Loading...
HomeMy WebLinkAboutSH25-006 Customer Implementatoin Guide LECustomer Implementation Guide Law Enforcement frock safety Table of Contents Implementation Timeline................................................................. 2 FlockSafety Team................................................I..........................1 3 Implementation Service briefs: Existing Infrastructure ............. 6 vs Standard vs Advanced • Existing Infrastructure Implementation • Standard Implementation • Advanced Implementation Things to Consider When Selecting Locations 12 Customer Responsibilities: AC -Powered Cams ........................ 14 Electrician Handout ...................................................................... 15 • Electrician Installation Steps • FAQs about AC -Powered Flock Cameras Installation Service Brief Summary 18 Permitting: Pre -Install Questionnaire 1. Timeline 2. Right of Way 3. AC Power vs. Solar 4. Traffic Control & Installation Methods 5. Paperwork & Required Forms 6. Contacts *Fee Schedule ............................................................................ 21 Help Center ........................................................................... 22 CustomerSupport.......................................................................... 22 CUSTOMER IMPLEMENTATION GUIDE: LAW ENFORCEMENT flock safety 1 Implementation Timeline This timeline provides general guidance and understanding of your installation process. While we typically complete installations 6-8 weeks after locations have been finalized, delays can occur as noted in the timeline below: REVIEW LOCATIONS 41 Confirm Camera Locations With Your Sales Representative FLOCK: Your sales representative will present several viable options for camera locations CUSTOMER: Review Deployment Plan & approve camera locations PLEASE NOTE: If Public Works is required to move forward, please obtain approval FINALIZE LOCATIONS * Prepare For Finalized Camera Locations FLOCK: Confirm Deployment Plane and signed agreement. Flock will move forward with next steps for locations that don't need permits (minimum 10 locations needed to move forward with partial installation) CUSTOMER: Prepare the below items, as needed • If permits are required, begin application process • If camera will be AC -powered, hire an electrician/street department STEP 1 I1P Conduct On -site Survey & Place Flags FLOCK: Flock technician conducts site survey to (1) evaluate/reconfirm solar or power access, (2) check line of sight to the road, and (3) evaluate/reconfirm cellular service in the area. When the technician deems the locations suitable, s/he will place a white flag at each spot PLEASE NOTE: If the initially determined locations don't meet Flock standards, we will evaluate a new location, obtain customer approval, and redo a site survey. This may push timeline for installation STEP 2 Call 811 FLOCK: Flock Safety will coordinate with Call 811 to mark each camera location for underground utilities within a 10-foot radius PLEASE NOTE: Call 811 is a government service, so turnaround times may vary and is outside of Flock control STEP 3 • Schedule Installation FLOCK: Flock will (1) ship any site specific material that the technician does not have locally (2) schedule the installation date STEP 4 0 Install & Validate Cameras FLOCK: After installation, your Onboarding Specialist will confirm that cameras are capturing footage well and functioning properly. They will then give you full access to the system along with helpful training resources ONGOING -AS NEEDED 4P Finalize Any Installation Needs FLOCK: While we typically complete installations within 4 weeks of finalizing locations, delays may occur due to external factors. In these instances, we will continue to work through this process until your cameras are fully installed and operational Bock safety 2 Flock Safety Team Implementation ... Your Project Manager is your primary contact during camera installation. Your project manager will guide you through the entire installation process, keeping you apprised of all implementation updates as well as answering any questions you have during this time. They will Project Manager ensure that all the cameras are on the ground and operating for at least 48 hours before transitioning you to your Customer Success Manager. • The Field Operations team is responsible for the physical installation and maintenance of cameras and associated equipment provided by f Flock. This includes a large team of technicians, schedulers, and many others involved in ensuring the delivery of the product. Field Operations They take the technical plan you finalized with Team Product Implementation and work closely with other teams at Flock to make sure that the cameras are installed quickly and safely and in a way that maximizes the opportunity to solve crime at a specific location. • *Note*: For all Installation questions or concerns, please always direct them to your Customer Success Manager and not the technician. flock safety Relationship Team How..