HomeMy WebLinkAbout2026 - 2031 Six-Year Capital Improvement Plan - Final
From the Cascades … to the Columbia
Adopted __________ by the Board of County Commissioners
●
Ordinance No. _________
Kittitas County
Capital Improvement Program
2026-2031 Six Year Plan
Kittitas County Capital Improvement Program 2025
Table of Contents Page i
Table of Contents
UPDATE TO REFLECT NEW PAGE NUMBERS!
0BSix-Year Plan .................................................................................... 1
Introduction ....................................................................................... 1
2026-2031 Summary ........................................................................ 2
1. 2BAirport Facilities ................................................................... 23
2. Kittitas County Administrative Offices .................................. 32
3. Kittitas Valley Event Center / Fairgrounds ............................ 27
4. 5BKittitas County Maintenance Shops, Storage, & Parking ..... 47
5. 6BKittitas County Roads .......................................................... 49
6. 7BRegional Parks and Trails .................................................... 50
7. 8BSolid Waste .......................................................................... 51
8. 9BLibrary Services ................................................................... 54
9. 10BEmergency Services ............................................................ 56
10. Education ............................................................................. 81
11. 12BWater - Group A Systems .................................................. 131
12. 13BSanitary Sewer ........................Error! Bookmark not defined.
13. 6BKittitas County Flood Control Zone District ........................ 138
14BFrequently Asked Questions ......................................................... 139
Six-Year Plan Page 1
0BSix-Year Plan
Introduction
The Six-Year Plan shows capital improvements that are needed to provide adequate public
facilities in Kittitas County. The County either directly provides these capital improvements or
coordinates with other agencies to provide them. The Six-Year Plan is reviewed and updated
annually. Annual updates are made to correct or modify project costs, revenue sources, and dates
of construction.
The Capital Improvement Program follows a six-year planning format that is oriented toward
sufficiently planning growth according to the larger 20-year planning horizon. The 2026-2031
plan contained herein is a review and update of the previous 2024-2029 plan.
The following departments within Kittitas County were coordinated with in producing this plan:
• Airports
• Administrative Offices
• Event
Center/Fairgrounds/Maintenance
Shops/Storage/Parking
• County Roads
• Flood Control
• Solid Waste
• Water Systems
• Sewer Systems
• Fire District 1
• Fire District 2
• Fire District 3
• Fire District 4
• Fire District 51
• Fire District 6
• Fire District 7
• Sheriff
• Gilmour Memorial Library
• Carpenter Memorial Library
• Ellensburg Public Library
• Roslyn Public Library
• Roslyn Public Library
• Cle Elum – Roslyn School District
• Ellensburg School District
• Easton School District
• Damman School District
• Kittitas School District
• Thorp School District
• Central Washington University
• Kittitas Valley Healthcare
Table 1 below is a summary of the planned and/or needed investments by department.
2026-2031 Summary Page 2
2026-2031 Summary
The following table summarizes the 2026-2031 Six-Year Plan.
(Budgets have been estimated in 2026 dollars using a 3% inflation factor. A 3% inflation factor
should be applied to estimates per year until an engineer’s estimate is produced with design.)
Six-Year Plan Summary
2026-2031 Summary Kittitas County Public Facility Projects
1. Airport Facilities
Project Name Location & Description Funding Source Schedule Total Cost
Hangar Taxilane
Complex (West)
Bowers Field Airport. New
hangar, taxilane including
asphalt paving and markings.
Federal
Aviation
Administration
(FAA) General
Aviation (GA)
Entitlement and
Local Match
2026 1,227,005
Runway 11/29
Parallel Taxiway and
Taxiway Lighting
Project
Bowers Field Airport. Construct
new parallel taxiway including
pavement, lighting, and
marking installation
FAA GA
Entitlement and
other funding,
Local Match
2026 7,344,840
ALP Update with
Forecast Verification
Bowers Field Airport. Minor
update to the Airport Layout
Plan to include Forecast
Verification
FAA GA
Entitlement and
other funding
2027 $60,000
Rehabilitate Runway
11/29
Bowers Field Airport.
Rehabilitate Runway 11/29
including AGIS survey,
reducing the runway width,
drainage improvements, and
replacing the runway lighting
system.
FAA GA
Entitlement,
Local Match
2028-2030 $3,666,667
Industrial Park
Building
Development
Bowers Field, Design and
construct two new industrial
buildings in the Bowers Field
Industrial Park.
TBD 2027-2030 TBD
Hangar Taxilane
Complex (East)
Bowers Field Airport. New
hangar taxilane including
asphalt paving and markings.
FAA GA
Entitlement and
Local Match
2029-2031 $1,166,667
Wildlife Hazard
Mitigation
Develop and construct wildlife
hazard mitigations in the
vicinity of runway 11/29
FAA GA
Entitlement and
other funding
2030 $2,450,000
Runway 11
Extension
Bowers Field Airport. Extend
Runway 11/29 Design
FAA GA
Entitlement and
other funding
2030 $500,000
2. Kittitas County Administrative Offices
Project Name Location & Description Funding Source Schedule Total Cost
Relocate Permit
Center and Health
Department
411 N Ruby, Ellensburg.
Relocate facilities for
Community Development
Services (CDS), Public Works
General
Obligation
Bonds
2022-2031 $15,950,000
2026-2031 Summary Page 3
Dept. (PWD), and Fire Marshal
offices. Also relocate Health
Department.
New County
Administration
Building
New Courthouse
REET &
Commissioner
approved bond
2025-2031 $152,905,000
Public Safety
Building
Improvements
205 W. 5th, Ellensburg
General Fund
& 1/10th sales
tax
2025-2031 $11,450,000
Juvenile Detention
Holding Facility 205 W. 5th, Ellensburg Law and Justice
sales tax 2026-2031 $50,000
Corrections Facility To be determined Commissioner
approved bond 2026-2031 $1,000,000
Upper County
Sheriff’s Office
Facility
To be determined Commissioner
approved bond 2026-2031 $5,500,000
3. Kittitas Valley Event Center/Fairgrounds
Project Name Location & Description Funding Source Schedule Total Cost
Rodeo Arena
Grandstands
901 E. 7th, Ellensburg
Replace old rodeo
grandstands complex to
include the seating bleachers
and box seats along with
Behind the Chutes
Revenue
Bonds, LTAC,
State Grants,
Local
partnerships
(City of
Ellensburg,
Ellensburg
Rodeo)
2022-2031 $12,969,100
Renovated Barn
Complex and
Emergency
Evacuation Shelter
901 E 7th, Ellensburg
Federal
Infrastructure
or Emergency
Funding
Sources
(Ferguson
Gorup) and
General
Obligation
Bonds.
2022-2031 $6,500,000
2026-2031 Summary Page 4
RV Park 900 N.
Alder St.
900 N. Alder St.
An RV park built on the former
site of Shady Brook Mobile
Park.
State Grant
(WSDA), Sale
of F&L
Property, Cold
Weather
Shelter Income,
Commissioner
Approved Bond
2023-2031 $2,650,000
4. Kittitas County Maintenance Shops, Storage, Parking, & Pits/Quarries
Project Name Location & Description Funding Source Schedule Total Cost
Upper County
Maintenance Shop
Automated wash bay design
and construction.
TBD
(Maintenance
Funds)
2028 $400,000
Lower County
Maintenance Shop
Potential land acquisition and
shop relocation
ER&R Fund
501 2023-2027 $8,950,000
Hyak Joint
Maintenance Facility
with Snoqualmie Pass
Utility District
(SPUD)
Ongoing operations, On capital
improvements planned. SPUD Match TBD TBD
Hansen Pit Potential Advanced
Environmental Mitigation site.
Airport Fund
107, Flood
Control Fund
107, FAA
Grant
2027 $1,750,000
Other Pits and
Quarries
Ongoing operations, on capital
improvements planned.
TBD
(Public Works
Project Funds?)
TBD TBD
5. Roads – County Owned (capital improvements scheduled for construction)
Project Name Location & Description Funding Source Schedule Total Cost
Manastash Road
Creek Bank Stab, and
Snow Park
Improvements
MP 10.65-MP 11.01
Roadway safety, repair and
improvements
Planned
Federal Lands
Access
Program /
Federal
Highway
Administration
(FLAP/FHWA)
funds, local
funds
(FCZD or WA
State Park
funds match?)
2023 $1,700,000
Liberty Rd Swauk
Creek Bridge
Swauk Creek bridge (No.
07101) on Liberty Road at mile
post 0.02 crosses Swauk Creek.
This load restricted bridge is
being replaced to improve
access to the town of Liberty
and provide access to the
Federal Lands
Access Program
(FLAP)
2025 $600,000
2026-2031 Summary Page 5
Okanogan-Wenatchee National
Forest.
2024 Vantage Hwy
Paving
The Vantage Highway is a
major east/west corridor in the
Lower Kittitas Valley. Regular
roadway maintenance improves
roadway safety while
maintaining reliable
infrastructure. This project will
grind and overlay asphalt on
Vantage Highway within the
existing pavement limits along
with temporary and permanent
pavement marking for repair,
rehabilitation and preservation.
This segment is the second
phase of surface improvements.
Surface
Transportation
Block Grant –
(STBG), local
funds
2025 $2,961,000
I-90 Widening (State
Project)
High bypass traffic volumes
through Upper County is a
concern for residents and the
condition of roads. This
increase in traffic when I-90 is
busy results in degraded
roadways as well as increased
safety concerns. A group was
formed, the STEER I90
Coalition, meets monthly to
engage stakeholders to discuss
issues and solutions. A draft
feasibility study has been
completed to identify possible
improvements.
Local funds 2025 $250,000
Hungry Junction
Road Widening/Faust
Rd Culvert
Replacement
Hungry Junction Rd from US
97 to Reecer Creek Rd is
narrow with vertical curves that
do not provide adequate sight
distance. The road has
moderate truck traffic. The
work will include changing the
vertical curve profile to comply
with WSDOT design manual,
widening and paving the road
to increase paving structure.
The existing culverts at the
intersection of Hungry Junction
Rd and Faust Rd floods
periodically and is a fish
passage barrier. This project
will remove the existing
culverts under Hungry Junction
Road and replace them with a
new structure, realigning
Rural Arterial
Program (RAP),
local funds
2025-2027 $3,972,000
2026-2031 Summary Page 6
Reecer Creek through the new
structure.
Snoqualmie Pass
Comprehensive
Safety Plan
Snoqualmie Pass is a
recreational destination and key
transportation corridor
spanning two counties. Kittitas
County is working with King
County, WSDOT, and area
stakeholders to increase the
safety for outdoor enthusiasts
and area businesses. The
Comprehensive Safety Plan
will address safety concerns
and increased usage of the Pass,
taking a proactive approach to
minimize risks to public safety.
Safe Streets for
All (SS4A),
local funds
2025-2027 $504,000
Huntzinger Rd Safety
Improvements –
Phase 1
Huntzinger Road has several
areas with steep embankments
and no shoulders. The work
will include installing guardrail,
placing signage and additional
delineation to improve travelers
safety.
Highway Safety
Improvement
Program (HSIP)
2025 $1,581,000
Horizontal Curve
Safety Project
Kittitas County Road Safety
Improvement Plan 2023
(Resolution 2023-047) was
created to reduce collisions and
improve safety within the
County Road network.
Horizontal curves have been
identified as high risk by data
collected for the 2023 Safety
Plan. The proposed project is to
identify, plan, design, and
implement measures for crash
prevention. The project
includes adding advisory
speeds, LED chevrons, and
additional carsonite safety posts
to reduce crashes on the road
system.
Highway Safety
Improvement
Program (HSIP)
2025-2026 $375,000
Yellowstone Culvert
Replacement
The Yellowstone Road culvert
project will replace the existing
undersized and deteriorating
culvert with a larger culvert that
has the capacity to handle high
water flow and sediment in the
stream. The culvert replacement
will prevent the washout of the
county road as well as improve
fish passage.
Surface
Transportation
Block Grant
(STBG), local
funds
2026-2027 $1,755,000
2026-2031 Summary Page 7
Denmark Road
Improvements
Denmark Road serves as a local
connector from nearby
residential developments and
agricultural activities.
Improvements are proposed to
Denmark Road from Thrall
Road to Fourth Parallel Road.
Improvements include
widening and replacement of
the structure over Cascade
Canal.
RAP funds,
HSIP funds,
local funds
2026-2029 $4,710,000
Airport Road Culvert
Replacement
Undersized irrigation culverts
under Airport Road in Cle Elum
have increased drainage issues
in the area. Replacement of
these undersized culverts with
larger, adequate culverts will
decrease flooding issues for
nearby property owners while
also protecting the roadway
from damage.
RAP funds 2029-2030 $1,290,000
Short Span Structure
Replacement
Program
Kittitas County has 156
routinely inspected structures
having a length under 20-feet.
These structures are not eligible
for the WSDOT Local Bridge
Program funding, as such it is
the County’s responsibility to
maintain or replace these
structures with County funds.
Based on field reviews many of
these structures need significant
repairs or to be replaced. This
phase begins to address the
need to repair or replace these
structures. Multiple phases will
be required to address all
structures.
STBG funds,
local funds
2026-2030 $4,200,000
Reecer Creek Rd over
Towne Ditch
Bridge #88212 on Reecer
Creek Road over the Towne
Ditch. Replace existing single
span, structurally deficient, load
posted concrete bridge with a
longer, single span, prestressed
concrete girder structure to
meet current design standards
and to improve the hydraulic
opening.
RAP funds,
local funds
2026-2028 $2,734,000
Badger Pocket Road
HMA
Traffic and heavy truck traffic
have deteriorated existing hot
mix asphalt roadway resulting
in pavement rutting conditions.
RAP funds,
STBG funds,
local fund
2026-2028 $1,640,000
2026-2031 Summary Page 8
An HMA overlay will
remediate the rutted condition
and restore the roadway
segment. The road segment will
be widened to accommodate
the larger truck loads entering
and exiting hay press facility.
HSIP 2025 awarded
project
The Highway Safety
Improvement Program (HSIP)
is a federal program that allows
states, and the local
governments within them, to
target safety funds to their most
critical safety needs. The goal
of the program is to reduce fatal
and serious injury crashes,
following Washington State's
Strategic Highway Safety Plan
(Target Zero) and each
agency's local road safety plan.
WSDOT's programs for local
governments include the
County Safety program, the
City Safety program, and the
Railway-Highway Crossing
program. Focus is on the
Kittitas Highway and No. 6
Road intersection.
HSIP funds 2026-2027 $530,000
Bridge Rehabilitation
Program
Each year the County inspects
approximately 50% of its
bridges on an alternating basis
to comply with National Bridge
Inspection Standards
requirement of a 24 month
maximum inspection cycle.
During these inspections
potential problems and
maintenance issues are
identified and documented.
Routine inspections identify
deficiencies early and
corrective measures can be
taken in order to eliminate a
potential for major repairs or a
hazard to the driving public.
This program has been
successful in identifying
problems and correcting
deficiencies in County bridges
and extending the life of
existing bridges
Local funds 2025-2028 $1,029,000
Bender Road
Widening and
To accommodate the increase in
traffic along Bender Road and
Surface
Transportation
2029-2030 $2,300,000
2026-2031 Summary Page 9
Pedestrian
Improvements
to link future developments to
the City of Ellensburg, Bender
Road will be widened. Widened
shoulders will be constructed
for bicycle use. Work includes
shoulder widening and
resurfacing the road,
construction of sidewalk, and
installation of drainage
structures. Sidewalk to be
constructed on north side of
roadway only.
Block Grant –
Transportation
Alternatives
(STBGTA),
local funds
Sanders Road
Improvements
To accommodate the increase in
traffic along Sanders Road and
to link future developments to
the City of Ellensburg, the road
will need to be widened. Non-
motorized pathways will need
to be constructed for pedestrian
and bicycle use. This will allow
for a uniform roadway from
county to city limits. Work will
include widening and paving
the road, construction of
sidewalk, and installation of
drainage structures.
STBGTA funds,
local funds
2030 $400,000
HSIP 2027 awarded
project
The Highway Safety
Improvement Program (HSIP)
is a federal program that allows
states, and the local
governments within them, to
target safety funds to their most
critical safety needs. The goal
of the program is to reduce fatal
and serious injury crashes,
following Washington State's
Strategic Highway Safety Plan
(Target Zero) and each
agency's local road safety plan.
WSDOT's programs for local
governments include the
County Safety Program, the
City Safety Program, and the
Railway-Highway Crossing
Program.
HSIP funds 2028-2029 $540,000
Vantage Hwy Paving
Phase 3
The Vantage Highway is a
major east/west corridor in the
Lower Kittitas Valley. Regular
roadway maintenance improves
roadway safety while
maintaining reliable
infrastructure. This project will
grind and overlay asphalt on
STBG funds,
local funds
2027-2028 $3,000,000
2026-2031 Summary Page 10
Vantage Highway within the
existing pavement limits along
with temporary and permanent
pavement marking for repair,
rehabilitation and preservation.
This road segment is the third
phase of the surface
improvements on Vantage
Highway.
Vantage Hwy Paving
Phase 4
The Vantage Highway is a
major east/west corridor in the
Lower Kittitas Valley. Regular
roadway maintenance improves
roadway safety while
maintaining reliable
infrastructure. This project will
grind and overlay asphalt on
Vantage Highway within the
existing pavement limits along
with temporary and permanent
pavement marking for repair,
rehabilitation and preservation.
The fourth phase of surface
improvements on Vantage
Highway connects to the award
winning pavement project
completed on the roadway in
2021.
STBG funds,
local funds
2029-2030 $3,000,000
No. 6 Rd
Improvements
No. 6 Road is a major
north/south collector in the
Lower Kittitas Valley. Regular
roadway maintenance improves
roadway safety while
maintaining reliable
infrastructure. This project will
grind and overlay asphalt on
No. 6 Road within the existing
pavement limits along with
temporary and permanent
pavement marking for repair,
rehabilitation and preservation.
RAP funds,
local funds
2026-2027 $1,450,000
Bar 14 Turnaround 2017 flood events caused water
to overtop Bar 14 Road at
Bridge #89041. Subsequent
inspection found significant
damage to one of the girders.
The County removed the bridge
and completed channel repair
work to alleviate flood
problems. While the County
plans to pursue funding to
replace the bridge, the funding
is competitive and Bar 14 Road
Local funds 2027 $175,000
2026-2031 Summary Page 11
does not see sufficient daily
traffic. Since the likelihood of
obtaining funds in the near
future is remote, the county will
build a turnaround at each dead
end until funding is secured.
Work will be done by County
Forces.
Gravel Road
Upgrades
Kittitas County gravel road
upgrade will complete road
maintenance projects and
improvements on existing
gravel roads at various
locations throughout the
County on an annual schedule.
Local funds 2026 $450,000
Liberty Road Swauk
Creek Bridge
MP 0.2 Liberty Road
Bridge replacement – safety
Planned
FLAP/FHWA
funds, local
funds
(BRAC $?)
2023-2024 $3,207,000
Dickey Creek Bridge
Replacement
Teanaway Road
Bridge replacement Local Funds 2023 $400,000
I-90 Widening (State
Project)
Cle Elum to Easton
Improve capacity and safety
Local funds
State
Transportation
and FHWA
through
WSDOT.
2023-2024 $750,000
6. Regional Parks and Trails
Project Name Location & Description Funding Source Schedule Total Cost
Manastash Trailhead
Parking Lot
Manastash Trail, Design &
build parking lot TBD 2026 $485,000
Upper County ATV
Trail (UC)
Upper County Planning and
project development TBD 2030-2031 $350,000
Ellensburg Field
House
Lower County, County cost
share with Ellensburg TBD 2027-2030 $3,000,000
Gladmar Park (MC)
Mid County.
