HomeMy WebLinkAbout2025-07-28-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS
Public Works Study Session
Regular Meeting
Monday July 28, 2025 - 1:30 PM
BoCC Auditorium
205 West 5th Room 109 - Ellensburg
1. Call to Order
2. Citizen Comments (1 min. time limit)
3. Request to Approve a Resolution Authorizing Chair Signature on the First Amendment to
Memorandum of Agreement between Mid -Columbia Fisheries Enhancement Group and Kittitas
County Flood Control District
4. Water Filling Station Discussion
5. Kittitas County CWU Technology Transfer Center Feasibility Project Update
6. Kittitas County Conference of Governments Regional Advocacy
7. Other Business - No Action to be taken
8. Concluded
Created on 7/23/2025 10:43:37 AM
KITTITAS COUNTY
PUBLIC WORKS STUDY SESSION MINUTES
COMMISSIONERS' AUDITORIUM, 205 WEST 5TH ROOM 109
Regular Meeting
MONDAY 1:30 PM JULY 28, 2025
Board members present: Chairman Laura Osiadacz and Commissioner Brett
Wachsmith.
Others: Josh Fredrickson, Arden Thomas, Rebecca Cruse, Public Works;
Stephanie Hartung, Prosecuting Attorney's Office; 2 Members of the
Public
At 1:32 PM Chairman Laura Osiadacz opened the Public Works Study
Session.
No Citizen Comments
REQUEST TO APPROVE A RESOLUTION AUTHORIZING CHAIR SIGNATURE ON THE
FIRST AMENDMENT TO MEMORANDUM OF AGREEMENT BETWEEN MID-COLUMBIA
FISHERIES ENHANCEMENT GROUP AND KITTITAS COUNTY FLOOD CONTROL
DISTRICT
Arden Thomas briefed the Board of County Commissioners on the grant
from the Department of Ecology and a proposed Memorandum of Agreement
Amendment with Mid -Columbia Fisheries Enhancement Group and listed
components of grant and projects to receive funding. Arden Thomas
stated past projects have been successful with this partnership and
the agreement will provide role clarity for both parties.
Commissioner Brett Wachsmith moved to approve Resolution 2025-138 and
Chairman Laura Osiadacz seconded the motion. Resolution 2025-138
approved.
WATER FILLING STATION DISCUSSION
Arden Thomas gave an update on policy the City of Cle Elum
implemented for their water filling station and stated County
residence's and Contractors in unincorporated County are impacted.
Arden Thomas stated that currently the county does not have
infrastructure and resources to implement a water fill site at the
Public Works Upper County Shop. Discussion was held on different
options and alternatives to the City of Cle Elum site including that
the City of Kittitas has expressed interest in developing a fill
station.
Josh Fredrickson distinguished between the Public Works Road Crew's
needs for water, and gaining access to water for residential use/
construction usage. Chairman Laura Osiadacz directed staff to keep
monitoring.
Pat Deneen, a member of the public stated he is getting communication
from residences regarding providing water.
07/28/25 MINUTES
KITTITAS COUNTY CWU TECHNOLOGY TRANSFER CENTER FEASIBILITY PROJECT
UPDATE
Josh Fredrickson stated that Conference of Governments(COG) has
expressed the need to hire a professional service group to help
advocate for regional needs at the federal level and has interest in
soliciting for the service. Josh Fredrickson stated that discussion
amongst the group is that each agency would fund a portion of the
service cost and a draft of the request for services was presented.
Commissioner Brett Wachsmith asked about proportionate funding from
each entity. The Board of County Commissioners directed staff to
present a monthly COG update through Public Works. The Board of
County Commissioners directed staff to move forward with the
proposal. Discussion was held on by laws. Josh Fredrickson recognizes
that this group has expressed a lot of collaboration.
