Loading...
HomeMy WebLinkAbout2025-05-27-minutes-ec-study-sessionKITTITAS COUNTY COMMISSIONERS EC Study Session Special Meeting Tuesday May 27, 2025 -1:00 PM BOCC Conference Room 205 West 5th Room 108 - Ellensburg 1. Call to Order 2. Citizen Comments (1 min. time limit) 3. Approve Chair's Signature on a Developers Agreement with City of Ellensburg 4. Other Business - No Action to be taken 5. Concluded Created on 5/22/2025 3:23:03 PM KITTITAS COUNTY EC STUDY SESSION MINUTES BOCC CONFERENCE ROOM, 205 WEST 5TH ROOM 108 - ELLENSBURG Special Meeting TUESDAY 1:00 PM May 27, 2025 Board members present: Chairman Laura Osiadacz, Vice -Chairman Cory Wright, Commissioner Brett Wachsmith Others: Kady Porterfield (Event Center Director) 1. Call to Order - Chairman Osiadacz called the meeting to order at 1:00pm. 2. Citizen Comments (1 min. time limit) — none 3. Approve Chair's Signature on a Developers Agreement with City of Ellensburg — Staff report was presented by Porterfield along with received legal advisement comments. Vice -Chairman Wright moved to approve the chair's signature on the agreement. Commissioner Wachsmith seconded the motion. Motion passed 3-0. OTHER BUSINESS — Commissioner Wachsmith asked about unauthorized parking in the future RV lot. Porterfield shared that it does happen often, and even bus groups that stage in that area do not reach out ahead of time. Porterfield shared that livestock sale agreement is still pending. The Friends of the Fair will meet tomorrow night (May 28) and she hopes to hear back good news that we can move forward with signing. Fair worker positions will open sometime in June. Commissioner Wachsmith shared he knows of lots of high school students that want to apply. Porterfield provided an update on the status of preventative maintenance work around the barn area and remainder of the grounds, mostly focusing on electrical needs and other safety enhancements. Porterfield tried to contact the Bowling Alley lessee about the proposed opening date conflict but had not heard back. Vice -Chairman Wright will contact the lessee and connect back with Porterfield. Meeting concluded at 1:20pm. Kady Po roe d 2025-05-27 MINUTES KITTITAS COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Laura Osiadacz, Chairman KITTITAS VALLEY EVENT CENTER Home of the Kittitas County Fair and Ellensburg Rodeo 901 E. 7' Ave, Suite 1, Ellensburg, WA 98926 EventCenter@co.kittitas.wa.us Office (509) 962-7639 1_ KITTITA' cni= 'TY Fax (509) 962-7010 STUDY SESSION STAFF REPORT AGENDA DATE: May 27, 2025 AGENDA ITEM: Request to Approve Chair's Signature on Developers Agreement with the City of Ellensburg BACKGROUND: The City of Ellensburg has prepared a Developer Agreement with Kittitas County to support the extension of three-phase power to the KVEC RV Park. The project, titled Fairgrounds RV Park 3PH Extension (Job #3450-316), outlines the installation of underground electric primary and secondary distribution systems, including street lighting infrastructure. We are responsible for paying the estimated amount up front and covering any additional actual costs incurred. A refund will be issued if the actual cost is lower than estimated. Total to be invoiced for this Agreement is $100,579.10, which will be reimbursed through our WSDA grant. INTERACTION: Kittitas Valley Event Center Facilities and Maintenance Board of County Commissioners ACTION REQUESTED: Approve the Chair's Signature on the Agreement ATTACHMENT(S): 3450-316 Dev Agreement LEAD STAFF: Kady Porterfield, Kittitas Valley Event Center Director CITY OF ELLENSBURG KITTITAS COUNTY, WASHINGTON FAIRGROUNDS RV PARK 3PH MENTION AGREEMENT and SPECIFICATIONS FOR ELECTRICAL SYSTEM INTALLATION Page 1 JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT Table of Contents SECTION1— SUMMARY................................................................................................................................ 3 1.1 Scope...................................................................................................................................................................3 1.3 Standard Specifications...........................................................................................................................3 SECTION2 - GENERAL PROVISIONS ......... .......................................... ;........................................................... 3 2.1 City Light Pre -Construction Meeting....................................................................................................... 3 2.2 Contractor Point of Contact....................................................................................................................4 2.3 City Inspections.......................................................................................................................................4 2.4 City Light Workers and Equipment........................................................................................................4 2.5 Developer Crew and Equipment............................................................................................................. 