Feasibility study to support
access include preliminary
design.
TBD 2029 $100,000
Upper County
Recreation Center
Upper County, County cost
share for recreation center Local 2028-2031 $3,000,000
Yakima River Access
Canyon Road. Design and
construct additional facilities
including parking and trails.
TBD 2027-2031 $600,000
Vantage River Walk
(LC) Lower County. TBD 2030-2031 $600,000
Thompson Park
Thompson Park Naneum Road.
Design and construct restroom
facility.
Local 2026 $75,000
2026-2031 Summary Page 12
7. Solid Waste
Project Name Location & Description Funding Source Schedule Total Cost
A. Relocate
Ellensburg Transfer
Station and Compost
Facility
B. Decommission
and Restore Existing
Location and Identify
Options for Future
Use.
925 Industrial Way, Ellensburg.
Build a new Transfer Station
and Compost Facility.
Solid Waste
Fund / Grant /
Loan
2025-2031 $23,000,000
Cle Elum Transfer
Station Entrance
Cle Elum Transfer Station 50
No. 5 Mine Road.
Construct a new entrance to
allow for better queuing for the
scales.
Solid Waste
Fees and Grants 2025-2031 $1,6000,000
8. Library Services
Project Name Location & Description Funding Source Schedule Total Cost
Ellensburg Public
Library HVAC
System
209 N Ruby St., Ellensburg
WA
Install new HVAC system to
replace current system.
Commissioner
Approved Bond
(City of
Ellensburg)
2024-2028 $1,000,000
2026-2031 Summary Page 13
9. Emergency Services
Project Name Location & Description Funding Source Schedule Total Cost
Sheriff’s Office
Training Room
307 W Umptanum. Training
room at the sheriffs office General Fund 2026 $288,000
Sheriff’s Office
Evidence Room &
Expansion
307 W Umptanum Rd.
Enhancement to current
evidence processing & storage
facilities, and improvements to
overflow evidence & property
storage bay.
General Fund,
Federal Funds
(anticipated)
2026 $150,000
Upper County
Emergency
Operations Center &
Search and Rescue
Base
Airport Road off Cle Elum
Airport Access Road.
Establishing primary
Emergency Operations Center
in growing upper county.
General Fund,
Federal Funds
(anticipated)
2026-2031 $3,000,000
Natural Gas
Generator with
enclosure
10700 N Thorp Hwy, Thorp Fire
Staton
FEMA Grant/
Rotary Club
Grant
2026-2031 $125,000
Solar Generator Fire Station 12 on Hwy 10 TBD
2026-2031 $45,000
Table 1 continued - Six-Year Plan Summary
2024-2029 Summary Kittitas County Public Facility Projects
Project Name Location & Description Funding Source Schedule Total Cost
Kittitas Valley
Healthcare Hospital
Expansion
603 S. Chestnut, Ellensburg
Hospital expansion to surgery,
materials management, and
radiology.
TBD 2023-2028 $13,586,000
Kittitas Valley
Healthcare
Orthopedic Clinic
611 S. Chestnut St. Ste. D & E
Complete interior remodel. TBD 2024-2028 $2,484,000
Kittitas Valley
Healthcare General
Surgery Clinic
611 S. Chestnut St. Ste. A
Tenant improvement project,
interior update.
TBD 2024-2028 $783,000
Kittitas Valley
Healthcare New
Parking Lot
611 S. Pearl St.
Vacant lot NW of KVH
Medical Arts Center. New
parking lot.
TBD TBD TBD
Kittitas Valley
Healthcare Cle Elum
Family Medical
Clinic
201 Alpha Way, Cle Elum.
“Possible addition” TBD TBD TBD
Kittitas Valley
Healthcare Internal
Medicine
700 E. Manitoba Ave.
Remodel of KVH Interal
Medicine Clinic, 9000 sq. ft.
facility
$250,000
Sunderland
Grant
2024-2028 $250,000
Kittitas Valley
Healthcare Cle Elum
Physical Therapy
201 Alpha Way, Cle Elum.
Recarpeting and repainting of
building (may be maintenance)
TBD TBD TBD
2026-2031 Summary Page 14
Kittitas Valley
Healthcare Home
Health
1506 Radio Rd.
Remodel of half of 10000 sq. ft.
facility.
TBD TBD TBD
Kittitas Valley
Healthcare Family
Medicine
716 E. Manitoba Ave.
Complete remodel of two
facilities, one is 7000 sq. ft and
one is 3000 sq. ft.
TBD TBD TBD
10. Education
Project Name Location & Description Funding Source Schedule Total Cost
Central Washington
University,
Secondary
Geothermal Module
Parcel # 143534, E Dean
Nicholson Blvd, CWU campus,
Ellensburg, WA
The secondary Geothermal
Module adds redundancy and
future expansion capability for
our geothermal infrastructure.
State Office of
Financial
Management
(OFM) Capital,
&Climate
Commitment
Act.
2025-2031 $16,464,000
Central Washington
University, Science
Building Carbon
Reduction
Parcel # 143534, 400 E
University Way, CWU
campus, Ellensburg, WA
The project implements the
energy efficiency improvement
of the Science 1 mechanical
buildings.
Climate
Commitment
Act
2025 $4,509,000
Central Washington
University, Black
Hall/Multicultural
Center
Parcel # 143534, 400 E
University Way, CWU
Campus. The project establishes
a student focused academic
facility dedicated to the
celebration of Equity &
Diversity.
State OFM
Capital 2025 $6,000,000
Central Washington
University, North
Academic Complex
Parcel # 143534, 1303 N.
Walnut St. , CWU
campus, Ellensburg, WA
The North Academic Complex
is a replacement project
for the existing Farrell Hall,
L&L Building.
State OFM
Capital,
Climate
Commitment
Act
2023-2031 $108,963,000
Table 1 continued - Six-Year Plan Summary
2024-2029 Summary Kittitas County Public Facility Projects
Project Name Location & Description Funding Source Schedule Total Cost
Ellensburg School
District, Lincoln
Elementary Install
Additional
Playground
Equipment
Lincoln Elementary Playground
Equipment Capital Fund FY 2026-
2030 $50,000
Ellensburg School
District, EHS
Refurbish Main Gym
Floor
Ellensburg High School -
Refurbish/Sand Main Gym
Floor
General Fund
Transfer to
Capital
FY 2026-
2030
$90,000
Ellensburg School
District, EHS
Remodel Culinary
Arts Kitchen
Ellensburg High School -
Remodel Culinary Arts
Kitchen.
General Fund
and Grant
FY 2024-
2025 $185,000
2026-2031 Summary Page 15
Ellensburg School
District, EHS Repair
Asphalt
Ellensburg High School Repair
Asphalt
General Fund
Transfer to
Capital
FY 2024-
2025 $224,642
Ellensburg School
District, EHS Replace
Aux Gym Floor
Ellensburg High School
Replace Aux Gym Floor
General Fund
Transfer to
Capital
FY 2026-
2030 $50,000
Ellensburg School
District, EHS Replace
Main Gym Bleacher
Drive Wheels
Ellensburg High School
Replace Main Gym Bleacher
Drive Wheels
Capital Fund FY 2024-
2025 $38,401
Ellensburg School
District, EHS Replace
“away” bleachers
Ellensburg High School
Replace “Away” Bleachers
General Fund
Transfer to
Capital
FY 2026-
2030 $70,000
Ellensburg School
District, EHS Replace
Football Goal Posts
Ellensburg High School
Replace Football Goal Posts
General Fund
Transfer to
Capital
FY 2026-
2030
$15,000
Ellensburg School
District, EHS Replace
Football Field
Sprinklers
Ellensburg High School
Replace Football Field
Sprinkler System
Capital Fund FY 2026-
2030 $30,000
Ellensburg School
District, EHS Home
Economics
Improvements
Ellensburg High School,
Replace Home Economics
Countertop, Electrical,
Plumbing.
Capital Fund FY 2024-
2025 $43,750
Ellensburg School
District, EHS
Sidewalk
Improvements
Ellensburg High School
Sidewalk Resurface/ Repair
General Fund
Transfer to
Capital
FY 2024-
2025 $10,000
Ellensburg School
District, EHS
Sealcoat and Paint
Ellensburg High School
Sealcoat and Paint Parking Lots
and Driveways
General Fund
Transfer to
Capital
FY 2024-
2025 $124,223
Ellensburg School
District, Early
Learning Center Bus
Land
705 W 15th. Early Learning
Center Install Additional Bus
Lane
Capital Fund FY 2026-
2030 $50,000
Ellensburg School
District, Early
Learning Center
Security Cameras
705 W 15th. Early Learning
Center Install Additional
Security Cameras
General Fund
Transfer to
Capital
FY 2026-
2030 $10,000
Ellensburg School
District, Ida Nason
Aronica Elementary
Fence and Irrigation
2101 N Cora St. Extend
Playground Fence and Irrigation Capital Fund FY 2024-
2025 $50,000
Ellensburg School
District, Ida Nason
Aronica Elementary
Install Card Readers
2101 N Cora St. Install Card
Readers
General Fund
Transfer to
Capital
FY 2026-
2030 $12,000
Ellensburg School
District, Ida Nason
Aronica Elementary
Install Top Soil for
Playground
2101 N Cora St. Install Top Soil Capital Fund FY 2026-
2030 $30,000
Ellensburg School
District,
IT Mitigation Plan
1300 E 3rd. IT Mitigation Plan Tech Levy FY 2024-
2030 $5,041,671
2026-2031 Summary Page 16
Ellensburg School
District, Lincoln
Elementary School
Install Card Readers
200 South Sampson St.
Install Card Readers
General Fund
Transfer to
Capital
FY 2026-
2030 $10,000
Ellensburg School
District, Morgan
Middle School
HVAC
400 E 1st Ave. Morgan Middle
School Upgrade HVAC Capital Fund FY 2026-
2030 $150,000
Ellensburg School
District, Morgan
Middle School
Outdoor Lighting
400 E. 1st Ave.
Additional Outdoor Lighting
General Fund
Transfer to
Capital
FY 2026-
2030 $10,000
Ellensburg School
District, Morgan
Middle School Install
Card Readers
400 E. 1st Ave.
Install Card Readers
General Fund
Transfer to
Capital
FY 2026-
2030 $12,000
Ellensburg School
District, Morgan
Middle School Install
Mechanical Choir
Shells
400 E. 1st Ave. Install
Mechanical Choir Shells in
MPAC
General Fund
Transfer to
Capital
FY 2026-
2030 $20,000
Ellensburg School
District, Morgan
Middle School Install
Video Equipment
400 E. 1st Ave. Install Video
Equipment in MPAC
General Fund
Transfer to
Capital
FY 2026-
2030 $10,000
Ellensburg School
District, Morgan
Middle School
Replace Cores and
Keys
400 E. 1st Ave. Replace Cores
and Keys
General Fund
Transfer to
Capital
FY 2026-20
30 $30,000
Ellensburg School
District, Morgan
Middle School
Replace MPAC
Sound System
400 E. 1st Ave. Replace MPAC
Sound System
General Fund
Transfer to
Capital
FY 2026-
2030 $35,000
Ellensburg School
District, Morgan
Middle School Retro-
Commission HVAC,
Lighting, and
Building Envelope to
meet HB 1257
400 E. 1st Ave Retro-
Commission HVAC, Lighting,
and Building Envelope to meet
HB 1257
General Fund
Transfer to
Capital
FY 2026-
2030 $10,000
Ellensburg School
District, Morgan
Middle School
Parking Lot Sealcoat
400 E. 1st Ave Parking Lot
Sealcoat for Satellite Parking
Lot
General Fund
Transfer to
Capital
FY 2024-
2025 $10,000
Ellensburg School
District, Morgan
Middle School
MPAC Stage
Lighting Upgrade
400 E. 1st Ave Upgrade MPAC
Stage Lighting
General Fund
Transfer to
Capital
FY 2026-
2030 $50,000
Ellensburg School
District, Mt. Stuart
Elementary Add Top
Soil for Playground
1701 N Cora St. Add Top Soil
for Playground Capital Fund FY 2024-
2025 $30,000
2026-2031 Summary Page 17
Ellensburg School
District, Mt. Stuart
Elementary Dredge
Collection Pond
1701 N Cora St. Dredge
Collection Pond Capital Fund FY 2024-
2025 $35,000
Ellensburg School
District, Mt. Stuart
Elementary
Playground Cameras
1701 N Cora St. Install
Additional Playground Cameras
General Fund
Transfer to
Capital
FY 2026-
2030 $20,000
Ellensburg School
District, Mt. Stuart
Elementary Rehab
Community Center
Gym Floor
1701 N Cora St. Rehab
Community Center Gym Floor Capital Fund FY 2026-
2030 $60,000
Ellensburg School
District, Mt. Stuart
Elementary Upgrade
Fire, Communication
and HVAC
1701 N Cora St. Upgrade Fire,
Communications, and HVAC at
Community Center
Capital Fund FY 2026-
2030 $150,000
Ellensburg School
District
Transportation 10-
Passenger Van
1501 E Capitol Ave Ten
Passenger Van
General Fund
Transfer to
Capital
FY 2026-
2030 $80,000
Ellensburg School
District
Transportation Lunch
Delivery Truck
1501 E Capitol Ave Lunch
Delivery Truck
General Fund
Transfer to
Capital
FY 2024-
2025 $80,000
Ellensburg School
District
Transportation New
Transfer Location
Between Softball
Field and Bus Barn
1501 E Capitol Ave New
Transfer Location Between
Softball Field and Bus Barn
Capital Fund FY 2026-
2030 $60,000
Ellensburg School
District
Transportation Bus
Replacement
1501 E Capitol Ave Vehicle
Fund Support to Increase
Student Growth / 30-Year Bus
Replacement
Transportation
Vehicle Fund
FY 2024-
2030 $7,758,088
Ellensburg School
District
Transportation
Replace Fuel Tank
1501 E Capitol Ave Replace
Fuel Tank
General Fund
Transfer to
Capital
FY 2026-
2030 $50,000
Ellensburg School
District
Transportation
Sealcoat and Paint
Parking Lots
1501 E Capitol Ave Sealcoat
and Paint Parking Lots Capital Fund FY 2024-
2025 $75,000
Ellensburg School
District
Transportation
Upgrade HVAC
1501 E Capitol Ave Upgrade
HVAC Capital Fund FY 2026-
2030 $85,000
Ellensburg School
District Valley View
Elementary Replace
Playground
Equipment
1508 E 3rd Ave Replace
Playground Equipment
General Fund
Transfer to
Capital
FY 2026-
2030 $100,000
2026-2031 Summary Page 18
Ellensburg School
District Valley View
Elementary Sealcoat
and Paint all Parking
Lots
1508 E 3rd Ave Sealcoat and
Paint all Parking Lots and
Valley View Blvd
General Fund
Transfer to
Capital
FY 2024-
2025 $124,223
Thorp School District
Cooling System
Upgrade
10831 N. Thorp Hwy
Gym/Locker Room and High
School Kitchen Cooling System
Clean Air Grant 2024-2025 $1,000,000
Thorp School District
Remodel
10831 N. Thorp Hwy Brick
Building Kitchen and Staff
Lounge Remodel
Small School
Modernization
Grant
2024-2025 $250,000
Thorp School District
Security System
10831 N. Thorp Hwy Security
System Upgrades / Cameras
Capital Projects
Levy 2024-2025 $15,000
Thorp School District
Replace Exterior
Doors
10831 N. Thorp Hwy Replace
Numerous External Doors
Small School
Modernization
Grant
2024-2025 $40,000
Thorp School District
Asbestos Abatement
10831 N. Thorp Hwy Asbestos
Abatement in Brick Building
Small School
Modernization
Grant
2024-2025 $80,000
Thorp School District
Outdoor Education
Classrooms
10831 N. Thorp Hwy Outdoor
Education Classrooms
Healthy Kids
Grant 2024-2025 $30,000
Thorp School District
Resurfaced and
Painted Main Gym
Floor
10831 N. Thorp Hwy
Resurfaced and Painted Main
Gym Floor
Capital Projects
Levy 2024-2025 $40,000
Thorp School District
New Exterior Lights
10831 N. Thorp Hwy New
Exterior Lights for Brick
Building
Small School
Modernization
Grant
2024-2025 $25,000
Thorp School District
New Scoreboard
10831 N. Thorp Hwy New
Scoreboard
Capital Projects
Levy 2026-2031 $140,000
Thorp School District
CTE Engineering
Classroom, Shop
Remodel
10831 N. Thorp Hwy CTE
Engineering Classroom, Shop
Remodel
Capital Projects
Levy 2026-2031 $140,000
Thorp School District
Outdoor Education
Classrooms
10831 N. Thorp Hwy Outdoor
Education Classrooms
Capital Projects
Levy/ Healthy
Kids Grant
2026-2031 $50,000
Kittitas School
District Solar Project
500 N Pierce St, Kittitas
Elementary School Clean
Energy Improvement Solar
Project
Dept. of
Commerce
Grant/ KSD
2025 $521,449
11. Flood Control Zone District
Project Name Location & Description Funding Source Schedule Total Cost
Flood Hazard Risk
and Repetitive Loss
Program
Yakima River. Comprehensive
Flood Planning and Repetitive
Loss Hazard Assessment
Flood Control
Zone District
(FCZD) Levy,
future phases
by grant
2027 $60,000
2026-2031 Summary Page 19
Repetitive Loss:
Easton Reach Flood
Study
Outreach informed by repetitive
loss area analysis and 2023
Easton Reach Flood Hazard
Assessment.
Flood Control
Assistance
Account
Program
(FCAAP),
FCZD Levy.
Future phases
will be grant
eligible
2028-2029 $40,000
CTP Flood Studies
Continued funding through
FEMA’s Cooperating Technical
Partnership (CTP) program to
improve flood models and
channel migration zone
mapping. 2027-2028 Wilson-
Naneum, 2029-2030 Manastash
flood and alluvial fan mapping
FEMA CPT
and local
funding
2027-2030 $275,000
Lower Kittitas Reach
Floodplain
Reconnection
Implementation of preferred
alternative from Hanson Pits
Restoration Plan and Design.
2026- Final design and
permitting, 2027-2029-
Implementation, 2030-2031
vegetation management.
SRFB, IP, FbD,
and local 2022-2031 $13,395,000
Reecer Creek
Dolarway to
University
Project scheduled to be
completed by the City of
Ellensburg. If not completed
funding could be extended to
2026.
City of
Ellensburg 2025-2026
WNC-Phase 3
Whiskey Creek Re-
Route
Pending results of feasibility
study underway. 2026-2027
Final design and permitting.
2028-2029 Implementation
Federal
Highways AOP
and local
2026-2031 $2,120,000
Whisky Creek at
Ellensburg Water
Company (EWC)
Siphon
WNC.
Increase flood conveyance,
eliminate canal / creek
intermingling, and address fish
passage barrier by replacing
current EWC crossing at
Whiskey Creek with a siphon.
FCZD Levy,
Grant or partner
support for
construction
2026-2029 $1,780,000
Flow Conveyance
Restoration- Mercer
Creek
MCF-KC Partnership. Mercer
at Helena project maintenance
and Mercer Creek west of
Railroad project design(2026)
Mercer Creek west of Railroad
Ave project permitting,
implementation and
maintenance.
Ecology 2026-2031 $272,000
Flow Conveyance
Restoration- Whiskey
Creek
Inset floodplain and crack
willow removal between
Bowers and Bender Roads.
2026-Permitting. 2027 Phase 1
construction.
