HomeMy WebLinkAboutCOP21 Fiber and Data P.O. BOX 926 / 103 EAST 4TH AVE, SUITE 209 ELLENSBURG, WA 98926 509-925-9747 brandon@belsmith.com February 24, 2025 Re: Site Fiber and Data COP #21 Per the description below, we present the following change order proposal #21 (COP#21). Please see the attached change order to run 12 strand fiber from the demarcation point at the MRW building to the Admin, Compost, Transfer, and Scale house building. Please see the attached breakdowns below for more information. Base Bid: $145,224.93 + WSST Additive: $7,820.35 + WSST Time extension required: 0 days Sincerely, Brandon Drexler, Belsaas & Smith Construction BELSAAS & SMITH CONSTRUCTION SHEET 1 of 2 C.O.P. #21 CHANGE ORDER PROPOSAL BREAKDOWN SHEET UNIT COSTSEQUIP SUB MATERIAL LABOR #DESCRIPTION QUAN.UNIT Mat.EQUIPLABOR COST COST COST COST LVTS - Data and Fiber Data & Fiber Base Bid 1 LS 0.00 126,834.00 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 *TOTALS 0 126,834.00 0 0 BELSAAS & SMITH CONSTRUCTION SHEET 2 of 2 C.O.P. #21 CHANGE ORDER PROPOSAL BREAKDOWN SHEET EQUIP SUB MATERIAL LABOR COST COST COST COST TOTALS FROM PREVIOUS PAGE 0 126,834.00 0 0 OVERHEAD 3%0.00 3,805.02 0 0 PROFIT 10%12,683.40 BONDING 1.5%1,902.51 SUB TOTAL 0 145,224.93 0 0 SUB TOTAL 0 145,224.93 0 0 LABOR 0 MATERIAL 0 EQUIPMENT 0 SUBCONTRACTORS 145,224.93 SUB TOTAL SUB TOTAL 145,224.93 GRAND TOTAL TOTAL 145,224.93 TIME EXTENTION REQUIRED:0 NOTICE TO PROCEED REQUIRED BY: WE RESERVE OUR RIGHTS UNDER THE CONTRACT TO ACCESS THIS CHANGE CUMULATIVELY AS IT AFFECTS TIME AND AMOUNT. BELSAAS & SMITH CONSTRUCTION SHEET 1 of 2 C.O.P. #21 CHANGE ORDER PROPOSAL BREAKDOWN SHEET UNIT COSTSEQUIP SUB MATERIAL LABOR #DESCRIPTION QUAN.UNIT Mat.EQUIPLABOR COST COST COST COST LVTS - Data and Fiber Data & Fiber Additive 1 LS 0.00 6,830.00 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 *TOTALS 0 6,830.00 0 0 BELSAAS & SMITH CONSTRUCTION SHEET 2 of 2 C.O.P. #21 CHANGE ORDER PROPOSAL BREAKDOWN SHEET EQUIP SUB MATERIAL LABOR COST COST COST COST TOTALS FROM PREVIOUS PAGE 0 6,830.00 0 0 OVERHEAD 3%0.00 204.90 0 0 PROFIT 10%683.00 BONDING 1.5%102.45 SUB TOTAL 0 7,820.35 0 0 SUB TOTAL 0 7,820.35 0 0 LABOR 0 MATERIAL 0 EQUIPMENT 0 SUBCONTRACTORS 7,820.35 SUB TOTAL SUB TOTAL 7,820.35 GRAND TOTAL TOTAL 7,820.35 TIME EXTENTION REQUIRED:0 NOTICE TO PROCEED REQUIRED BY: WE RESERVE OUR RIGHTS UNDER THE CONTRACT TO ACCESS THIS CHANGE CUMULATIVELY AS IT AFFECTS TIME AND AMOUNT. Office: 509.951.8306 Fax: 509.452.6714 License # TITANEL877RD Lower Valley Transfer Station Data and Fiber Date: 02-24-2023 Titan Electrical is pleased to present this electrical proposal for the Data and Fiber Package at the Lower Valley Transfer Station. We are committed to delivering an exceptional product while maintaining our mission of a “Spirit of Service”. Titan Electrical is grateful for the opportunity to work alongside you and fully equipped to execute this exciting project. Referenced Documents • Data Shop Drawings sent 2.3.25 (which are based on the Permit Set 5.20.25 and not the 6.4.25 Issue for Bid set Clarifications • 12 strand fiber from MRW to Admin Building, Compost Office, Transfer Station and Scale House • MRW to have 4-post enclosure, 2-post rack and (2) dedicated power circuits • All other building will have wall mount enclosure for fiber and cat 6 cable • All fiber and copper cabling will be terminated, tested and certified. Office: 509.951.8306 Fax: 509.452.6714 License # TITANEL877RD Base Bid Total: $126,834 Alternates/Additions UPS Option $6,830