5 2.6 Developer Electrical Contracts............................................................................................................ 5 SECTION3 — SPECIFIC REQUIREMENTS......................................................................................................... 6 3.1 Consumables..................................... ......................................................................................................6 3.2 Earthwork................................................................................................................................................6 3.3 Ducts.....................................................................................................................................................................6 3.4 Working Hours-.......— .................. ............................................................................ ............................. 7 SECTION 4 — DEVELOPER'S AGREEMENT FOR ELECTRICAL VAULT & CONDUIT SYSTEM ............................. 8 4.1 City Utility Responsibilities: ..................................................................................................................... 8 4.2 Developer Responsibilities: ........ .............................. __ .................................................... ____ ............... 9 4.3 City Light installation of electric primary & secondary distribution facilities summary: ........................ 9 APPENDIXA— MATERIAL SPECIFICATIONS.................................................................................................12 A.1.1 310160 & 310156 — Secondary Fiberglass Handbox Specs.........................................................12 A.1.2 310156—Secondary Handbox Standard Detail..........................................................................13 A.1.3 310005 - Fiberglass Transformer Vault Spec..............................................................................14 A.1.4 310005 — Fiberglass Transformer Vault Detail (1 of 2)...............................................................15 A.1.5 310005 — Fiberglass Transformer Vault Detail (2 of 2)...............................................................16 A.1.6 313030 — Warning Tape..............................................................................................................17 A.1.7 EL-12 — Distribution Trench Requirements..............................................................................18 A.1.8 EL-13 —Service Line Trench Requirements.................................................................................19 A.1.9 DMB—Stub Detail.......................................................................................................................20 A.1.10 310020 & 310090 — VC57 — Concrete 5' x 7' Vau It..................................................................... 21 A.1.11 310020 & 310087— VCX357 — Concrete 5' x 7' Vault with transformer lid.— ............................. 23 APPENDIX B — ELECTRICAL SITE DRAWINGS...............................................................................................24 B.1 Electrical Site Drawings.........................................................................................................................24 Page 2 JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT SECTION 1 - SUMMARY 1.1 Scope This agreement is made and entered into this 9�7 day of 2025 ("Effective Date"), by and between THE CITY OF ELLENSBURG, a non -charter de city of the State of Washington (hereinafter called the "CITY") and Kittitas County, an entity authorized to do business in the state of Washington (hereinafter called the "DEVELOPER"). The purpose of these specifications is to outline the scope and minimum requirements of the Developer's responsibilities in order to receive the requested capital improvements to their electrical service (herein after referred to as "the Agreement"). This agreement allows the Developer to pay in advance for the estimated work as part of the JOB #3450-316 the fairgrounds RV park 3ph extension project. The work performed shall be done in a thorough and craftsman -like manner to ensure a potentially trouble -free installation; therefore, only qualified personnel will be permitted to perform the work covered by these specifications, using prudent practices and methods recognized as approved standards of workmanship by the electrical industry. The work shall be done in accordance with the following plans, specifications, City Standards and construction drawings. Drawings for electrical construction projects shall be furnished by the City of Ellensburg. Joint use of the trenches shall be allowed for local telecommunications companies and City Utility facilities, as long as they maintain minimum clearance between City and telecommunication company's facilities. Telecommunication company facilities shall not be placed directly on top of or contacting any part of City Utility facilities. 