HomeMy WebLinkAbout2025-05-27-minutes-ec-study-sessionKITTITAS COUNTY COMMISSIONERS
EC Study Session
Special Meeting
Tuesday May 27, 2025 -1:00 PM
BOCC Conference Room
205 West 5th Room 108 - Ellensburg
1. Call to Order
2. Citizen Comments (1 min. time limit)
3. Approve Chair's Signature on a Developers Agreement with City of Ellensburg
4. Other Business - No Action to be taken
5. Concluded
Created on 5/22/2025 3:23:03 PM
KITTITAS COUNTY
EC STUDY SESSION MINUTES
BOCC CONFERENCE ROOM, 205 WEST 5TH ROOM 108 - ELLENSBURG
Special Meeting
TUESDAY 1:00 PM May 27, 2025
Board members present: Chairman Laura Osiadacz, Vice -Chairman Cory Wright, Commissioner
Brett Wachsmith
Others: Kady Porterfield (Event Center Director)
1. Call to Order - Chairman Osiadacz called the meeting to order at 1:00pm.
2. Citizen Comments (1 min. time limit) — none
3. Approve Chair's Signature on a Developers Agreement with City of Ellensburg — Staff report
was presented by Porterfield along with received legal advisement comments. Vice -Chairman
Wright moved to approve the chair's signature on the agreement. Commissioner Wachsmith
seconded the motion. Motion passed 3-0.
OTHER BUSINESS — Commissioner Wachsmith asked about unauthorized parking in the
future RV lot. Porterfield shared that it does happen often, and even bus groups that stage in that
area do not reach out ahead of time. Porterfield shared that livestock sale agreement is still
pending. The Friends of the Fair will meet tomorrow night (May 28) and she hopes to hear back
good news that we can move forward with signing. Fair worker positions will open sometime in
June. Commissioner Wachsmith shared he knows of lots of high school students that want to
apply. Porterfield provided an update on the status of preventative maintenance work around the
barn area and remainder of the grounds, mostly focusing on electrical needs and other safety
enhancements. Porterfield tried to contact the Bowling Alley lessee about the proposed opening
date conflict but had not heard back. Vice -Chairman Wright will contact the lessee and connect
back with Porterfield.
Meeting concluded at 1:20pm.
Kady Po roe d
2025-05-27 MINUTES
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Laura Osiadacz, Chairman
KITTITAS VALLEY EVENT CENTER
Home of the Kittitas County Fair and Ellensburg Rodeo
901 E. 7' Ave, Suite 1, Ellensburg, WA 98926
EventCenter@co.kittitas.wa.us
Office (509) 962-7639
1_ KITTITA' cni= 'TY Fax (509) 962-7010
STUDY SESSION STAFF REPORT
AGENDA DATE: May 27, 2025
AGENDA ITEM: Request to Approve Chair's Signature on Developers Agreement
with the City of Ellensburg
BACKGROUND: The City of Ellensburg has prepared a Developer Agreement with
Kittitas County to support the extension of three-phase power to the
KVEC RV Park. The project, titled Fairgrounds RV Park 3PH
Extension (Job #3450-316), outlines the installation of underground
electric primary and secondary distribution systems, including
street lighting infrastructure.
We are responsible for paying the estimated amount up front and
covering any additional actual costs incurred. A refund will be
issued if the actual cost is lower than estimated. Total to be
invoiced for this Agreement is $100,579.10, which will be
reimbursed through our WSDA grant.
INTERACTION: Kittitas Valley Event Center
Facilities and Maintenance
Board of County Commissioners
ACTION REQUESTED: Approve the Chair's Signature on the Agreement
ATTACHMENT(S): 3450-316 Dev Agreement
LEAD STAFF: Kady Porterfield, Kittitas Valley Event Center Director
CITY OF ELLENSBURG
KITTITAS COUNTY, WASHINGTON
FAIRGROUNDS RV PARK 3PH MENTION
AGREEMENT and SPECIFICATIONS
FOR
ELECTRICAL SYSTEM INTALLATION
Page 1
JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT
Table of Contents
SECTION1— SUMMARY................................................................................................................................ 3
1.1 Scope...................................................................................................................................................................3
1.3 Standard Specifications...........................................................................................................................3
SECTION2 - GENERAL PROVISIONS ......... .......................................... ;...........................................................
3
2.1 City Light Pre -Construction Meeting.......................................................................................................
3
2.2 Contractor Point of Contact....................................................................................................................4
2.3 City Inspections.......................................................................................................................................4
2.4 City Light Workers and Equipment........................................................................................................4
2.5 Developer Crew and Equipment.............................................................................................................
5
2.6 Developer Electrical Contracts............................................................................................................
5
SECTION3 — SPECIFIC REQUIREMENTS.........................................................................................................
6
3.1 Consumables..................................... ......................................................................................................6
3.2 Earthwork................................................................................................................................................6
3.3 Ducts.....................................................................................................................................................................6
3.4 Working Hours-.......— .................. ............................................................................ .............................
7
SECTION 4 — DEVELOPER'S AGREEMENT FOR ELECTRICAL VAULT & CONDUIT SYSTEM .............................
