HomeMy WebLinkAboutInteragency Agreement DOE and KCPHD PPABOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION
NO.2025-
RESOLUTION TO AUTHORIZE EXECUTION OF AN INTERLOCAL AGREEMENT
BETWEEN THE KITTITAS COUNTY PUBLIC HEALTH DEPARTMENT AND THE
STATE OF WASHINGTON, DEPARTMENT OF ECOLOGY FOR POLLUTION
PREVENTTION ASSISTANCE PARTNERSHIP
WHEREAS, RCW 39.34, the Interlocal Cooperation Act, provides the capability for public
agencies to cooperate for mutual advantage; and
WHEREAS, Kittitas County, through the Kittitas County Public Health Department (KCPHD),
is charged with the preservation, promotion, and improvement of health in the
County; and
WHEREAS, one of the many ways KCPHD preserves and promotes health improvements is by
partnering with other agencies on high priority environmental issues; and
WHEREAS, KCPHD desires to partner with the Washington State Department of Ecology to
provide Pollution Prevention Assistants Specialists who will provide technical
assistance and education outreach to small quantity generators in effort to prevent
pollution of waters of the state as detailed in the attached Interlocal Agreement that
is hereby incorporated by this reference.
NOW THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Kittitas
County, Washington, authorizes execution of the attached Interagency Agreement with the
Washington State Department of Ecology.
DATED this day of , 2025, at Ellensburg, Washington.
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Chair
Vice -Chair
Commissioner
ATTEST:
Clerk of the Board
Kittitas County Public Health Public Health
Contract/Agreement Review Form
Today's Date: 07/02/2025
Fund/Department: 116-Public Health
Legal Request #: 111654
Agenda Date:
Contract/Agreement Information
Contract/Agreement Agency: Department of Ecology
Contract/Agreement Title: Interagency Agreement between Department of Ecology and Kittitas County Public Health
Begin Date: 07/01/25
Total $ Amount: $125,608.84
Contract/Agreement Summary:
End Date: 06/30/27
Contract/Agreement #: C2500178
The purpose of this agreement is for the contractor to provide Pollution Prevention Assistance
(PPA) Specialist who will provide technical assistance and education outreach to small quantity
generators in an effort to prevent pollution of waters of the state as part of the Pollution
Prevention Assistance Partnership.
Kittitas County Prosecutor and Auditor Review and Comment:
APPROVED AS TO FORM:
Signature of Prosecutor's Office
Signature of Auditor's Office
Riirlupt Infnrmatinn
Date
Date
Revenue Code( s):
116 - 615.08.05.334
Expense Code(s):
116 - 615.08.05.51001 /52001 /54906/54301 /53115
✓❑
Agency is not suspended/disbarred
Not Checked (reason)
Pass Through Information
Agency to Pass Through
Amount to Pass Through Expense Code:
Sub -Contract Approved Date:
ADMIN Version: 0 supersedes: 0 Date Adopted: 12/01/2024 1 Modified By: Katie Odiaga Approval By: Chelsey Loeffers
7/7/25, 2:46 PM
SAM.gov
Entity Information
STATE OF WAS H I N G TO N Active Registration
Unique Entity ID CAGE/NCAGE
N48GCZ2FJA47 OWP75
Physical Address Mailing Address
300 Desmond DR SE PO Box 47615
Lacey, Washington Olympia, Washington
98503-1274, United States 98504-7615, United States
Purpose of Registration
All Awards
Version
Current Record 1 1
BUSINESS INFORMATION
Expiration Date
Doing Business As URL
Department of https://ecology.wa.g Registration Dates
Ecology ov/
Division Name
Division Number
Activation Date
(blank)
(blank)
Mar 25, 2025
Congressional
State/Country of
Submission
District
Incorporation
Date
Washington 10
(blank), (blank)
Mar 21, 2025
Initial Registration
Owner
CAGE Legal Business
Date
Name
Jan 3, 2002
Immediate
(blank) (blank)
Owner
Highest Level
(blank)(blank)
Entity Dates
Owner
Mar 21, 2026
https://sam.gov/entities/view/N48GCZ2FJA47/core Data ?status=Active&emrKeyValue=2016622-1740493756584454 1 /3
7/7/25, 2:46 PM
SAM.gov
Government Types
https://sam.gov/entities/view/N48GCZ2FJA47/coreData?status=Active&emrKeyValue=2O16622-1740493756584454 3/3
LJUI.Uwy II Clivulupc ILi. 4000YC/U I J/ Jr—ioul-voo I - I I G I FD-+DuV 10
DEPARTMENT OF
ECOLOGY
State of Washington
IAA No. C2500178
INTERAGENCY AGREEMENT (IAA)
BETWEEN
THE STATE OF WASHINGTON, DEPARTMENT OF ECOLOGY
am
Kittitas County Public Health
THIS INTERAGENCY AGREEMENT ("Agreement" or "IAA") is made and entered into by and
between the state of Washington, Department of Ecology, hereinafter referred to as "ECOLOGY," and
the Kittitas County Public Health hereinafter referred to as the "CONTRACTOR," pursuant to the
authority granted by Chapter 39.34 of the Revised Code Washington, Interlocal Cooperation Act.
THE PURPOSE OF THIS AGREEMENT is for the CONTRACTOR to provide Pollution Prevention
Assistance (PPA) Specialists who will provide technical assistance and education outreach to small quantity
generators in an effort to prevent pollution of waters of the state as part of the Pollution Prevention Assistance
Partnership.
WHEREAS, ECOLOGY has legal authority (RCW 70A.214 and RCW 70A.300) and the
CONTRACTOR (other party) has legal authority (Specific authority to conduct inspections and provide
technical assistance is derived from Kittitas County Code (KCC) Title 13, which outlines the powers of
the health officer.) that allows each party to undertake the actions in this agreement.
THEREFORE, IT IS MUTUALLY AGREED THAT:
1. SCOPE OF WORK
The CONTRACTOR shall furnish the necessary personnel, equipment, material and/or service(s) and
otherwise do all things necessary for or incidental to the performance of the work set forth in Appendix
A, Statement of Work, attached hereto and incorporated herein.
Version 4/14/25 (Access Equity)
L/UL,ublyI I CI IV VIUpt:; IU. 'hUJO11.70 I -U I Jr--+DVZ-JOD I- I I C I row DO'+ 10
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
2. PERIOD OF PERFORMANCE
The period of performance of this IAA will commence on July 1, 2025, and be completed by June 30,
2027, unless the Agreement is terminated sooner as provided herein. Amendments extending the period
of performance, if any, shall be at the sole discretion of ECOLOGY.
3. COMPENSATION
Compensation for the work provided in accordance with this IAA has been established under the terms of
RCW 39.34.130 and RCW 39.26.180(3). This is a performance -based agreement, under which payment
is based on the successful completion of expected deliverables.
Compensation for this agreement will be released in two 1-year phases. Phase One is limited to 50 percent
of the project budget and Phase Two can be up to the remaining percentage of the project budget. On or
before August 15, 2026, Ecology will evaluate available funding and the CONTRACTOR's performance
and progress towards meeting contract deliverables and spending. To release the second year of funding
the CONTRACTOR, by June 30, 2026, must:
1. Complete a minimum of 40% of the total site visit deliverables, and
2. Utilize 40% of the total compensation award.
If performance obligations have been met and funding is available per ECOLOGY's determination, the
full year 2 budget award will be considered available. Should the CONTRACTOR fail to make
satisfactory progress, ECOLOGY will determine the appropriate additional funding to release for year 2
of the contract. Ecology will consider various factors in determining year 2 funding including, but not
limited to, available funding, performance to date, staff vacancies, time and costs spent on unique
program elements, and potential circumstances beyond the CONTRACTOR's control.
The source of funds for this IAA is Model Toxics Capital Account (23N). Both parties agree to comply
with all applicable rules and regulations associated with these funds.
The parties have determined that the cost of accomplishing the work identified herein will not exceed one
hundred twenty-five thousand, six hundred eight dollars, and eighty-four cents ($125,608.84), including
any indirect charges. Payment for satisfactory performance of the work shall not exceed this amount
unless the parties mutually agree via an amendment to a higher amount. Compensation for services shall
be based on the terms and tasks set forth in Appendix A, Statement of Work. ECOLOGY will not make
payment until it has reviewed and accepted the work.
Travel expenses (meals, lodging, and POV mileage) will be reimbursed according to current state per -
diem rates at the time of travel, not to exceed the total budget (see Appendix B, Budget Detain.
Expenses related to initial 24-hour (or 40-hour) HAZWOPER training, and required yearly 8-hour
refresher training courses will be reimbursed as part of the quarterly invoicing submittal. Invoices for
those training courses must be submitted as supporting documentation for the quarterly submittal.
Expenses for language services will be reimbursed in quarterly invoice submittals. CONTRACTOR must
submit invoices from the language service provider, or time sheets for internal staff providing language
services, to be reimbursed as part of quarterly invoice submittals.
Funds for the purchase of source control tools or equipment (e.g. spill kits, plastic drum covers) and
promotional items for distribution to businesses under this contract must be included in the Goods &
2
Version 4/14/25 (Access Equity)
L/UL,Ub R9l I CI IVZIUPC ILl. •+UJ0'+VQ I-L)I or-YovL-.7oo I - I I C IF D-+DU-+ I J
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
Services Budget or Equipment Budget categories in Appendix B, Budget Detail. Any purchase of
equipment or goods & services over $1,000.00 not specifically listed in Appendix B, Budget Detail must
be pre -approved by ECOLOGY in writing. When the agreement expires, or when the equipment is no
longer needed for the originally authorized purpose (whichever comes first) the disposition of equipment
shall be at ECOLOGY's sole discretion.
Indirect rates for the contract will be paid as indicated in Appendix B, Budget Detail. Changes to the
indirect rate may be considered by ECOLOGY. CONTRACTOR shall provide supporting documentation
necessitating the change to the indirect rate to ECOLOGY. ECOLOGY's approval will be communicated
by e-mail by the Pollution Prevention Assistance Coordinator. An increase in indirect rate does not
increase the total contract award. Changes are handled by adjusting the budget between categories listed
in Appendix B, Budget Detail. Changes to the total budget cost of the contract shall require an
amendment. The budget referenced in Appendix B, Budget Detail may be adjusted between categories
with ECOLOGY's preapproval, and if the total budget is not exceeded.
