HomeMy WebLinkAbout2024-12-23-minutes-public-works-and-cds-study-sessionKITTITAS COUNTY COMMISSIONERS
Public Works and CDS Study Session
Regular Meeting
Monday December 23, 2024 - 1:30 PM
BoCC Auditorium
205 West 5th Room 109 - Ellensburg
1. Call to Order
2. Citizen Comments (1 min. time limit)
3. Community Development Services
-Critical Areas Update
-Senate Bill 5290
4. Public Works
-G4-29290 Water Right Permit Assignment
-Broadband Planning Update
5. EXECUTIVE SESSION - RCW 42.30.110(1)(b) - To consider the selection of a site or the
acquisition of real estate by lease or purchase when public knowledge regarding such
consideration would cause a likelihood of increased price.
6. EXECUTIVE SESSION - RCW 42.30.110(1)(i)- To discuss with legal counsel representing the
agency matters relating to agency enforcement actions, or to discuss with legal counsel
representing the agency litigation or potential litigation to which the agency, the governing
body, or a member acting in an official capacity is, or is likely to become, a party, when public
knowledge regarding the discussion is likely to result in on adverse legal or financial
consequence to the agency
7. Other Business - No Action to be taken
8. Concluded
Created on 12/19/2024 11:15:14 AM
KITTITAS COUNTY
PUBLIC WORKS/COMMUNITY DEVELOPMENT SERVICES STUDY SESSION MINUTES
COMMISSIONERS' AUDITORIUM, 205 WEST 5TH ROOM 109
Regular Meeting
MONDAY
1:30 PM
December 23, 2024
Board members present: Chairman Brett Wachsmith, Vice Chairman Laura
Osiadacz, and Commissioner Cory Wright.
Others: Josh Fredrickson, Arden Thomas, Sally Kraft, Public Works;
Chad Bala, Jeremy Johnston, Jessica Miller, Community Development
Services; Chris Horner, Prosecuting Attorney's Office.
At 1:30PM Chairman Brett Wachsmith opened the Public Works and
Community Development Services Study Session.
No Citizen Comments
COMMUNITY DEVELOPMENT SERVICES
CRITICAL AREAS UPDATE
Chad Bala briefed the Board of County Commissioners on the status of
Resolution 2024-093. CDS will work with Facet NW Consultants to
gather necessary data for a cost of $13.9K.
SENATE BILL 5290
Jeremy Johnston briefed the Board of County Commissioners on Senate
Bill 5290 that will go into effect January 1, 2025. This bill
primarily focuses on changes to the development review timelines.
Chad Bala and Jeremy Johnston will be reviewing the mandate and how
it will affect current application fees.
PUBLIC WORKS
G4-29290 Water Right Permit Assignment
Arden Thomas requested direction from Board of County Commissioners
on the proposed partnership between Kittitas County and Joyce
Palelek, a Vantage Area water right holder, and the subsequent
request for Technical Assistance on Assignment of Application G4-
29290 to the Department of Ecology. The proposed partnership between
Kittitas County and Ms. Palelek would enable the groundwater permit
application to be processed and would maintain and provide water
mitigation options with Vantage. Kittitas County would enter into a
mitigation agreement with Ecology for an annual fee that would
initially be absorbed in the 403 Fund. Water user fees would be
developed to cover these costs. The Board provided direction to staff
to send the technical assistance letter upon addressing Commissioner
Cory Wright's direction to verify the use of the term, "Town", with
Chad Bala, Community Development Services Director.
Broadband Planning Update
12/23/24 MINUTES
Josh Fredrickson briefed the Board of County Commissioners about the
status of the Broadband expansion. Two of the three projects received
grants and are underway. The third project is seeking funding through
the NTIA BEAD project for seven identified project areas. The
application process is robust and each of the seven projects requires
a separate application, due at the end of January 2025. Marc Eyler is
assisting in the identification of non -serviceable areas and Josh
requested Marc receive a stipend for his work. County Commissioner
concurred and suggested a contract amendment to cover this cost.
EXECUTIVE SESSION 1
At 1:54PM the Board of County Commissioners announced they would
recess into Executive Session for 10 minutes with Josh
Fredrickson, Arden Thomas, and Chris Horner per RCW
42.30.110(1)(b) - To consider the selection of a site or
acquisition of real estate by lease or purchase when public
knowledge regarding such consideration would cause a likelihood of
increased price. Action anticipated.
At 2:04PM the Board of County Commissioners reconvened out of
Executive Session.
Vice Chairman, Laura Osiadacz, moved to approve Chair Signature on
two Trust Water Right Purchase and Sale Agreements between
Kittitas County and Suncadia and to direct staff to prepare
enabling documents. Commissioner Wright seconded. Motion carried
3-0.
EXECUTIVE SESSION 2
At 2:05PM the Board of County Commissioners announced they would
recess into Executive Session for 10 minutes with Josh Fredrickson
and Chris Horner per RCW 42.30.110(1)(i)- To discuss with legal
counsel representing the agency matters relating to agency
enforcement actions, or to discuss with legal counsel representing
the agency litigation or potential litigation to which the agency,
the governing body, or a member acting in an official capacity is,
or is likely to become, a party, when public knowledge regarding
the discussion is likely to result in an adverse legal or
financial consequence to the agency. No Action Taken.
At 2:10PM the Board of County Commissioners reconvened out of
Executive Session.
Meeting concluded at 2:10 PM
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Sally Kraft, Administrative Chairman
Assistant
12/23/24 MINUTES
KITTITAS COUNTY
COMMUNITY DEVELOPMENT SERVICES
COMMUNITY DEVELOPMENT SERVICES — BOARD OF COUNTY COMMISSIONERS
2024 STUDY SESSION STAFF REPORT
STUDY SESSION DATE: December 23, 2024
TOPIC: Facet NW: Critical Areas
ACTION REQUESTED: None
LEAD STAFF:
Chad Bala, CDS Director
RECOMMENDATION:
None
BRIEFING SUMMARY:
Resolution 2024-093 authorized the Community Development Services Director contract authority over
task orders for immediate need in planning support services. As part of the ongoing negotiations with the
Yakama Nation and additional Kittitas County Critical Area Code discussions with Facet NW (Critical
Areas Consultant) CDS will be moving forward with this task order to gather real data regarding GIS &
Stream Buffer information and conduct an analysis pursuant to Best Available Science (BAS).
This will be supportive information that will be utilized as part of our periodic review of the Critical
Areas Code.
BACKGROUND:
The Periodic Update requires an additional review of the Critical Areas Code, and this information will
be a supportive analysis to the Critical Areas Code update.
DISCUSSION:
None
FISCAL IMPACTS:
None
ATTACHMENTS:
None
KITTITAS COUNTY
COMMUNITY DEVELOPMENT SERVICES
COMMUNITY DEVELOPMENT SERVICES — BOARD OF COUNTY COMMISSIONERS
2024 STUDY SESSION STAFF REPORT
STUDY SESSION DATE: December 23, 2024
TOPIC: Senate Bill 5290
ACTION REQUESTED: None
LEAD STAFF:
Chad Bala, CDS Director
Jeremy Johnston, Long Range Planner
RECOMMENDATION:
None
BRIEFING SUMMARY:
This bill is intended to modernize and streamline local project review. This bill primarily focuses on
changes to the development review timelines. Note: If action isn't taken by January 1, 2025, then the
new state timelines will automatically apply.