8
4.1 City Utility Responsibilities: .....................................................................................................................
8
4.2 Developer Responsibilities: ........ .............................. __ .................................................... ____ ...............
9
4.3 City Light installation of electric primary & secondary distribution facilities summary: ........................
9
APPENDIXA— MATERIAL SPECIFICATIONS.................................................................................................12
A.1.1 310160 & 310156 — Secondary Fiberglass Handbox Specs.........................................................12
A.1.2 310156—Secondary Handbox Standard Detail..........................................................................13
A.1.3 310005 - Fiberglass Transformer Vault Spec..............................................................................14
A.1.4 310005 — Fiberglass Transformer Vault Detail (1 of 2)...............................................................15
A.1.5 310005 — Fiberglass Transformer Vault Detail (2 of 2)...............................................................16
A.1.6 313030 — Warning Tape..............................................................................................................17
A.1.7 EL-12 — Distribution Trench Requirements..............................................................................18
A.1.8 EL-13 —Service Line Trench Requirements.................................................................................19
A.1.9 DMB—Stub Detail.......................................................................................................................20
A.1.10 310020 & 310090 — VC57 — Concrete 5' x 7' Vau It..................................................................... 21
A.1.11 310020 & 310087— VCX357 — Concrete 5' x 7' Vault with transformer lid.— ............................. 23
APPENDIX B — ELECTRICAL SITE DRAWINGS...............................................................................................24
B.1 Electrical Site Drawings.........................................................................................................................24
Page 2
JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT
SECTION 1 - SUMMARY
1.1 Scope
This agreement is made and entered into this 9�7 day of 2025
("Effective Date"), by and between THE CITY OF ELLENSBURG, a non -charter de city of the
State of Washington (hereinafter called the "CITY") and Kittitas County, an entity authorized
to do business in the state of Washington (hereinafter called the "DEVELOPER").
The purpose of these specifications is to outline the scope and minimum requirements of the
Developer's responsibilities in order to receive the requested capital improvements to their
electrical service (herein after referred to as "the Agreement"). This agreement allows the
Developer to pay in advance for the estimated work as part of the JOB #3450-316 the
fairgrounds RV park 3ph extension project.
The work performed shall be done in a thorough and craftsman -like manner to ensure a
potentially trouble -free installation; therefore, only qualified personnel will be permitted to
perform the work covered by these specifications, using prudent practices and methods
recognized as approved standards of workmanship by the electrical industry. The work shall
be done in accordance with the following plans, specifications, City Standards and
construction drawings. Drawings for electrical construction projects shall be furnished by the
City of Ellensburg.
Joint use of the trenches shall be allowed for local telecommunications companies and City
Utility facilities, as long as they maintain minimum clearance between City and
telecommunication company's facilities. Telecommunication company facilities shall not be
placed directly on top of or contacting any part of City Utility facilities.
1.3 Standard Specifications
The Standard Specifications of the City of Ellensburg City Light Department and Washington
State Department of Transportation, as described in this section, and amendments thereto,
shall control electric facility installation in the project. Refer to attached Assembly Unit sheets
for additional Detail Drawings of electrical specifications. All materials shall be installed to
manufacturer's recommendations.
SECTION 2 - GENERAL PROVISIONS
2.1 City Light Pre -Construction Meeting
Upon receiving a signed copy of the Agreement from the Developer and after the invoice has
been paid by the Developer for the City Light installation of underground electrical primary
and secondary distribution system, the parties will schedule a mandatory City Light pre -
construction meeting with the Developer, their installation contractor, and their electrical
contractor. This pre -construction meeting shall be held one week priorto Developer installing
any City Utility facilities.
Page 3
JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT
2.2 Contractor Point of Contact
The Developer shall designate a project foreperson/superintendent employed by the prime
contractor who is familiar with all phases of the work and who has the full authority of the
Developer. The foreperson or superintendent shall be assigned prior to starting construction.
The foreperson or superintendent shall carry a cellular phone on the job and that number
shall be provided to the City of Ellensburg. The foreperson or superintendent shall maintain a
copy of the drawings and specifications of the Agreement on the job site and mark any and
all changes in the work approved by the City of Ellensburg.
2.3 City Inspections
The foreperson or superintendent must call the City Light Inspector a minimum of 24 hours
in advance of required inspections to inspect all work as specified by the Agreement. At a
minimum, this includes the key installation milestones identified below.
The City Light Inspector must witness and approve the following key installation milestones
prior to the project advancing to the next stage:
1) Open Trench
i. Bedding sand — bottom of trench
2) Backfill
i. Bedding sand —top of conduit
ii. 6 inches to 1 foot of lift
iii. Trench Tape
iv. Complete backfill
v. Compaction (where required)
3) Vault grade
The City of Ellensburg City Light Department may stop work if the Developer fails to meet any
City of Ellensburg requirement as specified in the agreement. The City of Ellensburg is not
responsible forthe costs of delays incurred as a result of stopping work. The City of Ellensburg
reserves the right to refuse to energize the system if all required inspections have not been
performed and approved.