• Your Customer Success Manager is your strategic partner for your lifetime as a Flock customer. While the cameras are getting installed, your CSM i will help get your account set up and get all key • users trained on the system. Customer Success Post -Camera -Installation, your CSM will be your Manager go -to for most account -related needs: You should reach out to them to: • Set up Account Training • Understand benefits of features • Learning best practices for getting relevant data • Identifying opportunities to expand the security network in your area • Provide feedback on your partnership with Flock The Flock Safety Support team is committed to s answering all your day-to-day questions as quickly as possible. To get in touch with support, simply email support@flocksafety.com or call r. 866-901-1781 Mon -Fri Sam-8pm EST. Support can help you: Flock Safety • Request camera maintenance Support • Troubleshoot online platform • Contract / Billing questions • Update account information • Camera Sharing questions • Quick "How to" questions in your Flock Account flock safety 4 Outside Party When They May Be Involved Electrician/Street If the Flock cameras need to be AC powered, you Department (customer) are responsible for providing an electrician to ensure power connectivity Public Works (LE) To weigh in on the use of public Rights of Way or property Department of Transportation If installation in your area requires permitting (DOT), City, or County agencies PLEASE NOTE: On some occasions, third parties outside of Flock Safety may be (or need to be) involved in your implementation. flock safety 5 Implementation Service Briefs: Existing Infrastructure vs Standard vs Advanced COST: $150 per camera (one time cost) Included In Scope: Once designated locations are approved by the customer, as part of the Existing Infrastructure Implementation Service Flock will perform the following: • An in -person site survey to confirm the installation feasibility of a location (location assessment, solar assessment, visibility review, etc.) o Cameras need sufficient power. Since a solar panel is required per camera, it can prevent adequate solar power if two cameras and two solar panels are on a single pole (blocking visibility). Therefore if relying on solar power, only one camera can be installed per pole. • Confirm that a location is safe for work by following State utility locating procedures. • Each installation may include the following: o Installation of camera and solar panel or AC adapter box on a suitable existing pole Bock safety 6 ■ Types of existing infrastructure such as existing utility, light, and traffic signal poles. ■ Pole no higher than 8'-12' (approval at Flock Safety's discretion) ■ Flock will provide and mount an AC adapter unit that a qualified electrician can connect to AC power following our electrical wiring requirements. Flock is unable to make any AC connections or boreholes in any material other than dirt, grass, loose gravel (or other non-diggable material). Electrical work requiring a licensed electrician and associated costs, not included in the scope. o Access requiring up to a 14' using an A -frame ladder o Standard MUTCD traffic control procedures performed by a Flock technician • Obtain a business license to operate in the city and state of camera location Out Of Scope: By default, Flock does not include the following as part of the Existing Infrastructure Implementation Service but can provide a quote for sourcing at an additional cost: • Mounting on mast arms (always require bucket truck and traffic control) • Call 811 'Call -before -you -Dig' system • Installation of any poles including but not limited to o Standard, 12' above grade Flock breakaway pole o NCHRP 350 or MASH approved pole (as may be required for locations in DOT right of way) • A Bucket Truck for accessing horizontal/cross-beams and/or height above 14' • Special equipment rentals for site access • Site -specific engineered traffic plans • Third -party provided traffic control • State or city -specific specialty contractor licenses or unique attachment/ connection requirements • Custom engineered drawings • Electrical work requires a licensed electrician. flock safety 7 o Flock will provide and mount an AC adapter that a qualified electrician can connect to AC power but cannot make any AC connections or boreholes in any material other than dirt, grass, loose gravel (or other non-diggable material). • Concrete cutting • Private utility search for privately owned items not included in standard 811 procedures (communication, networking, sprinklers, etc.) • Upgrades to power sources to ready them for Flock power (additional fuses, switches, breakers, etc.) • Any fees or costs associated with filing for required city, county, or state permits • Licensing or attachment agreements with asset / infrastructure owners • Utility contracts and billing • Customer requested relocations (see fee schedule) COST: $650 per camera (one time cost) Included In Scope: Once designated locations are approved by the customer, as part of the Standard Implementation Service Flock will perform the following: • An in -person site survey to confirm the installation feasibility of a location (location assessment, solar