HomeMy WebLinkAbout2026 - 2031 Six-Year Capital Improvement Plan - Final From the Cascades … to the Columbia Adopted __________ by the Board of County Commissioners ● Ordinance No. _________ Kittitas County Capital Improvement Program 2026-2031 Six Year Plan Kittitas County Capital Improvement Program 2025 Table of Contents Page i Table of Contents UPDATE TO REFLECT NEW PAGE NUMBERS! 0BSix-Year Plan .................................................................................... 1 Introduction ....................................................................................... 1 2026-2031 Summary ........................................................................ 2 1. 2BAirport Facilities ................................................................... 23 2. Kittitas County Administrative Offices .................................. 32 3. Kittitas Valley Event Center / Fairgrounds ............................ 27 4. 5BKittitas County Maintenance Shops, Storage, & Parking ..... 47 5. 6BKittitas County Roads .......................................................... 49 6. 7BRegional Parks and Trails .................................................... 50 7. 8BSolid Waste .......................................................................... 51 8. 9BLibrary Services ................................................................... 54 9. 10BEmergency Services ............................................................ 56 10. Education ............................................................................. 81 11. 12BWater - Group A Systems .................................................. 131 12. 13BSanitary Sewer ........................Error! Bookmark not defined. 13. 6BKittitas County Flood Control Zone District ........................ 138 14BFrequently Asked Questions ......................................................... 139 Six-Year Plan Page 1 0BSix-Year Plan Introduction The Six-Year Plan shows capital improvements that are needed to provide adequate public facilities in Kittitas County. The County either directly provides these capital improvements or coordinates with other agencies to provide them. The Six-Year Plan is reviewed and updated annually. Annual updates are made to correct or modify project costs, revenue sources, and dates of construction. The Capital Improvement Program follows a six-year planning format that is oriented toward sufficiently planning growth according to the larger 20-year planning horizon. The 2026-2031 plan contained herein is a review and update of the previous 2024-2029 plan. The following departments within Kittitas County were coordinated with in producing this plan: • Airports • Administrative Offices • Event Center/Fairgrounds/Maintenance Shops/Storage/Parking • County Roads • Flood Control • Solid Waste • Water Systems • Sewer Systems • Fire District 1 • Fire District 2 • Fire District 3 • Fire District 4 • Fire District 51 • Fire District 6 • Fire District 7 • Sheriff • Gilmour Memorial Library • Carpenter Memorial Library • Ellensburg Public Library • Roslyn Public Library • Roslyn Public Library • Cle Elum – Roslyn School District • Ellensburg School District • Easton School District • Damman School District • Kittitas School District • Thorp School District • Central Washington University • Kittitas Valley Healthcare Table 1 below is a summary of the planned and/or needed investments by department. 2026-2031 Summary Page 2 2026-2031 Summary The following table summarizes the 2026-2031 Six-Year Plan. (Budgets have been estimated in 2026 dollars using a 3% inflation factor. A 3% inflation factor should be applied to estimates per year until an engineer’s estimate is produced with design.) Six-Year Plan Summary 2026-2031 Summary Kittitas County Public Facility Projects 1. Airport Facilities Project Name Location & Description Funding Source Schedule Total Cost Hangar Taxilane Complex (West) Bowers Field Airport. New hangar, taxilane including asphalt paving and markings. Federal Aviation Administration (FAA) General Aviation (GA) Entitlement and Local Match 2026 1,227,005 Runway 11/29 Parallel Taxiway and Taxiway Lighting Project Bowers Field Airport. Construct new parallel taxiway including pavement, lighting, and marking installation FAA GA Entitlement and other funding, Local Match 2026 7,344,840 ALP Update with Forecast Verification Bowers Field Airport. Minor update to the Airport Layout Plan to include Forecast Verification FAA GA Entitlement and other funding 2027 $60,000 Rehabilitate Runway 11/29 Bowers Field Airport. Rehabilitate Runway 11/29 including AGIS survey, reducing the runway width, drainage improvements, and replacing the runway lighting system. FAA GA Entitlement, Local Match 2028-2030 $3,666,667 Industrial Park Building Development Bowers Field, Design and construct two new industrial buildings in the Bowers Field Industrial Park. TBD 2027-2030 TBD Hangar Taxilane Complex (East) Bowers Field Airport. New hangar taxilane including asphalt paving and markings. FAA GA Entitlement and Local Match 2029-2031 $1,166,667 Wildlife Hazard Mitigation Develop and construct wildlife hazard mitigations in the vicinity of runway 11/29 FAA GA Entitlement and other funding 2030 $2,450,000 Runway 11 Extension Bowers Field Airport. Extend Runway 11/29 Design FAA GA Entitlement and other funding 2030 $500,000 2. Kittitas County Administrative Offices Project Name Location & Description Funding Source Schedule Total Cost Relocate Permit Center and Health Department 411 N Ruby, Ellensburg. Relocate facilities for Community Development Services (CDS), Public Works General Obligation Bonds 2022-2031 $15,950,000 2026-2031 Summary Page 3 Dept. (PWD), and Fire Marshal offices. Also relocate Health Department. New County Administration Building New Courthouse REET & Commissioner approved bond 2025-2031 $152,905,000 Public Safety Building Improvements 205 W. 5th, Ellensburg General Fund & 1/10th sales tax 2025-2031 $11,450,000 Juvenile Detention Holding Facility 205 W. 5th, Ellensburg Law and Justice sales tax 2026-2031 $50,000 Corrections Facility To be determined Commissioner approved bond 2026-2031 $1,000,000 Upper County Sheriff’s Office Facility To be determined Commissioner approved bond 2026-2031 $5,500,000 3. Kittitas Valley Event Center/Fairgrounds Project Name Location & Description Funding Source Schedule Total Cost Rodeo Arena Grandstands 901 E. 7th, Ellensburg Replace old rodeo grandstands complex to include the seating bleachers and box seats along with Behind the Chutes Revenue Bonds, LTAC, State Grants, Local partnerships (City of Ellensburg, Ellensburg Rodeo) 2022-2031 $12,969,100 Renovated Barn Complex and Emergency Evacuation Shelter 901 E 7th, Ellensburg Federal Infrastructure or Emergency Funding Sources (Ferguson Gorup) and General Obligation Bonds. 2022-2031 $6,500,000 2026-2031 Summary Page 4 RV Park 900 N. Alder St. 900 N. Alder St. An RV park built on the former site of Shady Brook Mobile Park. State Grant (WSDA), Sale of F&L Property, Cold Weather Shelter Income, Commissioner Approved Bond 2023-2031 $2,650,000 4. Kittitas County Maintenance Shops, Storage, Parking, & Pits/Quarries Project Name Location & Description Funding Source Schedule Total Cost Upper County Maintenance Shop Automated wash bay design and construction. TBD (Maintenance Funds) 2028 $400,000 Lower County Maintenance Shop Potential land acquisition and shop relocation ER&R Fund 501 2023-2027 $8,950,000 Hyak Joint Maintenance Facility with Snoqualmie Pass Utility District (SPUD) Ongoing operations, On capital improvements planned. SPUD Match TBD TBD Hansen Pit Potential Advanced Environmental Mitigation site. Airport Fund 107, Flood Control Fund 107, FAA Grant 2027 $1,750,000 Other Pits and Quarries Ongoing operations, on capital improvements planned. TBD (Public Works Project Funds?) TBD TBD 5. Roads – County Owned (capital improvements scheduled for construction) Project Name Location & Description Funding Source Schedule Total Cost Manastash Road Creek Bank Stab, and Snow Park Improvements MP 10.65-MP 11.01 Roadway safety, repair and improvements Planned Federal Lands Access Program / Federal Highway Administration (FLAP/FHWA) funds, local funds (FCZD or WA State Park funds match?) 2023 $1,700,000 Liberty Rd Swauk Creek Bridge Swauk Creek bridge (No. 07101) on Liberty Road at mile post 0.02 crosses Swauk Creek. This load restricted bridge is being replaced to improve access to the town of Liberty and provide access to the Federal Lands Access Program (FLAP) 2025 $600,000 2026-2031 Summary Page 5 Okanogan-Wenatchee National Forest. 2024 Vantage Hwy Paving The Vantage Highway is a major east/west corridor in the Lower Kittitas Valley. Regular roadway maintenance improves roadway safety while maintaining reliable infrastructure. This project will grind and overlay asphalt on Vantage Highway within the existing pavement limits along with temporary and permanent pavement marking for repair, rehabilitation and preservation. This segment is the second phase of surface improvements. Surface Transportation Block Grant – (STBG), local funds 2025 $2,961,000 I-90 Widening (State Project) High bypass traffic volumes through Upper County is a concern for residents and the condition of roads. This increase in traffic when I-90 is busy results in degraded roadways as well as increased safety concerns. A group was formed, the STEER I90 Coalition, meets monthly to engage stakeholders to discuss issues and solutions. A draft feasibility study has been completed to identify possible improvements. Local funds 2025 $250,000 Hungry Junction Road Widening/Faust Rd Culvert Replacement Hungry Junction Rd from US 97 to Reecer Creek Rd is narrow with vertical curves that do not provide adequate sight distance. The road has moderate truck traffic. The work will include changing the vertical curve profile to comply with WSDOT design manual, widening and paving the road to increase paving structure. The existing culverts at the intersection of Hungry Junction Rd and Faust Rd floods periodically and is a fish passage barrier. This project will remove the existing culverts under Hungry Junction Road and replace them with a new structure, realigning Rural Arterial Program (RAP), local funds 2025-2027 $3,972,000 2026-2031 Summary Page 6 Reecer Creek through the new structure. Snoqualmie Pass Comprehensive Safety Plan Snoqualmie Pass is a recreational destination and key transportation corridor spanning two counties. Kittitas County is working with King County, WSDOT, and area stakeholders to increase the safety for outdoor enthusiasts and area businesses. The Comprehensive Safety Plan will address safety concerns and increased usage of the Pass, taking a proactive approach to minimize risks to public safety. Safe Streets for All (SS4A), local funds 2025-2027 $504,000 Huntzinger Rd Safety Improvements – Phase 1 Huntzinger Road has several areas with steep embankments and no shoulders. The work will include installing guardrail, placing signage and additional delineation to improve travelers safety. Highway Safety Improvement Program (HSIP) 2025 $1,581,000 Horizontal Curve Safety Project Kittitas County Road Safety Improvement Plan 2023 (Resolution 2023-047) was created to reduce collisions and improve safety within the County Road network. Horizontal curves have been identified as high risk by data collected for the 2023 Safety Plan. The proposed project is to identify, plan, design, and implement measures for crash prevention. The project includes adding advisory speeds, LED chevrons, and additional carsonite safety posts to reduce crashes on the road system. Highway Safety Improvement Program (HSIP) 2025-2026 $375,000 Yellowstone Culvert Replacement The Yellowstone Road culvert project will replace the existing undersized and deteriorating culvert with a larger culvert that has the capacity to handle high water flow and sediment in the stream. The culvert replacement will prevent the washout of the county road as well as improve fish passage. Surface Transportation Block Grant (STBG), local funds 2026-2027 $1,755,000 2026-2031 Summary Page 7 Denmark Road Improvements Denmark Road serves as a local connector from nearby residential developments and agricultural activities. Improvements are proposed to Denmark Road from Thrall Road to Fourth Parallel Road. Improvements include widening and replacement of the structure over Cascade Canal. RAP funds, HSIP funds, local funds 2026-2029 $4,710,000 Airport Road Culvert Replacement Undersized irrigation culverts under Airport Road in Cle Elum have increased drainage issues in the area. Replacement of these undersized culverts with larger, adequate culverts will decrease flooding issues for nearby property owners while also protecting the roadway from damage. RAP funds 2029-2030 $1,290,000 Short Span Structure Replacement Program Kittitas County has 156 routinely inspected structures having a length under 20-feet. These structures are not eligible for the WSDOT Local Bridge Program funding, as such it is the County’s responsibility to maintain or replace these structures with County funds. Based on field reviews many of these structures need significant repairs or to be replaced. This phase begins to address the need to repair or replace these structures. Multiple phases will be required to address all structures. STBG funds, local funds 2026-2030 $4,200,000 Reecer Creek Rd over Towne Ditch Bridge #88212 on Reecer Creek Road over the Towne Ditch. Replace existing single span, structurally deficient, load posted concrete bridge with a longer, single span, prestressed concrete girder structure to meet current design standards and to improve the hydraulic opening. RAP funds, local funds 2026-2028 $2,734,000 Badger Pocket Road HMA Traffic and heavy truck traffic have deteriorated existing hot mix asphalt roadway resulting in pavement rutting conditions. RAP funds, STBG funds, local fund 2026-2028 $1,640,000 2026-2031 Summary Page 8 An HMA overlay will remediate the rutted condition and restore the roadway segment. The road segment will be widened to accommodate the larger truck loads entering and exiting hay press facility. HSIP 2025 awarded project The Highway Safety Improvement Program (HSIP) is a federal program that allows states, and the local governments within them, to target safety funds to their most critical safety needs. The goal of the program is to reduce fatal and serious injury crashes, following Washington State's Strategic Highway Safety Plan (Target Zero) and each agency's local road safety plan. WSDOT's programs for local governments include the County Safety program, the City Safety program, and the Railway-Highway Crossing program. Focus is on the Kittitas Highway and No. 6 Road intersection. HSIP funds 2026-2027 $530,000 Bridge Rehabilitation Program Each year the County inspects approximately 50% of its bridges on an alternating basis to comply with National Bridge Inspection Standards requirement of a 24 month maximum inspection cycle. During these inspections potential problems and maintenance issues are identified and documented. Routine inspections identify deficiencies early and corrective measures can be taken in order to eliminate a potential for major repairs or a hazard to the driving public. This program has been successful in identifying problems and correcting deficiencies in County bridges and extending the life of existing bridges Local funds 2025-2028 $1,029,000 Bender Road Widening and To accommodate the increase in traffic along Bender Road and Surface Transportation 2029-2030 $2,300,000 2026-2031 Summary Page 9 Pedestrian Improvements to link future developments to the City of Ellensburg, Bender Road will be widened. Widened shoulders will be constructed for bicycle use. Work includes shoulder widening and resurfacing the road, construction of sidewalk, and installation of drainage structures. Sidewalk to be constructed on north side of roadway only. Block Grant – Transportation Alternatives (STBGTA), local funds Sanders Road Improvements To accommodate the increase in traffic along Sanders Road and to link future developments to the City of Ellensburg, the road will need to be widened. Non- motorized pathways will need to be constructed for pedestrian and bicycle use. This will allow for a uniform roadway from county to city limits. Work will include widening and paving the road, construction of sidewalk, and installation of drainage structures. STBGTA funds, local funds 2030 $400,000 HSIP 2027 awarded project The Highway Safety Improvement Program (HSIP) is a federal program that allows states, and the local governments within them, to target safety funds to their most critical safety needs. The goal of the program is to reduce fatal and serious injury crashes, following Washington State's Strategic Highway Safety Plan (Target Zero) and each agency's local road safety plan. WSDOT's programs for local governments include the County Safety Program, the City Safety Program, and the Railway-Highway Crossing Program. HSIP funds 2028-2029 $540,000 Vantage Hwy Paving Phase 3 The Vantage Highway is a major east/west corridor in the Lower Kittitas Valley. Regular roadway maintenance improves roadway safety while maintaining reliable infrastructure. This project will grind and overlay asphalt on STBG funds, local funds 2027-2028 $3,000,000 2026-2031 Summary Page 10 Vantage Highway within the existing pavement limits along with temporary and permanent pavement marking for repair, rehabilitation and preservation. This road segment is the third phase of the surface improvements on Vantage Highway. Vantage Hwy Paving Phase 4 The Vantage Highway is a major east/west corridor in the Lower Kittitas Valley. Regular roadway maintenance improves roadway safety while maintaining reliable infrastructure. This project will grind and overlay asphalt on Vantage Highway within the existing pavement limits along with temporary and permanent pavement marking for repair, rehabilitation and preservation. The fourth phase of surface improvements on Vantage Highway connects to the award winning pavement project completed on the roadway in 2021. STBG funds, local funds 2029-2030 $3,000,000 No. 6 Rd Improvements No. 6 Road is a major north/south collector in the Lower Kittitas Valley. Regular roadway maintenance improves roadway safety while maintaining reliable infrastructure. This project will grind and overlay asphalt on No. 6 Road within the existing pavement limits along with temporary and permanent pavement marking for repair, rehabilitation and preservation. RAP funds, local funds 2026-2027 $1,450,000 Bar 14 Turnaround 2017 flood events caused water to overtop Bar 14 Road at Bridge #89041. Subsequent inspection found significant damage to one of the girders. The County removed the bridge and completed channel repair work to alleviate flood problems. While the County plans to pursue funding to replace the bridge, the funding is competitive and Bar 14 Road Local funds 2027 $175,000 2026-2031 Summary Page 11 does not see sufficient daily traffic. Since the likelihood of obtaining funds in the near future is remote, the county will build a turnaround at each dead end until funding is secured. Work will be done by County Forces. Gravel Road Upgrades Kittitas County gravel road upgrade will complete road maintenance projects and improvements on existing gravel roads at various locations throughout the County on an annual schedule. Local funds 2026 $450,000 Liberty Road Swauk Creek Bridge MP 0.2 Liberty Road Bridge replacement – safety Planned FLAP/FHWA funds, local funds (BRAC $?) 2023-2024 $3,207,000 Dickey Creek Bridge Replacement Teanaway Road Bridge replacement Local Funds 2023 $400,000 I-90 Widening (State Project) Cle Elum to Easton Improve capacity and safety Local funds State Transportation and FHWA through WSDOT. 