HomeMy WebLinkAboutFinalized Contract Agreement Packet@AIA Document A101"20L7
Standard Form of Agreement Between Owner and Contractor
AGREEMENT made as of the 3rd day of September in the year 2024.
BETWEEN the Owner:
Kittitas County
205 West 5th Avenue, Suite 108
Ellensburg, Washington 98926-2887
and the Contractor:
Belsaas & Smith Construction, Inc
PO Box 926
Ellensburg, WA 98926
for the following Project:
Lower Valley Transfer Station
2600 West Green Avenue
Ellensburg, Washington 98950
The project includes the following components as defined by the contract documents, including, but not limited to:
1. Mobilization and demobilization of equipment and persormel for the project.
2. Construction layout and surveying, including location of existing, below grade and above grade utilities
in the work area.
3. Establishment and maintenance of erosion and sediment control throughout the project.
4. Clear and grub work areas.
5. Removal of unsuitable soil.
6. Placement and compaction of soil embankment material.
7. Installation of water, sanitary sewer, electric, stormwater, and fire suppression systems/structures.
8. Construction of Transfer Building, Scales, Scalehouse, MRW Building, Administration Building.
9. Rough grading, fine grading, geotextile installation, subgrade preparation, base course, and asphalt for
road and parking lots.
10. Installation of fencing and gates, signage, and striping.
11. Construction Quality Control (CQC) testing.
12. Completion of record drawings and related documentation.
13. Repair/replacement of existing features impacted during construction.
The Architect/Engineer:
SCS Engineers
2405 l40th Avenue NE,#107
Bellevue, Washington 98005
The Owner and Contractor agree as follows
2
3
4
5
6
7
8
I
TABLE OF ARTICLES
1 THECONTRACTDOCUMENTS
THE WORK OF THIS CONTRACT
DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
CONTMCT SUM
PAYMENTS
DISPUTE RESOLUTION
TERMINATION OR SUSPENSION
MISCELLANEOUS PROVISIONS
ENUMEMTION OF CONTRACT DOCUMENTS
EXHIBIT A ]NSURANCE AND BONDS
ARTICLE I THECONTRACT DOCUMENTS
The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary, and other
Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed
in this Agreement, and Modifications issued after execution of this Agreement, all of which form the Contract, and are
as fu|ly a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire
and integrated agreement between the parties hereto and supersedes prior negotiations, representations, or agreements,
either written or oral. An enumeration of the Conffact Documents, other than a Modification, appears in Article 9.
ARTICLE 2 THE WORK OF THIS CONTRACT
The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in
the Contract Documents to be the responsibility of others.
ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
$ 3.1 The date of commencement of the Work shall be: September 23,2024.
$ 3.2 The Contract Time shall be measured from the date of commencement of the Work.
$ 3.3 Substantial Completion
$ 3.3.1 Subject to adjustments of the Contract Time as provided in the Conhact Documents, the Contractor shall
achieve Substantial Completion of the entire Work:
lxl Not later than 450 calendar days from the date of commencement of theWork.
$ 3.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, ifportions of the Work are
io be completed prior to Substantial Completion of the entire Work, the Contractor shall achieve Substantial
Completion of such portions by the following dates:
All work shall be substantially completed Not later Than 450 Calendar Days from the date of commencement of
work
$ 3.3.3 If the Contractor fails to achieve Substantial Completion as provided in this Section 3.3, liquidated damages, if
any, shall be assessed as set forth in Section 4.5.
ARTICLE 4 CONTRACT SUM
$ 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the
Contract. The Contract Sum shall be $19,991,062.74 for the base bid and Additive Alternative A2-MRW
Building,inclusive of State of Washington Sales Tax (8.4Yo), subject to additions and deductions as provided in the
Contract Documents.
$ 4.2 Alternates
$ 4.2.1 Alternates included in the Contract Sum:
Item Price
Additive Alternative Bid Item No. A2 - MRW Building $1,707,000.00
Contractor agrees to hold bid prices for 30 Calendar days following issuance ofNotice to Proceed for the following
Additive Alternative bid items:
Item Price
1. A1- Administration Buitding
2. A3- Tire Drop-off Area
3. A4 - Hauling Soil to Ryegrass Landfill
$642,000.00
$130,000,00
$784,000.00
$ 4.2.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner following
execution of this Agreement. Upon acceptance, the Owner shall issue a Modifrcation to this Agreement.
None
$ 4.3 Allowances, if any, included in the Contract Sum
None
$ 4.4 Unit prices, if any: Unit Prices Listed in the Bid Schedule
$ 4.5 Liquidated damages, if any:
$500 Per Calendar Day
$ 4.6 other:
None
ARTICLE 5 PAYMENTS
$ 5.1 Progress Payments
$ 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for
Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the
Contractor as provided below and elsewhere in the Contract Documents'
$ 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the
month, or as follows:
Other mutually agreed date by OWNER and Contractor.
$ 5.1.3 Provided that an Application for Payment is received by the Architect not later than the 7th day of a month, the
Owner shall make payment of the amount certified to the Contractor not later than 30 calendar days. If an
Application for Payment is received by the Architect after the application date fixed above, payment of the amount
certified shall be made by the Owner not later than 45 calendar days after the Architect receives the Application for
Payment.
$ 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor
in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the
various portions of the Work. The schedule of values shall be prepared in such form, and supported by such data to
substaniiate its accuracy, as the Architect may require. This schedule of values shall be used as a basis for reviewing
the Contractor's Applications for Payment.
$ 5.1.5 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of
the period covered by the Application for Payment.
$ 5.1.6 In accordance with AIA Document A201rM-2017, General Conditions of the Contract for Conskuction, and
subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as
follows:
$ 5.1.6.1 The amount of each progress payment shall first include:
.1 That portion of the Contract Sum properly allocable to completed Work;
,2 That portion of the Conhact Sum properly allocable to materials and equipment delivered and suitably
stored at the site for subsequent incorporation in the completed construction, or, ifapproved in advance
by the Owner, suitably stored off the site at a location agreed upon in writing; and
,3 That portion of Construction Change Directives that the Architect determines, in the Architect's
professional judgment, to be reasonably justified.
$ 5.1 .6.2 The amount of each progress payment shall then be reduced by:
.1 The aggregate of any amounts previously paid by the Owner;
.2 The amount, if any, for Work that remains uncorrected and for which the Architect has previously
withheld a Certificate for Payment as provided in Article 9 of AIA DocumentA20l-2017;
.3 Any amount for which the Contractor does not intend to pay a Subcontractor or material supplier,
unless the Work has been performed by others the Conhactor intends to pay;
.4 For Work performed or defects discovered since the last payment application, any amount for which
the Architect may withhold payment, or nullifu a Certificate of Payment in whole or in part, as provided
in Article 9 of AIA Document A20l-2017; and
.5 Retainage withheld pursuant to Section 5.1.7.
$ 5.1.7 Retainage
$ 5.1.7.1 For each progress payment made prior to Substantial Completion of the Work, the Owner may withhold the
following amount, as retainage, from the payment otherwise due: 5%o
5.1.7.1.1 The following items are not subject to retainage:
Not applicable.
$ 5.1.7.2 Reduction or limitation of retainage, if any, shall be as follows:
Not applicable.
$ 5.1.7.3 Except as set forth in this Section5.l.7.3,upon Substantial Completion of the Work, the Contractormay submit an
Application for Payment that includes the retainage withheld from prior Applications for Payment pursuant to this Section 5.1.7
The Application for Payment submitted at Substantial Completion shall not include retainage as follows:
Not applicable.
$ 5.1.8 If final completion of the Work is materially delayed through no fault of the Contractor, the Owner shall pay the
Contractor any additional amounts in accordance with Article 9 of AIA Document A20l-2017.
$ 5.1.9 Except with the Owner's prior approval, the Contractor shall not make advance payments to suppliers for materials or
equipment which have not been delivered and stored at the site.
$ 5.2 Final Payment
$ 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor
when
,1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as
provided in Article l2 of AIA Document A20l-20I7, and to satisS other requirements, if any, which extend
beyond final payment; and
,2 a final Certificate for Payment has been issued by the Architect.
$ 5.2.2 The Owner's final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect's final
Certificate for Payment.
$ 5.3 Interest
Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the
absence thereof, at the legal rate prevailing from time to time at the place where the Project is located.
ARTICLE 6 DISPUTE RESOLUTION
$ 6.1 lnitial Decision Maker
The Architect will serve as the Initial Decision Maker pursuant to Article 15 of AIA Document A20l-2077, unless the parties
appoint below another individual, not a party to this Agreement, to serye as the initial Decision Maker.
Casey McFarlane, PE
Project Manager
Kittitas County
$ 6.2 Binding Dispute Resolution
For any Claim subject to, but not resolved by, mediation pursuant to Article l5 of AIA Document A20l-2017, the method of
binding dispute resolution shall be as follows:
I X 1 Arbitration pursuant to Section 15.4 of AiA Document A20l-201'7
If the Owner and Contractor do not select a method of binding dispute resolution, or do not subsequently agree in writing to a
binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court of competent jurisdiction.
ARTICLE 7 TERMINATION OR SUSPENSION
$ 7.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A20l-201'1.
$ 7.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A20l-2017.
ARTICLES MISCELLANEOUS PROVISIONS
$ 8.1 Where reference is made in this Agreement to a provision of AIA Document A20l-20I7 or another Contract Document, the
reference refers to that provision as amended or supplemented by other provisions of the Conhact Documents.
$ 8,2 The Owner's representative:
Casey McFarlane, PE
Kittitas County
925 Industrial Way
Ellensburg, WA 98926
casey.mcfarlane@co.kittitas.wa.us
$ 8.3 The Contractor's representative:
Brandon Drexler
Belsaas & Smith Construction, Inc.
PO Box 926
Ellensburg, WA 98926
$ 8.4 Neither the Owner's nor the Contractor's representative shall be changed without ten days' prior notice to the other party
$ 8,5 lnsurance and Bonds
$ 8.5,1 The Owner and the Contractor shall purchase and maintain insurance as set forth in AIA Document Al0lrM-2017,
Standard Form of Agreement Between Owner and Conhactor where the basis of payment is a Stipulated Sum, Exhibit A,
Insurance and Bonds, and elsewhere in the Contract Documents,
$ 8.5.2 The Contractor shall provide bonds as set forth in AIA Document Al0lrM-2017 Exhibit A, and elsewhere in the Contract
Documents.
$ 8,6 Notice in electronic format, pursuant to Article 1 of AIA Document A20l-2017, may be given in accordance with a building
information modeling exhibit, if completed, or as otherwise set forth below:
Not Applicable.
$ 8.7 Other provisions:
Not Applicable.
ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS
$ 9.1 This Agreement is comprised of the following documents:
.1 AIA Document A101nL2017, Standard Form of Agreement Between Owner and Contractor
.2 AIA Document A101rM-2017, Exhibit A, Insurance and Bonds
.3 AIA Document A201rV017, General Conditions of the Contract for Conshuction
.4 Drawings
Conformed set of Drawings, dated August 30,2024. (167 drawings)
.5 Specifications
Conformed set of specifications dated August 30' 2024 (857 Pages)
.6 Addenda:
Addendum No. 1
Addendum No. 2
Addendum No.3
Addendum No.4
Response to RFI Questions
.9 Other documents, if any, listed below:
None
as of and year first written above.
July 17,2024
July 23,2024
July 24,2024
July 29,2024
August 1,2024
7 Other Exhibits:
t ilt Supplementary and other Conditions of the Contract:
Document Title Date Pages
This Agreement
0
(Signature)
jxi.1::'Ir)ijn\,t t" i;lr,,il1qi:
iilriirlli - riil il:,?ir"r I i,.)i lr': lli'!1ir i
1 rlttit{i:, .
; ,,r - " 'lt li,,t'l;: r r' 'rr r"' r, ' -
r r,
rlj,;1,1"''-,''_
r r!iJ,llrr rti 1:t.t1i.ji,:.i,,, 1..1 rla)i :.1
.lJtt l r,i li \ ll j ii
. r lil i0i;ji i!11:;1ili',, ' lrtr!i ' riir:
-.,i iif:.ll;:lr'
1.'r)trir::ll ta -, i ,,lrrXr,' ii I
i . L!!r \r rr
',1,; 11111' jil lli,
" 1r., .' ,. , li )l' 'l
ii.ii rttj J lli l'?
].,rr'l';,fi.rrr ;1, .ril )'
lJ L rr :, ''.1'.',"
,1 1
!,r I rz1jiilt ,rLr 'lt, /a
lrr'-,'r; ' r.',r;;l:,lri'. -.lr;:t: 1,r,,4":- ,.r , 'r:rirl,,
- .i;, i ititiri;i:l. ( )) rr:lr:i Il!i:,3ir''i:li:t!)| .ri,1r"'rj:li:'-
(Printed name and title)
0
(Printed name and tttle)
ggAIA Document A101 @ - 201/ Exhibit A
Insurance and Bonds
This Insurance and Bonds Exhibit is part of the Agreement, between the Owner and the Contractor, dated 3'd day of
September in the y ear 2024.
for the following
PROJECT:
Lower Valley Transfer Station
2600 West Green Avenue
El le ns bur g, l4ras hington 9 8 9 5 0
THE OWNER:
Kittitas Cotmty
205 l4test 5th Avenue, Suite 108
El lens b urg, ll'ashington 9 8 9 2 6- 2 8 I 7
THE CONTRACTOR:
Belsaas & Smith Construction, Inc.
PO Box 926
Ellensburg, WA 98926
TABLE OF ARTICLES
A.1 GENERAL
4.2 OWNER'S INSURANCE
A.3 CONTRACTOR'S INSURANCE AND BONDS
4.4 SPECIAL TERMS AND CONDITIONS
ARTICLE A.1 GENERAL
The Owner and Contractor shall purchase and maintain insurance, and provide bonds, as set forth in this Exhibit.As
used in this Exhibit, the term General Conditions refers to AIA Document A20lrv10l7, General Conditions of the
Contract for Construction.
ARTICLE A.2 OWNER'S INSURANCE
$ A.2.1 General
Prior to commencement of the Work, the Owner shall secure the insurance, and provide evidence of the coverage,
required under this Article A.2 and, upon the Contractor's request, provide a copy of the property insurance policy or
policies required by Section A.2.3.The copy of the policy or policies provided shall contain all applicable conditions,
definitions, exclusions, and endorsements.
$ A.2.2 Liability lnsurance
The Owner shall be responsible for purchasing and maintaining the Owner's usual general liability insurance.
Copyright A[f€f]lsreserved, i:i'-./ir,]ir;ii,;'!lir.,iririir.:i;l
1
$ A.2.3 Required Property lnsurance
S A.2.3.1 Unless this obligation is placed on the Contractor pursuant to Section A.3.3.2.1, the Owner shall purchase and
maintain, from an insurance company or insurance companies lawfully authorized to issue insurance in the jurisdiction
where the Project is located, property insurance written on a builder's risk "all-risks" completed value or equivalent
policy form and sufficient to cover the total value of the entire Project on a replacement cost basis. The Owner's
property insurance coverage shall be no less than the amount of the initial Contract Sum, plus the value of subsequent
Modifications and labor ltcrlbntrc'cl ancl materials or ccluiprtte nt supplied by others The properly insurance shall be
maintained until Substantial Completion and thereafter as provided in Section A.2.3.1.3, unless otherwise provided in
the Contract Documents or otherwise agreed in writing by the parties to this Agreement. This insurance shall include the
interests ofthe Owner, Contractor, Subcontractors, and Sub-subcontractors in the Project as insureds. This insurance
shall include the interests of mortgagees as loss payees.
S A.2.3.1.1 Causes of Loss. The insurance required by this Section A.2.3.1 shall provide coverage for direct physical loss
or damage, and shall not exclude the risks of fire, explosion, theft, vandalism, malicious mischief, collapse, earthquake,
flood, or windstorm. The insurance shall also provide coverage for ensuing loss or resulting damage from error,
omission, or deficiency in construction methods, design, specifications, workmanship, or materials.
S 4.2,3.1.2 Specific Required Coverages. The insurance required by this Section A.2.3.1 shall provide coverage for loss
or damage to falsework and other temporary structures, and to building systems from testing and startup. The insurance
shall also cover debris removal, including demolition occasioned by enforcement of any applicable legal requirements,
and reasonable compensation for the Architect's and Contractor's services and expenses required as a result ofsuch
insured loss, including claim preparation expenses.
S A.2.3,1.3 Unless the parties agree otherwise, upon Substantial Completion, the Owner shall continue the insurance
requiredbySection A.2.3.1 or,ifnecessary,replacetheinsurancepolicyrequiredunderSection A.2.3.1withproperty
insurance written for the total value ofthe Project that shall remain in effect until expiration ofthe period for correction
of the Work set forth in Section 12.2.2 of the General Conditions.
S A.2.3.1.4 Deductibles and Self-lnsured Retentions. If the insurance required by this Section A.2.3 is subject to
deductibles or self-insured retentions, the Owner shall be responsible for all loss not covered because ofsuch
deductibles or retentions.
$ A,2.3.2 Occupancy or Use Prior to Substantial Completion, The Owner's occupancy or use of any completed or partially
completed portion of the Work prior to Substantial Completion shall not commence until the insurance company or
companies providing the insurance under Section A.2.3 .l have consented in writing to the continuance of coverage. The
Owner and the Contractor shall take no action with respect to partial occupancy or use that would cause cancellation,
lapse, or reduction of insurance, unless they agree otherwise in writing.
S 4.2.3.3 lnsurance for Existing Structures
If the Work involves remodeling an existing structure or constructing an addition to an existing structure, the Owner
shall purchase and maintain, until the expiration of the period for correction of Work as set forth in Section 12.2.2 of lhe
General Conditions, "all-risks" property insurance, on a replacement cost basis, protecting the existing structure against
direct physical loss or damage from the causes of loss identified in Section A.2.3.1, notwithstanding the undertaking of
the Work. The Owner shall be responsible for all co-insurance penalties.
$ A.2.4 Optional Extended Property lnsurance. Not Required
$ A.2.5 Other Optional lnsurance. Not Required.
ARTICLE A,3 CONTRACTOR'S INSURANCE AND BONDS
$ A.3.1 General
$ A.3,1.1 Certificates of lnsurance. The Contractor shall provide certificates of insurance acceptable to the Owner
evidencing compliance with the requirements in this Article A.3 at the following times: (l) prior to commencement of
the Work; (2) upon renewal or replacement of each required policy of insurance; and (3) upon the Owner's written
request. An additional certificate evidencing continuation of commercial liability coverage, including coverage for
completed operations, shall be submitted with the final Application for Payment and thereafter upon renewal or
replacement of such coverage untitrffrgraxpiration of the periods required by Seotigns.S&r?e8 and Seotion id,3,3,1,r The
2
certificates will show the Owner as an additional insured on the Contractor's Commercial General Liability and excess
or umbrella liability policy or policies.
S A,3.1.2 Deductibles and Selflnsured Retentions. The Contractor shall disclose to the Owner any deductible or self-
insured retentions applicable to any insurance required to be provided by the Contractor.
S 4.3,1.3 Additional lnsured Obligations. To the fullest extent permitted by law, the Contractor shall cause the
commercial general liability coverage to include (l) the Owner, the Architect, and the Architect's consultants as
additional insureds for claims caused in whole or in part by the Contractor's negligent acts or omissions during the
Contractor's operations; and (2) the Owner as an additional insured for claims caused in whole or in part by the
Contractor's negligent acts or omissions for which loss occurs during completed operations. The additional insured
coverage shall be primary and non-contributory to any ofthe Owner's general liability insurance policies and shall
apply to both ongoing and completed operations. To the extent commercially available, the additional insured coverage
shall be no less than that provided by Insurance Services Office, Inc. (ISO) forms CG 20 l0 07 04, CG 20 37 07 04,
and, with respect to the Architect and the Architect's consultants, CG 20 32 07 04.
$ A,3,2 Contractor's Required Insurance Coverage
S A.3,2.1 The Contractor shall purchase and maintain the following types and limits of insurance from an insurance
company or insurance companies lawfully authorized to issue insurance in the jurisdiction where the Project is located
The Contractor shall maintain the required insurance until the expiration of the period for correction of Work as set
forth in Section 12.2.2 of the General Conditions, unless a different duration is stated below:
S A.3.2.2 Commercial General Liability
S A.3,2.2.1 Commercial General Liability insurance for the Project written on an occurence form with policy limits of not less
thanllrQQlrlQQQ each occurrence, providing coverage for claims including
.1 damages because ofbodily injury, sickness or disease, including occupational sickness or disease,and
death of any person;
.2 personal injury and advertising injury;
.3 damages because ofphysical damage to, or destruction of, tangible property, including the loss ofuseof
such property;
.4 bodily injury or property damage arising out of completed operations; and
.5 the Contractor's indemnity obligations under Section 3.18 of the General Conditions.
S A,3.2,2.2 The Contractor's Commercial General Liability policy under this Section A.3.2.2 shall not contain an
exclusion or restriction of coverage for the following:
,1 Claims by one insured against another insured, if the exclusion or restriction is based solely on thefact
that the claimant is an insured, and there would otherwise be coverage for the claim.
.2 Claims for propenty damage to the Contractor's Work arising out of the products-completedoperations
hazard, where the damaged Work or the Work out of which the damage arises was performed by a
Subcontractor.
.3 Claims for bodily injury other than to employees of the insured.
.4 Claims for indemnity under Section 3. l8 of the General Conditions arising out of injury to employees of
the insured
,5 Claims or loss excluded under a prior work endorsement or other similar exclusionary language.
.6 Claims or loss due to physical damage under a prior injury endorsement or similarexclusionary
language.
.7 Claims related to residential, multi-family, or other habitational projects, if the Work is to beperformed
on such a pro.iect.
.8 Claims related to roofing, if the Work involves roofing.
.9 Claims related to exterior insulation finish systems (EIFS), synthetic stucco or similar exteriorcoatings
or surfaces, if the Work involves such coatings or surfaces.
.10 Claims related to earth subsidence or movement
.1'l Claims related to explosion, collapse, and underground hazards, where the Work involves such hazards.
l: .,,,1. ..i'; rill\ ilrf/i1/r i,,,,rr irli)t
Copy.ight All rights reserved. i ::., li::r{r i ,, .,:, it i .liii ttr, i ,l
3
S A.3.2.3 Automobile Liability Automobile Liability covering vehicles owned, and non-owned vehicles used, by the
Contractor, withpolicy limits of not less than $1"000.000 per accident, for bodily injury, death of any person, and property
damage arising out of the ownership, maintenance and use of those motor vehicles along with any other statutorily required
automobile coverage.
S A.3,2.4 The Contractor may achieve the required limits and coverage for Commercial General Liability and
Automobile Liability through a combination of primary and excess or umbrella liability insurance, provided such
primary and excess or umbrella insurance policies result in the same or greater coverage as the coverages required under
Section A3 .2.2 and, A.3.2.3, and in no event shall any excess or umbrella liability insurance provide narrower coverage
than the primary policy. The excess policy shall not require the exhaustion of the underlying limits only through the
actual payment by the underlying insurers.
S A,3,2,5 Workers' Compensation at statutory limits.
S A.3.2.6 Employers' Liability with policy limits not less than $1.000.000 each accident, $1.000.000 each employee,
and $1,000,000 policy limit.
S A.3.2.7 Not Required
S A.3,2.8 If the Contractor is required to furnish professional services as part of the Work, the Contractor shall procure
Professional Liability insurance covering performance of the professional services, with policy limits of not less than
$1.000"000 per claim and_$2,1009@ in the aggregate.
S A.3.2.9 Not Required
S A.3,2.10 Not Required
S 4.3,2,11 Not Required
S A.3.2.12 Not Required
$ A,3.3 Conhactor's Other lnsurance Coverage
S 4.3.3.1 Not Required
S A.3.3.2 Not Required
S A.3.4 Performance Bond and Payment Bond
The Contractor shall provide surety bonds, from a company or companies lawfully authorized to issue surety bonds in
the jurisdiction where the Project is located, as follows:
Type Penal Sun ($)
Payment Bond
Performance Bond
100% ofthe Contract Sum
100% ofthe Contract Sum
Payment and Performance Bonds shall be AIA Document A3l2rM, Payment Bond and Performance Bond, or contain
provisions identical to AIA Document A3l2'rM, current as of the date of this Agreement.
ARTICLE A.4 SPECIAL TERMS AND CONDITIONS
Special terms and conditions that modi$ this Insurance and Bonds Exhibit, if any, are as follows: Not Required.
Copyright All arghts reseFved. 'i .ii: 1'..trtr.:!ti.. :i li:i,:!i!;!{: rrl
4
AfA Document A201"2007
General Conditions of the Contract for Construction
for the following PROJECT:
(Name and location or address)
Lower Valley Transfer Station
2600 West Green Ave
Ellensburg. WA 98950
o
THE OWNER:
(Name, legal status and address)
Kittitas Countv
205 W 5th Avenue. Suite 108
Ellensburg. WA 98926-2887
THE AREHTECT ENGINEER (HEREAFTER NOTED AS ARCHITECD:
(Name, legal status and address)
SCS Ensineers
2405 l40th Ave NE. #107
Bellevue. WA 98005
TABLE OF ARTICLES
1 GENERAL PROVISIONS
2 OWNER
3 CONTRACTOR
4 ARCHITECT
5 SUBCONTRACTORS
6 CONSTRUCTIONBYOWNERORBYSEPARATECONTRACTORS
7 CHANGES IN THE WORK
8 TIME
9 PAYMENTS AND COMPLETION
1() PROTECTION OF PERSONSAND PROPERTY
11 INSURANCEAND BONDS
,12 UNCOVERING AND CORRECTION OF WORK
13 MISCELLANEOUS PROVISIONS
14 TERMINATION OR SUSPENSION OF THE CONTRACT
15 CLAIMSAND DISPUTES
ADDITIONS AND DELETIONS :
The author of this document
has added information
needed for its completion.
The author may al-so have
revised the text of the
original AIA standard form.
An Additions and Deletions
Report that notes added
information as well as
revisi-ons to the standard
form text is available from
the author and should be
reviewed.
This document has important
legal consequences.
Consultation with an
attorney is encouraged with
respect to its completion
or modification.
ELECTRONIC COPYING of any
portion of this AIA@ Document
to another electroni.c fife is
prohibited and constitutes a
violation of copyright laws
as set forth in the footer of
this document.
ArA Docunent A201 - 2OO"l. Copyright O 1911, 1915, L918, 1925, 193'1, I95I, 1958/ 1961, 1963, 1966' L9'70' 1976, 7981' 1991 and 2007. All
rights reserved. "The American Institute of Archj.tects," "American Institute of Architects," "AIa," the AIA Logo, and "AIA Contract
Docunents" are trademarks of The American Instieute of Alchitects, This draft was produced at 09:51:37 PT on 05/13/2024 under Otder
No-4104243047 which expi-res on 06/1,0/2024, is not for resale, is licensed for one-time use only, and nay onLy be used in accordance with
the AIA Contract Documentso Terms of Service. To report copyxight violations, e-mai.l docinfocaiacontracts.com.
user Noces: \I1649t60111
1
INDEX
(Topics and numbers in bold are section headings.)
Acceptance of Nonconforming Work
9.6.6,9.9.3,12.3
Acceptance of Work
9.6.6, 9.8.2, 9.9.3, 9. 10. 1, 9.10.3, 12.3
Access to Work
3.16,6.2.1,12.1
Accident Prevention
l0
Acts and Omissions
3.2, 3.3.2, 3.12.8, 3.18, 4.2.3, 8.3. l, 9.5. I, 10.2.5,
10.2.8, 13.4.2, 13.7, 14.1, 15.2
Addenda
1,1.1,3.11
Additional Costs, Claims for
3.7.4, 3.7 .5, 6.1.t, 7.3.7 .5, 10.3, 15. 1.4
Additional Inspections and Testing
9.4.2, 9.8.3, 12.2.1, 13.5
Additional Insured
11.1.4
Additional Time, Claims for
3.2.4, 3.7 .4, 3.7 .5, 3.10.2, 8.3.2, 15.1.5
Administration of the Contract
3.t.3,4.2,9.4,9.5
Advertisement or Invitation to Bid
1.1.1
Aesthetic Effect
4.2.13
Allowances
3.8,7.3.8
All-risk Insurance
11.3.1, 11.3.1.1
Applications for Payment
4.2.5, 7 .3.9, 9.2, 9.3, 9.4, 9.5 .1, 9 .6.3, 9.7, 9.10,
I 1. 1.3
Approvals
2.1 . l, 2.2.2, 2.4, 3 .1.3, 3 .10.2, 3.12.8, 3.12.9, 3 .12. 10,
4.2.7,9.3.2,13.5.1
Arbitration
8.3.1, I 1.3. 10, 13.r, 15.3.2, 15.4
ARCHITECT
4
Architect, Definition of
4.1.1
Architect, Extent of Authorify
2.4, 3.12.7, 4.1, 4.2, 5.2, 6.3, 7 .1.2, 7 .3.7, 7 .4, 9.2,
9.3.1, 9.4, 9.5, 9.6.3, 9.8, 9. 10. 1, 9. 10.3, 12.1, 12.2.1,
13.5.1, 13.5.2, 14.2.2, 14.2.4, 15.1.3, 15.2.1
Architect, Limitations of Authority and
Responsibility
2.1 .1, 3.12.4, 3.12.8, 3.12.10, 4.1.2, 4.2.1, 4.2.2,
4.2.3, 4.2.6, 4.2.7 , 4.2.10, 4.2.12, 4.2.13, 5.2.1, 7 .4,
9.4.2, 9,5.3, 9,6.4, 15.1.3, 15.2
Architect's Additional Services and Expenses
2.4, lI.3.l.l, 12.2.1, 13.5.2, 13.5.3, 14.2.4
Architect's Administration of the Contract
3.t.3, 4.2. 3 .7 .4, t5 .2, 9 .4.1 , 9 .5
Architect's Approvals
2.4, 3.r.3, 3.5, 3.10.2, 4.2.7
Architect's Authority to Reject Work
3.5, 4.2.6, 12.l .2, 12.2.1
Architect's Copyright
1.1.7, 1.5
Architect's Decisions
3.7 .4, 4.2.6,4.2.7 ,4.2.1r,4.2.12, 4.2.13, 4.2.14, 6.3,
7 .3.7, 7 .3.9, 8. 1.3, 8.3. 1, 9.2, 9.4.r, 9.5, 9.8.4, 9.9.1,
13.5.2, 15 .2, L5.3
Architect's Inspections
3.7 .4, 4.2.2, 4.2.9, 9.4.2, 9.8.3, 9.9 .2, 9. 1 0. I, I 3. 5
Architect's Instructions
3.2.4, 3.3.1, 4.2.6, 4.2.7, 13.5,2
Architect' s Interpretations
4.2.11,4.2.12
Architect' s Proj ect Representative
4.2.10
Architect's Relationship with Conkactor
1.1.2, 1.5, 3. 1.3, 3.2.2, 3.2.3, 3.2.4, 3.3.1, 3 .4.2, 3.5,
3.7 .4, 3.7 .5, 3.9.2, 3.9.3, 3. I 0, 3. 1 l, 3.12, 3. I 6, 3. I 8,
4.1.2, 4.1.3, 4.2, 5.2, 6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 9.5,
9.7, 9.8, 9.9, 10.2.6, I 0.3, I 1.3.7, 12, 13.4.2, 13.5,
15.2
Architect's Relationship with Subcontractors
1.1.2, 4.2.3, 4.2.4, 4.2.6,9.6.3, 9 .6.4, ll .3 .7
Architect's Representations
9.4.2,9.5.1,9.10.1
Architect's Site Visits
3.7 .4, 4.2.2, 4.2.9, 9 .4.2, 9.5 .1, 9.9.2, 9. I 0. I, I 3. 5
Asbestos
10.3.1
Attorneys'Fees
3.18.1,9.10.2, 10.3.3
Award of Separate Contracts
6.1 .1 , 6.1 .2
Award of Subcontracts and Other Contracts for
Portions of the Work
5.2
Basic Definitions
1.1
Bidding Requirements
l.l.l, 5 .2.1, ll.4.l
Binding Dispute Resolution
9.7, t|.3.9, I 1.3. I 0, t3.1, 15.2.5, 15.2.6.1, I 5.3. I,
15.3.2,15.4,1
Boiler and Machinery fnsurance
11.3.2
Bonds, Lien
7.3.7 .4, 9.10.2, 9.r0.3
Bonds, Performance, and Payment
7 .3.7 .4, 9.6.7 , 9 .10.3, 11 .3.9, ll.4
Building Permit
3.7.1
Capitalization
1.3
AIA Document A2Ol - 2OO-1. copyrisht @ 1911, 1915, 1918, 1925, 193?, 1951, 1958, 1961' 1963, 1965, L910' I9'16, 798?' 1997 and 200?. AII
rights reserved. "The American Instit'uEe of Archit'ecLs," "Anerican Institute of Architects," "AIA," the AIA togo/ and "AIA Codtract
Documents" are trademarks of The Amexicail Institute of Architects. This draft was produced at 09:51:3'i P'I on 05/13/2024 under Order
No.4104243047 which expires o^ 06/lO/2024, is not for lesale, is licensed for one-time use onfy, and may onl"y be used in accordance with
the AIA Contract Docunentso Terns of Selvice. To report copyright violations, e-nail docinfocaiacontracts.com.
Usqr Notes:
2
(r1649160r?)
Certificate of Substantial Completion
9.8.3, 9.8.4, 9.8.5
Certificates for Payment
4.2.1, 4.2.5, 4.2.9, 9.3.3, 9.4, 9.5,9 .6.1 , 9.6.6, 9.',l ,
9. I 0. I , 9. 10.3, 14.l .l .3 , 14.2.4, 15 .l .3
Certificates of Inspection, Testing or Approval
13.5.4
Certificates of Insurance
9.10.2, ll.l.3
Change Orders
l. l .l, 2.4, 3.4.2, 3.7 .4, 3.8.2.3, 3.1 l, 3.12.8, 4.2.8,
5.2.3, 7 .r.2, 7 .1.3, 7 .2, 7 .3 .2, 7 .3.6, 7 .3 .9, 7 .3.1 0,
8.3. 1, 9.3. l. l, 9. 10.3, 10.3.2, r1.3.r.2, 11.3.4, 1 1.3.9,
t2.t .2, l5.l .3
Change Orders, Definition of
7.2.1
CHAIIGES IN THE WORK
2.2.1, 3.1 l, 4.2.8, 7, 7 .2.1, 7 .3.1, 7 .4, 8.3. 1, 9.3. l. l,
I1.3.9
Claims, Definition of
15.1.1
CLAIMS AND DISPUTES
3.2.4, 6.1.1, 6.3, 7 .3.9, 9.3.3, 9.10.4, 10.3.3, 15, I 5.4
Claims and Timely Assertion of Claims
15.4.1
Claims for Additional Cost
3.2.4, 3.7 .4, 6.1.1, 7 .3.9, 10.3.2, 15.1.4
Claims for Additional Time
3.2.4, 3 ;7 .4, 6.1.1, 8.3.2, 10.3.2, 15.1.5
Concealed or Unknown Conditions, Claims for
3.7.4
Claims for Damages
3.2.4, 3.r8, 6. l. 1, 8.3.3, 9.5.1, 9.6.7, 10.3.3, I 1. l, I,
1 1.3.5, 1r.3.7, 14.1.3, 14.2.4, 15.1.6
Claims Subject to Arbitration
15.3.1, 15.4.1
Cleaning Up
3.15, 6.3
Commencement of the Work, Conditions Relating to
2.2. l, 3.2.2, 3.4.1, 3.7 .1, 3. I 0. l, 3.12.6, 5.2.r, 5.2.3,
6.2.2, 8.1.2, 8.2.2, 8.3.1, I l. 1, I 1.3. l, I 1.3.6, ll.4.l,
15.1.4
Commencement of the Work, Definition of
8.1.2
Communications Facilitating Contract
Administration
3.9.1,4.2.4
Completion, Conditions Relating to
3.4.1, 3.1 l, 3. I 5, 4.2.2, 4.2.9, 8.2, 9.4.2, 9.8, 9.9.1,
9.10, 12.2, 13.7, 14.1.2
COMPLETION, PAYMENTS AND
9
Completion, Substantial
4.2.9, 8.1.1, 8. 1.3, 8.2.3, 9.4.2, 9.8, 9.9.1, 9.10.3,
12.2,13.7
Compliance with Laws
I .6, 3 .2.3, 3.6, 3 .7, 3.12.10, 3.13, 4.1 . l, 9 .6.4, 10.2.2,
1 1.1, 11.3, 13.1, 13.4, 13.5.1, 13.5.2, 13.6, 14.1,1,
14.2.1.3, 15.2.8, I 5.4.2, | 5.4.3
Concealed or Unknown Conditions
3.7 .4, 4.2.8, 8.3. l, 10.3
Conditions of the Contract
1.1.1, 6.1.1, 6.1.4
Consent, Written
3 .4.2, 3.7 .4, 3.12.8, 3. 14.2, 4.r.2, 9.3.2, 9. 8.5, 9.9. l,
9.10.2, 9. 10.3, I 1.3. l, 13.2, 13.4.2, 15.4.4.2
Consolidation or Joinder
15.4.4
CONSTRUCTION BY OWNER OR BY
SEPARATE CONTRACTORS
1.1.4,6
Construction Change Directive, Definition of
7.3.1
Construction Change Directives
I .1 .1, 3 .4.2, 3.12.8, 4.2.8, 7 .1.1, 7 .1.2, 7 . 1,3, 7 .3,
9.3.l.l
Construction Schedules, Contractor's
3.10, 3.r2.1, 3.12.2, 6. 1.3, 15. 1.5.2
Contingent Assignment of Subcontracts
5.4,14.2.2.2
Continuing Contract Performance
1s.1.3
Contract, Defurition of
1.1.2
CONTRACT, TERMINATION OR
SUSPENSION OF THE
5.4.1.1,11.3.9,14
Contract Administration
3.7.3,4,9.4,9,5
Contract Award and Execution, Conditions Relating
to
3.7.1, 3.10, 5.2, 6.1, I l. 1.3, 11.3.6, 11.4.1
Contract Documents, Copies Furnished and Use of
1.5.2,2.2.5,5.3
Contract Documents, Definition of
1.1.1
Contract Sum
3 .7 .4, 3.8, 5.2.3, 7 .2, 7 .3, 7 .4, 9.1, 9.4.2, 9 .5.1 .4,
9.6.7, 9.7, 10.3.2, I 1.3. l, 14.2.4, 14.3.2, 15.1.4,
15.2.5
Contract Sum, Definition of
9.1
Contract Time
3 .7 .4, 3.7 .5, 3. 1 0.2, 5.2.3, 7 .2.1.3, 7 .3. 1, 7 .3.5, 7 .4,
8. 1. 1, 8.2. l, 8.3. 1, 9.5. 1, 9.7, 10.3.2, 12.l.r, 14.3.2,
15.1.5.1, 15.2.5
Contract Time, Definition of
8.1.1
CONTRACTOR
3
Contractor, Definition of
3.1,6.1.2
AIA Document A2OL - 2OO1. Copyright @ 1911, 1915, 7918, 1925, L937, 1951, 1958t 196I, 1963, L966, L9'lO, l9'16, L981, 1991 and 200?' All
rights reserved. '.The Americin fnstitute of Architects," "Ame.ican fnstitute of Architects," "AIA"' the AIA Logo, and "AIA ConLract
Doiuments,, are ttademarks of The American Institute of Architects. This dtaft was Ptoduced at 09151:37 P'I on 05/l'3/2024 under Order
No.4104243047 which expiles o^ 06/LO/2024, is not fo! resale, is licensed for one-time use only. and may only be used in accordance with
the AIA Contract Documentso terms of Setvice. To report copylight violations, e-maiI docinfooaiacontracts'con.