assessment, visibility review, etc.) • Confirm that a location is safe for work by following state utility locating procedures. Work with local utilities to prevent service interruptions during the installation o Engage 811 'Call -before -you -Dig' system to receive legal dig date o Apply approved markings Coordinate with 811 regarding any necessary high -risk dig clearances or required vendor meets • Each installation may include the following: o Installation of camera and solar panel with standard, 12'above grade Flock breakaway pole flock safety 8 o Installation of camera and AC adapter that a qualified electrician can connect to AC power on a suitable existing pole, no higher than 8-12' (approval at Flock Safety's discretion) ■ Flock will provide and mount an AC adapter that a qualified electrician can connect to AC power following our electrical wiring requirements. Flock is unable to make any AC connections or boreholes in any material other than dirt, grass, loose gravel (or other non-diggable material). Electrical work requiring a licensed electrician and associated costs, not included in the scope. o Access requiring up to a 14' A -frame ladder o Standard MUTCD traffic control procedures performed by a Flock technician • Obtain a business license to operate in the City and State of camera location Out Of Scope: By default, Flock does not include the following as part of the Standard Implementation Service but can provide a quote for sourcing at an additional cost: • Use and/or mounting to existing infrastructure. • NCHRP 350 or MASH approved pole (as may be required for locations in DOT right of way) • A Bucket Truck for accessing horizontal/cross-beams and/or height above 14' • Special equipment rentals for site access • Site -specific engineered traffic plans • Third -party provided traffic control • State or city -specific specialty contractor licenses • Custom engineered drawings • Electrical work requires a licensed electrician. o Flock will provide and mount an AC adapter that a qualified electrician can connect to AC power but cannot make any AC connections or boreholes in any material other than dirt, grass, loose gravel (or other non-diggable material). • Concrete cutting • Private utility search for privately owned items not included in standard 811 procedures (communication, networking, sprinklers, etc.) Bock safety 9 • Upgrades to power sources to ready them for Flock power (additional fuses, switches, breakers, etc.) • Any fees or costs associated with filing for required city, county, or state permits • Licensing or attachment agreements with asset / infrastructure owners • Utility contracts and billing • Customer requested relocations (see fee schedule) COST: $1,900 per camera (one time cost) Included In Scope: Once Designated Locations are confirmed, as part of the Advanced Implementation Service, Flock will perform the following: • An in -person site survey to confirm the installation feasibility of a location (location assessment, solar assessment, visibility review, etc.) • Confirm that a location is safe for work by following State utility locating procedures. Work with local utilities to prevent service interruptions during the installation o Engage 811 'Call -before -you -Dig' system to receive legal dig date o Apply approved markings Coordinate with 811 regarding any necessary high -risk dig clearances or required vendor meets • Each installation may include the following: o Installation of camera and solar panel on a suitable NCHRP 350 or MASH approved pole. o Installation of camera and AC adapter that a qualified electrician can connect to AC power. ■ Flock will provide and mount an AC adapter that a qualified electrician can connect to AC power following our electrical wiring requirements. Flock cannot make any AC connections or boreholes in any material other than dirt, grass, loose gravel (or other non-diggable material). flock safety 10 Electrical work requiring a licensed electrician and associated costs, not included in the scope. o Access requiring up to a 14' A -frame ladder o Standard MUTCD traffic control procedures performed by a Flock technician • Obtain a business license to operate in the City and State of camera location Out Of Scope: By default, Flock does not include the following as part of the Advanced Implementation Service but can optionally provide a quote for sourcing (additional cost): • Installation on Standard, 12'above grade Flock breakaway pole or existing infrastructure. • A Bucket Truck for accessing horizontal/cross-beams and/or height above 14' • Special equipment rentals for site access • Site -specific engineered traffic plans • Third -party provided traffic control • State or City -specific specialty contractor licenses • Custom engineered drawings • Electrical work requires a licensed electrician. Flock will provide and mount an AC adapter that a qualified electrician can connect to AC power but cannot make any AC connections or boreholes in any material other than dirt, grass, loose gravel (or other non-diggable material). • Concrete cutting • Private utility search for privately owned items not included in