The City of Ellensburg City Light Department shall invoice the Developer the total amount of
hours the City Light Inspector(s) spend(s) inspecting the Developers work at the conclusion of
each month that the Developer is installing the duct, vault, and street lighting system,
including proofing of conduits & installation and energization of street lighting system, at the
Inspector's rate. The City of Ellensburg will not approve the final Development permit through
the City of Ellensburg Community Development Department until the Inspection Fee has been
paid.
2.4 City Light Workers and Equipment
City Light shall provide all labor, supervision, tools, and equipment forthe performance of the
scope of work described on the design and in this Agreement. Any out -of -scope work that
Page 4
JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT
the Developer requests from any City employee not acting as City Light Inspector will be done
at Developers expense, according to the applicable rate(s) including equipment charges. An
invoice at the conclusion of each month will be sent to the Developer for all charges as
described. The City of Ellensburg will not approve the final Development permit through the
City of Ellensburg Community Development Department until the invoice for City Light
qualified electrical worker(s) has been paid.
2.5 Developer Crew and Equipment
The Developer shall provide all labor, supervision, tools, and equipment for the performance
of the work. Materials for contract execution shall be supplied by the City only where noted.
The Developer shall be responsible to verify quantities issued and supply its' own on -site
staging area where applicable. The minimum equipment capacity shall be sufficient to comply
with worst -case loading scenarios anticipated for this contract.
The Developer shall at all times employ workers who are qualified in their respective positions
per Ch. 19.28 RCW and WAC 296-46 (Electricians) and WAC 256.45. The Developer is
29645
restricted in his selection of labor and payment therefore by certain legal requirements which
must be observed for compliance with the public policy enunciated in Ch. 49.28 RCW. The
Developer should be thoroughly familiar with all provisions of this and other related statutes
before commencing work on this contract.
At the end of each day, all clean up shall have been completed.
2.6 Developer Electrical Contracts
The Developer shall not execute a contract with any contractorto perform any work included
in the Agreement until a statement of contractor qualifications has been submitted to the
City of Ellensburg and the City is satisfied that the contractor is qualified. The Developer's
contractor shall cause appropriate provisions to be inserted in all subcontracts, if applicable,
relative to the work to require compliance by each subcontractor with the provisions of the
Agreement.
The Developer shall be fully responsible to the City of Ellensburg for acts and omissions of its
contractor(s) and of persons either directly or indirectly employed by them, as he is for the
acts and omissions of persons directly employed by him.
The Developer shall cause appropriate provisions to be inserted in all contracts relative to the
work to require compliance by each contractor with the applicable provisions of the
Agreement. Nothing contained in the Agreement shall create any contractual relation
between any Developer's contractor and the City of Ellensburg.
The cost of any license shall be incidental to the Agreement.
Page 5
JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT
SECTION 3 - SPECIFIC REQUIREMENTS
3.1 Consumables
The Developer shall supply all consumables required to install the conduit and vault system.
Such consumables may include but are not limited to:
Sand, backfill, asphalt, concrete, landscaping etc.
3.2 Earthwork
Care shall be taken for adjacent structures and utilities. Where sidewalks or curbs are cut,
paving shall be removed to the nearest construction joint. The Developer shall be liable and
accountable for any damage due to Developer -performed excavation.
Excavation for vaults shall be of sufficient size to leave not less than one foot clearance
between the bank of the excavation and the vault. Sand bedding is required adjacent to
primary raceway apparatus.
Trenching for underground ducts shall be true to line and grade as shown on the drawings
and staked in the field at a minimum of 42" depth typically. Banks of trenches shall be kept
as vertical as possible. Duct trenches shall be maintained free from standing water when
ducts are being installed and shall be cleaned of excess and loose rock and loose earth before
installation of sand, per trench details provided in APPENDIX A — MATERIAL SPECIFICATIONS.
Bedding material may be placed with backhoe with redistribution by hand to ensure proper
cover and that subsequent backfilling operations do not disturb the duct.
Excavation materials may be used for backfilling, but not for bedding, provided it is free of
frozen particles or lumps, vegetable matter or foreign debris, large rock, paving materials or
cinders per trench details provided in APPENDIX A— MATERIAL SPECIFICATIONS. Backfill shall
not be placed until after inspection of the underground facilities has been completed and
approved in writing by the City Light Inspector. Backfill shall be compacted to 95% of the
maximum density of the surrounding earth.
Ducts must be bedded with sand per City specifications. Bedding shall include partial backfill
to a level appropriate for the positioning of trench marking tape (approximately one lift of
dirt backfill). This shall also include the positioning of said trench marking tape.
Joint trench occupation by the local telecommunications companies and City Utilities are
typical. Joint installation shall be coordinated by the Developer, when requested by the City.
Underjoint trenching scenarios, the Agreement shall include coincidental bedding and backfill
of all joint trench facilities.
3.3 Ducts
A minimum of six inches of sand bedding and shading shall be used to encase the ducts with
a minimum depth; per trench details provided in APPENDIX A — MATERIAL SPECIFICATIONS.
Page 6
JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT
At no time shall trenching for primary conduit exceed 48" or be less than 36" in depth to
achieve necessary coverage without prior approval from the City Light Inspector. The
Developer shall provide adequate shoring where applicable. In all cases, plastic warning tape
shall be placed 12" directly above the conduit.