OTHER BUSINESS- I-90 EXPANSION
Josh Fredrickson gave an update on an application for I-90 expansion
has made it onto a House Bill and is recognized as eligible project
to hopefully move forward for funding. Josh Fredrickson stated that
Rep. Kim Schrier has been a major proponent of getting this funding
forward. Josh Fredrickson stated that Public Works has done
feasibility for this I-90 expansion project and the next step would
be securing funding for environmental permitting. The Board
recognized ongoing efforts.
Meeting concluded at 2:03 PM.
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
1
Rebecca Cruse, Clerk Laura Osiadacz, Chairman
07/28/25 MINUTES
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: July 28, 2025
TOPIC: Mid -Columbia Fisheries Memorandum of Agreement
ACTION REQUESTED: Request to Approve a Resolution to Authorize Chair
Signature on Memorandum of Agreement Amendment with Mid -Columbia
Fisheries
LEAD STAFF:
Arden Thomas
RECOMMENDATION:
Authorize Chair signature on the First Amendment to Memorandum of Agreement
between Kittitas County and Mid -Columbia Regional Fisheries Enhancement Group
BRIEFING SUMMARY:
• The Board of County Commissioners previously authorized Public Works to enter
into grant agreement WQC-2024-KIPWD-00228 with the Department of Ecology
and into a Memorandum of Agreement (MOA) with Mid -Columbia Fisheries
(MCF) to implement grant agreement.
• The work conducted under this grant agreement provides flood reduction benefits
along Mercer Creek within the City of Ellensburg.
• MCF and Public Works would like Public Works staff to lead the design and
hydraulic modeling of a flood risk reduction project supported by the grant.
• The proposed amendment outlines roles and responsibilities and allocates grant
funding associated with this additional collaboration.
BACKGROUND:
In October 2022, Mid -Columbia Fisheries (MCF) applied for a Clean Water grant under
the Department of Ecology's solicitation to maintain a flood risk reduction project that
MCF and Kittitas County Public Works had collaborated on, and to design a second
project. The grant application ranked highly, but due to limited funding, Ecology staff
advised MCF to partner with a local jurisdiction that could serve as the project sponsor.
The Board of County Commissioners authorized Public Works to enter into Grant
Agreement WQC-2024-KIPWD-00228 and an MOA with MCF to implement the scope
of work (Resolution 2023-192).
Kittitas County and MCF have since identified additional opportunities for collaboration
on the project's design component under the grant.
Page 1 of 4
Public Works "Work Session Staff Report", 2025
DISCUSSION:
To date, Kittitas County's role in this grant has been largely administrative. In discussing
the flood risk reduction and habitat improvement project design with MCF, the parties
agreed that Public Works could provide the necessary project design and hydraulic
modeling services to support the project and that this partnership would be cost-effective.
FISCAL IMPACTS:
There is no match requirement for this grant. Direct costs incurred by Public Works,
estimated at $30,000.00, will be reimbursed through the grant.
ATTACHMENTS:
Exhibit A Resolution
Exhibit B: Memorandum of Agreement Amendment
Page 2 of 4
Public Works "Work Session Staff Report", 2025
EXHIBIT A
RESOLUTION
Page 3 of 4
Public Works "Work Session Staff Report", 2025
all
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION
NO.2025- 1
AUTHORIZING CHAIR SIGNATURE ON THE FIRST AMENDMENT TO MEMORANDUM
OF AGREEMENT BETWEEN MID-COLUMBIA FISHERIES ENHANCEMENT GROUP
AND
KITTITAS COUNTY FLOOD CONTROL ZONE DISTRICT
SUPPORTING WQC-2024-KIPWD-00228
WHEREAS: Kittitas County and Mid -Columbia Fisheries entered into a Memorandum of Agreement
(MOA), effective November 7th, 2023, and authorized by Kittitas County Resolution No.