1.3 Standard Specifications The Standard Specifications of the City of Ellensburg City Light Department and Washington State Department of Transportation, as described in this section, and amendments thereto, shall control electric facility installation in the project. Refer to attached Assembly Unit sheets for additional Detail Drawings of electrical specifications. All materials shall be installed to manufacturer's recommendations. SECTION 2 - GENERAL PROVISIONS 2.1 City Light Pre -Construction Meeting Upon receiving a signed copy of the Agreement from the Developer and after the invoice has been paid by the Developer for the City Light installation of underground electrical primary and secondary distribution system, the parties will schedule a mandatory City Light pre - construction meeting with the Developer, their installation contractor, and their electrical contractor. This pre -construction meeting shall be held one week priorto Developer installing any City Utility facilities. Page 3 JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT 2.2 Contractor Point of Contact The Developer shall designate a project foreperson/superintendent employed by the prime contractor who is familiar with all phases of the work and who has the full authority of the Developer. The foreperson or superintendent shall be assigned prior to starting construction. The foreperson or superintendent shall carry a cellular phone on the job and that number shall be provided to the City of Ellensburg. The foreperson or superintendent shall maintain a copy of the drawings and specifications of the Agreement on the job site and mark any and all changes in the work approved by the City of Ellensburg. 2.3 City Inspections The foreperson or superintendent must call the City Light Inspector a minimum of 24 hours in advance of required inspections to inspect all work as specified by the Agreement. At a minimum, this includes the key installation milestones identified below. The City Light Inspector must witness and approve the following key installation milestones prior to the project advancing to the next stage: 1) Open Trench i. Bedding sand — bottom of trench 2) Backfill i. Bedding sand —top of conduit ii. 6 inches to 1 foot of lift iii. Trench Tape iv. Complete backfill v. Compaction (where required) 3) Vault grade The City of Ellensburg City Light Department may stop work if the Developer fails to meet any City of Ellensburg requirement as specified in the agreement. The City of Ellensburg is not responsible forthe costs of delays incurred as a result of stopping work. The City of Ellensburg reserves the right to refuse to energize the system if all required inspections have not been performed and approved. The City of Ellensburg City Light Department shall invoice the Developer the total amount of hours the City Light Inspector(s) spend(s) inspecting the Developers work at the conclusion of each month that the Developer is installing the duct, vault, and street lighting system, including proofing of conduits & installation and energization of street lighting system, at the Inspector's rate. The City of Ellensburg will not approve the final Development permit through the City of Ellensburg Community Development Department until the Inspection Fee has been paid. 2.4 City Light Workers and Equipment City Light shall provide all labor, supervision, tools, and equipment forthe performance of the scope of work described on the design and in this Agreement. Any out -of -scope work that Page 4 JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT the Developer requests from any City employee not acting as City Light Inspector will be done at Developers expense, according to the applicable rate(s) including equipment charges. An invoice at the conclusion of each month will be sent to the Developer for all charges as described. The City of Ellensburg will not approve the final Development permit through the City of Ellensburg Community Development Department until the invoice for City Light qualified electrical worker(s) has been paid. 2.5 Developer Crew and Equipment The Developer shall provide all labor, supervision, tools, and equipment for the performance of the work. Materials for contract execution shall be supplied by the City only where noted. The Developer shall be responsible to verify quantities issued and supply its' own on -site staging area where applicable. The minimum equipment capacity shall be sufficient to comply with worst -case loading scenarios anticipated for this contract. The Developer shall at all times employ workers who are qualified in their respective positions per Ch. 19.28 RCW and WAC 296-46 (Electricians) and WAC 256.45. The Developer is 29645 restricted in his selection of labor and payment therefore by certain legal requirements which must be observed for compliance with the public policy enunciated in Ch. 49.28 RCW. The Developer should be thoroughly familiar with all provisions of this and other related statutes before commencing work on this contract. At the end of each day, all clean up shall have been completed. 