COUNTY
ENGINEER, NOT TO EXCEED SIX MONTHS
Josh Fredrickson briefed the Board of County Commissioners on the
need for an interim County Engineer due to the current Engineer's
departure effective 8/29/2025. The Board of County Commissioners has
the authority and requirement to employ a County Engineer. Josh
Frederickson stated that he has been working with HR, and the
position has been posted. Josh Fredrickson requested to be appointed
as the interim County Engineer as he had served as County Engineer
prior to being appointed as Public Works Director and has maintained
those qualifications.
08/25/25 MINUTES
Josh Frederickson requested approval of a resolution to designate
Public Works Director as interim County Engineer
Vice Chairman Cory Wright moved to approve Resolution 2025-148 and
Commissioner Brett Wachsmith seconded the motion. Resolution 2025-148
approved.
CONFERENCE OF GOVERNMENT - ECONOMIC DEVELOPMENT
Josh Frederickson gave an update of (COG) Conference of Governments.
He stated that as a part of COG, there is a work program related to
infrastructure and promoting economic development comprised of member
agencies from all municipalities, incorporated municipalities within
Kittitas County, and other representatives from Kittitas County.
Josh Fredrickson continued that partnership for framework
collaboration for economic development has been developed from the
County, Cities within Kittitas County, Central Washington University
and the Kittitas County Chamber of Commerce. Josh Frederickson gave
an overview of the implementation of an Executive Director, overseen
by COG, to drive economic development. Josh Fredrickson added that
in a recent COG meeting held on 8/20/25 an interlocal was discussed
and presented to members of COG. Josh Fredrickson stated that members
of COG were asked that it be taken back to their City Counsels for
review and discussion.
Josh Frederickson then introduced Rob Ogburn of CWU, BCS (Business
Community Services), to share informational analytical data regarding
economic challenges. Discussion was held.
FEMA MAP CHANGES - YAKIMA RIVER EASTON REACH
Arden Thomas briefed the Board of Commissioners on flood risk
assessments in the Yakima River Easton Reach. Arden Thomas stated
that Public Works has submitted the required updated technical
information to FEMA and is expecting FEMA to issue a map change based
on this new technical information. Arden Thomas recommended that a
mailing be sent out to all property owners in the affected area
regarding the updated information. Arden Thomas gave an overview to
the board of the appeal processes should there be an appeal to the
updated map change.
Arden Thomas requested direction on providing the mailing to the
owners in the affected areas and advised that FEMA will post the
information in the newspaper when they finalize a map change.
Direction was given to draft and send out a mailing to the affected
area property owners.
08/25/25 MINUTES
No other business.
Meeting concluded at 2:18 PM
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Lisa Godden, Administrative Laura Osiadacz, Chairman
Assistant
08/25/25 MINUTES
KITTITAS COUNTY
BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
AGENDA DATE: August 25, 2025
ACTION REQUESTED: Request to Approve a Resolution accepting Federal Aviation
Administration grant funds for the design phase of the Hangar
Taxilane Complex project.
BACKGROUND: An Airport Layout Plan (ALP) for Bowers Field was approved in
2018 by Resolution 2018-136. The ALP identifies existing facilities
and future facilities at Bowers Field. One of the future facilities
identified on the ALP is the development of a Hangar Taxilane
Complex area located on current vacant lots H-3 and H-4. This
taxilane project will allow for additional hangar space to be
constructed and associated access to the active runway.
The Federal Aviation Administration has noticed Public Works of
available funds to design the hangar taxilane complex through grant
number 3-53-0026-024-2025.
The FAA grant is for $183,986.00 or 95% of the expected allowable
design costs. A local match of $9,683 or 5% is required. Funds are
currently budgeted in the Airport Fund (101).
INTERACTION: Public Works
RECOMMENDATION: Recommendation, approval of a resolution accepting Federal Aviation
Administration grant funds for the design phase of the Hangar
Taxilane Complex project.
HANDLING: Return One original to Public Works
ATTACHMENTS: Resolution, Project Plan Sheet
LEAD STAFF: Josh Fredrickson, Public Works Director
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO.2025 -
ACCEPTING FEDERAL AVIATION ADMINISTRATION FUNDING FOR DESIGN OF
BOWERS FIELD HANGAR TAXILANE COMPLEX
WHEREAS: The adopted Airport Layout Plan (ALP) identifies existing and future facilities at Bowers
Field; and
WHEREAS: The ALP identifies a hangar taxilane complex to allow for additional hangar space and
access to the active runway; and
WHEREAS: Kittitas County Department of Public Works did receive notice from the Federal Aviation
Administration (FAA) supporting its request to construct a hangar taxilane complex at
Bowers Field; and
WHEREAS: The FAA did grant Kittitas County $183,986 in grant funds supporting the design phase
of the hangar taxilane complex project; and
WHEREAS: Funding for the design phase includes a 5 percent match required with the grant funds;
and
WHEREAS: Local matching funds are available within the current budget.
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest
of the public, does hereby accept Federal Aviation Administration funding for the design
phase of the hangar taxilane complex project; and
NOW, BE IT FURTHER RESOLVED: the Board of County Commissioners does authorize the
Director of Public Works to sign necessary documents to accept the grant funds.