2023-192 to define MCF's and the County's respective roles and responsibilities
implementing the scope of work for Grant Agreement WQC-2024-KiCPWD-00228; and
WHEREAS: Mid -Columbia Fisheries and Kittitas County identified additional opportunities for
collaboration in delivery of Task 3, Mercer Creek West of Railroad Avenue Design; and
WHEREAS: The Parties desire to amend the agreement to update the roles and responsibilities to reflect
this additional collaboration; and
WHEREAS: The Parties also desire to specify Task 3 budget allocation for MCF and the County's
respective Task 3 responsibilities; and
NOW THEREFORE, BE IT RESOLVED The Board of County Commissioners of Kittitas County,
Washington, in the best interest of the public, does hereby authorize Chair signature on the
first amendment to memorandum of Mid -Columbia Fisheries Enhancement Group and
Kittitas County Flood Control Zone District Supporting WQC-2024-KIPWD-00228.
DATED this 281 day of July 2025, at Ellensburg, Washington.
C.OiIslo�
ttesL
4 ;0 Clerk of
Julie Kjorsvik
L Deputy Clerk of the Board- Mandy Buchholz
l�In
. !M1
I
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
NauraDaczairmmian
ABSENT
EXHIBIT B
MEMORAUNUM OF AGREEMENT AMENDMENT
Page 4 of 4
Public Works "Work Session Staff Report", 2025
Docusign Envelope ID: BF05B7E6-47C1-4FC5-8DEO-OFB05C45787C
FIRST AMENDMENT TO
MEMORANDUM OF AGREEMENT
BETWEEN MID-COLUMBIA FISHERIES ENHANCEMENT GROUP
AND
KITTITAS COUNTY FLOOD CONTROL ZONE DISTRICT
SUPPORTING WQC-2024-KIPWD-00228
THIS FIRST AMENDMENT TO MEMORANDUM OF AGREEMENT is made and entered
into as of the 28th day of July, 2025, by and between Mid -Columbia Fisheries Enhancement
Group, hereinafter referred to as "MID-COLUMBIA FISHERIES" or "MCF," and the Kittitas
County, collectively referred to as the "PARTIES."
WHEREAS, Kittitas County and Mid -Columbia Fisheries entered into a Memorandum of
Agreement (MOA), effective November 7th, 2023 and authorized by Kittitas County Resolution
No. 2023-192 to define MCF's and the County's respective roles and responsibilities
implementing the scope of work for Grant Agreement WQC-2024-KiCPWD-00228; and
WHEREAS, Mid -Columbia Fisheries and Kittitas County identified additional opportunities for
collaboration in delivery of Task 3, Mercer Creek West of Railroad Avenue Design; and
WHEREAS, the Parties desire to amend the agreement to update the roles and responsibilities to
reflect this additional collaboration; and
WHEREAS, the Parties also desire to specify Task 3 budget allocation for MCF and the
County's respective Task 3 responsibilities; and
WHEREAS, all other elements of the MOA effective November 7th, 2023 remain unchanged;
NOW, THEREFORE, in consideration of the mutual covenants, promises, and agreements set
forth herein, it is agreed by and between Mid -Columbia Fisheries and Kittitas County to update
the Roles and Responsibilities Section and Appendix A as follows (additions are indicated by
underlining):
ROLES AND RESPONSIBILITIES
A. Mid -Columbia Fisheries will:
1. Implement the tasks and provide the deliverables described in the Mercer Creek
Design & Stewardship grant agreement, Department of Ecology #WQC-2024-
KiCPWD-00228 and summarized in Appendix A.
2. Comply with all relevant provisions and requirements of the grant agreement,
including quarterly and project close-out reporting.
3. Provide Kittitas County with all information needed for the required grant reporting,
and/or complete the grant reporting on behalf of the County if feasible.
4. Coordinate with Department of Ecology, participating landowners, Kittitas County,
and other stakeholders.
Docusign Envelope ID: BF05B7E6-47C1-4FC5-8DEO-OF605C45787C
5. Invoice the County not more than monthly for work that is reimbursable to the
County under the Grant. Ensure that invoices are accurate and have adequate
documentation required by the Department of Ecology and Kittitas County.
