HomeMy WebLinkAboutstaff_reportKittitas County
Solid Waste
Agenda Staff Report
AGENDA DATE:
3/4/2025
ACTION REQUESTED:
Board’s approval and chair's signature on Change Order No. 3
BACKGROUND:
On September 3, 2024, the Board of County Commissioners approved a resolution to award the Lower
County Transfer Station bid to Belsaas and Smith Construction, Inc.
We have completed the review of the following Change Order Proposals incorporated into Change Order
No. 3:
COP #05: Electrical vault downsizing.
COP #06: Blink charger upgrade.
COP #07: Feeder conduit size reduction.
COP #08: Credit for redundant switch gear.
COP #11: Additional insulation and siding at the transfer station tunnel and push wall.
COP #14: Upsizing the compost service hydrants and irrigation lines
COP #18: Scale model change.
COP #19: Mixer pump deletion.
Change order No. 3 results in a net reduction in contract cost of $16,287.33 before Washington State Sales
Tax
INTERACTION:
Belsaas and Smith Construction, Inc.
Kittitas County Solid Waste
SCS Engineers
Kittitas County Prosecutor's Office
RECOMMENDATION:
Recommend Board approval and Chair's signature on Change Order Number 3 with Belsaas and Smith
Construction, Inc.
HANDLING:
Return a signed copy of Change Order No. 3
LEAD STAFF:
Casey McFarlane