User Notss: (116491601?)
3
Contractor's Construction Schedules
3.10,3 .12.1, 3.12.2, 6.1.3, 15 .l .5.2
Contractor's Employees
3.3.2,3.4.3,3.8.1, 3.9, 3.18.2, 4.2.3, 4.2.6, 10,2, 10.3,
1 l. l. 1, 11.3.7, 14.1, 14.2.1.1
Contractor's Liability Insurance
11.1
Contractor's Relationship with Separate Contractors
and Owner's Forces
3.12.5, 3.1 4.2, 4.2.4, 6, 11.3.7, 12.1.2, 12.2.4
Contractor's Relationship with Subcontractors
1.2.2, 3.3.2, 3. 1 8. l, 3.18.2, 5, 9.6.2, 9 .6.7, 9 . 10.2,
11.3.1.2, 1 1.3.7, I 1.3.8
Contractor's Relationship with the Architect
I .1,.2, | .5, 3. 1.3, 3.2.2, 3.2.3, 3 .2.4, 3 .3.1, 3 .4.2, 3.5,
3.7 .4, 3.r0, 3.LL, 3.12, 3. I 6, 3. I 8, 4.1.3, 4.2, 5.2,
6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 9.5, 9.7, 9.8, 9.9, 10.2.6,
10.3, 11.3.7, 12, 13.5, 15.1.2, 15.2.1
Contractor's Representations
3 .2.1, 3.2.2, 3.5, 3.12.6, 6.2.2, 8.2.1, 9 .3 .3, 9.8.2
Contractor's Responsibility for Those Performing the
Work
3.3.2, 3.18, 5.3, 6.1.3, 6.2, 9.5.1, 10.2.8
Contractor's Review of Contract Documents
3.2
Contractor's Right to Stop the Work
9.7
Contractor's Right to Terminate the Contract
14.1, 15.1.6
Contractor's Submittals
3. I 0, 3. I l, 3.12.4, 4.2.7, 5.2.1, 5.2.3, 9.2, 9.3, 9.8.2,
9.8.3, 9.9.1, 9.10.2, 9. 10.3, 11.1.3, 11.4.2
Contractor's Superintendent
3.9, 10.2.6
Contractor's Supervision and Conskuction
Procedures
1.2.2,3.3,3.4,3.12.10, 4.2.2, 4.2.7 , 6.1.3, 6.2.4,
7.1.3, 7 .3.5, 7 .3.7, 8.2, 10, 12, 14, I 5. 1.3
Contractual Liability Insurance
11.1.1.8, 11.2
Coordination and Correlation
7.2, 3.2.1, 3.3.1, 3. 10, 3.12.6, 6.1.3, 6.2.1
Copies Furnished of Drawings and Specifications
1.5,2.2.5, 3 .11
Copyrights
1.5,3.17
Correction of Work
2.3, 2.4, 3.7 .3, 9.4.2, 9.8.2, 9.8.3, 9.9.1, 12.1.2, 12.2
Correlation and Intent of the Contract Documents
1.2
Cost, Definition of
7.3.7
Costs
2.4, 3 .2.4, 3.7 .3, 3.8.2, 3.1 5.2, 5.4.2, 6. | .1, 6.2.3,
7 .3 .3.3, 7 .3 .7, 7 .3 .8, 7 .3 .9, 9.10.2, 10.3 .2, I 0.3. 6,
|1.3, 12.1.2, 12.2.r, 12.2.4, 13.5, 14
Cutting and Patching
3.14,6.2.5
Damage to Construction of Owner or Separate
Contractors
3.14.2, 6.2.4, 10.2.1.2, 10.2.5, 10.4, 1 1.1.1, I 1.3,
12.2.4
Damage to the Work
3.1 4.2, 9.9 .r, 10.2.1.2, 10.2.5, 10.4, | | .3.1, 12.2.4
Damages, Claims for
3.2.4, 3.18, 6. 1. l, 8.3.3, 9.5.1, 9.6.7, I 0.3.3, 1 l. l. 1,
I 1.3.5, 11.3.7, 14.1.3, 14.2.4, 15.1.6
Damages for Delay
6.1.1, 8.3.3, 9.5.1.6, 9;7,10.3.2
Date of Commencement of the Work, Definition of
8.1.2
Date of Substantial Completion, Definition of
8.r.3
Day, Definition of
8.1.4
Decisions of the Architect
3.7 .4, 4.2.6, 4.2.7, 4.2.1 l, 4.2.12, 4.2.13, I 5.2, 6.3,
7 .3.7, 7 .3.9, 8. 1.3, 8.3. l, 9.2, 9.4, 9.5.1, 9.8.4, 9.9.1,
13.5.2, 14.2.2, 14.2.4, 15.1, 75 .2
Decisions to Withhold Certification
9.4.1, 9.5, 9.7, 14.1.1.3
Defective or Nonconforming Work, Acceptance,
Rejection and Correction of
2.3, 2,4, 3.5, 4.2.6, 6.2.5, 9.5.1, 9.5 .2, 9.6.6, 9 .8,2,
9.9.3,9.10.4,12.2.1
Definitions
Ll, 2.1.1, 3. l. l, 3.5, 3.12.1, 3.12.2, 3.12.3, 4.1.1,
1 5. l. l, 5.1, 6.1.2,'7 .2.1, 7 .3.1, 8. l, 9. 1, 9.8. I
Delays and Extensions of Time
3.2, 3.7 .4, 5.2.3, 7 .2.1, 7 .3.1, 7 .4, 8.3, 9.5. l, 9.7,
10.3.2, 10.4, 14.3.2, I 5. 1.5, I 5.2.5
Disputes
6.3,7 .3.9, 15 .1, 15 .2
Documents and Samples at the Site
3.11
Drawings, Definition of
1.1.5
Drawings and Specifications, Use and Ownership of
3.11
Effective Date of Insurance
8.2.2, tl.L.2
Emergencies
10,4,14.1.1.2, 15.1.4
Employees, Contractor's
3.3.2, 3.4.3, 3.8. 1, 3.9, 3.18.2, 4.2.3, 4.2.6, 10.2,
10.3.3, 1 1.1.1, 11.3.7, 14.1, 14.2.1.1
Equipment, Labor, Materials or
l. 1.3, l. 1.6, 3.4, 3.5, 3.8.2, 3.8.3, 3.12, 3.13, 3. 1 5. 1,
4.2.6, 4.2.7, 5.2.1, 6.2.1, J .3.7, 9 .3 .2, 9. 3.3, 9.5. 1.3,
9.10.2, 10.2.1, 10.2.4, 14.2.1.1, 14.2.1.2
Execution and Progress of the Work
1.1.3, I .2.1, I .2.2,2.2.3,2.2.5, 3.1, 3.3.1,3.4.1,3 .5,
3.7. 1, 3. 10. l, 3.12, 3.14, 4.2, 6.2.2, 7 .1.3, 7.3.5, 8.2,
9.5.1, 9.9.1, 10.2, 10.3, 12.2, 14.2, 14.3. l, I 5. 1.3
AIA Docunent p.2OI - 2OO'1, Copyright O 191.1, 1915, 79L8, 1925, 193'1, L951, f958' I96L, 1963' 1'966, 1910, I9'16' 79
ri.ghts reserved. .'The American Institute of Architects," "Ane!ican Institute of Architects," "AIA"'the AIA Logo
Do;uments', are trademarks of The l\melican Institute of Architects. this draft was Produced at 09151137 PT on 05/
No.4lO424304? which expires on 06/10/2024r is not for resaLe, is Licensed for one-ti'me use only, and may only be
the AIA Contract Docunentso Telns of Service. To report copyright violations. e-nail docinfooai"acontracts.com.
User NoCes:
8'7, 199'l and 2007. All
, and "AIA contract
13/2024 under order
used in accordance with
(1154916017)
4
Extensions of Time
3,2.4, 3.7 .4, 5.2.3, 7 .2. l, 7 .3, 7 .4, 9.5 .1, 9.7, 10.3.2,
10.4, 14.3, 15.1.5, 15.2.5
Failure of Payment
9.5. 1.3, 9.7, 9.10.2, 13.6, 14.1.1.3, 14.2.1.2
Faulty Work
(See Defective or Nonconforming Work)
Final Completion and Final Payment
4.2.1, 4.2.9, 9.8.2, 9.10, ll.l.2, I 1. 1.3, I 1.3. 1, I 1.3.5,
12.3, 14.2.4,14.4.3
Financial Arrangements, Owner's
2.2.r, 13.2.2, 14.1.1.4
Fire and Extended Coverage Insurance
11.3.1.1
GENERAL PROVISIONS
I
Governing Law
13.1
Guarantees (See Wananty)
Hazardous Materials
10.2.4,10.3
Identification of Subcontractors and Suppliers
5.2.r
fndemnification
3.17, 3.18, 9.10.2, 10.3.3, 10.3.5, 10.3.6, 11.3.1.2,
tt.3.7
Information and Services Required of the Owner
2. 1.2, 2.2, 3 .2.2, 3 .r2.4, 3 .12.10, 6.1,3, 6.1 .4, 6.2. 5,
9.6.1, 9.6.4, 9.9.2, 9.10.3, I 0.3.3, 11.2, 11.4, 13.5. l,
13.5.2, 14.1.1.4, 14.1.4, 15.1.3
Initial Decision
t5.2
Initial Decision Maker, Definition of
1.1.8
Initial Decision Maker, Decisions
14.2.2, 14.2.4,15.2.1, 15.2.2, 15.2.3, 15.2.4, 15.2.5
Initial Decision Maker, Extent of Authorily
t4.2.2, 1 4.2.4, I 5. 1.3, I 5.2.1, I 5.2.2, I 5.2.3, I 5.2.4,
15.2.5
Injury or Damage to Person or Property
10.2.8, 10.4
Inspections
3. I .3, 3. 3.3, 3.7 . l, 4.2.2, 4.2.6, 4.2.9, 9.4.2, 9.8.3,
9 .9 .2, 9 .10 .r , 12.2 .l , 13 .5
Instructions to Bidders
l.l.l
Instructions to the Contractor
3 .2.4, 3 .3. l, 3.8.1, 5.2.1, 7, 8.2.2, 12, 13.5.2
fnstruments of Service, Definition of
1.1.7
Insurance
3. I 8. 1, 6.1.1, 7 .3.7, 9.3.2, 9.8.4, 9.9 .1, 9. 10.2, ll
Insurance, Boiler and Machinery
1r.3.2
Insurance, Contractor's Liability
11.1
Insurance, Effective Date of
8.2.2,tt.1.2
Insurance, Loss ofUse
11.3.3
fnsurance, Owner's Liability
tt.2
Insurance, Property
10.2.5, 11.3
Insurance, Stored Materials
9.3.2
INSURANCE AND BONDS
11
Insurance Companies, Consent to Partial Occupancy
9.9.1
Intent of the Contract Documents
1.2.1, 4.2.7, 4.2.12, 4.2.13, 7 .4
Interest
13.6
Interpretation
1.2.3, 1.4, 4.1.1, 5 J, 6.1.2, 15.l.l
Interpretations, Written
4.2.t1,4.2.12, 15.1.4
Judgment on Final Award
t5.4.2
Labor and Materials, Equipment
l. 1.3, l. 1.6, 3.4, 3.5, 3.8.2, 3.8.3, 3.12, 3.13, 3. I 5. 1,
4.2.6, 4.2.7, 5.2. l, 6.2.1, 7 .3.7, 9.3.2, 9.3.3, 9.5.1 .3,
9.10.2, 10.2.1, 10.2.4, 14.2.1.1, 14.2.1.2
Labor Disputes
8.3. I
Laws and Regulations
1.5, 3.2.3, 3.6, 3.7, 3.12.10, 3. 13, 4.1 . l, 9 .6.4, 9.9. l,
10.2.2,11,1.1, 11.3, 13.1, 13.4, 13.5.1, 13.5.2,13.6,
14,15.2.8,15.4
Liens
2.1.2, 9.3.3, 9.10.2, 9.10.4, I 5.2.8
Limitations, Statutes of
12.2.5, 13.7 ,15.4.1.1
Limitations of Liability
2.3, 3.2.2, 3.5, 3.12.10, 3. I 7, 3. I 8. 1, 4.2.6, 4.2.7,
4.2.t2, 6.2.2, 9.4.2, 9.6.4, 9.6.7, I 0.2.5, I 0.3.3,
I I .r.2, r1.2, ll .3.7 , 12.2.5, 13 .4.2
Limitations of Time
2.1.2, 2.2, 2.4, 3.2.2, 3. I 0, 3. I l, 3.r2.5, 3.15.1, 4.2.7,
5.2, 5.3, 5.4.1, 6.2.4, 7 .3, 7 .4, 8.2, 9.2, 9.3 . l, 9.3 .3,
9.4.1, 9.5, 9.6, 9.7, 9.8, 9.9, 9. 10, I l. 1.3, I 1.3. 1.5,
I 1.3.6, I 1.3.10, 12.2, 13.5, 13.7, \4, 15
Loss of Use Insurance
11.3.3
Material Suppliers
1.5, 3 .12.1, 4.2.4, 4.2.6, 5.2.1, 9 .3, 9.4.2, 9 .6, 9.1 0.5
Materials, Hazardous
10.2.4,10.3
Materials, Labor, Equipment and
l. 1 .3, 1. 1.6, 1.5.1, 3.4.1, 3.5, 3.8.2, 3.8.3, 3.12, 3.13,
3. 1 5. l, 4.2.6, 4.2.7, 5.2.1, 6.2.1, 7 .3.7, 9.3.2, 9.3.3,
9.5.1.3, 9.10.2, 10.2.1.2, r0.2.4, 14.2.1.1, I 4.2.1.2
Means, Methods, Techniques, Sequences and
Procedures of Conskuction
3,3. l, 3. 12. 10, 4.2.2, 4.2.7, 9.4.2
AIA Document A2Ol - 2001. Copylight @ 1911, 1915, lgLl, 1925, 193?, I951, 1958. 1951' 1963, 7966, I9'lO, 1976' L981, 199"1 and 2007.
rights reserved. ..The American fnstiLute of Architects," "American Institute of Architects." "AIA"' the AIA Logo, and "AIA Contracl
Documents,, are trademarks of The American Institute of Architects. this draft was produced at 09:51:3? PI o^ 05/L3/2024 under Order
No.4104243047 which expires o^ 06/lO/2024, is not for resale, is Iicensed fol one-time use only, and may only be used in accordance with
the AIA Contract Documentso Terms of Service. To repo.t copyright violations, e-mail" docinfocaiacontracts.com.
user Notee: l7l649L6or1t
AII
5
Mechanic's Lien
2.1.2,15.2.8
Mediation
8.3.1, 10.3.5, 10.3.6, 15.2.1, L5.2.5, 15.2.6, 15.3,
t5.4.1
Minor Changes in the Work
1. 1.1, 3.12.8, 4.2.8, 7.1, 7.4
MISCELLANEOUS PROVISIONS
13
Modifications, Definition of
1.1.1
Modifications to the Contract
l.l.l, 1.1.2, 3.11, 4.1.2, 4.2.1, 5.2.3, 7, 8.3.1, 9.7,
I 0.3.2, 1 I .3. I
Mutual Responsibility
6.2
Nonconforming Work, Acceptance of
9.6.6,9.9.3,12.3
Nonconforming Work, Rejection and Correction of
2.3, 2.4, 3.5, 4.2.6, 6.2.4, 9.5.1, 9 .8.2, 9.9 .3, 9 .l 0.4,
12.2.1
Notice
2.2.1, 2.3, 2.4, 3 .2.4, 3 .3 .1, 3 .7 .2, 3.12.9, 5.2. l, 9.7,
9.10, 10.2.2, I 1.1.3, 12.2.2.1, 13.3, 13.5.1, 13.5.2,
14.1, r4.2, 15.2.8, 15.4.1
Notice, Written
2.3, 2.4, 3.3. l, 3.9.2, 3 .r2.9, 3.r2.10, 5 .2. l, 9 .7, 9.10,
10.2.2, 10.3, 1 1.1.3, I 1.3.6, 12.2.2.1, 13.3, 14, 15.2.8,
t5.4.t
Notice of Claims
3.7 .4, 10.2.8, 15.1.2, I 5.4
Notice of Testing and Inspections
t3 .5.1, 13.5.2
Observations, Contractor's
3.2,3.7.4
Occupancy
2.2.2, 9.6.6, 9.8, I 1.3.1.5
Orders, Written
l.l .l, 2.3, 3.9.2, 7, 8.2.2, I 1.3.9, 12.1, 12.2.2. l,
t3.5.2, 14.3.1
OWNER
2
Owner, Definition of
2.1.1
Owner, Information and Services Required of the
2. t.2, 2.2, 3.2.2, 3.12.10, 6.1.3, 6.1 .4, 6.2.5, 9.3.2,
9.6.1, 9.6.4, 9.9.2, 9.10.3, 10.3.3, 1 1.2, | 1.3, 1 3.5. 1,
13.5.2, 14.1.1.4, 14.1 .4, 15 .l .3
Owner's Authority
I .5, 2. Ll, 2.3, 2.4, 3.4.2, 3.8.1, 3.12.10, 3 . 1 4.2, 4. 1.2,
4.1 .3, 4.2.4, 4.2.9, 5.2.1, 5.2.4, 5 .4.1, 6.r, 6.3, 7 .2.1,
7 .3.1, 8.2.2, 8.3. l, 9.3. l, 9.3.2, 9.5.1, 9.6.4, 9.9.1,
9.10.2, 10.3.2, I 1.1.3, I 1.3.3, I 1.3.10, 12.2.2, 12.3,
13.2.2, 14.3, 14.4, 15.2.7
Owner's Financial Capability
2.2.r, 13.2.2, 14.1.1.4
Owner's Liability Insurance
tl.2
Owner's Relationship with Subcontractors
1.1.2, 5.2, 5.3, 5.4, 9.6.4, 9.10.2, 14.2.2
Owner's Right to Carry Out the Work
2.4,14.2.2
Owner's Right to Clean Up
6.3
Owner's Right to Perform Construction and to
Award Separate Contracts
6.1
Owner's Right to Stop the Work
2.3
Owner's Right to Suspend the Work
t4.3
Owner's Right to Terminate the Contract
14.2
Ownership and Use of Drawings' Specifications
and Other Instruments of Service
l. l- l, l. 1.6, 1.1.7, 1.5, 2.2.5, 3.2.2, 3. I 1, 3. 17, 4.2.12,
5.3
Partial Occupancy or Use
9.6.6,9,9, 1 I .3. I .5
Patching, Cutting and
3.14,6.2.5
Patents
3.17
Payment, Applications for
4.2.5, 7 .3.9, 9.2, 9.3, 9.4, 9.5, 9.6.3, 9.7, 9. 8. 5, 9. I 0. 1,
14.2.3, 14.2.4, 14.4.3
Payment, Certilicates for
4.2.5, 4.2.9,9.3.3, 9.4,9.5, 9.6.1, 9 .6.6, 9.7 ,9. I 0. I ,
9. I 0.3, 13.7, 14.1.1.3, 14.2.4
Payment, Failure of
9.5. 1.3, 9.7, 9.10.2, 13.6, 14.1.1.3, 14.2.1.2
Payment, Final
4.2. 1, 4.2.9, 9.8.2, 9.10, l l.l.2, 1 l. 1 . 3, | 1 .4.1, 12.3,
13.7 , 14.2.4, 14.4.3
Payment Bond, Performance Bond and
7 .3.7 .4, 9.6.7, 9.r0.3, ll.4
Payments, Progress
9.3, 9,6, 9.8.5, 9. 10.3, 13.6, 14.2.3, 15.1.3
PAYMENTS AND COMPLETION
9
Payments to Subcontractors
5 .4.2, 9 .5.1.3, 9.6.2, 9.6.3, 9.6.4, 9 .6.7, I 4.2.r.2
PCB
10.3.1
Performance Bond and Payment Bond
7 .3.7 .4, 9.6.7, 9.10.3, ll.4
Permits, Fees, Notices and Compliance with Laws
2.2.2, 3.7 , 3.13, 7 .3.7 .4, 10.2.2
PERSONS AND PROPERTY, PROTECTION
OF
10
Polychlorinated Biphenyl
10.3.1
Product Data, Definition of
3.12.2
AIA Document A2Of - 2001. copyright @ 1911, 1915, 1918, 1925, 193?, 1951, 1958, 1951, 1963' 7966, l91O' L9'16, 198't' 199'l and 2007. AIl
rig:hts reserved. '.The American Insti!ute of Alchitec!s," "Anerican Institute of Architects,"'AIA," the AIA Logo, and "AIA Contract
Documents,, are tradenarks of The American Institute of Architects. This draft was Produced at 09:51:37 P"l o\ 05/13/2024 under Order
No,410424304? which expires on 06/lO/2024, is not for resale, is licensed fot one-time use only, and may only be used in accordance wiLh
the AIA Contract Documentso Terns of Selvice. To report copyright violations, e-mail docinfooaiacootlacts.com.
user Noces i (1164916017)
6
Product Data and Samples, Shop Drawings
3.11,3.12,4.2.7
Progress and Completion
4.2.2, 8.2, 9.8, 9.9. 1, 14.1.4, 15.1.3
Progress Payments
9.3, 9.6, 9.8.5, 9. 10.3, 13.6, 14.2.3, 15.1.3
Project, Definition of
1.1.4
Project Representatives
4.2.10
Property Insurance
r0.2.5,11.3
PROTECTION OF PERSONS AND PROPERTY
10
Regulations and Laws
1.5, 3.2.3, 3.6, 3.7, 3.12.10, 3.13, 4.1.1, 9.6.4, 9,9.1,
10.2.2, 1 Ll, 11.4, 13.1, 13.4, 13.5.1, 13.5.2, 13.6, 14,
15,2.8,15.4
Rejection of Work
3.5,4.2.6, 12.2.1
Releases and Waivers of Liens
9.t0.2
Representations
3.2.1, 3.5, 3.12.6, 6.2.2, 8.2.1, 9.3.3, 9.4.2, 9.5.7,
9.8.2,9.10.1
Representatives
2.1 .1,3.1.1,3.9, 4.1.1, 4.2.r, 4.2.2, 4.2.10, 5 .l .1,
5.1.2,13.2.r
Responsibility for Those Performing the Work
3.3.2, 3.18, 4.2.3, 5.3, 6.1.3, 6.2, 6.3, 9.5. l, 10
Retainage
9.3.1, 9.6.2, 9.8.5, 9.9. l, 9.10.2, 9.10.3
Review of Contract Documents and Field
Conditions by Contractor
3.2, 3.12.7 , 6.1.3
Review of Contractor's Submittals by Owner and
Architect
3. I 0. 1, 3.10.2, 3.1 l, 3.12, 4.2, 5.2, 6.1.3, 9.2, 9.8.2
Review of Shop Drawings, Product Data and
Samples by Contractor
3.t2
Rights and Remedies
7 .1.2, 2.3, 2.4, 3.5, 3.7 .4, 3.r5.2, 4.2.6, 5,3, 5.4, 6.1,
6.3, 7 .3.1, 8. 3, 9. 5. 1, 9 :1, 10.2.5, 10.3, 12.2.2, 12.2.4,
13.4, 14, 15.4
Royalties, Patents and Copyrights
3.17
Rules and Notices for Arbitration
t5.4.1
Safety of Persons and Property
10,2,10.4
Safety Precautions and Programs
3.3.1, 4.2.2, 4.2.7, 5.3, 10,1, 10.2, 10.4
Samples, Definition of
3.12.3
Samples, Shop Drawings, Product Data and
3.|t,3.12,4.2.7
Samples at the Site, Documents and
3.11
Schedule of Values
9.2,9.3.r
Schedules, Construction
3.10, 3.12.1, 3.12.2, 6.1.3, 15.1.5.2
Separate Contracts and Contractors
1.1.4, 3.12.5, 3.1 4.2, 4.2.4, 4.2.7, 6, 8.3.1, 12.1.2
Shop Drawings, Definition of
3.12.1
Shop Drawings, Product Data and Samples
3.11,3.12,4.2.7
Site, Use of
3.t3,6.1.t, 6.2.1
Site Inspections
3 .2,2, 3.3.3, 3.7 .1, 3.7 .4, 4.2, 9.4.2, 9. I 0. 1, I 3.5
Site Visits, Architect's
3.7 .4, 4.2.2, 4.2.9, 9.4.2, 9.5.1, 9.9.2, 9. 1 0. 1, I 3. 5
Special Inspections and Testing
4.2.6, 12.2.1, 13.5
Specifications, Definition of
1.1.6
Specifications
1.1. l, 1.1.6, 1.2.2, 1.5, 3,1 l, 3. 12. 10, 3.17, 4.2.14
Statute of Limitations
13.7 , 15.4.1.1
Stopping the Work
2.3,9.7,10.3, 14.1
Stored Materials
6.2.1, 9.3.2, 10.2.1.2, 10.2.4
Subcontractor, Definition of
5.1.r
SUBCONTRACTORS
5
Subcontractors, Work by
1 .2.2, 3 .3.2, 3, 12.1, 4.2.3, 5.2.3, 5.3, 5.4, 9.3 . | .2,
9.6.7
Subcontractual Relations
5.3, 5.4, 9.3.1.2, 9.6, 9.r0, 10.2.1, 14. r, | 4,2.1
Submittals
3. I 0, 3. t l, 3.r2, 4.2.7, 5.2.1, 5.2.3, 7 .3.7, 9.2, 9.3,
9.8, 9.9.1, 9.10.2, 9. 10.3, I l. 1.3
Submittal Schedule
3.10.2,3.12.5,4.2.7
Subrogation, Waivers of
6.1.t,11.3.7
Substantial Completion
4.2.9, 8.1.1, 8. 1.3, 8.2.3, 9.4.2, 9.8, 9.9. 1, 9. I 0.3,
12.2,13.7
Substantial Completion, Definition of
9.8.1
Substitution of Subconhactors
5.2.3,5.2.4
Substitution of Architect
4.1.3
Substitutions of Materials
3.4.2,3.5,7.3.8
AIA Document A2Ot - 2007. Copyright O 1911, 1915, lgl8, 1925, 193'1, 195I, 1958, 1961, 1963, L966, L9-10' I9'16' 1981, I99'l and 2007' AIL
rights reserved. '.The American Institute of Architects," "Ame!ican lnstitute of Architects,"'AIA," lhe AIA logo/ and "AIA Contract
Doiuments,, are tradenarks of The American Iostitute of Axchitects. This draft was produced at 09:51:37 PI on 05/13/2024 under Order
No.410424304? which expites o^ 05/lO/2024, is not for resale, is licensed for one-time use only' and may only be used in accordance with
the AIA Contract Docunentso Telms of Service. To report copy!ight violatj.ons, e-mail docinfoGaiacontracts'com.
Us6r Notes:(116491601?)
7
Sub-subcontractor, Defi nition of
5.1.2
Subsurface Conditions
3.7.4
Successors and Assigns
13.2
Superintendent
3.9,10.2.6
Supervision and Construction Procedures
r.2.2, 3.3, 3.4, 3.12.10, 4.2.2, 4.2.7, 6.1 .3, 6.2.4,
7 .1.3, 7 .3.7, 8.2, 8.3.7, 9.4.2, 10, 12, 14, t 5.1.3
Surety
5.4.1 .2, 9.8.5, 9.1 0.2, 9. I 0.3, I 4.2.2, I 5.2.7
Surety, Consent of
9.10.2,9.10.3
Surveys
2.2.3
Suspension by the Owner for Convenience
14.3
Suspension of the Work
5.4.2,14.3
Suspension or Termination of the Contract
5.4.1.r,14
Taxes
3.6,3.8.2.1,7.3.7.4
Termination by the Contractor
14,1,15,1.6
Termination by the Owner for Cause
5.4.1.t,14.2,75.1.6
Termination by the Owner for Convenience
14.4
Termination of the Architect
4.r.3
Termination of the Conhactor
14.2.2
TERMINATION OR SUSPENSION OF TIIE
CONTRACT
t4
Tests and Inspections
3.1 .3 , 3 .3 .3, 4.2.2, 4.2.6, 4.2.9,9.4.2, 9.8.3, 9.9 .2,
9. 10. l, 10.3.2, ll.4.l, 12.2.1, 13.5
TIME
8
Time, Delays and Extensions of
3.2.4, 3 .7 .4, 5.2.3, 7 .2.1, 7 .3.1, 7 .4, 8.3, 9 .5 .1, 9.7,
10.3.2, t0.4, 14.3.2, 15.1.5, 15.2.5
Time Limits
2.1 .2, 2.2, 2.4, 3.2.2, 3. I 0, 3. I l, 3.12.5, 3.1 5.1, 4.2,
5.2, 5.3, 5.4, 6.2.4,7 .3,7 .4, 8.2, 9 .2, 9.3.1, 9 .3 .3,
9.4.1,9.5,9.6,9.7,9.8, 9.9, 9.10, I r.1.3,12.2, 13,5,
13.7 , 14, L5 .l .2, 15 .4
Time Limits on Claims
3.7 .4, 10.2.8, 13.7, 15.1.2
Title to Work
9.3.2,9.3.3
Transmission of Data in Digital Form
1.6
UNCOVERING AND CORRECTION OF
WORK
t2
Uncovering of Work
12.1
Unforeseen Conditions, Concealed or Unknown
3.7.4,8.3.1, 10.3
Unit Prices
7.3.3.2,7.3.4
Use of Documents
1. 1. 1, 1.5, 2.2.5, 3.12.6, 5.3
Use of Site
3.13,6.1.1,6.2.1
Values, Schedule of
9.2,9.3.1
Waiver of Claims by the Architect
13.4.2
Waiver of Claims by the Contractor
9.10.5, 13.4.2,15.1.6
Waiver of Claims by the Owner
9.9.3, 9.10.3, 9.10.4, 12.2.2.1, 13.4.2, 14.2.4,15.1.6
Waiver of Consequential Damages
14.2.4, ts.l.6
Waiver of Liens
9.10.2,9.10.4
Waivers of Subrogation
6.t.1,11.3.7
Warranty
3.5, 4.2.9, 9 .3.3, 9.8.4, 9.9.1, 9 .10.4, 12.2.2, 13.7
Weather Delays
t5.l.5.2
Work, Definition of
1.1.3
Written Consent
1.5.2, 3.4.2, 3,7 .4, 3.12.8, 3 .l 4.2, 4.1.2, 9.3 .2, 9.8.5,
9.9.1, 9.10.2, 9. 10.3, 1 1.4. l, 13.2, 13.4.2, 15.4.4.2
Written Interpretations
4.2.t1,4.2.12
Written Notice
2.3, 2.4, 3.3.1, 3.9, 3.12.9, 3 .12.10, 5.2.1, 8.2.2, 9.7,
9.10, 10.2.2, I 0.3, 1 I . I .3, 12.2.2, 12.2.4, 13.3, I 4,
15.4.1
Written Orders
l.l.L, 2.3, 3.9, 7, 8.2.2, 12.1, 12.2, 13.5.2, 14.3.1,
15.1.2
AIA Document A2gL - 2007, Copyrisht @ 1911, 1915, 1918, 1925, 193?, 1951, 1958, 796L, Lgfi, f966, l9'70, l9'16, 198'l' 19
righCs resetved. "The Anerican InstiLuLe of Alchitects," "American Institute of Architects," "AIA," the AIA Logo' and
Doiuments,, are ttadenarks of The Anerican Institute of Alchitect.s. This draft was produced at 09:51:3? Pl or 05/13/202
nlo.4L0424304'l which expires on 06/IO/2024, is not for resaLe, is Iicensed for one-time use only' and may only be used
the AIA Contract Documentso Terns of Service. To repolt copyright violations, e-mail docinfocaiacontracts.com.
Uger Notes:
97 and 2007. AIl
"AIA Contract
4 unde. order
i.n accordance with
8
(r.1549r501?)
ARTICLE 1 GENERAL PROVISIONS
s 1.1 BAS|C DEFINIilONS
s 1.1.1THE CoNTRACT DOCUMENTS
The Contract Documents are enumerated in the Agreement between the Owner and Contractor (hereinafter the
Agreement) and consist of the Agreement, Conditions of the Contract (General, Supplementary and other
Conditions), Drawings, Specifications, Addenda issued prior to execution of the Contract, other documents listed in
the Agreement and Modifications issued after execution of the Contract. A Modification is (l) a written amendment
to the Contract signed by both parties, (2) a Change Order, (3) a Construction Change Directive or (4) a written
order for a minor change in the Work issued by the Architect. Unless specifically enumerated in the Agreement, the
Contract Documents do not include the advertisement or invitation to bid, Instructions to Bidders, sample forms,
other information furnished by the Owner in anticipation of receiving bids or proposals, the Contractor's bid or
proposal, or portions of Addenda relating to bidding requirements.
s 1.1.2THE CoNTRACT
The Contract Documents form the Contract for Construction. The Contract represents the entire and integrated
agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written
or oral. The Contract may be amended or modified only by a Modification. The Contract Documents shall not be
construed to create a conhactual relationship of any kind (1) between the Contractor and the Architect or the
Architect's consultants, (2) befween the Owner and a Subconhactor or a Sub-subcontractor, (3) behveen the Owner
and the Architect or the Architect's consultants or (4) between any persons or entities other than the Owner and the
Contractor. The Architect shall, however, be entitled to performance and enforcement of obligations under the
Contract intended to facilitate performance of the Architect's duties.
