Loading...
HomeMy WebLinkAboutCOP08 Meter Cabinet Credit P.O. BOX 926 / 103 EAST 4TH AVE, SUITE 209 ELLENSBURG, WA 98926 509-925-9747 brandon@belsmith.com January 29, 2025 Re: Change Order Proposal #08 Per the description below, we are pleased to offer the following change order proposal #08 (COP#08). Per RFI #09 Titan noticed that due to the local codes and other electrical gear already needed there was a redundant breaker in the meter cabinet. Per the response given by Ali on 10/25 in the comment section of the RFI 09 there is a credit for the redundant gear. Total cost to be implemented into the contract: $ -10,000.00 Time extension required: 0 days Sincerely, Brandon Drexler, Belsaas & Smith Construction BELSAAS & SMITH CONSTRUCTION SHEET 1 of 2 C.O.P. #8 CHANGE ORDER PROPOSAL BREAKDOWN SHEET UNIT COSTS EQUIP SUB MATERIAL LABOR #DESCRIPTION QUAN.UNIT Mat.EQUIP LABOR COST COST COST COST Meter Swtich Titan Electrical 1 LS 0.00 (10,000.00)0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 *TOTALS 0 (10,000.00)0 0 BELSAAS & SMITH CONSTRUCTION SHEET 2 of 2 C.O.P. #8 CHANGE ORDER PROPOSAL BREAKDOWN SHEET EQUIP SUB MATERIAL LABOR COST COST COST COST TOTALS FROM PREVIOUS PAGE 0 (10,000.00)0 0 SUB TOTAL 0 (10,000.00)0 0 SUB TOTAL 0 (10,000.00)0 0 LABOR 0 MATERIAL 0 EQUIPMENT 0 SUBCONTRACTORS (10,000.00) SUB TOTAL SUB TOTAL (10,000.00) GRAND TOTAL TOTAL (10,000.00) TIME EXTENTION REQUIRED:0 NOTICE TO PROCEED REQUIRED BY: WE RESERVE OUR RIGHTS UNDER THE CONTRACT TO ACCESS THIS CHANGE CUMULATIVELY AS IT AFFECTS TIME AND AMOUNT. Titan Electrical LLC PO Box 698 Selah, Washington 98942 Phone: (509) 941-8306 Project: C24-197 - Lower Valley Transfer Station - Kittitas 925 Industrial Way Ellensburg, Washington 98926 Prime Contract Potential Change Order #004: Meter Switch Credit TO: Belsaas & Smith Construction Inc. 103 E 4th Ave # 209 Ellensburg, Washington 98926 FROM: Titan Electrical LLC 215 Keys Rd Yakima, Washington 98901 PCO NUMBER/REVISION: 004 / 0  CONTRACT:1 - Lower Valley Transfer Station   REQUEST RECEIVED FROM:   CREATED BY: Mike Yusi (Titan Electrical LLC) STATUS: Pending - Proceeding CREATED DATE: 1/23/2025 REFERENCE: PRIME CONTRACT CHANGE ORDER:  None   FIELD CHANGE: No   LOCATION: ACCOUNTING METHOD: Amount Based   SCHEDULE IMPACT: PAID IN FULL: No   EXECUTED:No SIGNED CHANGE ORDER RECEIVED DATE:   TOTAL AMOUNT: ($10,000.00) POTENTIAL CHANGE ORDER TITLE: Meter Switch Credit CHANGE REASON: Allowance POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) Credit is for the elimination of the redundant service disconnect in the meter section.   Total Credit - $10,000 ATTACHMENTS: #Budget Code Description Amount 1  $(10,000.00) Grand Total:$(10,000.00)    Belsaas & Smith Construction Inc. Titan Electrical LLC  103 E 4th Ave # 209  215 Keys Rd    Ellensburg, Washington 98926  Yakima, Washington 98901             ProcoreArchitectSignHere ProcoreArchitectSignedDate  ProcoreOwnerSignHere ProcoreOwnerSignedDate  ProcoreGeneralContractorSignHere ProcoreGeneralContractorSignedDate SIGNATURE DATE  SIGNATURE DATE  SIGNATURE DATE Titan Electrical LLC Page 1 of 1 Printed On: 1/23/2025  11:13 AM PST PCO #004