HomeMy WebLinkAboutR2025-137BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RE
NO.
N,7
RESOLUTION TO AUTHORIZE EXECUTION OF AN INTERLOCAL AGREEMENT
BETWEEN THE KITTITAS COUNTY PUBLIC HEALTH DEPARTMENT AND THE
STATE OF WASHINGTON, DEPARTMENT OF ECOLOGY FOR POLLUTION
PREVENTTION ASSISTANCE PARTNERSHIP
WHEREAS, RCW 39.34,the Interlocal Cooperation Act, provides the capability for public
agencies to cooperate for mutual advantage; and
WHEREAS, Kittitas County, through the Kittitas County Public Health Department (KCPHD),
is charged with the preservation, promotion, and improvement of health in the
County; and
WHEREAS, one of the many ways KCPHD preserves and promotes health improvements is by
partnering with other agencies on high priority environmental issues; and
WHEREAS, KCPHD desires to partner with the Washington State Department of Ecology to
provide Pollution Prevention Assistants Specialists who will provide technical
assistance and education outreach to small quantity generators in effort to prevent
pollution of waters of the state as detailed in the attached Interlocal Agreement that
is hereby incorporated by this reference.
NOW THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Kittitas
County, Washington, authorizes execution of the attached Interagency Agreement with the
Washington State Department of Ecology.
DATED this l5+",day ori lu-lrl ,2025, at Ellensburg, Washington.\)l
BOARD OF COUNTY COMMISSIONERS
, WASHINGTON
ABSENT
x
of
Commissioner
uuuustgn EllvEluPE lu. +uJo+JU l-J/ JF_+ouz_Joo l_ I lE lFo4DJ+ lJ
DEPARTM ENT OF
ECOLOGY
State of Washington
IAA No. C2500178
INTERAGENCY AGREEMENT (IAA)
BETWEEN
THE STATE OF WASHINGTON, DEPARTMENT OF ECOLOGY
AND
Kittitas County Public Health
THIS INTBRAGENCY AGREBMENT ("Agreement" or "lAA") is made and entered irrto by and
between the state of Washington, Department of Ecology, hereinafter referred to as "ECOLOGY," aud
the Kittitas Counfy Public Health hereinafter referred to as the "CONTRACTOR," pursuant to the
authority granted by Chapter 39,34 of the Revised Code Washington, InterlocalCooperation Act.
THE P{IRPOSE OF TIIIS AGREEMBNT is for the CONTRACTOR to provide Pollution Prevention
Assistance (PPA) Specialists who will provide technical assistance and education outreach to small quantity
generators in an effort to prevent pollution of waters of the state as part of the Pollution Prevention Assistance
Partnership.
WHEREAS, ECOLOGY has legal authority (RCW 10A.214 and RCW 70A.300) and the
CONTRACTOR (other pafty) has legal authority (Specific authority to conduct inspections and provide
technicalassistance is derived from Kittitas County Code (KCC) Title 13, whicli outlines the powers of
the health officer.) that allows each party to undertake the actions in this agreement.
THEREFORE,IT IS MUTUALLY AGREED THAT:
I. SCOPB OF WORK
The CONTRACTOR shall furnish the necessary personnel, equipment, material and/or service(s) and
otherwise do allthings necessary for or incidentalto the perfonnance of the work set forth in Appendix
A, Statentent of Work, attached hereto and incorporated herein.
Yersion 4/14/25 (Access Equity)
uuuulrgil EilvEtuPE tu. auJo+Ya t-ot Jr-+Dvz-Joo t-t tE ttronoJa tJ
State of Washington, Departrnent of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
2. PERIOD OF PERFORMANCE
Tlre period of performarrce of this IAA will commence on July 102025, and be cornpleted by June 30,
2027, r"rnless the Agreernent is terminated sooner as provided herein. Amendments extending the period
of perfomrance, if arry, shall be at the sole discretion of ECOLOGY.
3. COMPBNSATION
Compensation for the work provided in accordance with this IAA has been established under the terms of
RCW 39.34.130 and RCW 39.26.1B0(3). This is a performance-based agreement, under which payment
is based on the successful completion of expected deliverables.
Compensation for this agreement will be released in two I -year phases. Phase One is limited to 50 percent
of the project budget and Phase Two can be up to the remaining percentage of the project budget. On or
before August 15,2026, Ecology will evaluate available funding and the CONTRACTOR's performance
and progress towards meeting contract deliverables and spending. To release the second year of funding
the CONTRACTOR, by June 30,2026,must'.
1. Cornplete a minimum of 40Yo of the total site visit deliverables, and
2. Utilize 40%o of the total compensation award.
If performance obligations have been met and funding is available per ECOLOGY's detennination, the
full year 2 budget award will be considered available. Should the CONTRACTOR fail to make
satisfactory progress, ECOLOGY will determine the appropriate additional funding to release for year 2
of the contract. Ecology will consider various factors in determining year 2 funding includirrg, but not
lirnited to, available funding, performance to date, staff vacancies, time and costs spent on unique
program elernents, and potential circumstances beyond the CONTRACTOR's control.
The source of funds for this IAA is Model Toxics Capital Account (23N). Both parties agree to comply
with all applicable rules and regr,rlations associated with these funds.
The parties have detennined that the cost of accornplishing the work identified herein will not exceed one
hundred twenty-five thousand, six hundred eight dollars, and eighty-four cents ($ 125.608.84), including
any indirect charges. Payment for satisfactory perfonnance of the work shall not exceed this amount
nnless the pafties mutually agree via an amendment to a higher amount. Compensation for services shall
be based on the terms and tasks set forth in Appendix A, Statement of Work. ECOLOGY will not make
payment until it has reviewed and accepted the work.
Travel expeuses (meals, lodging, and POV rnileage) will be reimbursed according to cnrrent state per-
diem rates at the time of travel, not to exceed the total budget (see ApperrdixB, Bndget Detail).
Expenses related to initial 24-hour (or 40-hour) HAZWOPER training, and required yearly 8-hour
refresher training courses will be reimbursed as part of the quarterly invoicing submittal. Invoices for
those training courses must be subrnitted as supporting documentation for the quarterly submittal.
Expenses for language services will be reimbursed in quarterly invoice submittals. CONTRACTOR must
submit invoices from the language service provider, or time sheets for internal staff providing language
services, to be reimbursed as part of quarterly invoice submittals.
Funds for the purchase of source control tools or equiprnent (e.g. spill kits, plastic drum covers) and
promotional items for distribution to businesses under this contract must be iucluded in the Goods &
2
Version 4/14/25 (Access Equity)
uuLu5tgil EilvvtuPtr lu. auJo+JU l-Jl Jtr-aouz-Yoo I- I lE lro+DYa lJ
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
Serrrices Budget or Equiprnent Budget categories in Appendix B, Budget Detail. Any purchase of
equipment or goods & services over $ 1,000.00 not specifically listed in Appendix B, Budget Detail must
be pre-approved by ECOLOGY in writing. When the agreement expires, or when the equiprnent is no
longer needed for the originally authorized purpose (whichever comes first) the disposition of equipment
shall be at ECOLOGY's sole discretion.
Irrdirect rates for the contract will be paid as indicated in Appendix B, Budget Detail. Changes to the
indirect rate may be considered by ECOLOGY. CONTRACTOR shall provide supporting documentation
necessitating the change to the indirect rate to ECOLOGY. ECOLOGY's approval will be communicated
by e-rnail by the Pollution Prevention Assistance Coordinator. An increase in indirect rate does not
increase the total contract award. Changes are handled by adjusting the budget between categories listed
in Appendix B, Budget Detail. Changes to the total budget cost of the contract shall require an
arnendment. The budget referenced in Appendix B, Budget Detail rnay be adjusted between categories
with ECOLOGY's preapproval. and if the total budget is not exceeded.
ECOLOGY tnay, al its sole discretion, terminate or suspend this Contract in accordance with Sectiorr 19
or 20, or withhold payments clairned by the CONTRACTOR for services rendered, if the
CONTRACTOR fails to satisfactorily comply with any tenn or condition of tliis Agreement.
4. BILLING AND PAYI\{ENT PROCEDURE
Payment requests shall be submitted electronically or by mail, on state fonn Invoice Voucher A19-14.
Irrvoice voucher shall reference the Agreement (lAA) number and clearly identify those items that relate
to perfonnance under this Agreernent. Invoices shall describe and document to ECOLOGY's satisfaction
a description of the work perfonned, the progress of the work, and related costs. Each invoice shallbill
for actual hours worked during the quarter. The actual hours billed may be higher (if the total budget
conrpensation award is not exceeded) or lower than the FTE estimate in Appendix A, Statement of Work.
Attaclr supporting documentatiorr to the invoice. See Appendix A, Statentent of Work, Sections 4,5, and
1 I for additional infonnation (and Section 10, Small Change Voucher Progrant, if applicable).
Send invoices to:
State of Washington
Depaftment of Ecology
Hazardous Waste & Toxic Reduction Program
Attn: Andrew Maher
4601 N. MONROE ST.
SPOKANE, WA 99205
OR
Email invoices and supporting documentation to both:
Andy Maher, anma461@ecy.wa.gov & Kristine Ray, kray46l@ecy.wa.gov
Payment requests will be subrnitted on a Quafterly basis. Invoices must be submitted by the dates
outlirredirrAppendixA,StatententofWork,Sectionll:Invoices,Tablell.l. Uponexpirationofthis
Agreernent, any claim for payment not already made shall be submitted to ECOLOGY within 30 days
after the expiration date or the end of the fiscal year, whichever is earlier.