Senate Bill 5290 requires all jurisdictions to implement new code language requiring the following:
1. 65 days: For Administrative project decisions that do not require public notice from the deemed
complete date.
2. 100 days: For Administrative project decisions that require public notice to be from the deemed
complete date.
3. 170 days: ForNon-Administrative project decisions that require public notice from the deemed
complete date
If timelines are not met:
• A jurisdiction may be required to refund 10-20% of application review fees.
• After January 1, 2026, if a jurisdiction adopted at least three of the recommended permit
actions per RCW 36.70B.160(1) but is not meeting its permitting deadlines at least half
the time since its most recent comp. plan update will be required to adopt additional
measures.
BACKGROUND:
The Senate Bill was passed by legislature on May 81", 2023, with an effective date of July 23, 2023, and
requires an implementation date of January 1, 2025
DISCUSSION:
None
FISCAL IMPACTS:
To Be Determined: Potential application fee adjustment and training costs
ATTACHMENTS:
Senate Bill 5290, White Paper, & Draft Code:
HB 5290 White Paper
Beginning January 1, 2025:
• All GMA planning jurisdictions are required to implement HB 5290 regardless of their
ability to implement local regulations in time.
There are a variety of minor changes that will need to be made, however, we've
compiled a list below of the major issues for which we need to be made aware;
A. Permitting Timelines:
New permitting timelines are separated into 3 tiers. The "shot clock" is based on the deemed
complete date and timelines established must utilize calendar days, not business days.
1. For administrative project decisions that do not require public noticing, a final
decision must be issued within 65 days of the deemed complete date. This will impact
land use applications like parcel combinations, BLA's, etc.
2. For administrative project decisions that require public noticing, but no public
hearing, decisions must be issued within 100 days of the deemed complete date. This
will include projects like zoning variances, reasonable use exceptions, etc. (note: this
would not include short plats even though they would generally fall into this same
category. RCW 58.17.140 provides specific timelines for all preliminary plats.
3. For non -administrative projects the bill requires a decision be issued within 170
days from the deemed complete date (again this would not apply to preliminary long
plats).
B. Modification Allowances:
1. Modifications are allowed for these timelines for more complicated projects with
consolidated permit review such as: (i.e. PUDS, Master Planned Resorts, Etc.)
2. Modifications must be specific and implemented through a local ordinance.
3. Adoption of the prescribed provisions of this bill are not subject to appeal, however
any ordinance which does create these kinds of modifications are subject to appeal.
C. Implementation parameters:
The bill provides 2 approaches for local jurisdictions to demonstrate consistency.
Option 1— Up to 20% of permitting fees are subject to refund if timelines are not met.
-10% of permitting fees must be refunded if the application decision exceeds the
prescribed timelines by less than 20% of the maximum allowance.
Example: If the fee for a non -administrative application is $2,000 and the
decision isn't issued until the 203'd day from the deemed complete date
(19% beyond the 170-day allowance) the applicant would be refunded
$200.
-20% of permitting fees must be refunded if the application decision exceeds
the prescribed timelines by 20% or more.
Option 2 — HB 5290 provides ten project review and code revisions (listed below a-j) that can be
adopted to avoid Option 1. This option requires formal adoption of at least 3 of these
provisions.
(a) Expediting review for project permit applications for projects that are consistent
with adopted development regulations;
(b) Imposing reasonable fees, consistent with RCW 82.02.020, on applicants for
permits or other governmental approvals to cover the cost to the city, town, county, or
other municipal corporation of processing applications, inspecting and reviewing plans,
or preparing detailed statements required by chapter RCW. The fees imposed
may not include a fee for the cost of processing administrative appeals. Nothing in this
subsection limits the ability of a county or city to impose a fee for the processing of
administrative appeals as otherwise authorized by law; (c) Entering into an interlocal
agreement with another jurisdiction to share permitting staff and resources;
(d) Maintaining and budgeting for on -call permitting assistance for when permit
volumes or staffing levels change rapidly;
(e) Having new positions budgeted that are contingent on increased permit revenue;
(f) Adopting development regulations which only require public hearings for permit
applications that are required to have a public hearing by statute;
(g) Adopting development regulations which make preapplication meetings optional
rather than a requirement of permit application submittal;
(h) Adopting development regulations which make housing types an outright
permitted use in all zones where the housing type is permitted;
(i) Adopting a program to allow for outside professionals with appropriate
professional licenses to certify components of applications consistent with their license;
or
(j) Meeting with the applicant to attempt to resolve outstanding issues during the
review process. The meeting must be scheduled within 14 days of a second request for
corrections during permit review. If the meeting cannot resolve the issues and a local
government proceeds with a third request for additional information or corrections, the
local government must approve or deny the application upon receiving the additional
information or corrections.
Regardless of the option a jurisdiction chooses, every jurisdiction must provide annual reports,
beginning in 2026, that demonstrate if the required permit allowances are being met at least
50% of the time. If they are not being met the bill requires adoption of the measures noted
above (a-j) until permitting times are consistent with the statute.
Recommendation:
Utilizing option 1 appears to be the path of least resistance as follows:
• The County could choose to only collect 80% of the permitting fees upon application
submittal.
• Then require the remaining 20% upon successful permit issuance when timelines are
met.
Option 1 could avoid complicating financial records with various refunds when timelines are not
met. This may be especially true when application submittal and issuance timelines fall within
different budget cycles.
Maior Component to Comply:
• Possible adjustments to applications fees for this additional work requirement
• SmartGov assistance/cost: Additional training to run the appropriate stop and start
scenarios, and more importantly annual reports.
• This bill will require close monitoring and memorializing of all start and stop events in
application processing.
• The "shot clock" can be stopped anytime the applicant is informed of a need for
additional information. Maintaining clear records of these events will be vital for
reporting.
• The code will need to be updated to relay these new timelines and there are various
other more minor requirements that will need to be added as well.
o These include items like specific timelines and criteria for requesting information
and memorializing responses as well as some items that are exempt.
Kittitas County Code
Title 1 SA I PROJECT PERMIT APPLICATION PROCESS*
Chapters
15A.01 Administration, Purpose and Objective
15A.02 Definitions
—1-5A.03 Proiect Permit Application -Review
15A.04 Integration of SEPA
15A.05 Hearings
15A.06 Notice of Decision
15A.07 Administrative Decisions Appeals
15A.08 Judicial Appeal
15A.09 Planned Actions
15A.10 Amendments
15A.11 Development Agreements
15AA2 Coordination with State Permitting
15AA 3 (Repealed)
Prior legislation: Ords. 96-19 and 97-05.
Chapter 15A.01
ADMINISTRATION, PURPOSE AND OBJECTIVE
Sections
15A.01.010 Purpose and authority.
15A.01.020 Administrative and enforcement officers.
15A.01.030 Applicability.
15A.01.040 Roles and responsibilities.
15A.01.050 Severability.
15A.01.010 Purpose and authority.
It is the purpose of this title to effectively and efficiently administer applications for land use
development activities by combining environmental review process, both procedural and
substantive, with the procedure for review of project permits.
1. Each local government planning under __ __ shall establish a permit review
process that provides for the integrated and consolidated review and decision on two or
more project permits relating to a proposed project action, including a single
application review and approval process covering part of or all project permits
requested by an applicant for all or part of a project action, and a designated permit
coordinator.