ECOLOGY may, at its sole discretion, terminate or suspend this Contract in accordance with Section 19
or 20, or withhold payments claimed by the CONTRACTOR for services rendered, if the
CONTRACTOR fails to satisfactorily comply with any term or condition of this Agreement.
4. BILLING AND PAYMENT PROCEDURE
Payment requests shall be submitted electronically or by mail, on state form Invoice Voucher A19-1A.
Invoice voucher shall reference the Agreement (IAA) number and clearly identify those items that relate
to performance under this Agreement. Invoices shall describe and document to ECOLOGY's satisfaction
a description of the work performed, the progress of the work, and related costs. Each invoice shall bill
for actual hours worked during the quarter. The actual hours billed may be higher (if the total budget
compensation award is not exceeded) or lower than the FTE estimate in Appendix A, Statement of Work.
Attach supporting documentation to the invoice. See Appendix A, Statement of Work, Sections 4, 5, and
11 for additional information (and Section 10, Small Change Voucher Program, if applicable).
Send invoices to:
State of Washington
Department of Ecology
Hazardous Waste & Toxic Reduction Program
Attn: Andrew Maher
4601 N. MONROE ST.
SPOKANE, WA 99205
D"
Email invoices and supporting documentation to both:
Andy Maher, anma46 f @ecy.wa.gov & Kristine Ray, krav46I6bbec .wa. ov
Payment requests will be submitted on a Quarterly basis. Invoices must be submitted by the dates
outlined in Appendix A, Statement of Work, Section 11: Invoices, Table 11.1. Upon expiration of this
Agreement, any claim for payment not already made shall be submitted to ECOLOGY within 30 days
after the expiration date or the end of the fiscal year, whichever is earlier.
Version 4/14/25 (Access Equity)
L/UI.UJlyl I CI IVUJUpC IL). I -u/ Jr-wouL-Voo I- 1 I C I roYozv+ I J
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
Payment will be made within thirty (30) days of submission of a properly completed invoice (form A19-
1A) with supportive documentation. All expenses invoiced shall be supported with copies of invoices
paid.
Payment will be issued through Washington State's Office of Financial Management's Statewide Payee
Desk. To receive payment, CONTRACTOR must register as a statewide vendor by submitting a
statewide vendor registration form and an IRS W-9 form at website, Iittps://ofm.wa.gov/it=
s stems/statewide-vendo a ee-services. For questions about the vendor registration process, contact
Statewide Payee Help Desk at (360) 407-8180 or email PaveeRe istration oftn.wa. ov.
5. ALTERATIONS AND AMENDMENTS
This Agreement may be amended by mutual agreement of the parties. Such amendments shall not be
binding unless they are in writing and signed by personnel authorized to bind each of the parties.
6. ASSIGNMENT
The work to be provided under this Agreement, and any claim arising thereunder, is not assignable or
delegable by either party in whole or in part, without the express prior written consent of the other party,
which consent shall not be unreasonably withheld.
7. ASSURANCES
Parties to this Agreement agree that all activity pursuant to this agreement will be in accordance with all
the applicable current federal, state, and local laws, rules, and regulations.
8. CONFORMANCE
If any provision of this Agreement violates any statute or rule of law of the state of Washington, it is
considered modified to conform to that statute or rule of law.
9. DISPUTES
Parties to this Agreement shall employ every effort to resolve a dispute themselves without resorting to
litigation. In the event that a dispute arises under this Agreement that cannot be resolved among the
parties, it shall be determined by a Dispute Board in the following manner. Each party to this Agreement
shall appoint one member to the Dispute Board. The members so appointed shall jointly appoint an
additional member to the Dispute Board. The Dispute Board shall review the facts, agreement terms, and
applicable statutes and rules, and then make a determination of the dispute. The determination of the
Dispute Board shall be final and binding on the parties hereto, unless restricted by law. The cost of
resolution will be borne by each party paying its own cost. As an alternative to this process, if state
agencies, either of the parties may request intervention by the Governor, as provided by RCW 43.17.330,
in which event the Governor's process will control. The parties may mutually agree to a different dispute
resolution process.
10. FUNDING AVAILABILITY
ECOLOGY's ability to make payments is contingent on availability of funding. In the event funding
from state, federal, or other sources is withdrawn, reduced, or limited in any way after the effective date
and prior to completion or expiration date of this Agreement, ECOLOGY, at its sole discretion, may elect
to terminate the Agreement, in whole or part, for convenience or to renegotiate the Agreement subject to
new funding limitations and conditions. ECOLOGY may also elect to suspend performance of the
Agreement until ECOLOGY determines the funding insufficiency is resolved. ECOLOGY may exercise
4
Version 4/14/25 (Access Equity)
LJUL,Ublyll CI lvclu u ILJ. 9u Jow.7o I-J J Jr--+DU4-.70o I- 1 1 C 1 r0•fDZI'4 10
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
any of these options with no notification restrictions, although ECOLOGY will make a reasonable
attempt to provide notice.
In the event of termination or suspension, ECOLOGY will reimburse eligible costs incurred by the
CONTRACTOR through the effective date of termination or suspension. Reimbursed costs must be
agreed to by ECOLOGY and the CONTRACTOR. In no event shall ECOLOGY's reimbursement
exceed ECOLOGY's total responsibility under the agreement and any amendments.
11, GOVERNING LAW AND VENUE
This Agreement is entered into pursuant to and under the authority granted by the laws of the state of
Washington and any applicable federal laws. The provisions of this Agreement shall be construed to
conform to those laws. This Agreement shall be construed and interpreted in accordance with the laws of
the state of Washington, and the venue of any action brought hereunder shall be the Superior Court for
Thurston County.
12. INDEPENDENT CAPACITY
The employees or agents of each party who are engaged in the performance of this Agreement shall
continue to be employees or agents of that party and shall not be considered for any purpose to be
employees or agents of the other party.
13. ORDER OF PRECEDENCE
In the event of an inconsistency in the terms of this Agreement, or between its terms and any applicable
statute or rule, the inconsistency shall be resolved by giving precedence in the following order:
a. Applicable federal and state of Washington statutes, regulations, and rules.
b. Mutually agreed upon written amendments to this Agreement.
c. This Agreement, number C2500178.
d. Appendix A, Statement of Work.
e. Appendix B, Budget Detail.
f. Appendix C, Special Terms and Conditions.
g. Any other provisions or term of this Agreement, including materials incorporated by reference or
otherwise incorporated.
14. RECORDS MAINTENANCE
The parties to this Agreement shall each maintain books, records, documents, and other evidence that
sufficiently and properly reflect all direct and indirect costs expended by either party in the performance
of the service(s) described herein. These materials shall be subject to inspection, review, or audit by
personnel of both parties, other personnel duly authorized by either party, the Office of the State Auditor,
and federal officials so authorized by law. All books, records, documents, and other materials relevant to
this Agreement must be retained for six years after expiration of this Agreement. The Office of the State
Auditor, federal auditors, and any persons duly authorized by the parties shall have full access and the
right to examine any of these materials during this period. Each party will utilize reasonable security
procedures and protections for all materials related to this Agreement. All materials are subject to state
public disclosure laws.
Version 4/14/25 (Access Equity)
VUUUDIly1I CI I VCIUpC IL/. HUJUV.70 1 -J I Jr--t0UL-.70D I - I 1 C I r0•iDU•4 1 J
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
15. RESPONSIBILITIES OF THE PARTIES
Each party of this Agreement hereby assumes responsibility for claims and/or damages to persons and/or
property resulting from any act or omissions on the part of itself, its employees, its officers, and its
agents. Neither party will be considered the agent of the other party to this Agreement.
16, RIGHTS IN DATA
Unless otherwise provided, data which originates from this Agreement shall be "work made for hire" as
defined by the United States Copyright Act, Title 17 U.S.C. section 101 and shall be owned by state of
Washington, ECOLOGY. Data shall include, but not be limited to, reports, documents, pamphlets,
advertisements, books magazines, surveys, studies, computer programs, films, tapes, and/or sound
reproductions. Ownership includes the right to copyright, patent, and register these items, and the ability
to transfer these rights.
17, SEVERABILITY
If any provision of this Agreement or any provision of any document incorporated by reference shall be
held invalid, such invalidity shall not affect the other provisions of this Agreement which can be given
effect without the invalid provision, if such remainder conforms to the requirements of applicable law and
the fundamental purpose of this Agreement, and to this end the provisions of this Agreement are declared
to be severable.
18. SUBCONTRACTORS
a. CONTRACTOR agrees to take complete responsibility for all actions of any Subcontractor used
under this Agreement for the performance. When federal funding is involved, there will be
additional CONTRACTOR and subcontractor requirements and reporting.
Prior to performance, all subcontractors who will be performing services under this Agreement
must be identified, including their name, the nature of services to be performed, address,
telephone, WA State Department of Revenue Registration Tax number (UBI), federal tax
identification number (TIN), and anticipated dollar value of each subcontract. Identify whether
subcontractor is certified with
Office of Minority and Women's Business Enterprises (OMWBE), WA Dept of Veterans Affairs
(WDVA), or is a WA small business. Provide such information to ECOLOGY's representative.
b. Subcontractor Payment Reporting Requirements — Access Equity:
This Agreement is subject to compliance tracking of subcontractor(s) spending using the State's
business diversity management system, Access Equity (132Gnow). Access Equity is web -based
and can be accessed at the Office of Minority and Women's Business Enterprises (OMWBE) at
htt s:/Ioinwbe.diversi com liance.coml. The CONTRACTOR and all Subcontractor(s) shall
report and confirm receipt of payments made to the CONTRACTOR and each Subcontractor
through Access Equity.
The CONTRACTOR may contact Robyn Crawford (rvan46I @.ecy.wa.goy; (564) 223-5487),
Access Equity Contract Agent with Ecology's Hazardous Waste & Toxic Reduction Program for
technical assistance in using the Access Equity system.
User guides and documentation related to Contractor and Subcontractor access to and use of
Access Equity are available online at littps://omwbe.wa.gov/access-egLiitv-lielp-center.
6
Version 4/14/25 (Access Equity)
UUUUOlyI I CT I VCIUFIC I V. •4UJ0900 I-J! Jr--tDUL-C700 I- 1 I C I r090.7•T I J
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
ECOLOGY reserves the right to withhold payments from the CONTRACTOR for non-
compliance with this section. For purposes of this section, Subcontractor means any subcontractor
working on the Contract, at any tier and regardless of status as certified WMBE or Non-WMBE.