DATED this 25th day of August 2025, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASIRNGTON
Laura Osiadacz, Chairman
Cory Wright, Vice -Chairman
Brett Wachsmith, Commissioner
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO.2025 -_L�q
ACCEPTING FEDERAL AVIATION ADMINISTRATION FUNDING FOR DESIGN OF
BOWERS FIELD HANGAR TAXILANE COMPLEX
WHEREAS: The adopted Airport Layout Plan (ALP) identifies existing and future facilities at Bowers
Field; and
WHEREAS: The ALP identifies a hangar taxilane complex to allow for additional hangar space and
access to the active runway; and
WHEREAS: Kittitas County Department of Public Works did receive notice from the Federal Aviation
Administration (FAA) supporting its request to construct a hangar taxilane complex at
Bowers Field; and
WHEREAS: The FAA did grant Kittitas County $183,986 in grant funds supporting the design phase
of the hangar taxilane complex project; and
WHEREAS: Funding for the design phase includes a 5 percent match required with the grant funds;
and
WHEREAS: Local matching funds are available within the current budget.
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest
of the public, does hereby accept Federal Aviation Administration funding for the design
phase of the hangar taxilane complex project; and
NOW, BE IT FURTHER RESOLVED: the Board of County Commissioners does authorize the
Director of Public Works to sign necessary documents to accept the grant funds.
DATED this 25th day of August 2025, at Ellensburg, Washington.
ti coil
7,
est:
a
eta the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
�T 1�1 TNTY. WASHINGTON
(gory Wright, Vice -Chaff an
r
Bre ac smith, Commissioner
DATA SHEET
AIRPORT Kittitas County Airport - Bowers Field ILOCID E N LOCAL PRIORITY 1
PLANNED YEAR 2025
PROJECT Hangar Taxilane Complex — Phase 1 Design TO
DESCRIPTION CONSTRUCT
AIRPORT BUILDIIIG!FACILI T Y KEY
eN1
c�cror+sanf
m2v.
NY. YEswncN
na•.
rxi YsaewnaN
E�Y•.
ro YesrAnvnoN
e>:v.
'2:
'�w.vWrFasWmxEM3aMC6MMNMAMf
fl1(
iii lMrMraYAeoNWar
vn'
'Tj )v.aYaMMrAlwwz
L'➢6
ea T.WMEWYWrtMaEMwI
vr'
=`z
9BN9tlE1/'9dWTltWAN�KYIWNYaOYA
f)3Y
tl WYWtlMIQMWWIYIrIfi
1)4'
L MM.w.rMmAAWA3
1)fi
tl MMEMaA1MwW1l4urrsale�e
>n
'i'
3pARIWN!O?W)1£W36i0taer8lWMYaa+w
"-
'16 AMldMvlYwzWwr.AlYaAmaEwAll{AMAMW
UP]'
n )f1i1MfAWG11IlIBlt
ill
'/2 swv OUIVW ryN "J
vzr
•:4'
➢VurtwaFce WT49LL qfO 81bIM3lMYNA
113P
17 lyy,ry.ANIt91NAWYMMpYyhM3LAY WMW
L1L
'30 aWYM1aWMYMIrA
Il^J
1! UpW,aApEEAWW136MVMA[I
1NY
'S
�[M19YFNt<%WT/Yi9MiK81WN3YiYMA
f)9f'
3a EOUMYJrYlE3G 13DMRNITMYN/�AffiOYN4
1rY
31 .YswzaAaeaaarw pGill�Eltv:l
1r31
K iBYIrtLMR-on
iJ9Y
-�"6
-�Wr14L Y]NacalWNrJlexG
iP
;11. 1fHtlIHwN@1R0.�iYfA. :9MWM9R�W�W
9I W�(yFrrtNEflLIMtpM!➢Ir K6l8B4o[WdIS Ma'�IPEW.I
ns
AS rOWfmY -04
1131.
]
9wYTrMar W)vnte59wY[6IWRrann
v?<
20 fAUMYCNalAYMMi1EOfAYIb M1T
pl:'
71
46rM1iAIIWYWW11 Vj
'J5P
:8
MMasrvO, 9f WlYMl Puaw[nMMrrews
liE
2f IMIIAAA
fc A•6t
1r®
67 --On
4
35 YOMNOWIOAlMM{EWNNM)MMM ppIYflEV,
3)S
AB YMMMfLMo®SW6WR1
VW
'_WI
z3 )vwrt wxwt
vv
3t w1YOMtSf NlmnHrW111n YWNIMANEY.1
leaf
Y 9cW8Ue(unov�rMufnMUNYI
'u
rtWxaw9ztWRrxYMt
eYe•
:2A
�A ,WyyvaWYmMYBIroArEMNB P_w
L
36 (51Y:Ar4rW1YO�NM�0
llaLt`
u
wNIIMaVl9 awwEr+wxrrA
1]ls
23 T01k4TBN'.Y@]MTM9LL
3)SY
:31_SYi)%•lYwMiYYMYB
3 -
1!
IlAY1A'rOYMiA!Wt61n
I v1r
21nam)dYMEAYANYY
I vz3
S1-
�
...
SSO TOMWf 7/23 (S
o.
of �Tv'.�Sa
n )
Y �Y 3, �
Ark
fvNlCigNTO
IIFl01•wTEO
RtMWAY 73 ANY �`b.
TA3YYAY
�
TA1tlWAY6
A
lA%WAYY -
_ --�. m
y{I L
i
'
3.
_i
-
3F
I'' _• ]
12A4
M'utFAY
33
).
l
_ __'R YA' W X X�/
5Y
a u
3II
,7
-47
/
zacmAx
:� I
f
u
I
I
) SATE
E
g i I a ACAPOMTMdHTi6Y PAU
I
AMM WAGON S
MO MEYCNTOOF
WATIM TOWER.