2023-2024 $750,000 6. Regional Parks and Trails Project Name Location & Description Funding Source Schedule Total Cost Manastash Trailhead Parking Lot Manastash Trail, Design & build parking lot TBD 2026 $485,000 Upper County ATV Trail (UC) Upper County Planning and project development TBD 2030-2031 $350,000 Ellensburg Field House Lower County, County cost share with Ellensburg TBD 2027-2030 $3,000,000 Gladmar Park (MC) Mid County. Feasibility study to support access include preliminary design. TBD 2029 $100,000 Upper County Recreation Center Upper County, County cost share for recreation center Local 2028-2031 $3,000,000 Yakima River Access Canyon Road. Design and construct additional facilities including parking and trails. TBD 2027-2031 $600,000 Vantage River Walk (LC) Lower County. TBD 2030-2031 $600,000 Thompson Park Thompson Park Naneum Road. Design and construct restroom facility. Local 2026 $75,000 2026-2031 Summary Page 12 7. Solid Waste Project Name Location & Description Funding Source Schedule Total Cost A. Relocate Ellensburg Transfer Station and Compost Facility B. Decommission and Restore Existing Location and Identify Options for Future Use. 925 Industrial Way, Ellensburg. Build a new Transfer Station and Compost Facility. Solid Waste Fund / Grant / Loan 2025-2031 $23,000,000 Cle Elum Transfer Station Entrance Cle Elum Transfer Station 50 No. 5 Mine Road. Construct a new entrance to allow for better queuing for the scales. Solid Waste Fees and Grants 2025-2031 $1,6000,000 8. Library Services Project Name Location & Description Funding Source Schedule Total Cost Ellensburg Public Library HVAC System 209 N Ruby St., Ellensburg WA Install new HVAC system to replace current system. Commissioner Approved Bond (City of Ellensburg) 2024-2028 $1,000,000 2026-2031 Summary Page 13 9. Emergency Services Project Name Location & Description Funding Source Schedule Total Cost Sheriff’s Office Training Room 307 W Umptanum. Training room at the sheriffs office General Fund 2026 $288,000 Sheriff’s Office Evidence Room & Expansion 307 W Umptanum Rd. Enhancement to current evidence processing & storage facilities, and improvements to overflow evidence & property storage bay. General Fund, Federal Funds (anticipated) 2026 $150,000 Upper County Emergency Operations Center & Search and Rescue Base Airport Road off Cle Elum Airport Access Road. Establishing primary Emergency Operations Center in growing upper county. General Fund, Federal Funds (anticipated) 2026-2031 $3,000,000 Natural Gas Generator with enclosure 10700 N Thorp Hwy, Thorp Fire Staton FEMA Grant/ Rotary Club Grant 2026-2031 $125,000 Solar Generator Fire Station 12 on Hwy 10 TBD 2026-2031 $45,000 Table 1 continued - Six-Year Plan Summary 2024-2029 Summary Kittitas County Public Facility Projects Project Name Location & Description Funding Source Schedule Total Cost Kittitas Valley Healthcare Hospital Expansion 603 S. Chestnut, Ellensburg Hospital expansion to surgery, materials management, and radiology. TBD 2023-2028 $13,586,000 Kittitas Valley Healthcare Orthopedic Clinic 611 S. Chestnut St. Ste. D & E Complete interior remodel. TBD 2024-2028 $2,484,000 Kittitas Valley Healthcare General Surgery Clinic 611 S. Chestnut St. Ste. A Tenant improvement project, interior update. TBD 2024-2028 $783,000 Kittitas Valley Healthcare New Parking Lot 611 S. Pearl St. Vacant lot NW of KVH Medical Arts Center. New parking lot. TBD TBD TBD Kittitas Valley Healthcare Cle Elum Family Medical Clinic 201 Alpha Way, Cle Elum. “Possible addition” TBD TBD TBD Kittitas Valley Healthcare Internal Medicine 700 E. Manitoba Ave. Remodel of KVH Interal Medicine Clinic, 9000 sq. ft. facility $250,000 Sunderland Grant 2024-2028 $250,000 Kittitas Valley Healthcare Cle Elum Physical Therapy 201 Alpha Way, Cle Elum. Recarpeting and repainting of building (may be maintenance) TBD TBD TBD 2026-2031 Summary Page 14 Kittitas Valley Healthcare Home Health 1506 Radio Rd. Remodel of half of 10000 sq. ft. facility. TBD TBD TBD Kittitas Valley Healthcare Family Medicine 716 E. Manitoba Ave. Complete remodel of two facilities, one is 7000 sq. ft and one is 3000 sq. ft. TBD TBD TBD 10. Education Project Name Location & Description Funding Source Schedule Total Cost Central Washington University, Secondary Geothermal Module Parcel # 143534, E Dean Nicholson Blvd, CWU campus, Ellensburg, WA The secondary Geothermal Module adds redundancy and future expansion capability for our geothermal infrastructure. State Office of Financial Management (OFM) Capital, &Climate Commitment Act. 2025-2031 $16,464,000 Central Washington University, Science Building Carbon Reduction Parcel # 143534, 400 E University Way, CWU campus, Ellensburg, WA The project implements the energy efficiency improvement of the Science 1 mechanical buildings. Climate Commitment Act 2025 $4,509,000 Central Washington University, Black Hall/Multicultural Center Parcel # 143534, 400 E University Way, CWU Campus. The project establishes a student focused academic facility dedicated to the celebration of Equity & Diversity. State OFM Capital 2025 $6,000,000 Central Washington University, North Academic Complex Parcel # 143534, 1303 N. Walnut St. , CWU campus, Ellensburg, WA The North Academic Complex is a replacement project for the existing Farrell Hall, L&L Building. State OFM Capital, Climate Commitment Act 2023-2031 $108,963,000 Table 1 continued - Six-Year Plan Summary 2024-2029 Summary Kittitas County Public Facility Projects Project Name Location & Description Funding Source Schedule Total Cost Ellensburg School District, Lincoln Elementary Install Additional Playground Equipment Lincoln Elementary Playground Equipment Capital Fund FY 2026- 2030 $50,000 Ellensburg School District, EHS Refurbish Main Gym Floor Ellensburg High School - Refurbish/Sand Main Gym Floor General Fund Transfer to Capital FY 2026- 2030 $90,000 Ellensburg School District, EHS Remodel Culinary Arts Kitchen Ellensburg High School - Remodel Culinary Arts Kitchen. General Fund and Grant FY 2024- 2025 $185,000 2026-2031 Summary Page 15 Ellensburg School District, EHS Repair Asphalt Ellensburg High School Repair Asphalt General Fund Transfer to Capital FY 2024- 2025 $224,642 Ellensburg School District, EHS Replace Aux Gym Floor Ellensburg High School Replace Aux Gym Floor General Fund Transfer to Capital FY 2026- 2030 $50,000 Ellensburg School District, EHS Replace Main Gym Bleacher Drive Wheels Ellensburg High School Replace Main Gym Bleacher Drive Wheels Capital Fund FY 2024- 2025 $38,401 Ellensburg School District, EHS Replace “away” bleachers Ellensburg High School Replace “Away” Bleachers General Fund Transfer to Capital FY 2026- 2030 $70,000 Ellensburg School District, EHS Replace Football Goal Posts Ellensburg High School Replace Football Goal Posts General Fund Transfer to Capital FY 2026- 2030 $15,000 Ellensburg School District, EHS Replace Football Field Sprinklers Ellensburg High School Replace Football Field Sprinkler System Capital Fund FY 2026- 2030 $30,000 Ellensburg School District, EHS Home Economics Improvements Ellensburg High School, Replace Home Economics Countertop, Electrical, Plumbing. Capital Fund FY 2024- 2025 $43,750 Ellensburg School District, EHS Sidewalk Improvements Ellensburg High School Sidewalk Resurface/ Repair General Fund Transfer to Capital FY 2024- 2025 $10,000 Ellensburg School District, EHS Sealcoat and Paint Ellensburg High School Sealcoat and Paint Parking Lots and Driveways General Fund Transfer to Capital FY 2024- 2025 $124,223 Ellensburg School District, Early Learning Center Bus Land 705 W 15th. Early Learning Center Install Additional Bus Lane Capital Fund FY 2026- 2030 $50,000 Ellensburg School District, Early Learning Center Security Cameras 705 W 15th. Early Learning Center Install Additional Security Cameras General Fund Transfer to Capital FY 2026- 2030 $10,000 Ellensburg School District, Ida Nason Aronica Elementary Fence and Irrigation 2101 N Cora St. Extend Playground Fence and Irrigation Capital Fund FY 2024- 2025 $50,000 Ellensburg School District, Ida Nason Aronica Elementary Install Card Readers 2101 N Cora St. Install Card Readers General Fund Transfer to Capital FY 2026- 2030 $12,000 Ellensburg School District, Ida Nason Aronica Elementary Install Top Soil for Playground 2101 N Cora St. Install Top Soil Capital Fund FY 2026- 2030 $30,000 Ellensburg School District, IT Mitigation Plan 1300 E 3rd. IT Mitigation Plan Tech Levy FY 2024- 2030 $5,041,671 2026-2031 Summary Page 16 Ellensburg School District, Lincoln Elementary School Install Card Readers 200 South Sampson St. Install Card Readers General Fund Transfer to Capital FY 2026- 2030 $10,000 Ellensburg School District, Morgan Middle School HVAC 400 E 1st Ave. Morgan Middle School Upgrade HVAC Capital Fund FY 2026- 2030 $150,000 Ellensburg School District, Morgan Middle School Outdoor Lighting 400 E. 1st Ave. Additional Outdoor Lighting General Fund Transfer to Capital FY 2026- 2030 $10,000 Ellensburg School District, Morgan Middle School Install Card Readers 400 E. 1st Ave. Install Card Readers General Fund Transfer to Capital FY 2026- 2030 $12,000 Ellensburg School District, Morgan Middle School Install Mechanical Choir Shells 400 E. 1st Ave. Install Mechanical Choir Shells in MPAC General Fund Transfer to Capital FY 2026- 2030 $20,000 Ellensburg School District, Morgan Middle School Install Video Equipment 400 E. 1st Ave. Install Video Equipment in MPAC General Fund Transfer to Capital FY 2026- 2030 $10,000 Ellensburg School District, Morgan Middle School Replace Cores and Keys 400 E. 1st Ave. Replace Cores and Keys General Fund Transfer to Capital FY 2026-20 30 $30,000 Ellensburg School District, Morgan Middle School Replace MPAC Sound System 400 E. 1st Ave. Replace MPAC Sound System General Fund Transfer to Capital FY 2026- 2030 $35,000 Ellensburg School District, Morgan Middle School Retro- Commission HVAC, Lighting, and Building Envelope to meet HB 1257 400 E. 1st Ave Retro- Commission HVAC, Lighting, and Building Envelope to meet HB 1257 General Fund Transfer to Capital FY 2026- 2030 $10,000 Ellensburg School District, Morgan Middle School Parking Lot Sealcoat 400 E. 1st Ave Parking Lot Sealcoat for Satellite Parking Lot General Fund Transfer to Capital FY 2024- 2025 $10,000 Ellensburg School District, Morgan Middle School MPAC Stage Lighting Upgrade 400 E. 1st Ave Upgrade MPAC Stage Lighting General Fund Transfer to Capital FY 2026- 2030 $50,000 Ellensburg School District, Mt. Stuart Elementary Add Top Soil for Playground 1701 N Cora St. Add Top Soil for Playground Capital Fund FY 2024- 2025 $30,000 2026-2031 Summary Page 17 Ellensburg School District, Mt. Stuart Elementary Dredge Collection Pond 1701 N Cora St. Dredge Collection Pond Capital Fund FY 2024- 2025 $35,000 Ellensburg School District, Mt. Stuart Elementary Playground Cameras 1701 N Cora St. Install Additional Playground Cameras General Fund Transfer to Capital FY 2026- 2030 $20,000 Ellensburg School District, Mt. Stuart Elementary Rehab Community Center Gym Floor 1701 N Cora St. Rehab Community Center Gym Floor Capital Fund FY 2026- 2030 $60,000 Ellensburg School District, Mt. Stuart Elementary Upgrade Fire, Communication and HVAC 1701 N Cora St. Upgrade Fire, Communications, and HVAC at Community Center Capital Fund FY 2026- 2030 $150,000 Ellensburg School District Transportation 10- Passenger Van 1501 E Capitol Ave Ten Passenger Van General Fund Transfer to Capital FY 2026- 2030 $80,000 Ellensburg School District Transportation Lunch Delivery Truck 1501 E Capitol Ave Lunch Delivery Truck General Fund Transfer to Capital FY 2024- 2025 $80,000 Ellensburg School District Transportation New Transfer Location Between Softball Field and Bus Barn 1501 E Capitol Ave New Transfer Location Between Softball Field and Bus Barn Capital Fund FY 2026- 2030 $60,000 Ellensburg School District Transportation Bus Replacement 1501 E Capitol Ave Vehicle Fund Support to Increase Student Growth / 30-Year Bus Replacement Transportation Vehicle Fund FY 2024- 2030 $7,758,088 Ellensburg School District Transportation Replace Fuel Tank 1501 E Capitol Ave Replace Fuel Tank General Fund Transfer to Capital FY 2026- 2030 $50,000 Ellensburg School District Transportation Sealcoat and Paint Parking Lots 1501 E Capitol Ave Sealcoat and Paint Parking Lots Capital Fund FY 2024- 2025 $75,000 Ellensburg School District Transportation Upgrade HVAC 1501 E Capitol Ave Upgrade HVAC Capital Fund FY 2026- 2030 $85,000 Ellensburg School District Valley View Elementary Replace Playground Equipment 1508 E 3rd Ave Replace Playground Equipment General Fund Transfer to Capital FY 2026- 2030 $100,000 2026-2031 Summary Page 18 Ellensburg School District Valley View Elementary Sealcoat and Paint all Parking Lots 1508 E 3rd Ave Sealcoat and Paint all Parking Lots and Valley View Blvd General Fund Transfer to Capital FY 2024- 2025 $124,223 Thorp School District Cooling System Upgrade 10831 N. Thorp Hwy Gym/Locker Room and High School Kitchen Cooling System Clean Air Grant 2024-2025 $1,000,000 Thorp School District Remodel 10831 N. Thorp Hwy Brick Building Kitchen and Staff Lounge Remodel Small School Modernization Grant 2024-2025 $250,000 Thorp School District Security System 10831 N. Thorp Hwy Security System Upgrades / Cameras Capital Projects Levy 2024-2025 $15,000 Thorp School District Replace Exterior Doors 10831 N. Thorp Hwy Replace Numerous External Doors Small School Modernization Grant 2024-2025 $40,000 Thorp School District Asbestos Abatement 10831 N. Thorp Hwy Asbestos Abatement in Brick Building Small School Modernization Grant 2024-2025 $80,000 Thorp School District Outdoor Education Classrooms 10831 N. Thorp Hwy Outdoor Education Classrooms Healthy Kids Grant 2024-2025 $30,000 Thorp School District Resurfaced and Painted Main Gym Floor 10831 N. Thorp Hwy Resurfaced and Painted Main Gym Floor Capital Projects Levy 2024-2025 $40,000 Thorp School District New Exterior Lights 10831 N. Thorp Hwy New Exterior Lights for Brick Building Small School Modernization Grant 2024-2025 $25,000 Thorp School District New Scoreboard 10831 N. Thorp Hwy New Scoreboard Capital Projects Levy 2026-2031 $140,000 Thorp School District CTE Engineering Classroom, Shop Remodel 10831 N. Thorp Hwy CTE Engineering Classroom, Shop Remodel Capital Projects Levy 2026-2031 $140,000 Thorp School District Outdoor Education Classrooms 10831 N. Thorp Hwy Outdoor Education Classrooms Capital Projects Levy/ Healthy Kids Grant 2026-2031 $50,000 Kittitas School District Solar Project 500 N Pierce St, Kittitas Elementary School Clean Energy Improvement Solar Project Dept. of Commerce Grant/ KSD 2025 $521,449 11. Flood Control Zone District Project Name Location & Description Funding Source Schedule Total Cost Flood Hazard Risk and Repetitive Loss Program Yakima River. Comprehensive Flood Planning and Repetitive Loss Hazard Assessment Flood Control Zone District (FCZD) Levy, future phases by grant 2027 $60,000 2026-2031 Summary Page 19 Repetitive Loss: Easton Reach Flood Study Outreach informed by repetitive loss area analysis and 2023 Easton Reach Flood Hazard Assessment. Flood Control Assistance Account Program (FCAAP), FCZD Levy. Future phases will be grant eligible 2028-2029 $40,000 CTP Flood Studies Continued funding through FEMA’s Cooperating Technical Partnership (CTP) program to improve flood models and channel migration zone mapping. 2027-2028 Wilson- Naneum, 2029-2030 Manastash flood and alluvial fan mapping FEMA CPT and local funding 2027-2030 $275,000 Lower Kittitas Reach Floodplain Reconnection Implementation of preferred alternative from Hanson Pits Restoration Plan and Design. 2026- Final design and permitting, 2027-2029- Implementation, 2030-2031 vegetation management. SRFB, IP, FbD, and local 2022-2031 $13,395,000 Reecer Creek Dolarway to University Project scheduled to be completed by the City of Ellensburg. If not completed funding could be extended to 2026. City of Ellensburg 2025-2026 WNC-Phase 3 Whiskey Creek Re- Route Pending results of feasibility study underway. 2026-2027 Final design and permitting. 2028-2029 Implementation Federal Highways AOP and local 2026-2031 $2,120,000 Whisky Creek at Ellensburg Water Company (EWC) Siphon WNC. Increase flood conveyance, eliminate canal / creek intermingling, and address fish passage barrier by replacing current EWC crossing at Whiskey Creek with a siphon. FCZD Levy, Grant or partner support for construction 2026-2029 $1,780,000 Flow Conveyance Restoration- Mercer Creek MCF-KC Partnership. Mercer at Helena project maintenance and Mercer Creek west of Railroad project design(2026) Mercer Creek west of Railroad Ave project permitting, implementation and maintenance. Ecology 2026-2031 $272,000 Flow Conveyance Restoration- Whiskey Creek Inset floodplain and crack willow removal between Bowers and Bender Roads. 2026-Permitting. 2027 Phase 1 construction. Private, Ecology 2026-2031 $380,000 2026-2031 Summary Page 20 Crystal Creek Conveyance Project Implement project identified through Crystal Creek CTP Study Local 2031 $100,000 Hazard Mitigation Plan Update The Multi-jurisdictional Hazard Mitigation Plan needs to be updated every five years EMD 2028-2029 $150,000 West Ellensburg Interchange Flood informed development effort in West Ellensburg Interchange. 2024-Finalization of preferred alternative and design, 2025 – CLOMR / environmental permitting. 2026-2027 implementation Local 2024-2031 $2,750,000 CRS Critical Facility Compliance Address critical facility at flood risk from Yakima River flooding. Compliance required for continued good standing in National Flood Insurance Program and Community Rating System. Local 2025-2027 $2,000,000 Wilson Creek Realignment Implementation funding for proposal to relocate Wilson Creek in Brook Land vicinity. FbD, FCAAP, Local 2029-2031 $830,000 Wilson-Naneum Alluvial Fan Management 2027- Project scoping. 2028- 2030 – Geotechnical investigation. 2030-2031- Design and permitting, 2032 Implementation FCAAP 2028-2030 $305,000 2026-2031 Summary Page 21 12. Water – Group A Systems - No projects planned for 2026-2031 period 2026-2031 Summary Page 22 13. Sanitary Sewer - No projects planned for 2026-2031 period Kittitas County Airport Facilities Page 23 1. 2BAirport Facilities This section includes an inventory of the existing airport facilities in Kittitas County and a detailed description of each airport facility improvement that is included in the six-year plan. The inventory of facilities in Table 2 below also describes each facility’s size in order to determine if it addresses the County’s long-term community needs. Table 2 Existing Public Facilities and Services Airport Facilities Facility Provider Description Size Bowers Field Airport Kittitas County Asphalt, 11/29 Runway, 4,300’x150’, asphalt. Built 1943. 1,300 acres Bowers Field Hanger Bldg. 404 Kittitas County Built 1997. 20,000 sq. ft. Bowers Field T- Hanger Kittitas County Built 1960. 12,500 sq. ft. Cle Elum Municipal Airport City of Cle Elum 50,000 sq. ft. parking apron area, 07/25 Runway, 2,552’x40’, asphalt, 1,000 aircraft usage per year. Built 1959. 135 acres De Vere Field Jim De Vere (private owner) 08/26 Runway, 2,055’x30’, asphalt, 6 single engine aircraft based. Built 1963. 50 acres Easton State Airfield WSDOT 09/27 Runway, 2,640’x100’, turf, 30 aircraft usage per month, built in 1930’s. 15 acres Kittitas County Airport Facilities Page 24 Airport Facilities – Hangar Taxilane Complex (West) Project Information and Selection Criteria Location Bowers Field Airport, Ellensburg Links to Other Projects or Facilities N/A Description Design and construct new hangar taxilane including excavation, grading, fence relocation and drainage improvement. Justification (Need/Demand) This project provides storage for based/transient aircraft across the state. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Design and new construction Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2026 2027-2031 Total Design and Engineering $157,895 $157,895 Construction $1,069,110 $1,069,110 TOTAL $1,227,005 $1,227,005 Funding Sources 2026 2027-2031 Total FAA GA Entitlement $1,104,305 $1,104,305 Local Match $122,700 $122,700 TOTAL $1,227,005 $1,227,005 Annual Operations and Maintenance Estimated Costs The County does not currently track maintenance costs for these improvements. Estimated Revenues Based on lease rates Anticipated Savings Due to Project None Department Responsible for Operations Public Works Department Kittitas County Airport Facilities Page 25 Airport Facilities – Runway 11/29 Parallel Taxiway and Taxiway Lighting Project Project Information and Selection Criteria Location Bowers Field Airport, Ellensburg Links to Other Projects or Facilities N/A Description Construct new parallel taxiway including pavement, lighting, and marking installation Justification (Need/Demand) This project is needed to provide adequate facilities for projected airplane operations. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: New facility construction Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2026 2027-2031 Total Design and Engineering Construction $7,344,840 $7,344,840 TOTAL $7,344,840 $7,344,840 Funding Sources 2026 2027-2031 Total FAA GA Entitlement & Other Funding $6,977,597 6,977,597 Local Match $367,243 $367,243 TOTAL $7,344,840 $7,344,840 Annual Operations and Maintenance Estimated Costs The County does not currently track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Department Responsible for Operations Public Works Department Kittitas County Airport Facilities Page 26 Airport Facilities – Rehabilitate Runway 11/29 Project Information and Selection Criteria Location Bowers Field Airport, Ellensburg Links to Other Projects or Facilities N/A Description Rehabilitate Runway 11/29 including completing an AGIS survey, reducing the runway width, drainage improvements, and replacing the runway lighting system. Justification (Need/Demand) This project removes the failed asphalt pavement and replaces the runway lighting system that has outlived its useful life. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Facility repair and renovation Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2028 2029-2030 Total Design and Engineering $388,889 $388,889 Construction $3,277,778 $3,277,778 TOTAL $388,889 $3,277,778 $3,666,667 Funding Sources 2028 2029-2030 Total FAA GA Entitlement $350,000 $2,950,000 $3,300,000 Local Match $38,889 $327,778 $366,667 TOTAL $388,889 $3,277,778 $3,666,667 Annual Operations and Maintenance Estimated Costs The County does not currently track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Department Responsible for Operations Public Works Department Kittitas County Airport Facilities Page 27 Airport Facilities – ALP Update with Forecast Verification Project Information and Selection Criteria Location Bowers Field Airport, Ellensburg Links to Other Projects or Facilities N/A Description Update the Airport Layout Plan (ALP) and forecast verification. Justification (Need/Demand) Confirm need for a runway extension to accommodate larger aircraft. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Design and Forecasting Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2027 2028-2031 Total Design and Engineering $60,000 $60,000 Construction TOTAL $60,000 $60,000 Funding Sources 2027 2028-2031 Total FAA GA Entitlements $54,000 $54,000 Local Match $6,000 $6,000 TOTAL $60,000 $60,000 Annual Operations and Maintenance Estimated Costs The County does not currently track maintenance costs for utility improvements. Estimated Revenues None Anticipated Savings Due to Project None Department Responsible for Operations Public Works Department Kittitas County Airport Facilities Page 28 Airport Facilities– Industrial Park Building Development Project Information and Selection Criteria Location Bowers Field Airport, Ellensburg Links to Other Projects or Facilities N/A Description The design and construction of new industrial buildings in the Bowers Field Industrial Park. Justification (Need/Demand) Bowers Field has significant land to manage and under FAA recommendations the airport should work to be self -sufficient with support of the Sponsoring Agency (County) to relieve the financial burden on local agencies. These buildings would provide a positive initial step to increase independence and prove space for businesses. Level of Service (LOS) / Project Type LOS: N/A. Project Type: New facility Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2027 2028-2030 Total Design and Engineering TBD TBD TBD Construction TBD TBD TOTAL To Be Determined Funding Sources 2027 2028-2030 Total Funding options to be determined TBD TBD TBD TOTAL Annual Operations and Maintenance Estimated Costs $50,000 annually Estimated Revenues $150,000 annually Anticipated Savings Due to Project None Department Responsible for Operations Public Works Department Example Purposes Only Kittitas County Airport Facilities Page 29 Airport Facilities– Hangar Taxilane Complex (East) Project Information and Selection Criteria Location Bowers Field Airport, Ellensburg Links to Other Projects or Facilities N/A Description Design and construct new hangar taxilane including excavation, grading, fence relocation and drainage improvement. Justification (Need/Demand) This project provides storage for based/transient aircraft across the state. Level of Service (LOS) / Project Type LOS: N/A. Project Type: Design and construction Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2029 2030-2031 Total Design and Engineering $166,667 $166,667 Construction $1,000,000 $1,000,000 TOTAL $166,667 $1,000,000 $1,166,667 Funding Sources 2029 2030-2031 Total FAA GA Entitlement $150,000 $900,000 $1,050,000 Local Match $16,667 $100,000 $116,667 TOTAL $166,667 $1,000,000 $1,166,667 Annual Operations and Maintenance Estimated Costs The County does not currently track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Department Responsible for Operations Public Works Department Example Purposes Only Kittitas County Airport Facilities Page 30 Airport Facilities – Runway 11 Extension Project Information and Selection Criteria Location Bowers Field Airport, Ellensburg Links to Other Projects or Facilities N/A Description Extend runway 11/29 design Justification (Need/Demand) This project is needed to accommodate increased operations by larger jets. Level of Service (LOS) / Project Type LOS: N/A. Project Type: Design Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2030 2031 Total Design and Engineering $500,000 $500,000 Construction TOTAL $500,000 $500,000 Funding Sources 2030 2031 Total FAA GA Entitlement $450,000 $450,000 Local Match $50,000 $50,000 TOTAL $500,000 $500,000 Annual Operations and Maintenance Estimated Costs The County does not currently track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Department Responsible for Operations Public Works Department Kittitas County Events Center Page 31 Airport Facilities – Wildlife Hazard Mitigation Project Information and Selection Criteria Location Bowers Field Airport, Ellensburg Links to Other Projects or Facilities N/A Description Mitigate wildlife hazards in the vicinity of runway 11/29 Justification (Need/Demand) This project will address wildlife hazards established by the Wildlife Hazard Assessment. Level of Service (LOS) / Project Type LOS: N/A. Project Type: Design and Construction Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2030 2031 Total Design and Engineering $760,000 $760,000 Construction $1,690,000 $1,690,000 TOTAL $2,450,000 $2,450,000 Funding Sources 2030 2031 Total FAA GA Entitlement $2,327,500 $2,327,500 Local Match $122,500 $122,500 TOTAL $2,450,000 $2,450,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Department Responsible for Operations Public Works Department Vicinity Map Kittitas County Events Center Page 32 2. Kittitas County Administrative Offices This section includes an inventory of Kittitas County Administrative Offices and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 3 below also describes each facility’s size in order to determine if it addresses the County’s long-term community needs. Table 3 Existing Public Facilities and Services Kittitas County Administrative Offices Facility Department Description Size Armory Building Extension, Noxious Weed, and Kittitas Valley Event Center 901 E. 7th, built 1950. Remodel completed in 2014. 13,140 sq. ft. Cle Elum Public Health Public Health 415 E. First Ave., Cle Elum, leased building. Built unknown. 2,400 sq. ft. County Courthouse Assessor, Auditor, Clerk, Commissioners, Lower District Court, Human Resources, Information Services, Juvenile Probation, Maintenance, Prosecutor, Superior Court, Treasurer 205 W. 5th, built 1958. 47,691 sq. ft. Permit Center Public Works, Community Development Services, and Fire Marshal 411 N. Ruby, built 1959. 13,625 sq. ft. Public Safety Building Sheriff/Corrections 205 W. 5th, built 1985. Remodeled 2010 to 2012. 33,209 sq. ft. Sheriff Administration Office Sheriff 307 Umptanum Rd., built 2009. 11,880 sq. ft. Sorenson Building Public Health and Misdemeanant Probation 507 Nanum Rd., built 1942. 17,648 sq. ft. Upper District Court Building Upper District Court 700 E. 1st, Cle Elum, built unknown. Remodeled in 2013. 6,000 sq. ft. Vantage Marine Storage Building Sheriff Vantage Boat Launch, built in 2014. 1,024 sq. ft. Kittitas County Events Center Page 33 Kittitas County Administrative Offices – Relocate Permit Center and Health Department Project Information and Selection Criteria Location 411 N Ruby, Ellensburg– see existing facility inventory Links to Other Projects or Facilities N/A Description Relocate Permit Center Justification (Need/Demand) This project is needed to upgrade outdated facilities for CDS, PWD, Fire Marshal and Public Health offices. The building was constructed in 1959 and the County purchased the building in 2002. The County has outgrown the building and the Parking area around the building. Goal is to Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Facility repair, remodel, and renovation Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2026-2031 Total Design and Engineering 700,000 700,000 Construction $15,250,000 $15,250,000 TOTAL $15,950,000 $15,950,000 Funding Sources 2025-2029 Total General Obligation Bonds $15,950,000 $15,950,000 TOTAL $15,950,000 $15,950,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Kittitas County Events Center Page 34 Department Responsible for Operations Facilities and Maintenance Office Kittitas County Events Center Page 35 Kittitas County Administrative Offices – County Administration Building Project Information and Selection Criteria Location New Courthouse Links to Other Projects or Facilities Courthouse, Permit Center, and Morris Sorenson bldg. Description New County Administration Building Justification (Need/Demand) Office space is needed for all county functions. Consolidating administrative offices. This includes Commissioner’s Office, Auditors Office, Assessors’ Office, Treasurers Office, Fire Marshal, Community Development Services, and Public Works Administrative Office. The Courts and related offices would remain in the existing Courthouse. Level of Service (LOS) / Project Type Established LOS: N/A. Project Type: New facility Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2025 2026-2031 Total Master Plan / Conceptual Site Plan $120,000 $250,000 $370,000 Design and Engineering $1,500,000 $1,500,000 Construction $151,035,000 $151,035,000 TOTAL $120,000 $152,785,000 $152,905,000 Funding Sources 2021 2026-2031 Total Real Estate Excise Tax (REET)& commissioner approved Bond $120,000 152,785,000 $152,905,000 TOTAL $120,000 $152,785,000 $152,905,000 Annual Operations and Maintenance Kittitas County Events Center Page 36 Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Department Responsible for Operations Facilities and Maintenance Office Kittitas County Events Center Page 37 Kittitas County Administrative Offices – Public Safety Building Improvements Project Information and Selection Criteria Location 205 W. 5th, Ellensburg – see existing facility inventory Public Safety Building Links to Other Projects or Facilities N/A Description Various improvements to include new siding for old portion of jail and replace ceiling in hallways. Cover the Outdoor recreation areas and replacement of aging systems. Justification (Need/Demand) This project is needed to provide safe and adequate facilities for inmates and correctional officers. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Facility remodel and renovation Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2025 2026-2031 Total Design and Engineering $150,000 $300,000 $450,000 Construction $3,500,000 $7,500,000 $11,000,000 TOTAL $3,650,000 $7,800,000 $11,450,000 Funding Sources 2025 2026-2031 Total General Fund & 1/10th sales tax $3,650,000 $7,800,000 $11,450,000 TOTAL $3,650,000 $7,800,000 $11,450,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Kittitas County Events Center Page 38 Department Responsible for Operations Sheriff Office Kittitas County Events Center Page 39 Kittitas County Administrative Offices – Juvenile Detention Holding Facility Project Information and Selection Criteria Location 205 W. 5th, Ellensburg – see existing facility inventory County Courthouse Links to Other Projects or Facilities N/A Description Building remodel to provide a temporary holding cell for juvenile detention. Justification (Need/Demand) This project is needed to provide a secure area for temporarily holding juveniles at the Courthouse. Permanent detention facilities are rented by Yakima County and juveniles are transported as needed. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Facility remodel and renovation Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2025 2026-2031 Total Design and Engineering To Be Determined To Be Determined Construction $50,000 $50,000 TOTAL $50,000 $50,000 Funding Sources 2026-2031 Total Law & Justice sales tax $50,000 $50,000 TOTAL $50,000 $50,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Kittitas County Events Center Page 40 Department Responsible for Operations Facilities and Maintenance Office Kittitas County Administrative Offices – Kittitas County Corrections Facility Project Information and Selection Criteria Location To be Determined Links to Other Projects or Facilities New Kittitas County Jail Facility Description Construction of New Kittitas County Corrections Facility Justification (Need/Demand) Construct a new Kittitas County Corrections Facility to replace the aging facility that was built in 1980. The existing. Level of Service (LOS) / Project Type New Facility Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2026 2026-2031 Total Design and Engineering $1,000,000 $74,919,208 Construction $174,811,493 TOTAL $249,730,701 Funding Sources 2023-2027 Total Commissioner approved bond $249,730,701 TOTAL $249,730,701 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Facilities and Maintenance Office Kittitas County Events Center Page 41 Kittitas County Administrative Offices – Upper County Sheriff’s Office Facility Project Information and Selection Criteria Location Upper county, to be determined… Links to Other Projects or Facilities Description Facility for sheriff’s office in the upper portion of Kittitas County. Justification (Need/Demand) Lack of facility for sheriff’s office in the upper county diminishes department’s ability to conduct law enforcement activity in this region. Level of Service (LOS) / Project Type New Facility Comprehensive Plan Citations Capital Cost 2026-2031 Total Design and Engineering 500,000 500,000 Construction 5,000,000 5,000,000 TOTAL 5,500,000 5,500,000 Funding Sources 2026-2031 Total Commissioner approved bond TOTAL 5,500,000 5,500,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Facilities and Maintenance Office Kittitas County Events Center Page 42 Kittitas Valley Event Center / Fairgrounds This section includes an inventory of Kittitas Valley Event Center/Fairgrounds facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 4 below also describes each facility’s size in order to determine if it addresses the County’s long-term community needs. Table 4 Existing Public Facilities and Services Kittitas Valley Event Center / Fairgrounds Facility Built date Size Facility Built date Size Frontier Village Buildings 1890’s Unknown Restrooms / R.A. (1) 1960’s 2,035 sq. ft. Grandstand – Main/Heritage Bldg. 1925 18,965 sq. ft. Fair Office and Restrooms 1974 3,954 sq. ft. 8th Street Ticket Office 1930’s 1,568 sq. ft. Behind the Chutes 1976 1,000 sq. ft. Souvenir Booth 2004 Unknown Bloom Pavilion 1980 26,400 sq. ft. Posse Barn (1) 1940’s 3,000 sq. ft. Restrooms / R.A. (2) 1982 645 sq. ft. Posse Barn (2) 1940’s 4,800 sq. ft. Maintenance Shop 1986 1,500 sq. ft. Light Horse Barn 1940’s 3,200 sq. ft. Gazebo 1989 450 sq. ft. Cattle and Swine Barn 1940’s 12,000 sq. ft. Buckaroo’s Stands & Pens 1991 5,984 sq. ft. Draft Horse Barn 1940’s 10,450 sq. ft. Gold Buckle Building 2001 2,400 sq. ft. Teanaway/Umtanum Building 1940’s 17,556 sq. ft. Western Village 2004 3,140 sq. ft. First Rodeo Director’s Barn 1940’s 3,250 sq. ft. Fair Storage Shed 2004 600 sq. ft. Second Rodeo Director’s Barn 1940 3,250 sq. ft. East Rodeo Concession 2005 600 sq. ft. Bleachers E. (Uncovered) 1960’s 10,000 sq ft Bronze Pig Statue 2007 N/A Ellensburg Armory 1950 13,920 sq. ft. Rodeo Arena Bleachers 2007 3,950 sq. ft. Bleachers W. (Covered) 1960’s 10,756 sq. ft. Fair shed (Fuel) 2008 100 sq. ft. Kittitas County Events Center Page 43 Kittitas Valley Event Center / Fairgrounds – Rodeo Arena Northwest Grandstands Project Information and Selection Criteria Location 901 E. 7th, Ellensburg Links to Other Projects or Facilities N/A Description Replace old rodeo northwest grandstands complex. Justification (Need/Demand) This phase of this project is the replacement of section AA- JJ with the adjoining Behind the Chutes. Work includes removing existing structures and foundation, site work, new foundations and walls, seating structure and assembly, permitting, fees, and taxes. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Facility renovation Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost Total Design and Engineering $1,587,572 Construction $11,381,528 TOTAL $12,969,100 Funding Sources Total State Grants $999,100 $1,470,000 $2,469,100 Local Partnership – City of Ellensburg $2,500,000 $2,500,000 Local Partnership – Ellensburg Rodeo $2,500,000 $2,500,000 County LTAC Grant $3,000,000 $3,000,000 Revenue Bonds $2,500,000 $2,500,000 TOTAL $990,100 $11,970,000 $12,969,100 Kittitas County Events Center Page 44 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues ROI not yet calculated Anticipated Savings Due to Project $4,000,000 Department Responsible for Operations Kittitas Valley Event Center and Ellensburg Rodeo Kittitas Valley Event Center / Fairgrounds – Renovated Barn Complex and Emergency Evacuation Shelter Project Information and Selection Criteria Location 901 E. 7th, Ellensburg Links to Other Projects or Facilities N/A Description Fully replace 3 old barn facilities for a multi-purpose facility that can be utilized for various types of shows and exhibitions at the Kittitas Valley Event Center. This upgrade will better allow for the facilities to be used as emergency animal and human shelter during an emergency as well. Justification (Need/Demand) Equestrian activities, trade shows, exhibitions, fundraisers, sales, and other livestock events take place throughout the year and create demand for additional facilities. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Facility renovation Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost Total Design and Engineering $1,000,000 $1,000,000 Construction $5,500,000 $5,500,000 TOTAL $6,500,000 $6,500,000 Kittitas County Events Center Page 45 Funding Sources Total Federal Infrastructure or Emergency Funding Sources (Ferguson Group) $5,000,000 $5,000,000 General Obligation Bonds $1,500,000 $1,500,000 TOTAL $6,500,000 $6,500,000 Annual Operations and Maintenance Estimated Costs Not tracking maintenance costs for these improvements. Estimated Revenues Increased use will generate more revenue. Anticipated Savings Due to Project Maintenance and painting costs lowered. Will save over $1,000,000 in needed electrical upgrades for old, deteriorating facilities. Department Responsible for Operations Kittitas Valley Event Center Kittitas Valley Event Center / Fairgrounds – New RV Park Project Information and Selection Criteria Location 900 North Alder St., Ellensburg Links to Other Projects or Facilities Description An RV park to be built on the former site of Shady Brook Mobile Park. Justification (Need/Demand) Planned by the county for several years, will provide RV parking for the fairgrounds/rodeo. Level of Service (LOS) / Project Type New facility. Comprehensive Plan Citations Kittitas County Events Center Page 46 Capital Cost Total Design and Engineering $150,000 $150,000 Construction $2,500,000 $2,500,000 TOTAL $2,650,000 $2,650,000 Funding Sources Total State Grant (WSDA) $250,000 $250,000 Sale of F&L Property $252,000 $252,000 Cold Weather Shelter Income $71,000 $71,000 Commissioner approved bond $2,027,000 $2,027,000 TOTAL $2,650,000 $2,650,000 Annual Operations and Maintenance Estimated Costs $5,000 for water, lawn care, utilities, repairs annually Estimated Revenues $35,000 Anticipated Savings Due to Project Less repairs on old electrical and water hook ups. Department Responsible for Operations Facilities and Maintenance Office Kittitas County Maintenance Shops, Storage, and Parking Page 47 4. 