2.6 Developer Electrical Contracts The Developer shall not execute a contract with any contractorto perform any work included in the Agreement until a statement of contractor qualifications has been submitted to the City of Ellensburg and the City is satisfied that the contractor is qualified. The Developer's contractor shall cause appropriate provisions to be inserted in all subcontracts, if applicable, relative to the work to require compliance by each subcontractor with the provisions of the Agreement. The Developer shall be fully responsible to the City of Ellensburg for acts and omissions of its contractor(s) and of persons either directly or indirectly employed by them, as he is for the acts and omissions of persons directly employed by him. The Developer shall cause appropriate provisions to be inserted in all contracts relative to the work to require compliance by each contractor with the applicable provisions of the Agreement. Nothing contained in the Agreement shall create any contractual relation between any Developer's contractor and the City of Ellensburg. The cost of any license shall be incidental to the Agreement. Page 5 JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT SECTION 3 - SPECIFIC REQUIREMENTS 3.1 Consumables The Developer shall supply all consumables required to install the conduit and vault system. Such consumables may include but are not limited to: Sand, backfill, asphalt, concrete, landscaping etc. 3.2 Earthwork Care shall be taken for adjacent structures and utilities. Where sidewalks or curbs are cut, paving shall be removed to the nearest construction joint. The Developer shall be liable and accountable for any damage due to Developer -performed excavation. Excavation for vaults shall be of sufficient size to leave not less than one foot clearance between the bank of the excavation and the vault. Sand bedding is required adjacent to primary raceway apparatus. Trenching for underground ducts shall be true to line and grade as shown on the drawings and staked in the field at a minimum of 42" depth typically. Banks of trenches shall be kept as vertical as possible. Duct trenches shall be maintained free from standing water when ducts are being installed and shall be cleaned of excess and loose rock and loose earth before installation of sand, per trench details provided in APPENDIX A — MATERIAL SPECIFICATIONS. Bedding material may be placed with backhoe with redistribution by hand to ensure proper cover and that subsequent backfilling operations do not disturb the duct. Excavation materials may be used for backfilling, but not for bedding, provided it is free of frozen particles or lumps, vegetable matter or foreign debris, large rock, paving materials or cinders per trench details provided in APPENDIX A— MATERIAL SPECIFICATIONS. Backfill shall not be placed until after inspection of the underground facilities has been completed and approved in writing by the City Light Inspector. Backfill shall be compacted to 95% of the maximum density of the surrounding earth. Ducts must be bedded with sand per City specifications. Bedding shall include partial backfill to a level appropriate for the positioning of trench marking tape (approximately one lift of dirt backfill). This shall also include the positioning of said trench marking tape. Joint trench occupation by the local telecommunications companies and City Utilities are typical. Joint installation shall be coordinated by the Developer, when requested by the City. Underjoint trenching scenarios, the Agreement shall include coincidental bedding and backfill of all joint trench facilities. 3.3 Ducts A minimum of six inches of sand bedding and shading shall be used to encase the ducts with a minimum depth; per trench details provided in APPENDIX A — MATERIAL SPECIFICATIONS. Page 6 JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT At no time shall trenching for primary conduit exceed 48" or be less than 36" in depth to achieve necessary coverage without prior approval from the City Light Inspector. The Developer shall provide adequate shoring where applicable. In all cases, plastic warning tape shall be placed 12" directly above the conduit. During construction, partially -completed ducts shall be protected from the entrance of debris by means of conduit caps Trenches and vault orientation shall be constructed to allow ducts to enter concrete vaults perpendicular to the vault wall with a straight piece of conduit and not enter with a bend or at an angle. All conduit bends for electrical primary, secondary, and street light system shall be of minimum radius per the following table: Conduit Size ID (in) Minimum conduit elbow bend radius (in) 18 24 2 2 % 24 3 36 4 48 6 60 All conduit bends for electrical primary, secondary, and street light system shall be either 22.5-degree bends or 90 degree bends. No 45-degree bends will be accepted without prior approval. 