This project consists of design services for a new hangar taxilane. Elements of this design project include
excavation, grading, fence relocation, drainage improvements, base/subbase placement, asphalt paving, and
markings.
The project is depicted on the existing approved ALP as shown in the project sketch shown above. The project is
also justified according to the FAA AIP Handbook Table 3-4 as follows:
a. This Project Advances an AIP Policy: Through increasing Airport capacity for based and or transient aircraft.
b. There is an Actual Need: There is a strong demand for storing based/transient aircraft across the state, this is
the case for the Kittitas County Airport as well. Building this hangar taxilane will help prevent restricting use of
the airport. At least one sponsor owned hangar will be situated on the proposed taxilane.
c. The Project Scope is Appropriate: The scope is appropriate as the taxilane design phase is needed prior to the
construction project. No other elements are included in this scope of work.
KITTITAS COUNTY
BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
AGENDA DATE: August 25, 2025
ACTION REQUESTED: Request to Approve a Resolution designating interim acting County
Engineer, Not to exceed six months
BACKGROUND: The County Engineer position will be vacated the last week of
August. The Board of County Commissioners has the authority and
requirement to employ a county engineer (RCW 36.80.010). Public
Works with the assistance of Human Resources actively began
recruitment to fill the County Engineer position. Although the
recruitment process has begun, hiring a new county engineer will not
be in place prior to the end of the month. To avoid any lapse in having
an identified County Engineer, an interim county engineer may be
appointed. Public Works Director previously filled the role of County
Engineer and has maintained the required engineering license with the
State of Washington. Notice is to be provided to the County Road
Administration Board of any changes to the County Engineer
position.
INTERACTION: Public Works
RECOMMENDATION: Recommend approval of a resolution designating Public Works
Director as interim acting County Engineer.
HANDLING: Return One original to Public Works
ATTACHMENTS: Resolution
LEAD STAFF: Josh Fredrickson, Public Works Director
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2025 -
DESIGNATING AN INTERIM ACTING COUNTY ENGINEER, NOT TO EXCEED
SIX MONTHS
WHEREAS: The County legislative authority of each county is required to employ a county road
engineer (RCW 36.80.010); and
WHEREAS: The County legislative authority of each county is required to collect an official bond
(RCW 36.80.020) from a county road engineer upon employment; and
WHEREAS: The County has begun the solicitation process for hiring a County Engineer; and
WHEREAS: Kittitas County Public Works Director Josh Fredrickson is a licensed professional
engineer in the State of Washington in good standing with the Washington State Board of
Licensing; and
WHEREAS: The Kittitas County Board of County Commissioners elects to name Josh Fredrickson,
PE, under a county bond during his tenure as Interim Acting County Engineer.
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest
of the public, does hereby name Josh Fredrickson, PE, as Interim Acting County
Engineer, beginning August 29, 2025 not to exceed six months.
DATED this 25th day of August 2025, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Laura Osiadacz, Chairman
Cory Wright, Vice -Chairman
Brett Wachsmith, Commissioner
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2025 - i Li 9
DESIGNATING AN INTERIM ACTING COUNTY ENGINEER, NOT TO EXCEED
SIX MONTHS
WHEREAS: The County legislative authority of each county is required to employ a county road
engineer (RCW 36.80.010); and
WHEREAS: The county legislative authority of each county is required to collect an official bond
(RCW 36.80.020) from a county road engineer upon employment; and
WHEREAS: The County has begun the solicitation process for hiring a County Engineer; and
WHEREAS: Kittitas County Public Works Director Josh Fredrickson is a licensed professional
engineer in the State of Washington in good standing with the Washington State Board of
Licensing; and
WHEREAS: The Kittitas County Board of County Commissioners elects to name Josh Fredrickson,
PE, under a county bond during his tenure as Interim Acting County Engineer.
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest
of the public, does hereby name Josh Fredrickson, PE, as Interim Acting County
Engineer, beginning August 29, 2025 not to exceed six months.
DATED this 25th day of August 2025, at Ellensburg, Washington.
Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
.1 CO , WASHINGTON
Cory-Wrigg t, Vice-Ch ' an
c
Brett W chsmith, Commissioner
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: August 25, 2025
TOPIC: Conference of Government — Economic
Development
ACTION REQUESTED: Information only
LEAD STAFF:
Josh Fredrickson
RECOMMENDATION:
Informational briefing — no action required by the Board
BRIEFING SUMMARY:
• Kittitas Conference of Governments (COG) is a regional planning agency under
the authority of RCW 36.70.060 and RCW 36.64.080 through 36.64.110
• Kittitas County receives an allocation of Sales and Use tax for public facilities in
rural counties, or 0.09 funds
• COG has developed a work program related to infrastructure and promoting
economic development
• A partnership framework for collaboration and economic development has been
developed in partnership with the County Cities, Central Washington University
and Kittitas County Chamber of Commerce
• Economic development requires specific knowledge and skill set to be successful
• A structure for an economic development partnership has been developed
utilizing COG as an oversight body and supported by an Executive Director
BACKGROUND:
The Kittitas County Economic Development Partnership (KCEDP), a combination of
representatives from the City of Ellensburg, County, Central Washington University and
Kittitas County Chamber of Commerce have developed a framework to promote
economic development and begin implementation of the Economic Strategic Plan
adopted in 2023 (Resolution 2023-073). To build the necessary capacity and bring in the
required skill set to accomplish this, an organizational structure has been developed
(Exhibit 1).