5BKittitas County Maintenance Shops, Storage, & Parking This section includes an inventory of Kittitas County Maintenance shops, storage, and parking facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 5 below also describes facility’s size in order to determine if it addresses the County’s long-term community needs. The proposed projects for Kittitas County Maintenance Shops, Storage, and Parking are detailed in Appendix A. Table 5 Existing Public Facilities and Services Kittitas County Maintenance Shop, Storage, and Parking Facility Department Description Size Lower County PWD Heavy Equipment Storage West Shed Public Works 15th & Okanagon, built 1951. 4,875 sq. ft. Lower County PWD Heavy Equipment Storage East Shed Public Works 15th & Okanagon, built 1951. 4,875 sq. ft. Lower County PWD Main Heavy Equipment Shop Public Works 15th & Okanagon, built 1951. 6,240 sq. ft. Sheriff Central Storage Sheriff 307 Umptanum Rd., built 2009. 2,160 sq. ft. Upper County PWD main heavy equipment shop / admin Public Works 51 No. 5 Mine Road, Cle Elum, built 2021. 13,750 sq. ft Upper County PWD Salt / Sand storage Public Works 51 No. 5 Mine Road, Cle Elum, built 2021. 10,370 sq. ft Upper County PWD Large Equipment Storage Shed Public Works 51 No. 5 Mine Road, Cle Elum, built 2021. 9515 sq. ft Upper County PWD Equipment Storage Shed Public Works 51 No. 5 Mine Road, Cle Elum, built 2021. 4,400 sq. ft Upper County PWD Parking Lot Public works Asphalt parking area 18 stalls +2 ADA stalls. Built unknown. 20 stalls Vantage Boat Launch Parking Lot Public Works Vantage Boat Launch built approximately 1990. Includes large stalls for boats. 62 stalls Armory Parking Lot Ext, Weed, & Event Ctr Asphalt parking area. Built unknown. 20 stalls S Courthouse Parking Lot Courthouse Offices Off-street parking adjacent to Courthouse. Built unknown. 21 stalls W Courthouse Parking Lot Courthouse Offices Off-street parking adjacent to Courthouse. Built unknown. 7 stalls SW 6th Ave. & Water Street Courthouse Offices Improved parking lot. Built unknown. 44 stalls Kittitas County Maintenance Shops, Storage, and Parking Page 48 Table 5 – Continued Existing Public Facilities and Services Kittitas County Maintenance Shop, Storage, and Parking Facility Department Description Size NW 6th Ave. & Water Street Courthouse Offices Built unknown. Improved parking lot in 2010. 58 stalls NE 6th Ave. & Water Street Courthouse Offices Semi-improved parking lot. Built unknown. 18 stalls N Permit Center Public Works Improved off-street parking next to building. Built unknown. 14 stalls S Permit Center CDS Improved off-street parking next to building. Built unknown. 10 stalls Sheriff Administration Office Parking Lot Sheriff and Prosecutors Improved off-street parking next to building. Built unknown. 51 stalls SW Sorenson Building Parking Lot Public Health Improved off-street parking next to building. Built unknown. 24 stalls W Upper District Court Building Parking Lot Upper District Court Improved off-street parking next to building, 700 1st St., Cle Elum. Built unknown. 22 (shared) Cle Elum Centennial Center – Parking Lot for Public Health services by appointment Public Health Improved off-street parking next to building, 719 E. 3rd St, Cle Elum. Building space and parking are provided for Upper County Public Health services. Built unknown. 30 (shared) Suncadia / Upper County Sheriff Office Parking Lot Sheriff Improved off-street parking next to building., 4240 Bullfrog Rd, Suite 1, Cle Elum. Built unknown. 22 (shared) Kittitas Valley Event Center/Fairgrounds Parking Lots KV Event Center Does not include the unimproved parking areas used for large events. Built unknown. 136 Lower County PWD Shop Parking Lot Public Works Unimproved off-street parking next to building. Built unknown. 20 approx. E UPS Store Courthouse Improved off-street parking. Built unknown. 35 Kittitas County Roads Page 49 5. 6BKittitas County Roads The Kittitas County’s Six-Year Transportation Improvement Plan provides further detail of the facility improvements that were indicated in Table 1. The Six-Year Transportation Improvement Plan is adopted once a year in the fall and amended as needed throughout the first year of the program. Appendix B provides a detailed description of the proposed projects, mapping of the projects, and the funding plan. The latest version of the Six-Year Transportation Improvement Plan is available at the County website at: https://www.co.kittitas.wa.us/public-works/construction/default.aspx Solid Waste Page 50 6. 7BRegional Parks and Trails This section includes an inventory of Regional Parks and Trails facilities and a description of additional facility improvements that are included in the six-year recreation plan. The inventory of facilities in Table 6 below also describes existing facility’s size in order to determine if it addresses the County’s long-term community needs according to level of service standards. Table 6 Existing Public Facilities and Services Regional Parks and Trails Facility Provider Description Size Coal Mines Trail Coal Mines Trail Commission, Cle Elum, Roslyn, and Kittitas County From Cle Elum to Ronald, Northern Pacific Railway bed. Built unknown. 10.4 mi Palouse to Cascades State Park Trail/ Iron Horse State Park Washington State Parks Department From North Bend to Vantage, Chicago-Milwaukee-St. Paul-Pacific Railroad bed. Trail Built Over Existing Railroad Bed 1981. 100 mi Vantage Boat Launch and Restrooms Kittitas County Vantage Boat Launch, built 1990. 342 sq ft Vantage Boat Launch Overflow Parking Kittitas County Vantage Boat Launch 0.52 acres The Cove Recreation Area Grant County Public Utility District (PUD) and Washington State Parks West of Huntzinger Road near Wanapum Dam. Public access is for day use from Thursdays through Mondays. Built unknown. 20 acres Kittitas County Outdoor Recreation Inventory Varies All other Parks and Trails are listed in the comprehensive inventory of recreation facilities adopted by reference in the Comprehensive Plan. Built unknown. Varies Evergreen Sno-Park Sno-Park operated by Washington State Parks 1 mile east of Snoqualmie Summit. A trail system comprised of 23 miles. Built unknown. 4.9 acres Thompson Park Kittitas County Naneum Road north of Vantage Highway. Comprised of a pond and parking area. Built unknown. 5.1 acres Solid Waste Page 51 7. BSolid Waste This section includes an inventory of Solid Waste facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 7 below also describes each facility’s size in order to determine if it addresses the County’s long- term community needs. Table 7 Existing Public Facilities and Services Kittitas County Solid Waste Facility Built date Size Facility Built date Size Ellensburg Scale House (Storage), 801 Industrial Way 1981 160 sq. ft. Transfer Station – Cle Elum, 50 #5 Mine Rd., Cle Elum 2003 9,000 sq. ft. Cle Elum Scale House, Hwy 903 Cle Elum 1981 160 sq. ft. MRW – Cle Elum, 50 #5 Mine Rd., Cle Elum 2003 2,000 sq. ft. Cle Elum Bunker Building, Hwy. 903 Cle Elum 1981 3,000 sq. ft. MRW – Ellensburg, 50 #5 Mine Rd., Cle Elum 2001 3,000 sq. ft. Cle Elum Storage, Hwy. 903 Cle Elum 1981 925 sq. ft. Office/Admin Bldg., 50 #5 Mine Rd., Cle Elum 2003 120 sq. ft. Transfer Station Building, 1001 Industrial Way 2000 9,078 sq. ft. Cle Elum Scale House – new, 50 #5 Mine Rd., Cle Elum 2003 284 sq. ft. Scale House Bldg., 1001 Industrial Way 2000 1,000 sq. ft. Ryegrass Equipment Storage, 25900 Vantage Hwy. 1980 1,620 sq. ft. Transfer Station Office, 925 Industrial Way 1963 1,980 sq. ft. SW 400 sq. ft. building, 25900 Vantage Hwy. 2008 400 sq. ft. Transfer Station Shop, 925 Industrial Way 1963 1,680 sq. ft. Solid Waste Page 52 Solid Waste – Relocate Ellensburg Transfer Station and Compost Facility Project Information and Selection Criteria Location 925 Industrial Way, Ellensburg – 50-acre site on Highway 97 Links to Other Projects or Facilities N/A Description Build a new Transfer Station and Compost Facility in the Ellensburg vicinity. *Decommission of existing facility date and timeline TBD* Justification (Need/Demand) The current transfer station has inadequate access and space. It is also in an environmentally sensitive location. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: New Facility Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2022 2023-2027 Total Design and Engineering $2,000,000 $2,000,000 $3,000,000 Construction $3,000,000 $17,000,000 $20,000,000 TOTAL $5,000,000 $19,000,000 $23,000,000 Funding Sources 2022 2023-2027 Total Solid Waste Fund/Grant/Loan $5,000,000 $19,000,000 $23,000,000 TOTAL $5,000,000 $19,000,000 $23,000,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Department Responsible for Operations Solid Waste Solid Waste Page 53 Solid Waste – Cle Elum Transfer Station Entrance Project Information and Selection Criteria Location Cle Elum Transfer Station 50 No. 5 Mine Rd. Links to Other Projects or Facilities N/A Description Construct a new entrance to allow for better queuing for the scales. Justification (Need/Demand) Eliminate a traffic hazard on Highway 903 Level of Service (LOS) / Project Type Comprehensive Plan Citations Capital Cost 2022 2023-2027 Total Design and Engineering $50,000 $250,000 $300,000 Construction $1,350,000 $1,350,000 TOTAL $50,000 $1,600,000 $1,650,000 Funding Sources 2022 2023-2027 Total Solid Waste Fees and Grants $50,000 $350,000 $1,600,000 TOTAL $50,000 $350,000 $1,600,000 Annual Operations and Maintenance Estimated Costs $5,000 per year to maintain Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Solid Waste Library Services Page 54 8. 9BLibrary Services This section includes an inventory of Library Services facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 8 below also describes facility’s size in order to determine if it addresses the County’s long-term community needs. Table 8 Existing Public Facilities and Services Library Services Facility Provider Description Size Gilmour Memorial Library (Kittitas) Kittitas 2nd & Pierce Streets, Kittitas. Built unknown. Carpenter Memorial Library (Cle Elum) Cle Elum 302 Pennsylvania Ave., Cle Elum. Built unknown. Ellensburg Public Library Ellensburg 209 N. Ruby St, Ellensburg, founded in 1910, recently expanded in 2003. Roslyn Public Library Roslyn 201 S. First St., Roslyn, $3 million remodel began in 2009 to repair and update. Built unknown. Kittitas County Education Library Services – Ellensburg Public Library HVAC System Project Information and Selection Criteria Location 209 N Ruby St, Ellensburg WA 98926 Links to Other Projects or Facilities Description New HVAC system to replace current system. Justification (Need/Demand) Current HVAC is failing. Level of Service (LOS) / Project Type Replacement Comprehensive Plan Citations Capital Cost 2023 2024-2028 Total Design and Engineering $1,000,000 $1,000,000 Construction TOTAL $1,000,000 $1,000,000 Funding Sources 2023 2024-2028 Total Commissioner Approved Bond City of Ellensburg $1,000,000 TOTAL $1,000,000 Annual Operations and Maintenance Estimated Costs $1,000,000 Estimated Revenues Anticipated Savings Due to Project $5000 annually. Department Responsible for Operations Ellensburg Public Library Kittitas County Education 9. 10BEmergency Services This section includes an inventory of Emergency Services facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 9 below also describes each facility’s size in order to determine if it addresses the County’s long-term community needs. Table 9 Existing Public Facilities and Services Emergency Services Facility Provider Description Size Station #11 Thorp Fire District No. 1 Thorp – 10700 N. Thorp Hwy., all District 43.5 sq. mi. and serves 2,500 residences, built in 2000, remodeled in 2005, 2 engines, 1 Tender, 2 brush trucks, 1 aid unit, and 1 rescue. Built unknown. 6,400 sq. ft. Station #12 Clark Flats Fire District No. 1 Thorp - 10941 SR 10, 2 buildings at site, 1 tender, 1 brush truck, and 1 engine. Built unknown. 2,300 sq. ft. for both bldgs. Station #13 Elk Heights Fire District No. 1 Elk Heights – 152 Clubhouse Rd., Cle Elum, 1 building at site, and 1 engine. Built unknown. 1600 sq. ft Station #21 Fire District 2 (Kittitas Valley Fire and Rescue) 280 sq. mi. for all Dist. 2, 2020 Vantage Highway B-211, E-211, T-211, B-212, M-211, M-212, M-213 - Living Quarters – 2020’s, Bay – updated 2020, maintenance and training.– 2020. Built unknown. Station #22 Fire District 2 2672 Tjossem E-221 – 2018 Station 22S – 3301 Denmark Road –2015. Built unknown. Station #24 Fire District 2 4901 4th Parallel Road: B-241, E-241, B-242, T-241 – 2004. Built unknown. Station #23 Fire District 2 Main St, Kittitas – E-231, B-231, A-231 – 2010. Built unknown. Station 23 S Fire District 2 890 Cleman Road, Kittitas – E-232, B- 232, T-231 – 2010. Built unknown. Station #26 Fire District 2 6651 Brick Mill Road – E-261, B-261 – 1940’s – anticipate replacing in 2024. Built unknown. Kittitas County Education Station #26 Satellite Fire District 2 2380 Game Farm Road – E-262 – 1950’s – anticipate decommission and sale 2022. Built unknown. Station #27 Fire District 2 8800 Reecer Cr. Rd – E-271 – 1950’s. Built unknown. Station #28 Fire District 2 5640 Cove Road – B-281, E-281, T-281 – 2002. Built unknown. Table 9 - Continued Existing Public Facilities and Services Emergency Services Facility Provider Description Size Station #28 Satellite Fire District 2 51 Barnes Road – E-282 – 1960’s. Built unknown. Station #29 Fire District 2 400 E. Mountainview Ave – M-291, M- 292, M-293, R-291, B-291, E-291, L- 291, E-292 – 2018. Built unknown. Easton Station Fire District No. 3 (Easton) 180 Cabin Creek Easton WA. 98925, PO Box 52, 12 sq. mi. for all Dist. 33182 sq. ft., built in 1992, 1- aid car, 1-engine, 2- tankers, 1-rescue truck. 3,182 sq. ft. Vantage Station Fire District No. 4 (Vantage) Information Not Available. Built unknown. Snoq. Pass Station #46 King & Kittitas FD 51 Snoqualmie Pass Fire & Rescue 1211 SR 906 E. of I 90 Exit 53, houses E146, E246, A146, A246, Battalion 146, Brush146, Brush 246, Polaris ranger with trailer, built in 2011. Basic Life Support Ambulance Service 16,551 sq. ft. Station #61 KCFP District No. 6 (Ronald/Lk. Cle Elum) Serves south end of district / 7 sq. mi. for all Dist. 6. Built unknown. Station #62 KCFP District No. 6 (Ronald/Lk. Cle Elum) 14030 Salmon La Sac Road, Ronald, WA 98940. Serves north end of district / 7 sq. mi. for all Dist. 6, 1 engine, 1 brush truck, 1 tender, and 1 aid unit. Built unknown. South Cle Elum Fire Station South Cle Elum 523 Lincoln Ave., South Cle Elum, 1 pumper, 1 utility truck, and serves 0.5 mile area with 580 people. Can handle twice the size area. Built unknown. 1,200 sq. ft. Station #1 Peoh Point Rd. Fire District No. 7 (Upper County Area) 80 sq. mi. for all Dist. 7,1 fire engine, 1 wild land brush truck, 1 water tender, 1 aid unit, and ambulance. Built unknown. Kittitas County Education Station #2 SR 970 and Airport Rd. Fire District No. 7 Information Not Available. Built unknown. Station #3 off I-90 at Golf Course Exit 77 Fire District No. 7 Information Not Available. Built unknown. Station #4 Ballard Hill Rd. Fire District No. 7 Information Not Available. Built unknown. Station #5 Teanaway Valley, Middle Fork Rd. Fire District No. 7 Information Not Available. Built unknown. Table 9 - Continued Existing Public Facilities and Services Emergency Services Facility Provider Description Size Station #48 King & Kittitas FD 51 Snoqualmie Pass Fire & Rescue Located in Kachess Village, 1 engine 148, 1 aid car, and 1 brush truck, Basic Life Support Ambulance Service. Built unknown. Small 3 bay garage No bathrooms Leased Station #49 King & Kittitas FD 51 Snoqualmie Pass Fire & Rescue Located at intersection of Kachess Lake and Via Kachess Roads, 1 brush truck, rescue snowmobiles & trailer. Built unknown. Small 2 bay garage. No bathrooms Leased Station #47 King & Kittitas FD 51 Snoqualmie Pass Fire & Rescue Located at intersection of Stampede Pass and Lost Lake Roads, 1 pumper/Tender engine, 1 brush truck, snowmobiles with trailer. Built unknown. Small 2 bay garage, no bathrooms Kittitas Valley Community Hospital Hospital District No. 1 Located at 603 S. Chestnut. Level IV trauma service & 24-hr emergency care, S. Chestnut St. & E. Manitoba, Ellensburg. Built 1965. 89,232 Cle Elum Medical Center Hospital District No. 2 Located at 201 Alpha Way, Cle Elum. Family Medicine of Cle Elum. No urgent care services provided. Built unknown. 13,500 Cle Elum Urgent Care Hospital District No. 1 Located at 214 W. 1st St., Cle Elum. Built unknown. 2,864 New Cle Elum Ambulance Garage Hospital District No. 2 Exact address undetermined. Adjacent to 201 Alpha Way, Cle Elum. Approximate completion date 2021. 8,500 Medical Arts Building Hospital District No. 1 Located at 100 E. Jackson St., Ellensburg. No urgent care services provided at this building. KVH clinics include Pediatrics, Women’s Health, Lab, and Family 33,671 Kittitas County Education Medicine of Ellensburg. Some space also currently leased to other non-KVH clinical services. TI completed February 2020. Built 2009. KVH Physical Therapy Hospital District No. 1 Located at 301 Mountainview, Ellensburg. Entire building dedicated to physical therapy services. No urgent care services provided. Leased property. Built unknown. 6,912 KVH Occupational Therapy and Speech Hospital District No. 1 Located at 309 Mountain, Ellensburg. Also houses KVH IT Services. No urgent services provided. Leased property. Built unknown. 6,631 Table 9 - Continued Existing Public Facilities and Services Emergency Services Facility Provider Description Size Ellensburg Clinic Hospital District No. 1 Located at 700 Manitoba, Ellensburg. Houses Internal Medicine, KVH Quality Department, and soon to house Neurology Clinic. No urgent care services provided. Built unknown. 9,434 Valley Clinic Hospital District No. 1 Located at 716 Manitoba, Ellensburg. Formally Family Medicine of Ellensburg. This facility is now a pop-up clinic for COVID-19, and Lab annex. No urgent care services provided. Leased property. Built unknown. 7,230 Empty Building Hospital District No. 1 Located at 708 Manitoba, Ellensburg. This building is currently vacant but will most likely only be used for office space. Built unknown. 1,000 Mediplex Hospital District No. 1 Located at 611 S. Chestnut, Ellensburg. This has suites A-E and are all clinical use. No urgent care services provided by KVH or tenants. Built unknown. 10,291 Work Place Health Hospital District No. 1 Located at 702-B Mountainview, Ellensburg. No urgent care services provided. Leased suite. Built unknown. 1,710 Radio Hill Annex Hospital District No. 1 Located at 1506 Radio Road, Ellensburg. Currently half office space and half storage. Office space for accounting, Home Care, and Hospice. Will most likely never be clinical space. No urgent care services provided. Built unknown. 21,082 Kittitas County Education Hospice Friends Friends of Hospice Located at 302 E. 2nd Ave, Ellensburg. Non-KVH office space for Friends of Hospice. KVH owned. Built unknown. 