3
Yersion 4/14/25 (Access Equity)
uuLu>tgil EilvtrluPv lu, luJoavu l-Jt Jr_aDvz-Yoo l-l lE lFoaDJa I J
State of Washington, Deparlment of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
Payment will be made within thirry (30) days of submission of a properly completed invoice (fonn A19-
I A) with sr"rpportive documentation. All expenses invoiced shall be supported with copies of invoices
paid.
Payment will be issued through Washington State's Office of Financial Management's Statewide Payee
Desk. To receive payment, CONTRACTOR must register as a statewide vendor by submitting a
statewide vendor registration fonn and an IRS W-9 form at website, https://ofm.wa.gov/it-
systems/statewide-vendorpayee-services. For questions about the vendor registratiott process, contact
Statewide Payee Help Desk at (360) 407-8180 or ernail PayeeRegistration@ofm.wa.gov.
5. ALTERATIONS AND AMENDMENTS
This Agreement may be amended by rnutual agreement of the parties. Such amendments shall not be
binding unless they are in writing arrd signed by personnel autlrorized to bind each of the parties.
6. ASSIGNMENT
The work to be provided under this Agreement, and any claim arising thereunder, is rrot assignable or
delegable by either party in whole or in part, without the express prior written consent of the other party,
which consent shall not be unreasonably withheld.
7. ASSURANCES
Parties to this Agreement agree that all activity pursuant to this agreement will be in accordance with all
the applicable current federal, state, and local laws, rules, and regulations.
8. CONFORMANCE
If auy provision of this Agreement violates any statute or rule of law of the state of Washington, it is
considered rnodified to conform to that statute or rule of law.
9- DISPUTBS
Parties to this Agreement shall ernploy every effort to resolve a dispute themselves without resorting to
litigation. ln the event that a dispute arises under this Agreernent that cannot be resolved among the
pafties, it shall be determined by a Dispute Board in the following manner. Each party to this Agreement
shall appoint one mernber to the Dispute Board. The mernbers so appointed shalljointly appoint an
additional member to the Dispute Board. The Dispute Board shall review the facts, agreement tenns, and
applicable statutes and rules, and then make a determinatiou of the dispute. The determination of the
Dispute Board shall be final and binding on the parties hereto, unless restricted by law. The cost of
resolution will be bome by each party paying its own cost. As an alternative to this process, if state
agerrcies, either of the parties may request intervention by the Govemor, as provided by RCW 43.17 .330'
in which event the Governor's process will control. The parties may mutually agree to a different dispute
resolution process.
IO. FUNDING AVAILABILITY
ECOLOGY's ability to make payments is contingent on availability of funding. In the event funding
from state, federal, or other sources is withdrawn, reduced, or lirnited in any way after the effective date
and prior to completion or expiration date of this Agreement, ECOLOGY, at its sole discretion, may elect
to terminate tlre Agreement, in whole or part, for convenience or to renegotiate the Agreemerrt subject to
new funding limitatiorrs and conditions. ECOLOGY may also elect to suspend perfonnance of the
Agreement until ECOLOGY detennines the funding insufficiency is resolved. ECOLOGY may exercise
4
Version 4/14/25 (Access Equity)
uuuultgil EtlvEluPtr lu. avJo+Jo r-Jr Jtr-+DUz-JoD I- r rE rro+DJ+lJ
State of Washington, Deparlment of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
any of these options with no notification restrictions, although ECOLOGY will make a reasonable
attempt to provide notice.
In the event of termination or suspension, ECOLOGY will reimburse eligible costs incurred by the
CONTRACTOR through the effective date of termination or suspension. Reimbursed costs must be
agreed to by ECOLOGY and the CONTRACTOR. In no event shall ECOLOGY's reimbursement
exceed ECOLOGY's total responsibility under the agreeurent and any antendtnents.
I I. GOVERMNG LAW AND VENUE
This Agreerlent is errtered into pursuant to and under the authority granted by the laws of the state of
Washington and any applicable federal laws. The provisions of this Agreement shall be construed to
conform to those laws. This Agreement shall be construed and interpreted in accordance with the laws of
tlre state of Washington, and the venue of any action brought hereunder shallbe the Superior Court for
Thurston County.
I 2. INDEPENDENT CAPACITY
The ernployees or agents of each party who are engaged in the performance of this Agreement shall
continue to be employees or agents of that party and shallnot be considered for ar-ry purpose to be
employees or agents of the other party.
13. ORDEROFPRECEDENCE
In the event of an inconsistency in the terms of this Agreement, or between its terms and any applicable
statute or rule, the inconsistency shall be resolved by giving precedence in the following order:
a. Applicable federal and state of Washington statutes, regulations, and rules
b. Mutually agreed upon written amendments to this Agreement.
c. This Agreerneut, uumber C2500178.
d. Appendix A, Stalement of Work.
e. Appendix B, Budget Detail.
f. Appendix C, Special Terrns and Conditions.
g. Any other provisions or tenn of this Agreement, including materials incorporated by reference or
otherwise incorporated.
I 4. RECORDS MAINTENANCB
The parties to this Agreement sliall each maintain books, records, documents, and other evidence that
sufficiently and properly reflect all direct and indirect costs expended by either party in the performance
of the service(s) described herein. These materials shall be subject to inspection, review, or audit by
personnel of both parties, other personnel duly authorized by either party, the Office of the State Auditor,
arrd federal officials so authorized by law. All books, records, docutnents, and other materials relevant to
this Agreernent must be retained for six years after expiration of this Agreement. The Office of the State
Auditor, federal auditors, and any persons duly authorized by the pafties shall have full access and the
right to examine any of these materials during this period. Each party will utilize reasonable security
procedures and protections for all materials related to this Agreement. All materials are subject to state
public disclosure laws.
5
Yersion 4ll4125 (Access Equity)
uuuusrgil EilvtrtvPE tu. +vJgnvo l-J/ JT-tDUz-Yoo l-l lE lrotDv+ lJ
State of Washington, Depaftment of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
15. RESPONSIBILITIES OF THE PARTTES
Each party of this Agreernent hereby assumes responsibility for claims and/or damages to persons and/or
property resulting fi'orn any act or omissions on the part of itself, its employees, its officers, and its
agents. Neither palty will be considered the agent of the other party to this Agreement.
16. RIGHTSINDATA
Unless otherwise provided, data which originates frorn tl-ris Agreement shall be "wofk made for hire" as
defined by the United States Copyright Act, Title 17 U.S.C. section 101 and shall be owned by state of
Washington, ECOLOGY. Data shall include, but not be limited to, repofts, documents, pamphlets,
adveftisements, books rnagazines, surveys, studies, computer programs, films, tapes, and,/or sound
reproductions. Ownership includes the right to copyright, patent, and register these items, and the ability
to transfer these rights.
17. SEVERABILITY
If arry provisiori of this Agreement or any provisior-t of any document incorporated by reference shall be
held invalid, such invalidity shall not affect the other provisions of this Agreement which can be given
effect witliout the irrvalid provision, if such remainder conforms to the requirements of applicable law and
the fundamental purpose of this Agreement, and to this end the provisions of this Agreement are declared
to be severable.
18. SUBCONTRACTORS
a. CONTRACTOR agrees to take complete responsibility for all actions of any Subcontractor used
Lrnder this Agreement for the performance. When federal funding is involved, there will be
add itional CONTRACTOR and subcontractor requirements and reporting.
Prior to performance, all subcontractors who will be performing services under this Agreement
must be identified, includirrg their name, the nature of services to be performed, address,
telephone, WA State Department of Revenue Registration Tax number (UBI), federal tax
identificatiorr number (TIN), and anticipated dollar value of each subcontract. IdentiS, whether
subcontractor is certified with
Office of Minority and Women's Business Enterprises (OMWBE), WA Dept of Veterans Affairs
(WDVA), or is a WA small business. Provide such information to ECOLOGY's representative.
b. Subcontractor Payment Reporting Requirements - Access Equity:
This Agreeurent is subject to compliance tracking of subcontractor(s) spending using the State's
business diversity managemeut system, Access Equity (B2Gnow). Access Equity is web-based
and can be accessed at the Office of Minority and Women's Business Enterprises (OMWBE) at
https://omwbe.diversitvcornpliance.corn/. The CONTRACTOR and all Subcontractor(s) shall
report and confinn receipt of payments made to the CONTRACTOR and each Subcontractor
through Access Equity.
The CONTRACTOR may contact Robyn Crawford (rvan46l@ecy.wa.gov; (56D223-5487),
Access Equity Contract Agent with Ecology's Hazardous Waste & Toxic Redr"rction Program for
technical assistance in using the Access Equity system.
User guides and documentatior-r related to Contractor and Subcontractor access to and use of
Access Equity are available online at https://omwbe.wa.gov/access-equit-y-help-center.
6
Yersion 4ll4/25 (Access Equity)
uuuuStgrl EltvEluptr lu. tuJg+J9 l-ua JT-tDUZ-Joo l-l lE lro+DJ+ lJ
State of Washington, Department of Ecology
IAA No. C2500178
Entify Name: Kittitas Counfy Public Health
ECOLOGY reserves the right to withhold payments frorn the CONTRACTOR for non-
compliance with this section. For purposes of this sectiou, Subcontractor tneans any subcontractor
working on the Contract, at any tier and regardless of status as certified WMBE or Non-WMBE.
