Loading...
HomeMy WebLinkAbout2025-07-24-minutes-finance-study-sessionPage 1 of 2 Auditor “Study Session Staff Report”, 7/24/2025 KITTITAS COUNTY BOARD OF COUNTY COMMISSIONERS STAFF REPORT FOR STUDY SESSION Auditor STUDY SESSION DATE: 7/24/2025 TOPIC: Consideration of Additional Funding, Boys & Girls Club of the Columbia Basin ACTION REQUESTED: Discussion/Decision LEAD STAFF: Ann Leichleiter (Boys and Girls Club - Program Director) Zack DeHaven (Auditor) BRIEFING SUMMARY: • Boys & Girls Club (“B&G”) seeks additional funding of $40,000 to address permit costs within Kittitas County for the proposed “Community Hub” in Cle Elum. • None of the previous funding from the County has gone toward this project. • Ann Leichleiter will be present to field BOCC questions. BACKGROUND: • The Boys & Girls Club of the Columbia Basin was initially awarded the Commerce Planning Grant for $125,004 to look at the building on the Cle Elum/Roslyn School District property. • The B & G Club went back to Commerce and asked for additional funding in May 2025. We were awarded an additional $74,996. Although, we received $200,000 for this grant, the actual cost with architectural drawings and permits is approximately $350k • The grant funding has been spent on strategic plan, drawings, asbestos testing…. • Every step is proceeded with a permit fee for the building, one can not be completed without the other. FISCAL IMPACTS: Page 2 of 2 Auditor “Study Session Staff Report”, 7/24/2025 • If we do not receive the funding we will not be able to get to 100% design and permit phase which will hinder us in pursuing grants for the building • We are asking for $40,000 to help support the costs for the permits so, our target to break ground is the Spring of 2026 for the “Community Hub” in Cle Elum. • Below illustrates the funds that are necessary to complete the planning stage of the project. Admin conditional use permit $ 4,674.00 Air conditioning permit (per unit) 140.00 Appliance vent 40.00 Boundary line adjustment/ survey 7,750.00 Boundary Line adjustment 2,375.00 Building permit (est) 5,500.00 Demolition permit 230.00 Fire suppression system fee (est) 2,000.00 Furnace permit 140.00 Hood vent 210.00 M,E,P final design blueprints 150,000.00 Permit issuance fee 150.00 Pre application meeting 1,250.00 Preliminary site eval 1,267.11 Septic permit/design 2,128.00 $ 177,854.11 Permits/needed services to permit Admin conditional use permit $ 4,674.00 Air conditioning permit (per unit) 140.00 Appliance vent 40.00 Boundary line adjustment/ survey 7,750.00 Boundary Line adjustment 2,375.00 Building permit (est) 5,500.00 Demolition permit 230.00 Fire suppression system fee (est) 2,000.00 Furnace permit 140.00 Hood vent 210.00 Permit issuance fee 150.00 Pre application meeting 1,250.00 preliminary site eval 1,267.11 Septic permit/design 2,128.00 $ 27,854.11 ATTACHMENTS: None