HomeMy WebLinkAboutKVEC RODEO GRANDSTANDS LARGE CAP APPLICATIONKittitas County Lodging Tax Fund Application for Tourism -Related Infrastructure
Projects
Application Overview
This application is designed to provide funding for tourism -related infrastructure projects
in Kittitas County. Eligible projects must demonstrate a direct impact on tourism, support
visitor experiences, and contribute to the local economy. Please follow the application
format outlined below and attach supporting documents to this cover sheet. All
applications will be reviewed by the Lodging Tax Advisory Committee (LTAC), with final
approval by the Board of County Commissioners (BOCC).
Completion of application question can be directed to Kittitas County Chamber of
Commerce, Amy McGuffin email amy@kittitascountychamber.com or directly by phone at
(509) 925-2002.
I. Applicant Information
• Project Title: KVEC Rodeo Grandstands Reconstruction
• Total Request Amount: $3,000,000
• Applicant Name/Organization: Kittitas Valley Event Center
• Contact Person: Kady Porterfield, CFE - Event Center Director
■ Phone: (509) 306-5720
■ Email: kady.porterfield@co.kittitas.wa.us
• Mailing Address: 901 E 711 Ave, Ellensburg, WA 98926
II. Project Overview
1. Project Description
The Ellensburg Rodeo Grandstands project is a large-scale infrastructure initiative aimed at
enhancing the spectator experience and their safety at the historic Ellensburg Rodeo and
the vast array of year-round events held at the Rodeo Arena.
The project entails the demolition of the aging stadium structure —including seating
sections AA through JJ, the catwalk, restrooms, and the Behind the Chutes area —to make
way for the construction of modern, accessible, and comfortable grandstands and
supporting facilities such as updated and expanded restrooms. This redevelopment at the
RECEIVED
JUN 2 7 2025
Kittitas County Auditor
Rodeo Arena in the Kittitas Valley Event Center aims to enhance safety, accessibility, and
overall functionality while preserving the venue's historic character and charm.
Key components of the project are:
1. New Grandstands: Featuring aluminum bench seating with backs, premium seating
sections, and wheelchair accessible spaces. The seating numbers are consistent
with the current grandstands, but the seat count increases when accounting for the
addition of new wheelchair accessible spaces.
2. 5u�-ort-D-01dies: Upgraded restrooms, expanded concessions, a participant
staging area, and upgraded gathering space.
3. Improved Infrastructure: Enhanced pedestrian flow with a skywalk connection to
the fairgrounds, improved lighting, and compliance with modern building codes.
See `Attachment A' for visuals of the completed project as well as aspects of the design
plan.
2. Tourism Benefit
The redevelopment of the Rodeo Arena Grandstands is poised to significantly enhance
tourism in Kittitas County by transforming the venue into a premier destination for one of
the nation's top rodeos and a variety of major regional events. This effort aligns directly with
the top recommendation in the Kittitas County Tourism Strategic Plan, which prioritizes
investment in the renovation and modernization of the Kittitas Valley Event Center and its
Rodeo Grounds. A project of this scale promises wide -reaching benefits —not only
improving the functionality and appeal of the venue itself but also generating positive
economic and cultural impacts for the broader community.
One of the most notable advantages is the potential for increased attendance. Enhanced
facilities will make events at the Event Center more attractive to spectators, elevating their
reputation and drawing visitors from across the region and the nation. This increased
appeal not only drives ticket sales but also helps position Ellensburg as a destination for
high -quality entertainment and cultural experiences.
Another key benefit is the expansion of year-round usability. While the Ellensburg Rodeo
remains a flagship event, the upgraded infrastructure will enable the grandstands to
support a widervariety of programming. Concerts, equestrian competitions, festivals, and
community gatherings can be accommodated more effectively, creating new opportunities
for engagement and revenue generation throughout the year rather than being limited to
seasonal use.
The economic impact of these improvements is equally significant. As more visitors attend
events at the modernized facility, they will spend more in the local economy —staying in
hotels, dining at restaurants, shopping at local businesses, and fueling at area gas stations.