The CONTRACTOR shall:
a. Register and enter all required Subcontractor infonnation into Access Equity no later than
fifteen (15) days after ECOLOGY creates the file (Contract Record) in Access Equity.
b. Cornplete the reqr"rired user training (two (2) one-hour online sessions) no later than twenty
(20) days after ECOLOGY creates the file (Contract Record) in Access Equity.
c. Report the amount and date of all payments:
i. Received from ECOLOGY, and
ii. Paid to Subcontractors, uo later than fifteen ( 1 5) days after the issuance of each
payment rnade by ECOLOGY to the Contractor, unless otherwise specified in writing
by ECOLOGY, except that the Contractor shall mark as "Final" and report the final
Subcontractor payments into Access Equity no later than thirty (30) days after the
final payment is due the Subcontractor(s) under the Contract, with all payrnent
irrformation entered no later than sixty (60) days after end of fiscal year, June 30.
d. Monitor contract payments and respond promptly to any requests or instructions from
ECOLOGY or system-generated messages to check or provide infonnation in Access
Equiry.
e. Coordinate with Subcontractors, or ECOLOGY, when necessary, to resolve promptly any
discrepaucies between reported and received payments.
f. Require each Subcontractor to:
i. Register in Access Equity and complete the required user training.
ii. Verif, the amount and date of receipt of each payment frorn the Contractor or a
lrigher tier Subcontractor, if applicable, through Access Equity.
iii. Report payments made to any lower tier Subcontractors, if any, in the same manner
as specified herein.
iv. Respond promptly to any requests or instructions from the Contractor or system-
generated messages to check or provide infonnation in Access Equity; and
v. Coordinate with Contractor, or ECOLOGY, when necessary, to resolve promptly any
discrepancies between reported and received payments.
I9. SUSPENSION FOR COI\TVEMENCE
ECOLOGY may suspend this Agreement or any portion thereof for a temporary period by providing
written notice to the CONTRACTOR a minimum of seven (7) calendar days before the suspension date.
CONTRACTOR shall resume performance on the first business day following the suspension period
runless another day is specified in writing by ECOLOGY prior to the expiration of the suspension period.
20. TERMINATION FOR CAUSE
If for any calrse, either party does not fulfill in a tirnely and proper manller its obligations under this
Agreernent, or if either party violates any of these terms and conditiotrs, the aggrieved party will give the
other parly written notice of such failure or violation. The respotrsible party will be given the opportunity
to correct the violation or failure within fifteen ( I 5) business days. If failure or violation is not corrected,
this Agreernent may be tenninated irnmediately by written notice of the aggrieved party to the other.
7
Version 4/14/25 (Access Equity)
uuuustgil EilvtrluPE lu. auJo{vo l_ul Jr-+Dv4-Yoo l-l lE lrolDv9 lJ
State of Washington, Deparlrnent of Ecology
IAA No. C2500178
Entity Name: I(ittitas County Public Health
2I, TERMINATION FOR COI\T\IEMENCE
Either party rnay terminate this Agreement without cause upon thifty (30) calendar day prior written
notification to the other party. If this Agreement is so terminated, the parties shallbe liable only for
performance rendered or costs incurred in accordance with the tenns of this Agreement prior to the
effective date of tennination.
22. WAIVER
A failure by either party to exercise its rights under this Agreement shall not preclude that party from
subsequent exercise ofsuch rights and shall not constitute a waiver ofany other rights under this
Agreement unless stated to be such in a written amendment to this Agreement signed by an authorized
representative of the parties.
23. AGREBMENT MANAGEMENT
The representative for each ofthe parlies shall be responsible for and shall be the contact person for all
communications, notifications, and billings questions regarding the perfonnance of this Agreement. The
parties agree that if there is a change in representatives, they will prornptly notiff the other party in
writing of such change, such changes do not need an amendment.
The ECOLOGY Representative is:The Kittitas County Public Health
Representative is:
Name: Andrew Maher
Address: 4601 N. Monroe St.
Spokane, WA 99205
Plrone: (509) 290-1806 cell
Email: anrna46l@ecy.wa.gov
Name: Jesse Cox
Address: 507 N Nanum St.
Ellensburg, W A 98926
Phone: (509)962-7005
Ernail: iesse.cox@co.kittitas.wa.us
8
Yersion 4ll4/25 (Access Equity)
uuLustgil cltvtrtuPtr lu. auJoaYU t-Jt Jr-aouz-yoD r-t rG rroaDJt tJ
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
24, ALL WRITINGS CONTAINBD HEREIN
This Agreement contailrs allthe terms and conditions agreed upon by tlre parties. No other
urrderstandings, oral or otherwise, regarding the subject matter of this Agreement shall be deemed to ekist
or to bind any of the parties hereto.
The signatories to this Agreement represent that they have the authority to bind their respective
organizations to this Agreement.
IN WITNESS WHEREOF, the parties below, having read this Agreement in its entirety, including all
attachrnents, do agree in each and every particular as indicated by their signatures below.
State of Washington
Department of Ecology
By:
Kittitas County Public Health
By:
by:by:
,rl 8/6/202s b,frr1 7 /7s /202s
Signature Date Signature Date
Katrina Lassiter Chelsey Loeffers
Print Name Print Name
G'2
-DS
((
Hazardous Waste and Toxics Reduction
Program Manager
Title
Public Health Director
Title
9
Yersion 4/14/25 (Access Equity)
uuLusrgrl EllvtrluPY tu. auJo+vu l-uaOT-+DU4-YoD l-l lE lrotDv+ lJ
State of Washington, Depaftment of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
APPENDIX A
STATEMENT OF WORI(
Section 1. Introduction
Tlris statement of work is for the 2025 -2027 biennial Interagency Agreement (IAA) for the Pollution
Prevention Assistance (PPA) Partnership, which is overseen by the Washingtolt State Department of
Ecology (ECOLOGY), Hazardous Waste & Toxic Reduction Program (HWTR).
The mission of the PPA Paltnership is
"14/e protect Washington's residents and environment by helping snrull busin.esses reduce toxic
chernical ttse, safely nxan.age dangerous utaste, and keep stonnwaterfree of pollutants."
The CONTRACTOR, through their Pollution Prevention Assistance (PPA) program, willconduct
rnultimedia solrrce control site visits and pollution prevention activities to businesses that are small
quarrtity generators (SQGs) of dangerous waste. In this context an SQG is any business, non-profit,
facility, school, or other organization that generates less than 220 pounds of dangerous waste per calendar
month and less than2.2 pounds of extremely hazardous waste per calendar month. The site visits, along
with other pollution prevention activities conducted by ttre CONTRACTOR, will be designed to reduce or
eliminate dangerous waste and other pollutants at the source through best management practices tlrat
prevent spills and discharges to ground, air, and water (especially to industrial wastewater and
stonnwater).
To further facititate the redr.rctiorr or elimination of toxic chemical use at the source, the CONTRACTOR
will seek and discuss oppoftunities to assist businesses with switching processes, prodttcts, or equipment
to use effective safer altenratives. This prograln will be known as the "Product Replacement Progratn" or
PRP.
PPA work for the 2025 - 2027 contract cycle is expected to fall within the below general
proportions:
Table 1.1: PPA Work Tasks
I Approximately l0 - 15% of TA visits may involve Product Replacement Program visits
10
PPA Work Tasks 7o of Time Spent
Technical Assistance (TA) Visitsr
(See Appendix A, Statement of Work, Section 2 for ntore details)
600h
Unique Program Elements
(See Appendix A, Statement of Work, Section 3 for more details)
l5o/o
Training
(See Appendix A, Statement of t4tork, Section Sfor more details)
20,
Other
(Admin, staff meetings, etc.)
5.h
Version 4/14/25 (Aocess Equity)
uuuutrgil cilvEtuPE lu. +vJUaYo l-ut Jtr-aDvz-YoDr-l lE lFoaDva lJ
State of Washington, Department of Ecology
IAA No. C2500118
Entity Name: Kittitas County Public Health
The CONTRACTOR is expected to:
r Interact with other partners within the PPA Paftnership to provide technical assistance and
training and share resources and experiences.
o Set up alerts to receive notifications when requests for information have been made on the PPA
Partnership SharePoint Discussion Board.
o Ensure at least one staff member is available to provide tirnely information and feedback to
ECOLOGY's PPA Coordinator and to attend mandatory meetings and trainings. Feedback on
Partnership goals, direction, and projects will occasionally be requested via online surveys and
email requests.
o Act in a professional and ethical manner and avoid any conflict of interest that might influence
the CONTRACTOR's actions or judgernent.
o Disclose irnmediately to ECOLOGY any interest, direct or indirect, that might be construed as
prejudicial in any way to the professional judgrnent of the CONTRACTOR in rendering service
under tlris Agreement.
o CONTRACTORS will atternpt to provide 40% of their services (visits and unique program
elements) to businesses located within overburdened communities of Washington State. The
Overburdened Communities of Washington State map provided by the Office of Financial
Management is used to determine if businesses are located within an overburdened community.2
. CONTRACTORS are required to identiff facilities withirr Overburdened Communities irr
Washington State during data entry into the Local Source Corrtrol Database.
Key staff, estirnated FTE, and their roles are identified in Table l. Please note, this is an estimate of time
dedicated to this contract over the full two years of the contract; quarterly invoicirrg must reflect actual
hours worked even if hoLrrs are higher or lower than the FTE estimate.
Key personnel changes (staff or tnanager leaving, new hires, etc.) must be repofted to the Pollution
Preventiorr Assistance Coordinator within ten (10) business days. Changes to key personnel must be
docr-rmented with Lrpdated copies of the key staff table.
Table 1.2:Staff Table
Section 2. Technical Assistance Visits
The CONTRACTOR will corrduct technical assistance site visits to small quantity generators of
dangerous wastes, and to businesses or organizations that have the potential to pollute stormwater.