When a project permit application is filed, the project review process should include
land use, environmental, public, and governmental review so that documents prepared
under different requirements can be reviewed together by the public and other
agencies, in one project review process. In the event of inconsistencies within county
code pertaining to such processing, this title shall control. (Ord. 2000-07; Ord. 98-10,
1998)
15A.01.020 Administrative and enforcement officers.
1. It shall be the duty of the Community Development Services director or such other
persons designated by the county commissioners to administer the provisions of this
title.
2. The prosecuting attorney may institute any necessary legal proceedings to enforce the
provisions of this title.
3. The county sheriff and his authorized representatives shall have the authority to enforce
the provisions of this title. (Ord. 2007-22, 2007; Ord. 2000-07; Ord. 98-10, 1998)
15A.01.030 Applicability.
The provisions of this title shall apply to all land use permits under KCC Titles 15A, , ,
and , county shoreline master program, and to any related regulation or any other ordinance or
law implementing these provisions. In the event of conflict with the current county code, this title
shall control. (Ord. 2000-07; Ord. 98-10, 1998)
15A.01.040 Roles and responsibilities.
The regulation of land development is a cooperative activity including many different elected and
appointed bodies and county staff. The specific responsibilities of these bodies is set forth below and
outlined in at the end of this title.
1. Applicant. An applicant is expected to read and understand the county comprehensive
plan and code and be prepared to fulfill the obligations placed on the applicant. Pre -
application conferences are available to anyone who wishes to discuss such obligations
prior to submittal.
2. Community Development Services Director.
a. The Community Development Services Director (CDS Director) is
responsible for the administration of portions of ,
Environmental Policy, Title 15A, Project Permit Application Process, Title 16,
Subdivisions, Zoning, Title 17A, Critical Areas, and the shoreline
master program.
b. Upon request or as determined necessary, the CDS Director shall interpret
the meaning or application of the provisions of said titles and issue a
written administrative interpretation. Requests for interpretation shall be
written and shall concisely identify the issue and desired interpretation.
c. Administrative land use decisions on certain zoning conditional uses, and
variances from the standards and dimensional regulations of the zoning
code, _ such as setback and yard restrictions.
d. The CDS Director or his/her designee shall have the authority to review and
approve, deny, or approve with conditions, applications for the following:
i. Letters of exemption from a shoreline substantial development
permit;
ii. Shoreline substantial development permits;
iii. Revisions to shoreline substantial development permits; and
iv. Requests for timing extensions for i through iii above.
3. Board of County Commissioners. In addition to its legislative responsibilities
under K(_( i ifle I D , the board shall review and act on the following subjects pursuant
to this title:
a. Recommendations of the Planning Commission. Decision -making process
by the board shall consist of a public meeting or meetings wherein the
board reviews the written record transmitted from the Planning
Commission for Legislative matters and issues a written decision in
resolution or ordinance form. During such meeting(s), appropriate county
staff will present the record to the board, providing information as
necessary to ensure county code compliance. No new comment or
information will be allowed by the board during the decision -making
process.
b. Appeals of site -specific rezones.
c. Development Agreements.
4. Hearing Examiner - Decision. The Hearing Examiner shall review and make a final
decision for the purposes of appeal under KCC section 15A.07 on the following
applications and subjects pursuant to this title:
a. Initial local County decision on Shoreline Conditional Use Permits subject to
the Shoreline Master Program;
b. Initial local County decision on Shoreline Variances pursuant to the
Shoreline Master Program;
c. Shoreline substantial development permits that are included in
consolidated permit applications that are subject to Hearing Examiner
review and action;
d. Conditional use permits pursuant to the zoning code, KCC Title 17;
e. Application for preliminary plats;
f. Site -Specific Rezone applications;
g. Appeals of administrative SEPA actions regarding an action without an
underlying permit;
h. Open record appeal of administrative SEPA actions;
i. Appeal of administrative determinations such as short plats, variances, and
code interpretations;
j. Other actions requested or remanded by the Board of County
Commissioners; and
k. Appeal of administrative determinations regarding road standard variance
decisions.
S. Washington State Department of Ecology. The Washington State Department of
Ecology shall be responsible for the final approval, denial, or approval with conditions
for the following:
a. Shoreline conditional use permits and revisions to same; and
b. Shoreline variances and revisions to same.
(Ord. 2022-00` , 2022; Ord,_ 2018-021, 2018; Ord. 2016-00! , 2016; Ord. 2014-008, 2014;)
15A.01.050 Severability.
If any chapter, section, subsection, sentence, clause, phrase, part or portion of this title is for any
reason held to be invalid or unconstitutional by any court of competent jurisdiction, such decision
shall not affect the validity of the remaining portions of this title or the application of the provisions
to other persons or circumstances. (Ord. 2000-07; Ord. 98-10, 1998)
0
Chapter 15A.02
DEFINITIONS
Sections
15A.02.010 Generally.
15A.02.020 Administrator.
15A.02.030 Repealed.
15A.02.040 Consistency.
15A.02.045 Department
15A.02.050 Land use decision.
15A.02.06C Open record hearing.
15A.02.070 Person.
15A.02.08(l Project permit or project permit application.
15A.02.09n Public meeting.
15A.02.010 Generally.
Certain terms and words used in this title are defined in the following sections. Words used in the
present tense include the future; words in the singular number include the plural number; and words
in the plural number include the singular number; the word "building" includes the word "structure,"
and the word "shall" is mandatory and not directory. (Ord. 2000-07; Ord. 98-10, 1998)
15A.02.020 Administrator.
"Administrator" means the county planning director or his/her designee. (Ord. 2000-07; Ord. 98-10,
1998)
15A.02.030 Repealed. (Ord, 2012-0C , 2012; Ord. 2000-07; Ord. 98-10, 1998)
15A.02.040 Consistency.
"Consistency" means, including but not limited to, compliance, conformity and consistency, and
refers to performance in accordance with Kittitas County comprehensive plan and development
regulations. (Ord. 2000-07; Ord. 98-10, 1998)
15A.02.045 Department.
"Department" means the Community Development Services department
15A.02.050 Land use decision.
"Land use decision" means a final determination by a local jurisdiction's body or officer with the
highest level of authority to make the determination, including those with authority to hear appeals,
on:
An application for a project permit or other governmental approval required by law
before real property may be improved, developed, modified, subdivided, or used, but
excluding applications for permits or approvals to use, vacate, or transfer streets, parks,
and similar types of public property, excluding applications for legislative approvals such
as area -wide rezones and annexations, and excluding applications for business licenses;
An interpretive or declaratory decision regarding the application to a specific property
of zoning or other ordinance or rules regulating the improvement, development,
modification, maintenance, or use of real property; and
3. The enforcement by a local jurisdiction of ordinances regulating the improvement,
development, modification, maintenance, or use of real property. (Ord. 2000-07; Ord.
9810, 1998)
15A.02.060 Open record hearing.
"Open record hearing" means a hearing by a single hearing body or officer, authorized by the local
government to conduct such hearings, that creates the local government's record through testimony
and submission of evidence and information under procedures prescribed by the local government
by ordinance or resolution. (Ord. 2000-07; Ord. 98-10, 1998)
15A.02.070 Person.
"Person" means an individual, partnership, corporation, association, public or private organization, or
government entity or agency. (Ord. 2000-07; Ord. 98-10, 1998)
15A.02.080 Project permit or project permit application.