DISCUSSION:
With COG oversight, an Executive Director would be brought on board once the
organizational framework is finalized. COG would be charged with oversight,
accountability, and resourcing of the KCEDP. COG would appoint membership to
KCEDP and hire an Executive Director. The Executive Director would have a
collaborative relationship with the KCEDP and external support partners.
A draft interlocal agreement (Exhibit 2) was brought to COG at their August 20, 2025
regular meeting. COG members were asked to present this interlocal to their respective
councils for consideration. Proposed timeline below:
• August 201h
— Framework and ILA discussion at COG
• August 25th
— BOCC review of framework and ILA
• September —
Municipalities review and approve ILA
• October 7th
— Request for approval of ILA with the BOCC
FISCAL IMPACT:
Financial impacts are being determined for budget needs.
ATTACHMENTS:
Exhibit 1: Partnership Framework for Collaboration
Exhibit 2: Draft Interlocal Agreement
EXHIBIT 1: Partnership Framework for Collaboration
�
I
Cho
cch D
o
0>
c D
c O
o
. o
(n
3
E
CD
I
w
m
I
o
0
c W
p
��
O <.
CD
3o
n
�CD
co
r-Ln
��
U, �
�
�.
cn
CD
L- - - - - - - �
) CD Q •
r+
O � �
3
. —n
N flJ =
n C(D
O ::E
=3 O
O --1 m
3 77n
n' 60
< O
O.
� p A
av
0
m
Qo
'T1
�o X 0
o
n=3'�cD
O m cn
�.c
rr -p
� -O
rr m O
(D -0
G�
"°
=T m
CD
o�,�r
3 3°0�.
3
�' rr
0) Q m Ln
Ln m
p' 3
�-^
6
m (n cD
A
(D_CL
fl O W O
w�t
O
n 6 rCh
rnr m
(n' O m
O
C.
O< m o D
fs
o' -a
m
n O
o, 0
o�
�0Ln �
� COD Q
� m =
O
X
()
Ln
(D
e--r
n a
-�
o s �
Q 0
m
w r
m
O �.
� rt,
o
O
< v
m
CD r)
n, rn
m
LnO tQ
3 O C
Q-
-0 0=
n
30 m
U rt
O
6a
Cl.
rr
rr C flJ O
m "O
Q C
(n <
CAD < OL
n o 0
�' O
Q CD O
5-
Vl
m �.
C(nl � (D (�
rr cn
`< rr
�, —
e-r, Q
o O 0
-(OD 3 Gi
Q D
vim,
e-r
O
O
= cOii o-
O O O
Lp' Un
O
6 �
O
m
n
<
Im m
a
6
O
-h
0
3 ��
O"
CD
O
rt
C
L-Q.
cn p_ M O
c
IW O
Ln C
V) fl'
a1 rr
O n
m o m
O
Q m rn
C
tz Ln (D
0)
0.
o n C
C
n �
° p 0
Q
(DXa
O
m
a G)
-0,
O
N
o
�
CL
3
O\
m
o f� l3D
rtrp
m
6 w O
2-
rn
m O
Q rt rt
OMom0
m
s
(Dm
Q
D 6 (mD At"Sn. A
3Q'0
O COD � CD rtD ,fir 7
3 0 a= v(D � M'a �„ O O f3AD
Ln Q
(D(Dai(D 0
U')
rn cn c = O
0 m _0 0, o �• m o
3 � L O � fD
CD rD CD C
r F+
LA Z3
m 14 a o 0
3 -ri
� X D Q rr .0
0' (D�
(D Cn -0(D .
< O -p C�
cn' O rn
o C r;; rt 0 Q
70 O o Ort (�D
O rr on
rt (D CD
6 <
o
3 m m
3
o
(n 'a
CD
N
N
rOr
CD (mn
O
O a rr
CD
o
°
0
(
0
rr
N'
3
CD
m
=
3
3
(Dm
-a
C�
�'
O �
C
-O v
(<OD
�
rt O�
(D
(D
F
O
(D CZ rr
cn M
O
C
no
m
(D �, �
rr
Ln
h �
3 rDD
I
n
in
D n o w ^ �
r= O n p' n N
C70 Ln
Ln ��
O3f+
3 �' Ort rt U
H
� n n (D � n
COD rr X O C
< C 3
O CD
a o � 0 rn
CL m r* 3 0
o 3
< * V) 0 ((D O
O 0O ° -
c0_n D O ° A,
< -v
G� + Ln. w
p: m (OD M
O O
h� 3o sr c,
o n °
C: rt
7 rt
to M 3m
D m
3,oLOu,
�n � m S
�CA
CD LO �.
o_
���
m
f+
I
<
-
O
0
3
n'
3
rt
3
CD
o m
�n
00
l ,
o0
flJ
0 n
�v
� C
Q O
r+
0
D
T
V
c�
cD
D
(D
rt
(D
(D
La
Cu
O
h
rt
(D
n
O
c
lfl
V)
V)
V)
fl,
a
(D
V)
O
c
n
rD
0
rt
c
3
r*
(D
3
0
O
.c
O
c
(D
V)
O
C
rr
c
D
La
(D
(D
D
D
p
�n
�- o
a c
L
(D 3
o ,<
u
n <
LI,
O �
? <
(D
5
rt
(D
0
c
h
rt
c
C
D
rr
O
rD
rr
Ln
n
c
(D
rt
0)
c
rt
c
D
(D
(D
a.