During construction, partially -completed ducts shall be protected from the entrance of debris
by means of conduit caps
Trenches and vault orientation shall be constructed to allow ducts to enter concrete vaults
perpendicular to the vault wall with a straight piece of conduit and not enter with a bend or
at an angle.
All conduit bends for electrical primary, secondary, and street light system shall be of
minimum radius per the following table:
Conduit Size ID
(in)
Minimum conduit elbow
bend radius (in)
18
24
2
2 %
24
3
36
4
48
6
60
All conduit bends for electrical primary, secondary, and street light system shall be either
22.5-degree bends or 90 degree bends. No 45-degree bends will be accepted without prior
approval.
3.4 Working Hours
Normal working hours forthe construction of the conduit and vault system and/or street light
system construction shall be done at Developers choosing, as long as it meets City ordinances.
City Light inspection shall be during regular City Light Inspector working hours and are to be
determined during the pre -construction meeting between City Light & Developer. Developer
shall contact the City Light a minimum of 24 hours prior to all vault and conduit system and
electrical system construction to arrange for an inspector. Working hours may be modified
by mutual agreement. The Developer shall pay the applicable overtime cost (and any
applicable equipment cost) of a City Light Inspector to be on site outside of normal working
hours unless prior arrangements are made through and approved in writing by the City.
Page 7
JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT
SECTION 4 - DEVELOPER'S AGREEMENT FOR ELECTRICAL VAULT &
CONDUIT SYSTEM
The City of Ellensburg City Light Department will provide high voltage primary and secondary distribution
lines to newly developed property within the City Limits and the City's Urban Growth Area (UGA). Charges
for the extension of facilities to new developments shall be based on policies, fees, credits and rebates
adopted by the City Council and are subject to change at any time. Developers / Landowners must apply
for an extension of facilities using the appropriate application and provide all information detailed in
Section 4.2, Developer Responsibilities, below, for the City to determine how to provide electrical utility
service to the property. The Agreement must be signed, and the invoice paid within 30 days of the date
of invoicing.
Once the Agreement has been signed by both parties and the invoice has been paid, the Agreement will
not be subject to change based on changes to a utility's line extension policy and/or fees adopted by the
City Council as long as the construction of the electrical primary, secondary, and street light system has
been completed within 365 calendar days of the effective date. If construction of the electrical primary,
secondary, and street light system has not been completed after 365 calendar days of the effective date
this agreement will expire. If the Developer desires to renew the agreement the Developer will be subject
to revised costs, requirements and specifications as determined by City standards current at the time of
renewal.
4.1 City Utility Responsibilities:
1. Install all electric primary & secondary distribution facilities including the electrical
primary, secondary, & street lighting vault and conduit system, as well as streetlights,
street light posts, street light bases, & street light conductors.
2. Design and layout of electrical system within the development based on maps/plans
provided by Developer.
3. Costs provided to the Developer are based on City crew construction costs or contractor
bid costs, depending on state bid laws.
4. Provide Developer with a cost estimate including labor, materials, and equipment
necessary to provide utility service to the development, done by City crews.
5. Provide on -site inspection for key installation milestones detailed in Section 2.3.
6. Provide written acceptance or rejection of all work performed by Developer according
to Section 2.3, City Inspections.
7. Provide specifications for all construction elements to be completed by Developer
according to the Agreement.
8. Provide Developer with an invoice at the conclusion of each month for any out -of -scope
work that the Developer requests from any City Light worker not acting as City Light
Inspector, according to those workers applicable rate(s).
Page 8
JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT
4.2 Developer Responsibilities:
1. Submit civil plans (both hard copy and AutoCAD) showing the location of all lots and
roads within the development, including existing and proposed utilities, to include
natural gas, water, sewer, storm water, irrigation, swales, ponds, etc., and any elevation
changes.
2. Provide grade staking and survey control, trenching, sand bedding, and backfill for all
utilities in accordance with City Utility Trenching Specifications.
3. Complete all hard and soft surface restoration including but not limited to landscaping,
gravel, concrete and asphalt.
4. Pay all costs required of the Developer as invoiced by the City. Payment for City Light
installation of electric primary & secondary distribution facilities must be received before
facilities are installed by City Light and payment may be required before specialty
materials are ordered, if applicable.
5. Pay all costs associated with change orders resulting from Developer driven changes to
scope, unforeseen conditions, or errors and omissions.
6. The Developer or its agent shall notify the City Light Inspector that each key installation
milestone is ready for inspection, and not to proceed to the next stage of construction
until the City Light Inspector provides written approval for that stage of work. Additional
trips required of the City Light Inspector for re -inspections will result in additional fees.
7. Provide an easement to the City for all areas where utilities must be installed outside of
deeded utility corridors or public right-of-way.
4.3 City Light installation of electric primary & secondary distribution
facilities summary:
1. City to install a complete electrical system installation including Conduit, Vaults,
Transformers and Conductors. Payment for City Light installation of electric facilities
must be received before facilities are installed by City Light.