Approximately 60oh of tlie visits will be Initial Visits. If InitialVisits fall below 600%, combined Initial
Visits and Follow-Up Visits must account for at least 80% of the total visits. While necessary, efforts
should be made to minirnize Screening Visits.
2 https://geo.wa.gov/datasets/wa-ofin::overbuldened-communities-of-washington-
state/explore?location:47 .246690%2C- 121 .9 523 58%2C I 0.0 1
1l
RoleStaff Name Estimated FTE
0.35 PPA SpecialistLucerito Garcia
PPA ManagerJesse Cox 0.05
0.10 PPA Specialist (Backup)Kirn Shilley
Version 4/14125 (Access Equity)
uuuusrgrl ErrvEluPE lu. nvJo+vo l-Jl Jr-aouz_JaD l-l lE Iro+DJ+ lJ
State of Washington, Department of Ecology
IAA No. C2500178
Entity Narne: Kittitas County Public Health
r An Initial Visit occurs at the actual site and results in a cornpleted "Basic Checklist" (Link in
Appendix A, Statement of Work, Section 72: Resources), or enough data gathered to complete
data entry into the LSC Database (Link to database in Appendix A, Statement of Work, Section
12: Resom,ces). It will either be the first complete visit to a site OR the first visit in two (2) or
more years.
. A Screening Visit is an attempted visit to the site, but the business declined or put off the visit,
OR you were interrupted during the visit and were unable to gather complete data, OR you
discover that the facility does not exist anymore OR you discover that the business does not
qualify for a visit under the PPA program (e.g., it is a medium or large quantity generator).
. A Follow-Up Visit should occur within 90 days of the Initial Visit. Follow-up should generally
be done through an on-site visit. However, a phone conversation, mail or email exchange may
count as a Follow-Up Visit if it includes confinnation that the issues that were identified in the
initiat visit were resolved. Follow-Up Visits must be conducted to resolve High Priority
Environmental Issues (See Section Below).
Table 2.1: Total Number of Technical Assistance Visits
Number of Total Visits 100
Target for Initial Visits (60% of Total)60
Business sectors, organizations, waste streams, and/or geographical area that will provide a focus for the
2025 -2021 technical assistance visits are listed in Table 2.2 Technical Assistance Targets.
ECOLOGY rnay direct a portion of technical assistance visits towards specific priority sources or
contaminants.
CONTRACTORS will atternpt to provide 40o/o of their services (visits and unique program elements) to
businesses located within overburdened communities of Washington State. The Overburdened
Communities of Washington State rnap provided by the Office of Firrancial Management is used to
detennine if businesses are located within an overburdened community.3 CONTRACTORS must identifli
facilities within Overburdened Cornmunities in Washington State during data entry into the Local Source
Control Database.
Table 2.2: Technical Assistance Ta
r https://geo.wa.gov/clatasets/wa-ofm::overburdened-communities-of-washington-
state/explore?location:47 .246690oA2C- 121 .9 523 58Y,2C I 0.0 I
l2
Technical Assistance Targets Rationale for Selection
Automotive Sector
This sector will be a key focus due to its significant potential
for environmental impacts. Automotive businesses commonly
handle hazardous materials and chemicals that can pollute water
s and soil if not rnan
Small Intlustrial Facilities
These operations can pose significant environmental challenges
due to their use of chemicals and generation of hazardous
waste. These facilities often lack the resources or expertise to
irnplement best practices for reducing hazardous waste, safely
material and llution
Yersion 4/14/25 (Access Equity)
uuuusrgtr EllvEluPtr lu. +uQo+Jo l-Jr Jr_+DUZ_YoD l-l lE ltro{Dv+ I J
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
High Priority Environmental Issues
The below list is ECOLOGY's High Priority Environmental fssues list because they have the potential to
directly irnpact human health and/or the environment. If one or rnore of these issttes are found during a
site visit, a Follow-Up Visits is justified but not necessarity required. The severity of the issue will help
determine if a Follow-Up Visit is necessary. A Follow-Up Visit to a business for other (non-high
priority) issues is at the discretion of the CONTRACTOR.
When unable to resolve High Priority Environmental Issues, the Pollution Prevention Specialists will
refer the issue to ECOLOGY or another appropriate agency. Serious concerns about irnpacts to human
health and/or the environrnent warrant a consultation with ECOLOGY or other regulatory agencies to
detennine whether tlre issue needs to be referred.
High Priority Environmetrtal Issues List:
. Hazardons waste being irnproperly designated.
. Hazardous waste being improperly disposed.
. Hazardous products / wastes being improperly stored.
r Conrprornised dangerous waste containers need to be repaired or replaced
e Illegal plumbing conuection.
. Illicit discharge of wastewater to storm drain.
. Lnproperlystoredcontainerizedrnaterials.
. Improperlystorednon-containerizedmaterials'
e Leaks and spills iu dangerous waste storage areas.
Visit Guidance
The following guidance applies to technical assistance visits, unless otherwise discussed with
ECOLOGY:
Prior to the Visit:
Coordinate with other entities that rnay be conducting business visits in the area to reduce
potential "inspection fatigue".
Check with ECOLOGY Urban Waters Staff (where applicable) to ensure that the business is not
currently being visited by Urban Waters Staff.
Research site and issues prior to the visit using a combination of data sources, such as LSC
Database (Lirik in Appendix A, Staternent of l(ork, Section 12: Resources) for previot"ts visits or
visit to similar businesses, industry resources, news articles, etc.
To the extent possible, verifu the site is not a medium or large quantity generator.
13
a
a
a
a
Agricultural Operations
Agricultural operations represent a critical sector for the PPA
program due to their reliance on chemicals such as fertilizers,
pesticides, and fuels, as well as the potential for generating
hazardous waste. These operations include crop production,
livestock management, greenhouses, equipment maintenance,
and post-harvest processing, all of which can contribute to
pollution if materials are not properly managed.
Version 4/14125 (Access Equity)
uuuustgil Errvctupg lu. +uJo+vo r-u, Jr-+ouz-YoD r-r rE rFo+DY+ rJ
State of Washington, Depaftment of Ecology
IAA No. C2500178
Errtity Name: Kittitas County Public Health
Check to see if a sector specific Checklist or Tip Sheet is available on the PPA Partnership
SlrarePoint site on the Checklists & Tip Sheets Page. (Link in Apperrdix A, Statement of t{ork,
Sectiorr 12: Resources) to help guide the visit.
Durins the Visit:
. Provide technical assistance on proper management of dangerous waste, prevention of stormwater
pollution, spill prevention, and reduction of hazardous substance use (when applicable).
o Ensure, at a minimum, all items on the Basic Checklist are reviewed.
. If while at the site, it becomes apparent the business is a medium or large quantity getterator,
either complete the visit and count it as a screening visit OR forrnally refer the dangerous waste
portion to ECOLOGY to count it as a full initial visit.
o This site shoLrld not be scheduled for future visits, unless it is likely their generator status
has changed to qualifu as an SQG.
. [f appropriate, encourage businesses to parlicipate in local green business programs, suclr as the
EnviroStars business certification program, EnviroCertified, or other green business programs.
. If a Product Replacement Program (PRP) opportunity exists forthe business, discuss the
opportunity, tel'ms and conditions, and steps to qualifr as outlined in Appendix A, Statement of
Work. Sectiotl 5, Product Replacement Progrant.
o Discuss spill response preparedness and offer spill kit for developing a plan. Funds can be used
to purchase spill kits to provide to businesses. Occasionally, ECOLOGY will provide spill kits
throLrgh a bulk order if funding is available.
r Photograph observed issues for before and after photos to use in writing up case studies.
. Activities that may be beneficial during the visit include, but are not limited to:
o Walking tlre site (interior and exterior).
o Checking stonn drains.
o Checkirrg for illicit connections.
o Checking dumpster and waste storage.
o Providing handouts with technical information and guidance.
o Ensuring necessary pennits are in place.
Translation / Lansuage Services - Durins tlte Visit
CONTRACTORS are required to have a language service in place to be able to provide real-time
interpretation selices to businesses when doing PPA and/or PRP visits. This will ensure that the business
understands their commitrnent and the information being shared by PPA specialists.
CONTRACTOR staff can provide trarrslations and interpretations for languages they speak fluently, if
approved by tlie Pollution Prevention Assistance Coordinator. CONTRACTORS rnust have a setvice in
place to provide language services for those languages not spoken by CONTRACTOR staff.
CONTRACTORS that do not have a service contract in place at the time of signing the contract must
obtain a service contract within three months of signing the contract, or the contract will be sLrbject to
termination.
CONTRACTORS must submit invoices from language providers with supporting documentation during
quarterly invoices. If the language providers are in-house staff, CONTRACTOR will provide timesheets
showing the hours speut on language seruices and submit with supporting documentation.
a
Yersion 4/14/25 (Access Equity)
T4
uuuustgil EilvEluPv lu. +vJoavo l-J/ JF-louz-Yoo l_l lE lro+Dr+ I J
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas Counfy Public Health
End of Visit / After Visit:
Provide written follow-up to the business to docurnent the results of the visit. This can be dorre by
leaving a copy of the checklist or other documentation with the business at the end of the visit, by
using a commitrnent postcard (format available in Education & Outreach Documents on PPA
Partnership SharePoint), or by sending follow-up letters/emails, or alternatively by sending a
"thank you" postcard if no issues were identified.
If necessary, coordinate with other agencies (e.g., the fire marshal, code enforcemetlt, stonnwater,
wastewater treatrnent, and/or moderate risk waste staff) to ensure that the infonnation you are
providing is consistent with the other agency's regulations and/or best managemerrt practices.