"Project permit" or "project permit application" means any land use or environmental permit or
license required from a local government for a project action, including but not limited to building
permits, subdivisions, binding site plans, planned unit developments, conditional uses, shoreline
substantial development permits, site plan review, permits or approvals required by critical areas
ordinances, site -specific rezones authorized by a comprehensive plan or subarea plan, but excluding
the adoption or amendment of a comprehensive plan, subarea plan, or development regulations.
(Ord. 2000-07; Ord. 98-10, 1998)
15A.02.090 Public meeting.
"Public meeting" means an informal meeting, hearing, workshop, or other public gathering of people
to obtain comments from the public or other agencies on a proposed project permit prior to the
local government's decision. A public meeting may include, but is not limited to, a design review or
architectural control board meeting, a special review district or community council meeting, or a
scoping meeting on a draft environmental impact statement. A public meeting does not include an
open record hearing. The proceedings at a public meeting may be recorded and a report or
recommendation may be included in the local government's project permit application file. (Ord.
2000-07; Ord. 98-10, 1998)
4
Chapter 15A.03
PROJECT PERMIT APPLICATION REVIEW
Sections
15A.0�.0 i L; Complete application defined.
15A.03.020 Pre -application conference.
15A.03.030 Application and accompanying data.
15A.03.040 Determination of complete application.
15A.03.045 . Deadline extensions and supplemental information.
15A.03.050 Fee schedule.
15A.03.060 Notice of application.
15A.03.070 Specific procedures for permit review.
15A.03.080 Projects exempt from the provisions of notice of application.
15A.03.090 Review actions on project permit applications.
15A.03.100 Criteria for review of all project actions.
15A.03.110 Posting sites.
15A 03 120 Project permit categories review timelines and reporting.
15A.03.010 Complete application defined.
The definition of a complete project permit application is defined in the relevant section of the
zoning code, subdivision code, or, if applicable, development agreement adopted pursuant to this
title. (Ord. 2000-07; Ord. 98-10, 1998)
15A.03.020 Pre -application conference.
A pre -application conference is offered to all interested potential applicants. Applicants are
encouraged but not required to request this conference except in the case of a Cluster Platting and
Conservation Platting, Planned Unit Development, master planned resort, conditional use permit,
shoreline substantial development permit, shoreline conditional use permit, shoreline variance,
rezone and any preliminary plat over nine (9) lots where a pre -application conference is required.
1. Prior to formal submittal of a project permit application, one or more optional
conferences with appropriate county department representatives and other public
agency representatives may be requested by the applicant. The date, time and place of
such conferences shall be at the mutual agreement of the participants.
2. Such conferences are intended as informal discussion and review of possible
applications to assist the possible applicant in discovery of appropriate county
regulations, standards, application formats and review processes that would be required
of a project.
3. Such conferences are not publicized and the public is not permitted to attend in order
that a potential applicant's interests be protected.
4. A pre -application conference may be waived if the CDS Director or Planning Official
determines that the proposal is relatively simple (has few, if any, development -related
issues), is substantially similar to a prior proposal affecting the same property, or is
substantially similar to other projects developed by the same applicant. In order to
request a pre -application waiver, the applicant shall submit a completed pre -application
waiver request form, a written narrative justifying the request for a pre -application
waiver, and the required fee.
(Ord. 2016-00(., 2016; Ord. 2013-001, 2013; >jrd. 2011-0-1 , 2011; Ord. 2010-L. , 2010; Ord. 2007-22,
2007; Ord. 2007-22, 2007; Ord. 2000-07; Ord. 98-10, 1998)
15A.03.030 Application and accompanying data.
1. Written application for the approval of proposed project activities such as: zoning
variance; zoning conditional use; short plat, long plat or subdivision; binding site plans;
shorelines substantial development/conditional use/variance; master planned resort;
and site -specific rezone shall be filed in complete form in the Community Development
Services office upon forms prescribed for that purpose by the administrator.
2. The written application shall be accompanied by a site plan showing the dimensions and
arrangement of the proposed development or changes including all proposed land uses
and structures; points of access, roads and parking areas; septic tank and drainfield and
replacement areas; areas to be cut or filled; and natural features such as contours,
streams, wetlands, hazardous slopes, etc. The administrator may require other drawings,
topographic surveys, photographs, or other material essential to an understanding of
the proposed use and its relationship to the surrounding properties.
3. Applications for project permits shall be signed by the owner(s) of the property.
4. Appropriate fee(s) paid -in#ull.
a Eighty percent of all application fees are due at the time of application submittal. The
remaining twenty percent is due prior to permit issuance. In the event the Department
does not issue a decision within the time limits established in KCC15A.03.120, the
remainingtwenty wentypercent of the permit fees shall be reduced up to the following
amounts:
i Ten percent of the full permit fee if the decision was delayed no more than twenty
percent of the overall processing timeline.
ii Twenty percent of the full permit fee if the decision was delayed more than twenty
percent of the overall processing timeline.
Example
A non -administrative process has a maximum processing timeline of 170 days from the
date of notice of complete application If the Department processes this application and
issues the decision between 171 and 203 days from the deemed complete date, the
applicant's complete permit payment will be reduced by ten percent. If the Department
issues a determination beyond 204 days, the applicant will receive a twenty percent
reduction in the permitting fee.
*This example excludes any timeline modifications established in KCC15A.03.120(4).
(nr,] '�n','-r, 2014; 1-,-' `'nor 01•4, 2010; Ord. 2007-22, 2007; Ord. 2000-07; Ord. 98-10, 1998)
15A.03.040 Determination of complete application.
1. Within 28 days after receiving a project permit application, the local permitting agency
shall mail or provide in person a written determination to the applicant, stating either:
a. That the application is complete; or
b. That the application is incomplete and what is necessary to make the
application complete. An incomplete application shall expire after 180
calendar days unless the requested supplemental information is submitted
in complete form.
2. To the extent known by the permitting agency, the permitting agency shall identify
other agencies of local, state or federal governments that may have jurisdiction over
some aspect of the application.
3. A project permit application is complete for the purposes of this title when it meets the
procedural submission requirements of Kittitas County and is sufficient for continued
processing even though additional information may be required or project
modifications may be undertaken subsequently. The determination of completeness
shall not preclude Kittitas County from requesting additional information or studies
either at the time of the notice of completeness or subsequently if new information is
required or substantial changes in the proposed action occur.
4. Within 14 days after an applicant has submitted to the permitting agency additional
information identified by the permitting agency as being necessary for a complete
application, the permitting agency shall notify the applicant whether the application is
complete or what additional information is necessary. In determining the number of
days that have elapsed after Kittitas County has notified the applicant that the
application is complete, the following periods shall be excluded:
a.
Any period during which the applicant has been requested by Kittitas
County to correct plans, perform required studies, or provide additional
required information. The period shall be calculated from the date Kittitas
County notifies the applicant of the need for the additional information
until the earlier of the date Kittitas County determined whether the
additional information satisfies the request for information or 14 days after
the date the information has been provided to Kittitas County.
i. If Kittitas County determines that the additional information
submitted by the applicant is insufficient, it shall notify the
applicant of the continued deficiencies and the procedures
under subsection (4)(a) of this section shall apply as if a new
request for studies has been made.
b.
Any period during which an environmental impact statement is being
prepared following a determination of significance pursuant to
Chapter __ ____ _, if Kittitas County and the applicant in writing agree to
a time period for completion of an environmental impact statement.
c.