6. Specific to Task 3 Mercer Creek West of Railroad Ave Design and Deliverable 3.4
Conceptual Design:
• Conduct all necessary landowner and technical advisory group coordination
required for design development;
• Identify project goals and objectives and deliver the "Introduction, Goals, and
Objectives" Section of the Conceptual Design Report;
• Deliver the "Site Characterization" Section of the Conceptual Design Report
• Serve as the primM author of the "Alternatives Assessment and Selection"
section of the Conceptual Design Reportincorporating content provided by
Kittitas County;
• Provide Kittitas County with riparian planting_ polygons for incorporation into the
design sheets, and
• Provide Kittitas County with cost estimates for the preferred alternative riparian
planting plan proposal.
B. Kittitas County will:
1. Review grant agreement WQC-2024-KiCPWD-00228 when it is available for
consistency with County policies.
2. Enter into the approved grant agreement between Kittitas County and Department of
Ecology.
3. Invoice Department of Ecology quarterly (at the schedule required by Department of
Ecology, or more frequently if needed) for expenses made in implementing the
scope of work of the Grant, including Mid -Columbia Fisheries' expenses which will
be billed quarterly.
4. Reimburse Mid -Columbia Fisheries' invoices in a timely manner.
5. Coordinate with Mid -Columbia Fisheries on issues related to the administration of
the Grant.
6. Specific to Task 3 Mercer Creek West of Railroad Ave Design and Deliverable 3.4
Conceptual Design:
• Collect terrain information necessary to inform project design and for
incorporation into hydraulic modeling,
• Provide conceptual design drawing sheets incorporating the riparian planting
polygons provided by MCF
• Hydraulically model existing conditions and two restoration scenarios and
provide MCF with pertinent content (methods results and figures) for
incomoration into the "Alternatives Assessment and Selection" Section of the
Conceptual Design Report; and
Docusign Envelope ID: BF05B7E6-47C1-4FC5-8DEO-OFB05C45787C
• Complete conceptual design probable cost estimates incorporatinjZ riparian
planting
Appendix A
Scope of Work and Budget
1 $18,896 $3,000 Grant Administration
Properly manage and fully document that the project that meets
ECOLOGY's grant administrative requirements.
2 $120,206 Mercer Creek at Helena Avenue Stewardship
Implement weed management, fence maintenance, and other work to
ensure that the project achieves its goals of improved floodplain function,
habitat, and water quality.
3 $28,361 $27,000 Mercer Creek West of Railroad Ave Design
Design a water quality improvement project along another 1,400 feet of
Mercer Creek west of Railroad Avenue. As part of the work, Mid -Columbia
Fisheries will work with the landowners, Kittitas County, and the City of
Ellensburg to assess whether changes at the site could improve floodplain
function and flood protection in the area.
4 $10,978 Community Engagement
Engage community volunteers in restoration projects on streams in Kittitas
County and provide public trainings and presentations about water quality
and riparian habitat.
Task budgets are approximate. Department of Ecology allows some limited movement of funds between
tasks to accomplish the scope of work. Each entity can shift their budget between tasks, as long as
budget adjustments are within ten percent of the grant amount If either party will have a funding
surplus it will communicate an additional funding amount available for the other party's use through e-
mail.
IN WITNESS WHEREOF, the parties have executed this Amendment as of the day and year first
above written.
By: our Osia acz
Titl . hair, Board of County Commissioners
Date:
DocuSigned by:
By: Bill Mast
Title: President, MCFEG
Date: 7/28/2025
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: July 28, 2025
TOPIC: Water Filling Station
ACTION REQUESTED: Direction to Staff
LEAD STAFF:
Arden Thomas
RECOMMENDATION:
Direct staff to continue efforts to ensure that Public Works crews have access to
construction water to support road maintenance and construction activities.
BRIEFING SUMMARY:
• In 2024, the City of Cle Elum amended its municipal ordinance to limit use of its
water filling station.
• Discussions with the City in 2024 indicated that this change was prompted by use
of the filling station for purposes outside its intended scope, which is to provide
non -potable water for construction.