PPA Specialists will make referrals to ECOLOGY and other regulatory agencies as needed and
document the referral in the Local Source Control (LSC) database (Link in Appendix A,
Statement of Work, Section 12: Resources).
Section 3. Unique Program Elements
The CONTRACTOR will conduct the unique program elements for their PPA prograrn as outlined in
Table 3. 1, below.
Table 3.1: Un P Elements
a
a
a
Unique Program
Element Description Deliverable(s)
All-Staff Planning
Committee
Four separate committees
(one for each training
event) made up of PPA
Specialists and Ecology.
The committee will work
to schedule and facilitate
the meetings. The format
for these meetings will
likely be one in-person
per year and one virtual
meeting per year.
a Work with olte or two other.iurisdictions to
plan I All-Staff Trairring Event (virtualor
in-person) for the Spring 2027 PPA All-
Staff.
With other comrnittee members, determine a
committee chair to schedule planrring
meetings, track tasks, and finalize the
agenda.
Arrange for meeting logistics (venue, food,
and beverage, if in person) and speakers.
Participate in all workgroup meetings. If
you are unable to attend the meeting, give
the committee chair as much notice as
possible, and follow up with any
assignments or document review as sooll as
possible.
a
a
a
Resource
Consistency
Committee (RCC)
Participate on a team to
enhance partnership
brandirrg and consistency
across partners.
. Review and advise partners on logo and
template use, material and website design,
and other projects as needed.
o Particip ate in 90Vo of scheduled meetings.
. Review all assigned materials.
r Provide an update on the program in each
quarterly report.
o Provide an update on the program in each
annual report.
Version 4/14l2,s (Access Equity)
l5
uuuultgil EllvEluPE ru, auJo+vo r-JlJr-aDUZ_YQo l-l lE lro+o9+ rJ
State of Washington, Department of Ecology
IAA No. C2500178
Entity Narne: Kittitas County Public Health
Section 4: Partnership Branding and Outreach
When unique outreach or educatiorr materials are developed by the CONTRACTOR using PPA
Partnership funds, a draft must be sent to ECOLOGY for review and approval. To the extent feasible, the
CONTRACTOR must utilize the Partnership's branding tools and tentplates available to produce these
materials. The intent of this requirement is to facilitate a unified branding irnage and consistent
messaging across the Partnership. The Partnership logo and other branding resources are available on the
PPA Partnership SharePoint Publications & Handouts site (Link in Appendix A, Statement of Work,
Section 12: Resources).
It may be appropriate to inch,rde funding acknowledgement ol1 some outreach materials. The
CONTRACTOR will consult with ECOLOGY's PPA Partnership Coordinator to determine whether
funding acknowledgement is required.
Fiualized materials which may be useful to other Partnership contractors should be provided to
ECOLOGY for upload to the PPA Partnership SharePoint Publications & Handouts site (Link in
Appendix A, Statement of Work, Section 12: Resources).
Each CONTRACTOR must maintain a PPA webpage which meets the minimum requirements. See PPA
Partnerslrip SharePoirrt site for requirements. (Link in Appendix A, Statement of Work, Section 12:
Resources)
Section 5: Product Replacement Program (PRP)
The Product Replacement Program's (PRP) mission is to safeguard the health of all Washingtonians and
preserve their errvironrnent by providing financial resources and technical support to businesses to reduce
the use of targeted toxic chemicals and heavy metals in consumer products and industrial processes. PRP
removes and replaces products, processes, or teclrnologies that use toxic chemicals to prevent them from
entering the environment. One of the best and most effective ways to prevent further environmental
contamination, protegt water qr"rality, and reduce human health risk, is to eliminate these toxic chemicals
at the sources. The PRP assists businesses with switching to safer alternatives.
PPA contractors are irrtegral to the PRP. The CONTRACTOR will seek and discuss oppoftunities to
assist busir-resses with switching processes, products, or equipment to use effective safer alternatives.
The CONTRACTOR will assist ECOLOGY in implementing PRP projects by prornoting participation,.
makiug recornmendations, assisting with required paperwork, and conducting technical assistance and
confirmation visits.
PRP projects include, but are not lirnited to
Degreasers in parts washing systems in the automotive repair sector by visiting automotive repair
facilities, discussing the program, assisting with required paperwork, and completing the final
visit after new machirre installation. Guidelines for this program are outlined in separate
documents and posted on the PPA Partnership SharePoint (Link in Appendix A, Statement of
Work, Sectior"r 72: Resources).
Educate schools, recreation centers, local retailers, and salons on oppottunities to switch to safer
chemicals used in chemistry and art labs, foam cubes in tumbling pits, receipts used in cash
a
a
Yersion 4/14125 (Access Equity)
I6
uuLuttgil EilvtrluPE tu. 4uJUaYU r-ur Jtr-aDUz-YoD t-t rE tro+DYt tJ
State of Washingtor-r, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas Counfy Public Health
registers, and cosmetics products used in salons are potential PRP pro.iects during this contract
cycle.
The CONTRACTOR will suggest new PRP projects to Ecology based on opportunities they see during
technical assistance visits. A PPA-PRP Committee will assist Ecology in the development of new
projects, how to implement and market them, and develop training on implementation for the larger
Partnership.
ECOLOGY, in collaboration with the PPA Partnership, will develop procedures and criteria, which rnust
be met for a business to receive reimbursement for any of the chernicals or products included in the PRP.
Final guidelines for each project willbe posted on the PPA Partnership SharePoint page and training for
implemerrtation will be provided at webinars or All-Staff meetings.
PRP payrnents for reirnbursement to the business will corne directly from ECOLOGY and are not
included with the CONTRACTOR's funding compensation associated with this contract. Payment will be
made through direct disbursement from ECOLOGY to the business implementing the product or
equipment replacement. To facilitate these payments, the CONTRACTOR slrall assist ECOLOGY in
maintaining records indicating how the business qualified for the PRP reimbursement per the PRP
program's eligibility criteria. Each PRP program will have specific records requirements, and all records
w-ill be maintained on ECOLOGY's PRP SharePoint Site. The required records may include copies of the
program voucher, product invoices, disposal receipts, recycling receipts, state payee fonns, along with
any other docurnentation required by ECOLOGY to reimburse the business. Requirements for each PRP
Program will be available under Product Replacement Program on the PPA SharePoint site (Link in
Appendix A, Statentent of Work, Section 12: Resources).
The CONTRACTOR will provide technical assistance to the businesses to help ensure the business
qLralifies for a PRP reimbursement payment from ECOLOGY by completing the required steps, unless
otherwise specified in guidelines developed specific to an individual reimbursemeut. Specific
requirements for individual reimbursement programs are maintained on the PPA Partnership SharePoint
site (Link in Appendix A, Statentent of l4rork, Section 72: Resources).
Required Steps
CONTRACTOR conducts an initialtechnical assistance visit, reviews all aspects of the PPA
basic clrecklist on the PPA SharePoint Site (Link in Appendix A, Statement of Work, Section 12:
Resources) with the bnsiness, and identifies any issues that need to be addressed before moving
forward 'nvith a product replacement program.
CONTRACTOR provides the business with recomrnendations to reduce or eliminate a qualifoing
chemical or product based on the curently active product replacernent programs (see
ECOLOGY's PRP website for active programs) (Link in Appendix A, Statement of l(ork,
Sectiorr l2'. Resources).
CONTRACTORS review and complete the PRP voucher (if required for that specific PRP
project) with the business. CONTRACTORS provide copies (photographs or scanned copies) of
the cornpleted and signed voucher to the Product Replacernent Coordinator who reviews and
approves the business to make the purclrase of approved products or equiprnent.
a
a
a
Yersior"t 4/14/25 (Access Equity)
17
uuLubtgil EllvcluPc ru. +uoo+Yo l-Jr JT-+ouz-Yoo l-l lE lro+DU+ lJ
State of Washington, Department of Ecology
IAA No. C2500178
Entity Narne: Kittitas County Public Health
o CONTRACTOR assists businesses as needed with paperwork required to apply for
reimbursement, including a state payee registration form.
. CONTRACTOR lnLlst communicate to the businesses that it rnay take up to 4 months to receive
payment from ECOLOGY after purchase and that the business must respond to inquiries from
ECOLOGY or the Office of Financial Management (OFM) in a timely manner to avoid delays in
payment.
. Business purchases approved product or equipment and converts fully to utilization of new
product or equipment in accordance with the eligibility criteria for the PRP reimbursement.
o Business subnrits receipts for the product or equipment purchase and installation to ECOLOGY's
PRP Coordinator. This submittalmay be facilitated through the CONTRACTOR's representative
for some PRP projects.
o CONTRACTORS rnay be requested by ECOLOGY to verifz thror,rgh a site visit and review of
records that product or equipment has been installed per PPA Specialist or ECOLOGY
recornrnendations, old product or equipment has been legally disposed of or decommissiorred, and
all other eligibility criteria have been met.
For information about an optional voucher program that the CONTRACTOR can provide directly to a
business, see Appendix A, Statentent of Work, Section 1A, Small Change Voucher Program.