$ 1.1.3THE WORK
ih" t".rn "Work" means the construction and services required by the Contract Documents, whether completed or
partially completed, and includes all other labor, materials, equipment and services provided or to be provided by
ihe Contractor to fulfill the Contractor's obligations. The Work may constitute the whole or a part of the Project.
$ 1.1.4THE PROJECT
ihe Project is the total construction of which the Work performed under the Contract Documents may be the whole
or a part and which may include construction by the Owner and by separate contractors.
$ 1.1.5 THE DRAWTNGS
The Drawings are the graphic and pictorial portions of the Contract Documents showing the design, location and
dimensions of the Work, generally including plans, elevations, sections, details, schedules and diagrams'
$ 1.1.6THE SPECIFICATIONS
The Specifications are that portion of the Contract Documents consisting of the written requirements for materials,
equipment, systems, standards and workmanship for the Work, and performance of related seryices.
s I.1.7 |NSTRUMENTS OF SERVICE
Instruments of Service are representations, in any medium of expression now known or later developed, of the
tangible and intangible creative work performed by the Architect and the Architect's consultants under their
respective professional services agreements. Instruments of Service may include, without limitation, studies,
surveys, models, sketches, drawings, specifications, and other similar materials.
s 1,1.8 rNlTlAL DECISION MAKER
The Initial Decision Maker is the person identified in the Agreement to render initial decisions on Claims in
accordance with Section 15.2 and certify termination of the Agreement under Section 14.2.2.
$ 1.2 CORRELATTON AND INTENT OF THE CONTMCT DoCUMENTS
$ 1.2.1 The intent of the Contract Documents is to include all items necessary for the proper execution and
completion of the Work by the Contractor. The Contract Documents are complementary, and what is required by
one shall be as binding as if required by all; performance by the Contractor shall be required only to the extent
consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the
indicated results.
ArA Document A2OL - 2OO'1. Copyright @ 1911, 1915, 1918, 1925, 1931, L95I, L958, 1961, 1963, 1966, 1'9'70, l9'16, 198
rights reserved, "The American Institute of Axchitects," "American Institute of Architects," "AIA," the AIA Logo,
Do;uments" are cradenarks of fhe American Institute of Architects. lhis draft was produced at 09:5113? PT on 05/1
No.4lO4243O4'1 which expires o^ 06/lO/2024, is not for resaLe, is licensed for one-time use only, and may onfy be
the AIA Contract Docunentso Terms of Service. to report copyright vj.olations, e-maiI docinfoGaiacontracts.com.
User Notes:
-7, L99'7 and 200?. AII
and "AIA Contract
3/2024 under order
used in accordance with
9
(1164916017)
$ 1 .2.2 Organization of the Specifications into divisions, sections and articles, and arrangement of Drawings shall
not control the Conkactor in dividing the Work among Subcontractors or in establishing the extent of Work to be
performed by any trade.
$ 1.2.3 Unless otherwise stated in the Contract Documents, words that have well-known technical or construction
industry meanings are used in the Contract Documents in accordance with such recognized meanings.
s 1.3 CAP|TALTZATTON
Terms capitalized in these General Conditions include those that are (l) specifically defined, (2) the titles of
numbered articles or (3) the titles of other documents published by the American Institute of Architects.
$ I.4 TNTERPRETATrON
In the interest of brevity the Contract Documents frequently omit modifring words such as "all" and "any" and
articles such as "the" and "an," but the fact that a modifier or an article is absent from one statement and appears in
another is not intended to affect the interpretation of either statement.
$ l.5OWNERSH|P AND USE OF DRAW|NGS, SPEC|FTCATTONS AND OTHER INSTRUMENTS 0F SERVICE
S 1.5.1 The Architect and the Architect's consultants shall be deemed the authors and owners of their respective
Instruments of Service, including the Drawings and Specifications, and will retain all common law, statutory and
other reserved rights, including copyrights. The Contractor, Subcontractors, Sub-subcontractors, and material or
equipment suppliers shall not own or claim a copyright in the Instruments of Service. Submittal or distribution to
meet official regulatory requirements or for other purposes in connection with this Project is not to be construed as
publication in derogation ofthe Architect's or Architect's consultants' reserved rights.
S 1.5.2 The Contractor, Subcontractors, Sub-subconhactors and material or equipment suppliers are authorized to
use and reproduce the Instruments of Service provided to them solely and exclusively for execution of the Work. All
copies made under this authorization shall bear the copyright notice, if any, shown on the Instruments of Service.
The Contractor, Subcontractors, Sub-subcontractors, and material or equipment suppliers may not use the
Instruments of Service on other projects or for additions to this Project outside the scope of the Work without the
specific written consent of the Owner, Architect and the Architect's consultants.
$ I.6TRANSMISSIoN OF DATA lN DIGITAL FoRM
If the parties intend to transmit Instruments of Service or any other information or documentation in digital form,
they shall endeavor to establish necessary protocols goveming such transmissions, unless otherwise already
provided in the Agreement or the Contract Documents.
ARTICLE 2 OWNER
$ 2.1 GENERAL
S 2,1.1 The Owner is the person or entity identified as such in the Agreement and is referred to throughout the
Contract Documents as if singular in number. The Owner shall designate in writing a representative who shall have
express authority to bind the Owner with respect to all matters requiring the Owner's approval or authorization.
Except as otherwise provided in Section 4.2.1, the Architect does not have such authority. The term "Owner" means
the Owner or the Owner's authorized representative.
$ 2.1 .2 The Owner shall fumish to the Contractor within fifteen days after receipt of a written request, information
necessary and relevant for the Contractor to evaluate, give notice of or enforce mechanic's lien rights. Such
information shall include a correct statement of the record legal title to the properfy on which the Project is located,
usually referred to as the site, and the Owner's interest therein.
$ 2.2 |NFORMATION AND SERVICES REQUIRED OF THE OWNER
$ 2.2.1 Prior to commencement of the Work, the Contractor may request in writing that the Owner provide
reasonable evidence that the Owner has made financial arrangements to fuIfilI the Owner's obligations under the
Contract. Thereafter, the Contractor may only request such evidence if (1) the Owner fails to make payments to the
Contractor as the Contract Documents require; (2) a change in the Work materially changes the Contract Sum; or (3)
the Contractor identifies in writing a reasonable concern regarding the Owner's ability to make payment when due'
The Owner shall furnish such evidence as a condition precedent to commencement or continuation of the Work or
the portion of the Work affected by a material change. After the Owner fumishes the evidence, the Owner shall not
materially vary such financial arrangements without prior notice to the Contractor.
AIA Documenr A2O1 - 200?. Copyrighr A L'II, tgLs, LgL}, L925t Ig3-1, 1931,,1958, 1961, 19$, 1966, 79'10, L9'16' 1'98'7' 199'1 and 2007. AII
!igihts reserved. "the emerican I;stitute of Architects," "American InstituLe of Architects/"'AIA/" the AIA Logo' and "AIA Contract
Doiuments,, are trademarks of the Amelican Institute of Architects. This draft was ploduced at 09:51:3? P'I o^ 05/L3/2024 under Order
t'to.410424304? which expires on 05/:rO/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance wilh
the AIA Contract Docunentso Terms of Service
Uge. Noteg:
To report copyright violations. e-naiI docinfocaiacontracts.com
( r.1.6 4 91 6017 )
10
S 2,2,2 Except for permits and fees that are the responsibility of the Contractor under the Contract Documents,
including those required under Section 3.7.l, the Owner shall secure and pay for necessary approvals, easements,
assessments and charges required for construction, use or occupancy of permanent structures or for permanent
changes in existing facilities.
$ 2.2.3 The Owner shall furnish surveys describing physical characteristics, legal limitations and utility locations for
the site ofthe Project, and a legal description ofthe site. The Contractor shall be entitled to rely on the accuracy of
information furnished by the Owner but shall exercise proper precautions relating to the safe performance of the
Work.
$ 2.2.4 The Owner shall furnish information or services required of the Owner by the Contract Documents with
reasonable promptness. The Owner shall also furnish any other information or services under the Owner's control
and relevant to the Contractor's performance of the Work with reasonable promptness after receiving the
Contractor's written request for such information or services.
$ 2.2.5 Unless otherwise provided in the Contract Documents, the Owner shall furnish to the Contractor one copy of
the Contract Documents for purposes of making reproductions pursuant to Section 1.5.2.
$ 2,3 OWNER'S RIGHT TO STOP THE WORK
If the Contractor fails to correct Work that is not in accordance with the requirements of the Contract Documents as
required by Section 1.2.2 or repeatedly fails to carry out Work in accordance with the Contract Documents, the
Owner may issue a written order to the Contractor to stop the Work, or any portion thereof, until the cause for such
order has been eliminated; however, the right of the Owner to stop the Work shall not give rise to a duty on the part
of the Owner to exercise this right for the benefit of the Contractor or any other person or entity, except to the extent
required by Section 6.1.3.
s 2.4 oWNER'S RIGHT TO CARRY oUT THE WORK
If the Contractor defaults or neglects to carry out the Work in accordance with the Contract Documents and fails
within a ten-day period after receipt of written notice from the Owner to commence and continue correction of such
default or neglect with diligence and promptness, the Owner may, without prejudice to other remedies the Owner
may have, correct such deficiencies. In such case an appropriate Change Order shall be issued deducting from
payments then or thereafter due the Contractor the reasonable cost of correcting such deficiencies, including
bwner's expenses and compensation for the Architect's additional services made necessary by such default, neglect
or failure. Such action by the Owner and amounts charged to the Contractor are both subject to prior approval of the
Architect. If payments then or thereafter due the Contractor are not sufficient to cover such amounts, the Contractor
shall pay the difference to the Owner.
ARTICLE 3 CONTRACTOR
$ 3.1 GENERAL
S 3.1.1 The Conhactor is the person or entily identified as such in the Agreement and is referred to throughout the
Contract Documents as if singular in number. The Contractor shall be lawfully licensed, if required in the
jurisdiction where the Project is located. The Contractor shall designate in writing a representative who shall have
express authority to bind the Contractor with respect to all matters under this Contract. The term "Contractor" means
the Contractor or the Contractor's authorized representative.
$ 3.1.2 The Contractor shall perform the Work in accordance with the Contract Documents.
$ 3.1.3 The Contractor shall not be relieved of obligations to perform the Work in accordance with the Contract
Documents either by activities or duties of the Architect in the Architect's administration of the Contract, or by tests,
inspections or approvals required or performed by persons or entities other than the Contractor.
$ 3.2 REVIEW OF CONTRACT DoCUMENTS AND FIELD CoNDITIoNS BY CONTRACToR
$ 3,2.1 Execution of the Contract by the Contractor is a representation that the Contractor has visited the site,
become generally familiar with local conditions under which the Work is to be performed and correlated personal
observations with requirements of the Contract Documents.
ArA Document A2O\ - 2OO'7. Copyright O 1911, 1915, 19L8, 1925, L93'1, I95I, 1958' 1961, 1963, L966' l9'70, L9'16, 798
rights reserved. "The American Institute of ArchitecLs," "American Institute of Alchitects," t'AIA/" the AIA Logo,
Documents,'are tradenarks of The American Institute of Architects. This draft was produced at 09:51:3? PT on 05/1
No.410424304? whi-ch expires o^ 06/IO/2024, is not for resale, is ticensed for one-time use on1y, and may onLy be
the AIA Contract Documentso terms of Service, to report copyright violations, e-nai.L docinfoGalacontlacts.com.
Uger Noteg:
7. 199? and 200?. AII
and "AIA Contract
3/2024 under order
used in accordance with
(115491 601?)
11
S 3.2.2 Because the Contract Documents are complementary, the Contractor shall, before starting each portion of the
Work, carefully study and compare the various Contract Documents relative to that portion of the Work, as well as
the information furnished by the Owner pursuant to Section 2.2.3, shall take field measurements of any existing
conditions related to that portion of the Work, and shall observe any conditions at the site affecting it. These
obligations are for the puqpose of facilitating coordination and construction by the Contractor and are not for the
purpose of discovering errors, omissions, or inconsistencies in the Contract Documents; however, the Contractor
ihall promptly report to the Architect any errors, inconsistencies or omissions discovered by or made known to the
Contractor as a request for information in such form as the Architect may require. It is recognized that the
Contractor's review is made in the Contractor's capacity as a contractor and not as a licensed design professional,
unless otherwise specifically provided in the Contract Documents.
S 3.2.3 The Contractor is not required to ascertain that the Contract Documents are in accordance with applicable
iaws, statutes, ordinances, codes, rules and regulations, or lawful orders of public authorities, but the Contractor
shall promptly report to the Architect any nonconformity discovered by or made known to the Contractor as a
request for information in such form as the Architect may require.
S 3.2.4 If the Contractor believes that additional cost or time is involved because of clarifications or instructions the
Architect issues in response to the Contractor's notices or requests for information pursuant to Sections 3.2.2 or
3.2.3,the Contractor shall make Claims as provided in Article 15. If the Contractor fails to perform the obligations
of Sections 3.2.2 or 3 .2.3, the Contractor shall pay such costs and damages to the Owner as would have been
avoided if the Contractor had performed such obligations. If the Contractor perfiorms those obligations, the
Contractor shall not be liable to the Owner or Architect for damages resulting from errors, inconsistencies or
omissions in the Contract Documents, for differences between field measurements or conditions and the Contract
Documents, or for nonconformities of the Contract Documents to applicable laws, statutes, ordinances, codes, rules
and regulations, and lawful orders of public authorities.
$ 3.3 SUPERVISION AND CoNSTRUCTION PROCEDURES
5 f.f.t The Conhactor shall supervise and direct the Work, using the Contractor's best skill and attention. The
Contractor shall be solely responsible for, and have control over, construction means, methods, techniques,
sequences and procedures and for coordinating all portions of the Work under the Contract, unless the Contract
Documents give other specific instructions concerning these matters. If the Contract Documents give specific
instructions ionceming construction means, methods, techniques, sequences or procedures, the Contractor shall
evaluate the jobsite safety thereof and, except as stated below, shall be fully and solely responsible for the jobsite
safety of such means, methods, techniques, sequences or procedures. If the Conhactor determines that such means,
methods, techniques, sequences or procedures may not be safe, the Contractor shall give timely written notice to the
Owner and Architect and shall not proceed with that portion of the Work without further written instructions from
the Architect. If the Contractor is then instructed to proceed with the required means, methods, techniques,
sequences or procedures without acceptance ofchanges proposed by the Contractor, the Owner shall be solely
responsible for any loss or damage arising solely from those Owner-required means, methods, techniques, sequences
or procedures.
S 3.3.2 The Contractor shall be responsible to the Owner for acts and omissions of the Contractor's employees,
Subcontractors and their agents and employees, and other persons or entities performing portions of the Work for, or
on behalfof, the Contractor or any ofits Subcontractors.
$ 3.3.3 The Contractor shall be responsible for inspection of portions of Work already performed to determine that
such portions are in proper condition to receive subsequent Work.
s 3.4 LABOR AND MATERIALS
$ f.n.t Unless otherwise provided in the Contract Documents, the Contractor shall provide and pay for labor,
materials, equipment, tools, construction equipment and machinery, water, heat, utilities' transportation, and other
facilities and services necessary for proper execution and completion of the Work, whether temporary or permanent
and whether or not incorporated or to be incorporated in the Work.
$ 3.4,2 Except in the case of minor changes in the Work authorized by the Architect in accordance with Sections
i. t Z.g o. 7 .i, the Contractor may make substitutions only with the consent of the Owner, after evaluation by the
Architect and in accordance with a Change Order or Construction Change Directive.
AIA Document A2O1 - 2OO'1. Copyright @ 1911. 1915, 1918, L925, 193'1, 195I,1958, 1951, 1963, f966' 19'70, 1916' L9
tights reserved. '..I.he American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo
Documents,, are tradenarks of The Anerican fnstiLute of Architects. This draft was produced at 09:51:3? PT on 05/
No.410424304? whj.ch expires o^ 06/lO/2024, is not for resale, is Iicensed fo! one-time use only, and nay only be
the AIA Contract Documentso Terns of Setvice. To report coPyright violations, e-mail docinfoGaiacontracts.com.
User Notes:
8'7, 199'l and 2007. AII
, and "AIA Contract
13/2024 under o!de!
used in accordance with
(1164916017)
L2
$ 3.4.3 The Contractor shall enforce strict discipline and good order among the Contractor's employees and other
persons carrying out the Work. The Contractor shall not permit employment of unfit persons or persons not properly
skilled in tasks assigned to them.
s 3.5 WARRANW
The Conhactor warrants to the Owner and Architect that materials and equipment furnished under the Contract will
be of good quality and new unless the Contract Documents require or permit otherwise. The Conhactor further
warrants that the Work will conform to the requirements of the Contract Documents and will be free from defects,
except for those inherent in the quality of the Work the Contract Documents require or permit. Work, materials, or
equipment not conforming to these requirements may be considered defective. The Conhactor's warranty excludes
remedy for damage or defect caused by abuse, alterations to the Work not executed by the Contractor, improper or
insufficient maintenance, improper operation, or normal wear and tear and normal usage. If required by the
Architect, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment.
$ 3.6 TAXES
The Contractor shall pay sales, consumer, use and similar taxes for the Work provided by the Contractor that are
legally enacted when bids are received or negotiations concluded, whether or not yet effective or merely scheduled
to go into effect.
s 3.7 PERMITS, FEES, NOTICES AND COMPLIANCE WITH LAWS
S 3.7.1 Unless otherwise provided in the Contract Documents, the Contractor shall secure and pay for the building
permit as well as for other permits, fees, licenses, and inspections by government agencies necessary for proper
execution and completion of the Work that are customarily secured after execution of the Contract and legally
required at the time bids are received or negotiations concluded.
$ 3.7.2 The Contractor shall comply with and give notices required by applicable laws, statutes, ordinances, codes,
rules and regulations, and lawful orders of public authorities applicable to performance of the Work.
S 3.7.3 If the Contractor performs Work knowing it to be contrary to applicable laws, statutes, ordinances, codes,
rules and regulations, or lawful orders of public authorities, the Contractor shall assume appropriate responsibility
for such Work and shall bear the costs attributable to correction.
$ 3.7.4 Concealed or Unknown Conditions. If the Contractor encounters conditions at the site that are (1)
subsurface or otherwise concealed physical conditions that differ materially from those indicated in the Contract
Documents or (2) unknown physical conditions of an unusual nature, that differ materially from those ordinarily
found to exist and generally recognized as inherent in construction activities of the character provided for in the
Contract Documents, the Contractor shall promptly provide notice to the Owner and the Architect before conditions
are disturbed and in no event later than 2l days after first observance of the conditions. The Architect will promptly
investigate such conditions and, if the Architect determines that they differ materially and cause an increase or
decrease in the Contractor's cost of, or time required for, performance of any part of the Work, will recommend an
equitable adjustment in the Contract Sum or Contract Time, or both. If the Architect determines that the conditions
at the site are not materially different from those indicated in the Contract Documents and that no change in the
terms of the Contract is justified, the Architect shall promptly notify the Owner and Conhactor in writing, stating the
reasons. If either party disputes the Architect's determination or recommendation, that party may proceed as
provided in Article 15.
S 3.7.5 I{ in the course of the Work, the Contractor encounters human remains or recognizes the existence of burial
markers, archaeological sites or wetlands not indicated in the Contract Documents, the Contractor shall immediately
suspend any operations that would affect them and shall notifo the Owner and Architect. Upon receipt of such
notice, the Owner shall promptly take any action necessary to obtain governmental authorization required to resume
the operations. The Contractor shall continue to suspend such operations until otherwise instructed by the Owner but
shalliontinue with all other operations that do not affect those remains or features. Requests for adjustments in the
Contract Sum and Contract Time arising from the existence of such remains or features may be made as provided in
Article 15.
s 3.8 ALLOWANCES
$ 3.S.1 The Contractor shall include in the Conhact Sum all allowances stated in the Conhact Documents. Items
covered by allowances shall be supplied for such amounts and by such persons or entities as the Owner may direct,
AIA Document A2O1 - 2OO'7, Copyright @ lgl7, L973, L918, 1925, Lg3'1, I95I, 1958, L961, 1963, 1966, 19'10' 1976, l'98'1, 199'l and 2007' AII
riqhts reserved. ,'The American Institute of Architects," "Ame!ican InsCj.tute of Architects."'AIA," Lhe AIA Logo, and "AIA Contract
Doiunents,, are t.ademarks of The American Institute of Architects. This draft was produced at 09:51:3? P'I ofr 05/l'312024 unde. order
No.4L04243041 which expires o^ 06/IO/2024, is not fox resale, is licensed fo! one-time use only, and may only be used in accordance with
the AIA Contract Documentso ferms of Setvice, To report copylight violations, e-mail docinfoeaiacontlacts.com.
user Notesi (115491501?)
13
but the Contractor shall not be required to employ persons or entities to whom the Contractor has reasonable
objection.
S 3.8.2 Unless otherwise provided in the Conhact Documents,
,1 Allowances shall cover the cost to the Contractor of materials and equipment delivered at the site and
all required taxes, less applicable trade discounts;
,2 Contrictor's costs for unloading and handling at the site, labor, installation costs, overhead, profit and
other expenses contemplated for stated allowance amounts shall be included in the Contract Sum but
not in the allowances; and
.3 Whenever costs are more than or less than allowances, the Contract Sum shall be adjusted
accordingly by Change Order. The amount of the Change Order shall reflect (1) the difference
between actual costs and the allowances under Section 3.8.2.1 and (2) changes in Contractor's costs
under Section 3.8.2.2.
S 3.S.3 Materials and equipment under an allowance shall be selected by the Owner with reasonable promptness.
$ 3.9 SUPERINTENDENT
$ f.S.t The Contractor shall employ a competent superintendent and necessary assistants who shall be in attendance
at the Project site during performance of the Work. The superintendent shall represent the Contractor, and
communications given to the superintendent shall be as binding as if given to the Contractor'
S 3.9.2 The Contractor, as soon as practicable after award of the Contract, shall furnish in writing to the Owner
through the Architect the name and qualifications of a proposed superintendent. The Architect may reply within 14
days to the Contractor in writing stating (1) whether the Owner or the Architect has reasonable objection to the
proposed superintendent or (2) that the Architect requires additional time to review. Failure of the Architect to reply
within the 14 day period shall constitute notice of no reasonable objection
$ 3.9.3 The Contractor shall not employ a proposed superintendent to whom the Owner or Architect has made
ieasonable and timely objection. The Conhactor shall not change the superintendent without the Owner's consent,
which shall not unreasonably be withheld or delayed.
$ 3.10 CONTRACTOR'S CONSTRUCTION SCHEDULES
S f.tO.t The Contractor, promptly after being awarded the Contract, shall prepare and submit for the Owner's and
Architect's information a Contractor's construction schedule for the Work. The schedule shall not exceed time limits
current under the Contract Documents, shall be revised at appropriate intervals as required by the conditions of the
Work and Project, shall be related to the entire Project to the extent required by the Contract Documents, and shall
provide for expeditious and practicable execution of the Work'
$ 3.10.2 The Contractor shall prepare a submittal schedule, promptly after being awarded the Contract and thereafter
ur n.".5ury to maintain a current submittal schedule, and shall submit the schedule(s) for the Architect's approval.
The Architect's approval shall not unreasonably be delayed or withheld. The submittal schedule shall (1) be
coordinated with the Contractor's construction schedule, and (2) allow the Architect reasonable time to review
submittals. If the Contractor fails to submit a submittal schedule, the Contractor shall not be entitled to any increase
in Contract Sum or extension of Contract Time based on the time required for review of submittals.
$ 3.10.3 The Contractor shall perform the Work in general accordance with the most recent schedules submitted to
the Owner and Architect.
$ 3.11 DOCUMENTS AND SAMPLES AT THE SITE
ihe Contractor shall maintain at the site for the Owner one copy of the Drawings, Specifications, Addenda, Change
Orders and other Modifications, in good order and marked currently to indicate lteld changes and selections made
during construction, and one copy of approved Shop Drawings, Product Data, Samples and similar required
submittals. These shall be available to the Architect and shall be delivered to the Architect for submittal to the
Owner upon completion of the Work as a record of the Work as constructed.
AIA Document A20L - 2OO'7. Copyright @ 1911, 1915, 1'918, 1925, 193
rights reserved. "The herican Institute of Architects," "Anerica
Docunents" are trademarks of The American Institute of Architects
No,4L0424304? which expires o^ 06/lO/2024, is not for xesale, is
the AIA Contract Oocunentso Terms of Service. To report copy!i.ght
'7, 195L, 1958, 1961, 1963, 1966, r9',70, 7916, 1981' r
n fnstitute of Architects," "AIA"' the AIA Logo, and
. This draft was produced at 09:51:3? Pa on 05/13/20
licensed for one-time use only, and nay only be used
violations, e-maiL docitrfocaiacontracts.com.
997 and 2007. AlI
"AIA Contract
24 unde. order
in accordance with
User Noteg:(1r.549150r7)
L4
$ 3.12 SHoP DRAWINGS, PRoDUCT DATA AND SAMPLES
$ ltZ.t Shop Drawings are drawings, diagrams, schedules and other data specially prepared for the Work by the
Contractor or a Subcontractor, Sub-subcontractor, manufacturer, supplier or distributor to illustrate some portion of
the Work.
$ 3.12.2 Product Data are illustrations, standard schedules, performance charts, instructions, brochures, diagrams
and other information fumished by the Contractor to illustrate materials or equipment for some portion of the Work.
$ 3.12.3 Samples are physical examples that illustrate materials, equipment or workmanship and establish standards
by which the Work will be judged.
$ 3.12.4 Shop Drawings, Product Data, Samples and similar submittals are not Contract Documents. Their purpose
is to demonstrate the way by which the Contractor proposes to conform to the information given and the design
concept expressed in the Contract Documents for those portions of the Work for which the Contract Documents
requiri submittals. Review by the Architect is subject to the limitations of Section 4.2.7 .Informational submittals
upon which the Architect is not expected to take responsive action may be so identified in the Contract Documents.
Submittals that are not required by the Contract Documents may be returned by the Architect without action.
$ 3.12.5 The Contractor shall review for compliance with the Contract Documents, approve and submit to the
Architect Shop Drawings, Product Data, Samples and similar submittals required by the Contract Documents in
accordance *ith the submittal schedule approved by the Architect or, in the absence of an approved submittal
schedule, with reasonable promptness and in such sequence as to cause no delay in the Work or in the activities of
the Owner or of separate contractors.
S 3.12.6 By submitting Shop Drawings, Product Data, Samples and similar submittals, the Conhactor represents to
the Owner and Architect that the Contractor has (1) reviewed and approved them, (2) determined and verified
materials, field measurements and field construction criteria related thereto, or will do so and (3) checked and
coordinated the information contained within such submittals with the requirements of the Work and of the Contract
Documents.
$ 3.12.7 The Conhactor shall perform no portion of the Work for which the Contract Documents require submittal
and review of Shop Drawings, Product Data, Samples or similar submittals until the respective submittal has been
approved by the Architect.
S 3.12.S The Work shall be in accordance with approved submittals except that the Contractor shall not be relieved
of responsibility for deviations from requirements of the Contract Documents by the Architect's approval of Shop
Drawings, Product Data, Samples or similar submittals unless the Contractor has specifically informed the Architect
in writing of such deviation at the time of submittal and (l) the Architect has given written approval to the specific
deviation as a minor change in the Work, or (2) a Change Order or Construction Change Directive has been issued
authorizing the deviation. The Contractor shall not be relieved of responsibility for errors or omissions in Shop
Drawings, Product Data, Samples or similar submittals by the Architect's approval thereof.
$ 3.12.9 The Contractor shall direct specific attention, in writing or on resubmitted Shop Drawings, Product Data,
Samples or similar submittals, to revisions other than those requested by the Architect on previous submittals. In the
absence of such written notice, the Architect's approval of a resubmission shall not apply to such revisions.
$ 3.12.10 The Contractor shall not be required to provide professional services that constitute the practice of
architecture or engineering unless such services are specifically required by the Contract Documents for a portion of
the Work or unless the Contractor needs to provide such services in order to carry out the Contractor's
responsibilities for construction means, methods, techniques, sequences and procedures. The Contractor shall not be
required to provide professional services in violation of applicable law. If professional design services or
certificationi by a design professional related to systems, materials or equipment are specifically required of the
Contractor by ihe ConiraCt Doc.rments, the Owner and the Architect will specify all performance and design criteria
that such services must satisfy. The Contractor shall cause such services or certifications to be provided by a
properly licensed design professional, whose signature and seal shall appear on all drawings, calculations,
ipeiifrCations, certifications, Shop Drawings and other submittals prepared by such professional. Shop Drawings
and other submittals related to the Work designed or certified by such professional, if prepared by others, shall bear
such professional's written approval when submitted to the Architect. The Owner and the Architect shall be entitled
66, r9'10, !9't 6, 198'? , r
AIA," the AIA Logo, and
09:51:3? PT oa 05/13/20
y/ and nay only be used
iacontracts . com.
AIA Docunent A2Ol - 2OO'7. Copyrj-ght @ 1911, 1915' 1918, 1925' L93'1, 195L, 1958, 1961, 7963, f9
rights reserved. ..The Anerican Institute of Architects," "American InstiLute of Architects," "
Documents,, are trademarks of The llmerican Institute of Architects. This draft was produced at
No,4IO4243O4'1 which expires on 06/10/2024t is not for resale, is Iicensed for one-bine use ool
the AIA Contract Documantso Terns of Service, To report copyright violations, e-frail docinfo0a
997 and 2007. All
"AIA ConLract
24 under order
in accordance with
Us€r Notss:(116491601?)
15
to rely upon the adequacy, accuracy and completeness ofthe services, certifications and approvals performed or
provided by such design professionals, provided the Owner and Architect have specified to the Contractor all
performance and design criteria that such services must satisfy. Pursuant to this Section 3.12.10, the Architect will
ieview, approve or take other appropriate action on submittals only for the limited purpose of checking for
conformance with information given and the desiga concept expressed in the Contract Documents. The Contractor
shall not be responsible for the adequacy ofthe performance and design criteria specified in the Contract
Documents.
s 3.13 USE OF SrTE
The Conhactor shall confine operations at the site to areas permitted by applicable laws, statutes, ordinances, codes,
rules and regulations, and lawful orders of public authorities and the Contract Documents and shall not unreasonably
encumber the site with materials or equipment.
s 3.14 CUTTTNG AND PATCHING
S 3.14.1 The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to
make its parts fit together properly. All areas requiring cutting, fitting and patching shall be restored to the condition
existing prior to the cutting, frtting and patching, unless otherwise required by the Contract Documents.
$ 3.14.2 The Contractor shall not damage or endanger a portion of the Work or fully or partially completed
construction of the Owner or separate contractors by cutting, patching or otherwise altering such construction' or by
excavation. The Contractor shall not cut or otherwise alter such construction by the Owner or a separate contractor
except with written consent ofthe Owner and ofsuch separate contractor; such consent shall not be unreasonably
withheld. The Contractor shall not uffeasonably withhold from the Owner or a separate contractor the Contractor's
consent to cutting or otherwise altering the Work.
s 3.15 CLEANTNG UP
S 3.15.1 The Contractor shall keep the premises and surrounding area free from accumulation of waste materials or
rubbish caused by operations under the Contract. At completion of the Work, the Contractor shall remove waste
materials, rubbish, the Contractor's tools, construction equipment, machinery and surplus materials from and about
the Project.
S 3.15.2 If the Contractor fails to clean up as provided in the Contract Documents, the Owner may do so and Owner
shall be entitled to reimbursement from the Contractor.
s 3.16ACCESS TO WORK
The Conhactor shall provide the Owner and Architect access to the Work in preparation and progress wherever
located.
s 3.17 ROYALTIES, PATENTS AND CoPYRIGHTS
The Contractor shall pay atl royalties and license fees. The Contractor shall defend suits or claims for infringement
of copyrights and patent rights and shall hold the Owner and Architect harmless from loss on account thereof, but
shall not be responsible for such defense or loss when a particular design, process or product ofa particular
manufacturer or manufacturers is required by the Contract Documents, or where the copyright violations are
contained in Drawings, Specifications or other documents prepared by the Owner or Architect. However, if the
Contractor has reason to believe that the required design, process or product is an infringement of a copyright or a
patent, the Contractor shall be responsible for such loss unless such information is promptly furnished to the
Architect.
$ 3,lS |NDEMNIFICATIoN
S 3.1S.1 To the fullest extent permitted by law the Contractor shall indemniff and hold harmless the Owner,
Architect, Architect's consultants, and agents and employees of any of them from and against claims, damages,
losses and expenses, including but not limited to attorneys' fees, arising out of or resulting from performance of the
Work, provided that such claim, damage, loss or expense is atLributable to bodily rnf uty, sickness, disease or death,
or to injury to or destruction of tangible property (other than the Work itsel!, but only to the extent caused by the
negligent acts or omissions of the Contractor, a Subcontractor, anyone directly or indirectly employed by them or
anyone for whose acts they may be liable, regardless of whether or not such claim, damage, loss or expense is
caused in part by a party indemnified hereunder. Such obligation shall not be construed to negate, abridge, or reduce
AIA Document A2OI - 2OO'1. Copyrjght o 1.911, 1915, L918, 1925,193?, r951' 1958, 1961, 1963, 1966,79'70, l9'16, 19
rights reserved. "The American Institute of ArchiLects," "American lnslituLe of Architects,"'ata," the AIA Loqo
Documents" are trademarks of The American lnstitute of Architects. This draft was produced at 09:51:3? PT on 05/
No,4104243047 which expires o^ 06/)"0/2024, is not for resale, is licensed for one-time use only, and may only be
the AIA Contract Documentso Terns of Setvice. To report copyright violations, e-naiI docinfocaiacontracts,com.
81, 199'l and 200?. AII
, and "AIA Contract
13l2024 under Order
used in accordance with
User NoCeg:(rr54916017)
L6
other rights or obligations of indemnity that would otherwise exist as to a parfy or person described in this Section
3.18.
S 3.1S.2 In claims against any person or entify indemnified under this Section 3.18 by an employee of the
Contractor, a Subcontractor, anyone directly or indirectly employed by them or anyone for whose acts they may be
liable, the indemnification obligation under Section 3.18.1 shall not be limited by a limitation on amount or type of
damages, compensation or benefits payable by or for the Contractor or a Subcontractor urder workers'
compensation acts, disability benefit acts or other employee benefit acts.
ARTICLE 4 ARCHITECT
s 4.1 GENERAL
$ 4.1.1 The Owner shall retain an architect lawfully licensed to practice architecture or an entity lawfully practicing
architecture in the jurisdiction where the Project is located. That person or entity is identified as the Architect in the
Agreement and is referred to throughout the Contract Documents as if singular in number.
$ 4.1.2 Duties, responsibilities and limitations of authoriry of the Architect as set forth in the Contract Documents
shall not be restricted, modified or extended without written consent of the Owner, Contractor and Architect.
Consent shall not be unreasonably withheld.
S 4.1.3 If the employment of the Architect is terminated, the Owner shall employ a successor architect as to whom
the Contractor has no reasonable objection and whose status under the Contract Documents shall be that of the
Architect.
$ 4.2 ADMTNTSTRATION OF THE CONTRACT
$ 4,2.1 The Architect will provide administration of the Contract as described in the Contract Documents and will be
an Owner's representative during construction until the date the Architect issues the final Certificate for Payment.
The Architect will have authority to act on behalf of the Owner only to the extent provided in the Contract
Documents.
$ 4.2,2 The Architect will visit the site at intervals appropriate to the stage of construction, or as otherwise agreed
with the Owner, to become generally familiar with the progress and quality of the portion of the Work completed,
and to determine in general if the Work observed is being performed in a manner indicating that the Work, when
fully completed, will be in accordance with the Contract Documents. However, the Architect will not be required to
make exhaustive or continuous on-site inspections to check the quality or quantity of the Work. The Architect will
not have control over, charge of, or responsibility for, the construction means, methods, techniques, sequences or
procedures, or for the safety precautions and programs in connection with the Work, since these are solely the
Contractor's rights and responsibilities under the Contract Documents, except as provided in Section 3.3.1.
$ 4.2.3 On the basis of the site visits, the Architect will keep the Owner reasonably informed about the progress and
quality of the portion of the Work completed, and report to the Owner (l) known deviations from the Contract
Documents and from the most recent construction schedule submitted by the Contractor, and (2) defects and
deficiencies observed in the Work. The Architect will not be responsible for the Contractor's failure to perform the
Work in accordance with the requirements of the Contract Documents. The Architect will not have control over or
charge of and will not be responsible for acts or omissions of the Contractor, Subcontractors, or their agents or
employees, or any other persons or entities performing portions of the Work.
