Laserfiche WebLink
<br /> <br /> <br /> P.O. BOX 926 / 103 EAST 4TH AVE, SUITE 209 <br /> ELLENSBURG, WA 98926 <br /> 509-925-9747 <br /> brandon@belsmith.com <br /> <br /> <br /> <br /> <br /> <br /> <br />February 19, 2025 <br /> <br /> <br />Re: Scale model change COP #19 <br /> <br />Per the description below, we present the following change order proposal #19 (COP#19). <br /> <br />Per RFI #31 the civil drawings show a qty of 6 mixer pumps but the electricals show a qty of 5. <br />The RFI response was to match the electricals and supply a qty of 5 mixer pumps. Please see the <br />attached price reduction representing the deletion of the sixth pump. <br /> <br />Total Cost subtracted from Contract: $-7,315.00 <br /> <br /> <br /> <br />Time extension required: 0 days <br /> <br /> <br /> <br />Sincerely, <br /> <br /> <br />Brandon Drexler, <br />Belsaas & Smith Construction <br />Mixer pump Delete