3.4 Working Hours Normal working hours forthe construction of the conduit and vault system and/or street light system construction shall be done at Developers choosing, as long as it meets City ordinances. City Light inspection shall be during regular City Light Inspector working hours and are to be determined during the pre -construction meeting between City Light & Developer. Developer shall contact the City Light a minimum of 24 hours prior to all vault and conduit system and electrical system construction to arrange for an inspector. Working hours may be modified by mutual agreement. The Developer shall pay the applicable overtime cost (and any applicable equipment cost) of a City Light Inspector to be on site outside of normal working hours unless prior arrangements are made through and approved in writing by the City. Page 7 JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT SECTION 4 - DEVELOPER'S AGREEMENT FOR ELECTRICAL VAULT & CONDUIT SYSTEM The City of Ellensburg City Light Department will provide high voltage primary and secondary distribution lines to newly developed property within the City Limits and the City's Urban Growth Area (UGA). Charges for the extension of facilities to new developments shall be based on policies, fees, credits and rebates adopted by the City Council and are subject to change at any time. Developers / Landowners must apply for an extension of facilities using the appropriate application and provide all information detailed in Section 4.2, Developer Responsibilities, below, for the City to determine how to provide electrical utility service to the property. The Agreement must be signed, and the invoice paid within 30 days of the date of invoicing. Once the Agreement has been signed by both parties and the invoice has been paid, the Agreement will not be subject to change based on changes to a utility's line extension policy and/or fees adopted by the City Council as long as the construction of the electrical primary, secondary, and street light system has been completed within 365 calendar days of the effective date. If construction of the electrical primary, secondary, and street light system has not been completed after 365 calendar days of the effective date this agreement will expire. If the Developer desires to renew the agreement the Developer will be subject to revised costs, requirements and specifications as determined by City standards current at the time of renewal. 4.1 City Utility Responsibilities: 1. Install all electric primary & secondary distribution facilities including the electrical primary, secondary, & street lighting vault and conduit system, as well as streetlights, street light posts, street light bases, & street light conductors. 2. Design and layout of electrical system within the development based on maps/plans provided by Developer. 3. Costs provided to the Developer are based on City crew construction costs or contractor bid costs, depending on state bid laws. 4. Provide Developer with a cost estimate including labor, materials, and equipment necessary to provide utility service to the development, done by City crews. 5. Provide on -site inspection for key installation milestones detailed in Section 2.3. 6. Provide written acceptance or rejection of all work performed by Developer according to Section 2.3, City Inspections. 7. Provide specifications for all construction elements to be completed by Developer according to the Agreement. 8. Provide Developer with an invoice at the conclusion of each month for any out -of -scope work that the Developer requests from any City Light worker not acting as City Light Inspector, according to those workers applicable rate(s). Page 8 JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT 4.2 Developer Responsibilities: 1. Submit civil plans (both hard copy and AutoCAD) showing the location of all lots and roads within the development, including existing and proposed utilities, to include natural gas, water, sewer, storm water, irrigation, swales, ponds, etc., and any elevation changes. 2. Provide grade staking and survey control, trenching, sand bedding, and backfill for all utilities in accordance with City Utility Trenching Specifications. 3. Complete all hard and soft surface restoration including but not limited to landscaping, gravel, concrete and asphalt. 4. Pay all costs required of the Developer as invoiced by the City. Payment for City Light installation of electric primary & secondary distribution facilities must be received before facilities are installed by City Light and payment may be required before specialty materials are ordered, if applicable. 