Any period of administrative appeals of project permits, if an open record
hearing or a closed record appeal, or both, are allowed. The time period to
consider and decide such appeals shall not exceed:
i. Ninety days for an open record appeal hearing;
ii. Sixty days for a closed record appeal; and
iii. The parties to an appeal may agree to extend these time
periods.
d.
Any extension of time mutually agreed upon by the applicant and Kittitas
County.
e.
These time limits do not apply to a project permit application, if the project:
i. Requires an amendment to the comprehensive plan or a
development regulation;
ii. Requires approval of a new fully contained community as
provided in ',CW 36.70A.350, a master planned resort as
provided in 'CW 36.70A.360, or the siting of an essential
public facility as provided in ",CW 36.70A.200;
iii. Is substantially revised by the applicant, in which case the time
period shall start from the date at which the revised project
application is determined to be complete.
f.
If Kittitas County is unable to issue its final decision within the time limits
provided, it shall provide written notice of this fact to the applicant. The
notice shall include a statement of reasons why the time limits have not
been met and an estimated date of issuance of the notice of final decision.
g.
Applications shall be void if they remain incomplete for more than 180
days.
h.
This section shall apply to project permit applications filed on or after the
date of adoption of this title.
(Ord. 2014-015, 2014; Ord. 2000-07; Ord. 9810, 1998)
15A.03.045 Deadline extensions and supplemental information. .
1. Once an application has been deemed complete, the Director may request the applicant
to submit additional corrections, studies or other information on the proposed project.
The Director shall set a reasonable deadline for the submittal of corrections, studies or
other information when requested, and shall provide written notification of such
requests to the applicant.
2. Failure by the applicant to meet such deadline shall be cause for the application to be
void. However, an extension of such deadline may be requested by an applicant if the
request is made prior to the expiration of the deadline. Extension requests shall be
submitted in writing, include a justification of why an extension is warranted.
3. When considering a request for a deadline extension, the Director shall give
consideration to the code provisions to which the project is vested, if any. In order to
assure equity in permit processing between past, current, and future applicants,
deadline extensions shall be limited to one extension after code provisions affecting the
project have changed. Once code provisions have changed as to make the vested code
substantially different than current code, a requested deadline extension of up to six
months may be granted, but it shall be the final extension granted. The Director shall
determine whether code changes have created substantially different regulations.
4. The Director shall provide a written, mailed response to the applicant with its decision
on each extension request. (Ord. 2018-021, 2018; :)rd. 2013-001, 2013; Ord. 2010-014 ,
2010)
15A.03.050 Fee schedule.
The fees for application related to this title shall be established by resolution and are referenced
within of the Kittitas County Code.
2017; Ord. 2007-22, 2007; Ord. 2000-07; Ord. 98-10, 1998)
15A.03.060 Notice of application.
Kittitas County shall provide a notice of application to the public and the departments and agencies
with jurisdiction. If Kittitas County has made a SEPA determination of significance under
Chapter 43.21 C RCW concurrently with the notice of application, the notice of application shall be
combined with the determination of significance and scoping notice. Nothing in this subsection
prevents a determination of significance and scoping notice from being issued prior to a notice of
application.
1. The notice of application shall be provided within 14 days after the determination of
completeness in the following method:
a. Publishing notice, including at least the project location in other than a
legal description, brief description of project, type of permit(s) required,
comment period dates, and location where the complete application may
be reviewed in the newspaper of general circulation in the general area
where the proposal is located or in a local land use newsletter published by
Kittitas County. Additional legal notice may be published for development
applications located in the upper county in newspapers published at least
weekly, in addition to the legal publishing requirement in the official county
paper of record.
b. Notifying public or private groups with known interest in a certain proposal
or in the type of proposal being considered.
c. Mailing to adjacent landowners. Adjacent landowners are the owners of
real property, as shown by the records of the county assessor, located
within 500 feet of any portion of the boundary of the proposal's tax parcel
or lot of record (real property). If the owner of the real property which is
proposed for activity owns another parcel or parcels of real property which
lie adjacent to the real property proposed for activity, notice shall be given
to owners of real property located within 500 feet of any portion of the
boundaries of such adjacently located parcels of real property owned by
the owner of the real property proposed for activity. Mailed notice for Solar
Power Production Facilities shall be provided in accordance with
KCC 1.61 C.080(21.
d. Notifying the news media.
e. Posting notice via the Kittitas County Website.
f. Posting the site as outlined in m-L ii iu.
2. The notice of application shall include the following:
a. The date of initial application, the date of the notice of completion for the
application, and the date of the notice of application.
b. A description of the proposed project action and a list of the project
permits included in the application and, if applicable, a list of any additional
studies requested to complete the application.
c. The identification of other permits not included in the application to the
extent known by Kittitas County.
d. The identification of existing environmental documents that evaluate the
proposed project.
e. The location where the application and any studies can be reviewed.
f. A statement of the public comment period, which shall be not less than 14
nor more than 30 days following the date of the notice of application. This
comment period shall be pursuant to rable.A at the end of this title.
g. Statement of the right of any person to comment on the application,
receive notice of and participate in any hearings, request a copy of the
decision once made, and any appeal rights.
h. Kittitas County will accept public comments at any time prior to the closing
of the public comment period of the specific application.
i. The date, time, place and type of hearing, if applicable and scheduled at the
date of notice of the application.
j. A statement of the preliminary determination, if one has been made at the
time of notice, of those development regulations that will be used for
project mitigation and of consistency.
k. Identify the designated permit coordinator.
I. Any other information determined appropriate by Kittitas County.
If the administrator has a reasonable basis for determining significant adverse
environmental impacts are unlikely (pursuant to Chapter 15.04 KCC, SEPA Regulations)
for a proposal, the notice of application comment period will suffice for purposes of
compliance with Chapter 197-11 WAC, and a second comment period after issuance of
the SEPA threshold determination will not be required; provided, the notice of
application includes the following:
a. A statement indicating that the county expects to issue a DNS for the
proposal; and
b. A statement indicating that the optional DNS process is being used, and
that this may be the only opportunity to comment on the environmental
impacts of the proposal; and
c. A statement indicating that the proposal may include mitigation measures
under applicable codes, and the project review process may incorporate or
require mitigation measures regardless of whether an EIS is prepared; and
d. A statement indicating that a copy of the subsequent threshold
determination for the specific proposal may be obtained upon request.
4. A notice of application shall not be required for project permits that are categorically
exempt under Chapter 43.21 C RCS%, (SEPA), unless a public comment period is required
or for projects identified in <CC 15A.0. Projects exempt from the provisions of
notice of application. (Ord. 2018-018, 2018; Ord. 2007-22, 2007; Ord. 2000-07, 2000;
Ord. 98-10, 1998)
15A.03.070 Specific procedures for permit review.
The specific procedures for individual permit applications and independent administrative actions,
including public comment period, public hearing, decision -making body, and appeals, are
established pursuant to I at the end of this title. (Ord. 2000-07; Ord. 98-10, 1998)
15A.03.080 Projects exempt from the provisions of notice of application.
