Loading...
HomeMy WebLinkAboutALSC Signed Agreement - Phase 1L., -1, "..- � .,;, .1111. � LSC ARCHITECTS SPOKANE 203 N. Washington Ste. 400 Spokane, WA 99201 P 509.838.8568 aiscarchitects.com We bring our clients' stories to life. March 22, 2024 Kittitas County Facilities and Waste Operations 925 Industrial Way Ellensburg, WA 98926 Attn: Patti Stacey, Director Re: Ellensburg Rodeo Arena Improvements Proposal for Project Reduction Study Dear Patti, Thank you for this opportunity to provide Kittitas County with our proposal for studying a reduction of the previous scope of work for your Rodeo Arena. We have written this proposal letter such that it can simply be signed by a Kittitas County representative and represent our full agreement, or it can be used as an attachment to a more formal Kittitas County form of agreement if preferred. Project Understanding Our proposal is based on the information you and Kady Porterfield provided to us during our conversation on February 26th, 2024. Meeting minutes from that conversation are included as Attachment A to this proposal letter and represent our current understanding of the project. Project Tasks and Deliverables The project will be approached in two phases. Phase 1, which this proposal letter defines, will include restarting the previous project, establishing updated electronic files compatible with our current software, studying options for maximizing the available budget, updating visual graphic depictions as needed, and completing the Design development Phase to 50%. Phase 2 will complete PRINCIPALS: Rustin L Hall, AIA Ken J.Murphy, AIA,LEEDAP Indy S. Dehal, AIA Troy H.Bishop Kim Phelps, AJA /_\ARCHITECTS the Design Development phase to 100% and include all subsequent phases through construction closeout. The attached Effort Analysis (Attachment A) and Preliminary Project Schedule (Attachment B) identify the basic tasks, meeting frequency and deliverables we anticipate for accomplishing this work. At the conclusion of this initial phase, Kittitas County representatives will have the option to have our A/E team continue with the remaining work or to hold until a future date as needed. The Phase 1 deliverables will include the following: A. Re -starting the project: 1. Updating existing files to current software 2. Re -visiting code compliance for previous work completed 3. Project Budget 4. Appendix: Room Data Sheets, Interview Notes B. Scoping the project to fit your new budget: 1. Site Planning 2. Floor planning 3. Cost Estimate Update 4. Re -work of 3-D imagery as needed A detailed task list in included in Attachment A. Project Team ALSC Architects will lead this Phase 1 work, assisted by the following consultants: 1. MACC Estimating - Consulting on cost budgeting. 2. DCI Engineers — Civil and Structural engineering 3. MW Engineering — Mechanical, Electrical and Plumbing engineering Project Schedule 2024-004 — Ellensburg Rodeo Arena Improvements Study — 2024-03-22 ��� , L A?CkITECTS The work described will commence once a Notice to Proceed is received from Kittitas County. The workflow will generally follow the attached Preliminary Project Schedule (Attachment B). The intent is to generally follow this pace of work completion and to be completed by the first week of August of 2024. Compensation and Terms ALSC Architects P.S. and our consultant team will perform the tasks described above for a lump sum amount of $93,582. In addition, an allowance of $3,284 is recommended for reimbursable expenses as outlined in Attachment A. ALSC will provide monthly invoices based on the percentage of the work completed. Payments will be due within 30 days of receipt of invoice. Late payments will incur an interest charge of 1.0% per month. Exclusions and Additional Services The scope of work shall include the tasks outlined above and in the attachments. Slight deviations in scope may be included within the proposed fee. Tasks or deliverables not included in the information above are not included in the proposed fee. Additional services beyond those included in the proposal are available for an additional fee calculated on an hourly basis utilizing the hourly rates in the attached Preliminary Effort Analysis Worksheet (Attachment A). Additional services will not be performed without prior written approval from Kittitas County representatives. Reimbursable Expenses Expenses and services not directly provided by ALSC will be invoiced at one and 10/100 (1.10) times actual cost. Reimbursable expenses include travel, per diem, printing of documents and expedited delivery service. Estimated reimbursable expenses are noted on the attached Preliminary Effort Analysis Worksheet (Exhibit B). 