Private,
Ecology 2026-2031 $380,000
2026-2031 Summary Page 20
Crystal Creek
Conveyance Project
Implement project identified
through Crystal Creek CTP
Study
Local 2031 $100,000
Hazard Mitigation
Plan Update
The Multi-jurisdictional Hazard
Mitigation Plan needs to be
updated every five years
EMD 2028-2029 $150,000
West Ellensburg
Interchange
Flood informed development
effort in West Ellensburg
Interchange. 2024-Finalization
of preferred alternative and
design, 2025 – CLOMR /
environmental permitting.
2026-2027 implementation
Local 2024-2031 $2,750,000
CRS Critical Facility
Compliance
Address critical facility at flood
risk from Yakima River
flooding. Compliance required
for continued good standing in
National Flood Insurance
Program and Community
Rating System.
Local 2025-2027 $2,000,000
Wilson Creek
Realignment
Implementation funding for
proposal to relocate Wilson
Creek in Brook Land vicinity.
FbD, FCAAP,
Local 2029-2031 $830,000
Wilson-Naneum
Alluvial Fan
Management
2027- Project scoping. 2028-
2030 – Geotechnical
investigation. 2030-2031-
Design and permitting, 2032
Implementation
FCAAP 2028-2030 $305,000
2026-2031 Summary Page 21
12. Water – Group A Systems - No projects planned for 2026-2031 period
2026-2031 Summary Page 22
13. Sanitary Sewer - No projects planned for 2026-2031 period
Kittitas County Airport Facilities Page 23
1. 2BAirport Facilities
This section includes an inventory of the existing airport facilities in Kittitas County and a
detailed description of each airport facility improvement that is included in the six-year plan. The
inventory of facilities in Table 2 below also describes each facility’s size in order to determine if
it addresses the County’s long-term community needs.
Table 2
Existing Public Facilities and Services
Airport Facilities
Facility Provider Description Size
Bowers Field
Airport
Kittitas County Asphalt, 11/29 Runway, 4,300’x150’,
asphalt. Built 1943.
1,300 acres
Bowers Field
Hanger Bldg. 404
Kittitas County Built 1997. 20,000 sq. ft.
Bowers Field T-
Hanger
Kittitas County Built 1960. 12,500 sq. ft.
Cle Elum
Municipal Airport
City of Cle Elum 50,000 sq. ft. parking apron area, 07/25
Runway, 2,552’x40’, asphalt, 1,000 aircraft
usage per year. Built 1959.
135 acres
De Vere Field Jim De Vere
(private owner)
08/26 Runway, 2,055’x30’, asphalt, 6 single
engine aircraft based. Built 1963.
50 acres
Easton State
Airfield
WSDOT 09/27 Runway, 2,640’x100’, turf, 30
aircraft usage per month, built in 1930’s.
15 acres
Kittitas County Airport Facilities Page 24
Airport Facilities – Hangar Taxilane Complex (West)
Project Information and Selection Criteria
Location Bowers Field Airport, Ellensburg
Links to Other Projects or Facilities N/A
Description
Design and construct new hangar taxilane including
excavation, grading, fence relocation and drainage
improvement.
Justification (Need/Demand)
This project provides storage for based/transient aircraft
across the state.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Design and new construction
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2026 2027-2031 Total
Design and Engineering $157,895 $157,895
Construction $1,069,110 $1,069,110
TOTAL $1,227,005 $1,227,005
Funding Sources 2026 2027-2031 Total
FAA GA Entitlement $1,104,305 $1,104,305
Local Match $122,700 $122,700
TOTAL $1,227,005 $1,227,005
Annual Operations and Maintenance
Estimated Costs
The County does not currently track maintenance costs for
these improvements.
Estimated Revenues Based on lease rates
Anticipated Savings Due to Project None
Department Responsible for Operations Public Works Department
Kittitas County Airport Facilities Page 25
Airport Facilities – Runway 11/29 Parallel Taxiway and Taxiway
Lighting Project
Project Information and Selection Criteria
Location Bowers Field Airport, Ellensburg
Links to Other Projects or Facilities N/A
Description
Construct new parallel taxiway including pavement, lighting,
and marking installation
Justification (Need/Demand)
This project is needed to provide adequate facilities for
projected airplane operations.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: New facility construction
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2026 2027-2031 Total
Design and Engineering
Construction $7,344,840 $7,344,840
TOTAL $7,344,840 $7,344,840
Funding Sources 2026 2027-2031 Total
FAA GA Entitlement & Other Funding $6,977,597 6,977,597
Local Match $367,243 $367,243
TOTAL $7,344,840 $7,344,840
Annual Operations and Maintenance
Estimated Costs
The County does not currently track maintenance costs for
these improvements.
Estimated Revenues None
Anticipated Savings Due to Project None
Department Responsible for
Operations Public Works Department
Kittitas County Airport Facilities Page 26
Airport Facilities – Rehabilitate Runway 11/29
Project Information and Selection Criteria
Location Bowers Field Airport, Ellensburg
Links to Other Projects or Facilities N/A
Description
Rehabilitate Runway 11/29 including completing an AGIS
survey, reducing the runway width, drainage improvements,
and replacing the runway lighting system.
Justification (Need/Demand)
This project removes the failed asphalt pavement and
replaces the runway lighting system that has outlived its
useful life.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Facility repair and renovation
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2028 2029-2030 Total
Design and Engineering $388,889 $388,889
Construction $3,277,778 $3,277,778
TOTAL $388,889 $3,277,778 $3,666,667
Funding Sources 2028 2029-2030 Total
FAA GA Entitlement $350,000 $2,950,000 $3,300,000
Local Match $38,889 $327,778 $366,667
TOTAL $388,889 $3,277,778 $3,666,667
Annual Operations and Maintenance
Estimated Costs
The County does not currently track maintenance costs for
these improvements.
Estimated Revenues None
Anticipated Savings Due to Project None
Department Responsible for
Operations Public Works Department
Kittitas County Airport Facilities Page 27
Airport Facilities – ALP Update with Forecast Verification
Project Information and Selection Criteria
Location Bowers Field Airport, Ellensburg
Links to Other Projects or Facilities N/A
Description
Update the Airport Layout Plan (ALP) and forecast
verification.
Justification (Need/Demand)
Confirm need for a runway extension to accommodate larger
aircraft.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Design and Forecasting
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2027 2028-2031 Total
Design and Engineering $60,000 $60,000
Construction
TOTAL $60,000 $60,000
Funding Sources 2027 2028-2031 Total
FAA GA Entitlements $54,000 $54,000
Local Match $6,000 $6,000
TOTAL $60,000 $60,000
Annual Operations and Maintenance
Estimated Costs
The County does not currently track maintenance costs for
utility improvements.
Estimated Revenues None
Anticipated Savings Due to Project None
Department Responsible for
Operations Public Works Department
Kittitas County Airport Facilities Page 28
Airport Facilities– Industrial Park Building Development
Project Information and Selection Criteria
Location Bowers Field Airport, Ellensburg
Links to Other Projects or Facilities N/A
Description
The design and construction of new industrial buildings in the
Bowers Field Industrial Park.
Justification (Need/Demand)
Bowers Field has significant land to manage and under FAA
recommendations the airport should work to be self -sufficient
with support of the Sponsoring Agency (County) to relieve the
financial burden on local agencies. These buildings would
provide a positive initial step to increase independence and prove
space for businesses.
Level of Service (LOS) / Project Type
LOS: N/A.
Project Type: New facility
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2027 2028-2030 Total
Design and Engineering TBD TBD TBD
Construction TBD TBD
TOTAL To Be Determined
Funding Sources 2027 2028-2030 Total
Funding options to be determined TBD TBD TBD
TOTAL
Annual Operations and Maintenance
Estimated Costs $50,000 annually
Estimated Revenues $150,000 annually
Anticipated Savings Due to Project None
Department Responsible for Operations Public Works Department
Example Purposes Only
Kittitas County Airport Facilities Page 29
Airport Facilities– Hangar Taxilane Complex (East)
Project Information and Selection Criteria
Location Bowers Field Airport, Ellensburg
Links to Other Projects or Facilities N/A
Description
Design and construct new hangar taxilane including
excavation, grading, fence relocation and drainage
improvement.
Justification (Need/Demand)
This project provides storage for based/transient aircraft
across the state.
Level of Service (LOS) / Project Type
LOS: N/A.
Project Type: Design and construction
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2029 2030-2031 Total
Design and Engineering $166,667 $166,667
Construction $1,000,000 $1,000,000
TOTAL $166,667 $1,000,000 $1,166,667
Funding Sources 2029 2030-2031 Total
FAA GA Entitlement $150,000 $900,000 $1,050,000
Local Match $16,667 $100,000 $116,667
TOTAL $166,667 $1,000,000 $1,166,667
Annual Operations and Maintenance
Estimated Costs
The County does not currently track maintenance costs for
these improvements.
Estimated Revenues None
Anticipated Savings Due to Project None
Department Responsible for Operations Public Works Department
Example Purposes Only
Kittitas County Airport Facilities Page 30
Airport Facilities – Runway 11 Extension
Project Information and Selection Criteria
Location Bowers Field Airport, Ellensburg
Links to Other Projects or Facilities N/A
Description Extend runway 11/29 design
Justification (Need/Demand)
This project is needed to accommodate increased operations
by larger jets.
Level of Service (LOS) / Project Type
LOS: N/A.
Project Type: Design
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2030 2031 Total
Design and Engineering $500,000 $500,000
Construction
TOTAL $500,000 $500,000
Funding Sources 2030 2031 Total
FAA GA Entitlement $450,000 $450,000
Local Match $50,000 $50,000
TOTAL $500,000 $500,000
Annual Operations and Maintenance
Estimated Costs
The County does not currently track maintenance costs for
these improvements.
Estimated Revenues None
Anticipated Savings Due to Project None
Department Responsible for Operations Public Works Department
Kittitas County Events Center Page 31
Airport Facilities – Wildlife Hazard Mitigation
Project Information and Selection Criteria
Location Bowers Field Airport, Ellensburg
Links to Other Projects or Facilities N/A
Description Mitigate wildlife hazards in the vicinity of runway 11/29
Justification (Need/Demand)
This project will address wildlife hazards established by the
Wildlife Hazard Assessment.
Level of Service (LOS) / Project Type
LOS: N/A.
Project Type: Design and Construction
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2030 2031 Total
Design and Engineering $760,000 $760,000
Construction $1,690,000 $1,690,000
TOTAL $2,450,000 $2,450,000
Funding Sources 2030 2031 Total
FAA GA Entitlement $2,327,500 $2,327,500
Local Match $122,500 $122,500
TOTAL $2,450,000 $2,450,000
Annual Operations and Maintenance
Estimated Costs
Currently, the County does not track maintenance costs for
these improvements.
Estimated Revenues None
Anticipated Savings Due to Project None
Department Responsible for Operations Public Works Department
Vicinity Map
Kittitas County Events Center Page 32
2. Kittitas County Administrative Offices
This section includes an inventory of Kittitas County Administrative Offices and a detailed
description of each facility improvement that is included in the six-year plan. The inventory of
facilities in Table 3 below also describes each facility’s size in order to determine if it addresses
the County’s long-term community needs.
Table 3
Existing Public Facilities and Services
Kittitas County Administrative Offices
Facility Department Description Size
Armory Building Extension, Noxious Weed, and
Kittitas Valley Event Center
901 E. 7th, built 1950.
Remodel completed in 2014.
13,140 sq. ft.
Cle Elum Public
Health
Public Health 415 E. First Ave., Cle Elum,
leased building. Built
unknown.
2,400 sq. ft.
County
Courthouse
Assessor, Auditor, Clerk,
Commissioners, Lower District
Court, Human Resources,
Information Services, Juvenile
Probation, Maintenance,
Prosecutor, Superior Court,
Treasurer
205 W. 5th, built 1958. 47,691 sq. ft.
Permit Center Public Works, Community
Development Services, and Fire
Marshal
411 N. Ruby, built 1959. 13,625 sq. ft.
Public Safety
Building
Sheriff/Corrections 205 W. 5th, built 1985.
Remodeled 2010 to 2012.
33,209 sq. ft.
Sheriff
Administration
Office
Sheriff 307 Umptanum Rd., built
2009.
11,880 sq. ft.
Sorenson
Building
Public Health and Misdemeanant
Probation
507 Nanum Rd., built 1942. 17,648 sq. ft.
Upper District
Court Building
Upper District Court 700 E. 1st, Cle Elum, built
unknown. Remodeled in
2013.
6,000 sq. ft.
Vantage Marine
Storage Building
Sheriff Vantage Boat Launch, built
in 2014.
1,024 sq. ft.
Kittitas County Events Center Page 33
Kittitas County Administrative Offices – Relocate Permit Center and
Health Department
Project Information and Selection Criteria
Location 411 N Ruby, Ellensburg– see existing facility inventory
Links to Other Projects or Facilities N/A
Description Relocate Permit Center
Justification (Need/Demand)
This project is needed to upgrade outdated facilities for
CDS, PWD, Fire Marshal and Public Health offices. The
building was constructed in 1959 and the County purchased
the building in 2002. The County has outgrown the
building and the Parking area around the building. Goal is
to
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Facility repair, remodel, and renovation
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2026-2031 Total
Design and Engineering 700,000 700,000
Construction $15,250,000 $15,250,000
TOTAL $15,950,000 $15,950,000
Funding Sources 2025-2029 Total
General Obligation Bonds $15,950,000 $15,950,000
TOTAL $15,950,000 $15,950,000
Annual Operations and Maintenance
Estimated Costs
Currently, the County does not track maintenance costs for
these improvements.
Estimated Revenues None
Anticipated Savings Due to Project None
Kittitas County Events Center Page 34
Department Responsible for Operations Facilities and Maintenance Office
Kittitas County Events Center Page 35
Kittitas County Administrative Offices – County Administration
Building
Project Information and Selection Criteria
Location New Courthouse
Links to Other Projects or Facilities Courthouse, Permit Center, and Morris Sorenson bldg.
Description New County Administration Building
Justification (Need/Demand)
Office space is needed for all county functions.
Consolidating administrative offices. This includes
Commissioner’s Office, Auditors Office, Assessors’ Office,
Treasurers Office, Fire Marshal, Community Development
Services, and Public Works Administrative Office. The
Courts and related offices would remain in the existing
Courthouse.
Level of Service (LOS) / Project Type
Established LOS: N/A.
Project Type: New facility
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2025 2026-2031 Total
Master Plan / Conceptual Site Plan $120,000 $250,000 $370,000
Design and Engineering $1,500,000 $1,500,000
Construction $151,035,000 $151,035,000
TOTAL $120,000 $152,785,000 $152,905,000
Funding Sources 2021 2026-2031 Total
Real Estate Excise Tax (REET)&
commissioner approved Bond $120,000 152,785,000 $152,905,000
TOTAL $120,000 $152,785,000 $152,905,000
Annual Operations and Maintenance
Kittitas County Events Center Page 36
Estimated Costs
Currently, the County does not track maintenance costs for
these improvements.
Estimated Revenues None
Anticipated Savings Due to Project None
Department Responsible for Operations Facilities and Maintenance Office
Kittitas County Events Center Page 37
Kittitas County Administrative Offices – Public Safety Building
Improvements
Project Information and Selection Criteria
Location
205 W. 5th, Ellensburg – see existing facility inventory
Public Safety Building
Links to Other Projects or Facilities N/A
Description
Various improvements to include new siding for old portion
of jail and replace ceiling in hallways. Cover the Outdoor
recreation areas and replacement of aging systems.
Justification (Need/Demand)
This project is needed to provide safe and adequate facilities
for inmates and correctional officers.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Facility remodel and renovation
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2025 2026-2031 Total
Design and Engineering $150,000 $300,000 $450,000
Construction $3,500,000 $7,500,000 $11,000,000
TOTAL $3,650,000 $7,800,000 $11,450,000
Funding Sources 2025 2026-2031 Total
General Fund & 1/10th sales tax $3,650,000 $7,800,000 $11,450,000
TOTAL $3,650,000 $7,800,000 $11,450,000
Annual Operations and Maintenance
Estimated Costs
Currently, the County does not track maintenance costs for
these improvements.
Estimated Revenues None
Anticipated Savings Due to Project None
Kittitas County Events Center Page 38
Department Responsible for Operations Sheriff Office
Kittitas County Events Center Page 39
Kittitas County Administrative Offices – Juvenile Detention Holding
Facility
Project Information and Selection Criteria
Location
205 W. 5th, Ellensburg – see existing facility inventory
County Courthouse
Links to Other Projects or Facilities N/A
Description
Building remodel to provide a temporary holding cell for
juvenile detention.
Justification (Need/Demand)
This project is needed to provide a secure area for
temporarily holding juveniles at the Courthouse. Permanent
detention facilities are rented by Yakima County and
juveniles are transported as needed.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Facility remodel and renovation
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2025 2026-2031 Total
Design and Engineering To Be Determined To Be Determined
Construction $50,000 $50,000
TOTAL $50,000 $50,000
Funding Sources 2026-2031 Total
Law & Justice sales tax $50,000 $50,000
TOTAL $50,000 $50,000
Annual Operations and Maintenance
Estimated Costs
Currently, the County does not track maintenance costs for
these improvements.
Estimated Revenues None
Anticipated Savings Due to Project None
Kittitas County Events Center Page 40
Department Responsible for Operations Facilities and Maintenance Office
Kittitas County Administrative Offices – Kittitas County Corrections
Facility
Project Information and Selection Criteria
Location To be Determined
Links to Other Projects or Facilities New Kittitas County Jail Facility
Description Construction of New Kittitas County Corrections Facility
Justification (Need/Demand)
Construct a new Kittitas County Corrections Facility to
replace the aging facility that was built in 1980. The
existing.
Level of Service (LOS) / Project Type
New Facility
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2026 2026-2031 Total
Design and Engineering $1,000,000 $74,919,208
Construction $174,811,493
TOTAL $249,730,701
Funding Sources 2023-2027 Total
Commissioner approved bond $249,730,701
TOTAL $249,730,701
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for Operations Facilities and Maintenance Office
Kittitas County Events Center Page 41
Kittitas County Administrative Offices – Upper County Sheriff’s
Office Facility
Project Information and Selection Criteria
Location Upper county, to be determined…
Links to Other Projects or Facilities
Description
Facility for sheriff’s office in the upper portion of Kittitas
County.
Justification (Need/Demand)
Lack of facility for sheriff’s office in the upper county
diminishes department’s ability to conduct law enforcement
activity in this region.
Level of Service (LOS) / Project Type New Facility
Comprehensive Plan Citations
Capital Cost 2026-2031 Total
Design and Engineering 500,000 500,000
Construction 5,000,000 5,000,000
TOTAL 5,500,000 5,500,000
Funding Sources 2026-2031 Total
Commissioner approved bond
TOTAL 5,500,000 5,500,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for Operations Facilities and Maintenance Office
Kittitas County Events Center Page 42
Kittitas Valley Event Center / Fairgrounds
This section includes an inventory of Kittitas Valley Event Center/Fairgrounds facilities and a
detailed description of each facility improvement that is included in the six-year plan. The
inventory of facilities in Table 4 below also describes each facility’s size in order to determine if
it addresses the County’s long-term community needs.
Table 4
Existing Public Facilities and Services
Kittitas Valley Event Center / Fairgrounds
Facility
Built
date Size Facility Built date Size
Frontier Village
Buildings 1890’s Unknown Restrooms / R.A.
(1)
1960’s 2,035 sq. ft.
Grandstand –
Main/Heritage Bldg. 1925 18,965 sq. ft. Fair Office and
Restrooms 1974 3,954 sq. ft.
8th Street Ticket Office 1930’s 1,568 sq. ft. Behind the Chutes 1976 1,000 sq. ft.
Souvenir Booth 2004 Unknown Bloom Pavilion 1980 26,400 sq.
ft.