The following project proposals and land use actions shall be exempt from the provisions of
notification when not associated with a larger, overall project. These projects allow an abbreviated
application format and do not involve public review or hearing unless appeal to an administrative
determination involving the underlying project is properly filed:
1. An act of subdivision not required to be accomplished by long plat, large lot subdivision
short plat, or binding site plan;
2. Land use activity permitted without benefit of conditional use approval (administrative
or quasi judicial), as listed in Zoning;
3. Minor amendments or modifications to approved developments or permits. Minor
amendments are those which may affect the precise dimensions or locations of
buildings, accessory structures and driveways, but do not affect the overall project
character, increase the number of lots, dwelling units, or density, or decrease the quality
or amount of open space;
4. Building and associated construction permits, including but not limited to mechanical,
plumbing, tank and manufactured home placement, etc.;
5. Sign permit;
6. Flood development permit;
7. Critical areas binding determination;
8. Septic and associated health permits, including vault privy, pool and food handler, etc.;
9. Well and/or community water system permit;
10. Approval to access onto county road;
11. Acts of right-of-way vacation;
12. Miscellaneous county actions related to use of public areas or facilities;
13. Those actions categorically exempt from SEPA review, pursuant to Chapter 15.04 KCC,
except as may be required by KCC 15A.03.060(D);
14. Those actions exempt from shoreline substantial development permitting process as set
forth in WAC 173-27-040(2) and RCW 90.58.030.
(Ord. 2016-006, 2016; Ord. 2014-01 S, 2014; Ord. 2007-22, 2007; Ord. 2000-07; Ord. 98-10, 1998)
15A.03.090 Review actions on project permit applications.
Project review shall include the following steps:
1. A notice of determination of completeness to the applicant.
2. A notice of application to the public and agencies with jurisdiction.
3. No more than one consolidated open record hearing and no more than one closed
record appeal.
4. Provisions may be allowed by the local jurisdiction for any public meeting or required
open record hearing that may be held on the project by another local, state, regional,
federal, or other agency, in accordance with provisions of Chapter 36.7013 RCW.
5. A single report by a representative of the administrator, stating all the decisions made as
of the date of the report on all project permits included in the consolidated permit
process. The report shall state any mitigation required or proposed under the
development regulations or the agency's authority under The report
may be the local permit. If a threshold determination other than a determination of
significance has not been issued by Kittitas County, the report shall include or append
this determination.
6. A notice of decision.
7. Except as otherwise provided for in this title, Kittitas County shall issue its notice of final
decision on a project permit application in accordance with KCC 15A.03.120. within 20
days a4eF Kittitas CeLinty notifies the app"Eant that the applicatien ;5 EerAp! (Ord.
2000-07; Ord. 98-10, 1998)
15A.03.100 Criteria for review of all project actions.
Project review should start from the fundamental land use planning choices made in local
comprehensive plans and regulations, include review of consistency and land use impacts.
1. Applicable comprehensive plans and regulations that identify the type of land use for
the site, specify density, and identify and provide for funding of public facilities needed
to serve the proposed development and site should be the standard for project review.
Consistency should be determined in the project review process by considering four
factors found in applicable plans or regulations:
a. The type of land use permitted at the site, including uses that may be
allowed under certain circumstances, such as planned unit developments
and conditional uses, if the criteria for their approval have been satisfied;
b. The level of development allowed, such as units per acre or other measures
of density;
c. Infrastructure, such as the adequacy of public facilities and services
identified in the comprehensive plan, to serve the proposed project; and
d. The character of the proposed development, such as compliance with
specific development standards.
2. In determining consistency, the determinations made pursuant to this title shall be
controlling.
3. Project review should not require additional studies or mitigation under Chapter
(SEPA) where existing regulations have adequately addressed a proposed project's
probable specific adverse environmental impacts.
4. Supplemental authority as specified by Chapter 43.21 C RCW should be used to the
extent that existing requirements do not adequately address a project's specific
probable adverse environmental impacts.
5. Nothing in this title limits the authority of a permitting agency to approve, condition, or
deny a project as provided in its development regulations adopted under Kittitas County
comprehensive plan and development regulations and its policies adopted under
Project review shall be used to identify specific project design and
conditions relating to the character of the development, such as details of site plans,
curb cuts, drainage swales, transportation demand management, or other measures to
mitigate a proposal's probable adverse environmental impacts, if applicable.
6. Consistency between the proposed project and applicable regulations or plan should be
determined through a project review process that integrates land use and
environmental impact analysis, so that governmental and public review of the proposed
project, involving development regulations under Chapter �6./OA RCVV and
environmental process under Chapter _ __ run concurrently and not separately.
7. During project review, Kittitas County or any subsequent reviewing body shall not
reexamine alternatives to or hear appeals on the items identified in such Kittitas County
comprehensive plan and development regulation standards, except for issues of code
interpretation.
8. When holding a hearing on a project permit application, the hearing body should utilize
the following issues outlined as a review guide: earth, air, water (including irrigation
water and its conveyances), plants, animals, energy and natural resources, environmental
health, land and shoreline use, housing, aesthetics, light and glare, recreation, historic
and cultural preservation, transportation, public services, and utilities. (Ord. 2000-07;
Ord. 9810, 1998)
15A.03.110 Posting site.
1. These provisions shall apply to all development applications, except for development
applications processed administratively.
2. The applicant shall post the subject property with signs as required by Community
Development Services.
3. Signs shall be posted on each road frontage on the subject property and shall be clearly
visible and accessible.
4. Signs shall be posted and on -site prior to issuance of a Notice of Application.
5. The sign shall be a minimum 2 feet by 3 feet and laminated and posted in a sturdy
manner to remain on -site until after the expiration of the notice of decision appeal
period. It shall be the responsibility of the applicant to properly dispose of the sign.
6. At the time of development application, Community Development Services will identify
the number of signs needed and the general location of each sign on the subject
property.
7. It shall be the responsibility of the applicant to place the structure in which the sign will
be posted on -site. At such time the structure and sign is in place, the applicant shall
return the signed affidavit of posting form to Community Development Services.
(Ord. 2014-01 E, 2014; Ord. 2007-22, 2007)
15A 03 120 Project permit categories review timelines and reporting.
1. Administrative permits.
a. Administrative permits include those land use applications that do not require public
notice or a public hearing.
b. Decisions on administrative application shall be made within 30 days of the deemed
complete date For administrative applications that do not require a deem complete
step, a decision shall be issued within 65 days of the submittal date. These timelines
can be modified when any of the criteria of KCC15A.03.120(4) are met.
2. Administrative permits with public notice requirement.
a. When an administrative permit requires public notice a decision shall be issued
within 100 days from the deemed complete date.
b. Preliminary short plat applications shall follow the determination schedule outlined in
RCW 58.17.
3. Non -administrative permits.
a. A non -administrative permit is a permit that requires public notice and an open
record public hearing.
b. Decisions on non -administrative permits shall be issued within 170 days from the
deemed complete date.
c. Preliminaryplat implications shall follow the determination schedule outlined in RCW
58.17.
4. Exceptions.
a. The permit timelines established in KCC15A.03.120 do not include:
i Circumstances in which an applicant and the Department agree in writing
upon an extension to the processing timeline
ii Any time in which the Department is waiting on the applicant to submit
information necessary for application processing which has been requested by the
Department in writing.
iii Multiple application for the same project processed concurrently shall adhere
to the longest decision schedule permit category involved.
iv. The timelines established in 15A.03.120 shall not apply to Development
Agreements Planned Unit Developments Master Planned Resorts, Land
Development Code amendments and Comprehensive Plan amendment
applications.