The Kittitas Valley Event Center serves as a key economic driver for Kittitas County by
generating a significant volume of overnight stays in lodging facilities located both inside
and outside the City of Ellensburg. However, the non -City hotel stays directly contribute to
the Kittitas County Lodging Tax fund, reinforcing the Event Center's critical role in
supporting regional tourism. Table 2.1 illustrates where KVEC visitors stayed beyond city
boundaries, demonstrating the far-reaching impact on the local economy. With the
planned enhancements, this impact is expected to grow, further establishing the Event
Center as a key contributor to overnight visitation and regional economic development.
Increased activity will support local jobs and generate sustained growth, benefiting both
residents and business owners.
Table 2.1
Placer.ai Favorite Places - February 1, 2024-January 31, 2025
Hotel Location
K1 C-Shared ViS&M
The Lodge @ Suncadia
8400
Suncadia Resort
5900
Canyon River Ranch
4100
TOTAL
18400
In addition, improvements to the visitor experience will play a critical role in the success of
the redevelopment. Modernized seating, enhanced accessibility features, and upgraded
amenities will make the venue more comfortable and inclusive for all attendees, including
individuals with disabilities. A more enjoyable and welcoming experience encourages
repeat visits and fosters lasting community pride and loyalty to the venue. These combined
benefits highlight the importance of investing in the Event Centerto ensure it continues to
thrive as a vibrant hub for entertainment, culture, and civic connection.
Operational capacity is also poised to increase. The upgraded grandstands will make it
feasible to schedule 27 additional event days in the Rodeo Arena. Assuming these are
typical multi -day events, the venue could support approximately 9 new large-scale events
between mid -May and mid -October —even accounting for the annual temporary closure
required for Fair and Rodeo preparations. These events can include the National Team
Roping Finals, monster truck rallies and other stunt/thrill shows, concerts or live stage
performances, and new opportunities such as regional high school or collegiate rodeo
championships. The enhanced seating and infrastructure will not only attract a broader
range of events but also elevate the spectator experience, making the Rodeo Arena a
premier destination for outdoor entertainment in the region.
Each of these events has the potential to attract an average of 5,000 attendees, resulting in
a combined estimated attendance of 45,000 over a five -month span. According to the
Kittitas County Tourism Strategic Plan, approximately 34% of attendees are expected to
travel from more than 50 miles away —qualifying them as tourists. This equates to an
estimated 15,300 new visitors.
These tourists are projected to spend a minimum of $223 per day* and stay for an average
of 1.47 days**, generating an additional $5,015,493 in economic impact for both the City of
Ellensburg and Kittitas County. Roughly 24% of these visitors stay in Kittitas County hotels
Located outside the City of Ellensburg.
* Spending amount figure was pulled from Oxford Economics and presented by the
Thurston EDC during their official 2022 economic impact study on the Ellensburg Rodeo
**1.47 is the multiplier effect assigned to KVEC within the Kittitas County Tourism Strategic
Plan when discussing the potential economic impact of capital investments.
3. Target Users
By modernizing the venue while preserving its historic significance, the Rodeo Arena
Grandstands project will ensure a lasting impact on tourism and community engagement
in Kittitas County. The upgraded grandstands at the Kittitas Valley Event Center will serve a
diverse range of users, enhancing the overall experience for all who attend events at the
venue.
One of the primary groups of users will be tourists and spectators who travel to Ellensburg
to attend signature events such as the Ellensburg Rodeo, Bares N Broncs, Cowboy Cross,
and a variety of other entertainment offerings held throughout the year. These visitors
contribute significantly to the local economy and rely on comfortable, safe, and well-
equipped facilities to enjoy their experience.
Another key group includes the event participants themselves —rodeo athletes,
performers, and competitors —who depend on upgraded staging areas and support
infrastructure to safely and effectively prepare for and participate in events.
The grandstands will also benefit local and regional community members, providing
improved amenities for residents who attend cultural celebrations, sporting events, and
family activities at the venue.
Additionally, the renovations will address critical accessibility needs, offering enhanced
wheelchair -accessible seating and pathways to ensure that visitors with disabilities can
fully enjoy the events. Together, these improvements will create a more inclusive,
welcoming, and functional environment for all users of the grandstands.