The CONTRACTOR shall:
a. Register and enter all required Subcontractor information into Access Equity no later than
fifteen (15) days after ECOLOGY creates the file (Contract Record) in Access Equity.
b. Complete the required user training (two (2) one -hour online sessions) no later than twenty
(20) days after ECOLOGY creates the file (Contract Record) in Access Equity.
c. Report the amount and date of all payments:
i. Received from ECOLOGY, and
ii. Paid to Subcontractors, no later than fifteen (15) days after the issuance of each
payment made by ECOLOGY to the Contractor, unless otherwise specified in writing
by ECOLOGY, except that the Contractor shall mark as "Final" and report the final
Subcontractor payments into Access Equity no later than thirty (30) days after the
final payment is due the Subcontractor(s) under the Contract, with all payment
information entered no later than sixty (60) days after end of fiscal year, June 30.
d. Monitor contract payments and respond promptly to any requests or instructions from
ECOLOGY or system -generated messages to check or provide information in Access
Equity.
e. Coordinate with Subcontractors, or ECOLOGY, when necessary, to resolve promptly any
discrepancies between reported and received payments.
f. Require each Subcontractor to:
i. Register in Access Equity and complete the required user training.
ii. Verify the amount and date of receipt of each payment from the Contractor or a
higher tier Subcontractor, if applicable, through Access Equity.
iii. Report payments made to any lower tier Subcontractors, if any, in the same manner
as specified herein.
iv. Respond promptly to any requests or instructions from the Contractor or system -
generated messages to check or provide information in Access Equity; and
V. Coordinate with Contractor, or ECOLOGY, when necessary, to resolve promptly any
discrepancies between reported and received payments.
19. SUSPENSION FOR CONVENIENCE
ECOLOGY may suspend this Agreement or any portion thereof for a temporary period by providing
written notice to the CONTRACTOR a minimum of seven (7) calendar days before the suspension date.
CONTRACTOR shall resume performance on the first business day following the suspension period
unless another day is specified in writing by ECOLOGY prior to the expiration of the suspension period.
20. TERMNATION FOR CAUSE
If for any cause, either party does not fulfill in a timely and proper manner its obligations under this
Agreement, or if either party violates any of these terms and conditions, the aggrieved party will give the
other party written notice of such failure or violation. The responsible party will be given the opportunity
to correct the violation or failure within fifteen (15) business days. If failure or violation is not corrected,
this Agreement may be terminated immediately by written notice of the aggrieved party to the other.
7
Version 4/14/25 (Access Equity)
LlUI.UOIyl I CI I VCIUpr I V. 9VJ0400 I -J! Jr-YDVL-UOD 1- I I r- I r09OJ•f I J
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
21. TERMINATION FOR CONVENIENCE
Either party may terminate this Agreement without cause upon thirty (30) calendar day prior written
notification to the other party. If this Agreement is so terminated, the parties shall be liable only for
performance rendered or costs incurred in accordance with the terms of this Agreement prior to the
effective date of termination.
22. WAIVER
A failure by either party to exercise its rights under this Agreement shall not preclude that party from
subsequent exercise of such rights and shall not constitute a waiver of any other rights under this
Agreement unless stated to be such in a written amendment to this Agreement signed by an authorized
representative of the parties.
23, AGREEMENT MANAGEMENT
The representative for each of the parties shall be responsible for and shall be the contact person for all
communications, notifications, and billings questions regarding the performance of this Agreement. The
parties agree that if there is a change in representatives, they will promptly notify the other party in
writing of such change, such changes do not need an amendment.
The ECOLOGY Representative is:
Name:
Andrew Maher
Address:
4601 N. Monroe St.
Spokane, WA 99205
Phone:
(509) 290-7806 cell
Email:
ani-na461@ea.wa.gov
Version 4/14/25 (Access Equity)
The Kittitas County Public Health
Representative is:
Name: Jesse Cox
Address: 507 N Nanum St.
Ellensburg, WA 98926
Phone: (509) 962-7005
Email: jesse.cox@.co.kittitas.wa.us
L/Ul.ubllyll CI IV nupu IU. 4UJOY70 I-J! jr--+DU/-U0D I - I I C I r0-+DU+ 1 J
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
24, ALL WRITINGS CONTAINED HEREIN
This Agreement contains all the terms and conditions agreed upon by the parties. No other
understandings, oral or otherwise, regarding the subject matter of this Agreement shall be deemed to exist
or to bind any of the parties hereto.
The signatories to this Agreement represent that they have the authority to bind their respective
organizations to this Agreement.
IN WITNESS WHEREOF, the parties below, having read this Agreement in its entirety, including all
attachments, do agree in each and every particular as indicated by their signatures below.
State of Washington
Department of Ecology
By:
Signature Date
Katrina Lassiter
Print Name
Hazardous Waste and Toxics Reduction
Program Manager
Title
E
Version 4/14/25 (Access Equity)
Kittitas County Public Health
Signature Date
Chelsey Loeffers
Print Name
Public Health Director
Title
LJUL'uwy II GI IvulupC ILJ. YUJu-tvu I-J! Jr-Y000-U00 I- I I C I ru'40.7'f I J
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
APPENDIX A
STATEMENT OF WORK
Section 1. Introduction
This statement of work is for the 2025 — 2027 biennial Interagency Agreement (IAA) for the Pollution
Prevention Assistance (PPA) Partnership, which is overseen by the Washington State Department of
Ecology (ECOLOGY), Hazardous Waste & Toxic Reduction Program (HWTR).
The mission of the PPA Partnership is:
"We protect Washington's residents and environment by helping small businesses reduce toxic
chemical use, safely manage dangerous waste, and keep stormwater free of pollutants. "
The CONTRACTOR, through their Pollution Prevention Assistance (PPA) program, will conduct
multimedia source control site visits and pollution prevention activities to businesses that are small
quantity generators (SQGs) of dangerous waste. In this context an SQG is any business, non-profit,
facility, school, or other organization that generates less than 220 pounds of dangerous waste per calendar
month and less than 2.2 pounds of extremely hazardous waste per calendar month. The site visits, along
with other pollution prevention activities conducted by the CONTRACTOR, will be designed to reduce or
eliminate dangerous waste and other pollutants at the source through best management practices that
prevent spills and discharges to ground, air, and water (especially to industrial wastewater and
stormwater).
To further facilitate the reduction or elimination of toxic chemical use at the source, the CONTRACTOR
will seek and discuss opportunities to assist businesses with switching processes, products, or equipment
to use effective safer alternatives. This program will be known as the "Product Replacement Program" or
PRP.
PPA work for the 2025 — 2027 contract cycle is expected to fall within the below general
proportions:
Table 1.1: PPA Work Tasks
PPA Work Tasks
% of Time Spent
_
Technical Assistance (TA) Visitst
60%
(See Appendix A, Statement of Work, Section 2 for more details)
Unique Program Elements
15%
(See Appendix A, Statement of Work, Section 3 for more details)
Training
20%
(See Appendix A, Statement of Work, Section 8 for more details)
Other
5%
(Admin, staff meetings, etc)
Approximately 10 — 15% of TA visits may involve Product Replacement Program visits.
10
Version 4/14/25 (Access Equity)
VUI.Ubl I I CI IvrlupC lu. 'TUJu•Tuu I -J / Jr-4ow-.7oo 1-1 1 C I ru4C.74 I J
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
The CONTRACTOR is expected to:
• Interact with other partners within the PPA Partnership to provide technical assistance and
training and share resources and experiences.
• Set up alerts to receive notifications when requests for information have been made on the PPA
Partnership SharePoint Discussion Board.
• Ensure at least one staff member is available to provide timely information and feedback to
ECOLOGY's PPA Coordinator and to attend mandatory meetings and trainings. Feedback on
Partnership goals, direction, and projects will occasionally be requested via online surveys and
email requests.
■ Act in a professional and ethical manner and avoid any conflict of interest that might influence
the CONTRACTOR's actions or judgement.
• Disclose immediately to ECOLOGY any interest, direct or indirect, that might be construed as
prejudicial in any way to the professional judgment of the CONTRACTOR in rendering service
under this Agreement.
• CONTRACTORS will attempt to provide 40% of their services (visits and unique program
elements) to businesses located within overburdened communities of Washington State. The
Overburdened Communities of Washington State map provided by the Office of Financial
Management is used to determine if businesses are located within an overburdened community.'
• CONTRACTORS are required to identify facilities within Overburdened Communities in
Washington State during data entry into the Local Source Control Database.
Key staff, estimated FTE, and their roles are identified in Table 1. Please note, this is an estimate of time
dedicated to this contract over the full two years of the contract; quarterly invoicing must reflect actual
hours worked even if hours are higher or lower than the FTE estimate.
Key personnel changes (staff or manager leaving, new hires, etc.) must be reported to the Pollution
Prevention Assistance Coordinator within ten (10) business days. Changes to key personnel must be
documented with updated copies of the key staff table.
Table 1.2: Kev Staff Table
Staff Name
Estimated FTE
Role
Lucerito Garcia
0.35
PPA Specialist
Jesse Cox
0.05
PPA Manager
Kim Shilley
0.10
PPA Specialist (Backup)
Section 2. Technical Assistance Visits
The CONTRACTOR will conduct technical assistance site visits to small quantity generators of
dangerous wastes, and to businesses or organizations that have the potential to pollute stormwater.
Approximately 60% of the visits will be Initial Visits. If Initial Visits fall below 60%, combined Initial
Visits and Follow -Up Visits must account for at least 80% of the total visits. While necessary, efforts
should be made to minimize Screening Visits.
2 https://geo.wa.gov/datasets/wa-ofm::overburdened-communities-of-washington-
state/explore?location=47.246690%2C-121.952358%2C 10.01
11
Version 4/14/25 (Access Equity)
LJul.ub,yll ciivciupc mi. Vuoo4ao I JI or-flou4-.7oo i- i I C I ro•roa4 I J
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
■ An Initial Visit occurs at the actual site and results in a completed "Basic Checklist' (Link in
Appendix A, Statement of Work, Section 12: Resources), or enough data gathered to complete
data entry into the LSC Database (Link to database in Appendix A, Statement of Work, Section
12: Resources). It will either be the first complete visit to a site OR the first visit in two (2) or
more years.