2024-004 — Ellensburg Rodeo Arena Improvements Study — 2024-03-22 ARCHITECTS Termination Either parry may terminate the agreement for convenience after seven (7) days of written notice of intent to terminate. The Client shall be responsible for all costs and charges incurred up to the date of termination, including reasonable costs for ALSC to close the work and organize files. ALSC agrees not to charge for lost or anticipated profits on the work not completed and will provide copies of work files to Kittitas County upon receipt of final payment. Acknowledgment This proposal will remain valid for a period of 60 days. Please provide the signature of an authorized representative on the line below indicating acceptance of the proposed scope and fee for professional services. On behalf of our team, thank you very much for this exciting opportunity to assist you with the completion of your rodeo arena improvements. Please review, sign and return this agreement electronically to serve as a Notice to Proceed with the work. ALSC Architects Kittitas County, WA Signature Signature Rustin L. Hall/Director >`�( A L Ja C 16 0-1— r -(J�' � �"e :r CC Name / Title Nam/Title RLH:skm:2024-003 Attachments: Attachments A, B 2024-004 — Ellensburg Rodeo Arena Improvements Study — 2024-03-22 Estimate of Hours Ellensburg Rodeo Arena Improvements - Phase 1 ATTACHMENT A ALSC Architects, P.S. Preliminary Effort Analysis 312212024 PRIN. SEN ARCH P.A. INTERIORS DRAFT SEC. TOTAL HRS ALSC Summary of Tasks: Phase 1 1 Project Restart a Review previous archived work 0.5 2 2.5 t Update files to current software requirements 4 4 c Research Building Code update implications 0.5 4 4.5 c Initial Kick-off Meeting #1 with Key Stakeholders 8 8 0.51 16.5 2 Scope Stud a Cost Study to identify revised Scope of Work within new budget 1 4 2 2 9 b Design: Site/Building Ian initial revisions 1 6 16 23 c Meeting #2: Review scope, site, building plans 8 8 0.5 16.5 d Finalize conceptplans; revise 3-D illustrations as needed for new scope 1 1 2 4 8 e Meeting #3:Present to Rodeo Board 8 8 16 f Finalize with any needed changes: plans, images, budget 0.5 4 4 1 9.5 3 Design Development 50% a Develop revised scope drawings in Revit 1 4 2 24 31 b Meeting #4: Progress presentation on DD sot 8 8 0.5 16.5 c Develop 50% drawing set, narratives 4 16 4 12 40 4 80 d Update 3-D illustrations 1 24 4 29 e Meet #5: Review 50 % DO final drafts(Virtual) 2 2 0.5 4.5 f Make needed revisions 1 1 4 6 g Meeting #6: Present to Rodeo Board 2 21 4 h Finalize with any needed changes: plans, images, budget 1 11 4 1 7 i Project Management/Consultant Coordination 30 30 0 'Meetings in bold are in -person; others are virtual TOTAL HOURS 48.5 127 20 18 96 8 317.5 HOURLY RATES $235 $170 $130 $105 $90 $70 SUB TOTAL $11,398 $21,590 $2,600 $1.890 $8,640 $560 TOTAL ALSC FEE $46,67F Consultants (Allowances) 10% mu Cost Estimating - MACC Estimating $8,000 $800 $8,800 Structural Engineering - DCI $9 000 $900 $9 900 Civil Engineering -DCI $9,000 $900 $9,900 Mechanical Engineering -MW $9,820 $982 $10,802 Electrical Engineering - MW K820 $682 $7,502 TOTAL CONSULTANT COST (w/o reimbursables) $46,904 TOTAL LUMP SUM FEE 93,682 Reimbursable Costs Allowances; billed at actual plus 10% mark-up) person/trips $ per trip Travel 346 mile round trip, $.67 per mile) 5 $ 231.82 $1 159 Per Diem 15 $ 25.00 $375 Printing, Postage(Bidding Document Printing by Owner $250 Consultant Allowance $1,500 TOTAL REIMBURSABLES 3,2t14 TOTAL INCLUDING REIMBURSABLES $96,866 ALSC Architects 3222024 FIE ■ n NI ■ NMm NE■■ ■■ E■.■NEMM■mmM■M■m ■■■■■■OO1■EOO■■■ ■EIMEMMMENOONE.. ..no I"M llM iIi mMi iCc ■ ■ Mo . ■ .....MMO1.E11OM M1MM MEMO ...............n ■ 0 mm■E■m■ammo■■mm NONE M■Ma oEmmm■NiUmaO1 WE no ■ MM■aM■MMMM■MMmE COME■ Mm CUi 1E 0 OOmmm■mmEmOO.E. MUM MEME NE m■ ■ Mis iINUMMMmlmaEaml OOEN.N11ME1O1M1 .1E■ EEO■ Mimi UUMUNUUmi Mm CON EE . ■_E.mOm11ENENOIEI ■ mNOO �EEEI.O1O11NE.E1'EOE■ .CODE ■ ■m N.Elmmm■mNEN 11 IS HICUMURRICIUMUS is is MO'RMMUM MUS��M����IUN: 11 is HIMUMUMUMMMUMNIS on No E�Is 11 CON O- M ■�EN�isimimi;�������M OE1EN1.OmNmN®.00.MHUMMIN 1E.■E■OMMam1 ammamm 1■ NCO No WE O E.M1.EIE.ENM MEMMON MO1O.1E ■ M 1.11.M11111. MENEEMENOONE 1OEM■MM EEmmNNm 1E E1 ■ . ■�mEEa■RUN ■ .■MOON.MMMM 1.000..E ■M10■1■1 ■EEM■■Mm MUMMEmmaml IN ■ UMN.MIENE MMMEMOIE■ Om ■ MUUMUU mEEmommE■ ME .M ■ ■ OMmmMO1 1111111 .EME1■■■m11 1111mO1omM■ im is M�■IMUSUM'��INUMMMI ■O of COO ■E'1a■E■M®O■O1E1mamEmO' O- M M.M..E MMO.NMEOMMMO. O.MMMMMM.MMNMMMMMM.'. no 0�I Nunn IMENEEMEMNSEEMI is im U i�'�i'���������������� •�Q©©Q©OQOQ88®®8®88 •