Q
O
0
D
r-r
0
Cu
Z
(D
0
a
!D
FaT
(D
0
W
A
(D
a
0
0
D
n
r-r
Cu
O_
rt
(D
n
O
c
C0C
rC-r
0
cr
c
a.
Q
n'
0
3
c
rt
D
O,
rnt
(D
Q
5'
c
a
rD
rt
D
D
c
D
O
c
n
m
0
En
n
(D
Ln
w
O
0
c
F
5'
rr
rn
fl,
D
p
0
3
�
<
rt (D
`�
rt
CD c
a, n
p'
�
°�
7
f+
o s
0
rn
60
0
��h(D
�:
c cr
(D (D -V
c
�.
o
(D
�/i
G
o�O
t�D
(D
(D
tiD
_
<,�n
� �
rt
m
�' 0
m
70
O
CD30
3
0
O
(D
Q
o
O
cO
(3D
1 ■ ■
37
o
�rt<
6
��-,
n
2
cua
o
oO
n
Ln
r
O
c
0:
(D
CU
--r ,-t
01
C
r
O
O
rt
n (2 ((DD
(D
c
o
■
: rt
rt
O
A
Cu C�
�0v
CD
0
O
A\
rt
O
N0) 0
O
r"f
0
Ln
LALn
3
l 1
O
O
<
rn
O
�' c
p
O
(�D O
3
�.CU
3
rt
n
T
N
(D
<
ram_+
a
�.
Ln
O
rr
3
=
rt
r+ �.
cn
a
a
o M
0'
<
`"
a,
o
=
3
r*
-
3
a
(D
c
(D
Ln
r+Ln
� O
V
rt
� CD
CD
EXHIBIT 2: Draft Interlocal Agreement
INTERLOCAL AGREEMENT FOR THE KITTITAS COUNTY
ECONOMIC DEVELOPMENT PARTNERSHIP
THIS INTERLOCALAGREEMENT ("Agreement") is entered into pursuant to the Interlocal
Cooperation Act, Chapter 39.34 RCW, by and among Kittitas County, the municipalities of
Ellensburg, Kittitas, Cle Elum, South Cle Elum, and Roslyn, the Kittitas County Chamber of
Commerce, Ellensburg Downtown Association, Cle Elum Downtown Association, Roslyn
Downtown Association, and Central Washington University (collectively, the "Parties"), all
Located within Kittitas County, Washington.
WHEREAS, the Parties recognize the need for coordinated economic development to foster
a vibrant, resilient, and diversified economy in Kittitas County; and
WHEREAS, RCW 39.34 authorizes public agencies to enter into interlocal agreements to
jointly exercise powers and perform functions for the benefit of their communities; and
WHEREAS, RCW 82.14.370 authorizes rural counties to remit a portion of existing sales and
use tax revenues to fund public facilities and economic development activities; and
WHEREAS, the Parties desire to establish a formalized partnership as a collaborative entity
to implement the Kittitas County Economic Development Strategic Plan; and
WHEREAS, the Parties seek to define roles, responsibilities, and funding mechanisms of
such a partnership under the oversight of the Kittitas County Conference of Governments
(COG);
NOW, THEREFORE, the Parties agree as follows:
1. PURPOSE: The purpose of this Agreement is to establish the Kittitas County Economic
Development Partnership (KCEDP) to foster economic development within Kittitas County
through collaboration among public and private partners. The KCEDP will operate under the
oversight of the Kittitas County Conference of Governments (COG) and implement the
Kittitas County Economic Development Strategic Plan (the Plan) in alignment with the
mission, vision, and values outlined in the charter under Section 2 of this Agreement.
2. KITTITAS COUNTY ECONOMIC DEVELOPMENT PARTNERSHIP CHARTER
The KCEDP is established with the following foundational principles:
2.1 Mission: The KCEDP is committed to fostering a vibrant, resilient, and diversified
economy by uniting public and private partners across the county. We work together to
implement a strategic plan that honors our unique character, strengthens local
communities, and creates a sustainable economy for all residents of Kittitas County.
2.2 Vision: Kittitas County will become a model hub for transformative economic
development.
2.3 Values: The KCEDP is guided by the following goals identified under the Plan:
A. Collaboration: Unite upper and lower County government and organizations in
shared goals and actions that benefit the County as a whole.
B. Economic Resilience: Provide residents with tools and resources to access jobs
and opportunities in the area, including entrepreneurship.
C. Balanced Growth: Direct and manage the County's growth to build a dynamic
community that remains an attractive and affordable place to live.
D. Community Investment: Develop the County's infrastructure to meet its current
and future needs and position it to amplify the advantage of its central location.
E. Preservation: Preserve the legacy of the County, valuing its assets and resources to
turn them into opportunities for future generations.
3. ESTABLISHMENT OF THE KITTITAS COUNTY ECONOMIC DEVELOPMENT
PARTNERSHIP: The Parties hereby establish the KCEDP as a collaborative action entity to
facilitate, coordinate and conduct economic development activities within Kittitas County
while implementing the recommendations of the Plan.
4. ROLES AND RESPONSIBILITIES: The roles and responsibilities of this agreement are as
follows. (Reference Appendix Afor an organization chart.)