• A Screening Visit is an attempted visit to the site, but the business declined or put off the visit,
OR you were interrupted during the visit and were unable to gather complete data, OR you
discover that the facility does not exist anymore OR you discover that the business does not
qualify for a visit under the PPA program (e.g., it is a medium or large quantity generator).
• A Follow -Up Visit should occur within 90 days of the Initial Visit. Follow-up should generally
be done through an on -site visit. However, a phone conversation, mail or email exchange may
count as a Follow -Up Visit if it includes confirmation that the issues that were identified in the
initial visit were resolved. Follow -Up Visits must be conducted to resolve High Priority
Environmental Issues (See Section Below).
Tahle 2.1 ! Total Number of Technical Assistance Visits
Number of Total Visits 100
Target for Initial Visits (60% of Total) 60
Business sectors, organizations, waste streams, and/or geographical area that will provide a focus for the
2025 — 2027 technical assistance visits are listed in Table 2.2 Technical Assistance Targets.
ECOLOGY may direct a portion of technical assistance visits towards specific priority sources or
contaminants.
CONTRACTORS will attempt to provide 40% of their services (visits and unique program elements) to
businesses located within overburdened communities of Washington State. The Overburdened
Communities of Washington State map provided by the Office of Financial Management is used to
determine if businesses are located within an overburdened community.' CONTRACTORS must identify
facilities within Overburdened Communities in Washington State during data entry into the Local Source
Control Database.
Table 2.2: Technical Assistance
Technical Assistance Targets Rationale for Selection
This sector will be a key focus due to its significant potential
Automotive Sector for environmental impacts. Automotive businesses commonly
handle hazardous materials and chemicals that can pollute water
systems and soil if not managed properly.
These operations can pose significant environmental challenges
due to their use of chemicals and generation of hazardous
Small Industrial Facilities waste. These facilities often lack the resources or expertise to
implement best practices for reducing hazardous waste, safely
managing materials, and preventing pollution.
3 https://geo.wa.gov/datasets/wa-ofm::overburdened-communities-of-washington-
state/explore?location=47.246690%2C-121.952358%2C 10.01
12
Version 4/14/25 (Access Equity)
IJUI.uwyl1 CI IYCIUpC IU. '4UJ0.49U I J! Jr-+0UL-.70D I- I I C I r0'FO.7'T I J
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
Agricultural operations represent a critical sector for the PPA
program due to their reliance on chemicals such as fertilizers,
pesticides, and fuels, as well as the potential for generating
Agricultural Operations hazardous waste. These operations include crop production,
livestock management, greenhouses, equipment maintenance,
and post -harvest processing, all of which can contribute to
pollution if materials are not properly managed.
Hieh Priority Environmental Issues
The below list is ECOLOGY's High Priority Environmental Issues list because they have the potential to
directly impact human health and/or the environment. If one or more of these issues are found during a
site visit, a Follow -Up Visits is justified but not necessarily required. The severity of the issue will help
determine if a Follow -Up Visit is necessary. A Follow -Up Visit to a business for other (non -high
priority) issues is at the discretion of the CONTRACTOR.
When unable to resolve High Priority Environmental Issues, the Pollution Prevention Specialists will
refer the issue to ECOLOGY or another appropriate agency. Serious concerns about impacts to human
health and/or the environment warrant a consultation with ECOLOGY or other regulatory agencies to
determine whether the issue needs to be referred.
High Priority Environmental Issues List:
• Hazardous waste being improperly designated.
• Hazardous waste being improperly disposed.
• Hazardous products / wastes being improperly stored.
• Compromised dangerous waste containers need to be repaired or replaced.
• Illegal plumbing connection.
• Illicit discharge of wastewater to storm drain.
■ Improperly stored containerized materials.
• Improperly stored non -containerized materials.
• Leaks and spills in dangerous waste storage areas.
Visit Guidance
The following guidance applies to technical assistance visits, unless otherwise discussed with
ECOLOGY:
Prior to the Visit.
• Coordinate with other entities that may be conducting business visits in the area to reduce
potential "inspection fatigue".
• Check with ECOLOGY Urban Waters Staff (where applicable) to ensure that the business is not
currently being visited by Urban Waters Staff.
• Research site and issues prior to the visit using a combination of data sources, such as LSC
Database (Link in Appendix A, Statement of Work, Section 12: Resources) for previous visits or
visit to similar businesses, industry resources, news articles, etc.
• To the extent possible, verify the site is not a medium or large quantity generator.
13
Version 4/14/25 (Access Equity)
LJUI.Uwyl I CIIVCIUJJC ILJ. •TUJO•T.7U I-U / Jr-`tOUL-U0D I- I I C IF 0-tou'4 I J
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
■ Check to see if a sector specific Checklist or Tip Sheet is available on the PPA Partnership
SharePoint site on the Checklists & Tip Sheets Page. (Link in Appendix A, Statement of Work,
Section 12: Resources) to help guide the visit.
During the Visit:
• Provide technical assistance on proper management of dangerous waste, prevention of stormwater
pollution, spill prevention, and reduction of hazardous substance use (when applicable).
■ Ensure, at a minimum, all items on the Basic Checklist are reviewed.
• If while at the site, it becomes apparent the business is a medium or large quantity generator,
either complete the visit and count it as a screening visit OR formally refer the dangerous waste
portion to ECOLOGY to count it as a full initial visit.
o This site should not be scheduled for future visits, unless it is likely their generator status
has changed to qualify as an SQG.
• If appropriate, encourage businesses to participate in local green business programs, such as the
EnviroStars business certification program, EnviroCertified, or other green business programs.
• If a Product Replacement Program (PRP) opportunity exists for the business, discuss the
opportunity, terms and conditions, and steps to qualify as outlined in Appendix A, Statement of
Work, Section 5, Product Replacement Program.
■ Discuss spill response preparedness and offer spill kit for developing a plan. Funds can be used
to purchase spill kits to provide to businesses. Occasionally, ECOLOGY will provide spill kits
through a bulk order if funding is available.
• Photograph observed issues for before and after photos to use in writing up case studies.
• Activities that may be beneficial during the visit include, but are not limited to:
o Walking the site (interior and exterior).
o Checking storm drains.
o Checking for illicit connections.
o Checking dumpster and waste storage.
o Providing handouts with technical information and guidance.
o Ensuring necessary permits are in place.
Translation I Laneuaee Services -- During Me Visit
CONTRACTORS are required to have a language service in place to be able to provide real-time
interpretation services to businesses when doing PPA and/or PRP visits. This will ensure that the business
understands their commitment and the information being shared by PPA specialists.
CONTRACTOR staff can provide translations and interpretations for languages they speak fluently, if
approved by the Pollution Prevention Assistance Coordinator. CONTRACTORS must have a service in
place to provide language services for those languages not spoken by CONTRACTOR staff.
CONTRACTORS that do not have a service contract in place at the time of signing the contract must
obtain a service contract within three months of signing the contract, or the contract will be subject to
termination.
CONTRACTORS must submit invoices from language providers with supporting documentation during
quarterly invoices. If the language providers are in-house staff, CONTRACTOR will provide timesheets
showing the hours spent on language services and submit with supporting documentation.
14
Version 4/14/25 (Access Equity)
u uuu DIyl I GI I VOIUFJC ILJ. 9vJo4Jo I-:J I Jr-•t0UL-.700 I - 1 I C IF D.74 10
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
End of Visit /A ter Visit:
■ Provide written follow-up to the business to document the results of the visit. This can be done by
leaving a copy of the checklist or other documentation with the business at the end of the visit, by
using a commitment postcard (format available in Education & Outreach Documents on PPA
Partnership SharePoint), or by sending follow-up letters/emails, or alternatively by sending a
"thank you" postcard if no issues were identified.
• If necessary, coordinate with other agencies (e.g., the fire marshal, code enforcement, stormwater,
wastewater treatment, and/or moderate risk waste staff) to ensure that the information you are
providing is consistent with the other agency's regulations and/or best management practices.
• PPA Specialists will make referrals to ECOLOGY and other regulatory agencies as needed and
document the referral in the Local Source Control (LSC) database (Link in Appendix A,
Statement of Work, Section 12: Resources).
Section 3. Unique Program Elements
The CONTRACTOR will conduct the unique program elements for their PPA program as outlined in
Table 3.1, below.
Tnhle 3.1 ! ITn in ue Prnura nt Elements
Unique Program ^
Element
Description
Deliverable(s)
• Work with one or two other jurisdictions to
plan 1 All -Staff Training Event (virtual or
in -person) for the Spring 2027 PPA All -
Four separate committees
Staff.
(one for each training
a With other committee members, determine a
event) made up of PPA
committee chair to schedule planning
Specialists and Ecology.
meetings, track tasks, and finalize the
All -Staff Planning
The committee will work
to schedule and facilitate
agenda.
Committee
the meetings. The format
0 Arrange for meeting logistics (venue, food,
for these meetings will
and beverage, if in person) and speakers.
likely be one in -person
• Participate in all workgroup meetings. If
per year and one virtual
you are unable to attend the meeting, give
meeting per year.
the committee chair as much notice as
possible, and follow up with any
assignments or document review as soon as
possible.
■ Review and advise partners on logo and
template use, material and website design,
and other projects as needed.
Resource
Participate aa team to
enhance partnership
o participate in 90% of scheduled meetings.
Consistency
branding and consistency
,
, Review all assigned materials.
Committee (RCC)
across partners.
a Provide an update on the program in each
quarterly report.
• Provide an update on the program in each
annual report.
15
Version 4/14/25 (Access Equity)
L/U1.U.711,. II GI IV VIup= ILl. '1UJOY.7U I-J! Jr-VDue-.70D I- I I C I ro4D5Y I J
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
Section 4: Partnership Branding and Outreach
When unique outreach or education materials are developed by the CONTRACTOR using PPA
Partnership funds, a draft must be sent to ECOLOGY for review and approval. To the extent feasible, the
CONTRACTOR must utilize the Partnership's branding tools and templates available to produce these
materials. The intent of this requirement is to facilitate a unified branding image and consistent
messaging across the Partnership. The Partnership logo and other branding resources are available on the
PPA Partnership SharePoint Publications & Handouts site (Link in Appendix A, Statement of Work,
Section 12: Resources).