2,325 Kittitas County Education Emergency Services – Station 2-5 Project Information and Selection Criteria Location TBD – somewhere in the west interchange area. Links to Other Projects or Facilities Description Build a new three bay fire station to house an engine, medic unit, and a brush truck. Justification (Need/Demand) Growth in housing developments in the City of Ellensburg and Kittitas County, commercial development of Dolarway Rd. Level of Service (LOS) / Project Type Comprehensive Plan Citations Capital Cost 2023 2024-2028 Total Design and Engineering - property $500,000 $500,000 Construction $3,500,000 $3,500,000 TOTAL $4,000,000 $4,000,000 Funding Sources 2023 2024-2028 Total Commissioner approved bond $4,000,000 $4,000,000 TOTAL $4,000,000 $4,000,000 Annual Operations and Maintenance Estimated Costs $50,000 Estimated Revenues None Anticipated Savings Due to Project None Department Responsible for Operations Kittitas County Fire District 2 Kittitas County Education Emergency Services – Upper County Emergency Operations Center & Search and Rescue Base Project Information and Selection Criteria Location Cle Elum Airport Access Rd Links to Other Projects or Facilities Description Establishing a primary Emergency Operations Center (EOC) in the growing upper county and relocating Search and Rescue operations from current leased facility in Cle Elum. Justification (Need/Demand) Increasing scope and complexity of Emergency Management dictate an EOC capable of supporting a Type III Incident Management Team. Increasing Search and Rescue (SAR) call volume and complexity for upper county calls make this an excellent location for a permanent, dedicated SAR base of operations. Back 9-1-1 call center. Housing for a remediated County servers backup system. The facility will be able to host training which may bring in revenue. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: New Capital Facilities Comprehensive Plan Citations Capital Cost 2025 2026-2031 Total Design and Engineering Construction $3,000,000 $3,000,000 $6,000,000 TOTAL $3,000,000 $3,000,000 $6,000,000 Funding Sources 2025 2026-2031 Total General Fund $1,549,000 (REET funding) $3,250,000 $4,800,000 Federal Funds Anticipated $1,200,000 $1,200,000 Kittitas County Education TOTAL $2,749,000 $6,000,000 Annual Operations and Maintenance Estimated Costs $25,000 per year Estimated Revenues $1,000 to $5,000 per year Anticipated Savings Due to Project $3,000 to $5,000 a year saving in training and travel Department Responsible for Operations Sheriff’s Office with Kittitas County Search and Rescue (KCSAR) Kittitas County Education Sheriff’s Office Evidence Room & Expansion Project Information and Selection Criteria Location 307 W Umptanum Rd. Kittitas County Sheriff’ Office Links to Other Projects or Facilities Description Enhancements to current evidence processing & storage facilities, and improvements to overflow evidence & property storage bay Justification (Need/Demand) Evidence storage and processing facilities are dated and make it difficult to meet current accreditation requirements; expansion of overflow is also needed to accommodate vehicle and large property storage and processing. Level of Service (LOS) / Project Type Established LOS: Project Type: Renovation Comprehensive Plan Citations Capital Cost 2026 2027-2031 Total Design and Engineering Construction $150,000 TOTAL $150,000 $150,000 Funding Sources 2026 2027-2031 Total General Fund $150,000 Federal Funds Anticipated TOTAL $150,000 $150,000 Kittitas County Education Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Sheriff’s Office with Kittitas County Sheriff’s Office Training room Project Information and Selection Criteria Location 307 W Umptanum Rd. Kittitas County Sheriff’ Office Links to Other Projects or Facilities Description Training room at the Sheriff’s Office Justification (Need/Demand) The Sheriff’s Office does not have a dedicated area for training. Currently the training takes place in non-climate controlled storage units. This project would convert the old “marine bay” into a professional training room, with climate controlled. The project would frame in the roll up door and add mini splits for HVAC, carpet and add A/V equipment. This will increase the possibility of host training. Level of Service (LOS) / Project Type Established LOS: Increase level of service to bring in outside training. Project Type: New Capital Facilities Comprehensive Plan Citations Capital Cost 2026 2027-2031 Total Design and Engineering $8,000 Kittitas County Education Construction $288,000 TOTAL $288,000 $288,000 Funding Sources 2026 2027-2031 Total General Fund $288,000 Federal Funds Anticipated TOTAL $288,000 $288,000 Annual Operations and Maintenance Estimated Costs $2,000 per year Estimated Revenues $2,000 Anticipated Savings Due to Project $5,000 to $8,000 saving in the form of training and travel Department Responsible for Operations Sheriff’s Office with Kittitas County Kittitas County Education Emergency Services – Kittitas Valley Healthcare Hospital Expansion Project Information and Selection Criteria Location 603 S Chestnut St. Links to Other Projects or Facilities Description Hospital expansion to surgery, materials management, and radiology. Purpose of expansion is to make the hospital more energy efficient. In addition to above improvements, expansion also includes lighting, fanwalls, boiler plant and MRI fluid cooler. Justification (Need/Demand) Growth in patient counts. Increase energy efficiency. Level of Service (LOS) / Project Type Addition and Tenant Improvement (TI) of the above departments Comprehensive Plan Citations Capital Cost 2023 2024-2028 Total Design and Engineering $739,500 $246,500 $986,000 Construction $2,520,000 $10,080,000 $12,600,000 TOTAL $3,259,500 $10,326,500 $13,586,000 Funding Sources 2023 2024-2028 Total $500,000 (Dept. of Commerce Energy Efficiency Grant) $500,000 TOTAL $500,000 Annual Operations and Maintenance Estimated Costs Kittitas County Education We do not track Estimated Revenues Unknown Anticipated Savings Due to Project None Department Responsible for Operations Facilities, Surgery, Materials Management, and Radiology Kittitas County Education Emergency Services – Kittitas Valley Healthcare Orthopedic Clinic Project Information and Selection Criteria Location Orthopedic Clinic, 611 S. Chestnut St. Ste. D & E Links to Other Projects or Facilities Description Complete remodel of interior. Justification (Need/Demand) Outdated facility in need of remodel. Level of Service (LOS) / Project Type Remodel Comprehensive Plan Citations Capital Cost 2024-2028 2026-2031 Total Design and Engineering $284,000 $284,000 Construction $2,200,000 $2,200,000 TOTAL $2,484,000 $2,484,000 Funding Sources 2024-2028 2026-2031 Total TOTAL N/A N/A Annual Operations and Maintenance Estimated Costs We do not track Estimated Revenues Unknown Anticipated Savings Due to Project None Department Responsible for Operations Orthopedics and Wound Care. Kittitas County Education Emergency Services – Kittitas Valley Healthcare General Surgery Clinic Project Information and Selection Criteria Location General Surgery Clinic, 611 S. Chestnut St. Ste. A Links to Other Projects or Facilities Description Tenant Improvement Project. Interior update. Justification (Need/Demand) Surgery clinic requires an update to their interior facilities. Level of Service (LOS) / Project Type Upgrade to existing facility. Comprehensive Plan Citations Capital Cost 2024-2028 2026-2031 Total Design and Engineering $143,000 $143,000 Construction $640,000 $640,000 TOTAL $783,000 $783,000 Funding Sources 2024-2028 2026-2031 Total TOTAL N/A N/A Annual Operations and Maintenance Estimated Costs We do not track Estimated Revenues Unknown Anticipated Savings Due to Project None Department Responsible for Operations General Surgery and Vascular Kittitas County Education Emergency Services – Kittitas Valley Healthcare Parking Lot Project Information and Selection Criteria Location Vacant Lot NW of KVH Medical Arts Center, 611 S. Pearl St. Links to Other Projects or Facilities Description This project has been deferred indefinitely. Building a parking lot on vacant land owned by KVH. Justification (Need/Demand) Need to expand parking resources for medical arts center. (This was identified by KVH officials as a “potential project”) Level of Service (LOS) / Project Type New facility. Comprehensive Plan Citations Capital Cost 2024-2028 2026-2031 Total Design and Engineering Construction TOTAL TBD Funding Sources 2024-2028 2026-2031 Total TOTAL TBD Annual Operations and Maintenance Estimated Costs We do not track Estimated Revenues Unknown Anticipated Savings Due to Project Kittitas County Education Department Responsible for Operations Kittitas County Education Emergency Services – Kittitas Valley Healthcare Cle Elum Family Medical Clinic Project Information and Selection Criteria Location KVH Family Medicine – Cle Elum 201 Alpha Way, Cle Elum Links to Other Projects or Facilities Description “Possible” addition to Cle Elum Family Medical Clinic. Justification (Need/Demand) Department potentially will have the need to expand clinic’s patient service capacity. Level of Service (LOS) / Project Type Addition to existing facility. Comprehensive Plan Citations Capital Cost 2024-2028 2026-2031 Total Design and Engineering Construction TOTAL TBD Funding Sources 2024-2028 2026-2031 Total TOTAL TBD Annual Operations and Maintenance Estimated Costs We do not track Estimated Revenues Unknown Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Kittitas County Education Emergency Services – Kittitas Valley Healthcare Internal Medicine Project Information and Selection Criteria Location KVH Internal Medicine, 700 E. Manitoba Ave. Links to Other Projects or Facilities Description Remodel of KVH Internal Medicine Clinic, a 9000 sq. ft. facility. Justification (Need/Demand) Internal Medicine Clinic is in need of a remodel to adequately serve patients. Level of Service (LOS) / Project Type Remodel of existing facility. Comprehensive Plan Citations Capital Cost 2024-2028 2026-2031 Total Design and Engineering Construction TOTAL TBD Funding Sources 2024-2028 2026-2031 Total $250,000 (Sunderland Grant) $250,000 TOTAL $250,000 $250,000 Annual Operations and Maintenance Estimated Costs We do not track Estimated Revenues Unknown Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Kittitas County Education Emergency Services – Kittitas Valley Healthcare Cle Elum Physical Therapy Project Information and Selection Criteria Location KVH Family Medicine – Cle Elum Lease at Midtown Business Building Links to Other Projects or Facilities Description KVH is leasing the second story of one of the Midtown Business Buildings. Justification (Need/Demand) Provide adequate physical therapy space for the Cle Elum community and open up space in the Family Medical Center for providers. Level of Service (LOS) / Project Type New construction by Midtown owners. Comprehensive Plan Citations Capital Cost 2024-2028 2026-2031 Total Design and Engineering Construction TOTAL TBD Funding Sources 2024-2028 2026-2031 Total TOTAL TBD Annual Operations and Maintenance Estimated Costs We do not track Estimated Revenues Unknown Anticipated Savings Due to Project Kittitas County Education Department Responsible for Operations Kittitas County Education Emergency Services – Kittitas Valley Healthcare Home Health Project Information and Selection Criteria Location KVH Home Health, 1506 Radio Rd. Links to Other Projects or Facilities Description Remodel of 5000 sq. ft. of a 10000 sq. ft. facility. Justification (Need/Demand) Half of the building is in need of a remodel. Level of Service (LOS) / Project Type Remodel Comprehensive Plan Citations Capital Cost 2024-2028 2026-2031 Total Design and Engineering Construction TOTAL TBD Funding Sources 2024-2028 2026-2031 Total TOTAL TBD Annual Operations and Maintenance Estimated Costs We do not track Estimated Revenues Unknown Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Emergency Services – Kittitas Valley Healthcare Family Medicine Project Information and Selection Criteria Location KVH Family Medicine, 716 E. Manitoba Ave. Links to Other Projects or Facilities Description Complete remodel of two buildings, one is 7000 sq. ft. and the other is 3000 sq. ft. Justification (Need/Demand) Both buildings are in need of a remodel. Level of Service (LOS) / Project Type Remodel. Comprehensive Plan Citations Capital Cost 2024-2028 2026-2031 Total Design and Engineering Construction TOTAL TBD Funding Sources 2024-2028 2026-2031 Total TOTAL TBD Annual Operations and Maintenance Estimated Costs We do not track Estimated Revenues Unknown Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education 10. Education This section includes an inventory of education facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 10 below also describes each facility’s size in order to determine if it addresses the County’s long-term community needs. Table 10 Existing Public Facilities and Services Education Facility Provider Description Size Central Washington University Washington State Comprehensive public university main campus, 1500 employees, 94 buildings Oldest buildings built 1894. 11,110 students statewide (fall 2020) Cle Elum / Roslyn High School Cle Elum/ Roslyn School District 2692 - SR 903, Cle Elum, 9th grade to 12th grade. Built unknown. 254 students Cle Elum / Roslyn Elementary School Cle Elum/ Roslyn School District 2696 - SR 903, Cle Elum, pre-school, Kindergarten to 5th grade. Built unknown. 458 students Cle Elum / Roslyn Alternative School Cle Elum/ Roslyn School District 200 W. Oakes St., Cle Elum, 3rd grade to 12th grade. Built unknown. 21 students Walter Strom Middle School Cle Elum/ Roslyn School District 2694 - SR 903, Cle Elum, 6th grade to 8th grade. Built unknown. 237 students Cle Elum/ Roslyn School District Music Building Cle Elum/ Roslyn School District Music Building for Walter Strom Middle School and Cle Elum-Roslyn Middle School. Built unknown. Cle Elum/ Roslyn School District Transportation Facility Cle Elum/ Roslyn School District School bus covered parking, maintenance facility, and transportation staff office building. Built unknown. Damman Elementary School Damman School District Kindergarten to 5th grade, 1 school, 2.5 teachers, 2681 Umptanum Rd. Built 1890. 45 students Easton Elementary, Jr., Sr. High School Easton School District 1893 Railroad St., Easton. Built unknown. 93 students Lincoln Elementary School Ellensburg School District 26 classroom teachers, 200 S. Sampson St., Ellensburg Built 1948. Major remodel completed 2022. 340 students Kittitas County Education Mount Stuart Elementary School Ellensburg School District 27 classroom teachers, 705 W. 15th Ave., Ellensburg. Built 2021. 362 students Valley View Elementary School Ellensburg School District 26 classroom teachers, 1508 E. 3rd Ave., Ellensburg. Built 1990’s. 401 students Ida Nason Aronica Elementary School Ellensburg School District 22 classroom teachers, 2100 N. Cora St., Ellensburg. Built 2022. 278 students Table 10 - Continued Existing Public Facilities and Services Education Facility Provider Description Size Morgan Middle School Ellensburg School District 40 classroom teachers, 400 E. 1st Ave., Ellensburg. Built 1929, major remodel/addition completed 2018. 784 students Ellensburg High School Ellensburg School District 40 classroom teachers of a total 67 professional staff, 1203 E. Capitol Ave., Ellensburg. Built 2005. 942 students Kittitas Elementary School Kittitas School District Kindergarten to 5th grade, 7571 Kittitas Hwy, Kittitas. Built unknown. 270 students Kittitas High School Kittitas School District 6th grade to 12th grade, 7571 Kittitas Hwy, Kittitas. Built 2006. 334 students Parke Creek Treatment Center Kittitas School District 11042 Parke Creek Rd. Built unknown. 9 students Thorp Elementary, Jr., and Sr. High Schools Thorp School District Kindergarten to 12th grade, 10831 N. Thorp Hwy, Thorp. Built 1958. 261 students Kittitas County Education Black Hall Renovation/Multicultural Center – CWU, Ellensburg, WA Project Information and Selection Criteria Location Parcel # 334034, 400 E University Way, CWU campus, Ellensburg, WA 98926 Links to Other Projects or Facilities Black Hall, 911 N. Chestnut Street Description The project establishes a student focused academic facility dedicated to the celebration of Equity & Diversity. Justification (Need/Demand) The Black Hall Renovation will include upgrades for the College of Education & Professional Studies and the Multicultural Center, which is intended to be a central hub for students, staff, and faculty to build community and celebrate diversity and create a sense of belonging for traditionally underrepresented students, staff, and faculty. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Existing Building Renovation Comprehensive Plan Citations N/A Capital Cost 2025 2026-2031 Pending Approval Total Design and Engineering $1,500,000 $1,500,000 Construction $4,500,000 $4,500,000 TOTAL $6,000,000 $6,000,000 Funding Sources 2025 2026-2031 Pending Approval Total State OFM Capital $6,000,000 $6,000,000 Kittitas County Education TOTAL $6,000,000 $6,000,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Associated Students of Central Washington University Education – North Academic Complex- CWU, Ellensburg, WA Project Information and Selection Criteria Location Parcel # 143534, E Dean Nicholson Blvd, CWU campus, Ellensburg, WA 98926 Links to Other Projects or Facilities Brooks Library – West adjacent Description The North Academic Complex is a replacement project for the existing Farrell Hall, L&L Building (Adjacent) Justification (Need/Demand) The North Academic Complex project provides a new and modern facility that will house several social science related programs such as Humanities, Law & Justice. The new project will result in the demolition of Farrell Hall & L&L that suffer from a large backlog of deferred maintenance, inadequate and inefficient mechanical and electrical systems, current ADA, building code and energy efficiency. The new complex will provide state of the art design and pedagogy that will be experienced by a majority of collegiate freshmen, boosting the opportunity for retention and academic growth. The project will also be the first building utilizing geothermal technology for the heating and cooling and connect to our infrastructure to 3 other buildings. Kittitas County Education Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Facility Replacement Comprehensive Plan Citations N/A Capital Cost 2025 2026-2031 Pending Approval Total Design and Engineering $5,205,000 $0 $5,205,000 Construction 92,600,000 $11,158,000 $103,758,000 TOTAL $97,805,000 $11,158,000 $108,963,000 Energy Efficiency – Science Building Carbon Reduction- CWU, Ellensburg, WA Project Information and Selection Criteria Location Parcel # 143534, E Dean Nicholson Blvd, CWU campus, Ellensburg, WA 98926 Links to Other Projects or Facilities Northeast of Health Science Description As part of Washington legislation associated with the CCA (Climate Commitment Act), this project implements the energy efficiency improvement of the Science 1 mechanical buildings. Justification (Need/Demand) The state of Washington issued 2023 legislation that agencies must establish a pathway to decarbonize their district heating systems through House Bill 1390. Science Building Carbon Reduction establishes mechanical system improvements that reduce the carbon footprint of the building. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Infrastructure Comprehensive Plan Citations N/A Kittitas County Education Capital Cost 2025 2026-2031 Pending Approval Total Design and Engineering $0 $0 $0 Construction $4,509,000 $0 $4,509,000 TOTAL $4,509,000 $0 $4,509,000 Infrastructure – Secondary Geothermal Module- CWU, Ellensburg, WA Project Information and Selection Criteria Location Parcel # 143534, E Dean Nicholson Blvd, CWU campus, Ellensburg, WA 98926 Links to Other Projects or Facilities Northeast of Samuelson Hall Description The Secondary Geothermal Module adds redundancy and future expansion capability for our geothermal infrastructure. Funding Sources 2025 2026-2031 Total Pending Approval State OFM Capital $0 $0 $0 Climate Commitment Act $4,509,000 $0 $4,509,000 TOTAL $4,509,000 $0 $4,509,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Facility Maintenance Department Kittitas County Education Justification (Need/Demand) The state of Washington issued 2023 legislation that agencies must establish a pathway to decarbonize their district heating systems through House Bill 1390. The secondary geothermal (GeoEco) building will connect to extraction wells and injection wells that intend to connect 5 buildings to the expanding low temperature hot water loop. The wells will be approximately 600’ apart. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Infrastructure Comprehensive Plan Citations N/A Capital Cost 2025 2026-2031 Pending Approval Total Design and Engineering $1,266,723 $0 $1,266,723 Construction $11,197,277 $4,000,000 $15,197,277 TOTAL $12,464,000 $4,000,000 $16,464,000 Funding Sources 2025 2026-2031 Pending Approval Total State OFM Capital $0 $0 $0 Climate Commitment Act $12,464,000 $4,000,000 $16,464,000 TOTAL $12,464,000 $4,000,000 $16,464,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Facility Maintenance Department Education Page 51 Education – Ellensburg School District Ellensburg High School Resurface/Repair Sidewalks Project Information and Selection Criteria Location Ellensburg High School, 1203 East Capitol Avenue Links to Other Projects or Facilities Description Ellensburg High School Sidewalk Repair Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Safety $10,000 $10,000 TOTAL $10,000 $10,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total General Fund Transfer to Capital $10,000 $10,000 TOTAL $10,000 $10,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Ellensburg High School Sealcoat Parking Lots and Driveways, Includes Paint Project Information and Selection Criteria Location Ellensburg High School, 1203 East Capitol Avenue Links to Other Projects or Facilities Description Ellensburg High School Sealcoat Parking Lots and Driveway Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Sealcoat $124,223 $124,223 TOTAL $124,223 $124,223 Funding Sources FY 2024-2025 FYs 2026-2030 Total General Fund Transfer to Capital $124,223 $124,223 TOTAL $124,223 $124,223 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Early Learning Center Install Additional Bus Lane Along Main Parking Lot to Extend SW of the Current Bus Lane Project Information and Selection Criteria Location Early Learning Center, 705 West 15th Avenue Links to Other Projects or Facilities Description Early Learning Center Extension of Bus Lane Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Extend Bus Lane $50,000 $50,000 TOTAL $50,000 $50,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total Capital Fund $50,000 $50,000 TOTAL $50,000 $50,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Education – Ellensburg School District Kittitas County Education Early Learning Center Install Additional Security Cameras Project Information and Selection Criteria Location Early Learning Center, 705 West 15th Avenue Links to Other Projects or Facilities Description Early Learning Center Install Additional Security Cameras Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Security $10,000 $10,000 TOTAL $10,000 $10,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total General Fund Transfer to Capital $10,000 $10,000 TOTAL $10,000 $10,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Education – Ellensburg School District Kittitas County Education Ida Nason Aronica Elementary Extend Playground Fence and Irrigation Project Information and Selection Criteria Location Ida Nason Aronica Elementary, 2101 North Cora Street Links to Other Projects or Facilities Description Ida Nason Aronica Elementary Extend Playground Fence and Irrigation Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Extend Playground $50,000 $50,000 TOTAL $50,000 $50,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total Capital Fund $50,000 $50,000 TOTAL $50,000 $50,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Ida Nason Aronica Elementary Install Card Readers Project Information and Selection Criteria Location Ida Nason Aronica Elementary, 2101 North Cora Street Links to Other Projects or Facilities Description Ida Nason Aronica Elementary Card Readers Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 202-2030 Total Security $12,000 $12,000 TOTAL $12,000 $12,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total General Fund Transfer to Capital $12,000 $12,000 TOTAL $12,000 $12,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Ida Nason Aronica Elementary Install Top Soil for Playground Project Information and Selection Criteria Location Ida Nason Aronica Elementary, 2101 North Cora Street Links to Other Projects or Facilities Description Ida Nason Aronica Elementary Top Soil Installation Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Top Soil $30,000 $30,000 TOTAL $30,000 $30,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total Capital Fund $30,000 $30,000 TOTAL $30,000 $30,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District IT Mitigation Plan Project Information and Selection Criteria Location Ellensburg School District Information Technology, 1300 East Third Avenue Links to Other Projects or Facilities Description IT Mitigation Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Purchase $1,214,500 $3,827,171 $5,041,671 TOTAL $1,214,500 $3,827,171 $5,041,671 Funding Sources FY 2024-2025 FYs 2026-2030 Total Tech Levy $1,214,500 $3,827,171 $5,041,671 TOTAL $1,214,500 $3,827,171 $5,041,671 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Lincoln Elementary Install Additional Playground Equipment Project Information and Selection Criteria Location Lincoln Elementary, 200 South Sampson Street Links to Other Projects or Facilities Description Lincoln Elementary Additional Playground Equipment Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Playground Equipment $50,000 $50,000 TOTAL $50,000 $50,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total Capital Fund $50,000 $50,000 TOTAL $50,000 $50,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Lincoln Elementary Install Card Readers Project Information and Selection Criteria Location Lincoln Elementary, 200 South Sampson Street Links to Other Projects or Facilities Description Lincoln Elementary Install Card Readers Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Install Card Readers $10,000 $10,000 TOTAL $10,000 $10,000 Funding Sources FY 2043-2025 FYs 2026-2030 Total General Fund Transfer to Capital $10,000 $10,000 TOTAL $10,000 $10,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Morgan Middle School Upgrade HVAC Control System Project Information and Selection Criteria Location Morgan Middle School, 400 East First Avenue Links to Other Projects or Facilities Description Morgan Middle School HVAC Controls Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total HVAC Control System $150,000 $150,000 TOTAL $150,000 $150,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total Capital Fund $150,000 $150,000 TOTAL $150,000 $150,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Morgan Middle School Install Additional Outdoor Lighting Project Information and Selection Criteria Location Morgan Middle School, 400 East First Avenue Links to Other Projects or Facilities Description Morgan Middle School Outdoor Lighting Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Security $10,000 $10,000 TOTAL $10,000 $10,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total General Fund Transfer to Capital $10,000 $10,000 TOTAL $10,000 $10,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Morgan Middle School Install Card Readers Project Information and Selection Criteria Location Morgan Middle School, 400 East First Avenue Links to Other Projects or Facilities Description Morgan Middle School Card Readers Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Security $12,000 $12,000 TOTAL $12,000 $12,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total General Fund Transfer to Capital $12,000 $12,000 TOTAL $12,000 $12,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Morgan Middle School Install Mechanical Choir Shells in MPAC Project Information and Selection Criteria Location Morgan Middle School, 400 East First Avenue Links to Other Projects or Facilities Description Morgan Middle School Mechanical Choir Shells Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Choir Shells $20,000 $20,000 TOTAL $20,000 $20,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total General Fund Transfer to Capital $20,000 $20,000 TOTAL $20,000 $20,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Morgan Middle School Mount Video Equipment in MPAC Project Information and Selection Criteria Location Morgan Middle School, 400 East First Avenue Links to Other Projects or Facilities Description Morgan Middle School Mount Stage Video Equipment Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Mount Video Equipment $10,000 $10,000 TOTAL $10,000 $10,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total General Fund Transfer to Capital $10,000 $10,000 TOTAL $10,000 $10,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Morgan Middle School Replace Cores and Keys Project Information and Selection Criteria Location Morgan Middle School, 400 East First Avenue Links to Other Projects or Facilities Description Morgan Middle School Keys and Cores Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Security $30,000 $30,000 TOTAL $30,000 $30,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total General Fund Transfer to Capital $30,000 $30,000 TOTAL $30,000 $30,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Morgan Middle School Replace MPAC Sound System Project Information and Selection Criteria Location Morgan Middle School, 400 East First Avenue Links to Other Projects or Facilities Description Morgan Middle School Replace MPAC Sound System Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Sound System $35,000 $35,000 TOTAL $35,000 $35,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total General Fund Transfer to Capital $35,000 $35,000 TOTAL $35,000 $35,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Morgan Middle School Retro-Commission HVAC, Lighting, and Building Envelope to Meet HB1257 Project Information and Selection Criteria Location Morgan Middle School, 400 East First Avenue Links to Other Projects or Facilities Description Morgan Middle School Retro-Commission HVAC, Lighting, and Building Envelop to Meet HB1257 Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total HVAC, etc. $10,000 $10,000 TOTAL $10,000 $10,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total General Fund Transfer to Capital $10,000 $10,000 TOTAL $10,000 $10,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Morgan Middle School Sealcoat Satellite Parking Lot Project Information and Selection Criteria Location Morgan Middle School, 400 East First Avenue Links to Other Projects or Facilities Description Morgan Middle School Sealcoat Parking Lot Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Sealcoat Parking Lot $10,000 $10,000 TOTAL $10,000 $10,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total General Fund Transfer to Capital $10,000 $10,000 TOTAL $10,000 $10,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Morgan Middle School Upgrade MPAC Stage Lighting Project Information and Selection Criteria Location Morgan Middle School, 400 East First Avenue Links to Other Projects or Facilities Description Morgan Middle School Stage Lighting Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Stage Lighting $50,000 $50,000 TOTAL $50,000 $50,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total General Fund Transfer to Capital $50,000 $50,000 TOTAL $50,000 $50,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Mt. Stuart Elementary Add Top Soil for Playground Project Information and Selection Criteria Location Mt. Stuart Elementary, 1701 North Cora Street Links to Other Projects or Facilities Description Mt. Stuart Elementary Top Soil for Playground Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Top Soil $30,000 $30,000 TOTAL $30,000 $30,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total Capital Fund $30,000 $30,000 TOTAL $30,000 $30,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Mt. Stuart Elementary Dredge Collection Pond Project Information and Selection Criteria Location Mt. Stuart Elementary, 1701 North Cora Street Links to Other Projects or Facilities Description Mt. Stuart Elementary Dredge Collection Pond Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Dredge Pond $35,000 $35,000 TOTAL $35,000 $35,000 Funding Sources FY 2024-2025 FYs 2025-2030 Total Capital Fund $35,000 $35,000 TOTAL $35,000 $35,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Mt. Stuart Elementary Install Additional Playground Cameras Project Information and Selection Criteria Location Mt. Stuart Elementary, 1701 North Cora Street Links to Other Projects or Facilities Description Mt. Stuart Elementary Playground Security Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Security $20,000 $20,000 TOTAL $20,000 $20,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total General Fund Transfer to Capital $20,000 $20,000 TOTAL $20,000 $20,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Mt. Stuart Elementary Rehab Community Center Gym Floor Project Information and Selection Criteria Location Mt. Stuart Elementary, 1701 North Cora Street Links to Other Projects or Facilities Description Mt. Stuart Elementary Rehab Community Center Gym Floor Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Rehab Gym Floor $60,000 $60,000 TOTAL $60,000 $60,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total Capital Fund $60,000 $60,000 TOTAL $60,000 $60,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Mt. Stuart Elementary Upgrade Fire, Communications, and HVAC at Community Center Project Information and Selection Criteria Location Mt. Stuart Elementary, 1701 North Cora Street Links to Other Projects or Facilities Description Mt. Stuart Elementary Upgrade Fire, Communications, and HVAC at Community Center Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Fire, Communications & HVAC $150,000 $150,000 TOTAL $150,000 $150,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total Capital Fund $150,000 $150,000 TOTAL $150,000 $150,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Transportation 10-Passenger Van Project Information and Selection Criteria Location Ellensburg School District Transportation, 1501 East Capitol Avenue Links to Other Projects or Facilities Description Ellensburg School District 10-Passenger Van Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Motor Pool $80,000 $80,000 TOTAL $80,000 $80,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total General Fund Transfer to Capital $80,000 $80,000 TOTAL $80,000 $80,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Transportation Lunch Delivery Truck Project Information and Selection Criteria Location Ellensburg School District Transportation, 1501 East Capitol Avenue Links to Other Projects or Facilities Description Ellensburg School District Lunch Delivery Truck Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Lunch Delivery $80,000 $80,000 TOTAL $80,000 $80,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total General Fund Transfer to Capital $80,000 $80,000 TOTAL $80,000 $80,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Transportation New Transfer Location Between Softball Field and Bus Barn Project Information and Selection Criteria Location Ellensburg School District Transportation, 1501 East Capitol Avenue Links to Other Projects or Facilities Description Ellensburg School District Transportation Transfer Location Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Safety $60,000 $60,000 TOTAL $60,000 $60,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total Capital Fund $60,000 $60,000 TOTAL $60,000 $60,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Transportation Vehicle Fund Support to Increased Student Growth / 30-Year Bus Replacement Project Information and Selection Criteria Location Ellensburg School District Transportation, 1501 East Capitol Avenue Links to Other Projects or Facilities Description Ellensburg School District Transportation 30-Year Bus Replacement Cycle Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Bus Replacement $690,000 $7,068,088 $7,758,088 TOTAL $690,000 $7,068,088 $7,758,088 Funding Sources FY 2024-2025 FYs 2026-2030 Total Transportation Vehicle Fund $690,000 $7,068,088 $7,758,088 TOTAL $690,000 $7,068,088 $7,758,088 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Transportation Replace Fuel Tank Project Information and Selection Criteria Location Ellensburg School District Transportation, 1501 East Capitol Avenue Links to Other Projects or Facilities Description Ellensburg School District Transportation Replace Fuel Tank Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Safety $50,000 $50,000 TOTAL $50,000 $50,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total General Fund Transfer to Capital $50,000 $50,000 TOTAL $50,000 $50,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Transportation Sealcoat and Paint Parking Lots Project Information and Selection Criteria Location Ellensburg School District Transportation, 1501 East Capitol Avenue Links to Other Projects or Facilities Description Ellensburg School District Transportation Sealcoat Parking Lots Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Sealcoat $75,000 $75,000 TOTAL $75,000 $75,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total Capital Fund $75,000 $75,000 TOTAL $75,000 $75,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Transportation Upgrade HVAC Project Information and Selection Criteria Location Ellensburg School District Transportation, 1501 East Capitol Avenue Links to Other Projects or Facilities Description Ellensburg School District Transportation Upgrade HVAC Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total HVAC $85,000 $85,000 TOTAL $85,000 $85,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total Capital Fund $85,000 $85,000 TOTAL $85,000 $85,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Valley View Elementary Replace Playground Equipment Project Information and Selection Criteria Location Valley View Elementary, 1508 East Third Avenue Links to Other Projects or Facilities Description Valley View Replace Playground Equipment Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Playground Equipment $100,000 $100,000 TOTAL $100,000 $100,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total General Fund Transfer to Capital $100,000 $100,000 TOTAL $100,000 $100,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Valley View Elementary Sealcoat All Parking Lots & Valley View Blvd., Includes Paint Project Information and Selection Criteria Location Valley View Elementary, 1508 East Third Avenue Links to Other Projects or Facilities Description Valley View Sealcoat All Parking Lots and Valley View Blvd. Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Sealcoat $124,223 $124,223 TOTAL $124,223 $124,223 Funding Sources FY 2024-2025 FYs 2026-2030 Total General Fund Transfer to Capital $124,223 $124,223 TOTAL $124,223 $124,223 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Ellensburg High School Refurbish/Sand Main Gym Floor Project Information and Selection Criteria Location Ellensburg High School, 1203 East Capitol Avenue Links to Other Projects or Facilities Description Ellensburg High School Main Gym Floor Refurbish Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Safety $90,000 $90,000 TOTAL $90,000 $90,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total General Fund Transfer to Capital $90,000 $90,000 TOTAL $90,000 $90,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Ellensburg High School Remodel Culinary Arts Kitchen Project Information and Selection Criteria Location Ellensburg High School, 1203 East Capitol Avenue Links to Other Projects or Facilities Description Ellensburg High School Culinary Arts Kitchen Remodel Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total School Program $185,000 $185,000 TOTAL $185,000 $185,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total Grant and General Fund $185,000 $185,000 TOTAL $185,000 $185,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Ellensburg High School Repair Asphalt Project Information and Selection Criteria Location Ellensburg High School, 1203 East Capitol Avenue Links to Other Projects or Facilities Description Ellensburg High School Repair Asphalt Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Repair Asphalt $224,642 $224,642 TOTAL $224,642 $224,642 Funding Sources FY 2024-2025 FYs 2026-2030 Total General Fund Transfer to Capital $224,642 $224,642 TOTAL $224,642 $224,642 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Ellensburg High School Replace Aux Gym Floor Project Information and Selection Criteria Location Ellensburg High School, 1203 East Capitol Avenue Links to Other Projects or Facilities Description Ellensburg High School Replace Auxiliary Gym Floor Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Safety $50,000 $50,000 TOTAL $50,000 $50,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total General Fund Transfer to Capital $50,000 $50,000 TOTAL $50,000 $50,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Ellensburg High School Replace Main Gym Bleacher Drive Wheels Project Information and Selection Criteria Location Ellensburg High School, 1203 East Capitol Avenue Links to Other Projects or Facilities Description Ellensburg High School Bleacher Drive Wheel Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Safety $38,401 $38,401 TOTAL $38,401 $38,401 Funding Sources FY 2024-2025 FYs 2026-2030 Total Capital Fund $38,401 $38,401 TOTAL $38,401 $38,401 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Ellensburg High School Replace Football Field “Away” Bleachers Project Information and Selection Criteria Location Ellensburg High School, 1203 East Capitol Avenue Links to Other Projects or Facilities Description Ellensburg High School Football Field “Away” Bleachers Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Safety $70,000 $70,000 TOTAL $70,000 $70,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total General Fund Transfer to Capital $70,000 $70,000 TOTAL $70,000 $70,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Ellensburg High School Replace Football Field Goal Posts Project Information and Selection Criteria Location Ellensburg High School, 1203 East Capitol Avenue Links to Other Projects or Facilities Description Ellensburg High School Replace Football Field Goal Posts Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Safety $15,000 $15,000 TOTAL $15,000 $15,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total General Fund Transfer to Capital $15,000 $15,000 TOTAL $15,000 $15,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Ellensburg High School Replace Football Field Sprinkler System Project Information and Selection Criteria Location Ellensburg High School, 1203 East Capitol Avenue Links to Other Projects or Facilities Description Ellensburg High School Football Field Sprinkler System Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Security $30,000 $30,000 TOTAL $30,000 $30,000 Funding Sources FY 2024-2025 FYs 2026-2030 Total Capital Fund $30,000 $30,000 TOTAL $30,000 $30,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Education Education – Ellensburg School District Ellensburg High School Replace Home Economics Countertop, Electrical , and Plumbing Project Information and Selection Criteria Location Ellensburg High School, 1203 East Capitol Avenue Links to Other Projects or Facilities Description Ellensburg High School Home Economics Countertop Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2024-2025 FYs 2026-2030 Total Health Safety $43,750 $43,750 TOTAL $43,750 $43,750 Funding Sources FY 2024-2025 FYs 2026-2030 Total Capital Fund $43,750 $43,750 TOTAL $43,750 $43,750 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Water – Group A Systems Page 131 11. 12BWater - Group A Systems This section includes an inventory of Water – Group A Systems facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 11 below also describes facility’s size in order to determine if it addresses the County’s long-term community needs. Table 11 Existing Public Facilities and Services Water (Group A Systems) Facility Provider Description Size Ronald Water System Kittitas County Water District No. 2, Special District Community provider Serves 227 persons with 119 connections, 150 total approved connections. Effective since 1/1/1970. 125,000 gal Thorp Water System Kittitas County Water District No. 4, Special District Community provider Serves 230 persons with 104 connections, 112 total approved connections. Effective since 7/1/1987. 156,000 gal Elk Meadows Water System Kittitas County Water District No. 5, Community provider 141 Swallow Ln, Cle Elum, serves 600 persons with 296 connections, 340 total approved connections. Effective since 1/1/1970. 75,000 gal Easton Water System Easton Water District, Community provider 141 Swallow Ln, Cle Elum, serves 250 residential persons and 106 non-residential persons with 211 connections, 405 total approved connections. Effective since 1/1/1970. 195,000 gal Sunlight Waters Water System Kittitas County Water District No. 7, Special District Community provider 1710 Sunlight Dr., Cle Elum, serves 380 residential persons and 169 non-residential persons with 225 connections, 223 total approved connections. Effective since 1/1/1970. 200,000 gal Vantage Water System Vantage Water System, Investor Community provider Serves 73 residential persons and 105 non- residential persons with 80 connections, 129 total approved connections. Effective since 1/1/1970. 50,000 gal Evergreen Valley Water System Evergreen Valley Utilities, Investor Community provider Serves 35 residential persons and 5 non- residential persons with 262 connections, 411 total approved connections. Effective since 3/2/2004. 120,000 gal Reservoir Hill Water System Reservoir Hill Maintenance Association, Private Community provider South Cle Elum, serves 33 residential persons with 20 connections, 25 total approved connections. Effective since 2/25/1999. 20,000 gal Water – Group A Systems Page 132 Table 11 - Continued Existing Public Facilities and Services Water (Group A Systems) Facility Provider Description Size Central Mobile Home Park Central Mobile Home Park, Private Community provider Wilson Creek Rd. mobile home park, serves 110 residential persons with 52 connections, 52 total approved connections. Effective since 1/1/1970. 2,100 gal Snoqualmie Pass Private - Snoqualmie Pass Utility District Well capacity of 385 gallons per minute and 3 reservoirs storing 565,000 gallons. Serves 250 residential persons with 760 connections and 1053 approved connections. Built unknown. 565,000 gal Pine Loch Sun Beach Club Water System Private Community provider Serves 90 residential persons with 409 calculated connections, 439 total approved connections. Effective date of 1/1/1970 137,000 gal Sky Meadows Ranch Country Club WTR Private Community provider Serves 52 residential persons and 110 non- residential persons with 329 calculated connections and 335 total approved connections. Effective system date of 1/1/1970 164,200 gal Sun Country Estates 1-2- 3 Water System Private Community provider Serves 219 residential persons and 16 non- residential persons with 217 total calculated connections and 300 total approved connections. Effective date of 1/1/1970. 258,600 gal Swiftwater Trailer Park Swiftwater Trailer Park, Private Community provider S. Cle Elum mobile home park, serves 30 residential persons and 1 non-residential person with 19 total calculated connections and 24 total approved connections. Effective system date of 1/1/1970. 0 gal Wildwood 2 & 3 Water System Private Community Provider Serves 45 residential persons and 48 non- residential persons with 51 total calculated connections & 78 total approved connections. Effective system date of 1/1/1970. 45,000 gal Grasslands Park Private Community Provider Serves 29 residential persons with 14 total calculated connections and 14 total approved connections. Effective system date of 12/20/2006. 0 gal Millpond Mobile Manor Investor Community Provider Millpond Mobile Manor Serves 245 residential persons with 105 total calculated connections and 105 total approved connections. Effective system date of 1/1/1970. 0 gal Suncadia Resort Investor Community Provider Serves 103 residential persons & 903 non- residential persons with 590 total calculated connections and 1501 total approved 1,070,000 gal Water – Group A Systems Page 133 connections. Effective system date of 5/29/2008. Table 11 - Continued Existing Public Facilities and Services Water (Group A Systems) Facility Provider Description Size Driftwood Acres Maintenance Corporation Association Community Provider Serves 60 residential persons with 130 total calculated connections and 141 total approved connections. Effective system date of 1/1/1970. 100,000 gal Sun Island Maintenance Assn. Association Community Provider Serves 30 residential persons and 100 non- residential persons with 115 total calculated connections and an undetermined number of total connections. Effective system date of 1/1/1970. 18,000 gal Grasslands Water System Association Community Provider Serves 260 residential persons with 75 total calculated connections and 81 total approved connections. Effective system date of 1/1/1970. 21,000 gal AFC Ranch 2 Private Community Provider Serves 95 residential persons. There are 65 calculated connections with 99 approved connections. Effective 1991 0 gal Cascade View Estates #1 Investor Community Provider Residential pop 28. 11 Calculated connections. 13 approved connections. Effective 2021 0 gal Cascade View Estates #3 Investor Community Provider Residential population 25. 10 calculated connections and 10 approved connections. Effective 2020 0 gal Cascade View Estates #4 Investor Community Provider Serves 30 residential, Calculated 12 connections and 12 approved connections. Effective 2020 0 Gallons Cle Elum Water Department City Serves 2,213 population. 1,488 calculated connections with 3,414 approved connections. Effective 1970 2,700,000 Cottage Farms Private Community Provider Residential population of 30. Calculated connections of 14 and 16 approved connections. Effective 2017. 0 gal Dakota Heights Water Association Residential population of 28. 12 Calculated connections with 14 approved connections. Effective 2021 6,000 gal Easton Water System Easton Water District, Community provider 141 Swallow Ln, Cle Elum, serves 250 residential persons and 106 non-residential persons with 211 connections, 405 total approved connections. Effective since 1/1/1970. 195,000 gal Water – Group A Systems Page 134 Elk Meadows Water System Kittitas County Water District No. 5, Community provider 141 Swallow Ln, Cle Elum, serves 600 persons with 296 connections, 340 total approved connections. Effective since 1/1/1970. 75,000 gal Ellensburg Water Department City Serves 20,900 population. 10,902 calculations with 12,033 approved connections. Effective 1970 5,000,000 Evergreen Valley Water System Evergreen Valley Utilities, Investor Community provider Serves 54 residential persons and 5 non- residential persons with 294 connections, 411 total approved connections. Effective since 3/2/2004. 120,000 gal Game Farm Estates Private Community Provider Residential population 81. 27 calculated connections with 40 approved connections. Effective 2022 35200 gallons Hidden Valley Guest Ranch Private Provider Population of 40 individuals. 21 Calculated connections with 57 approved connections. Effective 2022 47,000 Kittitas, City of City Population of 1,418 persons. 829 nonresidential. 637 total calculated connections with 705 approved connections. Established 1970 500,000 Mountain Ridge Association Community Provider Serves 28 residential people with 17 total calculated connections and 40 total approved connections. 65,000 gal Palomino Fields Investor Community Provider Residential population of 156. 78 Calculated connections with 81 total approved connections. Effective 2022 0 gal Reservoir Hill Water System Reservoir Hill Maintenance Association, Private Community provider South Cle Elum serves 33 residential persons with 20 connections, 25 total approved connections. Effective since 2/25/1999. 20,000 gal Ronald Water System Kittitas County Water District No. 2, Special District Community provider Serves 227 people with 121 connections, 150 total approved connections. Effective since 1/1/1970. 125,000 gal Roslyn, City of City Residential population 976. Non residential of 1,123 with 710 calculated connections with unspecified connections. Effective 1970 1,000,000 Sunlight Waters Water System Kittitas County Water District No. 7, Special District Community provider 1710 Sunlight Dr., Cle Elum, serves 380 residential people and 0 non-residential persons with 235 connections, 267 total approved connections. Effective since 1/1/1970. 200,000 gal Thorp Water System Kittitas County Water District No. 4, Special District Community provider Serves 250 people with 116 connections, 209 total approved connections. Effective since 7/1/1987. 156,000 gal Water – Group A Systems Page 135 Turf Trails Domestic Water System Private Community Provider Residential population 30. 12 Calculated connections with 9 approved connections 0 gal Vantage Water System Vantage Water System, Investor Community provider Serves 73 residential people and 330 non- residential people with 140 connections, 129 total approved connections. Effective since 1/1/1970. 50,000 gal Sanitary Sewer Page 136 12. 13BSanitary Sewer This section includes an inventory of Sanitary Sewer facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 12 below also describes each facility’s size in order to determine if it addresses the County’s long- term community needs. Table 12 Existing Public Facilities and Services Sanitary Sewer Facility Provider Description Size Ellensburg treatment facilities Dan Walker 509- 962-7277 Kittitas County Utility District 8m daily operating limit, peak emergency capacity 15m. General sewer plan update in progress, estimated to be completed .2025. Ronald treatment facilities Kittitas County Water District No. 2 Single lift station that conveys wastewater flows from the Water District area to the City of Roslyn sewer system. 37 acres Snoqualmie Pass Utility District thasting@snopass. org Snoqualmie Pass Utility District Average daily flow approximately 170000 mgd., permitted treatment and discharge capacity of 0.368 mgd. and storage of excess flows of about 30 mill. Gal. Lagoon normal storage is 10.5 MG with an additional 10 MG emergency storage. MBR facility upgrade in 2026. Daily operating flow 250,000 gpd & peak flow 500,000 gpd. General sewer plan online (2019). Projected population growth 1,581 by 2038 Vantage wastewater collection and treatment system Vantage Water District No. 6 100,000 gpd daily operating limit. Working on grant to make additions and improvem ents. Upper Kittitas County Regional Wastewater Treatment Facility City of Cle Elum Provides wastewater treatment to South Cle Elum, City of Roslyn, City of Ronald & Suncadia Resort.3.6 m daily operating, instantaneous flow up to 10 m. Expected service capacity of 18,956. General sewer plan (2021) online. City of Kittitas Wastewater Treatment Facility Ryan Baker 509- 929-1249 City of Kittitas .45mgp daily flow, operating limit unknown, peak unknown General sewer plan update in progress, estimated to be completed 2025. Sewer District 8 Teanaway Ridge LLC No information provided Developin g sewer plan to implement County land use approvals. 13. 6BKittitas County Flood Control Zone District The Kittitas County’s Flood Control Zone District capital improvement plan is further detailed in Appendix D. Appendix D provides a detailed description of the proposed projects, mapping of the projects, and the funding plan. Frequently Asked Questions Page 139 14BFrequently Asked Questions Question 1: How does the County determine priorities for the projects listed in the CFP? Answer: This CFP provides general guidance on prioritizing public facility projects. Each project proposal is reviewed by the CFP Task Force using the following criteria: 1. Improvements to obsolete or worn out existing public facilities that achieve or maintain adopted levels of service. 2. New or expanded public facilities that achieve or maintain adopted levels of service. 3. Improvements to existing public facilities or new public facilities that eliminate hazards. 4. New or expanded public facilities that achieve or maintain adopted levels of service as forecasted during the next six-years. 5. Improvements to existing public facilities or new public facilities that reduce the operating cost of providing a public service or facility. 6. New facilities that provide excess capacity that will be needed beyond the next six-years. 7. All other facilities the County is obligated to complete that do not meet the criteria above. 8. Availability of funding. The Board of County Commissioners make the final determination of the priority order of the projects listed in the CFP. Question 2: Are projects automatically given funding in priority order? Answer: No, if grant funds are applied for and received, chances are good that the grant funded project will become a priority. Grant funds awarded become new and additional revenue to the County, above and beyond the County’s current resources. The County continually looks for ways to reduce the reliance on General Fund dollars for capital projects to stretch current resources. Question 3: Will a project that is partially funded be listed in the CFP? Answer: It depends. If the project is still in-progress, but no additional money is needed beyond what has already been appropriated, it will not show up in the CFP in future years. If the project does need additional funds appropriated beyond the current level of funding, it will continue to show up in the CFP. Question 4: Are all projects in the CFP completed within the next 6 years? Answer: No, for several reasons. First, the CFP is annually reviewed and amended to verify that fiscal resources are available. Second, the need for capital facilities is generated by population growth, existing facility deficiencies, major facility maintenance and repair needs, internal operations, and Comprehensive Plan goals and policies. There is a need to continually assess which projects are affected and should be considered a priority. As a result, project estimates and timelines may change. Frequently Asked Questions Page 140 Question 5: What does level of service (LOS) mean? Answer: The LOS is a quantifiable measure of the amount of public facilities that is provided, such as acres of park land per capita, vehicle capacity of intersections, or water pressure per square inch available for water system. Question 6: What is concurrency? Answer: All public facilities that are needed to serve new development or a growing service area population, must be in place at the time of initial need. If the facilities are not in place, a financial commitment must have been made to provide the facilities within six-years of the time of the initial need and must have the capacity to serve the new development or a growing service area population without decreasing service levels below locally established minimum standards. Question 7: How do I get involved in the CFP process? Answer: Information on the CFP process will be posted on the County’s website at the following address: https://www.co.kittitas.wa.us/cds/land-use/default.aspx. To receive email updates on when new information is posted, you can subscribe to Kittitas County’s email notification subscription service for “Comprehensive Plan Announcements.” All persons can provide written or verbal comments to the Planning Commission and to the Commissioners, before or during the scheduled public hearings. Frequently Asked Questions Page 141 APPENDIX A Kittitas County Maintenance Shops, Storage, Parking, Pits/Quarries Frequently Asked Questions Page 142 . Equipment Rental & Revolving Budget The Director of Public Works manages the Kittitas County Equipment Rental and Revolving (E. R. & R.) Fund. The E. R. & R. The purpose of the fund is to account for the financing of goods and services provided primarily to the road fund. The following Services are Provided by the ER&R Fund: Administration-The Administration division provides financial management and administration for the divisions within the E. R.