$ 4.2.4 COMMUNICATIoNS FACILITATING CONTRACT ADMINISTRATION
Except as otherwise provided in the Contract Documents or when direct communications have been specially
authorized, the Owner and Contractor shall endeavor to communicate with each other through the Architect about
matters arising out of or relating to the Contract. Communications by and with the Architect's consultants shall be
through the Architect. Communications by and with Subcontractors and material suppliers shall be through the
Contractor. Communications by and with separate contractors shall be through the Owner.
$ 4.2.5 Based on the Architect's evaluations of the Conhactor's Applications for Payment, the Architect will review
and certify the amounts due the Contractor and will issue Certificates for Payment in such amounts.
$ 4,2.6 The Architect has authority to reject Work that does not conform to the Contract Documents. Whenever the
Architect considers it necessary or advisable, the Architect will have authority to require inspection or testing of the
AIA Document A2O7 - 2OO'1. Copyrighr @ tgl.l., 1915, IgI8, L925, 193?, 1.951, L958, 196I, l-963, 1-966, 19'70, l9'76, 198?, L99"l and 2007. All
rights reserved. '.The American Institute of Arehitects," "American InsliLute of A.chitects," *AIA," the AfA Logo, add "AIA Contract
Documents" are erademarks of the American Institute of Architecis. This draft was Produced at 09:51:3? P'f o\ 05/13/2024 under order
No.410424304? which expires o^ 06/IO/2024, is not for resaLe/ is licensed for one-time use onLy' aod may only be used in accordance wiLh
the AfA Contract Docunentso Terns of Service. To.eport copyrighb violations, e-mail docinfoGaiacontracts.con.
u56r Notes: lrl649r6oyll
L7
Work in accordance with Sections 13.5.2 and 13.5.3, whether or not such Work is fabricated, installed or completed.
However, neither this authority of the Architect nor a decision made in good faith either to exercise or not to
exercise such authority shall give rise to a duty or responsibility of the Architect to the Contractor, Subcontractors,
material and equipment suppliers, their agents or employees, or other persons or entities performing portions of the
Work.
S 4.2,7 The Architect will review and approve, or take other appropriate action upon, the Contractor's submittals
such as Shop Drawings, Product Data and Samples, but only for the limited purpose of checking for conformance
with information giv& and the design concept expressed in the Contract Documents. The Architect's action will be
taken in accordanie with the submittal schedule approved by the Architect or, in the absence of an approved
submittal schedule, with reasonable promptness while allowing sufficient time in the Architect's professional
judgment to permit adequate review. Review of such submittals is not conducted for the purpose of determining the
u"ruracy and completeness of other details such as dimensions and quantities, or for substantiating instructions for
installation or performance of equipment or systems, all of which remain the responsibility of the Contractor as
required by the Contract Documents. The Architect's review of the Contractor's submittals shall not relieve the
Contractoi of the obligations under Sections 3.3, 3.5 and3.l2. The Architect's review shall not constitute approval
of safely precautions or, unless otherwise specifically stated by the Architect, of any construction means, methods,
techniquel, sequences or procedures. The Architect's approval of a specific item shall not indicate approval of an
assembly of which the item is a component.
$ 4.2.S The Architect will prepare Change Orders and Construction Change Directives, and may authorize minor
ihung.r in the Work as provided in Section 7.4. The Architect will investigate and make determinations and
recommendations regarding concealed and unknown conditions as provided in Section 3.7.4'
S 4.2.9 The Architect will conduct inspections to determine the date or dates of Substantial Completion and the date
of nnat completion; issue Certificates of Substantial Completion pursuant to Section 9.8; receive and forward to the
Owner, for the Owner's review and records, written warranties and related documents required by the Contract and
assembled by the Contractor pursuant to Section 9.10; and issue a frnal Certificate for Payment pursuant to Section
9.10.
S 4.2.10 If the Owner and Architect agree, the Architect will provide one or more project representatives to assist in
iarrying out the Architect's responsibilities at the site. The duties, responsibilities and limitations of authority of
such project representatives shall be as set forth in an exhibit to be incorporated in the Contract Documents.
$ 4,2.11 The Architect will interpret and decide matters concerning performance under, and requirements of, the
Contract Documents on written request of either the Owner or Contractor. The Architect's response to such requests
will be made in writing within any time limits agreed upon or otherwise with reasonable promptness.
S 4.2,'l2lnterpretations and decisions of the Architect will be consistent with the intent of, and reasonably inferable
irom, the Contract Documents and will be in writing or in the form of drawings. When making such interpretations
and decisions, the Architect will endeavor to secure faithful performance by both Owner and Contractor, will not
show partiality to either and will not be liable for results of interpretations or decisions rendered in good faith'
S 4.2.13 The Architect's decisions on matters relating to aesthetic effect will be final if consistent with the intent
expressed in the Conhact Documents.
$ 4.2.14 The Architect will review and respond to requests for information about the Conhact Documents. The
Architect's response to such requests wilt be made in writing within any time limits agreed upon or otherwise with
reasonable promptness. If appropriate, the Architect will prepare and issue supplemental Drawings and
Specifications in response to the requests for information.
ARTICLE5 SUBCONTRACTORS
$ 5.1 DEFTNTTTONS
t S.l.t A Subcontractor is a person or entity who has a direct contract with the Contractor to perform a portion of
ihe Work at the site. The term "subcontractor" is referred to throughout the Contract Documents as if singular in
number and means a Subcontractor or an authorized representative ofthe Subcontractor. The term "Subcontractor"
does not include a separate contractor or subcontractors ofa separate conhactor.
AIA Document A2Ol - 2OO'7, copyliqht @ 1911, 1915, )-9I8, 1923, 193?, 195I, 1958, I96L' )-963' 1966' 7910, l9'76 , 798'1, 199'1 and 200?. AII
Logo, and "AIA Contrac!
05/13/2024 under order
y be used in accordance with
rights reselved. "The American
Documents" are trademarks of The
No.410424304? wh.ich expi
the AfA Contract Documen
Institute of Architects," "American Institute of Architects," "AIA," the AIA
American Institute of Architects. This draft was Ploduced at 09:51137 PT on
res on 06/I0/2024, is not for resale, is Licensed for one-time use only. aod may onf
tso Terns of Service. To leport copyright violations, e-maiL docinfooaiacontracts'com
Use! Notss:(1164916017)
18
$ 5.1,2 A Sub-subcontractor is a person or entity who has a direct or indirect contract with a Subcontractor to
perform a portion of the Work at the site. The term "Sub-subcontractor" is referred to throughout the Contract
bocumenti as if singular in number and means a Sub-subcontractor or an authorized representative of the Sub-
subcontractor.
$ 5.2AWARD OF SUBCONTRACTS AND OTHER CoNTRACTS FOR PORTIONS 0F THE WORK
$ 5.2.1 Unless otherwise stated in the Contract Documents or the bidding requirements, the Contractor, as soon as
practicable after award of the Contract, shall furnish in writing to the Owner through the Architect the names of
p..ronr or entities (including those who are to furnish materials or equipment fabricated to a special design)
proposed for each principal portion of the Work. The Architect may reply within 14 days to the Contractor in
wriiing stating (1) whether the Owner or the Architect has reasonable objection to any such proposed person or
entity or (2) tia.t the Architect requires additional time for review. Failure of the Owner or Architect to reply within
the l4-day period shall constitute notice of no reasonable objection.
$ 5.2.2 The Contractor shall not conkact with a proposed person or entity to whom the Owner or Architect has made
ieasonable and timely objection. The Contractor shall not be required to contract with anyone to whom the
Contractor has made reasonable objection.
S 5.2.3 If the Owner or Architect has reasonable objection to a person or entity proposed by the Contractor, the
bontractor shall propose another to whom the Owner or Architect has no reasonable objection. If the proposed but
rejected Subcontiacior was reasonably capable of performing the Work, the Conhact Sum and Contract Time shall
be increased or decreased by the difference, ifany, occasioned by such change, and an appropriate Change Order
shall be issued before commencement of the substitute Subcontractor's Work. However, no increase in the Contract
Sum or Contract Time shall be allowed for such change unless the Contractor has acted promptly and responsively
in submitting names as required.
$ 5.2.4 The Contractor shall not substitute a Subcontractor, person or entity previously selected if the Owner or
Architect makes reasonable objection to such substitution.
$ 5,3 SUBCONTRACTUAL RELATIONS
By appropriate agreement, written where legally required for validity, the Contractor shall require each
Subcontractor, tJthe extent of the Work to be performed by the Subcontractor, to be bound to the Contractor by
terms of the Conhact Documents, and to assume toward the Contractor all the obligations and responsibilities,
including the responsibility for safety of the Subcontractor's Work, which the Contractor, by these Documents,
ursum"rlo1l1ard ihe Owner and Architect. Each subcontract agreement shall preserve and protect the rights of the
Owner and Architect under the Contract Documents with respect to the Work to be performed by the Subcontractor
so that subcontracting thereofwill not prejudice such rights, and shall allow to the Subcontractor, unless specifically
provided otherwise in the subcontract agreement, the benefit of all rights, remedies and redress against the
bontractor that the Contractor, by the Contract Documents, has against the Owner. Where appropriate, the
Contractor shall require each Subcontractor to enter into similar agreements with Sub-subconhactors. The
Contractor shall make available to each proposed Subcontractor, prior to the execution of the subcontract agreement,
copies of the Conhact Documents to which the Subcontractor will be bound, and, upon written request of the
Subcontractor, identifu to the Subcontractor terms and conditions of the proposed subcontract agreement that may
be at variance with the Contract Doctrments. Subconhactors will similarly make copies of applicable portions of
such documents available to their respective proposed Sub-subconhactors.
$ 5.4 CONTINGENT ASSIGNMENT OF SUBCONTRACTS
$ S.l.t Each subcontract agreement for a portion of the Work is assigned by the Contractor to the Owner, provided
that
.1 assignment is effective only after termination of the Contract by the Owner for cause pursuant to
Section 14.2 andonly for those subcontract agreements that the Owner accepts by notiffing the
Subcontractor and Contractor in writing; and
.2 assignment is subject to the prior rights of the surety, if any, obligated under bond relating to the
Contract.
When the Owner accepts the assignment of a subcontract agreement, the Owner assumes the Contractor's rights and
obligations under the subcontract.
AIA Document A2Ol - 2OO'1. Copyright @ 19r1, 1915' 19L8, 1925, 193'1, l95I' 1958' 1961, 1963, 19
rights reserved, '.The American Institute of Architects," "American Institute of Architects," "
Doiuments,, are trademarks of The American Institute of Architects. This draft was Produced at
1.1o.4104243047 which expires o^ 06/lO/2024, is not for resale, is Iicensed for ooe-Line use onI
the AIA Contract Docunentso Terms of Service. fo report copyright violations, e-naiI docitrfooa
User Noteg:
66, 1-910. l9-16' L98'1, 199? and 200?. AII
AIA/ " the AIA Logo, and "AIA Contlact
09:51:3? P"l oA 05/L3/2024 under Order
y, and may only be used in accordance wiLh
iacontracts . con.
(116491601?)
19
S 5.4.2 Upon such assignment, if the Work has been suspended for more than 30 days, the Subcontractor's
compensation shall be equitably adjusted for increases in cost resulting from the suspension.
S 5.4.3 Upon such assignment to the Owner under this Section 5.4, the Owner may further assign the subcontract to
a successor contractor or other entity. Ifthe Owner assigns the subcontract to a successor contractor or other entity,
the Owner shall nevertheless remain legally responsible for all of the successor contractor's obligations under the
subcontract.
ARTICLE 6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS
s 6.1 OWNER'S RtcHT TO PERFORM CONSTRUCTTON AND TO AWARD SEPARATE CoNTRACTS
S 6.1.1 The Owner reseryes the right to perform construction or operations related to the Project with the Owner's
own forces, and to award separate contracts in connection with other portions of the Project or other construction or
operations on the site under Conditions of the Contract identical or substantially similar to these including those
p-ortions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is
involved because of such action by the Owner, the Contractor shall make such Claim as provided in Article l5'
$ 6.1 .2 When separate contracts are awarded for different portions of the Project or other construction or operations
on the site, the term "Contractor" in the Contract Documents in each case shall mean the Contractor who executes
each separate Owner-Contractor Agreement.
$ 6.1.3 The Owner shall provide for coordination of the activities of the Owner's own forces and of each separate
conhactor with the Work of the Contractor, who shall cooperate with them. The Contractor shall participate with
other separate contractors and the Owner in reviewing their construction schedules. The Contractor shall make any
revisioni to the construction schedule deemed necessary after a joint review and mutual agreement. The construction
schedules shall then constitute the schedules to be used by the Contractor, separate contractors and the Owner until
subsequently revised.
$ 6.1.4 Unless otherwise provided in the Contract Documents, when the Owner performs construction or operations
related to the Project with the Owner's own forces, the Owner shall be deemed to be subject to the same obligations
and to have the same rights that apply to the Contractor under the Conditions of the Contract, including, without
excluding others, those stated in Article 3, this Article 6 and Articles 10, I I and 12.
$ 6.2 MUTUAL RESPONSIBILIW
$ O.Z.t The Contractor shall afford the Owner and separate contractors reasonable opportunity for introduction and
storage of their materials and equipment and performance of their activities, and shall connect and coordinate the
Contractor's construction and operations with theirs as required by the Contract Documents.
S 6.2.2 If part of the Contractor's Work depends for proper execution or results upon construction or operations by
ihe O-n.i or a separate contractor, the Contractor shall, prior to proceeding with that portion of the Work, promptly
report to the Architect apparent discrepancies or defects in such other construction that would render it unsuitable
foi such proper execution and results. Failure of the Contractor so to report shall constitute an acknowledgment that
the Owner'Jor separate contractor's completed or partially completed construction is fit and proper to receive the
Contractor's Work, except as to defects not then reasonably discoverable.
$ 6.2.3 The Contractor shall reimburse the Owner for costs the Owner incurs that are payable to a separate
conhactor because of the Contractor's delays, improperly timed activities or defective construction. The Owner shall
be responsible to the Contractor for costs the Contractor incurs because of a separate contractor's delays, improperly
timed activities, damage to the Work or defective construction.
S 6.2.4 The Conkactor shall promptly remedy damage the Contractor wrongfully causes to completed or partially
completed construction or to property of the Owner or separate contractors as provided in Section 10.2.5.
$ 6.2.5 The Owner and each separate contractor shall have the same responsibilities for cutting and patching as are
described for the Contractor in Section 3.14.
AIA Document A2O1 - 2OO'1. Copyright @ 1911, 1915, 7gI8t L925, 1931, L951, r958' 1951, 1963, 1966, 1'910, 79'16, I98
rights reserved. ,'The American Institute of Architects," "American Institute of Architects," {AIA," the AIA Logo,
Documents,, are trademarks of The American Institute of Architects. This dlaft was produced at 09:51:3? PT on 05,/1
No,410424304? which expires on 06/:10/2024, is not fo! resale, is licensed for one-tj"me use only, and nay only be
the AIA Contract Documentso Terms of Service, To report copyright violations, e-mail docinfocaiacontracls.com.
Uger Notes:
?, 1997 and 2007. All
and "AIA Contract
3/2024 under Order
used in accordance with
(1164916017)
20
$ 6.3 OWNER'S RIGHT TO CLEAN UP
If a dispute arises among the Contractor, separate contractors and the Owner as to the responsibility under their
respective conhacts for maintaining the premises and surrounding area free from waste materials and rubbish, the
Owner may clean up and the Architect will allocate the cost among those responsible.
ARTICLE 7 CHANGES IN THE WORK
s 7.1 GENERAL
$ Z.t .t Changes in the Work may be accomplished after execution of the Contract, and without invalidating the
-ontract, by Change Order, Construction Change Directive or order for a minor change in the Work, subject to the
limitations stated in this Article 7 and elsewhere in the Contract Documents.
S 7.1.2 A Change Order shall be based upon agreement among the Owner, Contractor and Architect; a Construction
-hunge Directive requires agreement by the Owner and Architect and may or may not be agreed to by the
Contractor; an order for a minor change in the Work may be issued by the Architect alone.
S 7.1 .3 Changes in the Work shall be performed under applicable provisions of the Contract Documents, and the
Contractor shall proceed promptly, unless otherwise provided in the Change Order, Construction Change Directive
or order for a minor change in the Work.
s 7.2 CHANGE oRDERS
$ Z.Z.t A Change Order is a written instrument prepared by the Architect and signed by the Owner, Contractor and
Architect stating their agreement upon all of the following:
.1 The change in the Work;
.2 The amount of the adjustment, if any, in the Contract Sum; and
.3 The extent of the adjustment, if any, in the Contract Time'
$ 7.3 CONSTRUCTION CHANGE DIRECTIVES
$ Z.f.t A Construction Change Directive is a written order prepared by the Architect and sigrred by the Owner and
Architect, directing a change in the Work prior to agreement on adjustment, if any, in the Contract Sum or Contract
Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes
in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the
Contract Sum and Contract Time being adjusted accordingly.
$ 7.3.2 A Construction Change Directive shall be used in the absence of total agreement on the terms of a Change
Order.
S 7.3.3 If the Construction Change Directive provides for an adjustment to the Contract Sum, the adjustment shall be
based on one of the following methods:
.1 Mutual acceptance of a lump sum properly itemized and supported by sufficient substantiating data to
permit evaluation;
.2 Unit prices stated in the Contract Documents or subsequently agreed upon;
,3 Cost to be determined in a manner agreed upon by the parties and a mutually acceptable fixed or
percentage fee; or
.4 As provided in Section 7.3.7.
S 7.3.4 If unit prices are stated in the Contract Documents or subsequently agreed upon, and if quantities originally
contemplated are materially changed in a proposed Change Order or Construction Change Directive so that
application of such unit prices to quantities of Work proposed will cause substantial inequity to the Owner or
Contractor, the applicable unit prices shall be equitably adjusted.
$ 7.3.5 Upon receipt of a Construction Change Directive, the Contractor shall promptly proceed with the change in
ihe Workin rolved and advise the Architect of the Contractor's agreement or disagreement with the method, if any,
provided in the Constmction Change Directive for determining the proposed adjustment in the Contract Sum or
Contract Time.
$ 7.3.6 A Construction Change Directive signed by the Contractor indicates the Conhactor's agreement therewith,
including adjustment in Contract Sum and Contract Time or the method for determining them. Such agreement shall
be effective immediately and shall be recorded as a Change Order.
AIA Docunent A2OI - 2OO'1. Copyriqht O 1911, 1915, 1978, L925, r93?, 195r, 1958, 196I, IgQ, 1966, 19'10' I9'16' L98'7' 199'l and 2007' AII
rights reserved. ..The American Institute of Architeces," "American InstiLute of Architects"'"AIA," the AIA Logo, and "AIA Contract
Doiuments,, are trademarks of The American Institute of Architects. This draft was produced at 09151:37 P"l o\ 05/13/2024 under Order
No.410424304? which expires on 06/LO/2024, is not for resale, is licensed fo! one-tine use only, and may ooly be used in accordance with
the AIA Contract Docunentso Terms of Sexvice. To report coPyright violations/ e-mail docinfoeaiacontracts.con.
useE Notes: (116491601?)
2L
S 7.3.7 If the Contractor does not respond promptly or disagrees with the method for adjustment in the Contract
Sum, the Architect shall determine the method and the adjustment on the basis of reasonable expenditures and
savings of those performing the Work attributable to the change, including, in case of an increase in the Contract
Sum, an amount for overhead and profit as set forth in the Agreement, or if no such amount is set forth in the
Agreement, a reasonable amount. In such case, and also under Section 7.3.3.3, the Contractor shall keep and present,
in such form as the Architect may prescribe, an itemized accounting together with appropriate supporting data,
Unless otherwise provided in the Contract Documents, costs for the purposes of this Section 7 .3.7 shall be limited to
the following:
.1 Costs of labor, including social security, old age and unemployment insurance, fringe benefits
required by agreement or custom, and workers' compensation insurance;
.2 Costs of materials, supplies and equipment, including cost of transportation, whether incorporated or
consumed;
.3 Rental costs of machinery and equipment, exclusive of hand tools, whether rented from the
Contractor or others;
.4 Costs of premiums for all bonds and insurance, permit fees, and sales, use or similar taxes related to
the Work; and
.5 Additional costs of supervision and field office personnel directly attributable to the change.
$ 7.3.8 The amount of credit to be allowed by the Contractor to the Owner for a deletion or change that results in a
net decrease in the Conhact Sum shall be actual net cost as confirmed by the Architect. When both additions and
credits covering related Work or substitutions are involved in a change, the allowance for overhead and profit shall
be figured on the basis of net increase, if any, with respect to that change.
$ 7.3.9 Pending final determination of the total cost of a Construction Change Directive to the Owner, the Contractor
may request payment for Work completed under the Conskuction Change Directive in Applications for Payment.
the Arihitect will make an interim determination for purposes of monthly certification for payment for those costs
and certify for payment the amount that the Architect determines, in the Architect's professional judgment, to be
reasonably justified. The Architect's interim determination of cost shall adjust the Conhact Sum on the same basis
as a Change Order, subject to the right of either party to disagree and assert a Claim in accordance with Article 15.
$ 7.3.10 When the Owner and Contractor agree with a determination made by the Architect concerning the
;djustments in the Contract Sum and Contract Time, or otherwise reach agreement upon the adjustments, such
agieement shall be effective immediately and the Architect will prepare a Change Order. Change Orders may be
issued for all or any part of a Construction Change Directive.
$ 7.4 MINOR CHANGES lN THE WoRK
The Architect has authority to order minor changes in the Work not involving adjustment in the Contract Sum or
extension of the Contract Time and not inconsistent with the intent of the Contract Documents. Such changes will be
effected by written order signed by the Architect and shall be binding on the Owner and Contractor.
ARTICLE 8 TIME
$ 8.1 DEFINITIONS
5 g.t.t Unless otherwise provided, Contract Time is the period of time, including authorized adjustments, aliotted in
the Contract Documents for Substantial Completion of the Work.
$ 8.1.2 The date of commencement of the Work is the date established in the Agreement.
$ 8.1.3 The date of Substantial Completion is the date certified by the Architect in accordance with Section 9.8
$ S.1.4 The term "day" as used in the Contract Documents shall mean calendar day unless otherwise specifically
defined.
$ 8.2 PROGRESS AND COMPLETION
5 g.Z.t Time limits stated in the Contract Documents are of the essence of the Contract. By executing the Agreement
the Contractor confirms that the Contract Time is a reasonable period for performing the Work.
ArA Document AzOt - 2OO'1. Copyright @ 1911, 1915, 19L8, \925, 193'1' 1951,1958, 1961, 1'963' 1966' 19'70' 79'16, 198
ri.ghls reserved. ,.the American fnstitute of Architects," "Amelican Institute of Architects,' the AfA Logo,
Documents., are trademarks of The American Institute of A.chitects. This draft was ploduced at 09:51:3? PT on 05/1
No.410424304? which expires o^ 06/LO/2024, i.s not fo! resale, is licensed fol one-time use only, and may only be
t.he AIA Contract Documentso Terms of Setvice. To report copylight violations, e-nail docinfocaiacontracts.com.
UgeE Notes:
?, 199? and 200?. AII
and'*AIA Contract
3/2024 under older
used in accordance with
( 1 1 64 9r.601? )
22
S S.2.2 The Contractor shall not knowingly, except by agreement or instruction of the Owner in writing, prematurely
commence operations on the site or elsewhere prior to the effective date of insurance required by Article 1l to be
fumished by the Contractor and Owner. The date of commencement of the Work shall not be changed by the
effective date ofsuch insurance.
$ S.2.3 The Contractor shall proceed expeditiously with adequate forces and shall achieve Substantial Completion
within the Contract Time.
$ 8.3 DELAYS AND EXTENSIONS OF TIME
S S.3.1 If the Contractor is delayed at any time in the commencement or progtess of the Work by an act or neglect of
the Owner or Architect, or of an employee of either, or of a separate contractor employed by the Owner; or by
changes ordered in the Work; or by labor disputes, fire, unusual delay in deliveries, unavoidable casualties or other
causes beyond the Contractor's control; or by delay authorized by the Owner pending mediation and arbitration; or
by other causes that the Architect determines may justifu delay, then the Contract Time shall be extended by Change
Order for such reasonable time as the Architect may determine.
S S.3.2 Claims relating to time shall be made in accordance with applicable provisions of Article 15.
$ 8.3.3 This Section 8.3 does not preclude recovery of damages for delay by either party under other provisions of
the Contract Documents.
ARTICLE 9 PAYMENTS AND COMPLETION
$ 9.l CONTRACT SUM
The Contract Sum is stated in the Agreement and, including authorized adjustments, is the total amount payable by
the Owner to the Contractor for performance of the Work under the Contract Documents.
$ 9.2 SCHEDULE OF VALUES
Where the Contract is based on a stipulated sum or Guaranteed Maximum Price, the Contractor shall submit to the
Architect, before the first Application for Payment, a schedule of values allocating the entire Contract Sum to the
various portions of the Work and prepared in such form and supported by such data to substantiate its accuracy as
the Architect may require. This schedule, unless objected to by the Architect, shall be used as a basis for reviewing
the Contractor's Applications for Payment.
$ 9.3 APPLTCATIONS FOR PAYMENT
$ 9.3,1 At least ten days before the date established for each progress payment, the Contractor shall submit to the
Architect an itemized Application for Payment prepared in accordance with the schedule of values, if required under
Section 9.2, for completed portions of the Work. Such application shall be notarized, if required, and supported by
such data substantiating the Contractor's right to payment as the Owner or Architect may require, such as copies of
requisitions from Subcontractors and material suppliers, and shall reflect retainage if provided for in the Conhact
Documents.
S 9.3.1.1 As provided in Section 7.3.9, such applications may include requests for payment on account of changes in
the Work that have been properly authorized by Construction Change Directives, or by interim determinations of the
Architect, but not yet included in Change Orders.
S 9.3.1,2 Applications for Payment shall not include requests for payment for portions of the Work for which the
Contractor does not intend to pay a Subcontractor or material supplier, unless such Work has been performed by
others whom the Contractor intends to pay.
S 9.3.2 Unless otherwise provided in the Contract Documents, payments shall be made on account of materials and
equipment delivered and suitably stored at the site for subsequent incorporation in the Work. If approved in advance
by the Owner, payment may similarly be made for materials and equipment suitably stored off the site at a location
agreed upon in writing. Payment for materials and equipment stored on or off the site shall be conditioned upon
compliance by the Contractor with procedures satisfactory to the Owner to establish the Owner's title to such
materials and equipment or otherwise protect the Owner's interest, and shall include the costs of applicable
insurance, storage and transportation to the site for such materials and equipment stored off the site.
AIA Docunent A2OL - 2001. Copyright o 1911, 1915, 19L8, L925, 1,93'7, 1,957, 1958, 1961, 1963, 1966, I9'10, 1916, 798'l' 199
rights reserved. "The Anerican Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "
Documents', are tradenarks of 1he Amelican Institute of Architects. This draft was produced at 09:51:37 PT o^ 05/13/2024
tto,4lO4243O4? whlch expires o^ 06/tO/2024, is not for resale, is licensed for one-tj.me use only, and nay only be used i
the AIA Contract Documentso Terms of Service. To report copyright violations, e-mail docinfocaiacontracts.com.
Uger Notea:
? and 200?. AII
AIA Contract.
under order
n accordance with
(rr6491601?)
23
S 9.3.3 The Contractor warrants that title to all Work covered by an Application for Payment will pass to the Owner
no later than the time of payment. The Conhactor further warrants that upon submittal of an Application for
Payment all Work for which Certificates for Payment have been previously issued and payments received from the
Owner shall, to the best of the Contractor's knowledge, information and belief, be free and clear of liens, claims,
security interests or encumbrances in favor of the Contractor, Subcontractors, material suppliers, or other persons or
entities making a claim by reason of having provided labor, materials and equipment relating to the Work.
$ 9.4 CERTIFICATES FOR PAYMENT
$ 9.4.1 The Architect will, within seven days after receipt of the Contractor's Application for Payment, either issue
to the Owner a Certificate for Payment, with a copy to the Contractor, for such amount as the Architect determines
is properly due, or notit/ the Contractor and Owner in writing of the Architect's reasons for withholding
certification in whole or in part as provided in Section 9.5.1.
$ 9.4.2 The issuance of a Certificate for Payment will constitute a representation by the Architect to the Owner,
based on the Architect's evaluation of the Work and the data comprising the Application for Payment, that, to the
best of the Architect's knowledge, information and beliei the Work has progressed to the point indicated and that
the quality of the Work is in accordance with the Contract Documents. The foregoing representations are subject to
an evaluation of the Work for conformance with the Contract Documents upon Substantial Completion, to results of
subsequent tests and inspections, to correction of minor deviations from the Conhact Documents prior to completion
and to specific qualifications expressed by the Architect. The issuance of a Certificate for Payment will further
constitute a representation that the Contractor is entitled to payment in the amount certified. However, the issuance
of a Certificate for Payment will not be a representation that the Architect has (1) made exhaustive or continuous on-
site inspections to check the quality or quantity of the Work, (2) reviewed construction means, methods, techniques,
sequences or procedures, (3) reviewed copies ofrequisitions received from Subcontractors and material suppliers
and other data requested by the Owner to substantiate the Contractor's right to payment, or (4) made examination to
ascertain how or for what purpose the Contractor has used money previously paid on account of the Contract Sum.
s 9.5 DEC|SIONS TO WITHHOLD CERTIFICATION
S 9.5,1 The Architect may withhold a Certificate for Payment in whole or in part, to the extent reasonably necessary
to protect the Owner, if in the Architect's opinion the representations to the Owner required by Section 9 .4.2 camot
be made. If the Architect is unable to certiff payment in the amount of the Application, the Architect will notiflt the
Contractor and Owner as provided in Section 9.4. t. If the Contractor and Architect cannot agree on a revised
amount, the Architect wili promptly issue a Certificate for Payment for the amount for which the Architect is able to
make such representations to the Owner. The Architect may also withhold a Certificate for Payment or, because of
subsequently discovered evidence, may nulliff the whole or a part of a Certificate for Payment previously issued, to
such extent as may be necessary in the Architect's opinion to protect the Owner from loss for which the Contractor
is responsible, including loss resulting from acts and omissions described in Section 3.3.2, because of
.1 defective Work not remedied;
.2 third party claims filed or reasonable evidence indicating probable filing of such claims unless
security acceptable to the Owner is provided by the Contractor;
.3 failure of the Contractor to make payments properly to Subcontractors or for labor, materials or
equipment;
,4 reasonable evidence that the Work cannot be completed for the unpaid balance of the Contract Sum;
.5 damage to the Owner or a separate contractor;
.6 reasonable evidence that the Work will not be completed within the Contract Time, and that the
unpaid balance would not be adequate to cover actual or liquidated damages for the anticipated delay;
or
.7 repeated failure to carry out the Work in accordance with the Contract Documents.
S 9.5.2 When the above reasons for withholding certification are removed, certification will be made for amounts
previously withheld.
S 9.5.3 If the Architect withholds certification for payment under Section 9.5.1.3, the Owner may, at its sole option,
issue joint checks to the Contractor and to any Subcontractor or material or equipment suppliers to whom the
Contractor failed to make payment for Work properly performed or material or equipment suitably delivered. If the
Owner makes payments by joint check, the Owner shall notify the Architect and the Architect will reflect such
payment on the next Certificate for Payment.
AIA Document A2Ol - 2OO?. Copyright @ 1911, 1.915, L978, L925, 193'7, 1951, 1958, 1961' 1963, L966, 1910, I976, 198?, 1991 and 2007. AII
rights reserved. ..The Aherican Institute of Architects," "American Institute of Architects."'AIA," the AIA Logo, and "AIA Contfact.
Documents,'are trademarks of The American Institute of Alchitects. This draft was produced at 09151:3? PI on 05/13/2024 under Order
No.4104243047 whlch expires oa O6/10/2Q24r is not for resale, is licensed for one-lime use only, and nay only be used in accordance with
the AIA Contract Documentso Terms of Service. To report copyright violations, e-mail docinfocaiacontracts.com.
user Noeee: {115491'601?)
24
s 9.6 PROGRESS PAYMENTS
$ g.O.t After the Architect has issued a Certificate for Payment, the Owner shall make payment in the manner and
within the time provided in the Contract Documents, and shall so notiff the Architect.
S 9.6.2 The Contractor shall pay each Subcontractor no later than seven days after receipt of payment from the
Owner the amount to which the Subcontractor is entitled, reflecting percentages actually retained from payments to
the Contractor on account of the Subcontractor's portion of the Work. The Contractor shall, by appropriate
agreement with each Subcontractor, require each Subcontractor to make payments to Sub-subcontractors in a similar
manner.
S 9.6.3 The Architect will, on request, furnish to a Subcontractor, if practicable, information regarding percentages
of completion or amounts applied for by the Contractor and action taken thereon by the Architect and Owner on
account of portions of the Work done by such Subcontractor.
S 9.6.4 The Owner has the right to request written evidence from the Contractor that the Contractor has properly
paid Subcontractors and material and equipment suppliers amounts paid by the Owner to the Contractor for
iubcontracted Work. If the Contractor fails to fumish such evidence within seven days, the Owner shall have the
right to contact Subcontractors to ascertain whether they have been properly paid. Neither the Owner nor Architect
shall have an obligation to pay or to see to the payment of money to a Subcontractor, except as may otherwise be
required by law.
S 9.6.5 Contractor payments to material and equipment suppliers shall be treated in a manner similar to that
provided in Sections 9.6.2,9.6.3 and9.6,4.
S 9.6.6 A Certificate for Payment, a progress payment, or partial or entire use or occtlpancy of the Project by the
Owner shall not constitute acceptance of Work not in accordance with the Contract Documents.
S 9.6.7 Unless the Contractor provides the Owner with a payment bond in the full penal sum of the Contract Sum,
payments received by the Contractor for Work properly performed by Subconhactors and suppliers shall be held by
ihe Contractor for those Subcontractors or suppliers who performed Work or fumished materials, or both, under
contract with the Contractor for which payment was made by the Owner. Nothing contained herein shall require
money to be placed in a separate account and not commingled with money of the Conhactor, shall create any
fiduciary liability or tort liability on the part of the Contractor for breach of trust or shall entitle any person or entify
to an award of punitive damages against the Contractor for breach of the requirements of this provision.
$ 9.7 FATLURE OF PAYMENT
If the Architect does not issue a Certificate for Payment, through no fault of the Contractor, within seven days after
receipt of the Contractor's Application for Payment, or if the Owner does not pay the Contractor within seven days
after the date established in the Contract Documents the amount certified by the Architect or awarded by binding
dispute resolution, then the Contractor may, upon seven additional days' written notice to the Owner and Architect,
stop the Work until payment of the amount owing has been received. The Contract Time shall be extended
appropriately and the Contract Sum shall be increased by the amount ofthe Contractor's reasonable costs ofshut-
down, delay and start-up, plus interest as provided for in the Contract Documents-
s 9.8 SUBSTANTIAL COMPLETION
5 g.A.t Substantial Completion is the stage in the progress of the Work when the Work or designated portion thereof
is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the
Work for its intended use.
$ 9.8,2 When the Contractor considers that the Work, or a portion thereof which the Owner agrees to accept
separately, is substantially complete, the Contractor shall prepare and submit to the Architect a comprehensive list of
items to be completed or corrected prior to final payment. Failure to include an item on such list does not alter the
responsibility of the Contractor to complete all Work in accordance with the Contract Documents.
$ 9.8.3 Upon receipt of the Contractor's list, the Architect will make an inspection to determine whether the Work or
designated portion thereof is substantially complete. If the Architect's inspection discloses any item, whether or not
included on the Contractor's list, which is not sufficiently complete in accordance with the Conhact Documents so
that the Owner can occupy or utilize the Work or designated portion thereof for its intended use, the Contractor
AIA Document A2OI - 2001. Copyright @ 1911, 1915. f918, 1925, 1931, 1951., 1958, L961, r9A' 1966, l'9-70, I9'16' 7981, L
rights reserved. "The American InstiLute of Architects," "Anerican Inst.itute of ArchitecLs." "AIA," the AIA Logo, and
Documents,, are trademarks of The American Institute of Architects. This drafL was produced at 09:51:3? Pa on 05/13/20
I.to.4104243047 which expires o^ 06/lo/2024t is not for resale, is licensed for one-time use only, and may only be used in accordance with
the AIA Contract Documentso Terms of Service. To report copyright violations, e-mail docinfoGaiacontracts.com'
user NoEes: (116491501?)