Section 6: Timeline
Table 6.1: Timeline
Section TzLocal Source Control (LSC) Database
Information gathered during technical assistance site visits by the CONTRACTOR must include all the
elements that are listed in the most up to date PPA Basic Checklist (check PPA Partnership SharePoint
site for details) and be entered into ECOLOGY's LSC database (Link in Appendix A, Statentent of Work,
Section 12: Resources). The following guidance applies to all tecl,nical assistance visits, unless other
discussed with ECOLOGY:
Time Period Goal for # of Site
Visits
Unique Program
Element Activities
Technical Assistance Target
Activities
Jr"rly 1, 2025 -
December 31,2025 25 Visits
Resource
Consistency
Committee
Agricultural Operations
January 1,2026-
Jvne 30,2026 25 Visits
Resource
Consistency
Committee
Srnall Industrial Facilities and the
Automotive Industries
July 1, 2026 -
December 31,2026 25 Visits
Resource
Consistency
Committee
Agricultural operations and Small
Industrial Facilities
January 1,2027 -
June 30,2021 25 Visits
Resource
Consistency
Committee; All-Staff
Planning Committee
On the final 6 months we would plarr
to focus on all remaining elements of
previous sectors that still need to be
addressed.
Yersion 4ll4/25 (Access Equity)
i8
uuLustgil EllvEluPtr lu. auJo+Yo l-J/ Jtr-+ouz-YoD I-l lE lro+DJ+ I J
State of Wasltington, Depaftrnent of Ecology
IAA No. C2500178
Entity Name: Kittitas Counfy Public Health
" Collect enough infonnation to complete allthe applicable fields in ECOLOGY's LSC database
(Link in Appendix A, Statentent of Work, Section 12: Resources) and enter it into tlre database
within fifteen (15) workdavs of the visit.
. [f you make a referral to a regulatory agency, enter the infonnation about the referral into the
database within fifteen (15\ workdavs of the referal.
. Eusure that data entry is complete and accurate
. At a nriniuruur, all elernents on the tnost recent version of ECOLOGY's PPA Basic Checklist
must be checked at each business visit. Specialists must attest that they have verified all
elements.
o Additional sector specific checklists are available on the ECOLOGY PPA Partnership
SharePoint Site.
o CONTRACTOR may substitute use of their own versiorr(s) of the checklist(s) if it
contains all elements of ECOLOGY's PPA Basic Clrecklist and has been reviewed and
approved by ECOLOGY.
. Refer to tlre LSC database (Link in Appendix A, Statement of Lltork, Section 12: Resources)
instructions posted in the database interface or eontact ECOLOGY PPA Staff for assistance with
database entry.
. If using paper checklists or equivalent documentation, maintain originals in accordance with your
local public disclosure laws.
Section 8: Training
ECOLOGY expects the CONTRACTOR to provide basic training to newly hired PPA Specialists, while
ECOLOGY will offer additional training to support PPA activities, especially site visits to small
businesses. ECOLOGY will provide additionaltraining to ensure that CONTRACTOR's staff are
properly trained and supporled to conduct PPA activities, and that experienced staffare exposed to new
information. ancl have opportunities to share their expertise for the benefit of the PPA Partnership. This
will include emerging issues and forums for sharing best practices, strengthenirrg the PPA Parlnership.
ECOLOGY, along with ln-House Mentors and PPA Mentors, will support new PPA Specialists. Within
two weeks of notice of hire, ECOLOGY will send a "welcome email" with instructions for accessing the
PPA Partnership SharePoint, LSC Database, and training iesources. All PPA Specialists must set up
weekly (or more frequent) alerts for the SharePoint Discussion Board.
HAZWOPER 24-hr. Certifi cation
ECOLOGY requires PPA specialists to obtain and maintaitt, at a minimum, a24-hr HAZWOPER
certificatiol and refresher class. CONTRACTORS are allowed, and encouraged, to obtain the 40-hr
HAZWOPER and refi'esher but are not required to obtain that level of training.
CONTRACTORS will be responsible for finding, registering, and paying for the HAZWOPER
certification ancl refreshers themselves. CONTRACTORS will submit copies of class registration and
paid invoices to ECOLOGY for reimbursement during quarterly submittals.
New PPA Srrecialist Trainins Modules & Know-2-Grow (K2G) Learnins Sessions
ECOLOGY ensLrres PPA Specialists are well-prepared by offering foundational and ongoing training,
requiring consistent parlicipation for effective program delivery. Foundational training includes self-
puced oriline modules on ECOLOGY's SharePoint, to be completed within the first qualter. Completion is
t9
Version 4/14i25 (Access Equity)
uuuulrgI EilvEluPc tu. avJo4v9 l_JIJT-tDUZ_VOOI-l lE lTOaDYa lJ
State of Washington, Department of Ecology
IAA No. C2500178
Entity Narne: Kittitas Counfy Public Health
tracked. Monthly live "Know 2 Grow" (K2G) sessions, led by PPA Mentors, provide interactive training
via Microsoft Teams (except July & December). Sessions are typically on the second Thursday, 10:00-
I 1:00 a.m., and may occasionally be adjusted, with advance notice provided'
Table 8.1: Know 2 Grow Session Schedule
One-on-One Field Mentoring
The CONTRACTOR will provide new PPA specialists with mentoring from experienced specialists (ln-
House PPA Mentors), focr.rsing on internal procedures and site visits. If no In-House Mentor is available,
ECOLOGY will assign a olle-oll-olle rnentor. The duration of the one-on-one mentoring will be
dependent on the new specialist's prior experience and will be agreed upon following evaluation by
Ecology and cliscussions with the specialist. Additionally, the PPA Mentoring Program connects new
specialists with mentors through K2G sessions, Webinars, All-Staff training(s), and the Discussion Board.
Specialists are encouraged to seek out additional mentoring support for problem-solving, sector research,
and field rnentoring. Fielcl rnentoring involves site visits with the new specialist observing the mentor alrd
serving as a backup specialist during field work. New specialists will gradually take over the lead dLrties
during field work fo prepare for full-time lead duties and to prepare for ECOLOGY's Shadow Workday.
Fieldlnentoring visits rnust occur before the ECOLOGY PPA Shadow Workday. For more details, refer
to the New Specialist Training Plan (Appendix A, Statement of Work, Section 12: Resources).
Ecolosy Shadow Workdav (Ecolosv ApDroval)
Once the PPA Meltor ald new PPA Specialist agree on readiness, ECOLOGY staff will accompany the
specialist on a few technical assistance visits (Ecology Shadow Workday). During these visits, the
specialist will dernonstrate their ability to engage with site contacts and present the PPA program'
including waste rnanagernent, spill prevention, stormwater pollution, and toxics reduction. After the
shadow workday, the ipecialist will inforrn ECOLOGY once the LSC database entries are complete and
provide any follow-up materials for review.
202720262A2s
January 14,2027January 8,2026August 14,2025
February 11,2027February 12,2026September 11,2025
March 11,2027March 12,2026October 9,2025
April8,2027April9,2026November 13,2025
May 13,2027lllay 14,2026
June 10,2027June 11,2026
Augnst 13,2026
September 10,2026
October 15,2026
November 12,2026
Attendance Requirement: All new PPA Specialists who have not yet attended ten (10) K2G monthly
sessions are required to attend. PPA Mentors are required to atten
notifu the PPA Partnership Coordinator if
d every K2G session. Mentors must
will not be able to attend
Version 4/14/25 (Access Equity)
20
uuuusrgil EilvtrluPc lu. auJgaYo l-Jl Jr-+ouz-Yoo l- I IE ItroaoYa l J
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
Ecolopv A Snecialist Annroval Process
ECOLOGY must explicitly approve the new PPA Specialist before they can conduct solo PPA site visits
under this contract. To gain approval, the new PPA Specialist must:
. Complete all online training modules'
o Attend required PPA webinars and monthly Know-2-Grow (K2G) sessions.
. Complete Shadow Workday with ECOLOGY.
. Subrnit follow-up materials and LSC database entries from the sites visited during the Shadow
Workday.
ECOLOGY may require the New PPA Specialist to undergo additional mentoring before granting
approval.
All-Staff Trainins for all PPA Specialists
All-Staff Trainings will be planned and conducted by teams of PPA Specialists from fwo or three PPA
Partlers, who have signed up to plan these trainings as a unique program element. When appropriate,
these trainings will Ue treta in-person to facilitate interaction and networking between PPA Specialists,
ECOLOGY, and invited presenters.
Trailing topics at All-Staff Trainings are intended to help new staff become more competent in their
work, and experienced staff to gain greater technical depth on relevant topics. ECOLOGY staff will
deterrnine the teams, provide initial gLridance, review agendas, and provide support for planning and
logistics.
Typically, these trainings are held the second Wednesday in September/October and March/April' The in-
p"i.on tiainings are typically scheduled to run between 8:30 a.m. and 3:30 p.rn. with overnighttravel
allowed for jLriisdictions if needed. ECOLOGY must pre-approve overniglrt travel if it is being charged
to the PPA partner bLrdget.
When trainings are held virtually online, the training will typically be scheduled for 8:30 a.m. to l2:00
p.m. across two days, usually a Tuesday and Wednesday.
Attendance Requirement: Unless prior approval has been given by ECOLOGY, it is mandatory for at
least one ppA Specialist per jurisdiction to attend the All-Staff Training. This person is responsible for
disserninatirrg inforrnation back to the PPA Specialists frorn that jurisdiction. Managers are welcome to
attend the All-Staff Trainings but are not required to attend.
Generally, trailing sr"rbstitr,rtions are not allowed for the All-Staff Training, however, exceptions may
apply. ppR Coorctinator must approve non-emergency absences or training substitutions at least two
weeks prior to the training.
Monthlv Webinar Traininss
ECOLOGY conducts rnonthly webinar trainings during most of the months of the year' These sessions
are intended to expose PPA Specialists to new information or technical topics relevant to their work.
