Laserfiche WebLink
<br />Kittitas County Solid Waste <br />925 Industrial Way <br />Ellensburg, WA 98926 <br /> <br />February 25, 2025 <br /> <br />Belsaas and Smith Construction <br />103 East 4th Avenue, Suite 209 <br />Ellensburg, WA 98926 <br />Project: Lower Valley Transfer, Change Order No. 3 <br /> <br />Mr. Nelson, <br /> <br />I am writing to formally acknowledge and award change order number 3 for the following Change <br />Order Proposals (COP): <br /> <br />COP #05: Electrical vault downsizing. <br />COP #06: Blink charger upgrade. <br />COP #07: Feeder conduit size reduction. <br />COP #08: Credit for redundant switch gear. <br />COP #11: Additional siding and insulation at the transfer station tunnel and push wall. <br />COP #14: Upsizing the compost service hydrants and irrigation lines <br />COP #18: Scale model change. <br />COP #19: Mixer pump deletion. <br /> <br />We propose the following modifications to our contract dated September 3, 2024. <br /> <br />Base Bid and Additive A2 $18,441,939.80 <br />Additive A1 $642,000.00 <br />Change Order No. 2 <$11,754.08> <br />COP #05 <$50,066.00 <br />COP #06 $35,400.42 <br />COP #07 <$25,000.00> <br />COP #08 <$10,000.00> <br />COP #11 $21,172.26 <br />COP #14 $3,249.13 <br />COP #18 $4,517.78 <br />COP #19 <$7,315.00> <br /> <br />Subtotal $19,044,144.31 <br />WSST $1,637,796.41 <br /> <br />Total $20,681,940.72