99? and 2007. All-
"AfA Contract
24 under order 25
shall, before issuance of the Certificate of Substantial Completion, complete or correct such item upon notification
by the Architect. In such case, the Contractor shall then submit a request for another inspection by the Architect to
determine Substantial Completion.
S 9.S.4 When the Work or designated portion thereof is substantially complete, the Architect will prepare a
Certificate of Substantial Completion that shall establish the date of Substantial Completion, shall establish
responsibilities of the Owner and Contractor for securify, maintenance, heat, utilities, damage to the Work and
insurance, and shall fix the time within which the Contractor shalt finish all items on the list accompanying the
Certificate. Waranties required by the Contract Documents shall commence on the date of Substantial Completion
of the Work or designated portion thereof unless otherwise provided in the Certificate of Substantial Completion.
$ 9.8.5 The Certificate of Substantial Completion shall be submitted to the Owner and Contractor for their written
acceptance ofresponsibilities assigned to them in such Certificate. Upon such acceptance and consent ofsurety, if
any, th" Owner shall make payment of retainage applying to such Work or designated portion thereof. Such payment
shall be adjusted for Work that is incomplete or not in accordance with the requirements of the Contract Documents.
s 9.9 PARTTAL oCCUPANCY 0R USE
$ 9.9.1 The Owner may occupy or use any completed or partially completed portion of the Work at any stage when
iuch portion is designated by separate agreement with the Contractor, provided such occupancy or use is consented
to bylhe insurer as required under Section I 1.3.1.5 and authorized by public authorities having jurisdiction over the
Project. Such partial occupancy or use may commence whether or not the portion is substantially complete, provided
the Owner and Contractor have accepted in writing the responsibilities assigned to each of them for payments,
retainage, if any, security, maintenanceo heat, utilities, damage to the Work and insurance, and have agreed in
writing concerning the period for correction of the Work and commencement of warranties required by the Contract
Documents. When the Contractor considers a portion substantially complete, the Contractor shall prepare and
submit a list to the Architect as provided under Section 9.8.2. Consent of the Contractor to partial occupancy or use
shall not be unreasonably withheld. The stage of the progress of the Work shall be determined by written agreement
between the Owner and Contractor or, if no agreement is reached, by decision of the Architect.
S 9.9.2 Immediately prior to such partial occupancy or use, the Owner, Contractor and Architect shall jointly inspect
the ureu to be occupied or portion of the Work to be used in order to determine and record the condition of the
Work.
S 9.9.3 Unless otherwise agreed upon, partial occupancy or use of a portion or portions of the Work shall not
constitute acceptance of Work not complying with the requirements of the Contract Documents.
s 9.10 FINAL CoMPLETION AND FINAL PAYMENT
S g.tO.t Upon receipt of the Contractor's written notice that the Work is ready for final inspection and acceptance
ind upon receipt of a final Application for Payment, the Architect will promptly make such inspection and, when the
Architect finds the Work acceptable under the Contract Documents and the Contract fully performed, the Architect
will promptly issue a final Certificate for Payment stating that to the best of the Architect's knowledge, information
and belief, and on the basis of the Architect's on-site visits and inspections, the Work has been completed in
accordance with terms and conditions of the Contract Documents and that the entire balance found to be due the
Contractor and noted in the final Certificate is due and payable. The Architect's final Certificate for Payment will
constitute a further representation that conditions listed in Section 9.10.2 as precedent to the Contractor's being
entitled to final payment have been fulfilled.
S 9.10.2 Neither final payment nor any remaining retained percentage shall become due until the Contractor submits
io the Architect (1) an affidavit that payrolls, bills for materials and equipment, and other indebtedness connected
with the Work for which the Owner or the Owner's property might be responsible or encumbered (less amounts
withheld by Owner) have been paid or otherwise satisfied, (2) a certificate evidencing that insurance required by the
Contract Documents to remain in force after final payment is currently in effect and will not be canceled or allowed
to expire until at least 30 days' prior written notice has been given to the Owner, (3) a written statement that the
Contiactor knows of no substantial reason that the insurance will not be renewable to cover the period required by
the Contract Documents, (4) consent of surety, if any, to final payment and (5), if required by the Owner, other data
establishing payment or satisfaction of obligations, such as receipts, releases and waivers of liens, claims, security
interests orencumbrances arising out of the Contract, to the extent and in such form as may be designated by the
Owner. If a Subconhactor refuses to furnish a release or waiver required by the Owner, the Contractor may fumish a
AIA Docunenr A20L - 2OO't. Copyright @ 1911, 1915, 1978, 1925, 1931, 1957, 1958, 1961. 1963, L966' 1910, I9'16, 798'1' 1991 and 2007' Alr
rights reserved. '.the emericin Institute of Architects," "American Institute of Architects," "AIA," the AIA T,ogo, and "AIA Contract
Doiunents,, are tlademarks of The Amexican Institute of Architects. this draft was Ptoduced at 09:51:37 P'f ot 05/13/2024 under orde!
No.4lO4243O4'l which expires on 06/lO/2024, is not for resale, is Iicensed for one-t1me use only, and may only be used in accordance with
the AIA Contract Documentso Tetfrs of Service. T'o report copyxight violations, e-maj.I docinfocaiacontracts.com.
us€r Not63: (116491601'7)
26
bond satisfactory to the Owner to indemniff the Owner against such lien. If such lien remains unsatisfied after
payments are made, the Contractor shall refund to the Owner all money that the Owner may be compelled to pay in
discharging such lien, including all costs and reasonable attorneys' fees.
S 9.10.3If, after Substantial Completion of the Work, final completion thereof is materially delayed through no fault
of the Conhactor or by issuance of Change Orders affecting final completion, and the Architect so confirms, the
Owner shall, upon application by the Contractor and certification by the Architect, and without terminating the
Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the
remaining balance for Work not fully completed or corrected is less than retainage stipulated in the Contract
Documents, and if bonds have been furnished, the written consent of surety to payment of the balance due for that
portion of the Work fully completed and accepted shall be submitted by the Contractor to the Architect prior to
certification of such payment. Such payment shall be made under terms and conditions goveming final payment,
except that it shall not constitute a waiver of claims.
$ 9.10.4 The making of final payment shall constitute a waiver of Claims by the Owner except those arising from
.1 liens, Claims, security interests or encumbrances arising out of the Contract and unsettled;
.2 failure of the Work to comply with the requirements of the Contract Documents; or
.3 terms of special warranties required by the Contract Documents.
$ 9.10.5 Acceptance of final payment by the Contractor, a Subcontractor or material supplier shall constitute a
waiver of claims by that payee except those previously made in writing and identified by that payee as unsettled at
the time of final Application for Payment.
ARTICLE 10 PROTECTION OF PERSONS AND PROPERW
$ 10.1SAFETY PRECAUTIONS AND PROGRAMS
The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs
in connection with the performance of the Contract.
$ 10.2 SAFEW OF PERSONS AND PROPERTY
$ 10.2.1 The Contractor shall take reasonable precautions for safety of, and shall provide reasonable protection to
prevent damage, injury or loss to
.1 employees on the Work and other persons who may be affected thereby;
.2 the Work and materials and equipment to be incorporated therein, whether in storage on or off the
site, under care, custody or control ofthe Contractor or the Contractor's Subcontractors or Sub-
subcontractors; and
.3 other property at the site or adjacent thereto, such as trees, shrubs, lawns, walks, pavements,
roadways, structures and utilities not designated for removal, relocation or replacement in the course
of construction.
$ 10.2.2 The Contractor shall comply with and give notices required by applicable laws, statutes, ordinances, codes,
rules and regulations, and lawful orders of public authorities bearing on safety of persons or property or their
protection from damage, injury or loss.
$ 10.2.3 The Contractor shall erect and maintain, as required by existing conditions and performance of the Contract,
reasonable safeguards for safety and protection, including posting danger signs and other warnings against hazards,
promulgating safety regulations and notifting owners and users of adjacent sites and utilities.
$ 10.2.4 When use or storage of explosives or other hazardous materials or equipment or unusual methods are
necessary for execution of the Work, the Contractor shall exercise utmost care and carry on such activities under
supervision of properly qualifi ed personnel.
$ 10.2,5 The Contractor shall promptly remedy damage and loss (other than damage or loss insured under property
insurun"" required by the Contract Documents) to property referred to in Sections 10.2.1.2 and 10.2.1.3 caused in
whole or in part by the Contractor, a Subcontractor, a Sub-subcontractor, or anyone directly or indirectly employed
by any of them, or by anyone for whose acts they may be liable and for which the Contractor is responsible under
Sections 10.2.1.2 and 10.2.1.3, except damage or loss attributable to acts or omissions of the Owner or Architect or
anyone directly or indirectly employed by either of them, or by anyone for whose acts either of them may be liable,
AIA Docunenr A2Ol - 2001. Copyright @ 1911, 1915, I9L8, 1925, 193'7, 1951, 1958, 1961. \963, 1966' l9'7O l9'76, 198'7, 1997 and 200?. All
righcs reserved. "The American Inst..itute of Architects." "American Inst.itule of Architects,' the AIA Logo,
Documenes,, are tradenarks of The American Institute of Architects. this draft was produced at 09;51:37 PT on 05/1
I'1o.4104243047 which expires on 06/I0/2Q24, is not for resale, is Iicensed for one-time use only/ and may only be
the AIA Contract Documentso Terms of Service. To report copyright violations, e-mail docinfocaiacontracts.com.
User Notes:
and "AIA Contiact
3/2024 under order
used in accordance with
(11649160r.7)
27
and not attributable to the fault or negligence of the Contractor. The foregoing obligations of the Contractor are in
addition to the Contractor's obligations under Section 3.18.
S 10.2.6 The Contractor shall designate a responsible member of the Contractor's organization at the site whose duty
ihutt b" the prevention ofaccidents. This person shall be the Contractor's superintendent unless otherwise
designated by the Contractor in writing to the Owner and Architect.
$ 10.2.7 The Contractor shall not permit any part of the construction or site to be loaded so as to cause damage or
create an unsafe condition.
s 10.2.8|NJURY 0R DAMAGE TO PERSON OR PROPERTY
if "ith.. party suffers injury or damage to person or property because of an act or omission of the other party, or of
others foi whose acts such party is legally responsible, written notice of such injury or damage, whether or not
insured, shall be given to the other party within a reasonable time not exceeding 21 days after discovery. The notice
shall provide sufhcient detail to enable the other parfy to investigate the matter.
$ 10.3 HMARDOUS MATERIALS
$ 10.3.1 The Contractor is responsible for compliance with any requirements included in the Conkact Documents
iegarding hazardous materialJ. Ifthe Contractor encounters a hazardous material or substance not addressed in the
Contract Documents and if reasonable precautions will be inadequate to prevent foreseeable bodily injury or death
to persons resulting from a material or substance, including but not limited to asbestos or polychlorinated biphenyl
GaB), encountered on the site by the Contractor, the Contractor shall, upon recognizing the condition, immediately
stop Work in the affected area and report the condition to the Owner and Architect in writing.
$ 10.3.2 Upon receipt of the Contractor's written notice, the Owner shall obtain the services of a licensed laboratory
io veriff the presenie or absence ofthe material or substance reported by the Contractor and, in the event such
material ot rubstatt"e is found to be present, to cause it to be rendered harmless. Unless otherwise required by the
Contract Documents, the Owner shall furnish in writing to the Contractor and Architect the names and qualifications
of persons or entities who are to perform tests verifuing the presence or absence of such material or substance or
who are to perform the task of removal or safe containment of such material or substance. The Contractor and the
Architect will promptly reply to the Owner in writing stating whether or not either has reasonable objection to the
persons or entities p.opored by the Owner. If either the Contractor or Architect has an objection to a person or entity
proposed by the Owner, the Owner shall propose another to whom the Contractor and the Architect have no
ieaionable objection. When the material or substance has been rendered harmless, Work in the affected area shall
resume upon written agreement of the Owner and Contractor. By Change Order, the Contract Time shall be
extended appropriately and the Contract Sum shall be increased in the amount of the Contractor's reasonable
additional costs of shut-down, delay and start-up.
S 10.3.3 To the fullest extent permitted by law, the Owner shall indemnify and hold harmless the Contractor,
Subcontractors, Architect, Architect's consultants and agents and employees of any of them from and against
claims, damages, losses and expenses, including but not limited to attomeys' fees, arising out of or resulting from
performance of the Work in the affected area if in fact the material or substance presents the risk of bodily injury or
ieath as described in Section 10.3.1 and has not been rendered harmless, provided that such claim, damage, loss or
expense is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property
(other than the Work itself), except to the extent that such damage, loss or expense is due to the fault or negligence
of the party seeking indemnify.
S 10.3.4 The Owner shall not be responsible under this Section 10.3 for materials or substances the Contractor brings
to the site unless such materials or substances are required by the Contract Documents. The Owner shall be
responsible for materials or substances required by the Contract Documents, except to the extent of the Contractor's
fault or negligence in the use and handling of such materials or substances'
$ 10.3.5 The Contractor shall indemnify the Owner for the cost and expense the Owner incurs (1) for remediation of
a material or substance the Contractor brings to the site and negligently handles, or (2) where the Contractor fails to
perform its obligations under Section 10.3.1, except to the extent that the cost and expense are due to the Owner's
fault or negligence.
ArA Document A2OI - 200'7. copyright. o 1911, 1915, 1918,
rights reserved.- "The American Institute of Alchitects.
Ig25, t93't,1951, 1958, 196!, 1963, 1966, r9'10, I976' 198'7,199? and 2007 A11
,, ..American InstiLute of Architects,,,.'AIA." the AlA Logo, and "AIA Contract.
Architects. This draft was produced at 09:51:37 P'l on 05/l'3/2024 under order
resaLe, is licensed fot one-time use only, and may only be used in accordance with1ro.4104243047 which expires on 06/10/2024, is not for
the AIA Contract Docunentso Terms of Service. to report
Documents" ate trademarks of The American Institute of
User Noteg:
copyright violations, e-maiI docinfooaiacontlacts.com.
(1154916017)
28
$ 10,3.6 If, without negligence on the part of the Contractor, the Contractor is held liable by a govemment agency
for the cost of remediation of a hazardous material or substance solely by reason of performing Work as required by
the Contract Documents, the Owner shall indemnify the Contractor for all cost and expense thereby incurred.
$ 10.4 EMERGENCTES
In an emergency affecting safety of persons or properfy, the Contractor shall act, at the Contractor's discretion, to
prevent threatened damage, injury or loss. Additional compensation or extension of time claimed by the Contractor
on account of an emergency shall be determined as provided in Article 15 and Article 7.
ARTICLE 11 INSURANCE AND BONDS
$ 11.1 CONTRACToR'S LIABILIW INSURANCE
$ tt.t.t The Contractor shall purchase from and maintain in a company or companies lawfully authorized to do
business in the jurisdiction in which the Project is located such insurance as will protect the Contractor from claims
set forth below which may arise out of or result from the Contractor's operations and completed operations under
the Contract and for which the Contractor may be legally liable, whether such operations be by the Contractor or by
a Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of
them may be liable:
.1 Claims under workers' compensation, disabilify benefit and other similar employee benefit acts that
are applicable to the Work to be performed;
.2 Claims for damages because of bodily injury, occupational sickness or disease, or death of the
Contractor's employees;
.3 Claims for damages because of bodily injury, sickness or disease, or death of any person other than
the Contractor's employees ;
.4 Claims for damages insured by usual personal injury liability coverage;
.5 Claims for damages, other than to the Work itself, because of injury to or destruction of tangible
property, including loss of use resulting therefrom;
.6 Claims for damages because of bodily injury, death of a person or property damage arising out of
ownership, maintenance or use of a motor vehicle;
.7 Claims for bodily injury or properfy damage arising out of completed operations; and
.8 Claims involving contractual liability insurance applicable to the Contractor's obligations under
Section 3.18.
S 11.{.2 The insurance required by Section I I .1 . I shall be written for not less than limits of liability specified in the
Contract Documents or required by law, whichever coverage is greater. Coverages, whether written on an
occurence or claims-made basis, shall be maintained without intemrption from the date of commencement of the
Work until the date of final payment and termination of any coverage required to be maintained after final payment,
and, with respect to the Contractor's completed operations coverage, until the expiration of the period for correction
of Work or for such other period for maintenance of completed operations coverage as specified in the Contract
Documents.
S 11.1.3 Certificates of insurance acceptable to the Owner shall be filed with the Owner prior to commencement of
ihe Work and thereafter upon renewal or replacement of each required policy of insurance. These certificates and the
insurance policies required by this Section I 1 .1 shall contain a provision that coverages afforded under the policies
will not be canceled or allowed to expire until at least 30 days' prior written notice has been given to the Owner. An
additional certificate evidencing continuation ofliability coverage, including coverage for completed operations,
shall be submitted with the final Application for Payment as required by Section 9.10.2 and thereafter upon renewal
or replacement of such coverage until the expiration of the time required by Section I I . I .2. Information conceming
reduition of coverage on account of revised limits or claims paid under the General Aggregate, or both, shall be
furnished by the Contractor with reasonable promptness.
$ 1 1.1.4 The Contractor shall cause the commercial liability coverage required by the Contract Documents to
include (l) the Owner, the Architect and the Architect's consultants as additional insureds for claims caused in
whole or in part by the Contractor's negligent acts or omissions during the Contractor's operations; and (2) the
Owner as an additional insured for claims caused in whole or in part by the Contractor's negligent acts or omissions
during the Contractor's completed operations.
$ 11.2 oWNER'S LIABILIW INSUR.ANCE
The Owner shall be responsible for purchasing and maintaining the Owner's usual liability insurance.
AIA Document A2O7 - 2OO'7. Copyright o 1911, r915, IgI8, 1925, Lg37, ]Ig5:.t 1958, 1961, 1951, 1966' 79'10, I9-76, 1'98'1, 1997 and 2007' AII
right.s reserved.. "The American Institute of Architects," "American Instilute of Architects," "AIA," the AIA Logo, and "AIA Contract
Documents,, are trademarks of The Anerican Institute of Architects. this draft was ploduced at 09:51:3? P'l on 05/13/2024 under Order
No.4104243047 which expires o^ 06/70/2024, is not for resale. is Iicensed fo! one-time use only/ and may only be used in accordance with
the AIA Contract Documentso Terms of Service, To leport copyright violations, e-mail docinfocaiacontracts.com
Uger Noges:(1164916017)
29
s 11.3 PROPERTY INSURANCE
t t t.S.t Unless otherwise provided, the Owner shall purchase and maintain, in a company or companies lawfully
authorized to do business in the jurisdiction in which the Project is located, property insurance written on a builder's
risk "all-risk" or equivalent policy form in the amount of the initial Contract Sum, plus value of subsequent Contract
Modifications and cost of miterials supplied or installed by others, comprising total value for the entire Project at
the site on a replacement cost basis without optional deductibles. Such property insurance shall be maintained,
unless otherwiie provided in the Contract Documents or otherwise agreed in writing by all persons and entities who
are beneficiaries of such insurance, until final payment has been made as provided in Section 9. 10 or until no person
or entity other than the Owner has an insurable interest in the property required by this Section I I '3 to be covered,
whichever is later. This insurance shall include interests of the Owner, the Contractor, Subcontractors and Sub-
subcontractors in the Project.
$ 11 .3.1.1 Property insurance shall be on an "all-risk" or equivalent policy form and shall include, without
limitation, insurance against the perils of fire (with extended coverage) and physical loss or damage including,
without duplication ofioverage, theft, vandalism, malicious mischief, collapse, earthquake, flood, windstorm,
falsework, testing and startup, temporary buildings and debris removal including demolition occasioned by
enforcement of any applicable legil requirements, and shall cover reasonable compensation for Architect's and
Conkactor's services and expenses required as a result of such insured loss.
$ 11.3.1.2 If the Owner does not intend to purchase such property insurance required by the Contract and with all of
th" rou.rug"s in the amount described above, the Owner shall so inform the Contractor in writing prior to
commencelnent of the Work. The Contractor may then effect insurance that will protect the interests of the
Contractor, Subcontractors and Sub-subcontractors in the Work, and by appropriate Change Order the cost thereof
shall be charged to the Owner. If the Contractor is damaged by the failure or neglect of the Owner to purchase or
maintain insurance as described above, without so notifuing the Contractor in writing, then the Owner shall bear all
reasonable costs properly attributable thereto.
S 11.3.1.3 Ifthe property insurance requires deductibles, the Owner shall pay costs not covered because ofsuch
deductibles.
$ 1 1 .3.1,4 This property insurance shall cover portions of the Work stored off the site, and also portions of the Work
in transit.
$ 11.3.1.5 Partial occupancy or use in accordance with Section 9.9 shall not commence until the insurance company
or companies providing property insurance have consented to such partial occupancy or use by endorsement or
otherwise. The Owner and the Contractor shall take reasonable steps to obtain consent of the insurance company or
companies and shall, without mutual written consent, take no action with respect to partial occupancy or use that
would cause cancellation, lapse or reduction of insurance.
$ 11.3.2 BOILER AND MACHINERY INSURANCE
ih" O*n"r shall purchase and maintain boiler and machinery insurance required by the Contract Documents or by
law, which shall specifically cover such insured objects during installation and until final acceptance by the Owner;
this insurance shail include interests of the Owner, Contractor, Subcontractors and Sub-subcontractors in the Work,
and the Owner and Contractor shall be named insureds.
$ 11.3.3 LoSS 0F USE TNSURANCE
ih" O*n.t, at the Owner's option, may purchase and maintain such insurance as will insure the Owner against loss
of use of the Owner's ptop"tty due to fire or other hazards, however caused. The Owner waives all rights of action
against the Contractorlor-loss of use of the Owner's property, including consequential losses due to fire or other
hazards however caused.
$ 1 1.3,4 If the Contractor requests in writing that insurance for risks other than those described herein or other
special causes of loss be included in the property insurance policy, the Owner shall, if possible, include such
insurance, and the cost thereofshall be charged to the Contractor by appropriate Change Order.
$ 1 1 .3.5 If during the Project construction period the Owner insures properties, real or personal or both, at or
idjacent to the site by property insurance under policies separate from those insuring the Project, or ifafter final
ArA Document A2OI - 2OO'1. copyright @ 1911, 1915, I9l8' 1925' 193?, 1951, 195
rights reserved, "The American Institute of ArchiCeetsr" "Amelican Institute
Doiuments" are trademarks of The American Institute of Architects. This draft
No.410424304? which expires on O6/10/2024, is not for resale, is licensed fot
the AIA Contract Documentso Terms of Service' lo report coPyright violations,
8, 196r, L963, t966, l9-70,7916, 19
of Architects," *AIA," the AIA togo
was produced at 09:51:3? PT on 05/
one-time use only, and may only be
e-naiL docinfocai.acontracts. com'
8'7, 1991 and 2007. AII
, and "AIA Contract
13/2024 under order
used in accordance with
User NoCeg:(1154916017)
30
payment property insurance is to be provided on the completed Project through a policy or policies other than those
inJuring ihe troject during the construction period, the Owner shall waive all rights in accordance with the terms of
Section 1 I .3.7 for damages caused by fire or other causes of loss covered by this separate property insurance' All
separate policies shall provide this waiver of subrogation by endorsement or otherwise.
$ 1 1.3.6 Before an exposure to loss may occur, the Owner shall file with the Contractor a copy of each policy that
includes insurance coverages required by this Section I 1.3. Each policy shall contain all generally applicable
conditions, definitions, exclusions and endorsements related to this Project. Each policy shall contain a provision
that the policy will not be canceled or allowed to expire, and that its limits will not be reduced, until at least 30 days'
prior written notice has been given to the Contractor.
$ 11.3.7WA|VERS 0F SUBRoGATION
ihe O*ner and Contractor waive all rights against (l) each other and any of their subcontractors, sub-
subcontractors, agents and employees, each of the other, and (2) the Architect, Architect's consultants, separate
contractors described in Article 6, if any, and any of their subcontractors, sub-subcontractors, agents and employees,
for damages caused by fire or other causes ofloss to the extent covered by property insurance obtained pursuant to
this Section I 1.3 or other property insurance applicable to the Work, except such rights as they have to proceeds of
such insurance held by the Owner as fiduciary. The Owner or Contractor, as appropriate, shall require of the
Architect, Architect's consultants, separate contractors described in Article 6, if any, and the subcontractors, sub-
subcontractors, agents and employees of any of them, by appropriate agreements, written where legally required for
validity, similar waivers each in favor of other parties enumerated herein. The policies shall provide such waivers of
subrogation by endorsement or otherwise. A waiver of subrogation shall be effective as to a person or entity even
though that person or entity would otherwise have a duty of indemnification, contractual or otherwise, did not pay
the insuranci premium directly or indirectly, and whether or not the person or entity had an insurable interest in the
property damaged.
$ 11.3.S A loss insured under the Owner's property insurance shall be adjusted by the Owner as fiduciary and made
payable to the Owner as fiduciary for the insureds, as their interests may appear, subject to requirements of any
applicable mortgagee clause and of Section I 1.3.10. The Contractor shall pay Subcontractors their just shares of
insurance proceeds received by the Conhactor, and by appropriate agreements, written where legally required for
validity, shall require Subconhactors to make payments to their Sub-subcontractors in similar manner.
S 1 1.3.9 If required in writing by a parfy in interest, the Owner as fiduciary shall, upon occurrence of an insured loss,
give bond for proper performance of the Owner's duties. The cost of required bonds shall be charged against
proceeds received as fiduciary. The Owner shall deposit in a separate account proceeds so received, which the
b*n". shall distribute in accordance with such agreement as the parties in interest may reach, or as determined in
accordance with the method of binding dispute resolution selected in the Agreement between the Owner and
Conhactor. If after such loss no other special agreement is made and unless the Owner terminates the Conhact for
convenience, replacement of damaged property shall be performed by the Contractor after notification of a Change
in the Work in accordance with Article 7.
S 11.3.10 The Owner as fiduciary shall have power to adjust and settle a loss with insurers unless one of the parties
in interest shall object in writing within five days after occurrence of loss to the Owner's exercise of this power; if
such objection is made, the dispute shall be resolved in the manner selected by the Owner and Contractor as the
method of binding dispute resolution in the Agreement. If the Owner and Contractor have selected arbitration as the
method of binding dispute resolution, the Owner as fiduciary shall make settlement with insurers or, in the case of a
dispute over distribution of insurance proceeds, in accordance with the directions of the arbitrators.
$ 11.4 PERFORMANCE BOND AND PAYMENT BOND
5 tt.n.t The Owner shall have the right to require the Contractor to furnish bonds covering faithful performance of
the Contract and payment of obligations arising thereunder as stipulated in bidding requirements or specifically
required in the Contract Documents on the date of execution of the Contract.
$ 1 1 .4.2 Upon the request of any person or entify appearing to be a potential beneficiary of bonds covering payment
of obligations arising under the Contract, the Contractor shall promptly furnish a copy of the bonds or shall
authorize a copy to be fumished.
AIA Document A2OI - zOO't. Copyright O 1911, 1915, IgI8, 1925, Ig3'1, lgSI' 1958, 1961, 1963, 1966' l9'70, I916, 198?, 19
rights reserved. "The emerican I;stitute of Architects," "American Institute of Alchitects," "AIA," the AIA Loqo, and
Documents,, are tradenarks of lhe American InstituLe of Architects. this draft was produced at 09:51:3? P"l on 05/L3/202
bto.4104243047 which expires on 06/10/2024, is not for resale. is licensed fox one-tine use only, and may only be used
the AIA Contract Docunents€ Terms of Setvice, To report copyright violaeions, e-mail docinfooaiacontracts.com.
User Noteg:
9? and 2007. AII
"AIA Contract
4 under orde!
in accordance wiLh
(116491601?)
31
ARTICLE 12 UNCOVERING AND CORRECTION OF WORK
$ 12.l UNCoVER|NG 0F WORK
S 12.1.1 If a portion of the Work is covered contrary to the Architect's request or to requirements specifically
expressed in the Contract Documents, it must, if requested in writing by the Architect, be uncovered for the
Architect's examination and be replaced at the Contractor's expense without change in the Contract Time.
S 12.1.2 If a portion of the Work has been covered that the Architect has not specifically requested to examine prior
to its being covered, the Architect may request to see such Work and it shall be uncovered by the Contractor. If such
Work is in accordance with the Contract Documents, costs of uncovering and replacement shall, by appropriate
Change Order, be at the Owner's expense. If such Work is not in accordance with the Contract Documents, such
costs and the cost of correction shall be at the Contractor's expense unless the condition was caused by the Owner or
a separate contractor in which event the Owner shall be responsible for payment of such costs.
s 12.2 CORRECTTON 0F WORK
s 12.2.1 BEFORE OR AFTER SUBSTANTIAL COMPLETION
The Contractor shall promptly correct Work rejected by the Architect or failing to conform to the requirements of
the Contract Documents, whether discovered before or after Substantial Completion and whether or not fabricated,
installed or completed. Costs of correcting such rejected Work, including additional testing and inspections, the cost
of uncovering and replacement, and compensation for the Architect's services and expenses made necessary
thereby, shall be at the Contractor's expense.
$ 12.2.2 AFTER SUBSTANTIAL COMPLETION
S 12.2.2.1In addition to the Contractor's obligations under Section 3.5, if, within one year after the date of
Substantial Completion of the Work or designated portion thereof or after the date for commencement of warranties
established under Section 9.9.1, or by terms of an applicable special warranty required by the Contract Documents,
any of the Work is found to be not in accordance with the requirements of the Contract Documents, the Contractor
shall correct it promptly after receipt of written notice from the Owner to do so unless the Owner has previously
given the Contractor a written acceptance of such condition. The Owner shall give such notice promptly after
dir"ou"ry of the condition. During the one-year period for correction of Work, if the Owner fails to notiff the
Contractor and give the Contractor an opportunity to make the correction, the Owner waives the rights to require
correction by the Contractor and to make a claim for breach of warranty. If the Contractor fails to correct
nonconforming Work within a reasonable time during that period after receipt of notice from the Owner or
Architect, the Owner may correct it in accordance with Section 2.4.
S 12.2,2.2The one-year period for correction of Work shall be extended with respect to portions of Work first
performed after Substantial Completion by the period of time befween Substantial Completion and the actual
completion of that portion of the Work.
S 12.2.2,3 The one-year period for correction of Work shall not be extended by corrective Work performed by the
Contractor pursuant to this Section 12.2.
S 12.2.3 The Conhactor shall remove from the site portions of the Work that are not in accordance with the
requirements of the Conhact Documents and are neither corrected by the Contractor nor accepted by the Owner.
S 12.2,4 The Contractor shall bear the cost of correcting destroyed or damaged construction, whether completed or
partially completed, of the Owner or separate contractors caused by the Contractor's correction or removal of Work
that is not in accordance with the requirements of the Contract Documents.
S 12.2.5 Nothing contained in this Section 12.2 shall be construed to establish a period of limitation with respect to
other obligations the Contractor has under the Contract Documents. Establishment of the one-year period for
correction of Work as described in Section 12.2.2 relates only to the specific obligation of the Contractor to correct
the Work, and has no relationship to the time within which the obligation to comply with the Contract Documents
may be sought to be enforced, nor to the time within which proceedings may be commenced to establish the
Contractor's liability with respect to the Contractor's obligations other than specifically to conect the Work.
AIA Document A2OL - 2OO'7. copyright @ 1911, 1915, Igi-}, 1925, 193'1, :I95I, 7958, L967, 1963, 1-966' l9'l0, l9'16, 798'7, a99'l and 2007' Alt
lights reserved, "The American Institute of Architects," "American Institule of Architects, the AIA Logo, and "AIA Conlract
Documents,, are trademarks of The 1\merican Institute of Alchitects. lhis dlaft was ploduced at 09:51:37 P'l a^ 05/13/2024 under Order
No.410424304? which expires o^ 06/lO/2024, is not for lesale, is Iicensed for one-time use only. and nay only be used in accordance with
the AIA Cont.ract Documentso Terms of Service. ?o report copyright violations. e-maiI docinfocaiacontracts'com.
ueer Notes: (11549160L7)
32
$ l2.3ACCEPTANCE OF NoNCoNFORMING WORK
if th" O*ne. prefers to accept Work that is not in accordance with the requirements of the Contract Documents, the
Owner may do so instead of requiring its removal and correction, in which case the Contract Sum will be reduced as
appropriate and equitable. Such adjustment shall be effected whether or not final payment has been made.
ARTICLE 13 MISCELLANEOUS PROVISIONS
s 13.I GOVERNrNG LAW
The Contract shall be governed by the law of the place where the Project is located except that, if the parties have
selected arbitration as the method of binding dispute resolution, the Federal Arbitration Act shall govern Section
15.4.
$ 13.2 SUCCESSORS AND ASSIGNS
S 13.2.1 The Owner and Contractor respectively bind themselves, their partners, successors, assigns and legal
iepresentatives to covenants, agreements and obligations contained in the Contract Documents. Except as provided
irrsection 13.2.2, neither party to the Contract shall assign the Contract as a whole without written consent of the
other. If either party attempts to make such an assignment without such consent, that party shall nevertheless remain
legally responsible for all obligations under the Contract.
S 13.2,2 The Owner may, without consent of the Contractor, assign the Contract to a lender providing construction
financing for the Project, if the lender assumes the Owner's rights and obligations under the Contract Documents.
The Contractor shall execute all consents reasonably required to facilitate such assignment.
s 13.3WR|TTEN NOTTCE
y7ritten notice shall be deemed to have been duly served if delivered in person to the individual, to a member of the
firm or entity, or to an officer of the corporation for which it was intended; or if delivered at, or sent by registered or
certified mail or by courier service providing proof of delivery to, the last business address known to the party
giving notice.
s 13.4 RTGHTS AND REMEDIES
$ 13.4.1 Duties and obligations imposed by the Contract Documents and rights and remedies available thereunder
shall be in addition to and not a limitation of duties, obligations, rights and remedies otherwise imposed or available
by law.
$ 13.4.2 No action or failure to act by the Owner, Architect or Contractor shall constitute a waiver of a right or duty
afforded them under the Contract, nor shall such action or failure to act constitute approval ofor acquiescence in a
breach there under, except as may be specifically agreed in writing.
s 13,5TESTS AND INSPECTIoNS
S 13.5.1 Tests, inspections and approvals of portions of the Work shall be made as required by the Contract
Documents and by applicable laws, statutes, ordinances, codes, rules and regulations or lawful orders of public
authorities. Unless otherwise provided, the Contractor shall make anangements for such tests, inspections and
approvals with an independent testing laboratory or entity acceptable to the Owner, or with the appropriate public
auihority, and shall bear all related costs oftests, inspections and approvals. The Contractor shall give the Architect
timely notice of when and where tests and inspections are to be made so that the Architect may be present for such
procedures. The Owner shall bear costs of (1) tests, inspections or approvals that do not become requirements until
after bids are received or negotiations concluded, and (2) tests, inspections or approvals where building codes or
applicable laws or regulations prohibit the Owner from delegating their cost to the Contractor.
S 13.5.2 If the Architect, Owner or public authorities having jurisdiction determine that portions of the Work require
additional testing, inspection or approval not included under Section 13.5.l, the Architect will, upon written
authorization from the Owner, instruct the Contractor to make arrangements for such additional testing, inspection
or approval by an entity acceptable to the Owner, and the Contractor shall give timely notice to the Architect of
when and where tests and inspections are to be made so that the Architect may be present for such procedures. Such
costs, except as provided in Section 13.5.3, shall be at the Owner's expense.
$ 13.5.3 Ifsuchproceduresfortesting,inspectionorapprovalunderSectionsl3.5.l and13.5.2revealfailureofthe
portions of the Work to comply with requirements established by the Contract Documents, all costs made necessary
AIA Document A2OL - 2OO'7. Copylight @ 1911, 1915, L978, L925, 1931, L95:., 1958, 1961, 1963, 1966, l9'70, 19'16' 198'1, 1991 and 200?' All
rights reserved. '.The American fnstitute of Architects/" "American Institule of Architects," "AIA," the AIA Logo, and "AIA Contract
Documents,, are trademarks of The American Institute of Architects. This dlaft was pxoduced at 09:51:3? PT o^ 05/13/2024 under Order
No.410424304? ilhich expires on 06/L0/2024t is not for resale, is licensed fol one-time use only. and may only be used in accordance with
the AIA Contract Docunentso Terns of Service. To report copyright violatiotrs, e-mail docinfocaiacontlacts.com.
User Notes: (11649160f7)
33
by such failure including those of repeated procedures and compensation for the Architect's services and expenses
shall be at the Contractor's expense.
$ 13.5.4 Required certificates of testing, inspection or approval shall, unless otherwise required by the Contract
Documents, be secured by the Contractor and promptly delivered to the Architect.