4.1 Administrative Roles and Responsibilities: The COG shall serve as the governing and
administrative body for the KCEDP, with the following responsibilities:
K
A. Establishment: Facilitate the formation of the KCEDP through this agreement and
subsequent actions.
B. Oversight and Accountability: Provide strategic guidance, ensure accountability,
and monitor the performance of the KCEDP in achieving the collective mission and
vision.
C. Resourcing: Allocate funding and other resources necessary to support KCEDP
activities.
D. Staffing: Hire, supervise, and evaluate staff, including an Executive Director, to
coordinate, support, and lead KCEDP activities. Staff may be assigned roles in:
i. Coordinating KCEDP initiatives and meetings.
ii. Managing contracts with external entities (e.g., consultants, economic
development agencies) as directed by COG to support KCEDP objectives.
iii. Conducting direct economic development and business recruitment activities.
iv. Facilitating reports from the KCEDP on activities, deliverables and outcomes,
to be shared with COG.
4.2 Partner Roles & Responsibilities: The KCEDP shall operate under the oversight of the
Kittitas County Conference of Governments (COG) and shall be comprised of two separate
but collaborative and interactive groups: the Economic Development Action Committee
(Action Committee) and the Economic Development Advisory Group(s) (Advisory Group)
that bring resources, values, and expertise to the partnership through:
A. Collaborative Action: Leverage the expertise of its members and their represented
members/constituents to develop and execute initiatives that achieve the mission,
vision, and values of the Partnership.
B. Strategic Implementation: Work collectively to implement the strategic economic
development plan, including business recruitment, infrastructure improvement,
and community development projects.
C. Advisory Role: Provide recommendations to the COG on economic development
priorities, funding allocations, and policy changes.
D. Accountability: Operate under the oversight of the COG, adhering to its strategic
guidance.
4.3 Membership: The Action Committee will consist of "doers" tasked with implementing
the recommendations of the Plan. The Advisory Group(s) will consist of stakeholders from
businesses, nonprofits, government, and educational institutions.
A. The Action Committee shall consist of the following membership seats.
Membership seats within the Action Committee may be created or removed at the
discretion of the COG.
3
i. Kittitas County Chamber of Commerce: One representative.
ii. Ellensburg Downtown Association: One representative.
iii. Cle Elum Downtown Association: One representative.
iv. Roslyn Downtown Association: One representative.
v. Central Washington University: One representative.
vi. Municipal Representatives: One representative from each of the following
municipalities:
a. City of Ellensburg
b. City of Kittitas
C. City of Cle Elum
d. Town of South Cle Elum
e. City of Roslyn
f. Kittitas County
B. The Advisory Group(s) are ad hoc committee(s) established at the request of the
Action Committee and Executive Director for the purpose of leveraging stakeholder
expertise in advancing the implementation of the KCEDSP.
4.4 Membership Requirements and Responsibilities
A. Qualifications: Individual Action Committee members shall be appointed by their
respective municipalities or community organizations. Those appointed should
possess expertise in economic development, business, community planning,
and/or related fields.
B. Meetings: The KCEDP shall meet at least quarterly, with additional meetings as
needed, to review progress, plan activities, and provide recommendations to the
COG.
C. Subcommittees: The KCEDP may establish subcommittees to address specific
initiatives (e.g., business recruitment, tourism, infrastructure), subject to COG
approval.
5. FUNDING: Funding for the KCEDP shall be provided by the COG, through the 0.09%
sales and use tax authorized under RCW 82.14.370. Additional funding sources may
include:
A. Grants from federal, state, or private entities.
B. Contributions from the Parties, as mutually agreed.
C. Other revenue streams identified by the COG or KCEDP.
5.1 Budget and Financial Management
A. The COG shall appropriate resources annually to KCEDP. Appropriations shall be
based on requests from the KCEDP membership and aligned with the mission,
vision, values and strategic objectives of this agreement. Additional requests for
Ci
funding outside of the annual appropriations process may be made by the KCEDP
and approved at the discretion of the COG.
B. Financial Oversight: The COG shall ensure that all funds are used in accordance
with RCW 82.14.370 and the mission of the KCEDP. Contracts shall be used to
support all COG appropriations to the KCEDP. The terms of the contracts will outline
necessary reporting and reimbursement requirements for use of the funds.
6. GOVERNANCE AND ADMINISTRATION
6.1 Oversight by COG: The COG shall have ultimate authority over the KCEDP, including:
A. Approve the KCEDP's annual work programs in support of the ultimate execution of
the Plan.
B. Modify or dissolve the KCEDP, subject to the terms of this Agreement
C. Resolve disputes among KCEDP members, or between the KCEDP and the COG.
6.2 Staff Support: The COG shall hire and supervise staff position(s) to coordinate and
facilitate the work of the KCEDP, serve as a liaison between the partnership and the COG,
perform Economic Development activities as directed by COG, and manage contracts with
external entities (e.g., consultants) as specified by COG to support KCEDP objectives.
Additional staff or contractors may be engaged as needed, subject to funding availability
and approval of the COG.
6.3 Decision -Making: The KCEDP shall operate on a collaborative action model, seeking
consensus among members whenever possible. In the event of a dispute or need for formal
decision -making, the COG shall have final authority. Assigned staff shall be responsible for
facilitation of KCEDP meetings and any agenda or staff prep needed to conduct the
meetings.
7. TERM AND TERMINATION
7.1 Term: This Agreement shall take effect upon execution by all Parties and shall remain in
effect until terminated as provided below.