5. Pay all costs associated with change orders resulting from Developer driven changes to scope, unforeseen conditions, or errors and omissions. 6. The Developer or its agent shall notify the City Light Inspector that each key installation milestone is ready for inspection, and not to proceed to the next stage of construction until the City Light Inspector provides written approval for that stage of work. Additional trips required of the City Light Inspector for re -inspections will result in additional fees. 7. Provide an easement to the City for all areas where utilities must be installed outside of deeded utility corridors or public right-of-way. 4.3 City Light installation of electric primary & secondary distribution facilities summary: 1. City to install a complete electrical system installation including Conduit, Vaults, Transformers and Conductors. Payment for City Light installation of electric facilities must be received before facilities are installed by City Light. 2. The invoice for the City Light installation of electric primary & secondary distribution facilities will be based on an estimate of the project costs. The Developer will be responsible for the final actual costs of the installation of the electric primary & secondary distribution facilities. A refund will be provided to the Developer if the estimated project costs are higher than the final actual project costs. An invoice will be sent to the Developer if the estimated project costs are lower than the final actual project costs. Page 9 JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT Payment details: TOTAL ESTIMATED COST FROM CITY FOR ELECTRIC UTILITY SYSTEM $99,892.71 LESS LINE EXTENSION AND SERVICE CREDITS ($800.00) NEW SERVICE SALES TAX 1.5% $1,486.39 TOTAL AMOUNT TO BE PAID BY DEVELOPER TO CITY $100,579.10 3. At Developer expense, the Developer provides the labor, equipment and materials associated with the excavation and restoration required to install the electrical primary and secondary distribution vault and conduit system, including street lighting facilities, as described in the Agreement. 4. A City Light Inspector will inspect any and all excavation for City facilities. City Light shall invoice the Developer the total amount of hours the City Light Inspector(s) spend(s) inspecting the Developers work as described previously in the Agreement. City Light will not approve the final Development permit through the City of Ellensburg Community Development Department until all of the Inspection Fees have been paid. 5. Any bonds that are held by the City for the construction of this development will not be released until the system has been completed and accepted by the City Light Department. 6. The project will not be signed off or finalized until the system has been completed and accepted by the City Light Department. Page 10 JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT Dated this ,.�_7 day of 2025. If construction of the electrical primary, secondary, and street light system has not been completed after one year of the effective date this agreement will expire. If the Developer desires to renew the agreement the Developer will be subject to revised costs, requirements and specifications as determined by City standards current at the time of renewal. Developer Agreement for an Electrical Vault and Conduit System: Developer, by his/her signature below, agrees to pay the amount shown above prior to the start of construction and agrees to pay for all actual costs above the estimated cost. The Developer also agrees to the development conditions and responsibilities as set forth in this Agreement and the attached Specifications for Electrical Vault and Conduit Systems and Street Light Systems. IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on their behalf by their respective duly authorized representatives effective as of the day and year written below. Date: Date: REPRESENTATIVE FOR Development Name Signature: } rr1, Print Name: Title: REPRESENTATIVE FOR City of Ellensburg —City Light Department Signature: Print Name: Title: Page 11 JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT APPENDIX A - MATERIAL SPECIFICATIONS A.1.1 Assembly Unit Specification Drawings 310160 & 310156 - Secondary Fiberglass Handbox Specs SECONDARY SERVICE BOX PP-20UX Enclosure with sleet Itl F rir — xy r 161; Irt' � t 11,16 .t r, t1 T- 241/E — 22 e264(57 Semi ii Gio" 1 E-20H DX Enclosure wltlt high denedy polyenrylene lid — 4T (-A F—i Enclosure with high density polyethylene lid for street IgM connecNam only STDCX Mijili it TOP 0111ENSiONS LID PATINQ LID TYPE APPROVED MAIKIFACTURERS D H PENCELL 310156 12 20 17 5000 Ibs Hl DENSITY PE PE 2D HOXCL364 310158 12 20 17 10.000 Ibs- STEEL PE 20 UPf GM 7 310160t 5_75 M 12 5000Ibs M DENSITY PE PE 14 HDXCL064 310163 17 30 19 5000 Ibs HI DENSITY PE PE-3012 HDX CL00084 310165 24 36 1 24 1 5000 Ibs Hl DENSITY PE PEW243624 I4DX 00084 310168 17 3t1 I 15 1 15.000Ib3 Polymer Concrehe OT 173015 PCX 00084 #1 - Dir. #2 - Op Sup_ #3 - Engr. #4 - Shop #5 - Drafiinq TRAFFIC RATED: Must include Ponta Head Batt 10 secure lid $ Note_ 310160 Is for street fight applications only a CITY OF ELLENSBURG LIGHT DIVISION SECONDARY SERVICE BOX DATE: I 12l10f2002 APPD ENGR DIV wow SCALE NTS I STOCK CATALOG 310156 DRAWN MIB IAPPD OPER DIV Page 12 JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT A.1.2 310156 -Secondary Handbox Standard Detail FIGURE 1 f' BCH 46 YPVL PENCE LL Cat No. PE -20-H DX 2. FlNAL GRADE SIF]El4'�Li{ - Tr I Is. T 30'klfN RS' FIR Zr 56H 40 PAC IYMDkL 90 CM R" - Zr RADLIS NOTE 00MU f'S SkWLD BE 4' TO 6' ABtME WHOM OF HMMX CITY OF ELLENS BURG PUBLICWORKS 3 UTILITIES LIGHT OE PARTM ENT CREATED BY: TG CREATED DATE:. 