$ 13.5.5 If the Architect is to observe tests, inspections or approvals required by the Contract Documents, the
Architect will do so promptly and, where practicable, at the normal place of testing.
$ 13.5.6 Tests or inspections conducted pursuant to the Contract Documents shall be made promptly to avoid
urueasonable delay in the Work.
s 13.6INTEREST
Payments due and unpaid under the Contract Documents shall bear interest from the date payment is due at such rate
as the parties may agree upon in writing or, in the absence thereof, at the legal rate prevailing from time to time at
the place where the Project is located.
$ 13.7T|ME LIMITS ON CLATMS
The Owner and Contractor shall commence all claims and causes of action, whether in contract, tort, breach of
warranty or otherwise, against the other arising out of or related to the Contract in accordance with the requirements
of the final dispute resolution method selected in the Agreement within the time period specified by applicable law,
but in any case not more than I 0 years after the date of Substantial Completion of the Work. The Owner and
Contractor waive all claims and causes of action not commenced in accordance with this Section 13.7.
ARTICLE 14 TERMINATION OR SUSPENSION OF THE CONTRACT
$ 14.1TERM|NAT|oN BY THE CONTMCTOR
S 14.1.1 The Contractor may terminate the Contract if the Work is stopped for a period of 30 consecutive days
through no act or fault ofthe Contractor or a Subcontractor, Sub-subcontractor or their agents or employees or any
other persons or entities performing portions of the Work under direct or indirect contract with the Contractor, for
any of the following reasons:
.1 lssuance of an order of a court or other public authority having jurisdiction that requires all Work to
be stopped;
.2 An act of government, such as a declaration of national emergency that requires all Work to be
stopped;
.3 Because the Architect has not issued a Certificate for Payment and has not notified the Contractor of
the reason for withholding certification as provided in Section 9.4.1, or because the Owner has not
made payment on a Certificate for Payment within the time stated in the Contract Documents; or
.4 The Owner has failed to furnish to the Contractor promptly, upon the Contractor's request, reasonable
evidence as required by Section 2.2. l.
$ 14.1.2 The Contractor may terminate the Contract if, through no act or fault of the Contractor or a Subcontractor,
Sub-subcontractor or their agents or employees or any other persons or entities performing portions of the Work
under direct or indirect contract with the Contractor, repeated suspensions, delays or intemrptions of the entire Work
by the Owner as described in Section 14.3 constitute in the aggregate more than 100 percent of the total number of
days scheduled for completion, or 120 days in any 365-day period, whichever is less.
$ 14.1.3 If one of the reasons described in Section 14.1.1 or 14.1.2 exists, the Contractormay, upon seven days'
written notice to the Owner and Architect, terminate the Contract and recover from the Owner payment for Work
executed, including reasonable overhead and profit, costs incurred by reason ofsuch termination, and damages.
$ 14.1.4 If the Work is stopped for a period of 60 consecutive days through no act or fault of the Contractor or a
Subcontractor or their agents or employees or any other persons performing portions of the Work under conhact
with the Contractor because the Owner has repeatedly failed to fulfill the Owner's obligations under the Contract
Documents with respect to matters important to the progress of the Work, the Contractor may, upon seven additional
days' written notice to the Owner and the Architect, terminate the Contract and recover from the Owner as provided
in Section 14.1.3.
AIA Documenb A201. - 2OO'1. Copyright @ 1911, 1915, 19f8, 1925, 193'1, 1951, L958, I96L, 1963, 1966, L9'70, L9'76, 798'7' 1991 and 200? All
riqihts reserved. ..The American Institute of Architects," "American Institute of Archibects,' the AIA Logo, and "AIA Contlact
Documents,, are tradenarks of The American Institute of Architects. fhis draft was ploduced at 09:51:37 P'f o^ 05/!3/2024 unde. order
No.410424304? which expires o^ O6/LO/2024, is not for resale, is licensed for one-time use only. and may only be used in accordance with
the AIA Contract Docunentso Terms of Service. To leport copyaight viol-ations, e-mail docinfocaiacontlacts.com.
us€r Notes: (116491501?)
34
$ 14.2 TERMTNATIoN BY THE OWNER FOR CAUSE
$ 14.2.1 The Owner may terminate the Contract if the Contractor
.1 repeatedly refuses or fails to supply enough properly skilled workers or proper materials;
,2 fails to make payment to Subcontractors for materials or labor in accordance with the respective
agreements between the Contractor and the Subcontractors;
.3 repeatedly disregards applicable laws, statutes, ordinances, codes, rules and regulations, or lawful
orders of a public authority; or
.4 otherwise is guilty of substantial breach of a provision of the Contract Documents.
S 14,2.2When any of the above reasons exist, the Owner, upon certification by the Initial Decision Maker that
Jufficient cause exists to justiff such action, may without prejudice to any other rights or remedies of the Owner and
after giving the Contractor and the Contractor's surety, if any, seven days' written notice, terminate employment of
the Contractor and may, subject to any prior rights of the surety:
.1 Exclude the Contractor from the site and take possession of all materials, equipment, tools, and
construction equipment and machinery thereon owned by the Contractor;
.2 Accept assignment of subcontracts pursuant to Section 5.4; and
.3 Finish the Work by whatever reasonable method the Owner may deem expedient. Upon written
request of the Contractor, the Owner shall furnish to the Contractor a detailed accounting of the costs
incurred by the Owner in hnishing the Work.
S 14.2.3 When the Owner terminates the Contract for one of the reasons stated in Section 14.2.1, the Contractor shall
not be entitled to receive further payment until the Work is finished.
S 14.2.4 If the unpaid balance of the Contract Sum exceeds costs of finishing the Work, including compensation for
ihe Architect's services and expenses made necessary thereby, and other damages incurred by the Owner and not
expressly waived, such excess shall be paid to the Contractor. If such costs and damages exceed the unpaid balance,
the Contractor shall pay the difference to the Owner. The amount to be paid to the Contractor or Owner, as the case
may be, shall be certified by the Initial Decision Maker, upon application, and this obligation for payment shall
survive termination of the Contract.
s 14.3 SUSPENSION BY THE OWNER FOR CONVENIENCE
$ t+.g.,| The Owner may, without cause, order the Contractor in writing to suspend, delay or intemrpt the Work in
whole or in part for such period of time as the Owner may determine.
$ 14.3.2 The Contract Sum and Contract Time shall be adjusted for increases in the cost and time caused by
suspension, delay or intemrption as described in Section 14.3.1. Adjustment of the Contract Sum shall include
profit. No adjustment shall be made to the extent
.1 that performance is, was or would have been so suspended, delayed or interrupted by another cause
for which the Contractor is responsible; or
,2 that an equitable adjustment is made or denied under another provision of the Contract.
4.4 TERMINATION BY THE OWNER FOR CONVENIENCE
4.4.1 The Owner may, atany time, terminate the Contract for the Owner's convenience and without cause.
S 14.4.2 Upon receipt of written notice from the Owner of such termination for the Owner's convenience, the
Contractor shall
.1 cease operations as directed by the Owner in the notice;
.2 take actions necessary, or that the Owner may direct, for the protection and preservation of the Work;
and
.3 except for Work directed to be performed prior to the effective date of termination stated in the
notice, terminate all existing subcontracts and purchase orders and enter into no further subcontracts
and purchase orders.
S 14.4.3 In case of such termination for the Owner's convenience, the Contractor shall be entitled to receive payment
ior Work executed, and costs incurred by reason of such termination, along with reasonable overhead and profit on
the Work not executed.
AIA Document A201. - 2OO?. Copylight @ 1911, 1915, Lgl}, 1925, 1931, L951,1958, 1961, 1963, 1966' 1910, I9'16, 198'7' \997 and 2007 A11
!ights reserved. ..the Americln Institute of ArchiLects," "American Institute of Architects/" "AIA," the AfA togo, and "AIA Contract
Doluments,'are tradenarks of The American Institute of Architects. this draft was produced at 09:51!3? P'l o1 05/13/2024 under Orde!
No.41.04243047 which expires on O6/LO/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with
the AIA Contract Documentso Terms of Service. To repolt copyright viol.ations, e-mail docinfocaiacontracts.com.
user Not€s: (1154916017)
$1
s1
35
ARTICLE 15 CLAIMS AND DISPUTES
$ 15.l CLA|MS
$ 15.1.1 DEFINTTTON
A Claim is a demand or assertion by one of the parties seeking, as a matter of right, payment of money, or other
relief with respect to the terms of the Contract. The term "Claim" also includes other disputes and matters in
question between the Owner and Contractor arising out of or relating to the Contract. The responsibility to
substantiate Claims shall rest with the party making the Claim.
$ 15.1.2 NOTTCE OF CLAIMS
Claims by either the Owner or Contractor must be initiated by written notice to the other party and to the Initial
Decision Maker with a copy sent to the Architect, if the Architect is not serving as the Initial Decision Maker.
Claims by either party must be initiated within 2l days after occurrence of the event giving rise to such Claim or
within 21 days after the claimant first recognizes the condition giving rise to the Claim, whichever is later.
$ 1s.l,3CoNTTNUTNG CONTRACT PERFoRMANCE
Pending final resolution of a Claim, except as otherwise agreed in writing or as provided in Section 9.7 and Article
14, the Contractor shall proceed ditigently with performance of the Contract and the Owner shall continue to make
payments in accordance with the Contract Documents. The Architect will prepare Change Orders and issue
Certificates for Payment in accordance with the decisions of the Initial Decision Maker.
s 15.1.4 CLATMS FoR ADDITIONAL COST
If the Contractor wishes to make a Claim for an increase in the Contract Sum, written notice as provided herein shall
be given before proceeding to execute the Work. Prior notice is not required for Claims relating to an emergency
endangering life or property arising under Section I 0.4.
s 15.,l.5 CLATMS FOR ADDITIONAL TIME
$ 15.1.5.1 If the Contractor wishes to make a Claim for an increase in the Contract Time, written notice as provided
herein shall be given. The Contractor's Claim shall include an estimate of cost and of probable effect of delay on
progress of the Work. In the case of a continuing delay, only one Claim is necessary'
$ 15.1.5.2 If adverse weather conditions are the basis for a Claim for additional time, such Claim shall be
documented by data substantiating that weather conditions were abnormal for the period of time, could not have
been reasonably anticipated and had an adverse effect on the scheduled construction.
s 15.1.6CLA|MS FoR CONSEQUENTIAL DAMAGES
The Contractor and Owner waive Claims against each other for consequential damages arising out of or relating to
this Contract. This mutual waiver includes
.1 damages incurred by the Owner for rental expenses, for losses of use, income, profit, financing,
business and reputation, and for loss of management or employee productivity or of the services of
such persons; and
.2 damages incurred by the Conhactor for principal office expenses including the compensation of
personnel stationed there, for losses of financing, business and reputation, and for loss of profit
except anticipated profit arising directly from the Work.
This mutual waiver is applicable, without limitation, to all consequential damages due to either parfy's termination
in accordance with Article 14. Nothing contained in this Section 15. I .6 shall be deemed to preclude an award of
liquidated damages, when applicable, in accordance with the requirements of the Contract Documents.
s 15,2 tNtilAL DECISION
$ l5,2.lClaims,excludingthosearisingunderSectionsl0.3, lO.4,ll.3.g,andll.3.10,shallbereferredtotheInitial
Decision Maker for initial decision. The Architect will serve as the Initial Decision Maker, unless otherwise
indicated in the Agreement. Except for those Claims excluded by this Section 15.2.1, an initial decision shall be
required as a condition precedent to mediation of any Claim arising prior to the date final payment is due, unless 30
days have passed after the Claim has been referred to the Initial Decision Maker with no decision having been
rendered. Unless the Initial Decision Maker and all affected parties agree, the Initial Decision Maker will not decide
disputes between the Contractor and persons or entities other than the Owner.
AIA Docunent A2Ol - 2OO'1. Copyright @ 1911, 1915, lgl8, 1925, 193'7, 1951, 1958, 1961, 7963' 1966, l9'10, I9'76, 19
rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo
Documents,, are trademarks of The American Institute of Archilects. This draft was Produced at 09:51137 PT on 05/
No.4LO4243O4'7 which expires on 06/L0/2024, is not for resale, is l"icensed for one-time use only, and nay onl-y be
the AIA Contlact Documentso Terns of Service. To report copyright violations, e-mail docinfoGaiacontlacts.com.
User Notea:
8'7, L99'l and 200?. AII
, and "AIA Contract
13l2024 under order
used in accordance with
(115491501?)
36
$ 15.2.2 The Initial Decision Maker will review Claims and within ten days of the receipt of a Claim take one or
more of the fotlowing actions: (l) request additional supporting data from the claimant or a response with supporting
data from the other party, (2) reject the Claim in whole or in part, (3) approve the Claim, (4) suggest a compromise,
or (5) advise the parties that the Initial Decision Maker is unable to resolve the Claim if the Initial Decision Maker
lacks sufficient information to evaluate the merits of the Claim or if the Initial Decision Maker concludes that, in the
Initial Decision Maker's sole discretion, it would be inappropriate for the Initial Decision Maker to resolve the
Claim.
S 15.2.3 In evaluating Claims, the Initial Decision Maker may, but shall not be obligated to, consult with or seek
information from either party or from persons with special knowledge or expertise who may assist the Initial
Decision Maker in rendering a decision. The Initial Decision Maker may request the Owner to authorize retention of
such persons at the Owner's expense.
$ 15.2.4 If the Initial Decision Maker requests a party to provide a response to a Claim or to fumish additional
iupporting data, such parby shall respond, within ten days after receipt ofsuch request, and shall either (1) provide a
rerpotse on the requested supportin g data, (2) advise the Initial Decision Maker when the response or supporting
data will be fumished or (3) advise the Initial Decision Maker that no supporting data will be fumished. Upon
receipt of the response or supporting data, if any, the Initial Decision Maker will either reject or approve the Claim
in whole or in part.
S 15.2.5 The Initial Decision Maker will render an initial decision approving or rejecting the Claim, or indicating
that the Initial Decision Maker is unable to resolve the Claim. This initial decision shall (1) be in writing; (2) state
the reasons therefor; and (3) notifu the parties and the Architect, if the Architect is not serving as the Initial Decision
Maker, of any change in the Contract Sum or Contract Time or both. The initial decision shall be final and binding
on the parties but subject to mediation and, if the parties fail to resolve their dispute through mediation, to binding
dispute resolution.
S 15.2.6 Either party may file for mediation of an initial decision at any time, subject to the terms of Section
l5.2.6.t.
$ 15.2.6.1 Either party may, within 30 days from the date of an initial decision, demand in writing that the other
party file for mediation within 60 days of the initial decision. If such a demand is made and the party receiving the
demand fails to file for mediation within the time required, then both parties waive their rights to mediate or pursue
binding dispute resolution proceedings with respect to the initial decision.
S 1 5.2.7 In the event of a Claim against the Contractor, the Owner may, but is not obligated to, notiff the surety, if
any, of the nature and amount of the Claim. If the Claim relates to a possibility of a Contractor's default, the Owner
may, but is not obligated to, notiff the surety and request the surety's assistance in resolving the controversy.
S 15.2.S If a Claim relates to or is the subject of a mechanic's lien, the party asserting such Claim may proceed in
accordance with applicable law to comply with the lien notice or filing deadlines.
s 15.3 MEDTATIoN
S 15.3.1 Claims, disputes, or other matters in controversy arising out of or related to the Contract except those
waived as provided for in Sections 9.10.4, 9.10.5, and 15.1.6 shall be subject to mediation as a condition precedent
to binding dispute resolution.
S 15.3.2 The parties shall endeavor to resolve their Claims by mediation which, unless the parties mutually agree
otherwise, shall be administered by the American Arbitration Association in accordance with its Construction
Industry Mediation Procedures in effect on the date of the Agreement. A request for mediation shall be made in
writing, delivered to the other party to the Contract, and filed with the person or entity administering the mediation'
The request may be made concurrently with the filing of binding dispute resolution proceedings but, in such event,
mediati,on shall proceed in advance of binding dispute resolution proceedings, which shall be stayed pending
mediation for a period of 60 days from the date of filing, unless stayed for a longer period by agreement of the
parties or court order. If an arbitration is stayed pursuant to this Section15.3.2, the parties may nonetheless proceed
to the selection ofthe arbitrator(s) and agree upon a schedule for later proceedings.
AIA Document A2OL - 2OO'1. Copyright @ 1911, 1915, Igl8, 1925, lg3'7, Ig5l, 1958, 196I, 19$, 7966, 7910' t"9'16, 1981, I99'l and 2007' AII
rig,hts reserved. ,.,I'he American fnstitute of Arehitects," "Ame!ican Instilute of Architects," "AIA," the AIA Logo, and "AIA Contract
Doiuments,, are trademarks of The American fnstitute of Architects. This drafr was Produced at 09:51:3? P'l on Q5/13/2024 under Order
No,410424304? which expires on 06/10/2024, is not fo! resale, is licensed for one-tine use only, and may only be used in accordance with
the AIA Contract Docunentso Terms of Service. To report copyright viol,ations. e-nail doci.nfo@aiacontracls.com.
User Notee: (1164916017)
37
S 15.3.3 The parties shall share the mediator's fee and any filing fees equally. The mediation shall be held in the
place where the Project is located, unless another location is mutually agreed upon. Agreements reached in
mediation shall be enforceable as settlement agreements in any court having jurisdiction thereof.
s I5.4ARBITRAT|ON
5 t S.+.t If the parties have selected arbitration as the method for binding dispute resolution in the Agreement, any
Claim sgbject io, but not resolved by, mediation shall be subject to arbitration which, unless the parties mutually
agree otherwise, shall be administered by the American Arbihation Association in accordance with its Construction
Industry Arbitration Rules in effect on the date of the Agreement. A demand for arbitration shall be made in writing,
delivered to the other party to the Contract, and filed with the person or entity administering the arbitration. The
party filing a notice of demand for arbitration must assert in the demand all Claims then known to that party on
which arbitration is permitted to be demanded.
$ 1 5.4.1.1 A demand for arbitration shall be made no earlier than concurrently with the filing of a request for
irediation, but in no event shall it be made after the date when the institution of legal or equitable proceedings based
on the Claim would be baned by the applicable statute of limitations. For statute of limitations pu{poses, receipt of a
written demand for arbitration by the person or entity administering the arbitration shall constitute the institution of
legal or equitable proceedings based on the Claim.
S 15.4.2 The award rendered by the arbitrator or arbitrators shall be final, and judgment may be entered upon it in
accordance with applicable law in any court havingjurisdiction thereof.
S 15.4.3 The foregoing agreement to arbitrate and other agreements to arbitrate with an additional person or entity
duly consented to by parties to the Agreement shall be specifically enforceable under applicable law in any court
having jurisdiction thereof.
s 15,4.4CONSOL|DAT|ON 0R JOINDER
i tS.+.1.1 Either party, at its sole discretion, may consolidate an arbitration conducted under this Agreement with
any other arbitration to which it is a party provided that (l) the arbitration agreement governing the other arbitration
permits consolidation, (2) the arbitrations to be consolidated substantially involve common questions of law or fact,
and (3) the arbitrations employ materially similar procedural rules and methods for selecting arbitrator(s).
S 15.4.4.2 Either party, at its sole discretion, may include by joinder persons or entities substantially involved in a
io1;1*on question of law or fact whose presence is required if complete relief is to be accorded in arbitration,
provided that the party sought to be joined consents in writing to such joinder. Consent to arbitration involving an
additional petsonbr entity shall not constitute consent to arbitration of any claim, dispute or other matter in question
not described in the written consent.
$ 15.4.4.3 The Owner and Conhactor grant to any person or entity made a party to an arbitration conducted under
ihis Section 15.4, whether by joinder or consolidation, the same rights ofjoinder and consolidation as the Owner and
Contractor under this Agreement.
AIA Docunent A2O1 - 2007, coPyright o 1911, 1915' 1918' 1925, 1937' 1951, 195
rights reserved. "The Anerican InstituCe of Alchitects," "Aherican InstituLe
Do;uments" are trademarks of The American Institute of Axchiteccs' This draft
No.410424304? which expiles o^ 06/lO/2024' is not for resale' is licensed for
the AIA Conlract Documentso Telms of Service' To report copyright violations,
User Noteg:
8, L96I,1963, 1966, L9'10' L9'16,198'1, 199'7 and 200?' AII
of Architects," "AIA," the AIA togo, and "AIA ConLracL
was produced at 09:51:37 PT o^ 05/\3/2024 under order
one-ti-me use only, and may onl'y be used in accoldance with
e-mai1 docinf oGaiacontracts. com.
( 1164916017)
38
KITTITAS COUNTY - LOWER VALLEY TRANSFER STATION
ADDENDUM NO.1
IULY L7,2O24
The above-referenced Contract Documents shall be amended as indicated in detail below. One signed
copy of the Certification page shall be included with the bid. The inclusion of this Addendum will be
noted in the Agreement, and the execution of the Contract shall indicate full acceptance by all parties of
the provisions contained herein. Allother provisions of the Plans, Specifications, and other Contract
Documents not noted in the Addendum shall remain unchanged and in full effect. This Addendum shall
be attached to and become a part of the Plans and Specifications for the project.
Addendum
Item
Document Section, Page
Number, or Sheet
Description of Change
L.01 Response to RFI
Questions List
Response to RFI Questions List is added
to Addendum No. 1.
r.o2 Sample AIA Contract The sample AIA contract to be
executed between Kittitas County and
the selected contractor is added to
Addendum No.1.
1.03 AIA Bid Form - 310 The AIA Bid Form - 310 to be
completed and included with the
contractors bid is added to Addendum
No. 1.
1.04 Groundwater Elevation
Monitoring Data
Technical memorandum prePared bY
Jacobs regarding groundwater depth
measurements is added to Addendum
No. 1.
ln addition, the County measured
groundwater elevations daily at an
existing well identified as "PVC in Case,
N513270.58 , EL617507 .90, Elev 1548.8'
on Drawing C1 from June 28 to JulY 15,
2024. Groundwater depths ranged
from 37" to 39" below ground surface.
1.05 2019 Boring Logs 20i"9 boring logs are added to
Addendum No. L.
Page 1 of 5
1.06 Bid ltem Schedule Section 00 00 04.L Replace Section 00 00 04.1 Bid
Schedule with the attached revised bid
schedule. Changed seeding to unit
price, and added landscaPe bid item
(lump sum).
Contractor must provide price for all
four (4) additive alternative bid items.
Contractor will be selected on lowest
responsive base bid. Depending on
base bid price and available funding,
the County may include additive
alternative bid items to the contract.
1".06.1 Revised Bid Proposal
Form
Section 00 00 04 Replace existing bid proposalform with
revised form.
t.o7 Measurement and
Payment Section
Section 00 43 01 Replace Measurement and PaYment
section in its entirety. Revised seeding
bid item to unit price and added
Landscape bid item No. 20.
1.08 CiviIAUTOCAD Files Civil AUTOCAD files are available upon
request. contact Danny Duong
(DDuong@scsengineers.com).
1.09 Section 010100
Summary of Work
Section 01 0100 Section 010100 is added to Addendum
No. L. Construction of the compost
area lined leachate ponds shall not
start until July/August 2025.
1_.10 Section 0104 00
Coordination with
Others
Section 01- 04 00
Part L3.1
Subsection I
Please add under Subsection H the
following statement:
CONTRACTOR shall use Trimble
ProjectSight for the construction
monogement software. OWNER will
provide and poy for a maximum of two
(2) licenses to the general contrqctor
for the duration of the
r.17 Lighting Substitution
Approval
The Lighting Substitution submittal is
approved and added to Addendum No
t.
I.I2.Revised Electrical
Drawings
Drawings E200,
E602, E503, E701
The following changes and additions
are shown on the revised electrical
drawings.
Page 2 of 5
1) Sheet 8603 & E701 -The
electrical panel PP-ASP is
changed from a 120/208V 3ph
panel to a277/48OY 3ph panel
as shown on the one-line and
in the schedules.
2l Sheet E701" - There is a minor
adjustment on the one-line for
the main switchboard - two
circuit breakers have been
updated to the correct size and
location.
3) Sheet E701 - The notes indicate
the irrigation pump enclosure
will require a stepdown
transformer and it is identified
as being supplied by the
irrigation pump ma nufacturer.
4l Drawing E200 was added to
identify the required conduit
and wiring for the aeration and
recirculation pump power and
controls.
T.L2,I Revised Civil Drawings Sheets C20,C24,
c27
Revised drawings are added to
Addendum No. 1.
1.13 Revised Specification
Section 40 95 13 Control
Panels, VFDS, and RMC
Section 40 95 13 Revised specification is added to
Addendum No. 1.
1.r4 Water Recirculation
System Specification
Section 40 95 1,4 New specification is added to
Addendum No. 1 for Leachate Pond
water recirculation system.
1.15 Dewatering Section 0L 50 00
Part 1.9,
Subsection B
Add following statement at the end of
the paragraph of Part L.9, subsection B
in Section 01 50 00:
lf dewotering is required, the
Contractor will be required to build
temporary sedimentation Ponds or
sedimentation trap BMPs which
discharge to the proiect storm system
in accordance with Stote of Woshington
- Deportment of Ecology - 2079
Stormwote r Mo nage ment M a n uol for
Edstern Woshington, Chopter 7,
Element #10, Page 769. Alternotely,
BMPs con drain to o temporary grovity
or pumped conveyance system draining
Page 3 of 5
directly to the adiacent channel.
Proposed dewatering BMPs must
conform to the Woshinton State
Ecology design standards and shall be
submitted to the engineer for opprovol
prior to dewaterinq activities.
L.L5 Pre-Bid Agenda,
Presentation, and Sign-
ln Sheet.
The Pre-Bid agenda, presentation, and
sign-in sheet are added to Addendum
No. 1.
t.17 Earthwork Notes Sheet G5 Sheet G5 - Earthwork Notes #1", add the
following statement:
Estimated removol depth is based on
avoiloble geotechnical dota and may
chonge depending on field conditions.
Contractor shall instoll geotextile fabric
at the bottom of oll unsuitable soil
excovations. Contrdctor sh all excavate
moterial ot a moximum slope of
1.5H:7.0V for all unsuitable soil
excovations.
1.18 Geomembrane Liner -
Leak Location Survey
022LOO Add new technical specification section
022tOO to the project documents
requiring leak location survey for both
the primary and secondary
geomembrane liners at the compost
leachate pond
1.19 Revised Sheet C3 Sheet C3 Revised Sheet C3 showing the 4-inch
and 7-inch asphalt paved surfaces is
added to Addendum No. 1.
END OF ADDENDUM NO. 1
Page 4 of 5
CERTIFICATION OF RECEIPT AND ACCEPTANCE OF ADDENDUM NO. 1
KITTITAS COUNTY - LOWER VALLEY TRANSFER STATION
The undersigned hereby acknowledges receipt of Addendum No. 1 prior to the submission of his bid;
and hereby agrees to the inclusion of this Addendum in the Agreement and in the Contract Documents;
and further agrees that the other provisions of the Contract Documents shall remain unchanged and in
full effect.
Contractor
Date
Page 5 of 5
KITTITAS COUNTY - LOWER VATLEY TRANSFER STATION
ADDENDUM NO.2
tuLY 2t,2024
The above-referenced Contract Documents shall be amended as indicated in detail below. One signed
copyoftheCertificationpageshallbeincludedwiththebid. TheinclusionofthisAddendumwillbe
noted in the Agreement, and the execution of the Contract shall indicate full acceptance by all parties of
the provisions contained herein. All other provisions of the Plans, Specifications, and other Contract
Documents not noted in the Addendum shall remain unchanged and in full effect. This Addendum shall
be attached to and become a part of the Plans and Specifications for the project.
Addendum
Item
Document Section, Page
Number, or Sheet
Description of Change
2.01 Response to RFI
Questions List
Response to RFI Questions List is
hereby added and included in the
contract documents.
2,O2 Bid Schedule
Spreadsheet
Attached is the Addendum No. 1 Excel
spreadsheet that the contractor can
use for the bid.
2.O3 Electrical Drawings
Revision 2
E200, E602, E603,
E70t
Replace electrical drawings E2O0, E602,
E603, and E701.
2.O4 Site Plan c3 Add the approximate unsuitable soil
stockpile location to Sheet C3.
2.05 Revised Specification
11 14 05
tLL405 ln Specification 11 14 05 - Truck Scale,
change the following:
Part 2.2.A- Change "8O-foot" to "70-
foot".
Part 2.3.A - Change "80 feet" to "7O
feet".
Part 2.4.A - Change to "The load cell
shall be constructed of stainless steel."
Part 2.5.CC - Delete scale instrument
manufacturer note.
Part 2.8.H - Delete lightning protection
system manufactu rer note.
Part 3.2.G - Delete inbound
unattended enclosure note,
Page 1 of 3
Part 3.2.H - Delete the outbound
unattended enclosure note.
2.06 Hot Mixed Asphalt
Special Specification
5-04 Add Special Document No. 2 - Hot Mix
Asphalt Special Specifications to the
Special Document Section located after
Technica I Specifications.
2.07 Civil Site Details Sheet
c18
Sheet C18 Add note under "Scale lnstallation
Notes" in Detailsection A/CI8:
THE CONTRACTOR SHALL COORDINATE
THE LOCATION OF THE SCALEHOUSE
TRANSACTION WINDOW AND THE
EDGE OF THE SCALE. THE SPACING
BETWEEN THE WINDOW AND EDGE OF
THE SCALE WILL BE A MAXIMUM OF 78
INCHES.
2.08 Specification0T L326 07 7326 Change: 2.01.A2b to read "GCP
Bituthene 4000".
2.09 Specification 07 2270 07 2270 Delete Specification 07 2270 - Roof
Anchor Posts.
2.10 Specification 07 25 00 07 25 00 ln Specification 07 25 00 - Weather
Barriers, change Part 2.1.Bta to read
"GCP Perm A Barrier VPS 30".
2.rt Specification 08 1100 08 11 00 Specification 08 11 00 - Storefront is
added to Addendum No. 2.
2.r2 Specification 10 26 01 LO260L Delete Specification 10 26 01 - Wall
and Corner Guards.
2.r3 Specification 10 75 00 10 75 00 Delete Specification 10 75 00 -
Flagpoles.
2.1-4 Door Hardware
Substitution
The exit device substitution
(Dormakaba Precision 2000 Series) is
approved; however, the door closer
substitution ( Dormakaba QDC100
Series) is rejected.
2.15 Hard-Cem Substitution The structural engineer has no
exception to the Hard-Cem lntegral
Hardening Admixture for concrete
finish.
2.16 Hi-Tech PE90
Substitution
The structural engineer has no
exception to the Hi-Tech PE90
substitution request for joint filler
END OF ADDENDUM NO. 2
Page 2 of 3
CERTIFICATION OF RECEIPT AND ACCEPTANCE OF ADDENDUM NO. 2
KITTITAS COUNTY - LOWER VATLEY TRANSFER STATION
The undersigned hereby acknowledges receipt of Addendum No. 2 prior to the submission of his bid;
and hereby agrees to the inclusion of this Addendum in the Agreement and in the Contract Documents;
and further agrees that the other provisions of the Contract Documents shall remain unchanged and in
full effect.
elpl2tu4
Date
Page 3 of 3
KITTITAS COUNTY - TOWER VALLEY TRANSFER STATION
ADDENDUM NO.3
tuLY 24,2024
The above-referenced Contract Documents shall be amended as indicated in detail below. One signed
copy of the Certification page shall be included with the bid. The inclusion of this Addendum will be
noted in the Agreement, and the execution of the Contract shall indicate full acceptance by all parties of
the provisions contained herein. All other provisions of the Plans, Specifications, and other Contract
Documents not noted in the Addendum shall remain unchanged and in full effect. This Addendum shall
be attached to and become a part of the Plans and Specifications for the project.
Addendum
Item
Document Section, Page
Number, or Sheet
Description of Change
3.01,Response to RFI
Questions List
Response to RFI Questions List is
hereby added and included in the
contract documents.
3.02 Door Operator
Substitution
The door operator substitution (Horton
Series 7000) is approved.
3.03 Architectural Drawings A1_4601,
A2_A801,
A3_A801,
A2_A101,
A2_A801,
A3 4101
Make the following changes below:
Sheets A1_A601, A2-A801, A3-A801:
WOM-1 and WM-]. are both Walk Off
Mats.
Sheet A2-A101: Provide Walk Off Mat
per Flag Note 8 in Lobby.
Sheet A2-A801: Room Finish Schedule:
Delete RF-1 at Lobby floor
Sheet A3-A101: Provide Walk Off Mat
per Flag Note 9. Floor Plan Room 3-01
3.04 Electrical Drawings Er.00,
E602
E1"00 -Remove EV Chargers at the
Compost Area.
E100 - Add the following note:
Concrete duct banks are required for
road crossings per the designed and
future roadways where heavy vehicles
travel over conduits. Duct banks
installed not under roadways shall be
properly compacted with sand/gravel
base with compacted overfill. AII
Page 1 of 3
underground cables are pulled inside
UPVC conduits.
E6O2 - Add the following note:
The main cable from the UtilitY
equipment to the customer disconnect
switch, then to the ATS and to the main
switch board shall be (2a) 600 MCM AL
conductor pulled inside (6)4" conduits.
3.05 Door Operator
Substitution
The door operator substitution (Horton
Series 7000) is approved.
3.06 EV Charger
Specifications
Add the following to the technical
specifications:
The EV chargers shall operate on the
normal power source only not on
backup power. Level(2)7.2 KW EV
chargers shall be fed through l-phase
10 KVA step down transformer next to
each pedestal (Grouping under one
transformer is allowed).
EV Chargers shall be Leviton Model
EC32W with EPED1 Single Mount
Charging Station Pedestal or approved
equal.
Total of 4 EV charging stations: 3 at the
Administration Building and 1 at the
Scalehouse.
END OF ADDENDUM NO. 3
Page 2 of 3
CERTIFICATION OF RECEIPT AND ACCEPTANCE OF ADDENDUM NO. 3
KITTITAS COUNTY. LOWER VALLEY TRANSFER STATION
The undersigned hereby acknowledges receipt of Addendum No. 3 prior to the submission of his bid;
and hereby agrees to the inclusion of this Addendum in the Agreement and in the Contract Documents;
and further agrees that the other provisions of the Contract Documents shall remain unchanged and in
full effect.
Contractor
Date
Page 3 of 3
KITTITAS COUNTY - LOWER VALTEY TRANSFER STATION
ADDENDUM NO.4
tuLY 29,2024
The above-referenced Contract Documents shall be amended as indicated in detail below' One signed
copyoftheCertificationpageshall beincludedwiththebid. TheinclusionofthisAddendumwillbe
noted in the Agreement, and the execution of the Contract shall indicate full acceptance by all parties of
the provisions contained herein. All other provisions of the Plans, Specifications, and other Contract
Documents not noted in the Addendum shall remain unchanged and in full effect. This Addendum shall
be attached to and become a part of the Plans and Specifications for the project.
Addendum
Item
Document Section,
Page
Number, or
Sheet
Description of Change
4.0!Response to
RFI Questions
List
Response to RFI Questions List is hereby added and
included in the contract documents.
4.O2 Bid Due Date Change Bid Due Date to August 2,2024 at L0:00 AM
Pacific Time Zone on the
INVITATION TO BID document.
Revised excel spreadsheet provided to contractors.
4.03 Revised Bid
Schedule
Attached is the revised Bid Schedule. Contractor must use
Addendum No 4 Bid Schedule with its bid.
Four(4) Bid quantities revised
Bid ltem 5 - Clear and Grub - increased bid quantity to 30
acres.
Bid ltem 8 - Geotextiles- lncreased Bid Qty to 55,400 SY
Bid ltem No. 17 - Site Fencing - 6' High Chainlink-
increased bid quantity to 3,975 LF.
Bid ltem No. 18 - Site Fencing - Gates- reduced bid
quantity to: 8 ea.
Gates shall be installed at the following locations
Four (4)- 10' Wide Gates at main entrance.
Two (2) - 10' Wide Gates along Hwy 97 at temporary
construction entrance
Two 2 - 12'Wide ga tes at Northwest corner of site.
Page 1 of 3
4.O4 Civil Sheet C-
3
Sheet C-3 Add the following note to drawing Sheet C-3:
Curb and gutter will be required on both sides of the
Transfer Building access road starting at the entrance to
the Transfer Building north for 235 LF (470 Lt total).
Contractor to coordinate with Owner and Engineer for
final curb and gutter location.
4.05 Specification
00 43 01
Measurement
and Payment
00 43 01 ln Part 3, under 3.O - Bid ltem #15 - Site Signage, add
thermoplastic stop bars to lump sum price.