7.2 Termination
A. By Mutual Agreement: The Parties may terminate this Agreement by unanimous
written consent.
B. By Individual Party: Any Party may withdraw from this Agreement with six (6) months'
written notice to the other Parties.
C. By COG: The COG may dissolve the KCEDP if it determines that the Partnership is no
longer fulfilling its mission or is financially unsustainable, subject to consultation
with the Parties.
5
7.3 Disposition of Assets
Upon termination or dissolution, any remaining KCEDP assets, including funds, shall be
returned to the COG. If other entities have contributed funds and there is a balance
remaining beyond what was contributed by the COG, then the other contributing entities
shall be remitted the remaining funds in proportion to their contributions or as otherwise
agreed, in compliance with RCW 82.14.370 and other applicable laws.
8. INDEMNIFICATION AND LIABILITY
Each Party shall indemnify and hold harmless the other Parties, their officers, employees,
and agents from any claims, damages, or liabilities arising from the Party's actions or
omissions under this Agreement, except to the extent caused by the negligence or willful
misconduct of another Party.
9. DISPUTE RESOLUTION
In the event of a dispute arising under this Agreement, the Parties shall first attempt to
resolve the matter through informal negotiation. If unresolved, the dispute shall be
submitted to non -binding mediation, with costs shared equally among the Parties. If
mediation fails, the dispute may be resolved through legal proceedings in Kittitas County
Superior Court.
10. MISCELLANEOUS
10.1 Amendments: This Agreement may be amended bywritten consent of all Parties,
subject to approval by their respective governing bodies.
10.2 Severability: If any provision of this Agreement is found to be invalid or
unenforceable, the remaining provisions shall remain in full force and effect.
10.3 Governing Law: This Agreement shall be governed by the laws of the State of
Washington.
10.4 Entire Agreement: This Agreement constitutes the entire understanding among the
Parties.
R
This agreement is entered into as of (effective date)
Kittitas County
City of Kittitas
Town of South Cle Elum
Chamber of Commerce
Roslyn Downtown Association
Central Washington University
City of Ellensburg
City of Cle Elum
City of Roslyn
Ellensburg Downtown Association
Cle Elum Downtown Association
17
Appendix A:
Kittitas Counter Economic Development
Partnership Framework for Collaboration and
Transformative Economic Development
Contract Management
Authority
1
Executive Director .........I
Staff
1 Action l
liv►saY
Cotnrntttee 1'�
CONSULTANTS
Phamber of Commerce (1)1
F Business €
Apo (1 ) 1
1
x Ed�rcatioai
1
CitieslCounty (6) (
Governmem
Downtown Assoc. (3) j
N
1 CWU (1)
E
----------------------------------------
Economic Development
Partnership
KI
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: August 25, 2025
TOPIC: FEMA Map Changes - Yakima River Easton Reach
ACTION REQUESTED: Direction to Staff
LEAD STAFF:
Arden Thomas
RECOMMENDATION:
Direct staff to mail informational sheets to affected landowners.
BRIEFING SUMMARY:
• In 2023, the Kittitas County Flood Control Zone District (FCZD) completed the
Easton Reach River Flood Hazard Analysis and Mapping Investigation.
• The results of this study were compared to the Federal Emergency Management
Agency (FEMA) regulatory flood maps.
• The FCZD study found that the floodplain extents were generally wider than
those shown on FEMA's regulatory maps. The study identified areas with both
increased and decreased base flood elevations and flood risk. It also indicated that
the regulatory floodway would need to be expanded.
• Kittitas County Code 14.08.105 (Duties and Responsibilities of the Floodplain
Administrator) requires the County to notify FEMA of any changes to base flood
elevations within six months. The updated technical information was submitted to
FEMA, and a map amendment is anticipated. A public appeal period will follow.
• Kittitas County will publish a public notice in the paper of record. Staff also
recommend mailing an informational sheet to affected landowners.
BACKGROUND:
In 2023, the Kittitas County Flood Control Zone District (FCZD) completed the Easton
Reach River Flood Hazard Analysis and Mapping Investigation, covering an 11-mile
section downstream of Easton Dam.
Since 1996, flood hazard planning has recognized that the Elk Meadows, Elk Meadows
Park, Pine Glen, and Sun Island communities are regularly impacted by Yakima River
flooding. These neighborhoods are the most frequently inundated areas in unincorporated
Kittitas County and have been identified as repetitive loss areas.
Although flood risks in these communities have been a longstanding concern, no
comprehensive flood risk studies had been conducted until this assessment. The purpose
Page 1 of 2
Public Works "Work Session Staff Report", 2025
of the Easton Reach Flood Hazard Assessment was to better understand, communicate,
and plan for these flood hazards.
The study's results were compared to FEMA's regulatory flood maps. The findings
revealed generally wider floodplain extents, with localized areas of both increased and
decreased base flood elevations and risk. The regulatory floodway was also determined to
require expansion.
Per Kittitas County Code 14.08.105, the County must notify FEMA of changes to base
flood elevations within six months of receiving new technical data. This notification must
include technical or scientific information. The updated data was submitted to FEMA in
2023, and the County anticipates an upcoming map amendment.
DISCUSSION:
Kittitas County will issue a public notice in the paper of record. Staff further recommend
mailing an informational flyer to affected landowners.
Map changes will take effect approximately 120 days after FEMA approves the Letter of
Map Revision (LOMR). A 90-day appeal period will follow the LOMR's approval.