1AA2CCa1 APPROVES BY: PM REVISM :4Q4f26 }AEC 0 SCALE : WS 12" X20" FIBERGLASS HAND BOX VAULT, FIBERGLASS,12'X 20' 1 VF1220 Page 13 JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT A.1.3 310005 -Fiberglass Transformer Vault Spec VAULT, FIBERGLASS, 38" x 42" Atop Fig. 4 Vault Lid Fig. 1 Highline Vault Fig. 2 ProGlass Vault Fig. 3 Nordic Vault Book #2 - Op Sup. Book #3 - Engr. Book #4 - Shop Book #5 - Drafting Revised 7/27/2018 CITY OF ELLENSBURG LIGHT DIVISION VAULT, FIBERGLASS. 38" x 42" DATE 1111312001 APPD ENGR DIV wew ISCALE NTS STOCK CATALOG 310004 !DRAWN APPD OPER DIV APPROVED STUCK NUMBER FIGURE pe thlFSeight MANUFACTURERS MacLean Filghllne ?raGlass Inc Nordic Fiberglass 1 15" HL�9-SO CBP-37�3-15A4V1G-22X24 310004 2 20" TX423820-T1 2 30 TX423830-TI 310005 310008 4 WA (Lid) HL-24-2EP LTX4238 GSG-37�3-MG Page 14 JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT A.1.4 310005 -Fiberglass Transformer Vault Detail (1 of 2) r `9DEWAL.K — 51 DEVAALK TYP TYP CITY OF ELLENSBURG PUBLIC WORKS & UTILITIES LIGHT DEPARTMENT CREATED BY: TG CREATED DATE: 4l30l2021 APPROVED BY: PM REVISED : PAGE SCALE 7NITS FIGURE t 2" OR 3" SCH 4D PVC TYPICAL -24'pp - - - 4. I�ap•� <a^ o M Im 6" MIN D BEDDING FINAL GRADE TYP 36" raiM:. 2 3 4 2" OR 3" SCH 40 PVC TYPICAL 49 DEC ELBOW FIBERGLASS TRANSFORMER VAULT VAULT, FIBERGLASS, XFMR I VFX Page 15 JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT A.1.5 310005 -Fiberglass Transformer Vault Detail (2 of 2) FIGURE 2 C 2~� 6" i PLAN VIEW - FIBERGLASS XFMR VAULT FINISHED GRADE VFX 3 3 / PROFILE VIEW - FIBERGLASS XFMR VAULT CITY OF ELLENSBURG PUBLIC WORKS & UTILITIES FIBERGLASS TRANSFORMER VAULT LIGHT DEPARTMENT CREATED BY: TG CREATED DATE: 4/3012021 APPROVED BY: PM REVISED: VAULT, FIBERGLASS, XFMR VFX PAGE 0 SCALE : NTS Page 16 JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT A.1.6 313030 -Warning Tape WARNING TAPE - 6" I �I Stock Appmed Maufaaurer Nunber Ideal HD Foam ! Chdsty's 313030 SKU 42-151 7A. ND.6.R_E `TA = Tape, ND = Non -Detectable, 6 = 6", R = Red, E = Electric Book #1 - Dir. Book #2 - Op Sup. Book #3 - Engr. Book #4 - Shop Book #5 - Drafting IREVISED 1 6/16121 - TG CITY OF ELLENSBURG LIGHT DIVISION WARNING TAPE - 6" DATE: ENGINEER APPD. WEW SCALE NTS 313030 STOCK CATALOG OP SUPERVISOR APPD. DRA'AIN' EEK Page 17 JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT A.1.7 EL-12 - Distribution Trench Requirements DISTRIBUTION TRENCH REQUIREMENTS SURFACE RESTORATION SEE DETAIL SC-30 36' MIN I 42' MA.X 111 29' TYPICAL SEE NOTE 1 FINISHED GRADE WARNING TAPE IT ABOVE - SEE NOTE 4 T 6' SAND COVER- SEE- NOTE 3 12-MIN T 6' SAND REDOING. SEE NOTE 3 16!(V ,RI511LRY ELECTRICAL CONDUIT ST LIGHT CONDUIT COMMUNICATIONS CONDUIT . - BACKFILL MATERIAL SEE NOTE 2 -- NATURAL GAS VAN WITH TRACER WIRE - SEE NOTE 5 SMOOTH SAND BEDDING 12' MIN SEPARATION i WAT-R'.. MA1N. I SEE NOTE 5'k MIN 3F SEPARATION GENERAL NOTES: I; THE MINIMUM COVER REQUIRED FOR I6KV PRIMARY ELECTRICAL CONDUIT IS 36', MAXIMUM OF42'-TRENCH DEPTH MIN -MAX MAY CHANGE WITH APPROVAL FROM LIGHT DEPARTMENT 2) BACKPILL SHOULD NOT HE USED IF IT CONTAINS LARGE ROCK, PAVING MATERIALS, CINDERS, LARGE OR SHARPLY ANGULAR SUBSTANCE OR CORROSIVE MATERIALS WHICH CAN DAMAGE CONDUITS, CABLES. OR OTHER SUBSTRUCTURES OR PREVENTADEQUATE COMPACTION OF FILL OR CONTRIBUTE TO CORROSION OF CONDUITS, CABLES OR OTHER SUBSTRUCTURES- 31 SMOOTH SAND BEDDING IS REQUIRED FOR ELECTRICAL CONDUITS, 6- 6ELOri AND 6' ABOVE MAINT XANCE SAND MAY NOT BE USED AS SAND BEDDING. 4} 6- WIDE, RED, NOWDETECTABLE ELECTRIC WARNING TAPE MULTIP!-E WARNING TAPES MAY BE REQUIRED WHEN CONDUITS ARE CUMULATIVELY MORE THAN 12' IN WIDTH_ PLACE WARNING TAPE 6' IN FROM EDGE OF END CONDUITS. 