2. The invoice for the City Light installation of electric primary & secondary distribution
facilities will be based on an estimate of the project costs. The Developer will be
responsible for the final actual costs of the installation of the electric primary &
secondary distribution facilities. A refund will be provided to the Developer if the
estimated project costs are higher than the final actual project costs. An invoice will be
sent to the Developer if the estimated project costs are lower than the final actual
project costs.
Page 9
JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT
Payment details:
TOTAL ESTIMATED COST FROM CITY FOR ELECTRIC UTILITY SYSTEM $99,892.71
LESS LINE EXTENSION AND SERVICE CREDITS ($800.00)
NEW SERVICE SALES TAX 1.5%
$1,486.39
TOTAL AMOUNT TO BE PAID BY DEVELOPER TO CITY $100,579.10
3. At Developer expense, the Developer provides the labor, equipment and materials
associated with the excavation and restoration required to install the electrical primary
and secondary distribution vault and conduit system, including street lighting facilities,
as described in the Agreement.
4. A City Light Inspector will inspect any and all excavation for City facilities. City Light shall
invoice the Developer the total amount of hours the City Light Inspector(s) spend(s)
inspecting the Developers work as described previously in the Agreement. City Light will
not approve the final Development permit through the City of Ellensburg Community
Development Department until all of the Inspection Fees have been paid.
5. Any bonds that are held by the City for the construction of this development will not be
released until the system has been completed and accepted by the City Light
Department.
6. The project will not be signed off or finalized until the system has been completed and
accepted by the City Light Department.
Page 10
JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT
Dated this ,.�_7 day of 2025.
If construction of the electrical primary, secondary, and street light system has not been completed after
one year of the effective date this agreement will expire. If the Developer desires to renew the agreement
the Developer will be subject to revised costs, requirements and specifications as determined by City
standards current at the time of renewal.
Developer Agreement for an Electrical Vault and Conduit System:
Developer, by his/her signature below, agrees to pay the amount shown above prior to the start of
construction and agrees to pay for all actual costs above the estimated cost. The Developer also agrees to
the development conditions and responsibilities as set forth in this Agreement and the attached
Specifications for Electrical Vault and Conduit Systems and Street Light Systems.
IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on their behalf by their
respective duly authorized representatives effective as of the day and year written below.
Date:
Date:
REPRESENTATIVE FOR
Development Name
Signature:
} rr1,
Print Name:
Title:
REPRESENTATIVE FOR
City of Ellensburg —City Light Department
Signature:
Print Name:
Title:
Page 11
JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT
APPENDIX A - MATERIAL SPECIFICATIONS
A.1.1 Assembly Unit Specification Drawings
310160 & 310156 - Secondary Fiberglass Handbox Specs
SECONDARY SERVICE BOX
PP-20UX Enclosure with sleet Itl
F rir — xy
r
161; Irt'
� t
11,16
.t r,
t1
T- 241/E —
22 e264(57 Semi ii Gio"
1
E-20H DX Enclosure wltlt high denedy polyenrylene lid
— 4T
(-A F—i
Enclosure with high density polyethylene lid for street
IgM connecNam only
STDCX Mijili it
TOP
0111ENSiONS
LID
PATINQ
LID
TYPE
APPROVED MAIKIFACTURERS
D
H
PENCELL
310156
12
20
17
5000 Ibs
Hl DENSITY PE
PE 2D HOXCL364
310158
12
20
17
10.000 Ibs-
STEEL
PE 20 UPf GM 7
310160t
5_75
M
12
5000Ibs
M DENSITY PE
PE 14 HDXCL064
310163
17
30
19
5000 Ibs
HI DENSITY PE
PE-3012 HDX CL00084
310165
24
36
1 24
1 5000 Ibs
Hl DENSITY PE
PEW243624 I4DX 00084
310168
17
3t1
I 15
1 15.000Ib3
Polymer Concrehe
OT 173015 PCX 00084
#1 - Dir.
#2 - Op Sup_
#3 - Engr.
#4 - Shop
#5 - Drafiinq
TRAFFIC RATED: Must include Ponta Head Batt 10 secure lid
$ Note_ 310160 Is for street fight applications only
a
CITY OF ELLENSBURG LIGHT DIVISION
SECONDARY SERVICE BOX
DATE: I 12l10f2002 APPD ENGR DIV wow
SCALE NTS I STOCK CATALOG 310156
DRAWN MIB IAPPD OPER DIV
Page 12
JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT
A.1.2 310156 -Secondary Handbox Standard Detail
FIGURE 1
f' BCH 46
YPVL
PENCE LL
Cat No.
PE -20-H DX
2.
FlNAL GRADE
SIF]El4'�Li{ - Tr I Is.
T
30'klfN
RS' FIR Zr 56H 40 PAC IYMDkL
90 CM R" - Zr RADLIS
NOTE 00MU f'S SkWLD BE 4' TO 6' ABtME WHOM OF HMMX
CITY OF ELLENS BURG
PUBLICWORKS 3 UTILITIES
LIGHT OE PARTM ENT
CREATED BY: TG CREATED DATE:. 1AA2CCa1
APPROVES BY: PM REVISM :4Q4f26
}AEC 0 SCALE : WS
12" X20" FIBERGLASS HAND BOX
VAULT, FIBERGLASS,12'X 20' 1 VF1220
Page 13
JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT
A.1.3 310005 -Fiberglass Transformer Vault Spec
VAULT, FIBERGLASS, 38" x 42"
Atop
Fig. 4 Vault Lid
Fig. 1 Highline Vault
Fig. 2 ProGlass Vault Fig. 3 Nordic Vault
Book #2 - Op Sup.