• This year, we learned that the ordinance change is affecting contractors with
construction projects located outside the City's water service area.
• Public Works currently lacks the capacity to develop an alternative fill station.
• As a water customer served by Cle Elum, our current understanding is that Public
Works can utilize City water for road construction and maintenance needs.
BACKGROUND:
In 2024, the City of Cle Elum amended its municipal ordinance to restrict use of its water
filling station. The new ordinance allows water access only to contractors with an active
building permit for projects within the critical water supply service area (Cle Elum, South
Cle Elum, Roslyn, Ronald, and Suncadia, including the urban growth areas).
Previous discussions with the City indicate that the change was prompted by use of the
fill station outside of its intended purpose, supplying non -potable water for construction
water. Kittitas County Public Works initially responded by attempting to better assess
residential and domestic water needs. This year, it became apparent that the change is
affecting contractors working on projects outside the water supply service area.
DISCUSSION:
Public Works currently lacks the capacity to develop an alternative fill station.
Establishing one would require significant capital investment and ongoing staffing.
Page 1 of 2
Public Works "Work Session Staff Report", 2025
Public Works staff have contacted local Fire Districts to explore alternative sources of
construction and fire suppression water; however, no viable options have been identified.
At this time, Kittitas County is prioritizing efforts to secure water for its own road
maintenance and construction operations. As a municipal water customer, we understand
that water accessed from the Upper County shop can be used to meet these needs.
FISCAL IMPACTS:
Water used for county road maintenance will be billed at the higher municipal rates.
Public Works has not yet developed cost estimates for constructing an alternative fill
station.
ATTACHMENTS:
None.
Page 2 of 2
Public Works "Work Session Staff Report", 2025
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: July 28, 2025
TOPIC: Kittitas County CWU Technology Transfer
Center Feasibility Project Update
ACTION REQUESTED: Informational only
LEAD STAFF:
Joshua Fredrickson
RECOMMENDATION:
Informational briefing — no action required by the Board
BRIEFING SUMMARY:
• Kittitas County was awarded planning grant funding from the Washington State
Community Economic Revitalization Board (CERB) to develop Technology
Transfer Center Feasibility Study
• Match funding made available through Distressed Sales and Use Tax (0.09 funds)
• Project development is underway, kickoff meeting with stakeholders was held,
public involvement is ongoing
• Development of management structure to foster a successful public private
partnership is occurring
• Report is currently being drafted
BACKGROUND:
The Washington State Community Economic Revitalization Board (CERB) selected
Kittitas County to receive planning grant funding. This funding is to aid in financing the
cost of the Kittitas County CWU Technology Transfer Center Feasibility Study (Project).
A consultant was selected, and project development is ongoing at this time. This
feasibility study is a partnership with Central Washington University (CWU).
A project kickoff meeting was held April 29, 2025. Additional stakeholder meetings have
been conducted. This has included working with Kittitas County Chamber of Commerce
to conduct a meeting with key stakeholders. Meetings have included local business
owners, developers, real estate developers and other key stakeholders. The consultant has
also been working with Business and Community Services group from Central
Washington University for the development of the organization to operate Old Heat. This
has included research into existing commercialization centers to identify a business
structure. This information will be included in the final report. The report draft has
begun, which will include all of the required information for CERB.
Page 1 of 2
Public Works "Work Session Staff Report", 2025
DISCUSSION:
As part of the study, the feasibility of a public/private partnership to share costs of
construction and improvements will be explored. The feasibility study will also exam
ownership models of this space that allow public and private investment. This planning
grant will assist in the groundwork for a technological transfer, training and development
hub to support economic and workforce development in the Central Washington Region.
This project will help to harness the intellectual power of Central Washington University
to create relationships with business and industry. The proximity of the facility to campus
will help provide a place to match innovative work in research and development with
investors in an off -campus environment.
The work being done as part of this feasibility study has also identified the opportunities
connected with industrial zoned lands at Bowers Field. The technology transfer and
business growth to Bowers Field is a natural location due to its proximity to CWU and
Ellensburg.
