HomeMy WebLinkAboutResolution 2025-053BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION
NO.A',-b<3
TO AWARD THE BID TO FURNISH MAINTENANCE ROCK MATERIALS FOR ONE
(1) CALENDAR YEAR FOLLOWING CONTRACT EXECUTION AND AUTHORIZE
THE COUNTY ENGINEER TO SIGN CONTRACT DOCUMENTS
WHEREAS: A Notice of Call for Bids was approved and signed on February 4,2025,to
furnish Maintenance Rock Materials for 2025; and
WHEREAS: Sealed bids were opened on February 20,2025, at2:00 pm in the Kittitas County
Public Works Office and two (2) bids were received; and
WHEREAS: The Public Works Department recommends that the responsible bid of Ellensburg
Cement Products, Inc. be accepted for Schedules "A", "B" and "C" for
Maintenance Rock Materials for one (1) calendar year following contract
execution; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the
best interest of the public, does hereby award the bid for 2025 Maintenance Rock Materials to
Ellensburg Cement Products, Inc. for Schedules "A","8", and "C", upon such terms and
conditions as specified in the Proposal submitted by said bidder(s); and
BE IT FURTHER RESOLVED that the County Engineer is authorized to sign the contract
documents upon such terms and conditions specified in the Proposal submitted by said bidder(s)
DATED this 4th day of March2025, at Ellensburg, Washington.
BOARD OF COLINTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
tWClerk of the Board- Julie Kjorsvik
(
n Depu\y Clerk of the Board- Mandy Buchholz
Cory Wright,
Commissioner
2025 Maintenance Rock Materials
Bid Opening February 20,2025 at 2:00 p.m.
SCHEDULE'A'
County to Provide Labor and Equipment to Load Materials
Green Dream lnternational LLC
I
I
PR|CE PER TON I TOTAL PRTCE
$113,360.00
$61,040.00
$34,880.00
$68,740.00
$19,640.00
$54,360.00
$54,360.00
$14,030.00
$14,030.00
$28,280.00
$28,2B0.00
$14,030.00
$14,030.00
$519,060.00
$17.44
$17.44
$17.44
$19.64
$19.64
$13.59
$13.59
$14.03
$14.03
$14.14
$14.14
$14.03
$14.03
Ellensburg Cement Products
I
PRrcE PER ToN I rorll- enrce
$79,625.00
$42,875.00
$24,500.00
$56,000.00
$16,000.00
$42,400.00
$42,400.00
$10,250.00
$10,250.00
$20,700.00
$20,700.00
$10,000.00
$10,000.00
$385,700.00
$12.25
$12.25
$12.25
$16.00
$16.00
$10.60
$10.60
$10.25
$10.25
$10.35
$10.35
$10.00
$10.00
ITEM DESCR|PNON
BST Crushed Surfacing 1/2 to No. 4
BST Crushed Surfacinq 1/2 to No. 4
BST Crushed Surfacing 1i2 to No. 4
BST Crushed Surfacing 3/8 to No. '10
BST Crushed Surfacing 3i8 to No. 10
Maintenance Sand
Maintenance Sand
1 1/4" Crushed Surfacing Base Course
1 1/4" Crushed Surfacing Base Course
5/8" Crushed Surfacinq Top Course
5/8" Crushed Surfacing Top Course
2112" Ballasl
2l12" BallasI
Total Schedule "A" -
Location
Ellensburg
East Kittitas
Cle Elum
Ellensburg
Cle Elum
Ellensburg
Cle Elum
Ellensburg
Cle Elum
Ellensburg
Cle Elum
Ellensburg
Cle Elum
ESTIMATED
QUANTITY
(ln TONS)
6,500
3.500
2,000
3,500
1,000
4,000
4,000
1,000
'1.000
2,000
2,000
1,000
1.000
ITEM
NO.
1
2
3
4
5
6
7
8
I
10
11
12
13
SCHEDULE "A'
2025 Maintenance Rock Materials
Bid Opening February 20,2025, at 2:00 p.m.
SCHEDULE'B'
Vendor to Provide Labor and Equipment to Load Materials
Green Dream lnternational LLC
I
PRrcE PER ToNl rorn- enrce
$143,640.00
$206,560.00
$1 55,610.00
$91,770.00
$41,952.00
$79,800.00
$79,800.00
$20,410.00
$20,410.00
$41,040.00
$41,040.00
$20,410.00
$20,410.00
$962.852.00
$23.94
$25.82
$23.94
$26.22
$26.22
$19.95
$19.95
$20.41
$20.41
$20.52
$20.52
$20.41
$20.41
Ellensburg Cement Products
I
PRICE PER TON I TOTAL PRICE
$78,000.00
$104,000.00
$84,500.00
$58,625.00
$26,800.00
$45,200.00
$45,200.00
$11,000.00
$11,000.00
$22,200.00
$22,200.00
$10.750.00
$10,750.00
$530,225.00
$13.00
$13.00
$13.00
$16.75
$16.75
$11.30
$11.30
$11.00
$11.00
$11.10
$11.10
$10.75
$10.75
TTEIIII DSSCRIPTION
BST Crushed Surfacino 1/2 to No. 4
BST Crushed Surfacinq 1/2 to No. 4
BST Crushed Surfacinq 1/2 to No. 4
BST Crushed Surfacinq 3/8 to No. 10
BST Crushed Surfacinq 3/8 to No. 10
Maintenance Sand
Mainienance Sand
1 1/4" Crushed Surfacing Base
Course
1 1/4" Crushed Surfacing Base
Course
5/8" Crushed Surfacinq Top Course
5/8" Crushed Surfacinq Top Course
2112" Ballasl
2112" Ballasl
Total Schedule "B" -
Locatlon
Ellensburg
East Kittitas
Cle Elum
Ellensburg
Cle Elum
Ellensburg
Cle Elum
Ellensburg
Cle Elum
Ellensburg
Cle Elum
Ellensburq
Cle Elum
ESTIMATED
OUANTITY
(ln TONS)
6,000
8,000
6,500
3,500
1,600
4,000
4,000
1,000
1,000
2,000
2,000
1,000
1,000
ITEM
NO.
1
2
J
4
5
b
7
9
10
11
12
13
SCHEDULE "8"
2025 Maintenance Rock Materials
Bid Opening February 20,2025, at 2:00 p.m.
SCHEDULE'C'
Vendor to Provide Labor and Equipment to Load Materials
GREEN DREAM INTERNATIONAL LLC
$13.11 $13.11
ELLENSBURG CEMENT
$6.00 0015
Per Ton
(Ellensburg)Select Borrow
$15.39$7.00 $7.00 $15.3916
Per Ton
(Cle Elum)Select Borrow
$41.78 $41.78$33.50 $33.5017
Per Ton
(Ellensburg)Light Loose Riprap
$49.59 $49.59$33.50 $33.5018
Per Ton
(Cle Elum)Light Loose Riprap
$20.69$10.90 $20.69Quarry Spalls $10.e019
Per Ton
(Ellensburg)
$27.36$16.75 $16.75 $27.3620
Per Ton
(Cle Elum)Quarry Spalls
'l:rl il,ll,1,\ ir 1 ,
.flrlf'\,'i li "
.{1i lt|li[i:]lltl,
llin l/,\ r1t3[i]ilftrjr t./,\ :2;,1 lrj'lil(cli r'liji rio)\\!iil i: tl il i:. )rlI li j,Ir irlr i.t.i4J(.ll'' lit:.1il