HomeMy WebLinkAboutResolution for Reecer Creek ProjectKITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
AGENDA STAFF REPORT
AGENDA DATE: June 3, 2025
ACTION REQUESTED: Request to Approve a Resolution to Authorize the Chair's signature
on County Road Administration Board Rural Arterial Program Project
Agreement, for Reecer Creek Rd over Towne Ditch project.
BACKGROUND: Reecer Creek Rd over Towne Ditch appears on the adopted six -year
transportation plan. On May 14, 2025, the County Road
Administration Board (CRAB) noticed Public Works of $841,360 in
Rural Arterial Trust Account (RATA) funding award through the
Rural Arterial Program (RAP). The grant supports the Reecer Creek
Rd over Towne Ditch project including structure replacement, road
widening to accommodate the continuation of a turn lane and
sidewalk and updating the guardrail and end treatments from mile
point 0.76 to mile point 0.93. Funding will be used to begin the design
of the improvements. Future funding is anticipated.
If approved, CRAB will send an electronic agreement for signature.
INTERACTION: Public Works
RECOMMENDATION: Approve the Resolution to Authorize the Chair's signature on CRAB
RAP Project Agreement for Construction Proposal.
HANDLING: Return one (1) original to Public Works
ATTACHMENTS: Resolution; CRAB RAP Project Agreement for Construction Proposal
Amendment Draft
LEAD STAFF: Cameron Curtis, County Engineer
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2025 -
AUTHORIZING THE CHAIR'S SIGNATURE ON COUNTY ROAD
AMDMINISTRATION BOARD RURAL ARTERIAL PROJECT AGREEMENT
FOR THE REECER CREEK RD OVER TOWNE DITCH PROJECT, CRP 322-24
WHEREAS: Reecer Creek Rd over Towne Ditch appears on the County's adopted six -
year transportation plan; and
WHEREAS: Public Works solicited and has received Rural Arterial Trust Account
(RATA) funding award from the County Road Administration Board
(CRAB) through the Rural Arterial Program (RAP) for the Reecer Creek
Rd over Towne Ditch project; and
WHEREAS: Public Works was notified by CRAB on May 14, 2025 of $841,360 in
funding had been awarded; and
WHEREAS: The County is required to enter into a project agreement with CRAB
accepting project funds;
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in
the best interest of the public, does hereby authorize the Chair's signature
on County Road Administration Board Rural Arterial Project Agreement
for Construction Proposal for the Reecer Creek Rd over Towne Ditch
project from mile point 0.76 — mile point 0.93, CRP 322-24.
DATED on this 3rd day of June, 2025, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
El Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Laura Osiadacz, Chairman
Cory Wright, Vice -Chairman
Brett Wachsmith, Commissioner
Submitting County: Kittitas
Project Number: 26-19-1179
Project Name: Reecer Creek Rd over Towne Ditch
Date Approved: May 01, 2025
AUTHORIZED RATA FUNDS: $841,360.00
Road Number(s)
Road Name(s)
BMP(s)
EMP(s) Segment #
93526
Reecer Creek Rd
0.76
0.93 1
The State of Washington County Road Administration Board (CRABoard) and Kittitas County (County)
mutually agree as follows:
(1) The funds hereby authorized are for completion of the proposed project as defined by chapter 36.79
RCW Roads and bridges - rural arterial program.
(2) The County is in compliance with the provisions of chapter 136-150 WAC regarding eligibility for
Rural Arterial Trust Account (RATA) funds. If the County is found not to be in compliance with these
provisions, such non compliance may be cause for the CRABoard to withdraw or deny the Certificate of
Good Practice of the County and require pay back of any RATA funds that have been paid to the County
for this project.
(3) If the project is reconstruction, the County shall gain approval from WSDOT (chapter 43.32 RCW) for
all deviations from the design standards listed in the Local Agency Guidelines prior to construction.
(4) If the project is 3R (resurfacing restoration and rehabilitation), the County shall document its design
considerations for the proposed improvements in keeping with 3R standards as listed in the Local
Agency Guidelines.
(5) The project shall be constructed in accordance with the information furnished to the CRABoard, and
the plans and specifications prepared by the county engineer.
(6) Phased construction methodology is permitted upon notification by the county engineer of the
phasing plan as authorized under WAC 136-170-030. Failure by the county to notify the CRABoard of
phasing plan at least 15 days prior to commencement of construction may result in withdrawal of funding
by the CRABoard and county forfeiture of all RATA funds expended.
(7) The County shall notify the CRABoard when a contract has been awarded and/or when construction
has started, and when the project has been completed.
(8) The County shall reimburse the RATA in the event a project post audit reveals improper expenditure
of RATA funds.
(9) Costs of the project which exceed the amount of RATA funds authorized by the CRABoard, set forth
above, and the required matching funds and other funds represented by the county to be committed to
the project, shall be paid by the County as necessary to complete the project as submitted to the
CRABoard.
(10) Matching funds and other funds represented to be committed to the project shall be available as
necessary to implement the projected development of the project as set forth in the construction
proposal prospectus.
(11) The CRABoard hereby agrees to reimburse the county from RATA funds allocated, and not
otherwise, for its reimbursable costs not to exceed the amount above specified.
(12) The CRABoard will reimburse costs incurred by the County based on project progress as certified
by the county engineer within the CRABoard's RAP Online project management application by monthly
progress payment vouchers received and approved on individual projects in the order in which they are
received in the CRABoard office, subject to the availability of RATA funds apportioned to the region.
Such obligation to reimburse RATA funds extends only to project costs incurred after the date of project
approval by the CRABoard.
(13) Either the CRABoard or the County may request changes to the provisions contained in this
agreement. Such changes shall be mutually agreed upon and incorporated by written amendment to this
agreement. No variation or alteration of the terms of this agreement shall be valid unless made in writing
and signed by authorized representatives of the CRABoard or the County hereto.
(14) During the term of this agreement and for a period not less than six (6) years from the date of final
payment by the CRABoard, the records and accounts pertaining to this agreement are to be kept
available for inspection and audit and copies of all records, accounts, documents, or other data
pertaining to the agreement will be furnished upon request. If any litigation, claim, or audit is
commenced, the records and accounts along with supporting documentation shall be retained until said
litigation, claim, or audit finding has been resolved even though such litigation, claim, or audit continues
past the six year retention period.
IN CONSIDERATION of the allocation by the CRABoard RATA funds to the project in the amount set out
above, the County hereby agrees that as condition precedent to payment of any RATA funds allocated
at any time to the above referenced project, it accepts and will comply with the terms of this agreement,
including the terms and conditions set forth in Chapter 49, Laws of 1983, 1 st Ex. Sess. (chapter 36.79
RCW); the applicable rules of Title 136 WAC and all representations made to the CRABoard upon which
the fund allocation was based; all of which are familiar to and within the knowledge of the county and are
incorporated herein and made a part of this agreement, although not attached.
This agreement supersedes all prior agreements issued using the project number listed above and shall
be valid and binding only if it is signed and returned to the CRABoard office within 45 days of its mailing
by the CRABoard.
COUNTY ROAD ADMINISTRATION BOARD:
By: NOT FOR SIGNATURE
Kittitas COUNTY:
By: NOT FOR SIGNATURE
Date: NOT FOR SIGNATURE Date: NOT FOR SIGNATURE
RAP Project Number: 26-19-1179