Loading...
HomeMy WebLinkAboutResolution 2025-053BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO.A',-b<3 TO AWARD THE BID TO FURNISH MAINTENANCE ROCK MATERIALS FOR ONE (1) CALENDAR YEAR FOLLOWING CONTRACT EXECUTION AND AUTHORIZE THE COUNTY ENGINEER TO SIGN CONTRACT DOCUMENTS WHEREAS: A Notice of Call for Bids was approved and signed on February 4,2025,to furnish Maintenance Rock Materials for 2025; and WHEREAS: Sealed bids were opened on February 20,2025, at2:00 pm in the Kittitas County Public Works Office and two (2) bids were received; and WHEREAS: The Public Works Department recommends that the responsible bid of Ellensburg Cement Products, Inc. be accepted for Schedules "A", "B" and "C" for Maintenance Rock Materials for one (1) calendar year following contract execution; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby award the bid for 2025 Maintenance Rock Materials to Ellensburg Cement Products, Inc. for Schedules "A","8", and "C", upon such terms and conditions as specified in the Proposal submitted by said bidder(s); and BE IT FURTHER RESOLVED that the County Engineer is authorized to sign the contract documents upon such terms and conditions specified in the Proposal submitted by said bidder(s) DATED this 4th day of March2025, at Ellensburg, Washington. BOARD OF COLINTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON tWClerk of the Board- Julie Kjorsvik ( n Depu\y Clerk of the Board- Mandy Buchholz Cory Wright, Commissioner 2025 Maintenance Rock Materials Bid Opening February 20,2025 at 2:00 p.m. SCHEDULE'A' County to Provide Labor and Equipment to Load Materials Green Dream lnternational LLC I I PR|CE PER TON I TOTAL PRTCE $113,360.00 $61,040.00 $34,880.00 $68,740.00 $19,640.00 $54,360.00 $54,360.00 $14,030.00 $14,030.00 $28,280.00 $28,2B0.00 $14,030.00 $14,030.00 $519,060.00 $17.44 $17.44 $17.44 $19.64 $19.64 $13.59 $13.59 $14.03 $14.03 $14.14 $14.14 $14.03 $14.03 Ellensburg Cement Products I PRrcE PER ToN I rorll- enrce $79,625.00 $42,875.00 $24,500.00 $56,000.00 $16,000.00 $42,400.00 $42,400.00 $10,250.00 $10,250.00 $20,700.00 $20,700.00 $10,000.00 $10,000.00 $385,700.00 $12.25 $12.25 $12.25 $16.00 $16.00 $10.60 $10.60 $10.25 $10.25 $10.35 $10.35 $10.00 $10.00 ITEM DESCR|PNON BST Crushed Surfacing 1/2 to No. 4 BST Crushed Surfacinq 1/2 to No. 4 BST Crushed Surfacing 1i2 to No. 4 BST Crushed Surfacing 3/8 to No. '10 BST Crushed Surfacing 3i8 to No. 10 Maintenance Sand Maintenance Sand 1 1/4" Crushed Surfacing Base Course 1 1/4" Crushed Surfacing Base Course 5/8" Crushed Surfacinq Top Course 5/8" Crushed Surfacing Top Course 2112" Ballasl 2l12" BallasI Total Schedule "A" - Location Ellensburg East Kittitas Cle Elum Ellensburg Cle Elum Ellensburg Cle Elum Ellensburg Cle Elum Ellensburg Cle Elum Ellensburg Cle Elum ESTIMATED QUANTITY (ln TONS) 6,500 3.500 2,000 3,500 1,000 4,000 4,000 1,000 '1.000 2,000 2,000 1,000 1.000 ITEM NO. 1 2 3 4 5 6 7 8 I 10 11 12 13 SCHEDULE "A' 2025 Maintenance Rock Materials Bid Opening February 20,2025, at 2:00 p.m. SCHEDULE'B' Vendor to Provide Labor and Equipment to Load Materials Green Dream lnternational LLC I PRrcE PER ToNl rorn- enrce $143,640.00 $206,560.00 $1 55,610.00 $91,770.00 $41,952.00 $79,800.00 $79,800.00 $20,410.00 $20,410.00 $41,040.00 $41,040.00 $20,410.00 $20,410.00 $962.852.00 $23.94 $25.82 $23.94 $26.22 $26.22 $19.95 $19.95 $20.41 $20.41 $20.52 $20.52 $20.41 $20.41 Ellensburg Cement Products I PRICE PER TON I TOTAL PRICE $78,000.00 $104,000.00 $84,500.00 $58,625.00 $26,800.00 $45,200.00 $45,200.00 $11,000.00 $11,000.00 $22,200.00 $22,200.00 $10.750.00 $10,750.00 $530,225.00 $13.00 $13.00 $13.00 $16.75 $16.75 $11.30 $11.30 $11.00 $11.00 $11.10 $11.10 $10.75 $10.75 TTEIIII DSSCRIPTION BST Crushed Surfacino 1/2 to No. 4 BST Crushed Surfacinq 1/2 to No. 4 BST Crushed Surfacinq 1/2 to No. 4 BST Crushed Surfacinq 3/8 to No. 10 BST Crushed Surfacinq 3/8 to No. 10 Maintenance Sand Mainienance Sand 1 1/4" Crushed Surfacing Base Course 1 1/4" Crushed Surfacing Base Course 5/8" Crushed Surfacinq Top Course 5/8" Crushed Surfacinq Top Course 2112" Ballasl 2112" Ballasl Total Schedule "B" - Locatlon Ellensburg East Kittitas Cle Elum Ellensburg Cle Elum Ellensburg Cle Elum Ellensburg Cle Elum Ellensburg Cle Elum Ellensburq Cle Elum ESTIMATED OUANTITY (ln TONS) 6,000 8,000 6,500 3,500 1,600 4,000 4,000 1,000 1,000 2,000 2,000 1,000 1,000 ITEM NO. 1 2 J 4 5 b 7 9 10 11 12 13 SCHEDULE "8" 2025 Maintenance Rock Materials Bid Opening February 20,2025, at 2:00 p.m. SCHEDULE'C' Vendor to Provide Labor and Equipment to Load Materials GREEN DREAM INTERNATIONAL LLC $13.11 $13.11 ELLENSBURG CEMENT $6.00 0015 Per Ton (Ellensburg)Select Borrow $15.39$7.00 $7.00 $15.3916 Per Ton (Cle Elum)Select Borrow $41.78 $41.78$33.50 $33.5017 Per Ton (Ellensburg)Light Loose Riprap $49.59 $49.59$33.50 $33.5018 Per Ton (Cle Elum)Light Loose Riprap $20.69$10.90 $20.69Quarry Spalls $10.e019 Per Ton (Ellensburg) $27.36$16.75 $16.75 $27.3620 Per Ton (Cle Elum)Quarry Spalls 'l:rl il,ll,1,\ ir 1 , .flrlf'\,'i li " .{1i lt|li[i:]lltl, llin l/,\ r1t3[i]ilftrjr t./,\ :2;,1 lrj'lil(cli r'liji rio)\\!iil i: tl il i:. )rlI li j,Ir irlr i.t.i4J(.ll'' lit:.1il