III. Budget and Funding
1. Project Budget Breakdown
Expense Item Cost
Initial Design &
Planning _
Revised 50% Design
100% Design &
Planning
Construction
Materials
Labor/Contractor
Fees
Permits & Fees
Soft
Costs/Contingency
$16,000,000.00
814,000,000.00
$12,000,000.00
$10,000,000.00
$8,000,000.00
$6,000,000.00
$4,000,000.00
$2,000,000.00
$0.00
Funding Source Funding
Status
1 $545,978.88 Kittitas County & Spent
_ Ellensburg Rodeo
$94,206.65 Department of Spent
Commerce Grant
$1,004,973.00
Department of
Secured
Commerce Grant
77%Secured
$7,208,574
County/City/Rodeo
Debt Service; DOC
Grant; JAC Grant
L
$3,501,928
County/City/Rodeo
77% Secured
Debt Service; DOC
Grant; LTAC Grant
$671,208
County/City/Rodeo
77%Secured
Debt Service; DOC
Grant; LTAC Grant
$862,290
County/City/Rodeo
77%Secured
Debt Service; DOC
Grant; LTAC Grant
Budget Share Brekadown
Cost
Completed
Yes — 2016
Yes - 2024
In Progress
No
No
No
me
■ Soft Costs/Contingency
■ Permits & Fees
■ Labor/Contractor Fees
■ Construction Materials
■ 100% Design & Planning
■ Revised 50% Design
in Initial Design & Planning
2. Funding Sources
The foundation for this project was laid in 2016 through a joint investment by Kittitas
County and the Ellensburg Rodeo. The first phase focused on planning and developing a
60% design for the reconstruction of the historic Rodeo Grandstands, located along the
northern edge of the Rodeo Arena. This critical design work cost nearly $546,000, equally
shared between the County and the Rodeo Association. At that time, the total project was
estimated to cost less than $10 million.
Following this initial phase, a concerted advocacy effort began to secure additional
funding. The City of Ellensburg and the State of Washington were brought into discussions
as potential partners, acknowledging the Grandstands' significance as both a local
Landmark and a regional tourism asset. Early funding conversations focused on a shared
cost model, with the County, City, and Rodeo each contributing a portion of the debt
service, and the remaining balance requested from the State.
As planning continued and construction costs rose, the estimated project budget had
grown to approximately $11.2 million by 2019. Then the COVID-19 pandemic hit —
introducing economic uncertainty and delaying project momentum.
Despite these challenges, project partners remained committed. In 2021, Representative
Tom Dent successfully sponsored a $1.5 million grant through the Washington State
Department of Commerce (DOC) Local Community Projects program. Anticipating further
cost increases due to inflation and supply chain disruptions, the County requested an
updated cost estimate from its architectural firm, which projected a revised total of $15.75
million.
Progress continued in 2023. Representative Dent again secured nearly $1 million through
the same DOC grant program to support completion of the final design phase. That same
year, the City of Ellensburg's Lodging Tax Committee pledged $250,000 annually over ten
years —totaling $2.5 million —matching the Ellensburg Rodeo's commitment.
With both the City and Rodeo contributing $2.5 million, the Board of Kittitas County
Commissioners have also verbally committed $3 million and agreed to carry the total debt
service for the project on behalf of all three partners ($8 million commitment), enabling a
unified financing strategy. The partnership debt service would be paid off over the course of
10 years.
Grant funding will be utilized to reimburse upfront costs and keep the debt service amount
down to the $8 million partnership commitment. Together with the $2.5 million in state
grants already secured, the final piece needed to fully fund the project is a $3 million
allocation from the Kittitas County Lodging Tax fund.
All other funding avenues have been thoroughly pursued and exhausted, includingfederal
infrastructure dollars over the past four years. The $3 million Lodging Tax Advisory
Committee (LTAC) grant —through the Large Capital Projects initiative —represents the
final, critical component to close the funding gap.
Importantly, the initial DOC grant awarded in 2021 is contingent upon full project funding. If
that threshold isn't met in time, those state funds may be reabsorbed into the state budget.
Securing the LTAC funding would unlock this $1.5 million grant and allow construction to
proceed without further delay or risk of escalating costs.
Finally, securing the DOC and LTAC grant funds will significantly reduce the required debt
service to $8 million. This approach not only lightens the financial load across all partners
and taxpayers, but also minimizes long-term interest costs —making this a fiscally
responsible and forward -thinking investment in the future of the Rodeo Arena and the
broader community it serves.