Suggestions on topics and speakers are welcotned from PPA Partners. ECOLOGY will also ask PPA
Partners to present on case studies.
Version 4/14/25 (Access Equity)
2l
uuuustvil Er lvEluPtr lu. +voo+gu l_u r Jr-lDUZ-voD l- l l E l roaDJ+ I J
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
Tfiese rneetings are olle and a half hour (1.5 hours) sessious, held on the second Wednesday of the month
Occasionally these sessions will need to be scheduled at alternative times to accommodate speaker
availability. Up to nine (9) webinars will be scheduled each contract year. See Table 8.2 for the tentative
training schedule.
Attendance Requirement: Each PPA Specialist must attend at least six (6) of the eight (8) Webinars
each contract year (JLrly 2025 through June 2026 and July 2026 through June 30, 2027, fot the current
contract). Table 8.2 below contains a tentative training schedule for monthly webinars and the twice
annual All-Staff rneetings; ECOLOGY will communicate the final schedule to the CONTRACTOR. For
those months identified as "Webinar or All-Staff ', there might be an All-Staff meeting planned for that
month. If ttrere is no All-Staff for a given month, then there will be a webinar planned for that month.
Other training courses, relevant to PPA Specialists' work, tnay be substituted for up to two of the
Webinars. Notification of the substitntion must be provided to and pre-approved by the PPA Coordinator
at least two weeks in advance of the Webinar that will be missed by the Specialist.
Table 8.2: Tentative Trainin Schedule toC
Section 9: Reporting and Contract Changes
Ouarterlv Progress Repofts
Training TypeDateDatelfraining Type
No TrainingJuly 2026No TrainingIuly 2025
WebinarAugtrst 12,2026WebinarAugust 13,2025
Webinar or All-StaffSeptember 9,2026September 10,2025 Webinar or All-Staff
Webinar or All-StaffWebinar or All-Staff October 14,2026October 8,2025
WebinarWebinarNovernber 10,2026November 12,2025
No TrainingNo Training Decenber 2026December 2025
WebinarWebinarJanuary 13,2027January 14,2026
WebinarFebruary 10,2027WebinarFebruary 11,2026
Webirrar or All-StaffMarclr 10,2021Webinar or All-StaffMarclr 11,2026
Webinar or All-StaffApril14,2027Webinar or All-StaffApril8,2026
WebinarMay 12,2027WebinarMay 13,2026
WebinarIlune9,202JJune 10,2026 Webinar
Attendance Requirement: Each PPA Specialist must attend at least six (6) of the eight (8) scheduled
Webinars each year. PPA Specialists must attend both All-Staff Trainings unless prior approval has
been obtained fi"om the PPA Coordinator.
Version 4/14/25 (Access Eqttity)
22
uuLurtgil ErlvtrluPE lu. +UJU+Y9 l_ul Jr-aDUZ-voD l-l lE lrotoY+ I J
State of Washington, Depafttnent of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
A brief progress repoft shall be subrnitted quarlerly with each invoice (See Schedule in Appendix B,
Statentent of Work, Section I 1, Table 11.7, Invoicing Schedule). This report should indicate the work
cornpleted dLrrirrg the quafter and billed on the invoice, including the type and number of visits conducted,
progress on unique prograrn elements, and any other information regarding contract performance that
shogld be brought to ECOLOGY's attention. The Quarterly Progress Report should ONLY include the
status of the work conducted cluring the quarter and NOT include a roll-up of progress to-date since it
serves as backup documentation for the expenses included in the quarterly invoicing. See Appendix A,
Statement of Work, Section Tl, htvoicing
Annual Reports
Annual Reporls are used to briefly surnmarize contract status to-date including number of site visits
perforrned, unique program element activities conducted, Technical Assistance target activities
conductecl, lessons learned, and budget status, progress towards goal of 40%o of visits in Overburdened
Communities in Washington State. Annual reports shall be provided to ECOLOGY by July 31, 2026,
and July 30, 2027. The report shall include two to three "case studies" of a business or organization that
benefittecl frorl a PPA site visit. Photographs of the br"rsiness before and after the visit, showing the
beleficial changes slrould be provided, if possible. The second-year anttual repoft should capture details
for the fnll contract period as ECOLOGY will use these reports to create a biennial report on the
Partnership. ECOLOGY will rnake report templates available on the PPA Parlrrership SharePoirrt.
ECOLOGY will request, witlr advanced notice, that PPA CONTRACTORS provide presentations on
their case str"rdies at Webinars and/or All-Staff Trainings.
Contract Changes
Any of the following charrges shall be reported to the ECOLOGY PPA Partnership Coordinator within 10
businesses days.
Key personnel changes (staff or manager leaving, new hires, etc.). Changes to key personnel must
be documented with updated copies of the key staff table.
Initiation of, or changes to, a subcontract. See Section 18 Subcontractors ofthe Interagency
Agreement for specific informatiou that is required regarding subcontractors.
Section 10: Small Change Voucher Program
The CONTRACTOR will offer businesses vouchers for the cost of pollution prevention equipment or
other recommendations, in accordance with the procedures developed for this voucher program.
Payments will be rnacle directly by the CONTRACTOR to the business. Examples of qualif,ing
equipment or costs include but are not limited to; secondary containmettt, drum covers, drum funnels with
licls, infrastructure changes, substitr-rtion of less toxic products, and catch basin cleaning. The
CONTRACTOR must maintain records for each of their voucher reimbursement payments, attd ensure a
business is lirnited to one voucher per calendar year. Each voucher paynent will be capped at $500.00 or
less. T|ese reimbursements will come from the Small Change Voucher Program budget category (see
Appendix B. Budget Detait). Documentation of voucher payments will be subrnitted to ECOLOGY with
tlre quarterly invoice (See Appendix A, Statement of Work, Section 11 Invoicing for more details).
The CONTRACTOR will follow the procedures approved by ECOLOGY and housed on the PPA
Partrrerslrip SharePoint (Link in Appendix A, Statement of Work, Section 12 Resources)'
a
a
Version 4/14/25 (Access EquitY)
23
State-of Washington, Department of EcologyIAA No. C2500178
Entify Name: Kittitas County public Health
Section 11: Invoicing
Invoice (billing) procedures are outlined in the Interagency Agreement, (see Section 4 Bitting unctP ayme n t p r o c e crur es). I n add ition, t'. roiio.,"ing i nfoimaiioni rl.ouio"o,
o See also Append-ix A, statentent of work,section 5: pRparrd^Append ix A, statement of work,Section l0: snnll change vouchir Programror aaaitioiar informatio"
""'*u,rrrting invoicesand reimbursement requests for those programs.
' The lnvoice Voucher (form A I 9- 1A) (ri'rt
.in Appendix A, statement of work,Section I 2:Resotu"ces)
'rust have an approved
"i""troni. ,lgir""t"* r""hod if subrn"n "J.i.o.nically.Acceptable signature formats include the follor,v"ing.
" - '
o Adobe Acrobat certificate-Based Signatur?, which requires BorH a scanned signatureirnage a,d Adobe info.natio'. SignJrs ao ,rtt n"ea an Adobe pno tJcenr", only theperson preparing the document foi their signature needs an Adobe pRo license.t
i::il:t"o
image of signature. copy una puJt.irr. i.an'r"d wet signarure into trre document
.,
;13."0
name ancl "signed electronically" with the signature date included in the signature
o Other methods approved by Ecology.
' [f submitting a scanned or electronic copy, the coNTRACToR will retain the original signedA l9- l A in coNTRAcroR's records, per ECoLoGY's record retention requirements.r Supporting documentation may be submitted via ernail a-frirrir" RuV Gfqy46.!-@Eg1l1rya.gAyand A'dy Maher q1ma461@;cy.;;). Refer to sectiorr 3 compensation foradditional derailson what is required fo,,uppJ-fr?*umentatiorr.o Each invoice shall only bilifor uJtuul hours worked during the quarter, which may behigher orrower than the FrE esiimate i" Ap;;;;; 4,ij;:;;;;;' )1*r9,n section 1, rntroiuction,rabte| '2 - Key staff Table' Actual t',ou., *orL"d should rn"1,,1"'au,"s worked, staff names, titles,hourly salary/benefit rate, honrs worked, final $.o Quafterly invoicing wiil foilow the scrredure in Tabre 1r.1, Invoicing schedure.
Table 11.1:fnvoic Schedule
Quarter in Contract Cvcle Months in Quarter Invoice Due Date
July, August, September 2025 November 10,2025
2 October, November, December 2025 February 10,2026
3 I anuary, February, March 2026 May I 1,2026
4 April, May,Iune2026 July 31, 2026*
5 July, August, Septembe r 2026 November 10,2026
6 October, November, December 2026 February 10,2027
7 January, February, March 2027 May 10,2027
8 April, May, Jtvre2027 July 30, 2027*
fiscal
{<Ear dueler ddate nu th ese artersung uedq endto o f uvear errtsremreq
Yersion 4/14/25 (Access Equity)
24
:lul.,9f Washington, Depar.rmenr of EcologyIAA No. C2500178
Entify Name: Kittitas County public Health
Section 12: Resources
;:"rfi:"J[*";:1:yt to resources and materials referenced in this contract. Links ancl resources Iistecl
r PpA paftnership Sharepoint:
o
a
a
PPA
o
Paftn erslrip Sharepoint Di scussion Board:
7
PPA Basic Checklist:
oh
0-
5 4c
a
&e:KWSLgy
Business Sector Checklists & Tip Sheets
a PPA PLrb lications & Handouts
PPA
o
S.
o
A
a PPA
o
ParherWeb product R"p lacement Program
a LSC Database
. PPA partner Website Required Elements
o
oh
a 0Invoice Voucher A l9_ l A
o
Ecolo
o
fr New Specialist Train ing Plan - Read Firstlo
Y-
gy's Product Repl acement Program Website
Prograln
Yersion 4/14/25 (Access Equity)
25
ll"l",:f Washington, Deparrrnent of EcologyIAA No. C2500t78
Entify Name: Kiftitas County public Health
APPENDIX B
BUDGET DETAIL
See Section # 3 Compensation and Section # 4 Biiling and payment procedures, for additionalrnstructiolts.