Posse Barn (1) 1940’s 3,000 sq. ft. Restrooms / R.A.
(2) 1982 645 sq. ft.
Posse Barn (2) 1940’s 4,800 sq. ft. Maintenance Shop 1986 1,500 sq. ft.
Light Horse Barn 1940’s 3,200 sq. ft. Gazebo 1989 450 sq. ft.
Cattle and Swine Barn 1940’s 12,000 sq. ft. Buckaroo’s Stands
& Pens 1991 5,984 sq. ft.
Draft Horse Barn 1940’s 10,450 sq. ft. Gold Buckle
Building 2001 2,400 sq. ft.
Teanaway/Umtanum
Building
1940’s 17,556 sq. ft. Western Village 2004 3,140 sq. ft.
First Rodeo Director’s
Barn 1940’s 3,250 sq. ft. Fair Storage Shed 2004 600 sq. ft.
Second Rodeo
Director’s Barn 1940 3,250 sq. ft. East Rodeo
Concession 2005 600 sq. ft.
Bleachers E.
(Uncovered)
1960’s 10,000 sq ft Bronze Pig Statue 2007 N/A
Ellensburg Armory 1950 13,920 sq. ft. Rodeo Arena
Bleachers 2007 3,950 sq. ft.
Bleachers W. (Covered) 1960’s 10,756 sq. ft. Fair shed (Fuel) 2008 100 sq. ft.
Kittitas County Events Center Page 43
Kittitas Valley Event Center / Fairgrounds – Rodeo Arena Northwest
Grandstands
Project Information and Selection Criteria
Location 901 E. 7th, Ellensburg
Links to Other Projects or Facilities N/A
Description Replace old rodeo northwest grandstands complex.
Justification (Need/Demand)
This phase of this project is the replacement of section AA-
JJ with the adjoining Behind the Chutes. Work includes
removing existing structures and foundation, site work, new
foundations and walls, seating structure and assembly,
permitting, fees, and taxes.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Facility renovation
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost Total
Design and Engineering $1,587,572
Construction $11,381,528
TOTAL $12,969,100
Funding Sources Total
State Grants $999,100 $1,470,000 $2,469,100
Local Partnership – City of Ellensburg $2,500,000 $2,500,000
Local Partnership – Ellensburg Rodeo $2,500,000 $2,500,000
County LTAC Grant $3,000,000 $3,000,000
Revenue Bonds $2,500,000 $2,500,000
TOTAL $990,100 $11,970,000 $12,969,100
Kittitas County Events Center Page 44
Annual Operations and Maintenance
Estimated Costs
Currently, the County does not track maintenance costs for
these improvements.
Estimated Revenues ROI not yet calculated
Anticipated Savings Due to Project $4,000,000
Department Responsible for Operations Kittitas Valley Event Center and Ellensburg Rodeo
Kittitas Valley Event Center / Fairgrounds – Renovated Barn
Complex and Emergency Evacuation Shelter
Project Information and Selection Criteria
Location 901 E. 7th, Ellensburg
Links to Other Projects or Facilities N/A
Description
Fully replace 3 old barn facilities for a multi-purpose facility
that can be utilized for various types of shows and
exhibitions at the Kittitas Valley Event Center. This upgrade
will better allow for the facilities to be used as emergency
animal and human shelter during an emergency as well.
Justification (Need/Demand)
Equestrian activities, trade shows, exhibitions, fundraisers,
sales, and other livestock events take place throughout the
year and create demand for additional facilities.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Facility renovation
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost Total
Design and Engineering $1,000,000 $1,000,000
Construction $5,500,000 $5,500,000
TOTAL $6,500,000 $6,500,000
Kittitas County Events Center Page 45
Funding Sources Total
Federal Infrastructure or Emergency
Funding Sources (Ferguson Group)
$5,000,000 $5,000,000
General Obligation Bonds $1,500,000 $1,500,000
TOTAL $6,500,000 $6,500,000
Annual Operations and Maintenance
Estimated Costs Not tracking maintenance costs for these improvements.
Estimated Revenues Increased use will generate more revenue.
Anticipated Savings Due to Project
Maintenance and painting costs lowered. Will save over
$1,000,000 in needed electrical upgrades for old,
deteriorating facilities.
Department Responsible for Operations Kittitas Valley Event Center
Kittitas Valley Event Center / Fairgrounds – New RV Park
Project Information and Selection Criteria
Location 900 North Alder St., Ellensburg
Links to Other Projects or Facilities
Description
An RV park to be built on the former site of Shady Brook
Mobile Park.
Justification (Need/Demand)
Planned by the county for several years, will provide RV
parking for the fairgrounds/rodeo.
Level of Service (LOS) / Project Type New facility.
Comprehensive Plan Citations
Kittitas County Events Center Page 46
Capital Cost Total
Design and Engineering $150,000 $150,000
Construction $2,500,000 $2,500,000
TOTAL $2,650,000 $2,650,000
Funding Sources Total
State Grant (WSDA) $250,000 $250,000
Sale of F&L Property $252,000 $252,000
Cold Weather Shelter Income $71,000 $71,000
Commissioner approved bond $2,027,000 $2,027,000
TOTAL $2,650,000 $2,650,000
Annual Operations and Maintenance
Estimated Costs
$5,000 for water, lawn care, utilities, repairs annually
Estimated Revenues $35,000
Anticipated Savings Due to Project Less repairs on old electrical and water hook ups.
Department Responsible for Operations Facilities and Maintenance Office
Kittitas County Maintenance Shops, Storage, and Parking Page 47
4. 5BKittitas County Maintenance Shops, Storage, & Parking
This section includes an inventory of Kittitas County Maintenance shops, storage, and parking
facilities and a detailed description of each facility improvement that is included in the six-year
plan. The inventory of facilities in Table 5 below also describes facility’s size in order to
determine if it addresses the County’s long-term community needs. The proposed projects for
Kittitas County Maintenance Shops, Storage, and Parking are detailed in Appendix A.
Table 5
Existing Public Facilities and Services
Kittitas County Maintenance Shop, Storage, and Parking
Facility Department Description Size
Lower County PWD Heavy
Equipment Storage West Shed
Public
Works
15th & Okanagon, built 1951. 4,875 sq. ft.
Lower County PWD Heavy
Equipment Storage East Shed
Public
Works
15th & Okanagon, built 1951. 4,875 sq. ft.
Lower County PWD Main
Heavy Equipment Shop
Public
Works
15th & Okanagon, built 1951. 6,240 sq. ft.
Sheriff Central Storage Sheriff 307 Umptanum Rd., built 2009. 2,160 sq. ft.
Upper County PWD main heavy
equipment shop / admin
Public
Works
51 No. 5 Mine Road, Cle Elum, built
2021.
13,750 sq. ft
Upper County PWD Salt / Sand
storage
Public
Works
51 No. 5 Mine Road, Cle Elum, built
2021.
10,370 sq. ft
Upper County PWD Large
Equipment Storage Shed
Public
Works
51 No. 5 Mine Road, Cle Elum, built
2021.
9515 sq. ft
Upper County PWD Equipment
Storage Shed
Public
Works
51 No. 5 Mine Road, Cle Elum, built
2021.
4,400 sq. ft
Upper County PWD Parking Lot Public
works
Asphalt parking area 18 stalls +2
ADA stalls. Built unknown.
20 stalls
Vantage Boat Launch Parking
Lot
Public
Works
Vantage Boat Launch built
approximately 1990. Includes large
stalls for boats.
62 stalls
Armory Parking Lot Ext, Weed,
& Event Ctr
Asphalt parking area. Built unknown. 20 stalls
S Courthouse Parking Lot Courthouse
Offices
Off-street parking adjacent to
Courthouse. Built unknown.
21 stalls
W Courthouse Parking Lot Courthouse
Offices
Off-street parking adjacent to
Courthouse. Built unknown.
7 stalls
SW 6th Ave. & Water Street Courthouse
Offices
Improved parking lot. Built unknown. 44 stalls
Kittitas County Maintenance Shops, Storage, and Parking Page 48
Table 5 – Continued
Existing Public Facilities and Services
Kittitas County Maintenance Shop, Storage, and Parking
Facility Department Description Size
NW 6th Ave. & Water Street Courthouse
Offices
Built unknown. Improved parking lot
in 2010.
58 stalls
NE 6th Ave. & Water Street Courthouse
Offices
Semi-improved parking lot. Built
unknown.
18 stalls
N Permit Center Public
Works
Improved off-street parking next to
building. Built unknown.
14 stalls
S Permit Center CDS Improved off-street parking next to
building. Built unknown.
10 stalls
Sheriff Administration Office
Parking Lot
Sheriff and
Prosecutors
Improved off-street parking next to
building. Built unknown.
51 stalls
SW Sorenson Building Parking
Lot
Public
Health
Improved off-street parking next to
building. Built unknown.
24 stalls
W Upper District Court Building
Parking Lot
Upper
District
Court
Improved off-street parking next to
building, 700 1st St., Cle Elum. Built
unknown.
22 (shared)
Cle Elum Centennial Center –
Parking Lot for Public Health
services by appointment
Public
Health
Improved off-street parking next to
building, 719 E. 3rd St, Cle Elum.
Building space and parking are
provided for Upper County Public
Health services. Built unknown.
30 (shared)
Suncadia / Upper County Sheriff
Office Parking Lot
Sheriff Improved off-street parking next to
building., 4240 Bullfrog Rd, Suite 1,
Cle Elum. Built unknown.
22 (shared)
Kittitas Valley Event
Center/Fairgrounds Parking Lots
KV Event
Center
Does not include the unimproved
parking areas used for large events.
Built unknown.
136
Lower County PWD Shop
Parking Lot
Public
Works
Unimproved off-street parking next to
building. Built unknown.
20 approx.
E UPS Store Courthouse Improved off-street parking. Built
unknown.
35
Kittitas County Roads Page 49
5. 6BKittitas County Roads
The Kittitas County’s Six-Year Transportation Improvement Plan provides further detail of the
facility improvements that were indicated in Table 1. The Six-Year Transportation Improvement
Plan is adopted once a year in the fall and amended as needed throughout the first year of the
program. Appendix B provides a detailed description of the proposed projects, mapping of the
projects, and the funding plan.
The latest version of the Six-Year Transportation Improvement Plan is available at the County
website at:
https://www.co.kittitas.wa.us/public-works/construction/default.aspx
Solid Waste Page 50
6. 7BRegional Parks and Trails
This section includes an inventory of Regional Parks and Trails facilities and a description of
additional facility improvements that are included in the six-year recreation plan. The inventory
of facilities in Table 6 below also describes existing facility’s size in order to determine if it
addresses the County’s long-term community needs according to level of service standards.
Table 6
Existing Public Facilities and Services
Regional Parks and Trails
Facility Provider Description Size
Coal Mines Trail Coal Mines Trail
Commission, Cle Elum,
Roslyn, and Kittitas
County
From Cle Elum to Ronald, Northern
Pacific Railway bed. Built unknown.
10.4 mi
Palouse to Cascades
State Park Trail/
Iron Horse State
Park
Washington State Parks
Department
From North Bend to Vantage,
Chicago-Milwaukee-St. Paul-Pacific
Railroad bed. Trail Built Over
Existing Railroad Bed 1981.
100 mi
Vantage Boat
Launch and
Restrooms
Kittitas County Vantage Boat Launch, built 1990. 342 sq ft
Vantage Boat
Launch Overflow
Parking
Kittitas County Vantage Boat Launch 0.52 acres
The Cove
Recreation Area
Grant County Public
Utility District (PUD)
and Washington State
Parks
West of Huntzinger Road near
Wanapum Dam. Public access is for
day use from Thursdays through
Mondays. Built unknown.
20 acres
Kittitas County
Outdoor Recreation
Inventory
Varies All other Parks and Trails are listed in
the comprehensive inventory of
recreation facilities adopted by
reference in the Comprehensive Plan.
Built unknown.
Varies
Evergreen Sno-Park Sno-Park operated by
Washington State Parks
1 mile east of Snoqualmie Summit. A
trail system comprised of 23 miles.
Built unknown.
4.9 acres
Thompson Park Kittitas County Naneum Road north of Vantage
Highway. Comprised of a pond and
parking area. Built unknown.
5.1 acres
Solid Waste Page 51
7. BSolid Waste
This section includes an inventory of Solid Waste facilities and a detailed description of each
facility improvement that is included in the six-year plan. The inventory of facilities in Table 7
below also describes each facility’s size in order to determine if it addresses the County’s long-
term community needs.
Table 7
Existing Public Facilities and Services
Kittitas County Solid Waste
Facility
Built
date Size Facility
Built
date Size
Ellensburg Scale House
(Storage), 801 Industrial
Way
1981 160 sq. ft. Transfer Station – Cle
Elum, 50 #5 Mine Rd., Cle
Elum
2003 9,000 sq. ft.
Cle Elum Scale House,
Hwy 903 Cle Elum
1981 160 sq. ft. MRW – Cle Elum, 50 #5
Mine Rd., Cle Elum
2003 2,000 sq. ft.
Cle Elum Bunker
Building, Hwy. 903 Cle
Elum
1981 3,000 sq. ft. MRW – Ellensburg, 50 #5
Mine Rd., Cle Elum
2001 3,000 sq. ft.
Cle Elum Storage, Hwy.
903 Cle Elum
1981 925 sq. ft. Office/Admin Bldg., 50 #5
Mine Rd., Cle Elum
2003 120 sq. ft.
Transfer Station
Building, 1001 Industrial
Way
2000 9,078 sq. ft. Cle Elum Scale House –
new, 50 #5 Mine Rd., Cle
Elum
2003 284 sq. ft.
Scale House Bldg., 1001
Industrial Way
2000 1,000 sq. ft. Ryegrass Equipment
Storage, 25900 Vantage
Hwy.
1980 1,620 sq. ft.
Transfer Station Office,
925 Industrial Way
1963 1,980 sq. ft. SW 400 sq. ft. building,
25900 Vantage Hwy.
2008 400 sq. ft.
Transfer Station Shop,
925 Industrial Way
1963 1,680 sq. ft.
Solid Waste Page 52
Solid Waste – Relocate Ellensburg Transfer Station and Compost
Facility
Project Information and Selection Criteria
Location
925 Industrial Way, Ellensburg – 50-acre site on Highway
97
Links to Other Projects or Facilities N/A
Description
Build a new Transfer Station and Compost Facility in the
Ellensburg vicinity.
*Decommission of existing facility date and timeline TBD*
Justification (Need/Demand)
The current transfer station has inadequate access and space.
It is also in an environmentally sensitive location.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: New Facility
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2022 2023-2027 Total
Design and Engineering $2,000,000 $2,000,000 $3,000,000
Construction $3,000,000 $17,000,000 $20,000,000
TOTAL $5,000,000 $19,000,000 $23,000,000
Funding Sources 2022 2023-2027 Total
Solid Waste Fund/Grant/Loan $5,000,000 $19,000,000 $23,000,000
TOTAL $5,000,000 $19,000,000 $23,000,000
Annual Operations and Maintenance
Estimated Costs
Currently, the County does not track maintenance costs for
these improvements.
Estimated Revenues None
Anticipated Savings Due to Project None
Department Responsible for Operations Solid Waste
Solid Waste Page 53
Solid Waste – Cle Elum Transfer Station Entrance
Project Information and Selection Criteria
Location Cle Elum Transfer Station 50 No. 5 Mine Rd.
Links to Other Projects or Facilities N/A
Description
Construct a new entrance to allow for better queuing for the
scales.
Justification (Need/Demand)
Eliminate a traffic hazard on Highway 903
Level of Service (LOS) / Project Type
Comprehensive Plan Citations
Capital Cost 2022 2023-2027 Total
Design and Engineering $50,000 $250,000 $300,000
Construction $1,350,000 $1,350,000
TOTAL $50,000 $1,600,000
$1,650,000
Funding Sources 2022 2023-2027 Total
Solid Waste Fees and Grants $50,000 $350,000 $1,600,000
TOTAL $50,000 $350,000 $1,600,000
Annual Operations and Maintenance
Estimated Costs
$5,000 per year to maintain
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for Operations Solid Waste
Library Services Page 54
8. 9BLibrary Services
This section includes an inventory of Library Services facilities and a detailed description of each
facility improvement that is included in the six-year plan. The inventory of facilities in Table 8
below also describes facility’s size in order to determine if it addresses the County’s long-term
community needs.
Table 8
Existing Public Facilities and Services
Library Services
Facility Provider Description Size
Gilmour
Memorial Library
(Kittitas)
Kittitas 2nd & Pierce Streets, Kittitas. Built unknown.
Carpenter
Memorial Library
(Cle Elum)
Cle Elum 302 Pennsylvania Ave., Cle Elum. Built
unknown.
Ellensburg Public
Library
Ellensburg 209 N. Ruby St, Ellensburg, founded in 1910,
recently expanded in 2003.
Roslyn Public
Library
Roslyn 201 S. First St., Roslyn, $3 million remodel
began in 2009 to repair and update. Built
unknown.
Kittitas County Education
Library Services – Ellensburg Public Library HVAC System
Project Information and Selection Criteria
Location 209 N Ruby St, Ellensburg WA 98926
Links to Other Projects or Facilities
Description
New HVAC system to replace current system.
Justification (Need/Demand)
Current HVAC is failing.
Level of Service (LOS) / Project Type Replacement
Comprehensive Plan Citations
Capital Cost 2023 2024-2028 Total
Design and Engineering $1,000,000 $1,000,000
Construction
TOTAL $1,000,000 $1,000,000
Funding Sources 2023 2024-2028 Total
Commissioner Approved Bond City of Ellensburg $1,000,000
TOTAL $1,000,000
Annual Operations and Maintenance
Estimated Costs
$1,000,000
Estimated Revenues
Anticipated Savings Due to Project $5000 annually.
Department Responsible for
Operations Ellensburg Public Library
Kittitas County Education
9. 10BEmergency Services
This section includes an inventory of Emergency Services facilities and a detailed description of each
facility improvement that is included in the six-year plan. The inventory of facilities in Table 9 below
also describes each facility’s size in order to determine if it addresses the County’s long-term
community needs.
Table 9
Existing Public Facilities and Services
Emergency Services
Facility Provider Description Size
Station #11 Thorp Fire District No. 1 Thorp – 10700 N. Thorp Hwy., all
District 43.5 sq. mi. and serves 2,500
residences, built in 2000, remodeled in
2005, 2 engines, 1 Tender, 2 brush
trucks, 1 aid unit, and 1 rescue. Built
unknown.
6,400 sq. ft.
Station #12 Clark
Flats
Fire District No. 1 Thorp - 10941 SR 10, 2 buildings at site,
1 tender, 1 brush truck, and 1 engine.
Built unknown.
2,300 sq. ft.
for both
bldgs.
Station #13 Elk
Heights
Fire District No. 1 Elk Heights – 152 Clubhouse Rd., Cle
Elum, 1 building at site, and 1 engine.
Built unknown.
1600 sq. ft
Station #21 Fire District 2 (Kittitas
Valley Fire and
Rescue)
280 sq. mi. for all Dist. 2, 2020 Vantage
Highway B-211, E-211, T-211, B-212,
M-211, M-212, M-213 - Living
Quarters – 2020’s, Bay – updated 2020,
maintenance and training.– 2020. Built
unknown.
Station #22 Fire District 2 2672 Tjossem E-221 – 2018 Station 22S
– 3301 Denmark Road –2015. Built
unknown.
Station #24 Fire District 2 4901 4th Parallel Road: B-241, E-241,
B-242, T-241 – 2004. Built unknown.
Station #23 Fire District 2 Main St, Kittitas – E-231, B-231, A-231
– 2010. Built unknown.
Station 23 S Fire District 2 890 Cleman Road, Kittitas – E-232, B-
232, T-231 – 2010. Built unknown.
