Auditor “Study Session Staff Report”, 7/24/2025
KITTITAS COUNTY
BOARD OF COUNTY COMMISSIONERS
STAFF REPORT FOR
STUDY SESSION
Auditor
STUDY SESSION DATE: 7/24/2025
TOPIC: Consideration of Additional Funding, Boys & Girls Club of the Columbia
Basin
ACTION REQUESTED: Discussion/Decision
LEAD STAFF:
Ann Leichleiter (Boys and Girls Club - Program Director)
Zack DeHaven (Auditor)
BRIEFING SUMMARY:
• Boys & Girls Club (“B&G”) seeks additional funding of $40,000 to address
permit costs within Kittitas County for the proposed “Community Hub” in Cle
Elum.
• None of the previous funding from the County has gone toward this project.
• Ann Leichleiter will be present to field BOCC questions.
BACKGROUND:
• The Boys & Girls Club of the Columbia Basin was initially awarded the
Commerce Planning Grant for $125,004 to look at the building on the Cle
Elum/Roslyn School District property.
• The B & G Club went back to Commerce and asked for additional funding in
May 2025. We were awarded an additional $74,996. Although, we received
$200,000 for this grant, the actual cost with architectural drawings and
permits is approximately $350k
• The grant funding has been spent on strategic plan, drawings, asbestos
testing….
• Every step is proceeded with a permit fee for the building, one can not be
completed without the other.
FISCAL IMPACTS:
Page 2 of 2
Auditor “Study Session Staff Report”, 7/24/2025
• If we do not receive the funding we will not be able to get to 100% design and
permit phase which will hinder us in pursuing grants for the building
• We are asking for $40,000 to help support the costs for the permits so, our
target to break ground is the Spring of 2026 for the “Community Hub” in Cle
Elum.
• Below illustrates the funds that are necessary to complete the planning
stage of the project.
Admin conditional use permit $ 4,674.00
Air conditioning permit (per unit) 140.00
Appliance vent 40.00
Boundary line adjustment/ survey 7,750.00
Boundary Line adjustment 2,375.00
Building permit (est) 5,500.00
Demolition permit 230.00
Fire suppression system fee (est) 2,000.00
Furnace permit 140.00
Hood vent 210.00
M,E,P final design blueprints 150,000.00
Permit issuance fee 150.00
Pre application meeting 1,250.00
Preliminary site eval 1,267.11
Septic permit/design 2,128.00
$ 177,854.11
Permits/needed services to
permit
Admin conditional use permit $ 4,674.00
Air conditioning permit (per unit) 140.00
Appliance vent 40.00
Boundary line adjustment/ survey 7,750.00
Boundary Line adjustment 2,375.00
Building permit (est) 5,500.00
Demolition permit 230.00
Fire suppression system fee (est) 2,000.00
Furnace permit 140.00
Hood vent 210.00
Permit issuance fee 150.00
Pre application meeting 1,250.00
preliminary site eval 1,267.11
Septic permit/design 2,128.00
$ 27,854.11
ATTACHMENTS: None