During this period, any property owner or lessee who believes their property rights are
adversely affected by FEMA's proposed flood hazard determinations may submit
scientific or technical data in support of an appeal.
Appeals must be submitted to Kittitas County. The County is responsible for collecting
and reviewing these submissions, forwarding them to FEMA, and determining —based on
the technical information provided —whether to appeal on behalf of the property owner or
lessee, all within the 90-day appeal window.
FISCAL IMPACTS:
The 2025 annual budget includes costs associated with landowner outreach in flood risk
areas.
ATTACHMENTS:
Exhibit 1: Draft informational flyer
Page 2 of 2
Public Works "Work Session Staff Report", 2025
EXHIBIT 1: Draft informational flyer
IL 'r .,. i 1L�uS q W
KITTITAS COUNTY FLOOD CONTROL ZONE DISTRICT
FEMA FLOOD
MAP UPDATES
The Elk Meadows, Elk Meadows Park, Pine Glen, and Sun Island
communities frequently experience flooding from the Yakima
River. These neighborhoods are among the most frequently
flooded areas in unincorporated Kittitas County and regularly
suffer flood damage
Although concerns about flood risks in these areas have existed
for a long time, no comprehensive flood -risk studies had been
conducted —until recently. The Easton Reach Flood Hazard
Assessment was completed to help us better understand,
communicate about, and plan for flood hazards.
-r
■ �1:
L.
Did
QR Code: Additional Study
Information
The results from the Easton Reach Flood Hazard Assessment informed us that the
current Federal Emergency Management Agency (FEMA) floodplain maps are not
accurate. As part of Kittitas County's participation in the National Flood Insurance
Program (NFIP), we are required to submit updated technical flood data to FEMA for use
in official regulatory maps. FEMA is currently reviewing this data, and we expect them to
issue revised maps based on the new information.
Frequently Asked Questions
How will the updated map differ from the current mapping?
• The floodplain will expand in some areas.
• The floodway boundaries will also increase.
• Base flood elevations (BFEs) will rise in some areas and decrease in others.
Contact Us
509-962-7523
publicwnr€irks@co.kiftitas.wa.us
These changes matter because:
The floodplain defines where stricter building standards apply and where flood
insurance may be required, especially for properties with mortgages.
The base flood elevation determines how high buildings must be constructed to
reduce flood damage.
Floodways are areas with strict regulations: new residential buildings are not
allowed, existing buildings cannot be significantly improved, and all
development must prove it will not increase flood risk before approval.
When will the new maps take effect?
We do not know for sure when FEMA will issue their determination. We anticipate this
will occur within the next 1 to 6 months. The new maps will become effective
approximately 120 days after FEMA issues a Letter of Final Determination.
Why does Kittitas County Participate in the National Flood Insurance Program?
Participation in the NFIP helps protect residents and property in areas at higher risk for
flooding. It also ensures that federally backed flood insurance is available to property
owners in our county. To remain in the program, Kittitas County must follow federal
regulations for development in mapped floodplains.
What can I do if I disagree with the new FEMA maps?
FEMA offers a 90-day appeal period that begins when they issue the Letter of Final
Determination. To appeal, you must provide scientific or technical data that supports
your case. Appeals must be submitted to Kittitas County, and we will forward all
received materials to FEMA for consideration.
How will the map changes affect the project I have planned for my property?
It depends on your property's location. We encourage you to contact us directly for
specific information about how the map changes might impact your plans or
development requirements.
Full Technical Report
The full technical report from this study is
available online:
Contact Us
ry�r*+-►. 509-962-75 2
publimorks n co.kcittitas.wams
EASTON REACH YAKIMA RIVER FLOOD HAZARD
ANALYSIS AND MAPPING INVESTIGATION
Yakima River Mile 191 To 202
ftp,ra,
[owKyP tWarin
411 N Auby Slnl
Ellell u.&WAM26
CpDEs._.To, Tj" p G
-0
KITUTAS COI:NTV
August 25, 2025
Kittitas County, Washington
BOARD OF COUNTY COMMISSIONERS
District One District Two District Three
Cory Wright Laura Osiadacz Brett Wachsmith
Jane Wall, Executive Director
Washington State County Road Administration Board Sent via electronic mail to:
2404 Chandler Ct SW, Suite 240 Jane.Wall@crab.wa.gov
Olympia, WA 98502-6067
RE: Notice of Change in Kittitas County Engineer
Dear Ms. Wall:
In compliance with WAC 136-12-020, this is to notify the County Road Administration Board
(CRAB) of a change Kittitas County has made to its County Engineer. The County has reviewed
the requirements within Chapter 136-12 WAC.
Kittitas County has a change in County Engineer due to the position vacated by Cameron Curtis.
By Resolution No. 2025-t $ (copy attached), the Board of County Commissioners has
appointed Josh Fredrickson, PE, as interim County Engineer. Josh was previously County
Engineer for Kittitas County and will assume the duties on an interim basis beginning August 29,
2025. We are actively recruiting for the position of County Engineer.
Kittitas County Board of County Commissioners
cc
Drew Woods, PE, Deputy Director — Drew.Woods(kcrab.wa.gov
Derek Pohle, PE, Support, Training and Compliance Manager — Derek.PohleAcrab.wa.gov
Kittitas County Courthouse 205 West 5'ti Avenue, STE 108 - Ellensburg, WA 98926
(509) 962-7508 -FAX (509) 962-7679
www.co.kiftitasma.us