standard 811 procedures (communication, networking, sprinklers, etc.) • Upgrades to power sources to ready them for Flock power (additional fuses, switches, breakers, etc.) • Fees or costs associated with filing for required City, County, or State permits flock safety 11 Things to Consider When Selecting Locations Falcon Cameras • Use Cases o Flock LPRs are designed to capture images of rear license plates aimed in the direction of traffic. o Flock LPRs are not designed to capture pedestrians, sidewalks, dumpsters, gates, other areas of non -vehicle traffic, intersections. • Placement o They capture vehicles driving away from an intersection. o They cannot point into the middle of an intersection. o They should be placed after the intersection to prevent stop and go motion activation or "stop and go" traffic. • Mounting o They can be mounted on existing utility, light, traffic signal poles, or 12 foot Flock poles.* o They should be mounted one per pole.** If using AC power, they can be mounted 2 per pole. • They can be powered with solar panels or direct wire -in AC Power (no outlets).*** • They will require adequate cellular service using AT&T or T-Mobile to be able to process & send images. * Permitting (or permission from pole owner) may be required to use existing infrastructure or install in specific areas, depending on local regulations & policies. ** Cameras need sufficient power. Since a solar panel is required per camera, it can prevent adequate solar power if two cameras and two solar panels are on a single pole (blocking visibility). Therefore if relying on solar power, only one camera can be installed per pole. *** Flock does not provide Electrical services. Once installed, the agency or community must work with an electrician to wire the cameras. Electrician services should be completed within two days of installation to prevent the camera from dying. flock safety 12 Solar Panels Solar panels need unobstructed southern -facing views. Pole If a location requires a "DOT Pole" (i.e., Advanced Pole, not Flock standard pole), the implementation cost will be $5,000/camera. ffock safety 13 Customer Responsibilities: AC -Powered Cams If the Flock cameras need to be AC -powered, the customer is responsible for acquiring an electrician and ensuring they connect the camera to power. See steps 2 and 6 below. IC 7� 1. Create a Deployment Plan Work with us to select the best location(s) for Flock Safety cameras and power sources 2. Acquire an Electric Quote Contact an electrician to receive a quote to run 120volt AC power to 120v the camera _ 3. Sign Flock Safety Agreement Sign the Flock Safety purchase order to begin the installation of cameras x4. Conduct Site Survey �( Flock will mark camera locations, locate underground utilities and mark if present 5. Install Camera Flock will install the camera and AC power kit at the specified camera location 6. Connect Camera to Power Cc Notify the electrician that the camera is ready for the power connection installation flock safety 14 Electrician Handout Electrician Installation Steps 1. Run AC cable and conduit to the box according to NEC Article 300 and any applicable local codes. The gland accepts'/2" conduit. 2. Open the box using hinges. 3. Connect AC Mains per wiring diagram below: 4- a. Connect AC Neutral wire to the Surge Protector white Neutral wire using the open position on the lever nut. b. Connect AC Line wire to the Surge Protector black Line wire using the open position on the lever nut. c. Connect AC Ground wire to the Surge Protector green ground wire using the open position on the lever nut. 4. Verify that both the RED LED is lit on the front of the box 5. Close box and zip tie the box shut with the provided zip tie 6. While still on -site, call Flock, who will remotely verify that power is working correctly: Southeast Region - (678) 562-8766 West -Region - (804) 607-9213 Central & NE Region - (470) 868-4027 SURGE PROTECTOR AGOC CONVERTER 24V SOW RED PALL LIGHT CAMERA L ACA ,20VAC V� FROM UG"t POLE N ACM v flock safety 15 FAQs about AC -Powered Flock Cameras What voltage is supported? The AC kit is designed to work with 120VAC Infrastructure by default. A 240VAC version is available on request. How much power does this consume? Peak current draw is 1.5 A at 120VAC. The average power draw is roughly 30W in high traffic conditions but maybe lower when fewer vehicles are present. Who is responsible for contracting the electrician? The customer is responsible for contracting an electrician. We can help answer questions, but the customer is responsible for identifying and contracting an electrician. Who is responsible for maintenance? Flock will handle all maintenance related to Flock's camera and power equipment. However, any problems with the electrical supply are the customer's responsibility. The AC junction box has two lights to indicate the presence of power and make it easy for quick diagnosis if there is a problem related to the AC power source. • If the camera indicates to Flock that there is a power supply problem, Flock will notify the customer and request that the customer verifies the lights on the AC junction