Station #26
Fire District 2 6651 Brick Mill Road – E-261, B-261 –
1940’s – anticipate replacing in 2024.
Built unknown.
Kittitas County Education
Station #26
Satellite
Fire District 2 2380 Game Farm Road – E-262 – 1950’s
– anticipate decommission and sale
2022. Built unknown.
Station #27 Fire District 2 8800 Reecer Cr. Rd – E-271 – 1950’s.
Built unknown.
Station #28
Fire District 2 5640 Cove Road – B-281, E-281, T-281
– 2002. Built unknown.
Table 9 - Continued
Existing Public Facilities and Services
Emergency Services
Facility Provider Description Size
Station #28
Satellite
Fire District 2 51 Barnes Road – E-282 – 1960’s.
Built unknown.
Station #29 Fire District 2 400 E. Mountainview Ave – M-291, M-
292, M-293, R-291, B-291, E-291, L-
291, E-292 – 2018. Built unknown.
Easton Station Fire District No. 3
(Easton)
180 Cabin Creek Easton WA. 98925, PO
Box 52, 12 sq. mi. for all Dist. 33182 sq.
ft., built in 1992, 1- aid car, 1-engine, 2-
tankers, 1-rescue truck.
3,182 sq. ft.
Vantage Station Fire District No. 4
(Vantage)
Information Not Available. Built
unknown.
Snoq. Pass Station
#46
King & Kittitas FD 51
Snoqualmie Pass Fire
& Rescue
1211 SR 906 E. of I 90 Exit 53, houses
E146, E246, A146, A246, Battalion 146,
Brush146, Brush 246, Polaris ranger with
trailer, built in 2011. Basic Life Support
Ambulance Service
16,551 sq.
ft.
Station #61 KCFP District No. 6
(Ronald/Lk. Cle Elum)
Serves south end of district / 7 sq. mi. for
all Dist. 6. Built unknown.
Station #62 KCFP District No. 6
(Ronald/Lk. Cle Elum)
14030 Salmon La Sac Road, Ronald, WA
98940. Serves north end of district / 7 sq.
mi. for all Dist. 6, 1 engine, 1 brush truck,
1 tender, and 1 aid unit. Built unknown.
South Cle Elum
Fire Station
South Cle Elum 523 Lincoln Ave., South Cle Elum, 1
pumper, 1 utility truck, and serves 0.5
mile area with 580 people. Can handle
twice the size area. Built unknown.
1,200 sq. ft.
Station #1 Peoh
Point Rd.
Fire District No. 7
(Upper County Area)
80 sq. mi. for all Dist. 7,1 fire engine, 1
wild land brush truck, 1 water tender, 1
aid unit, and ambulance. Built unknown.
Kittitas County Education
Station #2 SR 970
and Airport Rd.
Fire District No. 7 Information Not Available. Built
unknown.
Station #3 off I-90
at Golf Course
Exit 77
Fire District No. 7 Information Not Available. Built
unknown.
Station #4 Ballard
Hill Rd.
Fire District No. 7 Information Not Available. Built
unknown.
Station #5
Teanaway Valley,
Middle Fork Rd.
Fire District No. 7
Information Not Available. Built
unknown.
Table 9 - Continued
Existing Public Facilities and Services
Emergency Services
Facility Provider Description Size
Station #48 King & Kittitas FD 51
Snoqualmie Pass Fire
& Rescue
Located in Kachess Village, 1 engine
148, 1 aid car, and 1 brush truck, Basic
Life Support Ambulance Service. Built
unknown.
Small 3 bay
garage No
bathrooms
Leased
Station #49 King & Kittitas FD 51
Snoqualmie Pass Fire
& Rescue
Located at intersection of Kachess Lake
and Via Kachess Roads, 1 brush truck,
rescue snowmobiles & trailer. Built
unknown.
Small 2 bay
garage. No
bathrooms
Leased
Station #47 King & Kittitas FD 51
Snoqualmie Pass Fire
& Rescue
Located at intersection of Stampede Pass
and Lost Lake Roads, 1 pumper/Tender
engine, 1 brush truck, snowmobiles with
trailer. Built unknown.
Small 2 bay
garage, no
bathrooms
Kittitas Valley
Community
Hospital
Hospital District No. 1 Located at 603 S. Chestnut. Level IV
trauma service & 24-hr emergency care,
S. Chestnut St. & E. Manitoba,
Ellensburg. Built 1965.
89,232
Cle Elum
Medical Center
Hospital District No. 2 Located at 201 Alpha Way, Cle Elum.
Family Medicine of Cle Elum. No urgent
care services provided. Built unknown.
13,500
Cle Elum Urgent
Care
Hospital District No. 1 Located at 214 W. 1st St., Cle Elum. Built
unknown.
2,864
New Cle Elum
Ambulance
Garage
Hospital District No. 2 Exact address undetermined. Adjacent to
201 Alpha Way, Cle Elum. Approximate
completion date 2021.
8,500
Medical Arts
Building
Hospital District No. 1 Located at 100 E. Jackson St., Ellensburg.
No urgent care services provided at this
building. KVH clinics include Pediatrics,
Women’s Health, Lab, and Family
33,671
Kittitas County Education
Medicine of Ellensburg. Some space also
currently leased to other non-KVH
clinical services. TI completed February
2020. Built 2009.
KVH Physical
Therapy
Hospital District No. 1 Located at 301 Mountainview,
Ellensburg. Entire building dedicated to
physical therapy services. No urgent care
services provided. Leased property. Built
unknown.
6,912
KVH
Occupational
Therapy and
Speech
Hospital District No. 1 Located at 309 Mountain, Ellensburg.
Also houses KVH IT Services. No urgent
services provided. Leased property. Built
unknown.
6,631
Table 9 - Continued
Existing Public Facilities and Services
Emergency Services
Facility Provider Description Size
Ellensburg Clinic Hospital District No. 1 Located at 700 Manitoba, Ellensburg.
Houses Internal Medicine, KVH Quality
Department, and soon to house
Neurology Clinic. No urgent care services
provided. Built unknown.
9,434
Valley Clinic Hospital District No. 1 Located at 716 Manitoba, Ellensburg.
Formally Family Medicine of Ellensburg.
This facility is now a pop-up clinic for
COVID-19, and Lab annex. No urgent
care services provided. Leased property.
Built unknown.
7,230
Empty Building Hospital District No. 1 Located at 708 Manitoba, Ellensburg.
This building is currently vacant but will
most likely only be used for office space.
Built unknown.
1,000
Mediplex Hospital District No. 1 Located at 611 S. Chestnut, Ellensburg.
This has suites A-E and are all clinical
use. No urgent care services provided by
KVH or tenants. Built unknown.
10,291
Work Place
Health
Hospital District No. 1 Located at 702-B Mountainview,
Ellensburg. No urgent care services
provided. Leased suite. Built unknown.
1,710
Radio Hill Annex Hospital District No. 1 Located at 1506 Radio Road, Ellensburg.
Currently half office space and half
storage. Office space for accounting,
Home Care, and Hospice. Will most
likely never be clinical space. No urgent
care services provided. Built unknown.
21,082
Kittitas County Education
Hospice Friends Friends of Hospice Located at 302 E. 2nd Ave, Ellensburg.
Non-KVH office space for Friends of
Hospice. KVH owned. Built unknown.
2,325
Kittitas County Education
Emergency Services – Station 2-5
Project Information and Selection Criteria
Location TBD – somewhere in the west interchange area.
Links to Other Projects or Facilities
Description
Build a new three bay fire station to house an engine, medic
unit, and a brush truck.
Justification (Need/Demand)
Growth in housing developments in the City of Ellensburg
and Kittitas County, commercial development of Dolarway
Rd.
Level of Service (LOS) / Project Type
Comprehensive Plan Citations
Capital Cost 2023 2024-2028 Total
Design and Engineering - property $500,000 $500,000
Construction $3,500,000 $3,500,000
TOTAL $4,000,000 $4,000,000
Funding Sources 2023 2024-2028 Total
Commissioner approved bond $4,000,000 $4,000,000
TOTAL $4,000,000 $4,000,000
Annual Operations and Maintenance
Estimated Costs $50,000
Estimated Revenues None
Anticipated Savings Due to Project None
Department Responsible for Operations Kittitas County Fire District 2
Kittitas County Education
Emergency Services – Upper County Emergency Operations Center
& Search and Rescue Base
Project Information and Selection Criteria
Location Cle Elum Airport Access Rd
Links to Other Projects or Facilities
Description
Establishing a primary Emergency Operations Center
(EOC) in the growing upper county and relocating Search
and Rescue operations from current leased facility in Cle
Elum.
Justification (Need/Demand)
Increasing scope and complexity of Emergency
Management dictate an EOC capable of supporting a Type
III Incident Management Team. Increasing Search and
Rescue (SAR) call volume and complexity for upper
county calls make this an excellent location for a
permanent, dedicated SAR base of operations. Back 9-1-1
call center. Housing for a remediated County servers
backup system. The facility will be able to host training
which may bring in revenue.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: New Capital Facilities
Comprehensive Plan Citations
Capital Cost 2025 2026-2031 Total
Design and Engineering
Construction $3,000,000
$3,000,000
$6,000,000
TOTAL $3,000,000
$3,000,000
$6,000,000
Funding Sources 2025 2026-2031 Total
General Fund
$1,549,000 (REET
funding)
$3,250,000
$4,800,000
Federal Funds Anticipated $1,200,000 $1,200,000
Kittitas County Education
TOTAL $2,749,000
$6,000,000
Annual Operations and Maintenance
Estimated Costs $25,000 per year
Estimated Revenues $1,000 to $5,000 per year
Anticipated Savings Due to Project $3,000 to $5,000 a year saving in training and travel
Department Responsible for Operations
Sheriff’s Office with Kittitas County Search and Rescue
(KCSAR)
Kittitas County Education
Sheriff’s Office Evidence Room & Expansion
Project Information and Selection Criteria
Location 307 W Umptanum Rd. Kittitas County Sheriff’ Office
Links to Other Projects or Facilities
Description
Enhancements to current evidence processing & storage
facilities, and improvements to overflow evidence &
property storage bay
Justification (Need/Demand)
Evidence storage and processing facilities are dated and
make it difficult to meet current accreditation requirements;
expansion of overflow is also needed to accommodate
vehicle and large property storage and processing.
Level of Service (LOS) / Project Type
Established LOS:
Project Type: Renovation
Comprehensive Plan Citations
Capital Cost 2026 2027-2031 Total
Design and Engineering
Construction $150,000
TOTAL $150,000
$150,000
Funding Sources 2026 2027-2031 Total
General Fund $150,000
Federal Funds Anticipated
TOTAL $150,000
$150,000
Kittitas County Education
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for Operations Sheriff’s Office with Kittitas County
Sheriff’s Office Training room
Project Information and Selection Criteria
Location 307 W Umptanum Rd. Kittitas County Sheriff’ Office
Links to Other Projects or Facilities
Description Training room at the Sheriff’s Office
Justification (Need/Demand)
The Sheriff’s Office does not have a dedicated area for
training. Currently the training takes place in non-climate
controlled storage units. This project would convert the old
“marine bay” into a professional training room, with
climate controlled. The project would frame in the roll up
door and add mini splits for HVAC, carpet and add A/V
equipment. This will increase the possibility of host
training.
Level of Service (LOS) / Project Type
Established LOS: Increase level of service to bring in
outside training.
Project Type: New Capital Facilities
Comprehensive Plan Citations
Capital Cost 2026 2027-2031 Total
Design and Engineering $8,000
Kittitas County Education
Construction $288,000
TOTAL $288,000
$288,000
Funding Sources 2026 2027-2031 Total
General Fund $288,000
Federal Funds Anticipated
TOTAL $288,000
$288,000
Annual Operations and Maintenance
Estimated Costs $2,000 per year
Estimated Revenues $2,000
Anticipated Savings Due to Project $5,000 to $8,000 saving in the form of training and travel
Department Responsible for Operations Sheriff’s Office with Kittitas County
Kittitas County Education
Emergency Services – Kittitas Valley Healthcare Hospital Expansion
Project Information and Selection Criteria
Location 603 S Chestnut St.
Links to Other Projects or Facilities
Description
Hospital expansion to surgery, materials management, and
radiology. Purpose of expansion is to make the hospital
more energy efficient. In addition to above improvements,
expansion also includes lighting, fanwalls, boiler plant and
MRI fluid cooler.
Justification (Need/Demand) Growth in patient counts. Increase energy efficiency.
Level of Service (LOS) / Project Type
Addition and Tenant Improvement (TI) of the above
departments
Comprehensive Plan Citations
Capital Cost 2023 2024-2028 Total
Design and Engineering $739,500 $246,500 $986,000
Construction $2,520,000 $10,080,000 $12,600,000
TOTAL $3,259,500 $10,326,500 $13,586,000
Funding Sources 2023 2024-2028 Total
$500,000 (Dept.
of Commerce
Energy
Efficiency
Grant)
$500,000
TOTAL $500,000
Annual Operations and Maintenance
Estimated Costs
Kittitas County Education
We do not track
Estimated Revenues Unknown
Anticipated Savings Due to Project None
Department Responsible for Operations Facilities, Surgery, Materials Management, and Radiology
Kittitas County Education
Emergency Services – Kittitas Valley Healthcare Orthopedic Clinic
Project Information and Selection Criteria
Location Orthopedic Clinic, 611 S. Chestnut St. Ste. D & E
Links to Other Projects or Facilities
Description Complete remodel of interior.
Justification (Need/Demand) Outdated facility in need of remodel.
Level of Service (LOS) / Project Type Remodel
Comprehensive Plan Citations
Capital Cost 2024-2028 2026-2031 Total
Design and Engineering $284,000 $284,000
Construction $2,200,000 $2,200,000
TOTAL $2,484,000 $2,484,000
Funding Sources 2024-2028 2026-2031 Total
TOTAL N/A N/A
Annual Operations and Maintenance
Estimated Costs
We do not track
Estimated Revenues Unknown
Anticipated Savings Due to Project None
Department Responsible for Operations Orthopedics and Wound Care.
Kittitas County Education
Emergency Services – Kittitas Valley Healthcare General Surgery
Clinic
Project Information and Selection Criteria
Location General Surgery Clinic, 611 S. Chestnut St. Ste. A
Links to Other Projects or Facilities
Description Tenant Improvement Project. Interior update.
Justification (Need/Demand) Surgery clinic requires an update to their interior facilities.
Level of Service (LOS) / Project Type Upgrade to existing facility.
Comprehensive Plan Citations
Capital Cost 2024-2028 2026-2031 Total
Design and Engineering $143,000 $143,000
Construction $640,000 $640,000
TOTAL $783,000 $783,000
Funding Sources 2024-2028 2026-2031 Total
TOTAL N/A N/A
Annual Operations and Maintenance
Estimated Costs
We do not track
Estimated Revenues Unknown
Anticipated Savings Due to Project None
Department Responsible for Operations General Surgery and Vascular
Kittitas County Education
Emergency Services – Kittitas Valley Healthcare Parking Lot
Project Information and Selection Criteria
Location
Vacant Lot NW of KVH Medical Arts Center, 611 S. Pearl
St.
Links to Other Projects or Facilities
Description
This project has been deferred indefinitely. Building a
parking lot on vacant land owned by KVH.
Justification (Need/Demand)
Need to expand parking resources for medical arts center.
(This was identified by KVH officials as a “potential
project”)
Level of Service (LOS) / Project Type New facility.
Comprehensive Plan Citations
Capital Cost 2024-2028 2026-2031 Total
Design and Engineering
Construction
TOTAL TBD
Funding Sources 2024-2028 2026-2031 Total
TOTAL TBD
Annual Operations and Maintenance
Estimated Costs
We do not track
Estimated Revenues Unknown
Anticipated Savings Due to Project
Kittitas County Education
Department Responsible for Operations
Kittitas County Education
Emergency Services – Kittitas Valley Healthcare Cle Elum Family
Medical Clinic
Project Information and Selection Criteria
Location
KVH Family Medicine – Cle Elum
201 Alpha Way, Cle Elum
Links to Other Projects or Facilities
Description “Possible” addition to Cle Elum Family Medical Clinic.
Justification (Need/Demand)
Department potentially will have the need to expand
clinic’s patient service capacity.
Level of Service (LOS) / Project Type Addition to existing facility.
Comprehensive Plan Citations
Capital Cost 2024-2028 2026-2031 Total
Design and Engineering
Construction
TOTAL TBD
Funding Sources 2024-2028 2026-2031 Total
TOTAL TBD
Annual Operations and Maintenance
Estimated Costs
We do not track
Estimated Revenues Unknown
Anticipated Savings Due to Project
Department Responsible for Operations
Kittitas County Education
Kittitas County Education
Emergency Services – Kittitas Valley Healthcare Internal Medicine
Project Information and Selection Criteria
Location KVH Internal Medicine, 700 E. Manitoba Ave.
Links to Other Projects or Facilities
Description
Remodel of KVH Internal Medicine Clinic, a 9000 sq. ft.
facility.
Justification (Need/Demand)
Internal Medicine Clinic is in need of a remodel to
adequately serve patients.
Level of Service (LOS) / Project Type Remodel of existing facility.
Comprehensive Plan Citations
Capital Cost 2024-2028 2026-2031 Total
Design and Engineering
Construction
TOTAL TBD
Funding Sources 2024-2028 2026-2031 Total
$250,000
(Sunderland
Grant) $250,000
TOTAL $250,000 $250,000
Annual Operations and Maintenance
Estimated Costs
We do not track
Estimated Revenues Unknown
Anticipated Savings Due to Project
Department Responsible for Operations
Kittitas County Education
Kittitas County Education
Emergency Services – Kittitas Valley Healthcare Cle Elum Physical
Therapy
Project Information and Selection Criteria
Location
KVH Family Medicine – Cle Elum
Lease at Midtown Business Building
Links to Other Projects or Facilities
Description
KVH is leasing the second story of one of the Midtown
Business Buildings.
Justification (Need/Demand)
Provide adequate physical therapy space for the Cle Elum
community and open up space in the Family Medical
Center for providers.
Level of Service (LOS) / Project Type New construction by Midtown owners.
Comprehensive Plan Citations
Capital Cost 2024-2028 2026-2031 Total
Design and Engineering
Construction
TOTAL TBD
Funding Sources 2024-2028 2026-2031 Total
TOTAL TBD
Annual Operations and Maintenance
Estimated Costs
We do not track
Estimated Revenues Unknown
Anticipated Savings Due to Project
Kittitas County Education
Department Responsible for Operations
Kittitas County Education
Emergency Services – Kittitas Valley Healthcare Home Health
Project Information and Selection Criteria
Location KVH Home Health, 1506 Radio Rd.
Links to Other Projects or Facilities
Description Remodel of 5000 sq. ft. of a 10000 sq. ft. facility.
Justification (Need/Demand) Half of the building is in need of a remodel.
Level of Service (LOS) / Project Type Remodel
Comprehensive Plan Citations
Capital Cost 2024-2028 2026-2031 Total
Design and Engineering
Construction
TOTAL TBD
Funding Sources 2024-2028 2026-2031 Total
TOTAL TBD
Annual Operations and Maintenance
Estimated Costs
We do not track
Estimated Revenues Unknown
Anticipated Savings Due to Project
Department Responsible for Operations
Kittitas County Education
Emergency Services – Kittitas Valley Healthcare Family Medicine
Project Information and Selection Criteria
Location KVH Family Medicine, 716 E. Manitoba Ave.
Links to Other Projects or Facilities
Description
Complete remodel of two buildings, one is 7000 sq. ft. and
the other is 3000 sq. ft.
Justification (Need/Demand) Both buildings are in need of a remodel.