4.06 Specification
09 29 00
Gypsum
Board
09900 ln Section 09 9 00, change the following:
Paragraph 2.028 - (GB) 5/8" Type C, Change to 5/8" Type
X
The following items are not used on this project and shall
be deleted from Specification Section 09 9 00:
Defete paragraph: 2.0I, A.2
Delete paragraph: 2.02,8.5
Delete paragraph, 2.02 8.5.5
Delete paragraph, 2.02 C
Delete paragraph 2.02D
Delete paragraph 2.02E
Delete paragraph 2.02D
Delete paragraph 3.01. 15
Delete paragraph 3.01. 16
Revise paragraph 3.01D.2. Provide a level4 finish
4.O7 Specification
09 22L6
09 22L6 Provide flat bar backing per E.3b. Other backing is
provided as an option to the contractor.
4.08 Specification
TO 8L 12
Bird Control
Devices
10 8t 12 Bird netting not required. Delete references to bird
netting:
Delete paragraph: 1.3
Delete paragraph: 2.07C
Delete paragraph: 2.03
4.09 Hot Mix
Asphalt
Special
Specifications
5-04
5-04 Add the following: to Special Specification 5-04:
All asphalt shall have a nominal aggregate size of %-inch
END OF ADDENDUM NO.4
Page 2 of 3
CERTIFICATION OF RECEIPT AND ACCEPTANCE OF ADDENDUM NO. 4
KITTITAS COUNTY - LOWER VALLEY TRANSFER STATION
The undersigned hereby acknowledges receipt of Addendum No. 4 prior to the submission of his bid;
and hereby agrees to the inclusion of this Addendum in the Agreement and in the Contract Documents;
and further agrees that the other provisions of the Contract Documents shall remain unchanged and in
full effect.
Contractor
olulwd
Date
Page 3 of 3
TOWER VALTEY TRANSFER STATION
RESPONSE TO RFI QUESTIONS - August 1,2024
Jtcflor{OAIE RIqEVED I iR quclflloil RtSPOt{SE
00 43 01 5/2412024 L Wlll Je€ding be paid by tump Sum or unit price?
The bid item forseeding has been changed to unit quantity. ln addition, a
lump sum bld item has be€n added to include IandscapinSwork. See
addendum No. 1.
7 1312024 2 Lighting Substltution
The LiShting Substitution submital is apProved. Approved submiBal is
included in Addendum No, 1.
00 43 01 Pte"sid oql27 124 3 what is the scope of work for gid ltem - 6 - Unsuitable Soils Excavation?
The scope ofwork for 8id liem No. 6 - Unsuitable Soils €xcavation lncludes
dewatering (ifrequired), excavation, loadingsoil into a vehlcle, transpoiling to
a stockplle on sitq unloading matedal
Pte-Bid 06121 124 4
For theAdditiveAlteanative gid ltem No.4 - Hauling soil to Ryegrass landfill, who owns the soil?
What does this bid item include? ls the soll contaminated?
TheCountyownsthetoil. Thebid item includeshaullngsoalfrcmthesite to
the nyegrass Landfill only. Kifritas Countywlll have equipment at the Rye
Grass Landfill tospread the material. The5oil is notcontaminated.
Pte-Bid 06127 124 5 Excavation ofunsuitable soil may.equire dewatednS. Wherewater be discharged?
lfdewaterinS is r€quked, the Contradorwill be requked to build t€mporary
sedimentation ponds or sedimentation trap EMPs whlch dltcharge to the
project storm system in accorance with State of Washington ' Depadment of
Eaology - 2019 stormwater Management Manual for Easte.n washlnSton,
Chapter 7, €lement*10, Page 769. Alte.natelt EMPs can drain to a temPorary
Bravitv oa pumped conveyancesystem dralning dlrectly to the adjacent
ahannel. Proposed dewaterlng BMPS must conform to theWashinton State
Ecology design standerd! and shall be submitted to the enSineer for approval
prlor to dewaterinS adivitles, Addendlm No 1 added this informatlon at the
end of the paragraph of Pafr 1.9, subledion I ln Sedion 0l 5000
Pte-Bid 0512? /24 5 Will AIA gid Form A 310 be provided?Yes, AIA gld form 310 is provlde in Addendum No l
Prc-Sid 06127 /24 7 Who is responrible for qualjty control TestinE?
The contractorshall retain the seruices ofan lndependent Qu.lity Contrcl
lesting for to perform soil and concrete testlng during constructlon See
Technical Specification Section 01 4000 for QualityControl Testing. Payment
for QC tegtlng will be paid in accordance with 8id ltem No.3 _qualitYContol
Testing. The City of Ellensburg will be perfo.ming inspection of water and
sewer system componenB. ln addition, the Engineerwlll pedorm speclalty
steel inspedionseillaes.
Prc-Bid 06127124 8 Forthe Additive alternative bid items No. 1,2,3, what isthe conslruction limitforthese ltems,
ForAdditiveAlternative gid ltem No. 1' Administration guildlnS, Additive
Alt€rnative Bid ltemr No.2 - MRw guilding, and AdditlveAlternatlve Bid ltem
No.3 -Tire RecyclingArea, th€ bid item should lnclude all items above the
subgrade completion leyer lncluding plumbing, electrical, water, foundation
solls, concrete, and all other building cooponenB fu pafr of utllltv bid iiems,
the contractorshall inst.ll and cap all utilities within 5'ofthe building.
ke-Bid 06127124 9 ls there additlonal Groundwaterdepth information available?piezometer and monitoring ls provided in Addendum No. l.
Prc-Bld 06121 124 10 Cen Civil Autcadd Drewings be provided?
Yes, civil AutoCADDdrawings are evaliable upon request. Contact Oanny
Duong (DduonS@scsenglneers.con).
Prc-Sid 06/27 124 1l Clarify limib of Bid ltem No.7 - Geotexules.
Geotextile fabla shall be placed under ail grav€l and paved surface5 and atthe
bottom ofthe unsuitable soil ex.avation {note wes added to Eailhwo*
Gene.al Notes in Addendum No. 1, sheetG5)
7 172/2024 12 Door Hardware S0bstitution
The exit device substitution (Dormakaba Precision 2o0O Seri€s) is approved;
however, the door closer rubstitution (oohakaba QDC1ooSeries) ls reject€d.
13 Clarify4-inch and 7-inah 65phalt paved surfaces shown on plan sheet c3.
Sheet c3 was.evised to clearly identifYthe 4-inah and Tinch asphalt p.ved
surfaces and is included ln Addendum No.1.
7 /16/2024 14
Arethe fire alarm svstems in the four buildinSs going to be conn€cted together fo. monitoring
reasong? Or, do they need to be connected sin8ularly? Ako, for be.m detedion, there are five of
Yes. All SFACP are conn€cted to the FACP. The FACP is the sopewisingstation
that wlll contact the fire depadment. The quantityofbeam detectors is
subject to chan8e bythe fire alarm cedified deslSner.
7 /L7 12024 15
One buildingshows FACP and the other 3 aieSFACP so I was assuminS that the SFACP are sub-
paneh to the main panel to form a netuork. lfthls is coffedwe need to install a PVC condult
between all buildingt so I can install a 16/2 &lrted pak wire for my nework and this way all
buildlnSs will be connected and we only use one c€llular for the monitoring ofall buildlngs.
All SFACP arecodnected to the FACP.
The connection p.otocols allowed are anyofthe followlnS:
1. Dkedlyconnected non coded gyst€m.
2. Dlgital alarm conmunicator tran3mitter (DACTI
3. Telephone lines
4. Two-way radio frequenry(RF)
5, Private mlcaowave radio transmifrer.
lfthe cont6ctor choose the telephone lines option, there It an avaliable 2"
conduit feedinE into each bullding.
11 34 19 1 /17 12024 15
Spec (13 34 19 1.2 S 1 c) says Manufactur€r must p.ovide FM Global approved .oof and wall
assembli6, when PEMg manuftcturers are onlysupplylnS the wall panel and roofpanel, not an
assembly. Pleese confirm whether or not FM Global is a requirement for thewall.nd roofpanels
FNI 6lobal approval is not required where PEMB manufacturer ls only
supplying wall panels or roofpanel5.
13 34 19 7 177 12024 1'l Please Confirm Wind Speed - 110MPH in Plan! on 0-5001 and 99MPH ln Specs 13'34'19
2.3E,1.c.4.a.
The specs are correat. The wind speed in the plans will be revised es follows:
Vult =99 mph
Vasd .77 frph
13 34 19 7 h7 /2024 18 Full helght wall liner panel called out in specs (13 34 19 2.2 A 1), but no liner panel shown inside
pFMR in 6l,h( ptFer..dnfrrm no lnterior liner oanel if,side PEMgs.
confirmed,
81112024
TOWER VAttEY TRANSFER STATION
RESPONSE TO RFI QUESTIONS - August 1,2024
lECnON DAIE RIdEI'ED I RN QUEN|oN SESFO|{SC
13 34 19 '1 117 12024 19
Spec section (13 34 19 2.2 A 2) calls out cross braclng as indicated on plans, but I cannotfind any
bracing locations on the plan set. please provide bracing locations as {13 34 19 2 3 0 1 a) does not
allow for bracln8 anph€re oth€rthan locatlons shown on drawings.
Gridlines 1.1 & 9.1 requirc (4) braced frames each. The frame,ocations are
tlexible, but need to be at int€rior bay5, within grids 9.1 to G.1. Coordinate
the loaationi with architectural and mechanlcal to avoid anyclashes.
'1i1712024 20 Can Window Types 5 & 6 be tiberglass?
Window Type 5: Vinyl is specified. Provide full divided lite mullions per
manufacturerstandard details at intelior horirontal and ve(ical
WindowType 6: Provide HM frame as detailed with horirontal and vedicel
mulliong as detailed
Fiberglass frames can be substituted wlth an approved substitution request.
oa 56 59 7/L't /2024 21 Oo window types 4A & 48 / transactionwindowg aorrespond to spec?
Transaction windows (Window Types 4A & 4Bl are per tpec aection 08 55 59
Mdt6ilr€d Seruice Window.
13 34 19 1 lt7 12024 22
Where does simple saver system 8o inside the PEM8 strudure5 and what ls rsquked thickness in
roofand wal15, lf requked? R-49 is called out in spect (13 34 19 2.1 A 2 b). PEMB wall details show
no insulation {A-A009 Detail 3). Is bird flashing requlred in areas thatare to re.elve timple saver
insulation sFtem?
Simple seversystem to be used in areas where there ls exposed insulation
This includes.oom3 in the MRW as well as the Elecvical and Mechanical
Rooms In theTransfer Euilding. gird flashlng is notrequked whereSimple
saver lnsulation system i9 installed.
7lr7 12024 23
P€lUB Manufacturer will notallow stainless steel tasteners due to rust and corroslon of nateials.
Are P€MB Manufadurer's stand.rd fasteners ac(eptable or can we not bld using the PElt4B
Manufactuterlf thevwon'tallowstainless steel fasteners?
PEMB Manufacture/s aorroslon resistant fastenerswill be revlewed during
PEMB submifral review and epproved.
13 34 19 "t ll7 12024 24
Wall panel profiles are not consistent betueen plans end spe6. Please provide profile foa pEMg
wall panels. Specs (13 34 19 2.7 A 8) notei estylwall ll - Flutes 4 lN wide flutes. Plans {1-4902
detall 1) wP1, wP2, and WP3 to be PSR/R- Panel. Pleare clarifywhatwall panel protileyou
requhe, lfthere is more than one panel profjle specified, please provide locations.
lhe profiles in the drawings are the Basis of Design. Detail 1 in sheet 1-A902
shows profileviews.
7 11712024 25
Spec5 forthe TranrferStation PEMO lean-to stru(ture appear to b€ r€questlng the desiSn,
englneering, and mate.ials for the leanlo to b€ provided by P[Mg ManufactureL but the plans
show a st€el stud fhmed structure, lndependent ofthe main P€Mg. Please confirm the lean to i5
to be desiSned by PEMB Manufadurerand clarify ifit k required to be steel stud framed
tean{o isto be desiSned by PEMB Manuf.cturer. Steel ltud framing is shown
to indicate geneaal design intent includin8 insulation, and enerSycode
requi.ements. Stud framinS it not requked
7 l77lZO24 26 Minlmqm clear heiSht ofthe Transfer Station PEMB is called out at 28L6" ln plans and 3010" ln 28'-5',
7 118/2024 27 Are there 3 scales in thig projed?2 scalei as ihown on sheet c3.
7 lLal2024 2A
Are the Mo 70'rcaler to be above ground or in Sround sc.les? lf abov€ ground, do th€ywant side
rails Included with the scale?
Above ground,side raik requlred.
7 l18l2024 29 For concrete or ste€l deck optlon, do theywent to see pricin8forboth options?concrete deck requlred. Specifications revked in Addendum No 2
11 14 05 7 lt8l2024 30
Itlooksliketheload cellspecforthePart2SO'acalecalltfordigitelloadcells,whilethespector
load cells forthe Part 1 scales mentions stainless steel and integratlon with the scales, but no
other spec
Per Pad 1.4.H, the load cell should be staioless steel. Revised in Addendum
No. 2.
11 14 05 7 /t812O24 31
It looks like the only scale instruments speclfied are the scale indicatoG and the remote displays
(Matko OA€), with a .equirement to interface to Paradi8m. ls that correct? I see a note about
insta lllng unanended enclosures, my ass umption it that this is equi pment supplied by the cou nty
for the contraator to install?
Yes, scale instrument specifled are the scale lndlcatorsand remote displays-
No unattend€d enclosures. Revised in Addendum No. 2.
11 14 05 ", hal2o24 32
With the 10 year warranty includinS damage due to surgevoltage and lightning, and rpecifying
that it i5 not complicated, have you seen theirexample thattheyare pointing to in this spea
section (2.8)?
10 year waffant is required per Pad 1.9, and the liehtning protection is
required per Pafr 2.8.
7 11912024 33
Under the ltem for Clearing and Grubbing, you require 6" of r€moval io stockpile. ls that quantity
of material included ln the items associated with 'unsultable soil' rehoval?
6" thiaktoposoil removal is jncluded in the Clearhg and Grobbing bid item.
7 lt9/2024 34
Can you adentify on the plans where the un$uitable material and grubbed material will be
stockpiled on slie? Specific area on site with dlmsnsionl o. drawn to scale and Seneral
descriptionofhowit15tob€leftuponcompletion? ltwillbeamassivepilethatcouldrequtre
additional work to stack if confined in a small area or Srade flat if required
Addendum No.2 includes a site plan showing the stockplle location ofthe
unsuitable material, top soll, and grubbed meterial on site. The propoJed
locatlon is located nodh ofthe contracior staging, we* ofcompo5t, and the
contractor must avold the wetlands,
7 h912024 35
ln Add€ndum 1, note 1.17, you brought up the factthatwe will haveto slope the deep
excavationsfortheunsultablesoiliatal.Srl. Canyouconnrmthatthetoilremovedforthe
5lopi ng will be q uantlfled and lnclud ed ln the paid q uantity for 8ld lten g6? And the ea nh
removed in those stopes wiil be replaced wlth material quantlfied as'common fill'?
The contradorshall perform a topoBraphlc surueyfor each unsuitable toil
aemoval area prior to gtafrlng excavatlon. Once theexcavation is completq
the contradorwill perform a final topographic surueY and will be pald based
on the soil removed and topographic suryeys. Common fill will be calculated
u5ln8 the same methodology.
t h912024 36 Wjll there be any addltional ContradTime added wlth the acceptanae of Additive Alternate items-i No additional time will be added to the contract.
1l 12 00 7hel2o24 ?7 There is a spe. seciton 13 12 o0 lor Preassembleed Modular BulldinSs, butwe cannot locate thls Preasrenbled modular bulldlng is 5hown on Sheet C3, and lt is called outas
"Oftice Traile/' in the aonpost area.
7lrglzo24 38
I don't Jee a specon the asphalt pavinS for the prolect. You just have a descrlptlon on howyou
are paying for the bid item. The solls repoft t€llt mewhat soil to use. ls there Soingto be another Yes, speclficatlon on the asphali paving for the projectls includ.d in
Addendum No. 2.
11 14 05 7 lt9l2024 39 ln sedlon 1.4 A & B, lt notes wo 70' x 11' scales, concrete or steel deak, wlth no manufacturer unltea scale or approved equal.
11 14 05 7lt9l2O24 40 ln sectlon 2.2 A, it noter a Unitec scale or approved equal,Unitec rcale or approved equal.
11 14 05 7/1912024 4l ln section 2.2 8, it 5ay9 one 80' x 10' Iow profile above Sround con.rcte deck scale
goth saales are above ground concrete deck. 70'in lenSth is required. Revised
in Addendum no. 2
o7 22 70 7 11912024 42 We cannotfind any reference to the roof anchor posts on the drawings (spec sedlon 07 22 70)
Please provlde quantitv and locations.
No roofanchor porB to be provided. Delete spec section 07 22 70.
08 41 10 7 119/7024 43 Please provide a spec for the alumlnum entrance doo.s forthe s.ale house and admln building.Specification 08 41 10 is added to Addendum No.2.
102601 7 /19/2024 44 specsedion102601indicatescornerEua.ds,butnoneareshownontheplans Pleasecla.ify oeleteSpealfication S€ction 10 26 01 Wall and CornerGuards.
10 75 OO 711912024 4S Please indicatethe location and quantity offlaS polet on the drawlngs
There are no flag poies on the projed. Delete Specification Section 10 75 0o
FlaSpoles.
8lu2o24
TOWER VALLEY TRANSFER STATION
RESPONSE TO RFI QUESTIONS - August 1, 2024
sCCflOil OAE trCIEVED I nFt quEsnoN RE;FOT{SG
7/1912024 46 Please indicate whlch windows receive roller shade!.Provide rollcrshades at all exterior window5.
111912024 47
A. what edgeband thlckness/nat€ri.l for casework box€s?
8. what edgeband thicknets/m.t€rial for casework frcnts?
C. Whatedgebandthitknest/materialforcaseworklaminatecountcnops?
A. Cabinets to have 1 mm ABS/PVCedgeband to match cabinet box colol.
B. Fronts to have 3mm ABS/PVC edSeband to metch door and drawer colo.
C. taminate countefrops to have plattic laminate edge to match countedop
color and flnlsh.
7 11912024 48
Sh€et C3 references a 6 hilh cha in link fence wlth tan slat5, type 3 per WSDOT gtandard deta il L-
20.10-03. This type offen.ing (tension wire ln lieu oftop and boKom rail3l does notfafw€ll with
Jlats as the wind will usually push the screen around causingdamage relativelyquickly
Recomm€nd adding top and botom rails ifthe slab are Solng to be installed.
Top.nd bottom €iis are requfed if using slats. The diameter ofthe top and
botom rails sho!ld match the dlameter ofthe 5ide railt and posts
7 12212024 49
Electrical Dudbank Requirements:
Could we please g€t clarification on what requkes an electricsl ductbank and what doesn't?
According to the specifications, all underSround raceways should beencas€d in concrete unless
otherwhe specified in the drawlngs. Jhere are no detalls or notes on E100 specifYin8 what
requires a dudbank. Our primary concern i5 the requlaementforductbanks forllSht pole
underground conduih. EV stellons, underground conduits around the w.ter pond, and control
panels.
Add the following note to sheet 8100:
Con(rete duct banks ar€ required forroad crossings perthe desiSned and
future roadwaYs where heaw vehlcles travel over condulb Duct banks
installed not under roadways shall be p.ope.lyaompacted with sand/gravel
base with compacted overtill, All underground cab'es are pulled inside UPVC
conduits.
sheet E1o0 7122/2024 50
General Note 13 on E100:
Could we please get clarification on the requlaenenb outlined in General Note 13 on E100?
Specifically, will manholes be requi.ed torlight pole5 every 200'? Note 5 mentions ro handholes.
We need clarification on the requkemenb for manholes. Thankyou.
Lighting poles are less than 150'apart. The 200'rule does not applyper
general note 13. Manholes are required for !nderyround conduit.un fo.
Sheet E701 712212024 51
Utility Meter Responsibility on E7011
Orawing E7o1, construction Note 7, indicetes that the utility meter will be prcvided byothe.s.
HoweveL the 8eneral notes indicate thatthe utility conpany supplies up to thetranttormerand
eveMhing on th€ load side ofthe transformer is ptovlded by the owner. Could we please get
clarification on whether the utllity meter sedion wlll b€ tupplied by the eledrical cont.actor or
others? Thankyou,
The meter base and the consumer dlsconned lwltch supplied bythe
contEctor, whlle the meterwill be supplied by the Utillty. Follow the electrical
utility standard for dlstributlon of respon5ibillty.
sheet E602 7 12212024 52
Feede. Nuhbers on 8602:
Could we please 8et a feeder nuhberfrom the utilitv meterto the automatlctransfer switch.
asguminEwe are supplyin8 this a5 p€r my previous question? Additionally, could weget a fe€der
nunberfrom the automatic taansfer switch to the mein switchboard?lhe information nceded for
each feeder number Includes the numbe. of conductors, conductor types, numberofconduits,
Add the following note to sheet E602:
The main cable from the Utility equlpment to thecustomer dlsconnect 5witch,
then to the ATS and to the main swltch board shall be (241 500 MCM AL
condudor pulled inside (6) 4" conduits.
7 l22l2OZ4 53
Oetailg on EVStations:
Could we get more details on the EV stations? There are no specifications, but the notes nention
EV 7.2(W,8ooo VA, and a 4OA single pole breaker' General notes state that EVchargers thall not
run on the Bqnetator,
The EV ahargers shall operate on the normal powelsourc€ only noton backup
power. kvel (2) 7.2 (W EVch.rgersshall be fed through 1'pha3e 10 wA step
down transformea nett to each pedestal (GroupinS under one transformer is
allowed). EVChat8e.s shall be Leviton Model EC32Wwith EPEDl Single
MountCharglns Stalion Pedestel or app.oved equal.
!€viton Model €c32W with EPE0I SinSle MountCharsing Station Pedestal
EV Specifications:
Amperage:32A
greaker:40A
Charge connector Cord : firo AWG SAE J1772
Numberof Phase / Wle: 11, t2 and Ground, Eottom Feed
OperatingTemperatu.e : -30' Cto 50'c
Output Power : 7.6kW
Shoil Circuit Cur.ent Ratlng : 20 mA CCID Per UL 2231
Voltage : 208/240 VAC
€nalosure lvlatedal : Pla5tic (PC+pgTl
Enclosu.e RatlnS: NEMAType 3R
Status Indlaator: Power Present, Charging, Feult
Altitude: Up to 5,500 ft. (2,000 m)
Charging Cable Operatlng Tenp.rature : _22'F to +r22'F ('30'C to +50'Cl
coolln8 : Natural cooling
Operating Humidlty: < 95% Relative Humldity, NonCondensing
c.ble Length:1,8 ft. (5,5 m)
Standards and Cedifi.atione : UL2594l Ut 223f-l1 Ul 2231- 2l U1 2251 | Ut
621 Ul-9911U119981 NFPA70Afrlcle625l Ul840l CSAStd. C22.2t2801 OCPp
1.5 Compll.nt
Sh€et €100 712212024 s4 Location of PP-Scal€ Transformel:
Could we please getthe loaation ofthe PP-scale transformeron the slte plan 8100?
The PP-scale transformershall be located nonh ofthe HVAC uniton a
housekeeping concrete pad at the gcale house.
't 122/?024 55
Fiber Optlc Conduit RequiremenB:
Can we run the spare 2" fiberoptlc aondui! lhrough the power manholet, ordo we need to supplt
additlonal handholes or manholes every 2OO feetfor the 2" fiber optlcconduiB?
Generally, yes but also dep€nding on lhe type offiber optlc cable being
provided. Fiberoptlc cables runnlng thaough electrical vaults must be properly
marked and protected from damaSe for new and future power cabling
installaiion. Also refe.to NEc 770.133 (A)
Sheet E1O1 7122/2024 56
Addltional 2" PVCCondults:
Where it indlcates 2" additional PvC condu:ts forfiber cables, are theyreferinS to the conduit in
thevench o.from a vault? Callout 102 and 101 feede.s are marked for ilo addltional 2'PVC
conduits for fiber cables. will this be a total of4 aonduits or 2 conduits from 102/101 back to thell
source? Thank you.
lhere ls a total oftwo {2) 2" conduaB for fiber and communication cabllnS,
runninE parallel to power, Soingto each bulldlnS. These conduits are for
connedlng flre alah, data and telecommunlcation fo. the project.
sheet E701 712212024 57
Offlce and White Goods Area:
Could we please 8et the missin8 drawinSs forthe PP'O panel schedule and buildingdrawldSs? Pp_
O on E7O1 lsn't marked with Conitructlon Note 3 fortuture exp.nsion. Thank you.
The PP-O panel is pan otthe future expansion, whlch i5 not partofthit
contract.
8lrl2o24
nEsFot{sE$gnoN OAIE RECIE!'ED t EH QUESflOtI
The feeder callout 109 is pafr ofthe future expaniion, whlch is not part of thi5
contract,Sheet E100 7 12212024 58
Sales Eulldlng (PP-Sales):
The Sal€s guilding irn't marked with Constructlon Note 3 for future expansion Additionally, there
is a feeder<allout 109 torlhls circuit, butthere is no ta8 109 on the site plan9. Could we please
clarifywhetherthls conduit needs to be run sonewhe.€ on the slte plans 8100?
(2Ol 500 Mctvl At Conductors in (2) S" conduits. (12) 500 MCM in (1) 5" and
{8} soOMCM in a {1) 6" conduit. (NoTE: the contractorcan p.ovideother
combinations ofwire and cabling as long a5 it satlsfies the NEC.)
Sheet E502 7 12212024 s9
Clariflcation on Feeder 105 on E602:
Could we please getclarification on calloutfeeder 106 on E602? 0o theywant 7-5" conduits
wlth 3xS00 kcmil?
Electric Fire Pump ls future and there are no conduits/wircs. The lrain
Switahboard shall be equipped wlth connection lugs to accommodate the
futurc Electric Fire Pump.
Sheet E701 7 12212024 50
tke Pump Conduit She:
Whatsize conduitis rcquited torthe fire puop? Construction Note 2 on plan 8701 mentions
underground condultg, and we assome it is 6" based on other 6" undeEround conduiB Could
you please confirm?
Yes. asphalt pavinB is required ln the rerycling centersheet c3 7 12212024 6T
On plan sheet C3, the4" thick pavementhatchlnS 15 shown goingthrou8h the recyclinSaent€r. see
the red clouded area in the snip below. Pleate conlirm this area slll receive asphalt pavement.
No asphalt paving required within the MRW buildlnS. This erea in the MRW
buildingwill be construded of a concrete slab.62
Also on plan sh€etC3, the4" thlck pavement hatchinS ls shown Soing throlgh the MRW bulldlnS
seethe Sreen clouded area in the 5nip below. HoweveL in the strudu€l plan5. lhe MRw building
is shown with a slab lloor. Please confirm whelherthis..ea will receive asphalt pavement
SheetC3 7 122/2024
Eiplosion proofheat detection works as well and rhould be pad ofthe Fire
Specialists desiSn ba!ed on the pedormance5pe.ill.ationt.
since thls i5 a performance speclfication, codeminimum will work for ho.n
The quantities and location of the fire alarm equlpmenta.e an estlmate in the
desjgn and aredependent upon the Washin8ton State Cenified Alarm
Speciallst that wlll detail the entire rystem durinS aon*rudion.
63
AlsotheMRwbuildinghasanoteaboutbeingexplosionproofatleastoutinthemainarea lfsq
you would most likely notwant smoke and heatdetection on thecelling as smokesthat are
explosion proofaae4k each my cost, heat detecto.s are notas b.d as they run around 300 each.
Also, theyshow a huge numbetofhorn strobes in therq more than needed and those are verv
expensive es well. I just need to know lfwe can do code nlnlmum or if All those devices are
actuallyexplosion proof. I left another messaSe todaywlth your firm.
7 12212024
The onlv location on the projedwhere curb and Suttea ls requk€d {oelail A or
C-9) is along the sloped access road le.ding intothetFn5fer building Curb
end Bunerwill be r€quired on both 5ide5 ofthetransfer buildlng access roed
st.ning at the entrance to the kansfer bulldlng nodh for 235 lf {470 lftotal).
sheetca 7/2412024 64
Sheet c9 Detail A,/C9 5hows a road section with curb & 8ufte. on both sldes. Note below says
'transfe.bulldingnorthentranceandexlt'. Thepl.nsheeBforthisarsadonotappeartoshowa
cu.borhavecallouttothlsdetall. Canyouclarifywherqifany,concretecurbandEufterwould
be located?
SpecSection 10 81 12- Blrd Control oevices-
Delete paragraphe 1.3 Slrd Nenlng, 2.01c Blrd NettlnS, and 2.03 sird Nefring
Herdwere
10 81 12 7/2412024 55 Spec Sectlon 10 81 12- gkd Control Devices_ Whatarethe locations and llmits fo. the bid nettingi
LOWER VALLEY TRANSFER STATION
RESPONSE TO RFI QUESTIONS - August 1,2024
StructuraldrawingsshowwoodtraminS. Architectuhlshowsamixofsteelstudandwood
f.amin& but the wall types page AOO9 shows all steel stud framihs Fuilher, there is no 054000-
speaification section, which ls typically whe.ewewould 5ee lhe exteriorwall or load bearinS
frahlng. There is a 092216 non-structural metal stud framlng specificatlon, but it does not
referencethefremingofexterlorwall5. lsthereanymeblstudframinSonthisproied?
GWB specification includes meny differenttypes ofGWB, some whlch come at a much hlSher
priceperst. lcannotflndanywhereinthedrawlngsthatidentlfieswheretouleeachdifferent
type ofGWS. Some ofthe aoncerning GWg products includei
0929002.028-(68)5/8lTypeC-thisboardi5typi.allyusedinspeciflclJLassemblies. lamnot
saelng .ny fire rated GWB assemblie5 id these buildinSs. Al5o, note 5 on the Agsembly pege A009
dlreds me to use a more standard 5/8" Type X GWB product.
092900 2.028.5 -(WRGB) USG FiberockAqua-Tou8h -This produddoes match the d€scription.
This i5 not a paper fac€d product, and therefore requires siSnitlcantwork to finish-
O929OO 2.028.5 (Pan 2) {FRX-G) - lmpact Resistant GWB -where is this located?
092900 2.02C- Coatad Tile backer boaad and underlayment_ UsG Fiberock Sackerboard-l wlll
quallry. GP Denshield Tilebacker.
O929OO 2.020 - Cem€nt gackea Board - thls 5hows 5/8" Wallboard, %" Floorin8 lnde.layment-
theydo not identlfya p.odud, and I would be excludlng flooring underlayment.
0929002.2€-LirtsGypsheathingasbelnginspecsectlon061000 Spe.OS1000doesnotshow
gyp sheathing, I would be excludlnS all €xterior sheathln8.
092900 2.2F -Abuse Resistant Panels (ARP) -where is this located?
092900 3-01.15 - Instrucb u5 to use WRGB in wet locations notscheduled to receive tite fintsh or
(ARP).
O929OO 3.01.16- lnstruats us to use Coated Fiber-faaed Gypsum Board ln areas scheduled to
No.4 for changes to Section 09 29 00.
Relerto structural for exteriorwall framlngatAdmin and Saalehouse {Wood
framed). Assembly lypes shown on page A009 that arekeyed to Admin,
Scalehousq MRW and T.asfer Euilding are shown to indicate 8€neral design
intent includinS Insutatlon and energycode requlrenents. All elemenb of
Mnw and Transfer bullding to be deslgned by PEMB MFR, ste€l stud franing
is not required.
Provide flat bar becking per E,3b, Othea backing ls provided as an option to
the contractor,
4 8lu2024
TOWER VALLEY TRANSFER STATION
RESPONSE TO RFI qUESTIONS - August 1,2024
sEcllor{OAIE RECIEI'ED I RftquEnoil RESPOIIEI
The cwB products that I would expectto use on a project llke thlt would include:
Georgla Pacific5/8'TypeX GWB at all locetions other than what I list below.
G€orgia Pacific 5/8" Tilebacker - at all locatlons scheduled to recelve wall tile. (Shown in
restrooms only to 5'AFF.)
Georgia Pacific 5/8" Mold Guard paperfaced GWB- in wet areas as defined ln 092900 1.03A.
Abuse and/or lmpact Reslgtant GWB -This would only be at speclfied areas, of whlch I cannot
find. This s€ems like an unusua I produd for thil type of project, and I would prefer to exclude this
produd unlesswe can determine where itis needed.
Fib€rglass Faced GWB such as Georgia Pacific Dens Armour/USG Flb€rock Aqua Tough -this
would typically be called outin ertremelywet areas, or areas wh€re we would be hanSing GWB
prlortothebuildingbeingddedln. OrperhapsahlShhumidityareasuchasanindoorpool.l
would preferto exclude thb producl unless we aan determine whe.e it is needed.
092900 3.010.2.a -Calls for Level 5 atall surfaces exposed to viewthatare to receive p.int.
Se€ms exp€nsive and strange Siven the type ofbuildings these are, but I will tiSure a l€vel 5 flnish,
unlesr you direct me otherulse.
095100 - The fln ish schedules identify ACT-1 at all locations s.heduled to receive ACT. The
OgslOOspeciticationldentitles3difterenttypesofACT. WheredoweidentifywhlchtileisACf-l?
Ir it corectthatthere is only 1 tvpe ofACTon thls proied?
O951OO & O953OO - lt may be too late, butwewould be able to offer a significantsavlnSs of, the
ACTpackaSeifCenainte€dACTcompa.ableproductswouldbeacceptable. (lfyoucan(onflrm
the desiredACTproduct, we can offera VE deduct ifthere is a Cedainteed comparable tile and
Srid product ifthatworkg foryou.)
7 l2sl2o24 67
on plan page C8 there h a note sayinS thatthere needs to be Thermoplasticstop Bari at all sToP
signs. WhGrcarewesupposetoputtheseinthebldtab? ThereisonlyooubleYellowandSingle
whate strlping bid items,
This item can be add€d to 8id Base ltem 115 _ Site si8na8e.
7 /2s12O24 68
l.lsinsulationrequi.edonthetrahsferltationandtheMRWbullding? lfsowhatisrequiredand
where is it located? (see recommendations below)
2. What paint speciflcally i5 tequired for all structural steel located attheTransferStatlon and
MRW Suildings?
lnsulation 13 requircd per Wall Secllons 5/A1-A501, 7 1A1-A501, 2lA4-A5Ol,
and 3/A4-A501, Structural steel palnt requiremenls added toAddendum No.
4.
Add the followinS to sedion 09 96 002.01 e AccEPTABIE MANUFACTURERS
gasis of DeslSnr Supply SheNin-Wllli.ms Compsny producB indlcated or
.omparable p.oduds from thoselisted below:
Steel Substates: PiSmented PolYurethane over Epoxy System
1. Prime coeti Epoxy, high-build, low Sloss:
1st coat: S"w Macropoxy 646-100 Fast cure €pory, 858 series (7 0-13,5
mils wet,5.0-10.0 mlls dry percoat.
2. lntermediate Coat: S"W Hl-Solids Polyurethane Semi-Gloss, 965_350 Series
3. Topcoat: Polyurcthane, Mo-component, Pigmented, glosil
S.W Hi-Solids PolyurethaneSemlclots,965'350Series. {4 5'8 0 ilils wet,
3.0-5.0 mils dry percoat.
4. €poxy Prlmer: lstCoati
a. lfthe m€tal does not have a zinc rich primer already applled, u5e the
lollowingas a firststep:
b. S-WCorothane I GalvaPac2K Zlnc-Rlch Primer g5SG10 (3.0-4.0 mils drY)
Metal:
5. Miscellaneous, Ferrous Metal, Raillngs
a. Waterbased: Semicloss FInirh: 1!t Coat: S_W Pro lndustrial Pro-Cryl
universal Primer, 856-1310 Serlet (5.0 mils wel 2 0 mils dry)
2nd coat: s-w Pro lndustrlal waterbased Alkyd urethane €namcl semi_
Gloss, 853-1150serie5.
3rd Coat: S-W Pro lndustrlal W.terbased Alkyd Urethane Enamel Semi'
Gloss,853-1150 series {4,0-5,0 mils wet, 1 4'1.7 milsdryper coat)
6. Manufadurec: Subject to compli.nce with requi.ements, provide producs
bV one ofthe followingr
lnternational Prot*tlve Coatinas; AkzoNobel.
PPG Paints; PPG lndustrles, lnc.
nust-OIeum Conohtlon; a subsldiary of RPM Internationrl, lna.
5heilin-Wlllams Company {Thel.