& R. Fund. Services include asset management, developing rental rates and inventory management. Revenues are provided. Pits and Quarries -The Pits & Quarries division manages the pits and stockpiles of rock owned by Kittitas County. The rock stockpiled in these pits is purchased by the County Road Fund for use on county road maintenance and construction projects and winter road sanding operations. In addition to county owned pits, we also solicit bids from private vendors for maintenance rock used by the County Road Fund. Revenues are provided through sales of county owned rock primarily to the County Road. Mechanic Shop - The Mechanical Shop division is responsible for maintaining the fleet of vehicles utilized by the County Road Fund. This division also maintains the County mechanical shop facilities. The division includes two mechanics and one shop foreman. Kittitas County also sublets light duty vehicle preventive maintenance such as lube and oil changes to local vendors. Central Stores - The Central Stores maintains a supply of culvert pipe and guardrail used by the County Road Fund in the event of unscheduled repairs. For scheduled construction projects culvert pipe and guardrail are purchased direct by the road fund as these materials do not require storage. Revenues are provided through the sales of materials to the County Road Rental Services - The Equipment Rental Services accounts for the maintenance and operation of the vehicles and equipment used primarily by the County Road Fund. Revenues are provided through adopted equipment rental rates. Rates are established to cover the operating costs of the equipment (fuel, insurance, repairs) and a replacement factor to cover inflation. Sign Fabrication Shop - This functionality is being moved to Road Maintenance. Frequently Asked Questions Page 143 Kittitas County Maintenance Shops, Storage, Parking, & Pits/Quarries Project Name Location & Description Funding Source Schedule Total Cost Upper County Maintenance Shop Automated wash bay design and construction. 2028 $400,000 Lower County Maintenance Shop Potential land acquisition and shop relocation ER&R Fund 501 2028-2031 $8,950,000 Hyak Joint Maintenance Facility with SPUD Ongoing operations. Public Works Maintenance budget TBD +/- $100,000 annually Hansen Pit Potential Advanced Environmental Mitigation site. Airport Fund 107, Flood Control Fund 107, FAA Grant 2027 $1,750,000 Other Pits and Quarries Ongoing operations. Public Works Maintenance budget TBD +/- $100,000 annually Frequently Asked Questions Page 144 APPENDIX B Kittitas County Six-Year Transportation Plan Frequently Asked Questions Page 145 introduction: Annually Kittitas County Department of Public Works develops a listing of county road and bridge improvements for Board of County Commission consideration. The listing is accompanied by a public outreach effort. Public comments are evaluated, and staff adjusts the original proposal that is then finalized and presented to the Board of County Commissioners during the annual County budget process. Given the complexity of municipal engineering, environmental permitting, right of way acquisition and construction; Public Works schedules projects an additional five years beyond the first budget year. The planning schedule includes programmed funding amounts and sources along with project forecast expenses. The schedule identifies the various projects beginning in the first budget year (2026) extending to the last program year (2031). 2026-2031 Plan: This plan is organized into two components for ease of understanding the various projects contained in the six-year plan: 1 - The six-year project listing and associated funding plan. 2 - Project specific sheets listing specific project information including: County Road Project Number (if assigned at the time of publication), priority number, title, project description, project status, photos, and funding sources. Frequently Asked Questions Page 146 Frequently Asked Questions Page 147 APPENDIX C Kittitas County Regional Parks and Trails Frequently Asked Questions Page 148 2026 Parks and Recreation Fund Preliminary Budget Public Works administers the Parks and Recreation/Tourism Fund 113 on behalf of the Kittitas County Board of County Commissioners. The annual capital plan and six-year capital facility plan are considered for projects. The General Fund of County government provides Fund 113 funding for plan implementation. Real Estate Excise Tax (REET 2) is a funding source available to parks and recreation capital projects. In addition to implementing the Recreation/Tourism annual and six-year plans; Public Works provides maintenance of the Vantage Boat Launch restrooms along with management activities for Gladmar and Ryan Thompson parks. General Fund provides the necessary maintenance funding within Fund 113. Frequently Asked Questions Page 149 APPENDIX D Kittitas County Flood Control Zone District Frequently Asked Questions Page 150 Kittitas County Flood Control Zone District Capital Facility Plan 2024- 2029 July 25, 2023 Frequently Asked Questions Page 151 Introduction Every year, the Kittitas County Flood Control Zone District (“District”) develops a list of capital improvement projects for Board of County Commission consideration. The proposal is presented to the Board of County Commissioners during the annual County budget process. Given the complexity of flood hazard planning, engineering, environmental permitting, and construction, the Flood Control Zone District schedules projects an additional five years behind the first budget year. The planning schedule includes programmed funding amounts and sources along with project forecast expenses. The schedule identifies the various projects beginning in the first budget year (2024) extending to the last year in program (2029). This plan This plan is organized into three major components for the ease of understanding the various projects contained in the six-year plan: 1. Map identifying the various projects located around the County. 2. The six-year project listing and associated funding plan. 3. Project specific sheets listing specific project information including title, project description, project status, photos and funding sources. Frequently Asked Questions Page 152 Acronyms CIP Capital Improvement Project CRS Community Rating System CTP Cooperating Technical Partners Program DOE Washington State Department of Ecology EWC Ellensburg Water Company FCAAP Flood Control Assistance Account Program FCZD Flood Control Zone District FEMA Federal Emergency Management Agency SRFB Salmon Recovery Funding Board WNC Wilson-Naneum-Cherry Watershed YBIP Yakima Basin Integrated Plan Frequently Asked Questions Page 153 Six Year Program Summary SUMMARY: 6-YEAR PROGRAM REVENUE, COSTS AND ENDING FUND AMOUNTS YEAR 2024 2025 2026 2027 2028 2029 FCZD CAPITAL PROGRAM PROJECT COSTS 4,380 2,071 140 6,237 2,106 1,748 ADMINISTRATION AND OPERATIONS COSTS 716 771 1,026 1,054 1,055 1,056 ADMINISTRATION 180 180 180 180 180 180 TRAINING/CONFERENCES 8 8 8 8 8 8 PERMIT PROCESSING 30 31 32 33 34 35 PUBLIC TECHNICAL ASSISTANCE 50 50 50 50 50 50 AGENCY COORDINATION 12 12 12 12 12 12 PUBLIC OUTREACH / ED 15 15 15 15 15 15 FLOW CONVEYANCE 100 100 100 100 100 100 LEVEE MAINTENANCE 10 10 10 10 10 10 STORMWATER 60 90 90 90 90 90 PROPERTY MAINTENANCE 30 30 30 30 30 30 DEBT SERVICING 200 200 200 200 EMERGENCY RESPONSE 150 150 150 150 150 150 INFLATION 71 95 149 176 176 176 TOTAL 5,096 2,842 1,166 7,291 3,160 2,804 TAX LEVY 860 903 948 996 1,045 1,098 OTHER INCOME 21 22 22 23 24 24 PERMITS 30 31 32 33 34 35 GRANTS / COST SHARE 960 707 98 5,670 1837 840 VOTER APPROVED FUNDING 1,000 TOTAL 1,871 2,662 1,100 6,721 2940 1996 TOTAL (3,225) (180) (66) 6,721 (221) 807.77 BEGINNING 3,500 275 95 29 6750 6529.56 FUND $275 $95 $29 $6,750 $6,530 $7,337 *Costs are shown as thousands Frequently Asked Questions Page 154 GLOSSARY Frequently Asked Questions Page 155 • Americans with Disabilities Act (ADA): The Americans with Disabilities Act of 1990 or ADA is a civil rights law that prohibits discrimination based on disability. • Airports Geographic Information Systems (AGIS): GIS software that provides a 3D visualization of the airport during the design period, allowing engineers to test and change their designs. Once the airport is built, AGIS can assist with day-to-day operations. • Base Realignment and Closure (BRAC): Refers to the process the Department of Defense (DoD) has used to reorganize its installation infrastructure to more efficiently and effectively support its force structure, increase operational readiness, and facilitat e new ways of doing business. • Community Aviation Revitalization Board (CARB): The Community Aviation Revitalization Board (CARB) loan program bill, SB 5031, was signed into law by the Governor on May 3, 2021 (effective June 30, 2021). The corresponding capital budget bill, SHB 1080, which provides an additional $5 million for the 2021-2023 biennium was signed into law by the Governor on May 18, 2021. The revolving loan program is for revenue-producing capital projects to help public-use general aviation airports become more self-sustainable and less dependent on public funding. Eligible projects can include hangars, fueling facilities, business parks on airport property, paid parking facilities, passenger amenities and other revenue-generating or cost-cutting developments. • Community Development Services (CDS): A department within the Kittitas County government. The purpose of CDS is to assist the citizens of Kittitas County in planning for the use and development of land and buildings while protecting public health and safety, sustaining a vibrant economy, promoting the conservation of natural resources, and protecting the environment. • Capital Improvement Program (CIP): A Six-Year Plan that shows capital improvements that are needed to provide adequate public facilities in Kittitas County. The County either directly provides these capital improvements or coordinates with other agencies to provide them. The Six-Year Plan is reviewed and updated annually. Annual updates are made to correct or modify project costs, revenue sources, and dates of construction. • Conditional Letter of Map Revision (CLOMR): A Conditional Letter of Map Revision, or CLOMR, is FEMA’s comment on a proposed project that would affect the hydrologic or hydraulic characteristics of a flooding source. Frequently Asked Questions Page 156 • Decommission: The process of dismantling or demolishing a public facility when it has deteriorated due to age. Accompanies the opening of a new facility to replace the old facility. • Department of Natural Resources (DNR): An agency of the Washington State government. Under the elected leadership of the Commissioner of Public Lands, the DNR manages seven specific trusts to generate revenue and preserve forests, water, and habitat. The DNR manages 5.6 million acres of forest, range, agricultural, aquatic, and commercial lands for more than $200 million in annual financial benefit for public schools, state institutions, and county services. • Ellensburg Business Development Authority (EBDA): A board within the City of Ellensburg, the purpose of the EBDA is to strategically recruit and support businesses, and connect businesses to resources so they can start, grow, and prosper in the City of Ellensburg. • Ellensburg Water Company (EWC): The water utility company within the City of Ellensburg. • Emergency Operations Center (EOC): A centralized location of emergency response and recovery support operations during incidents and emergencies. • Federal Aviation Administration (FAA): A federal agency within the United States Department of Transportation (USDOT). Governs commercial aviation in the United States. • Federal Highway Administration (FHWA): A federal agency within the United States Department of Transportation (USDOT). The FHWA supports State and local governments in the design, construction, and maintenance of the Nation’s highway system (Federal Aid Highway Program) and various federally and tribal owned lands (Federal Lands Highway Program). • Federal Lands Access Program (FLAP): The Federal Lands Access Program was established by federal directive to improve transportation facilities that provide access to, are adjacent to, or are located within Federal lands. • Flood Control Assistance Account Program (FCAAP): A program within the Washington State Department of Ecology (WSDOE). The state legislature established the Flood Control Assistance Account Program to assist local jurisdictions with comprehensive floodplain management planning and implementing actions to mitigate flood hazards. Funding is determined every biennium by the state legislature. Frequently Asked Questions Page 157 • Flood Control Zone District (FCZD): Established by the Board of County Commissioners (BoCC) of Kittitas County in 2012, the FCZD serves residents in both unincorporated areas and incorporated towns and cities by providing technical assistance and implementing flood- reduction projects and programs. • General Aviation (GA): General Aviation is defined by the International Civil Aviation Organization (ICAO) as "all civil aviation operations other than scheduled air services and non-scheduled air transport operations for remuneration or hire". • Heating, Ventilation, and Air Conditioning (HVAC): Refers to the different systems used for moving air between indoor and outdoor areas, along with heating and cooling both residential and commercial buildings. • Highway Safety Improvement Program (HSIP): A core Federal-aid program with the purpose to achieve a significant reduction in traffic fatalities and serious injuries on all public roads, including non-State-owned roads and roads on tribal land. The HSIP requires a data- driven, strategic approach to improving highway safety on all public roads with a focus on performance. • HB1257: A bill passed by the Washington State legislature in 2019 which was subsequently signed into law by Governor Inslee. The law mandates, starting in 2026, most existing commercial buildings (including schools and dormitories) in Washington State over 50,000 SF will be required to meet certain Energy Use Index Targets (EUIT). Any building owner not in compliance by the target dates will incur a penalty of $1/SF + a $5,000 fee per year. • Information Technology (IT): The use of any computers, storage, networking and other physical devices, infrastructure and processes to create, process, store, secure and exchange all forms of electronic data. • Kittitas County Conservation District (KCCD): The Kittitas County Conservation District works with local landowners and land managers (public and private) to conserve natural resources that are vital to the county economy and the county quality of life. KCCD focuses on collaborative efforts to partner with landowners, public agencies, tribes and the general public to create and maintain resilient working landscapes through voluntary incentive-based measures. • Kittitas County Search and Rescue (KCSAR): An all-volunteer, non-profit organization, formed in 1991 at the request of the Kittitas County Sheriff’s Office. Provides personnel for the Kittitas County Sheriff’s Office to conduct search, rescue, recovery, and evacuation operations, primarily within Kittitas County. KCSAR does not act in any capacity except at the direction of the Sheriff’s Office. • Kittitas Valley Healthcare (KVH): A public hospital network that provides healthcare to Kittitas County residents and surrounding areas. Frequently Asked Questions Page 158 • Levy: A local property tax passed by the voters that generates revenue to fund programs and services that the state does not pay for . • Limited Area of More Intensive Rural Development (LAMIRD): Areas outside an established urban growth area designated as existing rural residential communities or villages, areas of mixed use activity, isolated areas of small-scale commercial/industrial activity, and historic towns pursuant to RCW 36.70A. • Mid-Columbia Fisheries Enhancement Group (MCFEG): A non-profit organization that seeks to protect and restore wild salmon populations, their habitats, and ecosystem functions that support native fish species through restoration, protection, educat ion, and community involvement. • National Environmental Policy Act (NEPA): The National Environmental Policy Act was signed into law on January 1, 1970. NEPA requires federal agencies to assess the environmental effects of their proposed actions prior to making decisions. It is enforced by the United States Environmental Protection Agency (EPA). • Office of Financial Management (OFM): The Office of Financial Management provides vital information, fiscal services, and policy support that the governor, legislature and state agencies need to serve the people of Washington. • Public Utility District (PUD): Community-owned, locally regulated utilities that are formed by a vote of the people. Unlike private utilities, public utility districts are run by an elected, nonpartisan board of commissioners who are directly accountable to the voters. • Public Works Department (PWD): A department within the Kittitas County government whose primary focus is infrastructure projects that are needed to facilitate development of public infrastructure and public capital assets for the residents of Kittitas County. • Real Estate Excise Tax (REET): Real estate excise tax is a tax on the sale of real property. All sales of real property in the state are subject to REET unless a specific exemption is claimed. REET processes are governed by the Washington State Department of Revenue. • Rural Arterial Program (RAP): A biennial road and bridge reconstruction funding program in which counties compete for Rural Arterial Trust Account (RATA) funds within their respective regions taken from fuel tax revenues. The RATA account generates approximately $40 million per biennium. Frequently Asked Questions Page 159 • Salmon Recovery Funding Board (SRFB): Created by the Washington State legislature in 1999, the SRFB provides grants to protect and/or restore salmon habitat and assist related activities. Composed of five citizens appointed by the Governor, and five state agency directors, the board brings together the experiences and viewpoints of citizens and the major state natural resource agencies. • Search and Rescue (SAR): The search for and provision of aid to people who are in distress or imminent danger. Search and rescue operations within Kittitas County are within the jurisdiction of the Kittitas County Sheriff’s Office. • Snoqualmie Pass Utility District (SPUD): A public utility district within the Snoqualmie Pass community. The primary focus of the SPUD is to provide water utilities to Snoqualmie Pass including treatment of wastewater. • Surface Transportation Block Grant (STBG): The Surface Transportation Block Grant program is the most flexible of all federal-aid highway programs, allowing wide discretion for recipients to use funds as needed to meet state and local transportation prior ities. • Tenant Improvement (TI): Customized alterations of a rental facility to improve function for the facility’s tenants. • United States Bureau of Reclamation (USBR): The largest wholesaler of water in the United States. The USBR provides water to more than 31 million people, and provides one out of five Western farmers with irrigation water for 10 million acres of farmland. • Washington State Department of Transportation (WSDOT): A state agency that constructs, maintains, and regulates the use of transportation infrastructure in Washington State such as bridges, highways and ferries.