Level of Service (LOS) / Project Type Remodel.
Comprehensive Plan Citations
Capital Cost 2024-2028 2026-2031 Total
Design and Engineering
Construction
TOTAL TBD
Funding Sources 2024-2028 2026-2031 Total
TOTAL TBD
Annual Operations and Maintenance
Estimated Costs
We do not track
Estimated Revenues Unknown
Anticipated Savings Due to Project
Department Responsible for Operations
Kittitas County Education
10. Education
This section includes an inventory of education facilities and a detailed description of each facility
improvement that is included in the six-year plan. The inventory of facilities in Table 10 below also
describes each facility’s size in order to determine if it addresses the County’s long-term community
needs.
Table 10
Existing Public Facilities and Services
Education
Facility Provider Description Size
Central
Washington
University
Washington State Comprehensive public university main
campus, 1500 employees, 94 buildings
Oldest buildings built 1894.
11,110
students
statewide
(fall 2020)
Cle Elum / Roslyn
High School
Cle Elum/ Roslyn
School District
2692 - SR 903, Cle Elum, 9th grade to
12th grade. Built unknown.
254
students
Cle Elum / Roslyn
Elementary School
Cle Elum/ Roslyn
School District
2696 - SR 903, Cle Elum, pre-school,
Kindergarten to 5th grade. Built
unknown.
458
students
Cle Elum / Roslyn
Alternative School
Cle Elum/ Roslyn
School District
200 W. Oakes St., Cle Elum, 3rd grade to
12th grade. Built unknown.
21
students
Walter Strom
Middle School
Cle Elum/ Roslyn
School District
2694 - SR 903, Cle Elum, 6th grade to 8th
grade. Built unknown.
237
students
Cle Elum/ Roslyn
School District
Music Building
Cle Elum/ Roslyn
School District
Music Building for Walter Strom
Middle School and Cle Elum-Roslyn
Middle School. Built unknown.
Cle Elum/ Roslyn
School District
Transportation
Facility
Cle Elum/ Roslyn
School District
School bus covered parking,
maintenance facility, and transportation
staff office building. Built unknown.
Damman
Elementary School
Damman School District Kindergarten to 5th grade, 1 school, 2.5
teachers, 2681 Umptanum Rd. Built
1890.
45
students
Easton Elementary,
Jr., Sr. High School
Easton School District 1893 Railroad St., Easton. Built
unknown.
93
students
Lincoln
Elementary School
Ellensburg School
District
26 classroom teachers, 200 S. Sampson
St., Ellensburg Built 1948. Major
remodel completed 2022.
340
students
Kittitas County Education
Mount Stuart
Elementary School
Ellensburg School
District
27 classroom teachers, 705 W. 15th Ave.,
Ellensburg. Built 2021.
362
students
Valley View
Elementary School
Ellensburg School
District
26 classroom teachers, 1508 E. 3rd Ave.,
Ellensburg. Built 1990’s.
401
students
Ida Nason Aronica
Elementary School
Ellensburg School
District
22 classroom teachers, 2100 N. Cora St.,
Ellensburg. Built 2022.
278
students
Table 10 - Continued
Existing Public Facilities and Services
Education
Facility Provider Description Size
Morgan Middle
School
Ellensburg School
District
40 classroom teachers, 400 E. 1st Ave.,
Ellensburg. Built 1929, major
remodel/addition completed 2018.
784
students
Ellensburg High
School
Ellensburg School
District
40 classroom teachers of a total 67
professional staff, 1203 E. Capitol Ave.,
Ellensburg. Built 2005.
942
students
Kittitas Elementary
School
Kittitas School District Kindergarten to 5th grade, 7571 Kittitas
Hwy, Kittitas. Built unknown.
270
students
Kittitas High
School
Kittitas School District 6th grade to 12th grade, 7571 Kittitas
Hwy, Kittitas. Built 2006.
334
students
Parke Creek
Treatment Center
Kittitas School District 11042 Parke Creek Rd. Built unknown. 9
students
Thorp Elementary,
Jr., and Sr. High
Schools
Thorp School District Kindergarten to 12th grade, 10831 N.
Thorp Hwy, Thorp. Built 1958.
261
students
Kittitas County Education
Black Hall Renovation/Multicultural Center –
CWU, Ellensburg, WA
Project Information and Selection Criteria
Location
Parcel # 334034, 400 E University Way, CWU
campus, Ellensburg, WA 98926
Links to Other Projects or Facilities Black Hall, 911 N. Chestnut Street
Description
The project establishes a student focused academic
facility dedicated to the celebration of Equity &
Diversity.
Justification (Need/Demand)
The Black Hall Renovation will include upgrades for
the College of Education & Professional Studies and
the Multicultural Center, which is intended to be a
central hub for students, staff, and faculty to build
community and celebrate diversity and create a sense
of belonging for traditionally underrepresented
students, staff, and faculty.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Existing Building Renovation
Comprehensive Plan Citations N/A
Capital Cost
2025
2026-2031
Pending
Approval
Total
Design and Engineering $1,500,000 $1,500,000
Construction $4,500,000 $4,500,000
TOTAL $6,000,000 $6,000,000
Funding Sources
2025
2026-2031
Pending
Approval
Total
State OFM Capital $6,000,000 $6,000,000
Kittitas County Education
TOTAL $6,000,000 $6,000,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations Associated Students of Central Washington University
Education – North Academic Complex- CWU, Ellensburg, WA
Project Information and Selection Criteria
Location
Parcel # 143534, E Dean Nicholson Blvd, CWU
campus, Ellensburg, WA 98926
Links to Other Projects or Facilities Brooks Library – West adjacent
Description
The North Academic Complex is a replacement project
for the existing Farrell Hall, L&L Building (Adjacent)
Justification (Need/Demand)
The North Academic Complex project provides a new
and modern facility that will house several social
science related programs such as Humanities, Law &
Justice. The new project will result in the demolition
of Farrell Hall & L&L that suffer from a large backlog
of deferred maintenance, inadequate and inefficient
mechanical and electrical systems, current ADA,
building code and energy efficiency. The new complex
will provide state of the art design and pedagogy that
will be experienced by a majority of collegiate
freshmen, boosting the opportunity for retention and
academic growth. The project will also be the first
building utilizing geothermal technology for the
heating and cooling and connect to our infrastructure to
3 other buildings.
Kittitas County Education
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Facility Replacement
Comprehensive Plan Citations N/A
Capital Cost
2025
2026-2031
Pending
Approval
Total
Design and Engineering $5,205,000 $0 $5,205,000
Construction 92,600,000 $11,158,000 $103,758,000
TOTAL $97,805,000 $11,158,000 $108,963,000
Energy Efficiency – Science Building Carbon Reduction- CWU,
Ellensburg, WA
Project Information and Selection Criteria
Location
Parcel # 143534, E Dean Nicholson Blvd, CWU
campus, Ellensburg, WA 98926
Links to Other Projects or Facilities Northeast of Health Science
Description
As part of Washington legislation associated with the
CCA (Climate Commitment Act), this project
implements the energy efficiency improvement of the
Science 1 mechanical buildings.
Justification (Need/Demand)
The state of Washington issued 2023 legislation that
agencies must establish a pathway to decarbonize their
district heating systems through House Bill 1390.
Science Building Carbon Reduction establishes
mechanical system improvements that reduce the
carbon footprint of the building.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Infrastructure
Comprehensive Plan Citations N/A
Kittitas County Education
Capital Cost
2025
2026-2031
Pending
Approval
Total
Design and Engineering $0 $0 $0
Construction $4,509,000 $0 $4,509,000
TOTAL $4,509,000 $0 $4,509,000
Infrastructure – Secondary Geothermal Module- CWU,
Ellensburg, WA
Project Information and Selection Criteria
Location
Parcel # 143534, E Dean Nicholson Blvd, CWU
campus, Ellensburg, WA 98926
Links to Other Projects or Facilities Northeast of Samuelson Hall
Description
The Secondary Geothermal Module adds redundancy
and future expansion capability for our geothermal
infrastructure.
Funding Sources 2025 2026-2031 Total
Pending
Approval
State OFM Capital $0 $0 $0
Climate Commitment Act $4,509,000 $0 $4,509,000
TOTAL $4,509,000 $0 $4,509,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations Facility Maintenance Department
Kittitas County Education
Justification (Need/Demand)
The state of Washington issued 2023 legislation that
agencies must establish a pathway to decarbonize their
district heating systems through House Bill 1390. The
secondary geothermal (GeoEco) building will connect
to extraction wells and injection wells that intend to
connect 5 buildings to the expanding low temperature
hot water loop. The wells will be approximately 600’
apart.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Infrastructure
Comprehensive Plan Citations N/A
Capital Cost
2025
2026-2031
Pending
Approval
Total
Design and Engineering $1,266,723 $0 $1,266,723
Construction $11,197,277 $4,000,000 $15,197,277
TOTAL $12,464,000 $4,000,000 $16,464,000
Funding Sources
2025
2026-2031
Pending
Approval
Total
State OFM Capital $0 $0 $0
Climate Commitment Act $12,464,000 $4,000,000 $16,464,000
TOTAL $12,464,000 $4,000,000 $16,464,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations Facility Maintenance Department
Education Page 51
Education – Ellensburg School District
Ellensburg High School Resurface/Repair Sidewalks
Project Information and Selection Criteria
Location Ellensburg High School, 1203 East Capitol Avenue
Links to Other Projects or Facilities
Description Ellensburg High School Sidewalk Repair
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Safety $10,000 $10,000
TOTAL $10,000 $10,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $10,000 $10,000
TOTAL $10,000 $10,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Ellensburg High School Sealcoat Parking Lots and Driveways,
Includes Paint
Project Information and Selection Criteria
Location Ellensburg High School, 1203 East Capitol Avenue
Links to Other Projects or Facilities
Description Ellensburg High School Sealcoat Parking Lots and
Driveway
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Sealcoat $124,223 $124,223
TOTAL $124,223 $124,223
Funding Sources FY 2024-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $124,223 $124,223
TOTAL $124,223 $124,223
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Early Learning Center Install Additional Bus Lane Along Main
Parking Lot to Extend SW of the Current Bus Lane
Project Information and Selection Criteria
Location Early Learning Center, 705 West 15th Avenue
Links to Other Projects or Facilities
Description Early Learning Center Extension of Bus Lane
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Extend Bus Lane $50,000 $50,000
TOTAL $50,000 $50,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
Capital Fund $50,000 $50,000
TOTAL $50,000 $50,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Education – Ellensburg School District
Kittitas County Education
Early Learning Center Install Additional Security Cameras
Project Information and Selection Criteria
Location Early Learning Center, 705 West 15th Avenue
Links to Other Projects or Facilities
Description Early Learning Center Install Additional Security
Cameras
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Security $10,000 $10,000
TOTAL $10,000 $10,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $10,000 $10,000
TOTAL $10,000 $10,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Education – Ellensburg School District
Kittitas County Education
Ida Nason Aronica Elementary Extend Playground Fence and
Irrigation
Project Information and Selection Criteria
Location Ida Nason Aronica Elementary, 2101 North Cora Street
Links to Other Projects or Facilities
Description Ida Nason Aronica Elementary Extend Playground
Fence and Irrigation
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Extend Playground $50,000 $50,000
TOTAL $50,000 $50,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
Capital Fund $50,000 $50,000
TOTAL $50,000 $50,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Ida Nason Aronica Elementary Install Card Readers
Project Information and Selection Criteria
Location Ida Nason Aronica Elementary, 2101 North Cora Street
Links to Other Projects or Facilities
Description Ida Nason Aronica Elementary Card Readers
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 202-2030 Total
Security $12,000 $12,000
TOTAL $12,000 $12,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $12,000 $12,000
TOTAL $12,000 $12,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Ida Nason Aronica Elementary Install Top Soil for Playground
Project Information and Selection Criteria
Location Ida Nason Aronica Elementary, 2101 North Cora Street
Links to Other Projects or Facilities
Description Ida Nason Aronica Elementary Top Soil Installation
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Top Soil $30,000 $30,000
TOTAL $30,000 $30,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
Capital Fund $30,000 $30,000
TOTAL $30,000 $30,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
IT Mitigation Plan
Project Information and Selection Criteria
Location Ellensburg School District Information Technology,
1300 East Third Avenue
Links to Other Projects or Facilities
Description IT Mitigation
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Purchase $1,214,500 $3,827,171 $5,041,671
TOTAL $1,214,500 $3,827,171 $5,041,671
Funding Sources FY 2024-2025 FYs 2026-2030 Total
Tech Levy $1,214,500 $3,827,171 $5,041,671
TOTAL $1,214,500 $3,827,171 $5,041,671
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Lincoln Elementary Install Additional Playground Equipment
Project Information and Selection Criteria
Location Lincoln Elementary, 200 South Sampson Street
Links to Other Projects or Facilities
Description Lincoln Elementary Additional Playground Equipment
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Playground Equipment $50,000 $50,000
TOTAL $50,000 $50,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
Capital Fund $50,000 $50,000
TOTAL $50,000 $50,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Lincoln Elementary Install Card Readers
Project Information and Selection Criteria
Location Lincoln Elementary, 200 South Sampson Street
Links to Other Projects or Facilities
Description Lincoln Elementary Install Card Readers
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Install Card Readers $10,000 $10,000
TOTAL $10,000 $10,000
Funding Sources FY 2043-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $10,000 $10,000
TOTAL $10,000 $10,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Morgan Middle School Upgrade HVAC Control System
Project Information and Selection Criteria
Location Morgan Middle School, 400 East First Avenue
Links to Other Projects or Facilities
Description Morgan Middle School HVAC Controls
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
HVAC Control System $150,000 $150,000
TOTAL $150,000 $150,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
Capital Fund $150,000 $150,000
TOTAL $150,000 $150,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Morgan Middle School Install Additional Outdoor Lighting
Project Information and Selection Criteria
Location Morgan Middle School, 400 East First Avenue
Links to Other Projects or Facilities
Description Morgan Middle School Outdoor Lighting
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Security $10,000 $10,000
TOTAL $10,000 $10,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $10,000 $10,000
TOTAL $10,000 $10,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Morgan Middle School Install Card Readers
Project Information and Selection Criteria
Location Morgan Middle School, 400 East First Avenue
Links to Other Projects or Facilities
Description Morgan Middle School Card Readers
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Security $12,000 $12,000
TOTAL $12,000 $12,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $12,000 $12,000
TOTAL $12,000 $12,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Morgan Middle School Install Mechanical Choir Shells in MPAC
Project Information and Selection Criteria
Location Morgan Middle School, 400 East First Avenue
Links to Other Projects or Facilities
Description Morgan Middle School Mechanical Choir Shells
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Choir Shells $20,000 $20,000
TOTAL $20,000 $20,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $20,000 $20,000
TOTAL $20,000 $20,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Morgan Middle School Mount Video Equipment in MPAC
Project Information and Selection Criteria
Location Morgan Middle School, 400 East First Avenue
Links to Other Projects or Facilities
Description Morgan Middle School Mount Stage Video Equipment
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Mount Video Equipment $10,000 $10,000
TOTAL $10,000 $10,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $10,000 $10,000
TOTAL $10,000 $10,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Morgan Middle School Replace Cores and Keys
Project Information and Selection Criteria
Location Morgan Middle School, 400 East First Avenue
Links to Other Projects or Facilities
Description Morgan Middle School Keys and Cores
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Security $30,000 $30,000
TOTAL $30,000 $30,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $30,000 $30,000
TOTAL $30,000 $30,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Morgan Middle School Replace MPAC Sound System
Project Information and Selection Criteria
Location Morgan Middle School, 400 East First Avenue
Links to Other Projects or Facilities
Description Morgan Middle School Replace MPAC Sound System
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Sound System $35,000 $35,000
TOTAL $35,000 $35,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $35,000 $35,000
TOTAL $35,000 $35,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Morgan Middle School Retro-Commission HVAC, Lighting, and
Building Envelope to Meet HB1257
Project Information and Selection Criteria
Location Morgan Middle School, 400 East First Avenue
Links to Other Projects or Facilities
Description Morgan Middle School Retro-Commission HVAC,
Lighting, and Building Envelop to Meet HB1257
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
HVAC, etc. $10,000 $10,000
TOTAL $10,000 $10,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $10,000 $10,000
TOTAL $10,000 $10,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Morgan Middle School Sealcoat Satellite Parking Lot
Project Information and Selection Criteria
Location Morgan Middle School, 400 East First Avenue
Links to Other Projects or Facilities
Description Morgan Middle School Sealcoat Parking Lot
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Sealcoat Parking Lot $10,000 $10,000
TOTAL $10,000 $10,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $10,000 $10,000
TOTAL $10,000 $10,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Morgan Middle School Upgrade MPAC Stage Lighting
Project Information and Selection Criteria
Location Morgan Middle School, 400 East First Avenue
Links to Other Projects or Facilities
Description Morgan Middle School Stage Lighting
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Stage Lighting $50,000 $50,000
TOTAL $50,000 $50,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $50,000 $50,000
TOTAL $50,000 $50,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Mt. Stuart Elementary Add Top Soil for Playground
Project Information and Selection Criteria
Location Mt. Stuart Elementary, 1701 North Cora Street
Links to Other Projects or Facilities
Description Mt. Stuart Elementary Top Soil for Playground
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Top Soil $30,000 $30,000
TOTAL $30,000 $30,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
Capital Fund $30,000 $30,000
TOTAL $30,000 $30,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Mt. Stuart Elementary Dredge Collection Pond
Project Information and Selection Criteria
Location Mt. Stuart Elementary, 1701 North Cora Street
Links to Other Projects or Facilities
Description Mt. Stuart Elementary Dredge Collection Pond
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Dredge Pond $35,000 $35,000
TOTAL $35,000 $35,000
Funding Sources FY 2024-2025 FYs 2025-2030 Total
Capital Fund $35,000 $35,000
TOTAL $35,000 $35,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Mt. Stuart Elementary Install Additional Playground Cameras
Project Information and Selection Criteria
Location Mt. Stuart Elementary, 1701 North Cora Street
Links to Other Projects or Facilities
Description Mt. Stuart Elementary Playground Security
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Security $20,000 $20,000
TOTAL $20,000 $20,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $20,000 $20,000
TOTAL $20,000 $20,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Mt. Stuart Elementary Rehab Community Center Gym Floor
Project Information and Selection Criteria
Location Mt. Stuart Elementary, 1701 North Cora Street
Links to Other Projects or Facilities
Description Mt. Stuart Elementary Rehab Community Center Gym
Floor
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Rehab Gym Floor $60,000 $60,000
TOTAL $60,000 $60,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
Capital Fund $60,000 $60,000
TOTAL $60,000 $60,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Mt. Stuart Elementary Upgrade Fire, Communications, and
HVAC at Community Center
Project Information and Selection Criteria
Location Mt. Stuart Elementary, 1701 North Cora Street
Links to Other Projects or Facilities
Description Mt. Stuart Elementary Upgrade Fire, Communications,
and HVAC at Community Center
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Fire, Communications & HVAC $150,000 $150,000
TOTAL $150,000 $150,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
Capital Fund $150,000 $150,000
TOTAL $150,000 $150,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Transportation 10-Passenger Van
Project Information and Selection Criteria
Location
Ellensburg School District Transportation, 1501 East
Capitol Avenue
Links to Other Projects or Facilities
Description Ellensburg School District 10-Passenger Van
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Motor Pool $80,000 $80,000
TOTAL $80,000 $80,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $80,000 $80,000
TOTAL $80,000 $80,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Transportation Lunch Delivery Truck
Project Information and Selection Criteria
Location
Ellensburg School District Transportation, 1501 East
Capitol Avenue
Links to Other Projects or Facilities
Description Ellensburg School District Lunch Delivery Truck
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Lunch Delivery $80,000 $80,000
TOTAL $80,000 $80,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $80,000 $80,000
TOTAL $80,000 $80,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Transportation New Transfer Location Between Softball Field
and Bus Barn
Project Information and Selection Criteria
Location
Ellensburg School District Transportation, 1501 East
Capitol Avenue
Links to Other Projects or Facilities
Description Ellensburg School District Transportation Transfer
Location
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Safety $60,000 $60,000
TOTAL $60,000 $60,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
Capital Fund $60,000 $60,000
TOTAL $60,000 $60,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Transportation Vehicle Fund Support to Increased Student
Growth / 30-Year Bus Replacement
Project Information and Selection Criteria
Location
Ellensburg School District Transportation, 1501 East
Capitol Avenue
Links to Other Projects or Facilities
Description Ellensburg School District Transportation 30-Year Bus
Replacement Cycle
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Bus Replacement $690,000 $7,068,088 $7,758,088
TOTAL $690,000 $7,068,088 $7,758,088
Funding Sources FY 2024-2025 FYs 2026-2030 Total
Transportation Vehicle Fund $690,000 $7,068,088 $7,758,088
TOTAL $690,000 $7,068,088 $7,758,088
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Transportation Replace Fuel Tank
Project Information and Selection Criteria
Location
Ellensburg School District Transportation, 1501 East
Capitol Avenue
Links to Other Projects or Facilities
Description Ellensburg School District Transportation Replace Fuel
Tank
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Safety $50,000 $50,000
TOTAL $50,000 $50,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $50,000 $50,000
TOTAL $50,000 $50,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Transportation Sealcoat and Paint Parking Lots
Project Information and Selection Criteria
Location
Ellensburg School District Transportation, 1501 East
Capitol Avenue
Links to Other Projects or Facilities
Description Ellensburg School District Transportation Sealcoat
Parking Lots
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Sealcoat $75,000 $75,000
TOTAL $75,000 $75,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
Capital Fund $75,000 $75,000
TOTAL $75,000 $75,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Transportation Upgrade HVAC
Project Information and Selection Criteria
Location
Ellensburg School District Transportation, 1501 East
Capitol Avenue
Links to Other Projects or Facilities
Description Ellensburg School District Transportation Upgrade
HVAC
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
HVAC $85,000 $85,000
TOTAL $85,000 $85,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
Capital Fund $85,000 $85,000
TOTAL $85,000 $85,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Valley View Elementary Replace Playground Equipment
Project Information and Selection Criteria
Location Valley View Elementary, 1508 East Third Avenue
Links to Other Projects or Facilities
Description Valley View Replace Playground Equipment
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Playground Equipment $100,000 $100,000
TOTAL $100,000 $100,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $100,000 $100,000
TOTAL $100,000 $100,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Valley View Elementary Sealcoat All Parking Lots &
Valley View Blvd., Includes Paint
Project Information and Selection Criteria
Location Valley View Elementary, 1508 East Third Avenue
Links to Other Projects or Facilities
Description Valley View Sealcoat All Parking Lots and Valley
View Blvd.