box. If the AC Source light is illuminated, Flock will send a technician to investigate. If the AC source light is not illuminated, the customer should check any GFCI's or breakers in the supply circuit or call the electrician who installed the power supply. How much does it cost? Work required to bring AC power to each location will be different, so exact pricing is unavailable. Primary cost drivers include arrow boards and the distance from the camera location to the AC power source. What information do I need to provide my electrician? The Flock deployment plan and these work instructions should be sufficient to secure a quote. It will be helpful if you know the location of the existing power infrastructure before creating the deployment plan. flock safety 16 Can you plug it into my existing power outlet? The Flock AC power adapter does not use a standard outlet plug but must be directly wired into the power mains. While using outlet plugs may be convenient, they can easily be unplugged, presenting a tampering risk to this critical safety infrastructure. The electrician can route power directly to the camera with a direct wire -in connection if an outlet is close to the camera. How long does this process typically take? The installation process typically takes 6-8 weeks. To accelerate the process, be sure to have the electrician perform his work shortly after the Flock technician finishes installing the camera. What kind of electrician should I look for? Any licensed electrician should perform this work, though we have found that those who advertise working with landscape lighting are most suited for this work. What happens if the electrician damages the equipment? The customer is responsible for contracting the electrician. Any liability associated with this work would be assumed by the customer. If any future work is required at this site due to the electrical infrastructure or the work performed by the electrician would be the responsibility of the customer. When should the electrician perform his work? Once Flock installs the camera, you will receive an email alert letting you know that this has been completed. After this, you will need to schedule the electrician to route power to the pole. What if my electrician has questions about Flock's AC Kit? You should share the AC -Power Kit Details packet with the electrician if they have questions. What if the AC power is on a timer? Sometimes the AC power will be on a timer (like used for exterior lighting). Flock requires that the AC power provided to the camera be constant. The source that the electrician uses must not be on a timing circuit. flock safety 17 Installation Service Brief Summary Below outlines the statement of work for the Flock Camera Installation: What Is Covered By Flock What Is NOT Covered By Flock Special Note Flock Cameras & Traffic Control And Any Online Platform Associated Costs Mounting Poles *DOT Approved Pole Cost Electrician & Ongoing Electrical Costs AC Power Kit (As Needed) Engineering Drawings Solar Panels (As Needed) Relocation Fees Excluding Changes During Initial Installation Site Surveys And Call 811 Contractor Licensing Fees Scheduling Installation Labor Costs Permit Application Processing Fees Including, But Not Limited Customer Support / Training Specialist Mounting Equipment To, **MASH Poles Or Adapters Cellular Data Coverage Bucket Trucks Maintenance Fees Loss, Theft, Damage To Flock (Review Fees Sheet For Equipment More Details) Data Storage For 30 Days Camera Downtime Due To Only Applicable For Power Outage AC -Powered Cameras ***Field Technician Maintenance For Falcon— Flex *If a location requires a "DOT pole" (i.e., not our standard), the implementation cost will be $5,000/camera; This cost is applicable for installations in GA, IL, SC, TN, and CA. **MASH poles: Manual for Assessing Safety Hardware (MASH) presents uniform guidelines for crash testing permanent and temporary highway safety features and recommends evaluation criteria to assess test results ***If a camera is lost, stolen, or damaged, a replacement device can be purchased at a discounted price of $800 flock safety 18 Permitting: Pre -Install Questionnaire 1. Timeline • In Flock Safety's experience, in-depth permitting requirements can add 2+ months to the installation timeline. • The SLA for permit document submission is within 15 days from contract signature date (contract Closed -Won) 2. Right of Way • Will any Flock Safety cameras be installed on the city, state, or power company -owned poles or in the city, county, or state Right of Way (RoW)? o What is the RoW buffer? o Will additional permits or written permission be required from third -party entities (such as DOT, power companies, public works, etc.)