Capital Cost
Design and Eng�neerin
2024
$94,207
Construction and Associated Costs
TOTAL
Funding Sources
$94,207
2024
State Grants
$94,207
Local Partnership — City ofEllensburg
Local Partnership — Ellensburg Rodeo
CounLv LTAC Grant
Local Partnership — County
TOTAL
$94,207
Funding Sources
I
------------
2025-2026
Total
$1,004,973
$1,053,516
$12,369,920
$12,369,920
$13,374,893
$13,423,436
2025-2026
Total
$2,374,893
$2,469,100
$2,500,000
$2,500,000
$2,500,000
$2,500,000
$3,000,000
$3,000,000
$3,000,000
$3,000,000
$13,374,893
$13,423,436
v State Grants . City of Ellensburg ■ Ellensburg Rodeo
Li LTAC Grant m Kittitas County
3. Long -Term Maintenance Plan
To ensure the long-term viability and success of the Rodeo Arena Grandstands, a
comprehensive maintenance and funding strategy will be implemented, designed to
preserve the facility's condition, enhance the visitor experience, and support continued
economic contributions to Kittitas County. This proactive approach emphasizes
sustainability, financial responsibility, and strategic partnerships to safeguard the
investment and extend the life of the upgraded venue.
A key element of this plan is the implementation of a routine maintenance schedule to
preserve the long-term quality and functionality of the grandstands. Regular inspections
and timely upkeep of critical infrastructure —including seating, support facilities, plumbing,
and electrical systems —will help ensure the safety, reliability, and visual appeal of the
venue.
Currently, much of our annual maintenance for the Rodeo Arena seating and support areas
is centered on ongoing repairs and safety checks. Facility walk-throughs are conducted
annually or semi-annually with stakeholders to inspect and assess maintenance needs.
Once issues are identified, they are incorporated into our yearly maintenance schedule,
which includes both winterization and spring reopening preparations.
Each year, this work typically involves replacing or re -securing boards on the seating,
stairwells, and walkways; welding railings; replacing toilets; and repairing leaks and other
broken components throughout the restrooms. This reactive approach focuses heavily on
addressing liabilities and urgent safety concerns. Over the past decade, we've incurred
significant repair costs simply to maintain basic usability.
Shifting to a preventative maintenance model for the new facility will help reduce costly
repairs, minimize downtime, and preserve the venue's quality for both spectators and event
participants.
To support these ongoing efforts, a dedicated maintenance fund will be established. A
portion of sponsorship revenues and grant funding will be directed into a Capital
Improvements reserve, specifically earmarked for facility repairs, upgrades, and general
upkeep. This financial foundation will ensure that resources are available when needed
and will reduce reliance on emergency funding or reactive fixes.
Collaboration with local businesses and organizations will further strengthen the long-term
maintenance strategy. Strategic partnerships will be pursued to secure sponsorship
opportunities and develop fundraising initiatives that contribute directly to the upkeep and
enhancement of the facility. These relationships not only provide financial support but also
help build community investment and pride in the venue.
Sustainability will be at the core of the infrastructure management approach. The use of
durable, low -maintenance building materials and the integration of energy -efficient
systems will minimize operational costs and environmental impact. By reducing the
frequency and cost of repairs and lowering energy consumption, these sustainable choices
will contribute to the facility's long-term affordability and resilience.
Regular facility assessments will also be conducted by professionals to identify potential
issues early and recommend necessary upgrades. These evaluations will be critical in
preventing deterioration, ensuring compliance with safety standards, and continuously
improving the visitor experience.
Additionally, the Ellensburg Rodeo has committed to reinvesting a portion of event -
generated revenue into the facility's maintenance and enhancement. In partnership with
Kittitas County, this ongoing financial commitment ensures that the grandstands receive
continued support, reflecting the shared dedication to preserving the quality and legacy of
this iconic venue.
By implementing this comprehensive strategy, the Rodeo Arena Grandstands will be well -
positioned to remain a premier event destination for generations to come. With a projected
lifespan of at least 60 years —and potentially longer through proactive maintenance —these
efforts will safeguard the County's investment while ensuring the venue continues to be a
vital hub for tourism, community engagement, and economic growth in Kittitas County.