Book #3 - Engr.
Book #4 - Shop
Book #5 - Drafting Revised 7/27/2018
CITY OF ELLENSBURG LIGHT DIVISION
VAULT, FIBERGLASS. 38" x 42"
DATE 1111312001 APPD ENGR DIV wew
ISCALE NTS STOCK CATALOG 310004
!DRAWN APPD OPER DIV
APPROVED
STUCK
NUMBER
FIGURE
pe thlFSeight
MANUFACTURERS
MacLean
Filghllne
?raGlass Inc
Nordic Fiberglass
1
15"
HL�9-SO
CBP-37�3-15A4V1G-22X24
310004
2
20"
TX423820-T1
2
30
TX423830-TI
310005
310008
4
WA (Lid)
HL-24-2EP
LTX4238
GSG-37�3-MG
Page 14
JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT
A.1.4 310005 -Fiberglass Transformer Vault Detail (1 of 2)
r `9DEWAL.K —
51 DEVAALK TYP
TYP
CITY OF ELLENSBURG
PUBLIC WORKS & UTILITIES
LIGHT DEPARTMENT
CREATED BY: TG CREATED DATE: 4l30l2021
APPROVED BY: PM REVISED :
PAGE SCALE 7NITS
FIGURE t
2" OR 3" SCH 4D
PVC TYPICAL
-24'pp
- - -
4.
I�ap•�
<a^ o
M
Im
6" MIN
D BEDDING
FINAL GRADE
TYP
36" raiM:. 2 3 4
2" OR 3" SCH 40
PVC TYPICAL
49 DEC ELBOW
FIBERGLASS TRANSFORMER VAULT
VAULT, FIBERGLASS, XFMR I VFX
Page 15
JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT
A.1.5 310005 -Fiberglass Transformer Vault Detail (2 of 2)
FIGURE 2
C
2~�
6"
i
PLAN VIEW - FIBERGLASS XFMR VAULT
FINISHED GRADE
VFX
3 3 /
PROFILE VIEW - FIBERGLASS XFMR VAULT
CITY OF ELLENSBURG
PUBLIC WORKS & UTILITIES FIBERGLASS TRANSFORMER VAULT
LIGHT DEPARTMENT
CREATED BY: TG CREATED DATE: 4/3012021
APPROVED BY: PM REVISED: VAULT, FIBERGLASS, XFMR VFX
PAGE 0 SCALE : NTS
Page 16
JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT
A.1.6 313030 -Warning Tape
WARNING TAPE - 6"
I
�I
Stock Appmed Maufaaurer
Nunber Ideal HD Foam ! Chdsty's
313030 SKU 42-151 7A. ND.6.R_E
`TA = Tape, ND = Non -Detectable, 6 = 6", R = Red, E = Electric
Book #1 - Dir.
Book #2 - Op Sup.
Book #3 - Engr.
Book #4 - Shop
Book #5 - Drafting
IREVISED 1 6/16121 - TG
CITY OF ELLENSBURG LIGHT DIVISION
WARNING TAPE - 6"
DATE:
ENGINEER APPD.
WEW
SCALE NTS
313030
STOCK CATALOG
OP SUPERVISOR APPD.
DRA'AIN' EEK
Page 17
JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT
A.1.7 EL-12 - Distribution Trench Requirements
DISTRIBUTION TRENCH REQUIREMENTS
SURFACE RESTORATION
SEE DETAIL SC-30
36' MIN I
42' MA.X 111 29' TYPICAL
SEE NOTE 1
FINISHED GRADE
WARNING TAPE
IT ABOVE -
SEE NOTE 4 T
6' SAND COVER-
SEE- NOTE 3 12-MIN
T
6' SAND REDOING.
SEE NOTE 3
16!(V ,RI511LRY
ELECTRICAL
CONDUIT
ST LIGHT
CONDUIT
COMMUNICATIONS
CONDUIT
. - BACKFILL MATERIAL
SEE NOTE 2
-- NATURAL GAS VAN
WITH TRACER WIRE -
SEE NOTE 5
SMOOTH SAND
BEDDING
12' MIN
SEPARATION
i WAT-R'..