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Sealcoat $124,223 $124,223
TOTAL $124,223 $124,223
Funding Sources FY 2024-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $124,223 $124,223
TOTAL $124,223 $124,223
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Ellensburg High School Refurbish/Sand Main Gym Floor
Project Information and Selection Criteria
Location Ellensburg High School, 1203 East Capitol Avenue
Links to Other Projects or Facilities
Description Ellensburg High School Main Gym Floor Refurbish
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Safety $90,000 $90,000
TOTAL $90,000 $90,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $90,000 $90,000
TOTAL $90,000 $90,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Ellensburg High School Remodel Culinary Arts Kitchen
Project Information and Selection Criteria
Location Ellensburg High School, 1203 East Capitol Avenue
Links to Other Projects or Facilities
Description Ellensburg High School Culinary Arts Kitchen
Remodel
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
School Program $185,000 $185,000
TOTAL $185,000 $185,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
Grant and General Fund $185,000 $185,000
TOTAL $185,000 $185,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Ellensburg High School Repair Asphalt
Project Information and Selection Criteria
Location Ellensburg High School, 1203 East Capitol Avenue
Links to Other Projects or Facilities
Description Ellensburg High School Repair Asphalt
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Repair Asphalt $224,642 $224,642
TOTAL $224,642 $224,642
Funding Sources FY 2024-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $224,642 $224,642
TOTAL $224,642 $224,642
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Ellensburg High School Replace Aux Gym Floor
Project Information and Selection Criteria
Location Ellensburg High School, 1203 East Capitol Avenue
Links to Other Projects or Facilities
Description Ellensburg High School Replace Auxiliary Gym Floor
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Safety $50,000 $50,000
TOTAL $50,000 $50,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $50,000 $50,000
TOTAL $50,000 $50,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Ellensburg High School Replace Main Gym
Bleacher Drive Wheels
Project Information and Selection Criteria
Location Ellensburg High School, 1203 East Capitol Avenue
Links to Other Projects or Facilities
Description Ellensburg High School Bleacher Drive Wheel
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Safety $38,401 $38,401
TOTAL $38,401 $38,401
Funding Sources FY 2024-2025 FYs 2026-2030 Total
Capital Fund $38,401 $38,401
TOTAL $38,401 $38,401
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Ellensburg High School Replace Football Field “Away”
Bleachers
Project Information and Selection Criteria
Location Ellensburg High School, 1203 East Capitol Avenue
Links to Other Projects or Facilities
Description Ellensburg High School Football Field “Away”
Bleachers
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Safety $70,000 $70,000
TOTAL $70,000 $70,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $70,000 $70,000
TOTAL $70,000 $70,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Ellensburg High School Replace Football Field Goal Posts
Project Information and Selection Criteria
Location Ellensburg High School, 1203 East Capitol Avenue
Links to Other Projects or Facilities
Description Ellensburg High School Replace Football Field Goal
Posts
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Safety $15,000 $15,000
TOTAL $15,000 $15,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
General Fund Transfer to Capital $15,000 $15,000
TOTAL $15,000 $15,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Ellensburg High School Replace Football Field Sprinkler
System
Project Information and Selection Criteria
Location Ellensburg High School, 1203 East Capitol Avenue
Links to Other Projects or Facilities
Description Ellensburg High School Football Field Sprinkler
System
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Security $30,000 $30,000
TOTAL $30,000 $30,000
Funding Sources FY 2024-2025 FYs 2026-2030 Total
Capital Fund $30,000 $30,000
TOTAL $30,000 $30,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Education
Education – Ellensburg School District
Ellensburg High School Replace Home Economics Countertop,
Electrical , and Plumbing
Project Information and Selection Criteria
Location Ellensburg High School, 1203 East Capitol Avenue
Links to Other Projects or Facilities
Description Ellensburg High School Home Economics Countertop
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2024-2025 FYs 2026-2030 Total
Health Safety $43,750 $43,750
TOTAL $43,750 $43,750
Funding Sources FY 2024-2025 FYs 2026-2030 Total
Capital Fund $43,750 $43,750
TOTAL $43,750 $43,750
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Water – Group A Systems Page 131
11. 12BWater - Group A Systems
This section includes an inventory of Water – Group A Systems facilities and a detailed
description of each facility improvement that is included in the six-year plan. The inventory of
facilities in Table 11 below also describes facility’s size in order to determine if it addresses the
County’s long-term community needs.
Table 11
Existing Public Facilities and Services
Water (Group A Systems)
Facility Provider Description Size
Ronald
Water
System
Kittitas County Water
District No. 2, Special
District Community
provider
Serves 227 persons with 119 connections,
150 total approved connections. Effective
since 1/1/1970.
125,000 gal
Thorp Water
System
Kittitas County Water
District No. 4, Special
District Community
provider
Serves 230 persons with 104 connections,
112 total approved connections. Effective
since 7/1/1987.
156,000 gal
Elk
Meadows
Water
System
Kittitas County Water
District No. 5,
Community provider
141 Swallow Ln, Cle Elum, serves 600
persons with 296 connections, 340 total
approved connections. Effective since
1/1/1970.
75,000 gal
Easton
Water
System
Easton Water District,
Community provider
141 Swallow Ln, Cle Elum, serves 250
residential persons and 106 non-residential
persons with 211 connections, 405 total
approved connections. Effective since
1/1/1970.
195,000 gal
Sunlight
Waters
Water
System
Kittitas County Water
District No. 7, Special
District Community
provider
1710 Sunlight Dr., Cle Elum, serves 380
residential persons and 169 non-residential
persons with 225 connections, 223 total
approved connections. Effective since
1/1/1970.
200,000 gal
Vantage
Water
System
Vantage Water System,
Investor Community
provider
Serves 73 residential persons and 105 non-
residential persons with 80 connections, 129
total approved connections. Effective since
1/1/1970.
50,000 gal
Evergreen
Valley
Water
System
Evergreen Valley
Utilities, Investor
Community provider
Serves 35 residential persons and 5 non-
residential persons with 262 connections,
411 total approved connections. Effective
since 3/2/2004.
120,000 gal
Reservoir
Hill Water
System
Reservoir Hill
Maintenance Association,
Private Community
provider
South Cle Elum, serves 33 residential
persons with 20 connections, 25 total
approved connections. Effective since
2/25/1999.
20,000 gal
Water – Group A Systems Page 132
Table 11 - Continued
Existing Public Facilities and Services
Water (Group A Systems)
Facility Provider Description Size
Central
Mobile
Home Park
Central Mobile Home
Park, Private Community
provider
Wilson Creek Rd. mobile home park, serves
110 residential persons with 52 connections,
52 total approved connections. Effective
since 1/1/1970.
2,100 gal
Snoqualmie
Pass
Private - Snoqualmie Pass
Utility District
Well capacity of 385 gallons per minute and
3 reservoirs storing 565,000 gallons. Serves
250 residential persons with 760 connections
and 1053 approved connections. Built
unknown.
565,000 gal
Pine Loch
Sun Beach
Club Water
System
Private Community
provider
Serves 90 residential persons with 409
calculated connections, 439 total approved
connections. Effective date of 1/1/1970
137,000 gal
Sky
Meadows
Ranch
Country
Club WTR
Private Community
provider
Serves 52 residential persons and 110 non-
residential persons with 329 calculated
connections and 335 total approved
connections. Effective system date of
1/1/1970
164,200
gal
Sun Country
Estates 1-2-
3 Water
System
Private Community
provider
Serves 219 residential persons and 16 non-
residential persons with 217 total calculated
connections and 300 total approved
connections. Effective date of 1/1/1970.
258,600 gal
Swiftwater
Trailer Park
Swiftwater Trailer Park,
Private Community
provider
S. Cle Elum mobile home park, serves 30
residential persons and 1 non-residential
person with 19 total calculated connections
and 24 total approved connections. Effective
system date of 1/1/1970.
0 gal
Wildwood 2
& 3 Water
System
Private Community
Provider
Serves 45 residential persons and 48 non-
residential persons with 51 total calculated
connections & 78 total approved
connections. Effective system date of
1/1/1970.
45,000 gal
Grasslands
Park
Private Community
Provider
Serves 29 residential persons with 14 total
calculated connections and 14 total approved
connections. Effective system date of
12/20/2006.
0 gal
Millpond
Mobile
Manor
Investor Community
Provider
Millpond Mobile Manor
Serves 245 residential persons with 105 total
calculated connections and 105 total
approved connections. Effective system date
of 1/1/1970.
0 gal
Suncadia
Resort
Investor Community
Provider
Serves 103 residential persons & 903 non-
residential persons with 590 total calculated
connections and 1501 total approved
1,070,000
gal
Water – Group A Systems Page 133
connections. Effective system date of
5/29/2008.
Table 11 - Continued
Existing Public Facilities and Services
Water (Group A Systems)
Facility Provider Description Size
Driftwood
Acres
Maintenance
Corporation
Association Community
Provider
Serves 60 residential persons with 130 total
calculated connections and 141 total
approved connections. Effective system date
of 1/1/1970.
100,000 gal
Sun Island
Maintenance
Assn.
Association Community
Provider
Serves 30 residential persons and 100 non-
residential persons with 115 total calculated
connections and an undetermined number of
total connections. Effective system date of
1/1/1970.
18,000
gal
Grasslands
Water
System
Association Community
Provider
Serves 260 residential persons with 75 total
calculated connections and 81 total approved
connections. Effective system date of
1/1/1970.
21,000 gal
AFC Ranch
2
Private Community
Provider
Serves 95 residential persons. There are 65
calculated connections with 99 approved
connections. Effective 1991
0 gal
Cascade
View
Estates #1
Investor Community
Provider
Residential pop 28. 11 Calculated
connections. 13 approved connections.
Effective 2021
0 gal
Cascade
View
Estates #3
Investor Community
Provider
Residential population 25. 10 calculated
connections and 10 approved connections.
Effective 2020
0 gal
Cascade
View
Estates #4
Investor Community
Provider
Serves 30 residential, Calculated 12
connections and 12 approved connections.
Effective 2020
0 Gallons
Cle Elum
Water
Department
City Serves 2,213 population. 1,488 calculated
connections with 3,414 approved
connections. Effective 1970
2,700,000
Cottage
Farms
Private Community
Provider
Residential population of 30. Calculated
connections of 14 and 16 approved
connections. Effective 2017.
0 gal
Dakota
Heights
Water Association Residential population of 28. 12 Calculated
connections with 14 approved connections.
Effective 2021
6,000 gal
Easton
Water
System
Easton Water District,
Community provider
141 Swallow Ln, Cle Elum, serves 250
residential persons and 106 non-residential
persons with 211 connections, 405 total
approved connections. Effective since
1/1/1970.
195,000 gal
Water – Group A Systems Page 134
Elk
Meadows
Water
System
Kittitas County Water
District No. 5,
Community provider
141 Swallow Ln, Cle Elum, serves 600
persons with 296 connections, 340 total
approved connections. Effective since
1/1/1970.
75,000 gal
Ellensburg
Water
Department
City Serves 20,900 population. 10,902
calculations with 12,033 approved
connections. Effective 1970
5,000,000
Evergreen
Valley
Water
System
Evergreen Valley
Utilities, Investor
Community provider
Serves 54 residential persons and 5 non-
residential persons with 294 connections,
411 total approved connections. Effective
since 3/2/2004.
120,000 gal
Game Farm
Estates
Private Community
Provider
Residential population 81. 27 calculated
connections with 40 approved connections.
Effective 2022
35200
gallons
Hidden
Valley
Guest Ranch
Private Provider Population of 40 individuals. 21 Calculated
connections with 57 approved connections.
Effective 2022
47,000
Kittitas, City
of
City Population of 1,418 persons. 829
nonresidential. 637 total calculated
connections with 705 approved connections.
Established 1970
500,000
Mountain
Ridge
Association Community
Provider
Serves 28 residential people with 17 total
calculated connections and 40 total approved
connections.
65,000 gal
Palomino
Fields
Investor Community
Provider
Residential population of 156. 78 Calculated
connections with 81 total approved
connections. Effective 2022
0 gal
Reservoir
Hill Water
System
Reservoir Hill
Maintenance Association,
Private Community
provider
South Cle Elum serves 33 residential persons
with 20 connections, 25 total approved
connections. Effective since 2/25/1999.
20,000 gal
Ronald
Water
System
Kittitas County Water
District No. 2, Special
District Community
provider
Serves 227 people with 121 connections, 150
total approved connections. Effective since
1/1/1970.
125,000 gal
Roslyn, City
of
City Residential population 976. Non residential
of 1,123 with 710 calculated connections
with unspecified connections. Effective 1970
1,000,000
Sunlight
Waters
Water
System
Kittitas County Water
District No. 7, Special
District Community
provider
1710 Sunlight Dr., Cle Elum, serves 380
residential people and 0 non-residential
persons with 235 connections, 267 total
approved connections. Effective since
1/1/1970.
200,000 gal
Thorp Water
System
Kittitas County Water
District No. 4, Special
District Community
provider
Serves 250 people with 116 connections, 209
total approved connections. Effective since
7/1/1987.
156,000 gal
Water – Group A Systems Page 135
Turf Trails
Domestic
Water
System
Private Community
Provider
Residential population 30. 12 Calculated
connections with 9 approved connections
0 gal
Vantage
Water
System
Vantage Water System,
Investor Community
provider
Serves 73 residential people and 330 non-
residential people with 140 connections, 129
total approved connections. Effective since
1/1/1970.
50,000 gal
Sanitary Sewer Page 136
12. 13BSanitary Sewer
This section includes an inventory of Sanitary Sewer facilities and a detailed description of each
facility improvement that is included in the six-year plan. The inventory of facilities in Table 12
below also describes each facility’s size in order to determine if it addresses the County’s long-
term community needs.
Table 12
Existing Public Facilities and Services
Sanitary Sewer
Facility Provider Description Size
Ellensburg
treatment facilities
Dan Walker 509-
962-7277
Kittitas County Utility
District
8m daily operating limit, peak
emergency capacity 15m.
General
sewer plan
update in
progress,
estimated
to be
completed
.2025.
Ronald treatment
facilities
Kittitas County Water
District No. 2
Single lift station that conveys
wastewater flows from the Water
District area to the City of Roslyn
sewer system.
37 acres
Snoqualmie Pass
Utility District
thasting@snopass.
org
Snoqualmie Pass Utility
District
Average daily flow approximately
170000 mgd., permitted treatment and
discharge capacity of 0.368 mgd. and
storage of excess flows of about 30
mill. Gal. Lagoon normal storage is
10.5 MG with an additional 10 MG
emergency storage.
MBR facility upgrade in 2026. Daily
operating flow 250,000 gpd & peak
flow 500,000 gpd.
General
sewer plan
online
(2019).
Projected
population
growth
1,581 by
2038
Vantage
wastewater
collection and
treatment system
Vantage Water District
No. 6
100,000 gpd daily operating limit. Working
on grant
to make
additions
and
improvem
ents.
Upper Kittitas
County Regional
Wastewater
Treatment Facility
City of Cle Elum Provides wastewater treatment to South
Cle Elum, City of Roslyn, City of
Ronald & Suncadia Resort.3.6 m daily
operating, instantaneous flow up to 10
m.
Expected
service
capacity
of 18,956.
General
sewer plan
(2021)
online.
City of Kittitas
Wastewater
Treatment Facility
Ryan Baker 509-
929-1249
City of Kittitas .45mgp daily flow, operating limit
unknown, peak unknown
General
sewer plan
update in
progress,
estimated
to be
completed
2025.
Sewer District 8 Teanaway Ridge LLC No information provided Developin
g sewer
plan to
implement
County
land use
approvals.
13. 6BKittitas County Flood Control Zone District
The Kittitas County’s Flood Control Zone District capital improvement plan is further detailed in
Appendix D. Appendix D provides a detailed description of the proposed projects, mapping of
the projects, and the funding plan.
Frequently Asked Questions Page 139
14BFrequently Asked Questions
Question 1: How does the County determine priorities for the projects listed in the CFP?
Answer: This CFP provides general guidance on prioritizing public facility projects. Each
project proposal is reviewed by the CFP Task Force using the following criteria:
1. Improvements to obsolete or worn out existing public facilities that
achieve or maintain adopted levels of service.
2. New or expanded public facilities that achieve or maintain adopted levels
of service.
3. Improvements to existing public facilities or new public facilities that
eliminate hazards.
4. New or expanded public facilities that achieve or maintain adopted levels
of service as forecasted during the next six-years.
5. Improvements to existing public facilities or new public facilities that
reduce the operating cost of providing a public service or facility.
6. New facilities that provide excess capacity that will be needed beyond
the next six-years.
7. All other facilities the County is obligated to complete that do not meet
the criteria above.