IV. Project Timeline
Milestone _I Start Date
Final Design Completed May 1, 2025
Permitting and Bidding July 1, 2025
Approval and Contracting September 16, 2025
Site Prep and Demolition October 1, 2025
Completion Date
June 30, 2025
September 9, 2025
September 30, 2025
November 15, 2025
Primary Construction
Final Inspections/Testing
November 16, 2025
May 31, 2026
June 1, 2026
July 31, 2026
Facility Opening and Prep
August 1, 2026
August 10, 2026
V. Feasibility and Risk Management
1. Feasibility
The feasibility of the Ellensburg Rodeo Grandstands project is strongly supported by a
foundation of thorough planning, professional expertise, and secured funding, all of which
contribute to a high level of confidence in the project's successful and timely completion.
This multi -faceted approach ensures that the grandstands redevelopment can move
forward efficiently, with minimal risk of delays or budgetary shortfalls.
Comprehensive studies and planning efforts have played a critical role in laying the
groundwork for success. Architectural and engineering assessments have confirmed that
the proposed construction timeline of 9 to 10 months is both realistic and achievable. The
design team has integrated efficient construction techniques and scheduling strategies
that aim to minimize disruption to surrounding activities while maximizing productivity. This
level of planning helps ensure that each phase of the project proceeds smoothly and on
schedule.
Financial readiness is another key factor in the project's feasibility. The grandstand
redevelopment is supported by a solid mix of committed funding sources, including state
grants, contributions from local partners, and revenue generated by the Ellensburg Rodeo
and other events. This financial backing ensures that the project can proceed without the
risk of unexpected funding gaps, allowing work to progress without interruption.
Regulatory compliance has also been carefully considered throughout the planning
process. Permitting requirements and environmental assessments have been addressed in
advance, significantly reducing the risk of administrative delays once construction begins.
By incorporating these critical steps early in the process, the project team has created a
streamlined path forward, avoiding common bureaucratic hurdles that can slow down
large-scale developments.
The team behind the project further strengthens its feasibility. The involvement of
experienced architects, engineers, and contractors —each with a proven track record of
delivering successful stadium and large -venue projects —provides assurance that the work
will meet high standards of quality, safety, and efficiency. Their collective expertise
enhances the project's overall credibility and reduces the likelihood of complications
during construction.
In addition, the project is construction -ready. Preliminary site preparation and strategic
procurement of materials are already underway to prevent supply chain disruptions and
support a seamless building process. These proactive steps ensure that once ground is
broken, the project can move forward without unnecessary delays.
With all of these elements in place, the Ellensburg Rodeo Grandstands project is
exceptionally well -positioned for timely and successful execution. The combination of
advanced planning, secured funding, regulatory preparedness, and a skilled project team
sets the stage for completion in time for the 2026 rodeo season, while still allowing the
venue to host pre -season events in the summer. This forward -thinking approach
underscores the commitment to revitalizing a key community asset and preserving the
Legacy of one of the nation's most respected rodeos.
2. Risk Management
While the project is carefully planned, there are potential risks and challenges that could
impact its timeline and success. The primary risk is completing construction in time for the
next Ellensburg Rodeo and Kittitas County Fair.
Ris_k_Can_siruction De(ay_s
The project is estimated to take 9-10 months based on consultations with architects
and engineers experienced in stadium construction. However, unforeseen challenges
such as supply chain issues, labor shortages, or weather conditions could extend the
timeline.
Mitigation Strategy: To minimize delays, we will work with experienced contractors who
have a proven track record of meeting tight deadlines. We will also implement a phased
construction approach to ensure that critical components, such as seating and
infrastructure, are prioritized.
Risk: Limited Pre -Rodeo Eve t Time
We aim to fully open at least one month before the rodeo, but any setbacks could
reduce that timeline.
Mitigation Strategy: By maintaining a buffer period in our schedule, we can still
accommodate smaller events and preparation plans even if minor delays occur.
Additionally, we will ensure early procurement of materials and permits to prevent
administrative delays.
MjUIi�*I�laTit%1�
Cost overruns could occur due to fluctuating material prices or unexpected structural
requirements.
Mitigation Strategy: A contingency fund is built into the budget to cover unexpected
expenses. Regular financial tracking and cost assessments will help ensure
expenditures stay within budget.