MA1N. I
SEE NOTE 5'k
MIN
3F
SEPARATION
GENERAL NOTES:
I; THE MINIMUM COVER REQUIRED FOR I6KV PRIMARY ELECTRICAL CONDUIT IS 36', MAXIMUM OF42'-TRENCH DEPTH MIN -MAX MAY CHANGE
WITH APPROVAL FROM LIGHT DEPARTMENT
2) BACKPILL SHOULD NOT HE USED IF IT CONTAINS LARGE ROCK, PAVING MATERIALS, CINDERS, LARGE OR SHARPLY ANGULAR SUBSTANCE OR
CORROSIVE MATERIALS WHICH CAN DAMAGE CONDUITS, CABLES. OR OTHER SUBSTRUCTURES OR PREVENTADEQUATE COMPACTION OF FILL
OR CONTRIBUTE TO CORROSION OF CONDUITS, CABLES OR OTHER SUBSTRUCTURES-
31 SMOOTH SAND BEDDING IS REQUIRED FOR ELECTRICAL CONDUITS, 6- 6ELOri AND 6' ABOVE MAINT XANCE SAND MAY NOT BE USED AS SAND
BEDDING.
4} 6- WIDE, RED, NOWDETECTABLE ELECTRIC WARNING TAPE MULTIP!-E WARNING TAPES MAY BE REQUIRED WHEN CONDUITS ARE
CUMULATIVELY MORE THAN 12' IN WIDTH_ PLACE WARNING TAPE 6' IN FROM EDGE OF END CONDUITS.
5) SEE APPROPRIATE DEVELOPMENT STANDARDS FOR NON -ELECTRIC UTILITY INSTALLATIONS
CITY OF El I ENSBURG
PUBLIC WORKS & UTILITIES
LIGHT DEPARTMENT
CREATED BY: M[B CREATED DATE: 7'i9ifli
APPROVED BY: TG REVISED: 9-20-22
PAGE # I OF I SCALE : NTS
DISTRIBUTION TRENCH REQUIREMENTS
LIGHT DEPT_ DISTRIBUTION TRENCH I L-12
Page 18
JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT
A.1.8 EL-13 - Service Line Trench Requirements
SERVICE TRENCH REQUIREMENTS
SURFACE RESTORATION
SEE DETAIL SC-30
30' MIN
W MAX
SEE NOTE 1
WARNING TAPE
12' ABOVE I
SEE NOTE 4 }
1 6' SAND COVER
SEE NOTE 3
- 1-1 TYPICAL
FINISHED GRATE
_ 5AC'KFIL L MATERIAL -
SEE NOTE 2
NATURAL GAS
SERVICE LINE WITH
TRACER WIRE_
SEE NOTE 5
18' PREFERRED
12' MIN
SEPARATION
y SMOOTH SAND
rl `i II BEDDING
6- SAND BEDDING J
SEE NOTE 3 11j
.I
12' M W SS
SECONDARY COMMUNICATIONS
ELECTRICAL SEPARATION CONDUIT
GENERAL NOTES: CONDUIT
1) THE MINIMUM COVER FOR SECONDARY ELECTRICAL SERVICE CONDUIT IS 3Tf, MAXIMUM OF 35"_ TRENCH DEPTH MIN! MAX MAY C:iANGE WITH
APPROVAL FROM LIGHT DEPARTMENT,
2) BACKFILL SHOULD NOT BE USED IF TT CONTAINS LARGE ROCK, PAVING MATERIALS. CINDERS. LARGE OR SHARPLY ANGULAR Si18STANCE OR
CORROSIVE MATERIALS WHICH CAN DALMAGE THE CONDUITS• CABLES OR OTriER SUBSTRUCTURES OR PREVENTS ADEQUATE COMPACTION OF
FILL.
3) SMOOTH SAND BEDDING IS REQUIRED FOR ELECTRICAL CONDUITS. 6" BELOW AND 6-ABOVE. MAINTENANCE SAND MAY 40T BE USED AS SAND
BEDDING_
4) 6" WIDE, RED, NON -DETECTABLE ELECTRIC WARNING TAoE
5) SEE APPROPRIATE DEVELOPMENT STANDARDS FOR NONELECTRIC UTILITY INSTALLATIONS_
61 TRENCrt SHOULD BE AS STRAIGHT AS POSSIBLE WITH NO MORE THAN 270' WORTH OF BENDS INC•_ULING THE 90" BEND AT THE METER BASE
AND THE Bc ND AT THE SOURCE. IN AREAS WHERE TRENCH CHANGES DIRECTION, CORNERS QHOULD BE ROUNDED TO ALLOW FOR SWEEPS. THE
FLOOR OF THE TRENCH, SHOULD BE AS LEVELAND FLAT AS POSSIBLE. THE SWEEP BELOW THE METER SHOULD BE DIRECTED TOWARD THE
SOURCE OF THE SERVICE ITYRICALLY THE TRANSFORMER OR HANDBOXAT THE PROPERTY CORNER'I, NOT PERPENDICJLAR TO THE BUILDING_
71 WIRE W1L L NOT BE PULLED INTO CONDUITS UNTIL BAC"KMLL IS COMPLETED, AND M=1"ERSASE IS LAI INSPECTEDAND APPROVED.
CITY OF ELLENSBURG
PUBLIC WORKS & UTILITIES
LIGHT DEPARTMENT
CREATED BY: M[B CREATED DATE: 7119A)l
APPROVED BY: TG REVISED: 9120YL2
PAGE €d 1 OF 2 SCALE : NTS
SERVICE TRENCH REQUIREMENTS
LIGHT DEFT_ SERVICE TRENCH I L-13
Page 19
JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT
A.1.9 DMB - Stub Detail
GROUND LEVEL
05 im
=4
�m
48" MAX
30" MIN — { <600V)
36" MIN — ( >600V )
,s
7
f
1
2,3,4, OR 6" SCH 40 PVC '
7' RED "UG POWER"
WHISKER
(STOCK #303154)
4" RED MARKER BALL`
(STOCK #303155)
I CAP NOT GLUED
—STRING OR TAPE TIED
�— TO CAP RING OR FOLDED
OVER TOP OF CONDUIT
UNDER CAP
*INSTALL THE MARKER BALL AT LEAST 6" ABOVE OR TO THE SIDE OF METALLIC OBJECTS.