? • Will any cameras be installed on city -owned traffic signal poles (vertical mass)? o If yes, please provide heights/photos to determine if a bucket truck is needed for the installation. ■ Note: A bucket truck is required if the height exceeds 15 feet tall. 3. AC Power vs. Solar • If AC powered, is there a 120V power source available, and is there access to an electrician who can connect the existing wire to the Flock Safety powered installation kit? • If solar -powered, consider the size of the solar panel and potential to impact the visibility of DOT signs/signals: o Single Panel: 21.25" x 14" x 2" (Length x Width x Depth) o Double Panel: 21.25" x 28" x 2" (LxWxD) 4. Traffic Control & Installation Methods • If a bucket truck is required, this typically necessitates an entire lane to be blocked in the direction of travel. Can you provide a patrol car escort, or will full traffic control be required?* PLEASE NOTE: If traffic control is required, you may incur additional costs due to city/state requirements; Fees will be determined by quotes received. flock safety 19 • If full traffic control is required (cones, arrow boards, etc.): o Will standard plans suffice, or are custom plans needed? Custom plans can double the cost, while standard plans can be pulled from the Manual of Uniform Traffic Control Devices (MUTCD). o Will a non -sealed copy of the traffic plan suffice? Or does the traffic plan need to be sealed and/or submitted by a professional engineer? o Are there state -specific special versions/variances that must be followed? • If a bucket truck is not required, the shoulder or sidewalk should suffice and enable Flock Safety to proceed without traffic control systems in place. o Note: In some states (i.e., arrow boards), sidewalks may require signage. If signage is mandatory, Will your Public Works department be able to assist? 5. Paperwork & Required Forms • Flock Safety will need copies of paperwork to complete before proceeding (ex., business license applications, encroachment permit applications). We can save critical time by gathering these documents upfront. We appreciate your assistance in procuring these. 6. Contacts • If Flock Safety needs to interface directly with the departments, please share the contact information of the following departments: o Permitting o Public Works o Traffic Department Bock safety 20 *Fee Schedule After a deployment plan with Designated Locations and equipment has been agreed upon by both Flock and the Customer, any subsequent changes to the deployment plan ("Reinstalls") driven by a Customer's request will incur a fee per the table below. What Services Incur Fees: • Requested relocations post -approval by customer • Relocations due to poor performance will be the responsibility of Flock o If a customer requests a location against the advisement of Flock, performance issues and any requested relocations will be the responsibility of the customer. • Per the contract and absent a defect, in the event that Flock Hardware is lost, stolen, or damaged, Customer may request that Flock replace the Flock Hardware at a fee according to the then -current Reinstall policy https://www.flocksafety.com/reinstall-fee-schedule • Misc billables for out of scope items for each implementation Incurred Fees: • Camera relocation o Existing infrastructure (non -AC powered)......................................................... $350 o Flock pole (non -AC powered)............................................................................... $750 o Advanced pole (non -AC powered)................................................................... $5000 • Replacements o Camera only as a result of vandalism, theft, or damage .............................. $800 o Pole replacement only as a result of vandalism, theft, or damage ■ Flock pole........................................................................................................... $500 ■ Advanced pole................................................................................................ $5000 o Full replacement as a result of vandalism, theft, or damage ° ■ Flock pole, camera, and solar (non -AC Powered) .................................. $1300 ■ Advanced pole, camera, and solar (non -AC Powered) .......................... $5800 flock safety 21 • Trip charge......................................................................................................................$350 o Examples: ■ Angle adjustment (elective) ■ Install additional Flock signage All fees are per reinstall or required visit (in the case that a reinstall is attempted but not completed) and include labor and materials. If you have any questions, please email support@flocksafety.com. Help Center Our Help Center is filled with many resources to help you navigate through the online platform. Below you will find some common questions and their relevant help article: How do I search camera footage? How do I add a user? How do I add a vehicle to my own Hot List? How do I enable browser notifications for Hot List alerts? How do I get text alerts for Hot List? How do I request camera access from other nearby agencies? How do I use the National Lookup to search for a plate? (National Lookup - network of law enforcement agencies that have opted to allow their network of Flock cameras to be used for searches) How do I reset my / another user's password? Customer Support You can reach our customer support team anytime by emailing support@flocksafety.com. They can help answer any "How -To" questions you may have. ftock safety 22