By proactively addressing these risks and maintain ingflexibility in the project schedule, we
can ensure the grandstands are completed in time for the 2026 rodeo season while also
allowing summer events to proceed as planned.
VI. Tourism Metrics and Success Measurement
The revitalization of the Ellensburg Rodeo Grandstands presents a unique opportunity to
position Kittitas County as a premier destination for both cultural tourism and year-round
entertainment. A comprehensive promotional strategy and strong support for tourism -
related activities will help maximize the visibility, impact, and long-term benefits of this
investment, while also enhancing the local quality of life.
To drive awareness and visitation, the project team will explore collaboration with the
Kittitas County Chamber of Commerce and regional tourism offices to promote the venue
across both statewide and regional platforms. These partnerships will be instrumental in
ensuring consistent messaging and broad outreach, including coordinated marketing
through tourism bureaus and travel associations.
A robust digital marketing campaign will be developed to showcase the new amenities,
honor the rich history of our annual traditions, and publicize upcoming events. Through
engaging content —such as promotional videos, social media campaigns, and interactive
event calendars —the campaign will attract both repeat visitors and new audiences.
Special emphasis will be placed on highlighting accessibility improvements and diverse
programming options, appealing to families, tourists, and cultural enthusiasts alike.
In addition, the venue will be included in statewide tourism listings and publications, such
as Experience Washington and other popular travel guides and websites, further
embedding the facility into the broader tourism narrative of the Pacific Northwest.
Beyond marketing efforts, the upgraded Rodeo Arena will serve as a dynamic hub for
tourism -related activities. The venue's enhanced infrastructure will accommodate a wide
variety of events, including concerts, regional and national equestrian competitions, and
cultural festivals —each of which will attract both local attendees and out-of-town visitors.
These events will not only enrich the community's cultural offerings but also generate
sustained economic activity.
Visitor services have been carefully considered in the grandstand design. On -site
amenities such as modernized concessions, expanded and accessible restrooms, and
clearly marked pathways will improve comfort and convenience for all guests. Additionally,
areas of the venue will remain accessible for informal community use and recreational
gatherings, ensuring the facility is active year -round —not just during headline events.
To evaluate the success of these efforts and inform future improvements, the Event Center
will implement a feedback and metrics strategy. Digital surveys will be distributed to event
attendees to gather real-time insights on visitor satisfaction and experience.
Simultaneously, key performance indicators such as ticket sales, concession revenues,
and lodging tax collections will be monitored to track economic impact.
The long-term outcomes of this multifaceted approach are expected to be substantial.
Year-round visitation to Ellensburg and the broader Kittitas County region is projected to
rise, driven by expanded programming and improved visitor experience. The local economy
will benefit from increased tourism spending, greater demand for accommodations, and a
more robust calendar of events. At the same time, the national and international profile of
the Ellensburg Rodeo will be elevated, cementing its status as a cultural landmark and a
must -visit destination. Finally, residents will enjoy enhanced amenities, increased
community pride, and more opportunities for engagement —all contributing to a higher
quality of life.
In short, the promotion and programming strategy for the new Ellensburg Rodeo
Grandstands is designed not only to attract visitors but to build lasting value for the
community, ensuring the project's success far beyond its initial launch. We are committed
to sharing follow-up information on the project's outcomes once data has been collected
and evaluated, ensuring transparent performance reporting and accountability.
VII. Applicant Certification
I certify that the information provided in this application is true and complete to the best of
my knowledge. I further certify that I understand the eligibility requirements and that this
project complies with there uirements of RCW 67.28.1816.
Signature
Name: Kady Porterfield, CFE
Title: Event Center Director
Date: ;Z (1P • 2 T
Submission Instructions
Applications must be submitted by July 1st, 2025, by 5:00 p.m. PST.
Application can be submitted via email or in -person to:
Kittitas County Auditor's Office
Attn: Lisa Bugni 205 West 5th Avenue, Suite 105 Ellensburg, WA 98926
Email: Lisa.bugni@co.kittitas.wa.us
Late or incomplete applications will not be considered. This infrastructure application
template ensures a thorough, transparent, and tourism -focused funding process. The
detailed scoring rubric helps LTAC evaluate projects consistently and fairly.
