Loading...
HomeMy WebLinkAboutlowervalleyTS_request for CA No. 3 _final 2405 140th Ave. NE, Suite 107, Bellevue, WA 98005 | 425-746-4600 | eFax 503-684-6948 Environmental Consultants & Contractors September 30, 2024 Project No. 01222292.00 Patti Stacey, Director Kittitas County Solid Waste/Facility Maintenance Director 925 Industrial Way Ellensburg, WA 98926 Subject: Project - Kittitas County Lower Valley Transfer Station Request for a Contract Amendment No. 3 Dear Patti: SCS Engineers (SCS) is requesting a contract amendment to provide engineering services during construction for the Lower Valley Transfer Station project in Ellensburg, WA. This amendment request also includes additional design work, project management, and additional services during the bidding phase as noted below. 1.0 CONSTRUCTION PHASE ENGINEERING SUPPORT SERVICES SCS will provide Kittitas County (County) construction phase support services including reviewing shop drawings, responding to Request For Information (RFI’s), preparing design changes, providing geotechnical engineering support, participation during project meetings, specialty inspection services, geotechnical engineering, asbuilts, and participation in a final project walkthrough. 1.1 Project Management SCS will provide project management services including subconsultant coordination, preparation of monthly invoices, and participation in monthly check-in calls with the County. Assumptions  Project Management Services for a 15-month period.  2 hours per month for SCS PM and 2 hours per month for Lead Engineer  Fifteen monthly invoices and check-in calls (30 mins each). 1.2 Submittal Review/RFI Responses/Design Change Notices SCS will perform review of contractor submittals. SCS will prepare responses utilizing Owner provided software (Trimble Project Sight). The estimated number of submittals by discipline is shown below:  Civil 56  Structural 10  Architectural 57  MEP 24  Total 147 Submittals Kittitas County Lower Valley Transfer Station September 30, 2024 Page 2 SCS will review and provide responses to an estimated 130 Request For Information (RFI) and prepare an estimated 30 Design Change Notices. Assumptions  147 Submittal Reviews (Estimated 2.5 hours per submittal)  Respond to 130 RFIs (Estimated 4 hours per RFI)  Develop 30 Design Change Notices (Estimated 14 hours per DCN) 1.3 Project Meetings and Specialty Inspections One SCS staff will participate in 30 – 1-hour progress meetings remotely throughout the 15- month project duration. The SCS team will provide approximately 20 specialty inspections of project components throughout the project duration. Each inspection will include 4–hours of onsite time and travel time from either Seattle of Spokane. Assumptions  Attendance of one SCS staff at 30 – 1-hour project meetings (remotely)  20 Specialty Inspections- 4-hours onsite 1.4 Geotechnical Engineering Support SCS’s subconsultant will provide approximately 60 hours of engineering services providing the Owner with support during construction on an as needed basis. Assumptions  60 Hours of Geotechnical Engineering Support 1.5 As-Builts and Project Closeout SCS will prepare as-built drawings utilizing contractor provided markups. Four (4) SCS team staff will participate in a substantial completion walkthrough and will provide the Owner with a final punch list of items to be corrected by the contractor. The number of asbuilt drawings to be prepared by discipline:  Civil 34  Architectural 59  Structural 27  MEP 46  Total 166 Asbuilt Drawings Assumptions  Preparation of 166 As-Built Drawings Kittitas County Lower Valley Transfer Station September 30, 2024 Page 3  Attendance of 4 SCS Team Staff on Final Substantial Completion Inspection  Each SCS staff (4 total) to be onsite for 12 hours for the final inspection 2.0 ADDITIONAL ENGINEERING SERVICES 2.1 Compost Pond Re-Design SCS will redesign the compost area contact water ponds to account for high groundwater elevations. The design will be based on the highest groundwater encountered during the recent irrigation season. The Owner will provide recent groundwater depths. The design will be submitted to Department of Ecology for review and approval and SCS will submit the revised drawings to the contractor. Drawings C-5B, C-6, C-17, and C-29 will be revised and re-submitted. Assumptions  Revise Drawings C-5B, C-6, C-17, and C-29.  One Submittal to Department of Ecology  One Submittal to Contractor 2.2 Additional Support During Bidding Phase SCS will provide additional engineering support during the bidding phase including utilizing and revising Owner requested AIA upfront documents, preparation of final contract documents, and development of conformed set of contract documents and drawings. Documents revised include:  Standard Form of Agreement (AIA 101-2017) – 6 pages  General Conditions of the Contract (AIA 201-2017)- 38 pages  Instruction to Bidders (AIA 701 – 2017) – 8 pages  Supplementary Instruction to Bidders - 1 Page  Supplementary General Conditions of the Contract – 24 pages  Conformed Set of Upfront Documents – 200 pages  Conformed Set of Technical Specifications – 858 Pages  Conformed Set of Drawings – 168 Drawings 2.3 Owner Requested Services SCS will provide additional engineering services as requested by the OWNER during the 15-month project duration. Services may include responding to regulatory agency questions/comments, additional construction administration support, and other requests by the Owner. The Owner will provide written authorization to SCS for work performed under this task. Work will be invoiced on a Time and Material basis in accordance with the standard unit rate sheet. ADDITIONAL BUDGET The estimated cost for the additional work described in this Amendment 3 is $438,470. The terms and conditions for this added scope of work will remain the same as those listed in the executed contract. Kittitas County Lower Valley Transfer Station September 30, 2024 Page 4 Table 1. Proposed Fees for Amendment 3 CLOSING SCS appreciates the opportunity to assist you on this important project. We will continue to work closely with you and your staff to ensure that responsive and efficient services are provided. We look forward to working with you further on this project. Please do not hesitate to contact us if you have any questions or comments. Sincerely, Thomas D. Parker, P.E., BCEE Michelle P. Leonard Project Director Senior Vice President SCS Engineers SCS Engineers Task Task Description Estimated Cost Billing Type 1.1 Project Management $24,164 Time and Materials 1.2 Submittal Review/RFI Response/ Design Changes Notices $211,896 Time and Materials 1.3 Project Meetings and Specialty Inspections $43,955 Time and Materials 1.4 Geotechnical Engineering Support $12,800 Time and Materials 1.5 Project Closeout and As-Builts $69,045 Time and Materials 2.1 Compost Pond Re-Design $18,200 Lump Sum 2.2 Additional Support During the Bidding Phase $39,910 Lump Sum 2.3 Owner Requested Services $18,500 Time and Materials Total $438,470