It may be appropriate to include funding acknowledgement on some outreach materials. The
CONTRACTOR will consult with ECOLOGY's PPA Partnership Coordinator to determine whether
funding acknowledgement is required.
Finalized materials which may be useful to other Partnership contractors should be provided to
ECOLOGY for upload to the PPA Partnership SharePoint Publications & Handouts site (Link in
Appendix A, Statement of Work, Section 12: Resources).
Each CONTRACTOR must maintain a PPA webpage which meets the minimum requirements. See PPA
Partnership SharePoint site for requirements. (Link in Appendix A, Statement of Work, Section 12:
Resources)
Section 5: Product Replacement Program (PRP)
The Product Replacement Program's (PRP) mission is to safeguard the health of all Washingtonians and
preserve their environment by providing financial resources and technical support to businesses to reduce
the use of targeted toxic chemicals and heavy metals in consumer products and industrial processes. PRP
removes and replaces products, processes, or technologies that use toxic chemicals to prevent them from
entering the environment. One of the best and most effective ways to prevent further environmental
contamination, protect water quality, and reduce human health risk, is to eliminate these toxic chemicals
at the sources. The PRP assists businesses with switching to safer alternatives.
PPA contractors are integral to the PRP. The CONTRACTOR will seek and discuss opportunities to
assist businesses with switching processes, products, or equipment to use effective safer alternatives.
The CONTRACTOR will assist ECOLOGY in implementing PRP projects by promoting participation,
making recommendations, assisting with required paperwork, and conducting technical assistance and
confirmation visits.
PRP projects include, but are not limited to:
■ Degreasers in parts washing systems in the automotive repair sector by visiting automotive repair
facilities, discussing the program, assisting with required paperwork, and completing the final
visit after new machine installation. Guidelines for this program are outlined in separate
documents and posted on the PPA Partnership SharePoint (Link in Appendix A, Statement of
Work, Section 12: Resources).
■ Educate schools, recreation centers, local retailers, and salons on opportunities to switch to safer
chemicals used in chemistry and art labs, foam cubes in tumbling pits, receipts used in cash
16
Version 4/14/25 (Access Equity)
Liuuuaiyi i oivoiuNe w. tivaowao i-at or-•rouc-voo i- i i rz i rowoaff i o
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
registers, and cosmetics products used in salons are potential PRP projects during this contract
cycle.
The CONTRACTOR will suggest new PRP projects to Ecology based on opportunities they see during
technical assistance visits. A PPA-PRP Committee will assist Ecology in the development of new
projects, how to implement and market them, and develop training on implementation for the larger
Partnership.
ECOLOGY, in collaboration with the PPA Partnership, will develop procedures and criteria, which must
be met for a business to receive reimbursement for any of the chemicals or products included in the PRP.
Final guidelines for each project will be posted on the PPA Partnership SharePoint page and training for
implementation will be provided at webinars or All -Staff meetings.
PRP payments for reimbursement to the business will come directly from ECOLOGY and are not
included with the CONTRACTOR's funding compensation associated with this contract. Payment will be
made through direct disbursement from ECOLOGY to the business implementing the product or
equipment replacement. To facilitate these payments, the CONTRACTOR shall assist ECOLOGY in
maintaining records indicating how the business qualified for the PRP reimbursement per the PRP
program's eligibility criteria. Each PRP program will have specific records requirements, and all records
will be maintained on ECOLOGY's PRP SharePoint Site. The required records may include copies of the
program voucher, product invoices, disposal receipts, recycling receipts, state payee forms, along with
any other documentation required by ECOLOGY to reimburse the business. Requirements for each PRP
Program will be available under Product Replacement Program on the PPA SharePoint site (Link in
Appendix A, Statement of Work, Section 12: Resources).
The CONTRACTOR will provide technical assistance to the businesses to help ensure the business
qualifies for a PRP reimbursement payment from ECOLOGY by completing the required steps, unless
otherwise specified in guidelines developed specific to an individual reimbursement. Specific
requirements for individual reimbursement programs are maintained on the PPA Partnership SharePoint
site (Link in Appendix A, Statement of Work, Section 12: Resources).
Required Steps
CONTRACTOR conducts an initial technical assistance visit, reviews all aspects of the PPA
basic checklist on the PPA SharePoint Site (Link in Appendix A, Statement of Work, Section 12:
Resources) with the business, and identifies any issues that need to be addressed before moving
forward with a product replacement program.
• CONTRACTOR provides the business with recommendations to reduce or eliminate a qualifying
chemical or product based on the currently active product replacement programs (see
ECOLOGY's PRP website for active programs) (Link in Appendix A, Statement of Work,
Section 12: Resources).
• CONTRACTORS review and complete the PRP voucher (if required for that specific PRP
project) with the business. CONTRACTORS .provide copies (photographs or scanned copies) of
the completed and signed voucher to the Product Replacement Coordinator who reviews and
approves the business to make the purchase of approved products or equipment.
17
Version 4/14/25 (Access Equity)
LjVUUOly II r-I Ivcluyc I U. 4wv4.7o I-J I Jr-40VL-D0DI-1 IC Iro'+DU4 I
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
• CONTRACTOR assists businesses as needed with paperwork required to apply for
reimbursement, including a state payee registration form.
■ CONTRACTOR must communicate to the businesses that it may take up to 4 months to receive
payment from ECOLOGY after purchase and that the business must respond to inquiries from
ECOLOGY or the Office of Financial Management (OFM) in a timely manner to avoid delays in
payment.
■ Business purchases approved product or equipment and converts fully to utilization of new
product or equipment in accordance with the eligibility criteria for the PRP reimbursement.
+ Business submits receipts for the product or equipment purchase and installation to ECOLOGY's
PRP Coordinator. This submittal may be facilitated through the CONTRACTOR's representative
for some PRP projects.
• CONTRACTORS may be requested by ECOLOGY to verify through a site visit and review of
records that product or equipment has been installed per PPA Specialist or ECOLOGY
recommendations, old product or equipment has been legally disposed of or decommissioned, and
all other eligibility criteria have been met.
For information about an optional voucher program that the CONTRACTOR can provide directly to a
business, see Appendix A, Statement of Work, Section 10, Small Change Voucher Program.
Section 6: Timeline
Tahle 6.1: Timeline
Goal for # of Site
Unique Program
Technical Assistance Target
Time Period
Visits
Element Activities
Activities
Resource
July 1, 2025 —
25 Visits
Consistency
Agricultural Operations
December 31, 2025
Committee
January 1, 2026 —
Resource
Small Industrial Facilities and the
June 30, 2026
25 Visits
Consistency
Automotive Industries
Committee
July 1, 2026 —
Resource
A ricultural operations and Small
g p
December 31, 2026
25 Visits
Consistency
Industrial Facilities
Committee
Resource
On the final 6 months we would plan
January 1, 2027 —
Consistency
to focus on all remaining elements of
June 30, 2027
25 Visits
Committee; All -Staff
previous sectors that still need to be
Planning Committee
addressed.
Section 7: Local Source Control (LSC) Database
Information gathered during technical assistance site visits by the CONTRACTOR must include all the
elements that are listed in the most up to date PPA Basic Checklist (check PPA Partnership SharePoint
site for details) and be entered into ECOLOGY's LSC database (Link in Appendix A, Statement of Work,
Section 12: Resources). The following guidance applies to all technical assistance visits, unless other
discussed with ECOLOGY:
18
Version 4/14/25 (Access Equity)
L/Ul.v O1y1I CI Iv"nupC IV. +UJONJO IV! JrWouc-DOC I - I I G I r09OC74 I J
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
+ Collect enough information to complete all the applicable fields in ECOLOGY's LSC database
(Link in Appendix A, Statement of Work, Section 12: Resources) and enter it into the database
within fifteen (15) workdays of the visit.
• If you make a referral to a regulatory agency, enter the information about the referral into the
database within fifteen (15) worklrlays of the referral.
• Ensure that data entry is complete and accurate.
■ At a minimum, all elements on the most recent version of ECOLOGY's PPA Basic Checklist
must be checked at each business visit. Specialists must attest that they have verified all
elements.
o Additional sector specific checklists are available on the ECOLOGY PPA Partnership
SharePoint Site.
o CONTRACTOR may substitute use of their own version(s) of the checklist(s) if it
contains all elements of ECOLOGY's PPA Basic Checklist and has been reviewed and
approved by ECOLOGY.
+ Refer to the LSC database (Link in Appendix A, Statement of Work, Section 12: Resources)
instructions posted in the database interface or contact ECOLOGY PPA Staff for assistance with
database entry.
■ If using paper checklists or equivalent documentation, maintain originals in accordance with your
local public disclosure laws.
Section 8: Training
ECOLOGY expects the CONTRACTOR to provide basic training to newly hired PPA Specialists, while
ECOLOGY will offer additional training to support PPA activities, especially site visits to small
businesses. ECOLOGY will provide additional training to ensure that CONTRACTOR's staff are
properly trained and supported to conduct PPA activities, and that experienced staff are exposed to new
information, and have opportunities to share their expertise for the benefit of the PPA Partnership. This
will include emerging issues and forums for sharing best practices, strengthening the PPA Partnership.
ECOLOGY, along with In -House Mentors and PPA Mentors, will support new PPA Specialists. Within
two weeks of notice of hire, ECOLOGY will send a "welcome email" with instructions for accessing the
PPA Partnership SharePoint, LSC Database, and training resources. All PPA Specialists must set up
weekly (or more frequent) alerts for the SharePoint Discussion Board.
HAZWOPER 24-hr. Certification
ECOLOGY requires PPA specialists to obtain and maintain, at a minimum, a 24-hr HAZWOPER
certification and refresher class. CONTRACTORS are allowed, and encouraged, to obtain the 40-hr
HAZWOPER and refresher but are not required to obtain that level of training.
CONTRACTORS will be responsible for finding, registering, and paying for the HAZWOPER
certification and refreshers themselves. CONTRACTORS will submit copies of class registration and
paid invoices to ECOLOGY for reimbursement during quarterly submittals.