5) SEE APPROPRIATE DEVELOPMENT STANDARDS FOR NON -ELECTRIC UTILITY INSTALLATIONS CITY OF El I ENSBURG PUBLIC WORKS & UTILITIES LIGHT DEPARTMENT CREATED BY: M[B CREATED DATE: 7'i9ifli APPROVED BY: TG REVISED: 9-20-22 PAGE # I OF I SCALE : NTS DISTRIBUTION TRENCH REQUIREMENTS LIGHT DEPT_ DISTRIBUTION TRENCH I L-12 Page 18 JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT A.1.8 EL-13 - Service Line Trench Requirements SERVICE TRENCH REQUIREMENTS SURFACE RESTORATION SEE DETAIL SC-30 30' MIN W MAX SEE NOTE 1 WARNING TAPE 12' ABOVE I SEE NOTE 4 } 1 6' SAND COVER SEE NOTE 3 - 1-1 TYPICAL FINISHED GRATE _ 5AC'KFIL L MATERIAL - SEE NOTE 2 NATURAL GAS SERVICE LINE WITH TRACER WIRE_ SEE NOTE 5 18' PREFERRED 12' MIN SEPARATION y SMOOTH SAND rl `i II BEDDING 6- SAND BEDDING J SEE NOTE 3 11j .I 12' M W SS SECONDARY COMMUNICATIONS ELECTRICAL SEPARATION CONDUIT GENERAL NOTES: CONDUIT 1) THE MINIMUM COVER FOR SECONDARY ELECTRICAL SERVICE CONDUIT IS 3Tf, MAXIMUM OF 35"_ TRENCH DEPTH MIN! MAX MAY C:iANGE WITH APPROVAL FROM LIGHT DEPARTMENT, 2) BACKFILL SHOULD NOT BE USED IF TT CONTAINS LARGE ROCK, PAVING MATERIALS. CINDERS. LARGE OR SHARPLY ANGULAR Si18STANCE OR CORROSIVE MATERIALS WHICH CAN DALMAGE THE CONDUITS• CABLES OR OTriER SUBSTRUCTURES OR PREVENTS ADEQUATE COMPACTION OF FILL. 3) SMOOTH SAND BEDDING IS REQUIRED FOR ELECTRICAL CONDUITS. 6" BELOW AND 6-ABOVE. MAINTENANCE SAND MAY 40T BE USED AS SAND BEDDING_ 4) 6" WIDE, RED, NON -DETECTABLE ELECTRIC WARNING TAoE 5) SEE APPROPRIATE DEVELOPMENT STANDARDS FOR NONELECTRIC UTILITY INSTALLATIONS_ 61 TRENCrt SHOULD BE AS STRAIGHT AS POSSIBLE WITH NO MORE THAN 270' WORTH OF BENDS INC•_ULING THE 90" BEND AT THE METER BASE AND THE Bc ND AT THE SOURCE. IN AREAS WHERE TRENCH CHANGES DIRECTION, CORNERS QHOULD BE ROUNDED TO ALLOW FOR SWEEPS. THE FLOOR OF THE TRENCH, SHOULD BE AS LEVELAND FLAT AS POSSIBLE. THE SWEEP BELOW THE METER SHOULD BE DIRECTED TOWARD THE SOURCE OF THE SERVICE ITYRICALLY THE TRANSFORMER OR HANDBOXAT THE PROPERTY CORNER'I, NOT PERPENDICJLAR TO THE BUILDING_ 71 WIRE W1L L NOT BE PULLED INTO CONDUITS UNTIL BAC"KMLL IS COMPLETED, AND M=1"ERSASE IS LAI INSPECTEDAND APPROVED. CITY OF ELLENSBURG PUBLIC WORKS & UTILITIES LIGHT DEPARTMENT CREATED BY: M[B CREATED DATE: 7119A)l APPROVED BY: TG REVISED: 9120YL2 PAGE €d 1 OF 2 SCALE : NTS SERVICE TRENCH REQUIREMENTS LIGHT DEFT_ SERVICE TRENCH I L-13 Page 19 JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT A.1.9 DMB - Stub Detail GROUND LEVEL 05 im =4 �m 48" MAX 30" MIN — { <600V) 36" MIN — ( >600V ) ,s 7 f 1 2,3,4, OR 6" SCH 40 PVC ' 7' RED "UG POWER" WHISKER (STOCK #303154) 4" RED MARKER BALL` (STOCK #303155) I CAP NOT GLUED —STRING OR TAPE TIED �— TO CAP RING OR FOLDED OVER TOP OF CONDUIT UNDER CAP *INSTALL THE MARKER BALL AT LEAST 6" ABOVE OR TO THE SIDE OF METALLIC OBJECTS. *No METAL OBJECTS (INCLUDING CABLE) ABOVE RED MARKER BALL. *PLACE SAND OR SOFT NATIVE SOIL OVER MARKER BALL TO PROTECT IT DURING BACKFILL. CITY OF ELLENSBURG PUBLIC WORKS & UTILITIES LIGHT DEPARTMENT CREATED BY : TG CREATED DATE: i irm2020 APPROVED BY: PM REVISED PAGE # SCALE : NTS PVC CONDUIT STUB WITH MARKERS DUCT MARKER BALL DMB Page 20 JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT A.1.10 310020 & 310090 - VCS7 - Concrete S' x 7' Vault COVER -Z No. 57-2-33F 2.43D Ibe. VAULT —' Na 575-LA 4,4UD The. w 0 NTERNALGROUND INSTALLED BY VAULT MANUFACTURER CITY OF E LLE N SO U RG PUBLICWORKS&UTILITIES jl LIGHT DEPARTMENT { TREATED BY:TG CREATED DATE: 1142021 APPROVED BY= PM REVISED PAGE SCALE:NTS F1GUR E 8 Full 18T Open —RF CESSED LIFT HANDLE mc CONCRETE 5' X T VAULT (5' X T L1D W/ ❑13L TX T DIA. PLATE DOORS) VAULT, CONCRETE, 5' X7' 1 VC57 Page 21 JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT FIGU RE 9 PLAN VIEW - 5' x 7' VAULT '.715' x�3n3Cn3n�iya;HT:eyx•y�Cn�r-e�axa wsw �Wax�k�ya�xra�i'"_ea a 17 al iT x NMI; 4 8 7 �jLydCHxr Sri �y3,,C�y3�Ltt ti.'LayyH�� H."iy.`3},C�� y�� i�ra'r.ws�.h J' 40Gll ha'r3W n. PROFILE VIEW - Tx T VAULT 1' 4' ENO 6" OF CRUSHED ROCK( 5.(SMINUS) R SAND. C MPACTED & LEVELED - FINISHED GRADE J J "dM� NOTE: TOP OF VAULT LID AT FINAL GRADE IF IN A HARD -SURFACED AREA. TOP OF VAULT UD AT Z' ABOVE FINAL GRADE IF IN A LANDSCAPED AREA. CITYOF EULENSBURG PUBLIC WORKS & UTILITIES CONCRETE 5' X T VAULT UGHT DEPARTMENT (5' X 7' LID WJDE3L 3 X 3' DIA. PLATE DOORS) CREATED BY: TG I CREATED DATE: 1.1 C2021 APPROVED BY: Ph1 IREVISED VAULT, CONCRETE, 5' x 7' VC57 PAGE # I SCALE : NTS Page 22 JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT A.1.11 310020 & 310087- VCX357 - Concrete 5' x 7' Vault with transformer lid FIGURE ? COVER 2,430 Ibs. 7 VAULT 4,400 Ibs. INTERNAL GROUND INSTALLED BY VAULT MANUFACTURER PROFILE VIEW ry- 5' x T VAULT FINISHED GRADE 7' NOTE: ® ® TOP OF VAULT LID AT FINAL :4•6 - GRADE IF IN A HARD -SURFACED AREA. TOP OF VAULT LID AT 2" y��.. ABOVE FINAL GRADE IF IN A 6" OF CRUSHED ROCK _ L41 JDSCAPED AREA. (518 MINUS) OR SAND, COMPACTED & LEVELED. NOTE: VAULT PIT DIMENSIONS 9' X 7' CITY OF ELLENSBURG CONCRETE 5' X T VAULT W1 XFMR LID (30 XFMR) PUBLIC WORKS &UTILITIES 8' X 8' LID W! 30 XFMR LID) LIGHT DEPARTMENT 81 CREATED BY: TG CREATED DATE: 09f07121 300kVA - 9 500kVA APPROVED BY : PM REVISED : 05ro6/25 VAULT, CONCRETE W/ XFMR LID, 30, 5' X 7' VCX357 PAGE # 111 SCALE : NTS Page 23 JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT APPENDIX B - ELECTRICAL SITE DRAWINGS B.1 Electrical Site Drawings Refer to separately attached drawing set. Electrical Utility Duct and Vault Drawing Page 24 JOB #3450-316 FAIRGROUNDS RV PARK 3PH EXTENTION, DEVELOPERS AGREEMENT