My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COP14 Upsize Compost Area Service & Hydrants
>
Meetings
>
2025
>
03. March
>
2025-03-04 10:00 AM - Commissioners' Agenda
>
COP14 Upsize Compost Area Service & Hydrants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2025 12:09:35 PM
Creation date
2/27/2025 12:09:03 PM
Metadata
Fields
Template:
Meeting
Date
3/4/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order No. 3 for the Lower County Transfer Station
Order
6
Placement
Consent Agenda
Row ID
128215
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br />BELSAAS & SMITH CONSTRUCTION, INC. <br /> P.O. BOX 926 / 103 EAST 4TH AVE, SUITE 209 <br />ELLENSBURG, WA 98926 <br />509-925-9747 FAX: 509-962-3031 <br />bryan@belsmith.com <br />January 24th, 2025 <br />Patti Stacey <br />Kittitas County Solid Waste <br />1001 Industrial Way <br />Ellensburg, WA 98926 <br />Project: Lower County Transfer Station Scale Improvements <br />RE: Change Order Proposal 14 – Upsizing water service and hydrants in composting area <br />We are offering the described work and pricing below as a Change Order Proposal to account for additional costs <br />due to design changes proposed by the Owner. <br />Plan Sheet C5A, provided in the Contract Documents, shows a 1” water service line running along the east and <br />south borders of the composting area, that feeds four 1” hydrants or hose bibs. Our proposal, as discussed with <br />Patti, is to upsize the 1” service line to a 2” diameter pipe, and to upsize three of the 4 hydrants to 1 ½”. <br />The total cost of the change order is listed below and broken down on the attached spreadsheet. The only real <br />costs for this change will be in the materials, as the extra labor to install the larger piping is minimal. The <br />materials for the plan work have already been purchased and delivered to the site, therefore they have to be <br />shipped back and a 15% restocking fee paid to the supplier. The new larger diameter piping is also considerably <br />more expensive. Material quotes from the supplier have also been attached for reference. <br />Change Order Total: $ 3,249.00 <br />No additional contract time will be requested with this proposal. <br />Feel free to contact me with questions or concerns. <br />Sincerely, <br />Bryan Nelson <br />Bryan Nelson <br />Belsaas & Smith Construction, Inc.
The URL can be used to link to this page
Your browser does not support the video tag.