New PPA Specialist Training Modules & Know-2-Grow (K2G) Learnine Sessions
ECOLOGY ensures PPA Specialists are well -prepared by offering foundational and ongoing training,
requiring consistent participation for effective program delivery. Foundational training includes self -
paced online modules on ECOLOGY's SharePoint, to be completed within the first quarter. Completion is
19
Version 4/14/25 (Access Equity)
VUUUbly II CI IVCIUpU IU. 'iUJU'iUU I-U/ Jr'•T0U4-V0D I- I I C I r0•+DU'} 1 J
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
tracked. Monthly live "Know 2 Grow" (K2G) sessions, led by PPA Mentors, provide interactive training
via Microsoft Teams (except July & December). Sessions are typically on the second Thursday, 10:00-
11:00 a.m., and may occasionally be adjusted, with advance notice provided.
Tahle 9_1 - Knnw 2 Grow (K2G) Session Schedule
2025
2026
2027
August 14, 2025
January 8, 2026
January 14, 2027
September 11, 2025
February 12, 2026
February 11, 2027
October 9, 2025
March 12, 2026
March 11, 2027
November 1312025
April 9, 2026
April 8, 2027
May 14, 2026
May 13, 2027
June 11, 2026
June 10, 2027
August 13, 2026
September 10, 2026
October 15, 2026
November 12, 2026
Attendance Requirement: All new PPA Specialists who have not yet attended ten (10) K2G monthly
sessions are required to attend. PPA Mentors are required to attend every K2G session. Mentors must
notify the PPA Partnership Coordinator if they will not be able to attend.
One -on -One Field Mentoring
The CONTRACTOR will provide new PPA specialists with mentoring from experienced specialists (In -
House PPA Mentors), focusing on internal procedures and site visits. If no In -House Mentor is available,
ECOLOGY will assign a one-on-one mentor. The duration of the one-on-one mentoring will be
dependent on the new specialist's prior experience and will be agreed upon following evaluation by
Ecology and discussions with the specialist. Additionally, the PPA Mentoring Program connects new
specialists with mentors through K2G sessions, Webinars, All -Staff training(s), and the Discussion Board.
Specialists are encouraged to seek out additional mentoring support for problem -solving, sector research,
and field mentoring. Field mentoring involves site visits with the new specialist observing the mentor and
serving as a backup specialist during field work. New specialists will gradually take over the lead duties
during field work to prepare for full-time lead duties and to prepare for ECOLOGY's Shadow Workday.
Field mentoring visits must occur before the ECOLOGY PPA Shadow Workday. For more details, refer
to the New Specialist Training Plan (Appendix A, Statement of Work, Section 12: Resources).
Ecolozy Shadow Workday (Ecology Approval
Once the PPA Mentor and new PPA Specialist agree on readiness, ECOLOGY staff will accompany the
specialist on a few technical assistance visits (Ecology Shadow Workday). During these visits, the
specialist will demonstrate their ability to engage with site contacts and present the PPA program,
including waste management, spill prevention, stormwater pollution, and toxics reduction. After the
shadow workday, the specialist will inform ECOLOGY once the LSC database entries are complete and
provide any follow-up materials for review.
20
Version 4/14/25 (Access Equity)
LJul.u,lyl l CI Ivuluyc ILI. 4uou'tvu 1-u f Jr-Youc-DuD I - I I r- IF E)-+DU-tI J
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
Ecoloev PPA Specialist Approval Process
ECOLOGY must explicitly approve the new PPA Specialist before they can conduct solo PPA site visits
under this contract. To gain approval, the new PPA Specialist must:
• Complete all online training modules.
• Attend required PPA webinars and monthly Know-2-Grow (K2G) sessions.
• Complete Shadow Workday with ECOLOGY.
• Submit follow-up materials and LSC database entries from the sites visited during the Shadow
Workday.
ECOLOGY may require the New PPA Specialist to undergo additional mentoring before granting
approval.
All -Staff Trainine for all PPA Specialists
All -Staff Trainings will be planned and conducted by teams of PPA Specialists from two or three PPA
Partners, who have signed up to plan these trainings as a unique program element. When appropriate,
these trainings will be held in -person to facilitate interaction and networking between PPA Specialists,
ECOLOGY, and invited presenters.
Training topics at All -Staff Trainings are intended to help new staff become more competent in their
work, and experienced staff to gain greater technical depth on relevant topics. ECOLOGY staff will
determine the teams, provide initial guidance, review agendas, and provide support for planning and
logistics.
Typically, these trainings are held the second Wednesday in September/October and March/April. The in -
person trainings are typically scheduled to run between 8:30 a.m. and 3:30 p.m. with overnight travel
allowed for jurisdictions if needed. ECOLOGY must pre -approve overnight travel if it is being charged
to the PPA partner budget.
When trainings are held virtually online, the training will typically be scheduled for 8:30 a.m. to 12:00
p.m. across two days, usually a Tuesday and Wednesday.
Attendance Requirement: Unless prior approval has been given by ECOLOGY, it is mandatory for at
least one PPA Specialist per jurisdiction to attend the All -Staff Training. This person is responsible for
disseminating information back to the PPA Specialists from that jurisdiction. Managers are welcome to
attend the All -Staff Trainings but are not required to attend.
Generally, training substitutions are not allowed for the All -Staff Training, however, exceptions may
apply. PPA Coordinator must approve non -emergency absences or training substitutions at least two
weeks prior to the training.
Monthlv Webinar Trainings
ECOLOGY conducts monthly webinar trainings during most of the months of the year. These sessions
are intended to expose PPA Specialists to new information or technical topics relevant to their work.
Suggestions on topics and speakers are welcomed from PPA Partners. ECOLOGY will also ask PPA
Partners to present on case studies.
21
Version 4/14/25 (Access Equity)
L/UI.UJIyI IF-[ IvrlupC ILl.-tuou'}.70 1 -u f or-4OUL-50O 1-1 IF- I ru-tOv,4 1,3
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
These meetings are one and a half hour (1.5 hours) sessions, held on the second Wednesday of the month.
Occasionally these sessions will need to be scheduled at alternative times to accommodate speaker
availability. Up to nine (9) webinars will be scheduled each contract year. See Table 8.2 for the tentative
training schedule.
Attendance Requirement: Each PPA Specialist must attend at least six (6) of the eight (8) Webinars
each contract year (July 2025 through June 2026 and July 2026 through June 30, 2027, for the current
contract). Table 8.2 below contains a tentative training schedule for monthly webinars and the twice
annual All -Staff meetings; ECOLOGY will communicate the final schedule to the CONTRACTOR. For
those months identified as "Webinar or All -Staff', there might be an All -Staff meeting planned for that
month. If there is no All -Staff for a given month, then there will be a webinar planned for that month.
Other training courses, relevant to PPA Specialists' work, may be substituted for up to two of the
Webinars. Notification of the substitution must be provided to and pre -approved by the PPA Coordinator
at least two weeks in advance of the Webinar that will be missed by the Specialist.
TahlP R_2- Tentative Training Schedule (Subject to Change)
Date
Training Type
Date
Training Type
July 2025
No Training
July 2026
No Training
August 13, 2025
Webinar
August 12, 2026
Webinar
September 10, 2025
Webinar or All -Staff
September 9, 2026
Webinar or All -Staff
October 8, 2025
Webinar or All -Staff
October 14, 2026
Webinar or All -Staff
November 12, 2025
Webinar
November 10, 2026
Webinar
December 2025
No Training
December 2026
No Training
January 14, 2026
Webinar
January 13, 2027
Webinar
February 11, 2026
Webinar
February 10, 2027
Webinar
March 11, 2026
Webinar or All -Staff
March 10, 2027
Webinar or All -Staff
April 8, 2026
Webinar or All -Staff
April 14, 2027
Webinar or All -Staff
May 13, 2026
Webinar
May 12, 2027
Webinar
June 10, 2026
Webinar
June 9, 2027
Webinar
Attendance Requirement: Each PPA Specialist must attend at least six (6) of the eight (8) scheduled
Webinars each year. PPA Specialists must attend both All -Staff Trainings unless prior approval has
been obtained from the PPA Coordinator.
Section 9: Reporting and Contract Changes
()uarterly Progress Repo
22
Version 4/14/25 (Access Equity)
uul.Uwy II CI IvtnupC Iu. 4u JOYvu 1-Jf Jr-You/-C70O 1-1 I G I ru'4oJV I J
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
A brief progress report shall be submitted quarterly with each invoice (See Schedule in Appendix B,
Statement of Work, Section 11, Table 11.1, Invoicing Schedule). This report should indicate the work
completed during the quarter and billed on the invoice, including the type and number of visits conducted,
progress on unique program elements, and any other information regarding contract performance that
should be brought to ECOLOGY's attention. The Quarterly Progress Report should ONLY include the
status of the work conducted during the quarter and NOT include a roll -up of progress to -date since it
serves as backup documentation for the expenses included in the quarterly invoicing. See Appendix A,
Statement of Work, Section 11, Invoicing.
Annual Reports
Annual Reports are used to briefly summarize contract status to -date including number of site visits
performed, unique program element activities conducted, Technical Assistance target activities
conducted, lessons learned, and budget status, progress towards goal of 40% of visits in Overburdened
Communities in Washington State. Annual reports shall be provided to ECOLOGY by July 31, 2026,
and July 30, 2027. The report shall include two to three "case studies" of a business or organization that
benefitted from a PPA site visit. Photographs of the business before and after the visit, showing the
beneficial changes should be provided, if possible. The second -year annual report should capture details
for the full contract period as ECOLOGY will use these reports to create a biennial report on the
Partnership. ECOLOGY will make report templates available on the PPA Partnership SharePoint.
ECOLOGY will request, with advanced notice, that PPA CONTRACTORS provide presentations on
their case studies at Webinars and/or All -Staff Trainings.
Contract Changes
Any of the following changes shall be reported to the ECOLOGY PPA Partnership Coordinator within 10
businesses days.
• Key personnel changes (staff or manager leaving, new hires, etc.). Changes to key personnel must
be documented with updated copies of the key staff table.
• Initiation of, or changes to, a subcontract. See Section 18 Subcontractors of the Interagency
Agreement for specific information that is required regarding subcontractors.
Section 10: Small Change Voucher Program
The CONTRACTOR will offer businesses vouchers for the cost of pollution prevention equipment or
other recommendations, in accordance with the procedures developed for this voucher program.