*8 Applied to Salaries Only
Table A:Goods &Services
Table B: E ent
Catego ry AmountSalaries
$60,966.88Benefits
$43,327.37Subcontracts
$0.00
Tab&Goods Servi ces see le(A Be low )$1,000.00Equiprnerrt (see Table B Be low)
$1,000.00Travel& Training
$2,000.00SmalaltChVogeucherPrograrn(See oSecti n XD
$0.00
Subtotal Direct Costs $108,294.25
Rate (28.4%)29.4v"Indirect Costsx
Indirect Amount $17,314.59
Total Award $125,608.84
sGood &Services over 1$,000 m ust be listed here or approved byYECOLOGPRIORtorermbrsement.Estimated Cost
E q overulpment must$1,000 be listed orhere rovedapp byYECOLOGPRIoRtorelmbursement.Estimated Cost
Yersion 4/t4/25 (Access Equity)
26
uuuultgil EilvEruPE tu, +uJo+Yo r-Jl Jr-*DUZ-YOD l-l lE rruaDYa I J
State of Washington, Departrnent of Ecology
IAA No. C2500178
Entity Name: Kittitas Counfy Public Health
APPENDIX C
SPECIAL TERMS AND CONDITIONS
1) Certification Regarding Suspension, Debarment, Ineligibility or Voluntary Exclusion
a) CONTRACTOR, by signing this agreernent, certifies that it is not suspended, debarred, proposed
for debarrnent, declared ineligible or otherwise excluded from contracting with the federal
goverrrment, or from receiving contracts paid for with federal funds. If the CONTRACTOR is
unable to cerliflr to the statements contained in tl-re certification, they must provide an explanation
as to why they cannot.
b) CONTRACTOR shall provide imrnediate written notice to ECOLOGY if at any tirne the
CONTRACTOR learns that its certification was erroneous when submitted or had become
errolleous by reason of changed circumstances.
c) The tenns covered transaction, debarred, suspended, ineligible, lower tier covered transactiou,
participant, person, primary covered transaction, principal, proposal, and voluntarily excluded, as
used in this clause, have the meaning set out in the Definitions and Coverage sections of rules
irnplementing Executive Order 12549. You may contact ECOLOGY for assistance in obtaining a
copy of those regulations.
d) CONTRACTOR agrees it shall not knowingly enter into any lower tier covered transaction with a
persou who is proposed for debannent under the applicable Code of Federal Regulations, debarred,
suspended, declared ineligible, or voluntarily excluded frorn palticipation in this covered
transaction.
e) CONTRACTOR further agrees by signing this agreement, that it will irrclude this clause titled
..CERTIFICATTON REGARDING SUSPENSION, DEBARMENT, INE,LIGIBILITY OR
VOLUNTARY EXCLUSION" without modification in all lor,ver tier covered transactions and in all
solicitations for lower tier covered transactions.
f) Pursuant to 2CFR180.330, the CONTRACTOR is responsible for ensuring that any lower tier
covered transaction complies with certification of suspension and debarment requirements.
g) CONTRACTOR acknowledges that failing to disclose the information reqr-rired in the Code of
Federal Regulations may result in the delay or negation of this funding agreement, or pursuance of
legal remedies, including suspension and debarment.
h) CONTRACTOR agrees to keep proof in its agreement file, that it, and all lower tier
CONTRACTORS or subcontractors, are not suspended or debarred, and will rnake this proof
available to ECOLOGY before requests for reimbursemetrts will be approved for payment.
CONTRACTOR rnust run a search in The System for Award Management and print a copy of
completed searches to document proof of compliance.
Yersion 4/14/25 (Access Equity)
27
uuuustgrl EllvgluPg lu. +uJo+Yg l-Jtor-+9UZ-YODI- I lE lrolDy+ lJ
*ffitG CONTRACT FACE SHEET
For lnternal Routing Use
(lnstructions on lnstructions Tab)
ECOLOGY
Type: Contract
CGP System #:
Contract#: C2500178
Amendment f:
Work Assignment #:
Contractor Statewide Vendor - SWV #:swv0010475-07 EIN:
Contractor Namel Kittitas Countv Public Health
Contract Title / Description / Bid #:pollution Prevention Assistance (PPA) - technical assistance and education outreach to small businesses.
Programl MOO.HWTR
Project Officen Andrew Maher Phone:L2
Secondary Proiect Officer (i.e., Budget Analyst)r Ellen Hafer Phone s64-233-8638
Stafi completed DES Contrqd !!e!n!ng Yes
(check all that apply)fl Goods/Services RCW 39.26 f-l Decision to Contract
f,l lnteragency RCW 39.34 fl DES State Contract s
l'l lr RCW 39.26 l'*l Competitive Bid #
T-l Public Works RCW 39.04 f-l Sole Source #
l-l Arch./Ens.RCW 39.80 i l Direct Buy
fl Other:
OWMBE: (check all that apply)N OMWBE [l WA Small Bus.Tl WA Veteran Bus.
Subcontractor:fl Uses Sub Contractor
AMENDMENT: (check allthat apply)E Time Extension
lncrease
Decrease
Amount of Amendment
[J oth.r'
Total of Contract after
Amendments:
TERM:Start Date 717/2025 End Date:6l30/2027
How To Encumber and Disburse:
Progra m Budget Manager Completes
contract cost s 125,608.84
Sales Tax (PW only):5
Total Eligible cost:s 125,608.84
Required information:
MIC (8 char)Fund/EAl Project - Sub-Proj
9M997D10 23N/D10
(Required for Single-year Operating Appropriations &
contracts extending beYond current biennium)
Prior Bien's Current Bl
FY:2026
Current Bl
FY:2021 Totals
62,804.42 62,804.42 r-25,608.84
Fiscal Staff:Budget
Budget Total must equal Total Elitible cost
Federolly Funded? No Federol Amount
GL:Subsidiary:Misc:
Remarks:
Date
t/ar-l< T. Gaffney (sign ed:rectrcni:ally) 6/22/tgt5 g7
Contracts
ECY 010-53 Rev 2/2024
Date
o
Kittitas County Public Health
Contract/Agreement Review Form
Kittitas County
Public Health
Departtrlent
Today's Date 0710212025 Fil Legal Request #11654
Fund/Department 1 16-Public Health [.,i'l ngenoa oate
nt lnformation
Bu lnformation
Pass Throu lnformation
Contract/Agreement Agency: Department of Ecology
Contract/Agreement Title: I nteragency Agreement between Department of Ecology and Kittitas County Public Health
End Date: 06130127Begin Date: 07101125
Contract/Agreement #: C250017 8Total S Amount: $125,608.84
Contract/Agreement Summa rY:
The purpose of this agreement is for the contractor to provide Pollution Prevention Assistance
(pPA) Specialist who will provide technical assistance and education outreach to small quantity
generators in an effort to prevent pollution of waters of the state as part of the Pollution
Prevention Assistance Partnershi p.
'I
REGBI\fED,;
AuG-82025 :'::
Bo^ST['33fi$'$nuo'
AP
7 3
Cou nty Prosecutor and Auditor Review and Comment:
Date
.0 '2
rosecutor'sSiureof
Datere of Audito fficeSigna
1 16 - 615.08.05.334Revenue Code(s)
1 16 - 615,08.05.51 001152001154906154301/531 15Expense Code(s)
Not Checked (reason)fZ ngency is not suspended/disbarred
Agency to Pass Through
Expense CodeAmount to Pass Through
Su b-Contract APProved Date
ADMIN Version;0 Supersedes:0 Date Adopted : t2/ OII 2024 Modified By: Katie Odiaga Approval By: Chelsey Loeffers
717125,2:46 PM
Unique Entity lD
N48GCZ2FJA,47
CAGE/NCAGE
OWP75
SAM.gov
Mailing Address
PO Box 476'15
Olympia, Washington
98504-761 5, United States
Entity lnformation
Expiration Date
Mar 21 ,2026
STATE OF WASHINGTON Active Registration
PhysicalAddress
300 Desmond DR SE
Lacey, Washington
98503-1 27 4, United States
Purpose of Registration
AllAwards
Version
Current Record
BUSINESS INFORMATION
Doing Business As
Department of
EcoloEy
Division Name
{blank}
Congressional
District
Washington 10
Owner
lmnnediate
Owner
URL
https://ecology.wa.g
ov/
Division Number
(blank)
State/Country of
lncorporation
(blank), (blank)
CAGE Legal Business
Name
{blank}(blank)
Registration Dates
Activation Date
lVlar 25, 2025
Submission
Date
Mar 21,2025
lnitial Registration
Date
Jan 3, 2002
Highest Level
Owner
(blank)(blank)Entity Dates
https://sam.gov/entities/view/N 4S3CZ2FJA4TicoreData?status=Active&emrKeyValue=201 6622-1740493756584454 1t3
717125,2:46 PM SAM.gov
Government TYPes
https://sam.gov/entities/vieWN 48GCZ2FJA47/coreData?status=Active&emrKeyValue=201 6622-1740493756584454 3/3