FISCAL IMPACTS:
Project costs are accounted for through awarded funds and fund balance.
ATTACHMENTS:
None
Page 2 of 2
Public Works "Work Session Staff Report", 2025
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: July 28, 2025
TOPIC: Conference of Governments Regional Advocacy
ACTION REQUESTED: Information only
LEAD STAFF:
Josh Fredrickson
RECOMMENDATION:
Informational briefing — no action required by the Board
BRIEFING SUMMARY:
• Through regional coordination efforts Kittitas Conference of Government (COG)
members in partnership with Central Washington University has identified the
need for regional advocacy at the federal level
• Regional advocacy is intended to provide COG and its members the assistance to
navigate federal programs, secure competitive funding and advocate for regional
priorities
• COG intends to solicit proposals to provide professional federal advocacy
BACKGROUND:
Kittitas County Conference of Governments (COG) is a regional planning agency with its
focus on regional planning among member agencies. This includes the municipalities of
Roslyn, Cle Elum, South Cle Elum, Kittitas, Ellensburg and Kittitas County. This
collective effort has developed a recognition of benefits working for regional purposes.
Recent efforts have identified that professional assistance is needed to navigate federal
programs with the goal to secure additional funding for the region, in particular efforts
for economic growth. Central Washington University is an active participant in the
economic development of the County. To help align all efforts, a single advocacy partner
will benefit all.
DISCUSSION:
COG has been working in regional coordination and cooperation among member
jurisdictions on matters affecting the public served by the member jurisdictions. Through
this effort regional advocacy at a Federal level has been identified as a current need.
Kittitas County has experienced success with federal advocacy partners in navigating
federal programs and advocating for priorities. COG membership is seeking assistance
with navigating federal programs, securing competitive funding and advocating for
regional priorities at the federal level. To obtain these professional services COG intends
to solicit proposals for professional services. A draft Request for Proposals (Exhibit 1)
has been prepared for solicitation.
FISCAL IMPACT:
Funding is anticipated from COG member agencies to provide this service
ATTACHMENTS:
Exhibit 1: Draft Request for Proposals for Regional Advocacy
Request for Qualifications for Regional
Advocacy and Federal Funding Strategy
Services
I. Introduction
A regional consortium of public agencies (hereinafter referred,to as "the Consortium") is
soliciting qualifications from firms or individuals (hereinafter referred to as "Consultant") to
provide professional federal advocacy and strategic funding support. The goal is to secure a
responsive and experienced partner to assist the Consortium in navigating federal
programs, securing competitive funding, and advocating,for regional prioritie''s at the
federal level.
The Consortium consists of the following entities:
• The Kittitas County Conference of Governments, comprised of delegates
representing Kittitas County and the municipalities of Cle Elum, Ellensburg, Kittitas,
Roslyn, and South Cle Elum
• Central Washington University, a public university with undergraduate enrollment of
over 8,500 students located in Ellensburg with six satellite locations across
Washington state
This RFQ seeks to establish a relationship with a Consultant who will serve as a
Washington D.C. Representative for a broad range of regional priorities and coordinate with
both the Consortium's leadership and member agencies.
II. Scope of Services
The Consultant will perform, but not be limited to, the following tasks:
A. Advocacy and Strategy
• Serve as the Washington D.C. Representative to the Consortium, acting on
behalf of its collective interests in federal affairs.
• Monitor and analyze legislative, regulatory, and policy developments at the
federal level that may impact the Consortium.
• Provide strategic guidance and regular consultation with the Consortium
Leadership to align advocacy efforts with federal priorities.
• Develop and execute an annual federal advocacy strategy in partnership with the
Consortium and its members.
B. Communications and Support
• Maintain liaison with the region's Congressional delegation and relevant federal
agency contacts.
• Facilitate meetings with federal officials and agencies, including logistics and
briefing preparation.
• Assist with federal funding strategy, including identifying funding opportunities
and advising on grant proposals.