Payments will be made directly by the CONTRACTOR to the business. Examples of qualifying
equipment or costs include but are not limited to; secondary containment, drum covers, drum funnels with
lids, infrastructure changes, substitution of less toxic products, and catch basin cleaning. The
CONTRACTOR must maintain records for each of their voucher reimbursement payments, and ensure a
business is limited to one voucher per calendar year. Each voucher payment will be capped at $500.00 or
less. These reimbursements will come from the Small Change Voucher Program budget category (see
Appendix B, Budget Detail). Documentation of voucher payments will be submitted to ECOLOGY with
the quarterly invoice (See Appendix A, Statement of Work, Section 11 Invoicing for more details).
The CONTRACTOR will follow the procedures approved by ECOLOGY and housed on the PPA
Partnership SharePoint (Link in Appendix A, Statement of Work, Section 12: Resources).
23
Version 4/14/25 (Access Equity)
LJUL,UOjyl I CI I VOIUFIC IU. 4v J04D0 1-J/ Jr-4OUL-.70D I - I I C I r04OU4 I J
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
Section 11: Invoicing
Invoice (billing) procedures are outlined in the Interagency Agreement, (see Section 4 Billing and
Payment Procedures). In addition, the following information is provided:
• See also Appendix A, Statement of Work, Section 5: PRP and Appendix A, Statement of Work,
Section 10: Small Change Voucher Program for additional information on submitting invoices
and reimbursement requests for those programs.
■ The Invoice Voucher (form A19-1A) (Link in Appendix A, Statement of Work, Section 12:
Resources) must have an approved electronic signature method if submitted electronically.
Acceptable signature formats include the following.
o Adobe Acrobat Certificate -Based Signature, which requires BOTH a scanned signature
image and Adobe information. Signers do not need an Adobe PRO license, only the
person preparing the document for their signature needs an Adobe PRO license.
o Scanned image of signature. Copy and paste the scanned wet signature into the document
itself.
o Typed name and "signed electronically" with the signature date included in the signature
line.
o Other methods approved by Ecology.
• If submitting a scanned or electronic copy, the CONTRACTOR will retain the original signed
A 19-1 A in CONTRACTOR's records, per ECOLOGY'S record retention requirements.
• Supporting documentation may be submitted via email to Kristine Ray (kray46 i ct ecy.wa.gov
and Andy Maher(an nia461 ec .wa. ov . Refer to Section 3 Compensation for additional details
on what is required for supporting documentation.
• Each invoice shall only bill for actual hours worked during the quarter, which may be higher or
lower than the FTE estimate in Appendix A, Statement of Work, Section 1, Introduction, Table
1.2 — Key Staff Table. Actual hours worked should include dates worked, staff names, titles,
hourly salary/benefit rate, hours worked, final $.
• Quarterly invoicing will follow the schedule in Table 11.1, Invoicing Schedule.
Tahle 11.1: In` oicinor Schedule
Quarter in Contract Cycle
Months in Quarter
Invoice Due Date
November 10, 2025
1
July, August, September 2025
2
October, November, December 2025
February 10, 2026
3
January, February, March 2026
May 11, 2026
4
April, May, June 2026
July 31, 2026*
5
July, August, September 2026
November 10, 2026
6
October, November, December 2026
February 10, 2027
7
January, February, March 2027
May 10, 2027
8 April, May, June 2027 July 30, 2027*
* - Earlier due date during these quarters due to end of fiscal year requirements.
24
Version 4/14/25 (Access Equity)
LjUUUbly II CI I VCIUFIC IL/. NUJO•TJOI J/Jr-+OUL-.7OO 1-1 Ir- IrO'4OJ41J
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
Section 12: Resources
The following are links to resources and materials referenced in this contract. Links and resources listed
are subject to change.
■ PPA Partnership SharePoint:
o litt s:/Istateofwa.sliare oint.comisiies/ECY-HWTR-PPA-Parinershi
• PPA Partnership SharePoint Discussion Board:
o htts://stateofwa.share oint.comisites/ECY-HWTR-PPA-
Partnerslii /Lists/Discussion%20ParteVAllltems.as x?viewid=04db004f%2Dc450°/a2D41
7a%2Db 727%2 D77d2fb734816
■ PPA Basic Checklist:
o litt s://stateofwa.share oirtt.corn/:w:/r/sites/ECY-HWTR-PPA-
Partrierslii /Clecklist%20%20Ti%20Sheets/Pollution%20Preventior3°/o20Assistance%2
0-
%20Basic%o2OCheck I i si.docx?d=w 1 179aa4654674c 17940dd22abefbd f5d&csf-- i &web=1
&e=KWSL9y
• PPA Business Sector Checklists & Tip Sheets:
o htts:Hstateofrva.sliare ❑iiit.com/sites/ECY-HWTR-PPA-
Partnei-slti /Checklist°/v20°/a20Ti °/a20S1ieets/Forms/All.ltems.as x
• PPA Publications & Handouts
o litt s://stateofwa.stiare oint.com/sites/ECY-HWTR-PPA-
Partriershi /SitePaiZes/Publications °/n26-Handouts.as x
• PPA PartnerWeb Product Replacement Program:
o 13tts://stateofwa.sliare oiiit.com/sites/ECY-HWTR-PPA-Partnerslii ISitePa eslPraduct-
Replacernent-Program.aspx
• LSC Database:
o llttpS'.//SCCLireaccess.wa.gov/ccv/lsc/Home.aspx
• PPA Partner Website Required Elements:
o litt s://stateofftva.sliare oint.coin/siteslECY-HWTR-PPA-
Partnerslzi /SiteAssets/PPA%20%20Partner°/n20Website°/a20Elemer3ts.docx?web=1
• Invoice Voucher A19-1A:
o htt s://des.wa. ov/sites/default/files/ ublic/documents/HRPa roll/SACS/A-19-
1 AForm.doc?=5c82f
• New Specialist Training Plan — Read First!
o litt s://stateofwa.sliare oirit.com/sites/ECY-HWTR-PPA-
Partnershi /New%20S ecialistO/o2OTrainiii Read%2OF'irst%2O%E2%80%94%2ONew%
20Specalist%20Ti-ainin2%a20PIan.pdf
• Ecology's Product Replacement Program Website:
o htt s://ecolo .wa,!ov/Waste-Toxies/Reduein -toxic-chemicals/Product-Re lacement-
Program
25
Version 4/14/25 (Access Equity)
Lluuublyl I CIIv CIupc ILJ. '+UJu-tva I -Jr Jr-VoUe-C70o I - I I C IF 0-to'j-t I J
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
APPENDIX B
BUDGET DETAIL
See Section # 3 Compensation and Section # 4 Billing and Payment Procedures, for additional
inctriw1innc_
Category
Amount
Salaries
$60,966.88
Benefits
$43,327.37
Subcontracts
$0.00
Goods & Services (see Table A Below)
$1,000.00
Equipment (see Table B Below)
$1,000.00
Travel & Training
$2,000.00
Small Change Voucher Program (See Section XI)
$0.00
Subtotal Direct Costs
$108,294.25
Indirect Costs*
Rate (28.4%)
28.4%
Indirect Amount
$17,314.59
Total Award
$125,608.84
* ® Applied to Salaries Only
Table A: Goods & Services
Goods & Services over $1,000 must be listed here or approved by Estimated Cost
ECOLOGY PRIOR to reimbursement.
Table B: E ui ment
Equipment over $1,000 must be listed here or approved by Estimated Cost
ECOLOGY PRIOR to reimbursement.
110
Version 4/14/25 (Access Equity)
vuwaiyi i F-i ivcwNo u..w. 4uou-iva i -o r or--+ouc-uoo i- i i r- i ro•+ot7w i o
State of Washington, Department of Ecology
IAA No. C2500178
Entity Name: Kittitas County Public Health
APPENDIX C
SPECIAL TERMS AND CONDITIONS
1) Certification Regarding Suspension, Debarment, Ineligibility or Voluntary Exclusion
a) CONTRACTOR, by signing this agreement, certifies that it is not suspended, debarred, proposed
for debarment, declared ineligible or otherwise excluded from contracting with the federal
government, or from receiving contracts paid for with federal funds. If the CONTRACTOR is
unable to certify to the statements contained in the certification, they must provide an explanation
as to why they cannot.
b) CONTRACTOR shall provide immediate written notice to ECOLOGY if at any time the
CONTRACTOR learns that its certification was erroneous when submitted or had become
erroneous by reason of changed circumstances.
c) The terms covered transaction, debarred, suspended, ineligible, lower tier covered transaction,
participant, person, primary covered transaction, principal, proposal, and voluntarily excluded, as
used in this clause, have the meaning set out in the Definitions and Coverage sections of rules
implementing Executive Order 12549. You may contact ECOLOGY for assistance in obtaining a
copy of those regulations.
d) CONTRACTOR agrees it shall not knowingly enter into any lower tier covered transaction with a
person who is proposed for debarment under the applicable Code of Federal Regulations, debarred,
suspended, declared ineligible, or voluntarily excluded from participation in this covered
transaction.
e) CONTRACTOR further agrees by signing this agreement, that it will include this clause titled
"CERTIFICATION REGARDING SUSPENSION, DEBARMENT, INELIGIBILITY OR
VOLUNTARY EXCLUSION" without modification in all lower tier covered transactions and in all
solicitations for lower tier covered transactions.
f) Pursuant to 2CFR180.330, the CONTRACTOR is responsible for ensuring that any lower tier
covered transaction complies with certification of suspension and debarment requirements.
g) CONTRACTOR acknowledges that failing to disclose the information required in the Code of
Federal Regulations may result in the delay or negation of this funding agreement, or pursuance of
legal remedies, including suspension and debarment.
h) CONTRACTOR agrees to keep proof in its agreement file, that it, and all lower tier
CONTRACTORS or subcontractors, are not suspended or debarred, and will make this proof
available to ECOLOGY before requests for reimbursements will be approved for payment.
CONTRACTOR must run a search in The System for Award Management and print a copy of
completed searches to document proof of compliance.
27
Version 4/14/25 (Access Equity)
UUL,U,IIy. II GI Ivrlupu ILl. 4U00.4D01 J (Jr-40UL-.700 I - I I C I ro-tov-} 10
CONTRACT FACE SHEET
For Internal Routing Use
D E PART N ENi OF (Instructions on Instructions Tab)
ECOLOGY
6
Type: Contract
CGP System #:
Contract#: C2500178
Amendment #:
Work Assignment M
Contractor Statewide Vendor - SWV #:
SWV0010475-07
EIN:
Contractor Name:
Kittitas County Public Health
Contract Title / Description / Bid M
Pollution Prevention Assistance (PPA) - technical assistance and education outreach to small businesses.