*No METAL OBJECTS (INCLUDING CABLE) ABOVE RED MARKER BALL.
*PLACE SAND OR SOFT NATIVE SOIL OVER MARKER BALL TO PROTECT IT DURING BACKFILL.
CITY OF ELLENSBURG
PUBLIC WORKS & UTILITIES
LIGHT DEPARTMENT
CREATED BY : TG CREATED DATE: i irm2020
APPROVED BY: PM REVISED
PAGE # SCALE : NTS
PVC CONDUIT STUB
WITH MARKERS
DUCT MARKER BALL
DMB
Page 20
JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT
A.1.10 310020 & 310090 - VCS7 - Concrete S' x 7' Vault
COVER -Z
No. 57-2-33F
2.43D Ibe.
VAULT —'
Na 575-LA
4,4UD The.
w
0
NTERNALGROUND INSTALLED
BY VAULT MANUFACTURER
CITY OF E LLE N SO U RG
PUBLICWORKS&UTILITIES jl
LIGHT DEPARTMENT {
TREATED BY:TG CREATED DATE: 1142021
APPROVED BY= PM REVISED
PAGE SCALE:NTS
F1GUR E 8
Full 18T Open
—RF CESSED LIFT HANDLE
mc
CONCRETE 5' X T VAULT
(5' X T L1D W/ ❑13L TX T DIA. PLATE DOORS)
VAULT, CONCRETE, 5' X7' 1 VC57
Page 21
JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT
FIGU RE 9
PLAN VIEW - 5' x 7' VAULT
'.715' x�3n3Cn3n�iya;HT:eyx•y�Cn�r-e�axa
wsw �Wax�k�ya�xra�i'"_ea a 17 al
iT x NMI; 4 8 7 �jLydCHxr Sri
�y3,,C�y3�Ltt
ti.'LayyH�� H."iy.`3},C�� y��
i�ra'r.ws�.h J' 40Gll ha'r3W n.
PROFILE VIEW - Tx T VAULT
1'
4'
ENO
6" OF CRUSHED
ROCK( 5.(SMINUS)
R SAND.
C MPACTED
& LEVELED -
FINISHED
GRADE
J
J
"dM�
NOTE: TOP OF VAULT LID AT FINAL GRADE IF IN A HARD -SURFACED AREA.
TOP OF VAULT UD AT Z' ABOVE FINAL GRADE IF IN A LANDSCAPED AREA.
CITYOF EULENSBURG
PUBLIC WORKS & UTILITIES CONCRETE 5' X T VAULT
UGHT DEPARTMENT (5' X 7' LID WJDE3L 3 X 3' DIA. PLATE DOORS)
CREATED BY: TG I CREATED DATE: 1.1 C2021
APPROVED BY: Ph1 IREVISED VAULT, CONCRETE, 5' x 7' VC57
PAGE # I SCALE : NTS
Page 22
JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT
A.1.11 310020 & 310087- VCX357 - Concrete 5' x 7' Vault with transformer lid
FIGURE ?
COVER
2,430 Ibs.
7
VAULT
4,400 Ibs.
INTERNAL GROUND INSTALLED
BY VAULT MANUFACTURER
PROFILE VIEW ry-
5' x T VAULT FINISHED GRADE
7'
NOTE:
® ® TOP OF VAULT LID AT FINAL
:4•6 - GRADE IF IN A
HARD -SURFACED AREA.
TOP OF VAULT LID AT 2"
y��.. ABOVE FINAL GRADE IF IN A
6" OF CRUSHED ROCK _ L41 JDSCAPED AREA.
(518 MINUS) OR SAND,
COMPACTED & LEVELED.
NOTE: VAULT PIT DIMENSIONS 9' X 7'
CITY OF ELLENSBURG CONCRETE 5' X T VAULT W1 XFMR LID (30 XFMR)
PUBLIC WORKS &UTILITIES 8' X 8' LID W! 30 XFMR LID)
LIGHT DEPARTMENT
81 CREATED BY: TG CREATED DATE: 09f07121 300kVA - 9 500kVA
APPROVED BY : PM REVISED : 05ro6/25 VAULT, CONCRETE W/ XFMR LID, 30, 5' X 7' VCX357
PAGE # 111 SCALE : NTS
Page 23
JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT
APPENDIX B - ELECTRICAL SITE DRAWINGS
B.1 Electrical Site Drawings
Refer to separately attached drawing set.
Electrical Utility Duct and Vault Drawing
Page 24
JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT