My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COP19 Mixer Pump Deletion
>
Meetings
>
2025
>
03. March
>
2025-03-04 10:00 AM - Commissioners' Agenda
>
COP19 Mixer Pump Deletion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2025 12:09:37 PM
Creation date
2/27/2025 12:09:05 PM
Metadata
Fields
Template:
Meeting
Date
3/4/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order No. 3 for the Lower County Transfer Station
Order
6
Placement
Consent Agenda
Row ID
128215
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> P.O. BOX 926 / 103 EAST 4TH AVE, SUITE 209 <br /> ELLENSBURG, WA 98926 <br /> 509-925-9747 <br /> brandon@belsmith.com <br /> <br /> <br /> <br /> <br /> <br /> <br />February 19, 2025 <br /> <br /> <br />Re: Scale model change COP #19 <br /> <br />Per the description below, we present the following change order proposal #19 (COP#19). <br /> <br />Per RFI #31 the civil drawings show a qty of 6 mixer pumps but the electricals show a qty of 5. <br />The RFI response was to match the electricals and supply a qty of 5 mixer pumps. Please see the <br />attached price reduction representing the deletion of the sixth pump. <br /> <br />Total Cost subtracted from Contract: $-7,315.00 <br /> <br /> <br /> <br />Time extension required: 0 days <br /> <br /> <br /> <br />Sincerely, <br /> <br /> <br />Brandon Drexler, <br />Belsaas & Smith Construction <br />Mixer pump Delete
The URL can be used to link to this page
Your browser does not support the video tag.