February 24, 2025
Re: Site Fiber and Data COP #21
Per the description below, we present the following change order proposal #21 (COP#21).
Please see the attached change order to run 12 strand fiber from the demarcation point at the
MRW building to the Admin, Compost, Transfer, and Scale house building. Please see the
attached breakdowns below for more information.
Base Bid: $145,224.93 + WSST
Additive: $7,820.35 + WSST
Time extension required: 0 days
Sincerely,
Brandon Drexler,
Belsaas & Smith Construction
BELSAAS & SMITH CONSTRUCTION
SHEET 1 of 2 C.O.P. #21
CHANGE ORDER PROPOSAL BREAKDOWN SHEET
UNIT COSTSEQUIP SUB MATERIAL LABOR
#DESCRIPTION QUAN.UNIT Mat.EQUIPLABOR COST COST COST COST
LVTS - Data and Fiber
Data & Fiber Base Bid 1 LS 0.00 126,834.00 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
*TOTALS 0 126,834.00 0 0
BELSAAS & SMITH CONSTRUCTION
SHEET 2 of 2 C.O.P. #21
CHANGE ORDER PROPOSAL BREAKDOWN SHEET
EQUIP SUB MATERIAL LABOR
COST COST COST COST
TOTALS FROM PREVIOUS PAGE 0 126,834.00 0 0
OVERHEAD 3%0.00 3,805.02 0 0
PROFIT 10%12,683.40
BONDING 1.5%1,902.51
SUB TOTAL 0 145,224.93 0 0
SUB TOTAL 0 145,224.93 0 0
LABOR 0
MATERIAL 0
EQUIPMENT 0
SUBCONTRACTORS 145,224.93
SUB TOTAL SUB TOTAL 145,224.93
GRAND TOTAL TOTAL 145,224.93
TIME EXTENTION REQUIRED:0
NOTICE TO PROCEED REQUIRED BY:
WE RESERVE OUR RIGHTS UNDER THE CONTRACT TO ACCESS THIS CHANGE
CUMULATIVELY AS IT AFFECTS TIME AND AMOUNT.
BELSAAS & SMITH CONSTRUCTION
SHEET 1 of 2 C.O.P. #21
CHANGE ORDER PROPOSAL BREAKDOWN SHEET
UNIT COSTSEQUIP SUB MATERIAL LABOR
#DESCRIPTION QUAN.UNIT Mat.EQUIPLABOR COST COST COST COST
LVTS - Data and Fiber
Data & Fiber Additive 1 LS 0.00 6,830.00 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
*TOTALS 0 6,830.00 0 0
BELSAAS & SMITH CONSTRUCTION
SHEET 2 of 2 C.O.P. #21
CHANGE ORDER PROPOSAL BREAKDOWN SHEET
EQUIP SUB MATERIAL LABOR
COST COST COST COST
TOTALS FROM PREVIOUS PAGE 0 6,830.00 0 0
OVERHEAD 3%0.00 204.90 0 0
PROFIT 10%683.00
BONDING 1.5%102.45
SUB TOTAL 0 7,820.35 0 0
SUB TOTAL 0 7,820.35 0 0
LABOR 0
MATERIAL 0
EQUIPMENT 0
SUBCONTRACTORS 7,820.35
SUB TOTAL SUB TOTAL 7,820.35
GRAND TOTAL TOTAL 7,820.35
TIME EXTENTION REQUIRED:0
NOTICE TO PROCEED REQUIRED BY:
WE RESERVE OUR RIGHTS UNDER THE CONTRACT TO ACCESS THIS CHANGE
CUMULATIVELY AS IT AFFECTS TIME AND AMOUNT.
Office: 509.951.8306 Fax: 509.452.6714 License # TITANEL877RD
Lower Valley Transfer Station Data and Fiber
Date: 02-24-2023
Titan Electrical is pleased to present this electrical proposal for the Data and Fiber Package at the Lower Valley Transfer
Station. We are committed to delivering an exceptional product while maintaining our mission of a “Spirit of Service”. Titan
Electrical is grateful for the opportunity to work alongside you and fully equipped to execute this exciting project.
Referenced Documents
• Data Shop Drawings sent 2.3.25 (which are based on the Permit Set 5.20.25 and not the 6.4.25 Issue for
Bid set
Clarifications
• 12 strand fiber from MRW to Admin Building, Compost Office, Transfer Station and Scale House
• MRW to have 4-post enclosure, 2-post rack and (2) dedicated power circuits
• All other building will have wall mount enclosure for fiber and cat 6 cable
• All fiber and copper cabling will be terminated, tested and certified.
Office: 509.951.8306 Fax: 509.452.6714 License # TITANEL877RD
Base Bid Total: $126,834
Alternates/Additions
UPS Option
$6,830