S. Any written notice from the Department requesting additional information shall include a
notice that non -responsiveness for 60 consecutive days may result in 30 days being
added to the time for review. Non -responsiveness means that the applicant is not
making demonstrable progress on providing additional requested information to the
Department or that there is no ongoing communication from the applicant to the
Department on the applicant's ability or willingness to provide the additional
information.
6. Permit processing timeline reporting
The county shall prepare an annual performance report consistent with the requirements of RCW
36 70B 080 These reports shall be provided to the Washington State Department of Commerce and
published on the County website no later than March 1 of each year to reflect the previous year's
reporting data.Disclaimer: This web site is provided for informational purposes only. Although every effort has been
made to provide accuracy, all information and resources shown are not official. Neither Kittitas County nor any of its
agencies, officials or employees guarantees the accuracy of any information on this web site. Reliance upon the
information contained on or accessed through this web site is entirely at your own risk. Kittitas County reserves the
right to make changes without notice.
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: December 23, 2024
TOPIC: G4-29290 Water Right Permit Assignment
ACTION REQUESTED: Direction to Staff
LEAD STAFF:
Arden Thomas
RECOMMENDATION:
Direct staff to sign and submit letter to the Department of Ecology.
BRIEFING SUMMARY:
• A Vantage Area water right holder is interested in assigning their water right
permit application G4-29290 to Kittitas County.
• The proposed assignment would expand the County's mitigation program to
Vantage.
• Assigning application G4-29290 to Kittitas County would maintain and provide
water mitigation options in Vantage.
• Costs associated with the proposed assignment would be covered by the 403 Fund
(Water Resources) until they could be covered by fees charged to water users.
• The next step to advance this request for assignment is to submit a formal request
for Technical Assistance to the Department of Ecology
BACKGROUND:
Joyce Palelek has a groundwater right, certificate 4042-A, for domestic supply in the
town of Vantage. In 1987 Ms. Palelek submitted application G4-29290 requesting a
change to domestic supply, future high density development supply, irrigation, and stock
water use. Kittitas County staff and representatives for Ms. Palelek have met with the
Department of Ecology to discuss potentially assigning application G4-29290 from Ms.
Palelek to Kittitas County, amending the place of use of the application, amending the
location of proposed wells, and retaining the multiple purposes previously applied for.
The next step to advance this request is for Kittitas County and Ms. Palelek to submit a
formal request for Technical Assistance on Assignment of Application G4-29290 to the
Department of Ecology. The proposed partnership between Kittitas County and Ms.
Palelek would enable the groundwater permit application to be processed and would
maintain and provide water mitigation options within Vantage.
Page 1 of 3
Public Works "Work Session Staff Report", 2024
DISCUSSION:
The proposed assignment would expand the County's mitigation program to the Vantage
Area. There is only one municipal water provider in this area. The County's existing
water bank has demonstrated the broader community benefits associated with the
County's entry into the water mitigation arena.
FISCAL IMPACTS:
Kittitas County would enter into a mitigation agreement with Ecology to utilize the Lake
Roosevelt Incremental Release Program and there is an associated annual fee. This
annual fee (estimated in the $17,000 - $30,000 range) would initially be absorbed in the
403 Fund (Water Resources) and water user fees would be developed to cover these
costs. We will budget for these costs in 2026. A budget amendment may be needed for
2025.
ATTACHMENTS:
Exhibit 1: Draft Technical Assistance on Assignment of Application G4-29290 Letter
Page 2 of 3
Public Works "Work Session Staff Report", 2024
EXHIBIT 1: Draft Technical Assistance on Assignment of Application G4-29290 Letter
Page 3 of 3
Public Works "Work Session Staff Report", 2024
December 23, 2024
Tom Tebb, Director
Office of Columbia River (OCR)
1250 West Alder Street
Union Gap, WA 98903
Re: Technical Assistance on Assignment of Application G4-29290
Dear Tom:
We are following up on our technical assistance meeting with additional detail on Kittitas County's
proposal to submit an assignment of the subject application from Applicant Joyce Palelek to Kittitas
County. Prior to our formal submittal, we wanted to send this letter and ensure you have all the
relevant information you need to process this assignment request to an approval. Concurrent with
the assignment, we will be requesting an amended place of use of the proposed application to
ensure Kittitas County can provide reliable service in this area of the County where we do not
currently have mitigation assets. '
As you are aware, Kittitas County has a county -wide goal to ensure that the public has reliable
access to minimum quantities of water for public health and safety needs. Additionally, there have
been times and locations where the County has believed the private sector has monopolized access
to mitigation supplies necessary to mitigate for both Total Water Supply Availability (TWSA) and
local senior water right holders. In those instances, the entry of the County into the mitigation
market has served the public interest by ensuring that the public has access to multiple options to
meet their development needs. This letter outlines our request, the procedural lens we
understanding Ecology will evaluate our request through, and the substantive public interest merits
of our request.
Joint County and Applicant Request
Our specific requests are:
1. Assign Application G4-29290 from Joyce Palelek to Kittitas County
2. Amend the place of use of Application G4-29290 as shown on Figure 1 below:
a. from the SE % NE % and the E%2 SE'/ of Section 30
b. to contiguous land inclusive of the E %2 of Section 30, Section 19, and the SE
of Section 18
3. Amend the location of two wells proposed for Section 30 to match the place of use as
the obstacle of I90 will necessitate having sources on each side of the freeway
4. Retain the existing multiple purposes applied for, inclusive of domestic supply, future
high density development supply, irrigation, and stockwater purposes
Office of Columbia River
December 7, 2024
Figure 1: Existing Place of Use (red outline in Section 30) and Proposed Place of Use (yellow)
Procedural Framework for Request
Our first request involves an assignment of the application from Joyce Palelek to Kittitas County
and we are in the process of preparing that on Ecology's required form. Based on our review of the
form, the statutory reference to RCW 90.03.310 (below), and Ecology's policy guidance in PRO
1000 (also below), this appears to be largely an exercise in ensuring that Ecology's contact
information on the application remains current. Absent additional technical assistance, we will
simply submit the form as required.
RCW 90.03.310
Appropriation procedure —Assignability of permit or application.
Any permit to appropriate water may be assigned subject to the conditions of the permit, but
no such assignment shall be binding or valid unless filed for record with the department.
Any application for permits to appropriate water prior to permit issuing, may be assigned by
the applicant, but no such assignment shall be valid or binding unless the written consent of
the department is first obtained thereto, and unless such assignment is filed for record with
the department.
Page 2
Office of Columbia River
December 7, 2024
PRO 1000 (Page 8)
IV. ASSIGNMENT OF APPLICATIONS
An application may be assigned to another person or persons by the applicant, upon written consent of
the department, using Ecology's Assignment of Application or Permit to Appropriate or Store Water
form. No such assignment(s) shall be binding unless properly filed with Ecology along with the
appropriate fee (RCW 90.03,310). Assignments are noted on either the application or permit.
Assignment is not required when an applicant or permit holder changes his/her name (e.g, due to
marriage, divorce, or corporate name change). In these cases, a memorandum to the file is made and a
ministerial amendment is made to the document.
Our second request is the place of use and point of withdrawal amendment. Ecology adopted WAC
508-12 governing the Administration of Surface and Groundwater Codes, which outlines the
process for such amendments. Our goal in this section is to demonstrate that our amendment can be
successfully processed by Ecology concurrent with our assignment request.