Scoring Rubric for LTAC Review
Criteria
Points
Description
Available
_
Tourism Impact
40
Demonstrates clear and measurable impact
on tourism.
Feasibility and
30
Project is well -planned, feasible, and has a
Sustainability
long-term plan.
Budget and Funding
20
Clear and realistic budget with secured or
Plan
I
pending funds.
Community Benefit
10
Project provides additional benefits to the
Local community.
Attachment A
Rodeo Ares ra stamSls—BenQnstructjon Renckrin _ S
North entry with new restrooms:
----------- Ellensburg Rodeo
awifift
4w-n, 0
"
m
OOOOFF-
owl
I
% * �l1en5�afgAodco �
t�easbp°'SRodeo� �------- _�_�
Y
�l
! I
)LE.:LLZ-aNk" 18001
��
Every Labor Day Weekend
609 N. MAIN ST
ELLENSBURG, WA 98926 (509)962-7831 1 1-800-637-2444
May 15, 2025
Kittitas County Lodging Tax Committee
205 W. 511 Ave
Ellensburg WA 98926
Re: Lodging Tax Large Capital Project Funding
On behalf of the Ellensburg Rodeo Association, I am writing to indicate our strong support for
the Kittitas Valley Event Center Director's request for Lodging Tax funding for Large Capital
Projects for the Kittitas Valley Event Center & Ellensburg Rodeo Arena restoration project. For
the past decade the Ellensburg Rodeo has been working with the Kittitas County
Commissioners on the design and funding of a much needed grandstand renovation for the
Ellensburg Rodeo Arena at the Kittitas Valley Event Center. This project will replace sections of
the grandstands identified with deteriorating structural integrity, non -compliant ingress and
egress, ADA accessibility and seating, and replace existing outdated restroom with accessible
and sanitary restroom facilities.
The Event Center is the premier large entertainment venue in Kittitas County, playing host to a
wide variety of public events like concerts, festivals, and, most famously, the Ellensburg Rodeo.
More than 39,000 people attend the Ellensburg Rodeo annually, creating a significant financial
impact to our community.
This critical funding will supplement the existing funding commitments from the Ellensburg
Rodeo Association, City of Ellensburg, and Kittitas County. This investment in the community
will provide opportunities to not only our generation, but for many generations to come.
We strongly encourage you to support the Kittitas Valley Event Center Director's request for
Lodging Tax funding for Large Capital Projects.
Thank you for your consideration,
E�__Q
Carl Jensvo
President
AA
ANDERSON PIONEERING DEPENDABLE OPPORTUNITIES FOR AGRICULTURE WORLDWIDE
P.O. BOX 99 910 S. ANDERSON ROAD ELLENSBURG, WA 98926 PHONE 509-925-9818 FAX 509-962-6785
June 11, 2025
Kittitas County Lodging Tax Committee
205 W. 51h Ave
Ellensburg WA 98926
Re: Lodging Tax Large Capital Project Funding
On behalf of Anderson Hay & Grain Co., Inc, I am writing to express our enthusiastic support for the
Event Center's Lodging Tax grant request to support critical infrastructure improvements —
specifically, the restoration of the Ellensburg Rodeo Arena's northwest grandstand.
We recognize the County's efforts to thoughtfully design and secure funding for this much -needed
project. The structural repairs and safety upgrades planned will significantly enhance the experience for
the thousands of guests who attend this facility each year. These improvements are essential for
maintaining a safe, functional, and welcoming venue for current and future users.
As Kittitas County's leading venue for major events and entertainment, the Event Center in many cases
is the face of our community. It is important for our community to have high quality facilities as we
attract future growth and new employment opportunities.
We are also aware that this Lodging Tax request will leverage other public and private funding
commitments, including support from the Ellensburg Rodeo Association, the City of Ellensburg,
Kittitas County, and grants secured through the Washington State Legislature. This is a smart and
forward -thinking investment in community infrastructure that will serve both immediate and long-term
needs.
We respectfully urge your full consideration and support for this request. The restoration of the
northwest grandstand is a vital step toward ensuring the Event Center remains a safe, high -quality
venue for generations to come.
Thank you for your time and for supporting projects that strengthen the cultural and economic fabric of
our region.
Sincerely,
Mark T. Anderson
CEO/President
Mark.Anderson(cc_DAndeson-Hay.com