• Provide ongoing briefing materials and talking points for meetings, hearings, and
conferences.
• Provide aid and guidance to the�'Consortium on the most efficient and effective
methodology of completing funding opportunity applications which will generate
high exposure and support.
C. Reporting
• Submit quarterly written reports summarizing federal developments and
advocacy activities.
• Provide�an annual in -person report outlining accomplishments and anticipated
issues for the coming year.
III. Proposal Requirements
Interested firms or individuals should submit three (3) copies of a qualifications package,
not exceeding 12 pages, that includes:
A. Cover Letter
• Introduction to the firm/consultant
• Statement of interest and understanding of the scope of services
B. Firm/Consultant Qualifications
• Overview of federal advocacy experience, especially in regional or multi -agency
contexts
• Description of experience working with Congressional offices and federal
agencies
• Familiarity with federal grant programs and funding strategies
• Summary of recent federal funding or policy wins
• Relevant experience supporting programs with members of the Consortium.
C. Approach to Scope of Work
• Description of approach to delivering the services outlined in the Scope of
Services.
• Narrative describing how the Consultant will collaborate with the Consortium
and its members
• Proposed methodologies for monitoring legislation, identifying funding
opportunities, and executing advocacy strategies
Y
• Communication protocols and timelines for regular updates and coordination
• Examples of tools, systems, or'frameworks used to,t rack progress, manage
stakeholder engagement, and measure impact
• Any innovative or value-added services the Consultant proposes to enhance
advocacy and funding efforts
D. Key Personnel
• Bios and resumes of lead individuals assigned to this engagement
• Description of roles and responsibilities
E. References
• At least three (3) references from current or former clients for similar services
IV Evaluation Criteria
Members of the Consortium will review all submittals and select the provider for
contracting. If interviews are desired by the Consortium, selected interviewees will be
notified in advance.
Submissions will be evaluated based on:
• Relevant experience and demonstrated success in federal advocacy (30 points)
• Qualifications of key personnel (25 points)
• Knowledge of federal funding programs and policy landscape (20 points)
• Communication and coordination approach (15 points)
• Client references and past performance (10 points)
• Relevant experience working for or in Kittitas County or the municipalities
therein (25 points)
V. Budget and Compensation
A final budget will be negotiated with the selected Consultant based on scope and
services. Respondents are encouraged to provide a general fee structure (e.g., monthly
retainer, hourly rates, or project -based pricing) in their response.
VI. Submission Process and Deadline
All responses must be submitted by 1:00 pm local time on August 29, 2025 to:
Kittitas County Public Works
Attn: Josh Fredrickson, Director
411 North Ruby Street, Suite 1
Ellensburg, WA 98926
The Consortium reserves the right to reject, 'any or all proposals, waive informalities, or
request additional information from respondents.
VII. Agreement of Services
The selected consultants) will be expected to enter into a standard Professional Services
Agreement with Kittitas County. Insurance requirements are included in that agreement.
The Professional Services Agreement is expected to extend through December 2027.
Persons with disabilities may request this information be prepared and supplied in
alternate forms by calling collect the Kittitas County Public Works office (509-962-7523).
The Consortium reserves the right to accept or reject any and all proposals or any items or
part thereof or to waive any information or irregularities in the proposals. The Consortium
shall have the sole discretion to determine the most responsible proposal.
The selected consultant shall comply fully with all applicable federal, state and local laws,
ordinances, executive orders and regulations that prohibit discrimination. These laws
include, but are not limited to, RCW 49.60, Titles VI and VII of the Civil Rights Act of 1964,
the American with Disabilities Act, and the Restoration Act of 1987. The consultant shall
further comply fully with any equal opportunity requirements set forth in any federal
regulations, statues or rules included or referenced in the contract documents.
VIII. Additional Information
Any questions or inquiries regarding this RFQ should be directed to:
Josh Fredrickson, Kittitas County Public Works Director
Josh Fredrickson@ co.kittitas.wa.us
(509) 962-7523