WAC 508-12-190(1) describes the process for amending place of use and point of diversion for
surface applications, and WAC 508-12-220 extends this same process to groundwater applications
(see below, including relevant underlined section).
WAC 508-12-190(1)
Surface water appropriation procedure —Amendments as to source, quantity, etc.
(1) In the event an applicant or permittee should desire to amend the terms of his
application or permit regarding source, quantity, point of diversion, purpose, or place of
use, the procedure shall be as outlined in RCW 90.03.380 excepting that no certificate of
change will issue but the amendments shall be incorporated in the terms of the permit.
WAC 508-12-220
Groundwater appropriation procedure —Applicability of foregoing rules.
The general application of rules numbered WAC 508-12-080 through 508-12-210 inclusive
on surface water applications, shall also apply to the groundwater appropriation procedure.
The rule requires the same analysis as that completed in RCW 90.03.380. The standard of review is
a finding of no impairment (see underlined sections below).
RCW 90.03.380
(1) The right to the use of water which has been applied to a beneficial use in the state shall
be and remain appurtenant to the land or place upon which the same is used: PROVIDED,
HOWEVER, That the right may be transferred to another or to others and become
appurtenant to any other land or place of use without loss of priority of right theretofore
established if such change can be made without detriment or injury to existingrights. ights. The
Page 3
Office of Columbia River
December 7, 2024
point of diversion of water for beneficial use or the purpose of use may be changed, if such
change can be made without detriment or injury to existing rights.
When considering impaired parties, only existing water rights are appropriate to consider because
applicants are not entitled to such protection under RCW 90.03.580(5)(a).
RCW 90.03.380(5)(a)
Pending applications for new water rights are not entitled to protection from impairment,
injury, or detriment when an application relating to an existing surface or ground water
right is considered.
In this case, the application will be fully mitigated under the Lake Roosevelt Incremental Release
Program, the County is prepared to accept the mitigation agreement with OCR to maintain this
mitigation in perpetuity, and no existing water right can be impaired by the modification of the
place of use. Additionally, the County will ensure that any well drilled to supply water under the
application will be located at sufficient distances to avoid well interference. This can be
documented in the findings of the Report of Examination. We believe our amendment request can
be successfully processed and welcome Ecology's final technical assistance before we submit a
letter request with our assignment form requesting concurrent amendment of the application.
Public Interest is Served
We note that an important difference between the surface and groundwater change statutes is the
lack of any public interest evaluation. This finding was confirmed by the Supreme Court in the
PUD District No. I of Pend Oreille v. Ecology (aka Sullivan Creek, 2002) decision. Because WAC
508-12-190(1) directs Ecology to make findings as required in RCW 90.03.380 only, there should
be no public interest evaluation of the County's request. Nonetheless, we believe our application is
in the public interest and offer the following additional points in support of our application.
• The County is better suited to plan and facilitate service to developments in this area. The
County has planning responsibilities under the Growth Management Act, and has a water
code it implements to ensure reliable service.
• Having access to mitigation from the County's mitigation program ensures that other
service providers are acting in consistent manner with regard to public service.
• The proposed place of use is subsumed within and contiguous with original requested place
of use and it is not being transferred to a different project removed from the original place
of use.
• We note that the applicant believed that the 2002 Settlement Agreement with Ecology that
references the unincorporated Town of Vantage as the service area for related Certificate
4042-A was also intended to apply to this pending application. In retrospect, an application
amendment should have been sought at that time, but this request ensures the applicant's
original intent is satisfied.
• The County's stewardship of this application ensures that it will be used in a non -
speculative manner.
• During the Report of Examination process, the County will submit growth density and
population projection information sufficient to support beneficial use under this permit. We
Page 4
Office of Columbia River
December 7, 2024
note that the application references irrigation of up to 85 acres as well as future high density
development supply. This speaks to the phased nature of the development where initial use
by irrigation would be phased out as "future" development occurs. Because irrigation is
typically the most water intensive use of water on the land, starting with the irrigation
quantities on which to base the 600 gpm instantaneous request was reasonable, and any
future development could be subsumed within those quantities.
The place of use in our amendment was selected after considering:
o The place of use noted in the original application materials.
o The complexity associated with serving unincorporated areas of the Town of
Vantage that straddles both sides of I90.
o County GIS maps showing the local water district boundary. We note that a portion
of this application could serve this same area, or could provide complementary
service in the vicinity.
o The local County boundary for areas designed for Limited Ares of More Intense
Rural Development.
o Local terrain and developable lots.
o Local zoning and public/private land use designations.
Based on all these criteria, the County's proposal reasonably includes the developable areas
in and around the unincorporated Town of Vantage, including the original place of use.
With an acknowledgement from Ecology that you have sufficient information to render a decision
on our request, the County and the Applicant are prepared to immediately file the required forms
and assist Ecology in processing the application and associated water service contract. Please feel
free to contact us at your earliest convenience if you need any additional information.
Sincerely,
Arden Thomas
Water Resource Manager
Kittitas County Public Works
Joyce Palelek
Applicant G4-29290
Page 5
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: December 23, 2024
TOPIC: Broadband Planning Update
ACTION REQUESTED: None Required
LEAD STAFF:
Joshua Fredrickson
RECOMMENDATION:
No action required.
BRIEFING SUMMARY:
• Two grants have been awarded to Kittitas County for broadband expansion
• Plan development for the Thorp and Edgemont areas is underway
• Contract is being developed for the second project award
• A third grant source is available to the County through the National
Telecommunications and Information Administration Broadband Equity Access
and Deployment Program (BEAD)
• Applications due January 31, 2025
BACKGROUND:
Kittitas County has been awarded two grants to help expand broadband (high speed
internet) in the County. Funding includes a grant through the Public Works Board (PWB)
and another through the Washington State Broadband Office (WSBO). Additional
funding for broadband expansion is available through the National Telecommunications
and Information Administration (NTIA) Broadband Equity Access and Deployment
(BEAD) Program. Public Works has been working with the County's broadband
consultant for development of broadband expansion phases.
DISCUSSION:
Project funding to expand broadband service to rural portions of the county is available
through the Public Works Board, Washington State Broadband Office and the NTIA.
Funding has been secured through two sources and being sought through the third.
The project funded through PWB will expand broadband service to areas of Thorp and
Edgemont. Design and permitting is underway for this project area. Expansion of
broadband in the Thorp and Edgemont area is anticipated to provide broadband service to
over 550 locations.
The project funded through WSBO is currently going through contract development. An
RFQ was circulated and received one submittal from a qualified provider, Lightcurve.
This is the same company working on the PWB project. This project continues to expand
broadband service in rural areas of the county, anticipating serving over 700 locations.
In November a Notice of Funding Opportunity (NOFO) was posted by the NTIA for the
BEAD project. Seven project areas have been identified and set up by the State
Broadband Office. Each project area requires a separate BEAD application. Originally it
appeared only four project areas might be viable. Currently we anticipate an application
for each of the seven project areas.
BEAD application submittals are robust, including the requirement for a full network
design and financial bonds supporting the design and construction. These items are being
developed by the providers with Public Works input. Funding match amount is
anticipated through the State of Washington. Applications are due January 31, 2025.
Working with our broadband consultant and providers it is anticipated that an application
will be submitted for each of the project areas.
FISCAL IMPACT:
Grant funding has been awarded through PWB and WSBO, additional funding will be
requested through BEAD applications.
ATTACHMENTS:
None