Program:
MOO-HWTR
Project Officer:
Andrew Maher
Phone: 509-329-3612
Secondary Project Officer (i.e., Budget Analyst):
Ellen Hafer
Phone: 564-233-8638
Staff completed DES Contract Training
Yes
(check all that apply)
❑1 Goads/Services RCW 39.26
❑ Decision to Contract
n Interagency RCW 39.34
I —I DES State Contract #
❑ IT RCW 39.26
❑ Competitive Bid #
F-I Public Works RCW 39.04
I —I Sole Source #
Arch./Eng. RCW 39.80
❑ Direct Buy
❑ Other:
OWMBE: (check all that apply)
❑ OMWBE
n WA Small Bus.
I-1 WA Veteran Bus.
Subcontractor:
❑ Uses Sub Contractor
AMENDMENT: (check all that apply)
❑ Time Extension
❑ Increase
❑ Decrease
Amount of Amendment:
❑ Other:
Total of Contract after
Amendments:
TERM:
Start Date:
7/1/2025
End Date:
6/30/2027
How To Encumber and Disburse:
Program Budget Manager Completes
Contract Cost:
$ 125,608.84
Sales Tax (PW only):
$
Total Eligible Cost:
$ 125,608.84
Required information:
MIC (8 char) Fund/EAI Project - Sub-Proj
9M997D10 23N/D10
(Required for Single -year Operating Appropriations &
contracts extending beyond current biennium)
Prior Bien's
Current BI
FY: 2026
Current BI
FY: 2027
Totals
62,804.42
62,804.42
125,608.84
Fiscal Staff:
BudgetTatal $ 125,608.84
Budget Total must equal Total Eligible Cost
Federally Funded? No Federal Amount $
IGL:
Subsidiary:
Misc:
Remarks:
Mark T. Gaffney (signed electronically) 6/23/2025 CZ
Fiscal / Contracts Approval Date Sub -Object
717, Giz61Z6?s
Program Budget Manager Approvai Date
ECY 010-53 Rev 2/2024
LJUI.0 J,y„ G,, VC,upr, uj. +uoo9ao , ti! Jr-•4OVCy0D , -, , C , r0.4Dtl'F 10
Freeze Exemption/Exception Request Form for Service
Contracts Under Directive 24-19
DEPARTMENT OF Exemption/Exception requests REQUIRE Deputy Director's signature and approval
ECOLOGY
State of Washington BEFORE processing.
Instructions: Program completes this form and emails it to the Chief Financial Officer's Executive Assistant,
Chrystal Witham. Subject line: ECY Exemption/Exception Request Form, Program Name.
Request Information
Requesting Program/Office/Division: HWTR / ERO / PPA
Program Contact(s):
Name: Andrew Maher
Name: Elaine Snouwaert
Email: anma461 @ecy.wa.gov
Email: esno461@ecy.wa.gov
Service Contracts or Amendments Exemption/Exception Request
Exemption/Exception Information
This form seeks Service Contract exemption/exception under the following condition:
Related to the protection of life or public safety (Safety)
Tax collection or other revenue -generating activities (Tax/Rev)
Approved information technology projects (IT)
Emergency Contracts as defined in RCW 39.26.130 (Emergency)
0 Deputy Director approval for essential non-exempt Service Contracts (DD)
Contract Information
Contractor/Agency: Multiple Agencies throughout Washington State
New Contract: 17 Yes ❑ No
Total estimated cost of contract/amendment: $8,400,000 spread across 31 IAA /
Budget(s) used to fund this contract/amendment: 170perating
Fund Source Account Number: MTCA Funding 23N; 23P
Term of contract: July 1, 2025 - June 30, 2027
WCapital ❑ Transportation
ECY Internal Form - Freeze Exemption/Exception Request Form for Service Contracts. Rev. 1/14/25
LJul.ualyI I CI IvcluyC IV. 4uJ09wu 1 -ur or-•+oVL-woo I- I I C I ru•fow•t I o
Brief description of contract or contract amendment in one or two sentences. Include existing
contract number or agreement number if amendment.
Interagency Agreements between Ecology and our Pollution Prevention Assistance (PPA)
partnership jurisdictions, located throughout the state. Our partners include cities, counties, and
local health jurisdictions.
PPA specialists provide free hands-on technical assistance to small quantity generators in their
jurisdictions and provide guidance to businesses, helping them stay in compliance with the
dangerous waste regulations and stormwater best management practices. PPA specialists visit
roughly 3,000 businesses each fiscal year.
Scope of contracted services
Work will be performed during the FY25-27 biennium
The CONTRACTOR, through the Pollution Prevention Assistance (PPA) program, will perform multimedia
source control site visits and pollution prevention activities for small quantity generators (SQGs) of
dangerous waste. SQGs are businesses, non -profits, schools, or organizations generating less than 220
pounds of dangerous waste or 2.2 pounds of extremely hazardous waste per month. These visits and
activities aim to reduce or eliminate dangerous waste and pollutants at the source using best
management practices to prevent spills and discharges to air, water, and ground, particularly in industrial
wastewater and stormwater.
Justification for contracted services (why is this critically necessary?)
This work is contracted out to local specialists, because Ecology does not have the capacity to visit all SQGs
statewide. This partnership allows local representatives to engage with businesses within their own
communities, building trust and fostering long-term relationships. This localized approach not only
strengthens the program but also promotes positive interactions between businesses and our PPA
specialists.
Additionally, by contracting with specialists familiar with the local area, we ensure that visits are more
efficient and culturally sensitive, which can enhance compliance outcomes. Our specialists conduct
thousands of visits to businesses that may be mismanaging dangerous waste and stormwater, helping to
irlPntifii and mitirratP nntPntiA rickc to hi imin haaith and the Pnvirnnmont Thrni inh thncn Pffnrtc 1nia
Explanation of why alternatives to contracting are not available:
Given Ecology's staffing limitations for conducting these types of visits, this work would not occur without
contracting to local jurisdictions. The external PPA specialists are well -positioned to conduct multiple
visits to Washington businesses covering significantly more businesses that Ecology could visit.
Contracting allows for the identification of high -priority environmental issues that otherwise would not
come to Ecology's attention or be addressed. These issues may have the potential to impact human health
and/or the environment.
ECY Internal Form - Freeze Exemption/Exception Request Form for Service Contracts. Rev. 1/14/25
VUI.Ubly II CI IVCIUpc ILJ. 4UJU470 I-U r Of -4DUL-.70D 1-1 1 C I r0140741 J
What would be the consequence if this contract is not approved?
Thirty-one agencies throughout the state will stop offering free technical assistance visits to the
businesses that need them the most. As a result, there is a risk that businesses may improperly
manage hazardous materials, potentially exposing workers, the public, and the environment to
contamination or hazardous wastes that would otherwise have been addressed through this
program, and will potentially expose the public, the environment, and workers at facilities to
contamination or wastes that would have been addressed through this program.
In addition, our Product Replacement Program relies on PPA specialists to do much of the field work
associated with replacing harmful products with safer alternatives. For example, our
Approval Signatures
This form is required to be routed in the following order before submitting to the Chief Financial
Officer's Executive Assistant, Chrystal Witham, for CFO review.
Budget Manager Signature: Date:
DigItally (ECY) signed by Hafer,
Ellen 3/21 /25
Date: 2025.03.21
11:57:00-07'00'
Program Manager/Office Director Signature Date:
Digitally signed by
Lassiter, Katrina (ECY) 3/21 /25
Date: 2025.03.21
15:46:04-07'00'
Chief Financial Officer Signature: Date:
Digitally
Ward, Garret Garret (ECY) signed by Ward, 4/5/25
(ECY) 1D117:27-000'5
Deputy Director Determination
0✓ Approved Denied
Deputy Director Signature- Date:
Digitally signed by
Heather R Bartlettciti t Date:2025.04.08
12:22:58-07'00'
ECY Internal Form - Freeze Exemption/Exception Request Form for Service Contracts. Rev. 1/14/25
0 docusign_
Certificate Of Completion
Envelope Id: 40364961-573F-4B02-98B1-11ElF64B9413
Subject: Dept. of Ecology - Kittitas PPA Contract FY2025-27 ready for DocuSign
Source Envelope:
Document Pages: 31 Signatures: 0
Certificate Pages: 2 Initials: 0
AutoNav: Enabled
Envelopeld Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
Record Tracking
Status: Original
6/30/2025 8:31:56 AM
Security Appliance Status: Connected
Storage Appliance Status: Connected
Signer Events
Jesse Cox
jesse. cox@co. kittitas.wa. us
EH Manager
Kittitas County
Security Level: Email, Account Authentication
(None)
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Chelsey Loeffers
chelsey.loeffers@co.kittitas.wa.us
Security Level: Email, Account Authentication
(None)
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Kristine Ray
kray461 @ecy.wa.gov
Security Level: Email, Account Authentication
(None)
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Cheryl Blackburn
cb1a461 @ecy.wa.gov
Security Level: Email, Account Authentication
(None)
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Katrina Lassiter
klas461@ecy.wa.gov
Security Level: Email, Account Authentication
(None)
Electronic Record and Signature Disclosure:
Not Offered via Docusign
In Person Signer Events
Holder: Kristine Ray
kray461@ecy.wa.gov
Pool: Statel-ocal
Pool: Washington State Department of Ecology
Signature
Signature
Status: Sent
Envelope Originator:
Kristine Ray
P.O. Box 47600
Olympia, WA 98504
kray461@ecy.wa.gov
I Address: 163.116.149.220
Location: DocuSign
Location: Docusign
Timestamp
Sent: 6/30/2025 8:38:09 AM
Viewed: 7/2/2025 10:56:06 AM
Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events
Status
Timestamp
Intermediary Delivery Events
Status
Timestamp
Certified Delivery Events
Status
Timestamp
Carbon Copy Events
Status
Timestamp
Witness Events
Signature
Timestamp
Notary Events
Signature
Timestamp
Envelope Summary Events
Status
Timestamps
Envelope Sent
Hashed/Encrypted
6130/2025 8:38:09 AM
Payment Events
Status
Timestamps