8. Availability of funding.
The Board of County Commissioners make the final determination of the priority
order of the projects listed in the CFP.
Question 2: Are projects automatically given funding in priority order?
Answer: No, if grant funds are applied for and received, chances are good that the grant
funded project will become a priority. Grant funds awarded become new and
additional revenue to the County, above and beyond the County’s current
resources. The County continually looks for ways to reduce the reliance on
General Fund dollars for capital projects to stretch current resources.
Question 3: Will a project that is partially funded be listed in the CFP?
Answer: It depends. If the project is still in-progress, but no additional money is needed
beyond what has already been appropriated, it will not show up in the CFP in
future years. If the project does need additional funds appropriated beyond the
current level of funding, it will continue to show up in the CFP.
Question 4: Are all projects in the CFP completed within the next 6 years?
Answer: No, for several reasons. First, the CFP is annually reviewed and amended to
verify that fiscal resources are available. Second, the need for capital facilities is
generated by population growth, existing facility deficiencies, major facility
maintenance and repair needs, internal operations, and Comprehensive Plan goals
and policies. There is a need to continually assess which projects are affected
and should be considered a priority. As a result, project estimates and timelines
may change.
Frequently Asked Questions Page 140
Question 5: What does level of service (LOS) mean?
Answer: The LOS is a quantifiable measure of the amount of public facilities that is
provided, such as acres of park land per capita, vehicle capacity of intersections,
or water pressure per square inch available for water system.
Question 6: What is concurrency?
Answer: All public facilities that are needed to serve new development or a growing
service area population, must be in place at the time of initial need. If the
facilities are not in place, a financial commitment must have been made to
provide the facilities within six-years of the time of the initial need and must
have the capacity to serve the new development or a growing service area
population without decreasing service levels below locally established minimum
standards.
Question 7: How do I get involved in the CFP process?
Answer: Information on the CFP process will be posted on the County’s website at the
following address: https://www.co.kittitas.wa.us/cds/land-use/default.aspx. To
receive email updates on when new information is posted, you can subscribe to
Kittitas County’s email notification subscription service for “Comprehensive
Plan Announcements.” All persons can provide written or verbal comments to
the Planning Commission and to the Commissioners, before or during the
scheduled public hearings.
Frequently Asked Questions Page 141
APPENDIX A
Kittitas County Maintenance Shops,
Storage, Parking, Pits/Quarries
Frequently Asked Questions Page 142
. Equipment Rental & Revolving Budget
The Director of Public Works manages the Kittitas County Equipment Rental and Revolving (E. R. & R.) Fund. The E. R. & R. The
purpose of the fund is to account for the financing of goods and services provided primarily to the road fund.
The following Services are Provided by the ER&R Fund:
Administration-The Administration division provides financial management and administration for the divisions within the E. R.& R.
Fund. Services include asset management, developing rental rates and inventory management. Revenues are provided.
Pits and Quarries -The Pits & Quarries division manages the pits and stockpiles of rock owned by Kittitas County. The rock
stockpiled in these pits is purchased by the County Road Fund for use on county road maintenance and construction projects and winter
road sanding operations. In addition to county owned pits, we also solicit bids from private vendors for maintenance rock used by the
County Road Fund. Revenues are provided through sales of county owned rock primarily to the County Road.
Mechanic Shop - The Mechanical Shop division is responsible for maintaining the fleet of vehicles utilized by the County Road Fund.
This division also maintains the County mechanical shop facilities. The division includes two mechanics and one shop foreman. Kittitas
County also sublets light duty vehicle preventive maintenance such as lube and oil changes to local vendors.
Central Stores - The Central Stores maintains a supply of culvert pipe and guardrail used by the County Road Fund in the event of
unscheduled repairs. For scheduled construction projects culvert pipe and guardrail are purchased direct by the road fund as these
materials do not require storage. Revenues are provided through the sales of materials to the County Road
Rental Services - The Equipment Rental Services accounts for the maintenance and operation of the vehicles and equipment used
primarily by the County Road Fund. Revenues are provided through adopted equipment rental rates. Rates are established to cover the
operating costs of the equipment (fuel, insurance, repairs) and a replacement factor to cover inflation.
Sign Fabrication Shop - This functionality is being moved to Road Maintenance.
Frequently Asked Questions Page 143
Kittitas County Maintenance Shops, Storage, Parking, & Pits/Quarries
Project Name Location & Description Funding Source Schedule Total Cost
Upper County Maintenance
Shop
Automated wash bay
design and construction.
2028 $400,000
Lower County Maintenance
Shop
Potential land acquisition
and shop relocation
ER&R Fund
501
2028-2031 $8,950,000
Hyak Joint Maintenance
Facility with SPUD
Ongoing operations.
Public Works
Maintenance
budget
TBD
+/- $100,000
annually
Hansen Pit
Potential Advanced
Environmental
Mitigation site.
Airport Fund
107, Flood
Control Fund
107, FAA
Grant
2027
$1,750,000
Other Pits and Quarries
Ongoing operations.
Public Works
Maintenance
budget
TBD
+/- $100,000
annually
Frequently Asked Questions Page 144
APPENDIX B
Kittitas County Six-Year
Transportation Plan
Frequently Asked Questions Page 145
introduction:
Annually Kittitas County Department of Public Works develops a listing of county road and
bridge improvements for Board of County Commission consideration. The listing is accompanied
by a public outreach effort. Public comments are evaluated, and staff adjusts the original proposal
that is then finalized and presented to the Board of County Commissioners during the annual
County budget process. Given the complexity of municipal engineering, environmental
permitting, right of way acquisition and construction; Public Works schedules projects an
additional five years beyond the first budget year. The planning schedule includes programmed
funding amounts and sources along with project forecast expenses. The schedule identifies the
various projects beginning in the first budget year (2026) extending to the last program year
(2031).
2026-2031 Plan:
This plan is organized into two components for ease of understanding the various projects
contained in the six-year plan:
1 - The six-year project listing and associated funding plan.
2 - Project specific sheets listing specific project information including: County Road
Project Number (if assigned at the time of publication), priority number, title, project
description, project status, photos, and funding sources.
Frequently Asked Questions Page 146
Frequently Asked Questions Page 147
APPENDIX C
Kittitas County Regional
Parks and Trails
Frequently Asked Questions Page 148
2026 Parks and Recreation Fund Preliminary Budget
Public Works administers the Parks and Recreation/Tourism Fund 113 on behalf of the Kittitas
County Board of County Commissioners. The annual capital plan and six-year capital facility
plan are considered for projects. The General Fund of County government provides Fund 113
funding for plan implementation. Real Estate Excise Tax (REET 2) is a funding source available
to parks and recreation capital projects.
In addition to implementing the Recreation/Tourism annual and six-year plans; Public Works
provides maintenance of the Vantage Boat Launch restrooms along with management activities
for Gladmar and Ryan Thompson parks. General Fund provides the necessary maintenance
funding within Fund 113.
Frequently Asked Questions Page 149
APPENDIX D
Kittitas County Flood
Control Zone District
Frequently Asked Questions Page 150
Kittitas County Flood
Control Zone District
Capital Facility Plan 2024-
2029
July 25, 2023
Frequently Asked Questions Page 151
Introduction
Every year, the Kittitas County Flood Control Zone District (“District”) develops a list of capital
improvement projects for Board of County Commission consideration. The proposal is presented to the Board
of County Commissioners during the annual County budget process. Given the complexity of flood hazard
planning, engineering, environmental permitting, and construction, the Flood Control Zone District schedules
projects an additional five years behind the first budget year. The planning schedule includes programmed
funding amounts and sources along with project forecast expenses. The schedule identifies the various
projects beginning in the first budget year (2024) extending to the last year in program (2029).
This plan
This plan is organized into three major components for the ease of understanding the various projects
contained in the six-year plan:
1. Map identifying the various projects located around the County.
2. The six-year project listing and associated funding plan.
3. Project specific sheets listing specific project information including title,
project description, project status, photos and funding sources.
Frequently Asked Questions Page 152
Acronyms
CIP Capital Improvement Project
CRS Community Rating System
CTP Cooperating Technical Partners Program
DOE Washington State Department of Ecology
EWC Ellensburg Water Company
FCAAP Flood Control Assistance Account Program
FCZD Flood Control Zone District
FEMA Federal Emergency Management Agency
SRFB Salmon Recovery Funding Board
WNC Wilson-Naneum-Cherry Watershed
YBIP Yakima Basin Integrated Plan
Frequently Asked Questions Page 153
Six Year Program Summary
SUMMARY: 6-YEAR PROGRAM REVENUE, COSTS AND ENDING FUND AMOUNTS
YEAR 2024 2025 2026 2027 2028 2029
FCZD CAPITAL PROGRAM
PROJECT COSTS
4,380
2,071
140
6,237
2,106
1,748
ADMINISTRATION AND
OPERATIONS COSTS
716
771
1,026
1,054
1,055
1,056
ADMINISTRATION 180 180 180 180 180 180
TRAINING/CONFERENCES 8 8 8 8 8 8
PERMIT PROCESSING 30 31 32 33 34 35
PUBLIC TECHNICAL ASSISTANCE 50 50 50 50 50 50
AGENCY COORDINATION 12 12 12 12 12 12
PUBLIC OUTREACH / ED 15 15 15 15 15 15
FLOW CONVEYANCE 100 100 100 100 100 100
LEVEE MAINTENANCE 10 10 10 10 10 10
STORMWATER 60 90 90 90 90 90
PROPERTY MAINTENANCE 30 30 30 30 30 30
DEBT SERVICING 200 200 200 200
EMERGENCY RESPONSE 150 150 150 150 150 150
INFLATION 71 95 149 176 176 176
TOTAL 5,096 2,842 1,166 7,291 3,160 2,804
TAX LEVY 860 903 948 996 1,045 1,098
OTHER INCOME 21 22 22 23 24 24
PERMITS 30 31 32 33 34 35
GRANTS / COST SHARE 960 707 98 5,670 1837 840
VOTER APPROVED FUNDING 1,000
TOTAL 1,871 2,662 1,100 6,721 2940 1996
TOTAL (3,225) (180) (66) 6,721 (221) 807.77
BEGINNING 3,500 275 95 29 6750 6529.56
FUND $275 $95 $29 $6,750 $6,530 $7,337
*Costs are shown as thousands
Frequently Asked Questions Page 154
GLOSSARY
Frequently Asked Questions Page 155
• Americans with Disabilities Act (ADA): The Americans with Disabilities Act of 1990 or ADA is a civil rights law that prohibits
discrimination based on disability.
• Airports Geographic Information Systems (AGIS): GIS software that provides a 3D visualization of the airport during the design period,
allowing engineers to test and change their designs. Once the airport is built, AGIS can assist with day-to-day operations.
• Base Realignment and Closure (BRAC): Refers to the process the Department of Defense (DoD) has used to reorganize its installation
infrastructure to more efficiently and effectively support its force structure, increase operational readiness, and facilitat e new ways of doing
business.
• Community Aviation Revitalization Board (CARB): The Community Aviation Revitalization Board (CARB) loan program bill, SB 5031,
was signed into law by the Governor on May 3, 2021 (effective June 30, 2021). The corresponding capital budget bill, SHB 1080, which
provides an additional $5 million for the 2021-2023 biennium was signed into law by the Governor on May 18, 2021. The revolving loan
program is for revenue-producing capital projects to help public-use general aviation airports become more self-sustainable and less
dependent on public funding. Eligible projects can include hangars, fueling facilities, business parks on airport property, paid parking
facilities, passenger amenities and other revenue-generating or cost-cutting developments.
• Community Development Services (CDS): A department within the Kittitas County government. The purpose of CDS is to assist the
citizens of Kittitas County in planning for the use and development of land and buildings while protecting public health and safety,
sustaining a vibrant economy, promoting the conservation of natural resources, and protecting the environment.
• Capital Improvement Program (CIP): A Six-Year Plan that shows capital improvements that are needed to provide adequate public facilities
in Kittitas County. The County either directly provides these capital improvements or coordinates with other agencies to provide them. The
Six-Year Plan is reviewed and updated annually. Annual updates are made to correct or modify project costs, revenue sources, and dates of
construction.
• Conditional Letter of Map Revision (CLOMR): A Conditional Letter of Map Revision, or CLOMR, is FEMA’s comment on a proposed
project that would affect the hydrologic or hydraulic characteristics of a flooding source.
Frequently Asked Questions Page 156
• Decommission: The process of dismantling or demolishing a public facility when it has deteriorated due to age. Accompanies the opening
of a new facility to replace the old facility.
• Department of Natural Resources (DNR): An agency of the Washington State government. Under the elected leadership
of the Commissioner of Public Lands, the DNR manages seven specific trusts to generate revenue and preserve forests, water, and habitat.
The DNR manages 5.6 million acres of forest, range, agricultural, aquatic, and commercial lands for more than $200 million in annual
financial benefit for public schools, state institutions, and county services.
• Ellensburg Business Development Authority (EBDA): A board within the City of Ellensburg, the purpose of the EBDA is to strategically
recruit and support businesses, and connect businesses to resources so they can start, grow, and prosper in the City of Ellensburg.
• Ellensburg Water Company (EWC): The water utility company within the City of Ellensburg.
• Emergency Operations Center (EOC): A centralized location of emergency response and recovery support operations during incidents and
emergencies.
• Federal Aviation Administration (FAA): A federal agency within the United States Department of Transportation (USDOT). Governs
commercial aviation in the United States.
• Federal Highway Administration (FHWA): A federal agency within the United States Department of Transportation (USDOT). The FHWA
supports State and local governments in the design, construction, and maintenance of the Nation’s highway system (Federal Aid Highway
Program) and various federally and tribal owned lands (Federal Lands Highway Program).
• Federal Lands Access Program (FLAP): The Federal Lands Access Program was established by federal directive to improve transportation
facilities that provide access to, are adjacent to, or are located within Federal lands.
• Flood Control Assistance Account Program (FCAAP): A program within the Washington State Department of Ecology (WSDOE). The
state legislature established the Flood Control Assistance Account Program to assist local jurisdictions with comprehensive floodplain
management planning and implementing actions to mitigate flood hazards. Funding is determined every biennium by the state legislature.
Frequently Asked Questions Page 157
• Flood Control Zone District (FCZD): Established by the Board of County Commissioners (BoCC) of Kittitas County in 2012, the FCZD
serves residents in both unincorporated areas and incorporated towns and cities by providing technical assistance and implementing flood-
reduction projects and programs.
• General Aviation (GA): General Aviation is defined by the International Civil Aviation Organization (ICAO) as "all civil aviation
operations other than scheduled air services and non-scheduled air transport operations for remuneration or hire".
• Heating, Ventilation, and Air Conditioning (HVAC): Refers to the different systems used for moving air between indoor and outdoor areas,
along with heating and cooling both residential and commercial buildings.
• Highway Safety Improvement Program (HSIP): A core Federal-aid program with the purpose to achieve a significant reduction in traffic
fatalities and serious injuries on all public roads, including non-State-owned roads and roads on tribal land. The HSIP requires a data-
driven, strategic approach to improving highway safety on all public roads with a focus on performance.
• HB1257: A bill passed by the Washington State legislature in 2019 which was subsequently signed into law by Governor Inslee. The law
mandates, starting in 2026, most existing commercial buildings (including schools and dormitories) in Washington State over 50,000 SF
will be required to meet certain Energy Use Index Targets (EUIT). Any building owner not in compliance by the target dates will incur a
penalty of $1/SF + a $5,000 fee per year.
• Information Technology (IT): The use of any computers, storage, networking and other physical devices, infrastructure and processes to
create, process, store, secure and exchange all forms of electronic data.
• Kittitas County Conservation District (KCCD): The Kittitas County Conservation District works with local landowners and land managers
(public and private) to conserve natural resources that are vital to the county economy and the county quality of life. KCCD focuses on
collaborative efforts to partner with landowners, public agencies, tribes and the general public to create and maintain resilient working
landscapes through voluntary incentive-based measures.
• Kittitas County Search and Rescue (KCSAR): An all-volunteer, non-profit organization, formed in 1991 at the request of the Kittitas
County Sheriff’s Office. Provides personnel for the Kittitas County Sheriff’s Office to conduct search, rescue, recovery, and evacuation
operations, primarily within Kittitas County. KCSAR does not act in any capacity except at the direction of the Sheriff’s Office.
• Kittitas Valley Healthcare (KVH): A public hospital network that provides healthcare to Kittitas County residents and surrounding areas.
Frequently Asked Questions Page 158
• Levy: A local property tax passed by the voters that generates revenue to fund programs and services that the state does not pay for .
• Limited Area of More Intensive Rural Development (LAMIRD): Areas outside an established urban growth area designated as existing
rural residential communities or villages, areas of mixed use activity, isolated areas of small-scale commercial/industrial activity, and
historic towns pursuant to RCW 36.70A.
• Mid-Columbia Fisheries Enhancement Group (MCFEG): A non-profit organization that seeks to protect and restore wild salmon
populations, their habitats, and ecosystem functions that support native fish species through restoration, protection, educat ion, and
community involvement.
• National Environmental Policy Act (NEPA): The National Environmental Policy Act was signed into law on January 1,
1970. NEPA requires federal agencies to assess the environmental effects of their proposed actions prior to making decisions. It is enforced
by the United States Environmental Protection Agency (EPA).
• Office of Financial Management (OFM): The Office of Financial Management provides vital information, fiscal services, and policy
support that the governor, legislature and state agencies need to serve the people of Washington.
• Public Utility District (PUD): Community-owned, locally regulated utilities that are formed by a vote of the people. Unlike private utilities,
public utility districts are run by an elected, nonpartisan board of commissioners who are directly accountable to the voters.
• Public Works Department (PWD): A department within the Kittitas County government whose primary focus is infrastructure projects that
are needed to facilitate development of public infrastructure and public capital assets for the residents of Kittitas County.
• Real Estate Excise Tax (REET): Real estate excise tax is a tax on the sale of real property. All sales of real property in the state are subject
to REET unless a specific exemption is claimed. REET processes are governed by the Washington State Department of Revenue.
• Rural Arterial Program (RAP): A biennial road and bridge reconstruction funding program in which counties compete for Rural Arterial
Trust Account (RATA) funds within their respective regions taken from fuel tax revenues. The RATA account generates approximately $40
million per biennium.
Frequently Asked Questions Page 159
• Salmon Recovery Funding Board (SRFB): Created by the Washington State legislature in 1999, the SRFB provides grants to protect and/or
restore salmon habitat and assist related activities. Composed of five citizens appointed by the Governor, and five state agency directors, the
board brings together the experiences and viewpoints of citizens and the major state natural resource agencies.
• Search and Rescue (SAR): The search for and provision of aid to people who are in distress or imminent danger. Search and rescue
operations within Kittitas County are within the jurisdiction of the Kittitas County Sheriff’s Office.
• Snoqualmie Pass Utility District (SPUD): A public utility district within the Snoqualmie Pass community. The primary focus of the SPUD
is to provide water utilities to Snoqualmie Pass including treatment of wastewater.
• Surface Transportation Block Grant (STBG): The Surface Transportation Block Grant program is the most flexible of all federal-aid
highway programs, allowing wide discretion for recipients to use funds as needed to meet state and local transportation prior ities.
• Tenant Improvement (TI): Customized alterations of a rental facility to improve function for the facility’s tenants.
• United States Bureau of Reclamation (USBR): The largest wholesaler of water in the United States. The USBR provides water to more than
31 million people, and provides one out of five Western farmers with irrigation water for 10 million acres of farmland.
• Washington State Department of Transportation (WSDOT): A state agency that constructs, maintains, and regulates the use of
transportation infrastructure in Washington State such as bridges, highways and ferries.