Loading...
HomeMy WebLinkAboutChange Order Acceptance Letter_Change Order No3 Kittitas County Solid Waste 925 Industrial Way Ellensburg, WA 98926 February 25, 2025 Belsaas and Smith Construction 103 East 4th Avenue, Suite 209 Ellensburg, WA 98926 Project: Lower Valley Transfer, Change Order No. 3 Mr. Nelson, I am writing to formally acknowledge and award change order number 3 for the following Change Order Proposals (COP): COP #05: Electrical vault downsizing. COP #06: Blink charger upgrade. COP #07: Feeder conduit size reduction. COP #08: Credit for redundant switch gear. COP #11: Additional siding and insulation at the transfer station tunnel and push wall. COP #14: Upsizing the compost service hydrants and irrigation lines COP #18: Scale model change. COP #19: Mixer pump deletion. We propose the following modifications to our contract dated September 3, 2024. Base Bid and Additive A2 $18,441,939.80 Additive A1 $642,000.00 Change Order No. 2 <$11,754.08> COP #05 <$50,066.00 COP #06 $35,400.42 COP #07 <$25,000.00> COP #08 <$10,000.00> COP #11 $21,172.26 COP #14 $3,249.13 COP #18 $4,517.78 COP #19 <$7,315.00> Subtotal $19,044,144.31 WSST $1,637,796.41 Total $20,681,940.72 Please consider this letter as our formal acceptance of the change order. We look forward to successfully completing this project together with these agreed-upon adjustments. Thank you, _______________________ ______________________________ Bryan Nelson Laura Osiadacz Secretary Chair, Board of County Commissioners Belsaas and Smith Construction Kittitas County 103 E 4th Ave # 209 205 W 5th Ave #108 Ellensburg, WA 98926 Ellensburg WA 98926