My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Exhibit D for PSA
>
Meetings
>
2025
>
05. May
>
2025-05-20 10:00 AM - Commissioners' Agenda
>
Exhibit D for PSA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2025 12:04:15 PM
Creation date
5/15/2025 12:03:38 PM
Metadata
Fields
Template:
Meeting
Date
5/20/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Professional Services Agreement with ALSC Architects
Order
4
Placement
Consent Agenda
Row ID
131080
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALSCARCHITECTS We bring our clients’ stories to life. <br />SPOKANE February 12,2025 <br />203 N.Washington <br />Ste.400 <br />Spokane,WA <br />99201 Kittitas County <br />P 509.838.8568 Facilities and Waste Operations <br />aiscarchitects.com 925 Industrial Way <br />Ellensburg,WA 98926 <br />Attn:Patti Stacey,Director <br />Re:Ellensburg Rodeo Arena Improvements <br />Proposal for Project Completion <br />Dear Patti, <br />Thank you for this opportunity to provide Kittitas County with our proposal for completing <br />the required NE services for the design and construction phases of your Ellensburg <br />Rodeo Arena project.We have written this proposal letter to attach to a more formal <br />Kittitas County form of agreement. <br />Project Understanding <br />Our proposal is based on the continuation of our team’s work in 2024,which resulted in a <br />50%complete Design Development package delivered in August 2024.The budget for <br />the maximum allowable construction cost (MACC)is $12,244,000.The fundamental <br />scope of work will include completion of the remaining 50%Design Development work, <br />Construction Documents,Bidding,Construction Administration and Project Closeout <br />phases as generally defined by the State of Washington Office of Financial Management <br />NE (OFM)Guidelines. <br />Project Tasks and Deliverables <br />ALSC Architects P.S.and our consultant team will complete the Design Development <br />Phase and provide a Design Development Report including the following: <br />1.Project Description <br />2.Site plan,floor plans,elevations,sections,and relevant details <br />3.Consultant preliminary plans depicting systems,locations,and other layout <br />information <br />4.Architectural and consultant narratives describing systems included in the facility <br />PRINCIPALS:Rustin L.Hail,AlA Ken J.Murphy,AlA,LEEDAP Indy S.Dehal,AlA Troy H.Bishop Kim Phelps,AlA Sheila K.Boyce <br />Exhibit "D"
The URL can be used to link to this page
Your browser does not support the video tag.