February 19, 2025
Re: Scale model change COP #19
Per the description below, we present the following change order proposal #19 (COP#19).
Per RFI #31 the civil drawings show a qty of 6 mixer pumps but the electricals show a qty of 5.
The RFI response was to match the electricals and supply a qty of 5 mixer pumps. Please see the
attached price reduction representing the deletion of the sixth pump.
Total Cost subtracted from Contract: $-7,315.00
Time extension required: 0 days
Sincerely,
Brandon Drexler,
Belsaas & Smith Construction
Mixer pump Delete
BELSAAS & SMITH CONSTRUCTION
SHEET 1 of 2 C.O.P. #19
CHANGE ORDER PROPOSAL BREAKDOWN SHEET
UNIT COSTSEQUIP SUB MATERIAL LABOR
#DESCRIPTION QUAN.UNIT Mat.EQUIPLABOR COST COST COST COST
Mixer Pump Delete
Pump Deduction 1 LS 0.00 (7,315.00)0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
0.00 0 0
*TOTALS 0 (7,315.00)0 0
BELSAAS & SMITH CONSTRUCTION
SHEET 2 of 2 C.O.P. #19
CHANGE ORDER PROPOSAL BREAKDOWN SHEET
EQUIP SUB MATERIAL LABOR
COST COST COST COST
TOTALS FROM PREVIOUS PAGE 0 (7,315.00)0 0
OVERHEAD 3%0.00 0.00 0 0
PROFIT 10%0.00
BONDING 1.5%0.00
SUB TOTAL 0 (7,315.00)0 0
SUB TOTAL 0 (7,315.00)0 0
LABOR 0
MATERIAL 0
EQUIPMENT 0
SUBCONTRACTORS (7,315.00)
SUB TOTAL SUB TOTAL (7,315.00)
GRAND TOTAL TOTAL (7,315.00)
TIME EXTENTION REQUIRED:0
NOTICE TO PROCEED REQUIRED BY:
WE RESERVE OUR RIGHTS UNDER THE CONTRACT TO ACCESS THIS CHANGE
CUMULATIVELY AS IT AFFECTS TIME AND AMOUNT.
TO:
Belsaas & Smith Construction
PO Box 926
******EMAIL*******
pbosman@belsmith.com
Ellensburg, WA 98926
Page:1
Date:7/24/2024
Salesperson:
0185079
Nathan Stark
Pam Bosman
Sales Order#:
Order Confirmation
209 S Hamilton Rd
Moses Lake, WA 98837
Phone: 509-766-6330
Fax: 509-766-6331
nstark@pumptechnw.com
PumpTech, LLC
FOB:
05Customer PO#:
FOB ORIGIN - FFA
Belsaas & Smith
Construction
103 East 4th Avenue
Suite 209
Ellensburg, WA 98926
SHIP TO:
Customer #:0176756
Accept Date:10/9/2024
Item Price ExtendQty
36,575.00 7,315.00AP2000-AU200 IXOM AP2000-AU200
AP2000 pedestal style mixer, AU200 air unit and 0.75" x
100' floating air hose.
5.00
QUANTITY CHANGE QUANTITY CHANGED FROM 6 TO 5 MIXERS PER
EMAIL FROM RILEY WITH BELSAAS.
2,300.00 2,300.00FreightFACTORY CRATING AND FREIGHT CHARGE
** product will arrive on three separate pallets **
1.00
2,000.00 2,000.00Labor - Service Tech w/Truck **OPTIONAL STARTUP**
ONE DAY STARTUP & TRAINING. ADDITIONAL
DAY(S) BILLED AT $2,000.00/DAY IF NECESSARY
---------------------------------------------------------------------------
1.00
Continued
updated 5 Pumps
TO:
Belsaas & Smith Construction
PO Box 926
******EMAIL*******
pbosman@belsmith.com
Ellensburg, WA 98926
Page:2
Date:7/24/2024
Salesperson:
0185079
Nathan Stark
Pam Bosman
Sales Order#:
Order Confirmation
209 S Hamilton Rd
Moses Lake, WA 98837
Phone: 509-766-6330
Fax: 509-766-6331
nstark@pumptechnw.com
PumpTech, LLC
FOB:
05Customer PO#:
FOB ORIGIN - FFA
Belsaas & Smith
Construction
103 East 4th Avenue
Suite 209
Ellensburg, WA 98926
SHIP TO:
Customer #:0176756
Accept Date:10/9/2024
Item Price ExtendQty
NOT INCLUDED:Not included unless expressly noted in the document
above:
* loading, unloading, storage
* installation or supervision
* certified drawings
* other documentation not specified in the quote
* witness or non-witness factory testing of any kind
* controls/ transducer(s)/ conduit
* electrical connections
* spare parts or other goods or services
* seismic calculations
* anchor bolt calculations or supply
* well/sump inspection or cleaning
* well/sump disinfection
* bacteriological testing
* excavation or backfill
* concrete or grout work
---------------------------------------------------------------------------
1.00
SubTotal 40,875.00
Sales Tax:0.00
40,875.00 Total:
TO:
* WA Bidding Contractors
Page:1
Date:
Salesperson:
7/24/2024
Quote #:
Expires:8/26/2024
Sales Quotation
209 S Hamilton Rd
Moses Lake, WA 98837
Phone: 509-766-6330
Fax: 509-766-6331
nstark@pumptechnw.com
PumpTech, LLC
FOB:
Lead Time:6WK/ SUB APPROVAL
Nathan Stark / Rob Stuart
Kittitas County Lower Valley Transfer StationProject Name:
BEST WAYShip Via:
0185079
Bid Date:7/30/2024 10:00AM
FOB ORIGIN - FFA
Customer#: 0175610
Item Qty ExtendPrice
AP2000-AU200 6.00IXOM AP2000-AU200
AP2000 pedestal style mixer, AU200 air unit and 0.75" x 100'
floating air hose.
43,890.00 7,315.00
Freight 1.00FACTORY CRATING AND FREIGHT CHARGE
** product will arrive on three separate pallets **
2,300.00 2,300.00
Labor - Service Tech
w/Truck
1.00**OPTIONAL STARTUP**
ONE DAY STARTUP & TRAINING. ADDITIONAL DAY(S)
BILLED AT $2,000.00/DAY IF NECESSARY
---------------------------------------------------------------------------
2,000.00 2,000.00
NOT INCLUDED: 1.00Not included unless expressly noted in the document above:
* loading, unloading, storage
* installation or supervision
* certified drawings
* other documentation not specified in the quote
* witness or non-witness factory testing of any kind
* controls/ transducer(s)/ conduit
* electrical connections
* spare parts or other goods or services
* seismic calculations
* anchor bolt calculations or supply
* well/sump inspection or cleaning
* well/sump disinfection
* bacteriological testing
* excavation or backfill
* concrete or grout work
---------------------------------------------------------------------------
0.00 0.00
SubTotal 48,190.00
Sales Tax:4,915.38
53,105.38
The above order is subject to Pumptech, LLC's standard terms and conditions and credit approval which are
attached and made part of this agreement. We appreciate your interest in our products and services and if
you have any questions on our offerings please do not hesitate to call.
By signature below, I accept this offering:
Signed:
Name:Title: Total - Card:
Total - Check/Cash:
54,831.30
Original 6 Pumps
TO:
* WA Bidding Contractors
Page:2
Date:
Salesperson:
7/24/2024
Quote #:
Expires:8/26/2024
Sales Quotation
209 S Hamilton Rd
Moses Lake, WA 98837
Phone: 509-766-6330
Fax: 509-766-6331
nstark@pumptechnw.com
PumpTech, LLC
FOB:
Lead Time:6WK/ SUB APPROVAL
Nathan Stark / Rob Stuart
Kittitas County Lower Valley Transfer StationProject Name:
BEST WAYShip Via:
0185079
Bid Date:7/30/2024 10:00AM
FOB ORIGIN - FFA
Customer#: 0175610
Item Qty ExtendPrice
NOTICE: ONGOING GLOBAL AND DOMESTIC SUPPLY INSTABILITIES
Due to the global supply chain disruptions, and material shortages, PumpTech, LLC is unable to guarantee any current or previously quoted
lead times. We always work vigorously to fulfill all orders as quickly as possible. Due to the continuous and ongoing global freight and material
price increases, we are strictly following our Quotation Validity Time of 30 days from the date of the quote. We are doing our best to contain both
costs and shipment dates.
Estimated lead times are subject to prior sale, availability and current shop loads. Lead times will be determined, per order, at the time of
receipt of order acknowledgment from our suppliers. Once we have received acknowledgment, we will alert you to the current lead time. Where
applicable, lead times will not begin until: internal engineering review and approval, 100% signed off approved submittals, and signed off
drawings and/or contract approval. Freight is not included in this quote, unless specifically stated. PumpTech, LLC will not accept any penalties
or LD’s for any delays caused by COVID-19, material shortages, supply chain issues, or transportation delays.
SubTotal 48,190.00
Sales Tax:4,915.38
53,105.38
The above order is subject to Pumptech, LLC's standard terms and conditions and credit approval which are
attached and made part of this agreement. We appreciate your interest in our products and services and if
you have any questions on our offerings please do not hesitate to call.
By signature below, I accept this offering:
Signed:
Name:Title: Total - Card:
Total - Check/Cash:
54,831.30