TnemecCompany, lnc.
1 l2sl2o24 69 Wlll the sloping or shoringarea necessary fo. the deep excavatlons be included in the sorueyed
calculatlon forpayment? That soil r€moved forsloping paid as unluitable sollt?
RFI spreadsheet- No.35 responJe addrcsses un9litablesoil payment:
The contraator shall perform a topographicsurueVforeach unsuilable soil
aemoval area prlorto stadine exaavation, oncetheexcavation is completg
the aontradorwill perform a final topographlcsuruey!nd will be paid based
on thesoil removed.nd topoSraphic surueys. Common lill will be calculated
7/2612024 10
lust curious itthe strudured aabling (volce/data/iberl 15 beingprovided byowner? I have an
el€drical aontractorwho ir requestinS a bid on that podion ofthework and I don't se€ any
specificatlons (olv. 27ooo). Pleate let me know a5 soon as posiible beings the bid ls due on the
3oth. lf$eownerisprovidingthl5workcouldyoupleasefodardmyinfordationtothem,
thanks.
Yes, cabling wlll be provided byowner
thl2024
LOWER VALLEY TRANSFER STATION
RESPONSE TO RFI qUESTIONS - August 1, 2024
5CCflOf{OAIE NECIE'ED I 8nqulsfitil ngFot{s€
1 /26/2024 77
Th€ bid schedule calls for 28501f ofchaln link fenceand 10 gates. The plan page C3 onlyshows 4
gates (2 - 2dwide double 5wlng gates). The scale may beoff, l'm gefring a total of3,910lf total of
the fence. Please cladfy where th e 6 missing gates arc located and what klnd of gates are
needed{ringle swings, double swinSs, roll 8ate5, etc.}
ReSardingthespecificatlons,theycallforablackfencewithtanprivacyslats PlanpageC3aalls
fora "6" high chaln linkfence w/tan slats per WSD0T standard plans. Pleese confkm lfthe fence is
galvenired or black.
A revised bid schedule is included in Addendum No. 14 for.evillngthe 5'hl8h
ahain llnk f€nce quantity and 8ates. Shall inclod€ a top and bonom €il.
The 6'hl8h chain link fence w/tan slats are forthe perlmeterslte fencinS and
ghall be Salvanized.
Section 32 31 13 - Chain Llnk, Fencing, and Gates i5 forfenci0g at lhe MRW
Building.
section 05 50 00- Metal Fabricationt address metal Srating and wire mesh on
the south elevation ofthe Transfer 8uildin8.
7 12912024
A.ethere any domestic requirements for mate.ials ?
We cannot find in the specs iflhere is .
Thewater and sewersystems shail be conskucted in accordancewith the City
of Ellensburg Standard Speciflcatlona. The specllication! do not mentlon
domestic rcquirements tor materials.
7 12s12024 7t
I am notable to find anyinformation provided on what the exterior lloodliShtt are suppoted to b€
mouniingto? Can you please confih?
- Mounting heiSht
- Pole type {square, round. etc.)
- Color
- Sire
Street Llghting: Type lVsimjlarto the MGLEo 571W
Sheet E100for lo.ation
Sheet E503 for the detail
spe6 25 55 2.o3 (g) for pole details
Flood liShtat composite area: slmilar to RsxF4 85,000 LM 646W
Sheet E100 for locatlon
lrounting He18ht40'
Specs 26 56 2.03 (B) for pole details
Flood lighton the exte.iorofMRW and the t.ansferbuildings
Slmil.rto RSXF4 85,000 fM 545W
Wall mounted bYwall bracket
2d AFFK at the MRWbuilding
7 /2912024 74
Fkst and foremost, the spec i5 callinS out a voice/evaa system. This ls something that i5 not
requked for thls occupancy type and is very costly. ls thlJ being mandated?
Also, Mo ofthe bldgs (scale and Admin) don't even require a lire alarm svstem as well. I'm all for
SoinB above and beyond whet'3 needed butwanted to make sure. Maybe on those Mo bldgs we
aould put in remote annunclators to save money. Just a thought if FA h not needed.
There are also things called out ln the spec that are noton the daawin85, ie, elevator shutdowns,
chute inte.locks, kitchen hoods, generator heaL duct smokes, etc. I also don't see anythin8for
doo6 and there's a whole section (E) dedlcated to that on lhe spec.
lfthe spec callr for something that is not the.e should I just iSnore it?
Also, i5 this within .ity limlB? Th€ city requires exterio. tuobet on the address side of each
buildinS that has a new flre alarm panel and everythingto be keyed as aat30
The Gen€ral Notes on 4-E101 says "All elecrical raceways, equipment, end devices to be rated for
lnstallation in explosion harardols areag" but the d.awinS doesh't actually5how which ar€a is an
explosion hazard. Does the whole slte need to ran in conduit?Thatwasn't called outelther on if
so, whether it's EMTor Ai8id.
The Hazardous area i5 within the MRW bulldlng where this Sene.al note lives.
Ref€.to sheet 0-A001 (Scope ofwork, paragraph (2)).
The fire alerm notifies the peopl€ to evacuate. The voice notilication i5 not
required.
All buildin8s shall have fire alarm ivstem.
Exclude from 24 46 00 2.03 thesystem interfaces thatdo notexistl
Items (Al (7 & 8)
Items (B) (2, 3, 4 & 5l
Items (C) and (E)
7 129/2024 7S
1. Addendum 3 clarlfied thatthe RecyclinBArea ls paved with asphall but gid ltem 39 for the area
calls for a 'concr€t€ Pad'. what is
'ncluded
in this bid ltem?
2.Bidltem40intheRecvclingAreacallsfor'SteelRamps'. lsthereadetailorplanfortheramps?
3.sheetClghasdetailsforanaluminumAOArampsYstem. Wecouldnottlndadlloutforthis
ramp, but have assumed that it was meant to beADA access for the modular bulldinS?
1. Yes, recyclin8 area is paved with asphah. The contractot thall put 2erofoa
8id ltem fl39.
2. one steel aamp is requked on the ea5tand west end of the RecycllnS drop_
offarea. s(eel ramp details are shown on sheet c_19. contractor shall proude
a price to install Mo steel ramps for Bid ltem t4o
3. These ramps are forthe necycling drop-offarea
7 12812024 76 The bulldin8 numbe,s in the specs and the plans do not match, the llsting forslSns ln the speas do
notcorrelate to anythinS that is on the plans llke room numbet room use, etc.
ln Specifi..tion 10 14 00,
oelete paraSraphr - 3.028, C, D, E.1, €7 -11
Add paragraph 3.02 A.8: Quantity:4
7 /29/2024 1l
Looking throu8h addendum 2 forthe HMA it references .75M ESALPG 64H'28 with payment bY
the ton and the addendun 2 bid Jheet reterences th€ HMA by the square yard lt the gquare yard
still the corred unit of measure?
pavmentwill be made bythe squareya.d.
7 l3O/2O24
ForsheetETOl,thenoteflforseneratorand transferswitchindlcates"Optlonelifneeded."
There is no specification on the Senerator.
There is no transfer swltch orgene€tor r€quired lor biddinS purposes.
811/2024
TOWER VAttEY TRANSFER STATION
RESPONSE TO RFI QUESTIONS - August 1, 2024
sEcfloN DAIE RIAEVED t in ouEsnof{lESFOilS€
7 13012024 79
l.TerminaUstretch/Line post/Top Rail Slrlng & GalEni!ation:
We ar€ proposing/clarifyinS the use of2-7/8" 40 wt. t€rmioal and stretah posts with 2_3/8" 40 wt
linepo5twlthl-5/S"40wttopandbonomrail. Thisiitheindustrystandardfora6'ftchainlink
commercial fencewith priv.cyslats. Currently theWSDOT specific6tions call out for 2_3/8"
terminals wlth 1-718" line posb with 1-718" top rail and bofrom nll. The end caps and boRom
Eil No way b€(kets are evailable butvery rare and expensive and way outlide ofthe norm tor a
prcjedofthls scope.
2.Pre-Slaned Mesh or TBditional 8ofton lock Priwcy Slats:
Currentlythe specifications call out for traditlonal (Tan) bonom lock privacyslaG which have to be
manuallyinstalledonebyone. Thislsnotaaontllctandverystandad. Thereisanotherproduct
which is a pre.slaned chain link mesh whlch haswider diamonds and I don't believe you can 8et it
standard in the 2,0 o. Salvanization coatlng but it,aves on labor to manually install the traditional
pdvacyslats and we want to clarifyto make ture thatwe are to bid the tradition.l bofrom lock
p.iv.cyslats and notth. pre-slatted mesh?
3. Port and Top/gottom Rail ASTM Requkements:
Cur.entlythere ls a aonfllctwlthin the fencingspeclfications in regards to theASTM requiremenb
on the posB and top/bo(om rail. lt states the u5e ofASTM F1083 pipe schedule 40 domeatlc but
then it also states in sedion 2.03 Source QuelitY Control f1 the use ofASTM F1043 HeaW
lndustrial plpewhlch is morethe industry standard and the lafter It delinitely less expensive for
Senerally the same product. Whlch are we to use?
4. Galhni2ed Chain link Mesh:
Curentlythespeclfications read to use ASTM A392 zinccoated rtee! which is the 2.0 or/SF
specification.theindustrystandadlsusuallythe1.2o2/Fs Therelsasignific6ntcostditference
between thetwo and we,ust wantto claritywhich me5h to use tp€cilically
L Contractorshall bid using WSDOT specifications. lfcontGdor is awarded
the contrad, Ownerwill ent€^ain value engineering proposals.
2. Contractor shall bid using projed specifications lfcontracter is awarded
ihe rontrad, Ownerwlll entedain value engineerlng propogals
3. Provlde ASTM f1043 Heavy lndustilal Pipe
4. PeTASTM A392, provide Class 2 wei8htof2.0 ol/SF. Contrador thall bid
usin! 2.0 ozAF 5peciflaation. Itcontractor i5 awarded the contract, Ownerwill
entedain valueentineeringproposals.
1/3O12024 80 087100 hardware spea i! missing hardware forgroups 7 and I can You 8et clarification pleese?
Hardware Groupt tHG-7): Rairooms.
Hinge x3 McKinneY T443386 uS3204.5x4 5
l-ockset Corbin Russwin M12055 NSA 530 5Alr4 M17
t-c M26
Modise Houring {key) Best CoreMax
Constructlon Core Eert TEMP_ REO
Close. Nodon PR75005SM 689 SNB
Wallstop Trimco 127OcV626
Gasket Pemko S88D lenglh as required.
Kickplate Tdmco K0050 10x2"1DW630
Thumb tatch and Status lndlcator
Hardwar. 6roup 8 {HG-8}r Conleronce, olll.€5
HinSe x3 lvlcKinney T4A3386 US32D4 5x4 5
Lockset Corbin Susswin MUoSSVR NSV 630 54114
tvr17 rc M26
Modise Housing (key) 8e3t CoreMax
Construdlon Co.€ Eest TEMP"4 R€D
Closer Nodon PR7500SSM 689 SNB
Wall Stop Trimco 1270CV 626
Gasket Pedko S88O length a9 requir€d
Kickplate Trimco K0050 10I2"LDW 630
Thrashold Pemlo 271A FHSI25
Door 8oftom Pemko 216APK 36"
7 11012024 81
1. ln re8ardr to oetail 2, 9 and 11 on 1-5303
How is the 5/8 plate.frached to the push wall f.amlnS? I don't s€e a weld slle or laYout c.llout?
And at the joint! of the 5/8 plttq i9 it a .lose butjoint wlth no w€ld or i5 that a welded seam? lf
welded is it ground tlush?
2. ls the steel push wall 816" overall includlng the angled 5/8" plat€ on top? Or ifjust the level
podlon ofthe 3teel wall 816" then the angled platet above that?
3. what i5 the materlal callout forthe armor plate? AR400 o.something else?
4. Do€s the armor plate run the length of the Jteel pu5h wall? Orjust efrbedded ld the concrete
wall? And does theweld ioint5 need to be 8.ound tlush?
5. Whatare the diemeterand lenSth ofthe concret€ anchors thathold the steel push wall?
And atwhat spaclnS?
6. We arsume note on detail 1, sheet 1-A102 that poinB to the hopp€r and says "future steel" is a
typo?
1. Aftach the HsS framing to thevertical 5/S" platewith 3/16" fillet each side
at 2" lenfth end 12" pitah. Proude a Srove weld and 8rind Bush
2. The angled 5/8" plates will sit on top ofthe 816" tteel wall,
3. The material calloutfor the armor plate i5 436.
4. The 5/8" armor plate is only requlred at concrete push walk. wdd the
seam beMeen the armor plete and steel wall plate with a grcove weld and
trlnd flush.
5,1/4" 0,8'of tl^ifrum embed,16" on center.
5. Change the noteto read: HOPPER PER STRUCTURAT.
8lr/2o24
LOWER VALLEY TRANSFER STATION
RESPONSE TO Rfl qUESTIONS - August 1,2024
LiBhtingfixturerfor theexlts, emergency bu8eYes, and watl packs areshown
on she€ts €000, 1-E101, 2-E101, 3-E101, and 4-E101.
rtit'is,ti i.t, ir| ,;!!l
82 Thera is no fixtures called outfor the E*t!, Emergenry gug Eyes orWall packs.7 130/2024
Material that meG the minimum specifications as provld€d in table 2(a) in
Revlsion 15 ofGRFGM13 will be.ccepted. The Engineerwill updatethe
specificatlon to complywlth current industry requlrementssfter Noilce of
Award i6 lssued to the selected contractor-
Please clarifuthatGRl GM 13 specificatlon 15 r€qulred forgeomenbEne line.
material/lnstalladon.7lnl2o24
81112024
sEciloN 00 00 03
INSTRUCTIONS TO BIDDERS (AlA DocumentAT0l - FOR REFERENCE ONLY)
6AIA
Instzuctions to Bi.dders
for the following Project:
(Name, location, and detailed description)
Lower Vallev Transfer Station
2600 West GreenAve
Ellensbwe. WA 98950
THE OWNER
(Name, legal status, address, and other information)
Kittitas CounW
205 W 5s Avenue Suite 108
Ellensbure. WA 98926-2887
THE ENGINEER (HEREAFTER REFERENCED AS ARCHTTECN:
1Name, legal status, address, and other infomtatiott)
SCS Eneineers
2405 l40h Ave. #107
Bellevue. WA 98005
TABLE OF ARTICLES
1 DEFINITIONS
2 BIDDERSREPRE$ENTATIONS
3 BIDDING DOCUMENTS
4 BIDDING PROCEDURES
5 CONSIDERATION OF BIDS
6 POST-BID INFORJIIATION
7 PERFORMANCE BONDANOPAYMENI BOND
8 ENUTIEMTION OF THE PROPOSED CONTMCT DOCUMENTS
Document A701"20L8
ADDITIONS AND DELETIONS :
The auEhor of this docunent
has added information
needed tor its ccmPletion.
The author may also have
revised the text of lhe
original AIA standard fom.
An Additions ard Del.etions
-Report that notes added
informatiLan as well as
revislons to the standard
form text is avallable from
the author ad should t'e
reviewed.
This docuent has j.mpo[tant
legal consequences'
consultation vri.th an
attorney is encouraqed with
respect to its conlplet.ion
or modifi-catlon.
FEDEML, STATE, AND LOCAL
LAWS }IAY IMPOSE
REOUIREMEIVTS ON PUBLIC
PROCUREME}IT CONTRACTS .
CONSULT LOCAL AUTHORITIES
OR AN ATTORNEY TO VERIEY
REQUIREMEIITS APPLICABLE TO
11{IS PROCUREMENT BEFORE
COMPLETING TEIS FORM.
It is intended that AIA
Document G6L2*-2OL1,
owner's InsLructions bo the
Architect, Parts A and B
uiI.l, be coropleEed Prior bo
using this document.
ELECTRONIC COEYING of ilY
portion of this AIAa Document
to another eLectronic tile is
prohi^blted and constitutes a
violatlon of copyright laws
as set forth in the footer of
this document.
1
I nstructions to Bidders
(AlA Document A701)
June 18, 2024
Kittitas County - Lower ValleY
Transfer Station
1of8
ARTICLE 1 DEFINITIONS
$ 1.1 Bidding Documents include the Bidding Requirements and the Proposed Conlract Documenls. The Bidding
i.equirementi consist of the advertisement oiinvitation to bid, Instructions to Bidders, supplementary instructions to
bidtlers, the bid fornr, and any other bidding fonns. The Proposed Contract Documents consist of the unexecuted form
of Agreement between the Owner ancl Conhactor and that Agreement's Exhibi*, Conditions of the Contract (General,
Supp-lementary and other Conditions), Drawings, Specifications, all Addenda, and all other documents enumerated in
Article 8 of these Instructions.
$ 1.2 Definitions set forth in the General Conditions of the C.ontract for Construction, or in other Proposed Contract
Documents apply to the Bidding Documents.
$ 1.3 Addenda are wntten or graphic instruments issued by the Architect, which, by additions, deletions, clariflications,
or corrections. rnodi$ or interpret the Bidding Documents.
S 1.4 A Bid is a complete and properly executed proposal to do the Work for the sr.uns stipulaled therein, submitted in
accordance with the Bidding Documents.
$ 1.5 The Base Bid is the sum stated in the Bid for which the Bidder offers to perfonn the Work described in the
Bidding Do..tments, to which Work may be added or deleted by swns stated in Altemate Bids.
$ 1.6 An Altemate Bid (or Alternate) is an amount stated in the Bid to be added to or deducted from, or that does not
ih.ng., the Base gid if ihe corresponding change in the Work, as described in the Bidding Documents, is accepted.
S 1.7 A UnitPrice is an anrount stated inthe Bid as a price per unit of rneasurement for materials, equipment, or
services, or a portion of the Worlg as described in the Bidding Documents
$ 1.8 A Bidcler is a person or entity who submits a Bid and who meets the requirements set forth in the Bidding
Documents.
$ 1.9 A Sub-bidder is a person or entity who submits a bid to a Bidder for materials, equipment, or labor for a portion of
the Work.
ARTICLE 2 BIDDERS REPRESENTATIONS
$ 2.1 By zubmitting a Bid, the Bidder represents that:
.1 the Bidder has read and understands the Bidding Documents;
.2 the Bidder wrderstands how the Bidding Documents relate to other portions of the Project if any, being
bid concurrently or presently under construction;
.3 the Bid complies with the Bidding Documents;
.4 the Bidder has visited the site, become familiar with local conditions under which the Work is to be
performed, and has correlatecl the Bidder's observations with the requirements of the Proposed Contract
Documents;
.5 the Bid is based upon the materials, equipmen! and systems required by the Bidding Documents without
exception; and
.6 the Iiiclder has read and understands the provisions for liquidated damages, if any, set lorth in the form of
Agreement between the Owner and Contractor.
ARTICLE 3 BIDDING DOCUMENTS
$ 3.1 Distribution
$ 3.1.1 Bidders shall obtain complete Bidding Documents, es-indi€otec+€l€+{'; from
advertisement or invitation to bid" for the deposit sum, if any, state d therein.
the issuing office designated in the
Deffien*)
Artr Docunent Al01 - 2018. copyright o 19?0' 19?4,
"tuerican Institute of Architects," "ArA." the AIA
AEchitects. fhis dtaft uas produced at 09:50i34 FT
is licensed for one'tine use only, and nay only be
copycight viol.ations, e-naiI docinfooaiecontracte'con
U.ar tfot.c:
LglAt 1987,199? and 2016. AlI rights reseEved. "The Metican Inslitute of Architects,"
trogo, and "AIA Contract DocuDent3" are trademorks of The herican Institute of
on oslL3/2o24 under older No-4LD4243041 wbich expires on D6/L0/2O24, i3 not for resaLe,
used in accordance vrith the AIA contract Docunents' Terms of Service' To report
2
19452442s91
Kittitas County - Lower ValleY
Transfer Station
lnstructions to Bidders
(AlA Document A701)
June L8,2024
2of8
$ 3.1.2 Any required cleposit shall be refunded to Bidders who submit a bona fide Bid and retum the paper Bidding
Documents in good condition within ten days after receipt of Bids. The cost to replace missing or damaged paper
documents will be deducted tiom the deposit. A Bidder receiving a Contract award may retain the paper Bidding
Documents, and the Bidder's deposit will be refunded.
$ 3.1.3 Bidding Documents will not be issued directly to Sub-bidders uniess specifically offered in the advertisement or
invitation to bid, or in suppiementary instructions to bidders.
$ 3.1.4 Bidders shall use complete Bidding Documents in preparing Bids. Neither the Owner nor Architect assumes
responsibility for enors or misinterpretations resulting from the use of incomplete Bidding Documents.
$ 3.1.5 The Biddrng Documents will be available for the sole purpose of obtaining Bids on the Work. No license or grant
of use is cont'erred by distribution of the Bidding Documents.
g 3.2 Modification or lnterpretalion of Bidding Documents
$ f.Z.t fn. Biclder shall carefully sh:dy the Bidding Documents, shall e><amine the site and local conditions, and shall
notify the Architect of errors, inionsisiencies, or ambiguities discovered and request clarification or interpretation
pursuant to Section 3.2.2.
$ 3.2.2 Requests for clarification or interpretation of the Bidding Documents shall be submitred by the Bidder in writing
and shall be received by the Architect at least seven days prior to the date for receipt of Bids.
gndieete hen+su€h es 4' entai| $'ebsitq llr,st sib,ble{ern++qer eeprt er edgr ntetlzedBiCders dwll subfiit t efltaests
@
$ 3.2.3 Modifications and interpretations of the Bidding Documents shall be made by Addendum. Modific_ations and
interpretations of the Bidding Documents made in any other manner shall not be binding, and Bidders shall not rely
upon them.
$ 3.3 Substitutions
I S.S.t fl. materials, products, and equipment described in the Bidding Documents establish a standard of required
function, dimension, appearance, and quality to be met by any proposed substitution.
$ 3.3.2 Substitution Process
$ S.f.Z.t Written requests for substitutions shall be receivecl by the Architect at least ten days prior to the date for receipt
of gid". Requests shatt Ue submitted in the same manner as that established for zubmifiing clarifications and
interpretations in Section 3.2.2.
$ 3.3.2.2 Biclders shall submit substitution requests on a Substitution Request Form if one is provided in the Biddrrg
Documents.
$ 3.3.2.3 If a Substitution Request Form is not provided, requests shall include (1) the name of the material or
iquipment specified rn the Bidding Documenls; (2) the reason for the requested zubstitution; (3) a complete description
of the propoied substitution including the name of the material or equipment proposed as the substitute, performance
and teit data, and relevant drawings; and (4) any other information necessary for an evaluation. The request shall
include a statem ent setting forth ch"ng"r in other maierials, equipm en! or other portions of the Work, incl_Yding
changes in the work of other conkacts or the impact on any Project Certifications (such as LEED), that will result from
incorporation of the proposed substitution.
$ 3.3.3Theburdenofproolofthemeritoftheproposedsubstitutionisupontheproposer.TheArchitect'sdecisionof
approval or disapproval of a proposed substitution shall be final.
$ 3.3.4 If the Architect approves a proposed substitution prior to receipt of Bids, zuch approval shall be set forth in an
Addendum. Approvals made in any other manner shall not be binding, and Bidders shall not rely upon them.
$ 3.3.5 No substitutions will be considered after the Contract award unless specificaliy provided for in the Contact
Documents.
AIA Docunent A?01 - 20
"Aoericao Institute of
18. cof,yright
Architects, "
@ 7910, 1914, L918, 198'1, 199? and 2t118. AII rights
'ArA,' the AtA Logo, and "ALe- contract Docu[ent3" are
reserved. "The Merican InstiLute of Archi.tects,"
tradenarks of The AheEican Institute of
AEchitects- Thig draft uas produced at 09:50:34 PT on 05/13/2024 undeE Order No.410424304?uhich expires on 06/10/2024' is not for resale,3
is licensed ior one-tire use
copyright violations, e-Bail
in accordance uith the AIA Contract Docunentst Tetns of servlce. To report
gror lotea:1945244259)
Kittitas County - Lower ValleY
Transfer Station
lnstructions to Bidders
(AlA Document 4701)
June 18, 2024
only, and hay only be used
docin fo0aiacont rac ts . con .
3of8
$ 3.4 Addenda
E S.l.t aaaenOa wiil be transmitted to Bidders known by the issuing office to have received complete Bidding
Documents.
| (Indieate llri$, sueh es otL email $'ebsite-hestsite,blafant paper eW: er eflrcrfite{rcd,4d*nda $'illbe h'ansnrittcd)
$ 3.4.2 Addenda will be available where Bidding Documents are on file.
$ 3.4.3 Adclenda will be issued no later than four days prior to the date tbr receipt of Bids, except an Addendum
withclrawing the request for Bids or one which includes postponement of the date for receipt of Bids.
$ 3.4.4 Prior to submitting a Bid, each Bidder shall ascertain that the Bidder has received all Addenda issued, and the
Bidder shall acknorvledge their receipt in the Bid.
ARTICLE 4 BIDDING PROCEDURES
g 4.1 Preparation of Bids
$ 4.1.1 Bids shall be subrnified on the forms included with or identified in the Bidding Documents.
$ 4.1.2 All blanks on the bid form shall be legibly executed. Paper bid forms shall be executed in a non-erasable
medium.
$ 4.1.3 Sums shall be expressed in both words and nunrbers, wrless noted otherwise on the bid form. In case of discrepancy,
the amountentered inwords shall govem.
$ 4.1 .4 Edits to entries made on paper bid forms must be initialed by the signer of the Bid.
$ 4.1.5 All requested Altemates shal1 be bicl. If no change in the Base Bid is required, enter "No Change" or as required
by the bid form.
$ 4.1 .6 Where two or more Bids for designated portions of the Work have been requested, th9 Bidder 1p1 without
iorfeiture of the bid security, state the Bidcler's iefusal to accept award of less than the combination of Bids stipulated
by the Bidder. The Bidcter shall neither make additional stipulations on the bid form nor qualily the Bid in any other
mannor.
$ 4.1.7 Each copy of the Bid shall state the legal name and legal status of the Bidder. As part of the docurnentation
Jubmitte d with ihe Bid, the Bidder shall provide evidence of its legal authority to perform the Work in the jwisdiction
where the Project is located. Each copy of the gia rnull be signed by the person or persons legally authorized to bind the
Bidder to a co'ntract. A Bid by a corpbration shall further name the state of incorporation and have the corporate seal
affixed. A Bid submitted by an agent shall have a current power of attomey attached, certifying the agent's authority to
bind the Bidder.
$ 4.1.8 A Bidder shall incw all costs associated with the preparation of its Bid'
$ 4.2 Bid Secuilty
$ 4.2.1 Each Bid shall be accompanied by th€-frtl€*$+biC+€€ttr"tc
A bid secwiw in the form and amount required. if so stipulated in the Instuction to Bidder'
$ 4.2.2 The Bidder pledges to enter into a Contract,,vith the Owner on the terms stated in the Bid and shall, if required,
imish boncls covering itr" faitnni performance of the Contract and payment of all obligations arising thereurder.
Should the Bidder refuse to enter into such Contact or fail to fumish such bonds if required, the amount of the bid
security shall be forfeited to the Owner as liquidated damages, not as a penalty. In the event the Owner fails to comply
with Section 6.2, the amount of the bid security shall not be forfeited to the Owner.
$ 4.2.3 If a swety bond is requirecl as bid security, it shall be written on AIA Docum ent A31 Oru, Bid Bonct unless
Jtherwise providied in the Bidding Documents. The attomey-in-fact who executes the bond on behalf of the surety shall
ArA Docunent A?01 - 2018. copyrj-ght @ L910, 7974, 1918t 198'1, 199? and 2018
"A6eEj.can Institute of Atchitects," "AIA,- the AIA logo, and "A1A Contract
Architects- Thj,s dtaft uas produced at 09:50:34 Er o\ 05/13/2024 under orde
is licensed fot one-tin€ use onlY, and may only be used in accordance uith
copyright violationg, e_naiI docinfoBaiacontracts'coh.
gaar llotor:
. AII rights Eeserved. 'The Atnerican Institute of Architects,'
Docudenti" are tradenark3 of The herican Institute of
r No-4104243041 which expires on 06/!0/2024' is not for resale,
the AIA Contrsct Docunentst Terms of Service. To report
1945244259 )
4
Kittitas County - Lower ValleY
Transfer Station
I nstructions to Bidders
(AlA Document A701)
June 1"8, 2024
4of8
affix to the bond a certified and current copy of an acceptable power of attorney. The Bidder shall provide surety honds
from a company or companies lawt'ully authorized to issue surety bonds in the lurisdiction where the Project is iocated.
$ 4.2.4 The Owner will have the right to retain the bid security of Bidders to whom an award is being considered until
(a) the Contract has been executed and bonds, if required, have been lumished; (b) the specified time has elapsed so that
Bids m ay be withdrawn: or (c) all Bids have bee n rejecte d However, if no Contract has been awarded or a Bidder has not
been notifiecl of the acceptance of its Bid, a Bidder rnay, beginning days after the opening of Bids, withdrarv its Bid and
request the retum of its bid security.
$ 4.3 Submission of Bids
$ 4.3.1 A Bidder shall submit its Bid as indicatedk
(Indieatelrrr$y saeh s W websitq ltest sitablaf,emt paper eW er etler nrctlpdBiddets slla.ll subffiit flEir Bi*)
on the Advertisement for Bid:
$ 4.3.2 Paper copies of the Bid, the bid security, and any other documents required to be submised with the Bid shall be
enclosed in a sealed opaque envelope. The envelope shall be addressed to the party receiving the Bids and shall be
identified with the Project name, the Bidder's name and address, and, if applicable" the desigrated portion of the Work
for which the Bid is submitted. If the Bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing
envelope withthe notation "SEALED BID ENCLOSED" on the face thereof.
$ 4.3.3 Bids shall be submised by the date and time and at the place indicated in the invitation to bid. Bids zubnritted
after the date and time for receipt of Bids, or at an incorrect place, will not be accepted
$ 4.3.4 The Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids.
$ 4.3.5 A Bid submitted by any method other than as provided in this Section 4.3 will not be accepted.
$ 4.4 Modificalion or Withdrawal of Bid
$ +.1.t nior to the date and time designated i'or receipt of Bids, a Bidder may submit a new Bid to replace a Bid
previously submitted, or withdralv its Bid entirely, by notice to the party designated to receive the Bids. Such notice
stratt Ue received and duly recorded by the receiving party on or before the date and time set for receipt of Bids. The
receiving party shall verify that replaced or withdrawn Bids are removed from the other submitted Bids and not
considered. Notice of submission of a replacement Bid or withdrawal of a Bid shall be worded so as not to reveal the
amount of the original Bid.
$ 4.4.2 Withdrawn Bids may be resubmitted up to the date and time designated for the receipt of Bids in the same
format as that established in Section 4.3, provided they fully conform with these Inshuctions to Bidders. Bid security
shall be in an amount sufficient for the Bid as resubmitted.
$ 4.4.3 After the date and time designated for receip of Bids, a Bidder who discovers that it made a clerical error in its
Bid shall notiff the Architect of such error within two days, or pursuant to a timeframe specifled by the law of the
jurisdiction where the Project is located, requesting withdrawal of its Bid. Upon providing evidence of such error to the
reasonable satisfaction of the Architec! the Bid shall be withdrawn and not resubmitte d. If a Bid is withdrawn pursuant
to this Section 4.4.3, the bid security will be sttenC€Cae{s-follewsi
(SbtB fte tsrms end €
retumed:
ARTICLE 5 CONSIDERATION OF BIDS
$ 5.1 Opening of Sds
if stipulated in an advertisement or invitation to bid, or when otherwise required by law, Bids properly identified and
receivedwithin the specified time limits will be publicly opened and read aloud" A summary of the Bids may be made
available to Bidders.
$ 5.2 Rejection of Bids
Unless otherwise prohibited by law, the Owner shall have the right to reject any or all Bids.
ArA Docunent A?01 -
U!€! f,otat:
Kittitas County - Lower Valley
Transfer Station
2018, Copyrj.ght
of Archi.tects, "
@ r91O, t9'14, L918, t981, l99l and 2018. AIt rights reserved. "The Anerican Inscitute of Architects."
"Aderican fnstitute "AIA," the AIA Logo, and "AIA Contract Docudent3" sre
Architect3- This draft uas pEoduced at 09:50:34 pT on 05/13/2024 under Order No-410424304?
is li.censed for cne-tihe use
copyrj.ght violations, e-nail
in accordance uith the AIA Contrsct Docunentso Terns of setvice. To repott
tEadenarks of The AheEican Institute of
uhich expiEes on O6/10/io24, i3 not for resale, 5
1945244259)
lnstructions to Bidders
(AlA Document A701)
June 18,2024
only, and n6y only be used
docinf ocaiaconttact3,coB.
5of8
$ 5.3 Acceptance of Bid (Award)
$ 5.3.t It is the intent of the Owner to award a Conkact to the lowest resporsive and responsible Bidder, provided the
Bid has been submitted in accordance with the requirements of the Bidding Documents. Unless othenvise prohibited by
law, the Owner shall have the right to waive informalities and irregularities in a Bid received and to accept the Bid
which, in the Owner's judgmenl is in the Owner's best interests.
$ 5.3.2 Unless otherwise prohibited by law, the Owner shall have the right to accept Aitemates in any order or
iombination, unless otherwise specifically provided in the Bidding Documents, and to determine the lowest responsive
and responsible Bidder on the basis of the sum of the Base Bid and Alternates accepted.
ARTICLE 6 POST.BID INFORMATION
g 6.1 Contractois Qualificalion Statement
Bidders to whom award of a Contract is under consideration shall submit !o the Architect, lpon request and within the
timeframe specified by the Architect, a properly executed AIA Document A305rM, Contractor's Qualification
Statement, unless such a Statement has been previously required and submitted for this Bid.
$ 6.2 Owne/s Financial Capabilily
A Bidcler to whom award of a Contract is under consideration may request in writing, fourteen days prior to the
expiration of the tim e for withdrawal of Bids, that the Owner fumish to the Bidder reasonable evidence that financial
arrangements have beenmade to fulfill the Owner's obligations under the Contact. The Owner shall then ftrnish such
reasonable evidence to the Bidder no later tlnn seven days prior to the expiration of the time for withdrawal of Bids.
Unless zuch reasonable evidence is fumished within the allotted time, the Biclder will not be required to execute the
Agreement between the Owner and Contractor.
$ 6.3 Submittals
$ S.S.t after notihcation of selection lor the award of the Contact, the Bidder shall, as soon as practicable or as
stipulated in the Bidding Documents, submit in writing to the Owner th,rough the Archibct:
.1 a designation of the Work to be performed with the Bidder's own forces;
.2 names of the principal products and systems proposed for the Work and the manufacturers and suppliers
ofeach; and
.3 names of persons or entities (including those who are to fumish materials or equipment fabricated to a
special design) proposed for the principal portions of the Work.
g 6.3.2 The Bidder will be required to establish to the satisfaction of the Architect and Owner the reliability and
iesponsibility of the persons or entities proposed to fumish and perform the Work described in the Bidding Documents.
$ 6.3.3 Prior to the execution of the Contrac! the Architect will notiff the Bidder if either the Owner or Architect after
due investigation, has reasonable objection to a person or entity proposed by the Bidder. Ifthe Owner or Architect has
reasonable objection to a proposed person or entity, the Bidder may, at the Bidder's option, withdraw the Bid or submit
an acceptable substitute person or entity. The Bidder may also submit any required adjustment in the Base Bid or
A.ltemate Bid !o account for the difference in cost occasioned by such substitution. The Owner may accept the adjusted
bid price or clisqualify the Bidder. In the event of either withdrawal or disqualihcatioq bid security will not be forfeited.
$ 5.3.4 Persons and entities proposed by the Bidder and to whom the Owner and Architect have made no reasonable
objection must be used on the Work for which they were proposed and shall not be changed except with the written
consent of the Owner and Architect.
ARTICLE 7 PERFORJilANCE BOND ANO PAYMENT BOND
g 7.1 Bond Requirements
$ Z.t.t ff strpulated in the Bidding Documents, the Bidder shall fumish bonds covering the faithful performance of the
Contract and payn:ent of all obligations arising thereunder.
$ 7.1.2 If the fumishing of suchbonds is stipulated in the Bidding Documents, the cost shall be included in the Bid. If
the fumishing of such 6onds is required at'ter receipt of bids and before execution of the Contract, the cost of such bonds
shall be added to the Bid in determining the Contact Sum.
$ 7.1.3 The Bidder shall provide swety bonds from a company or companies lawfully authorized to issue surety bonds
in the jwisdiction where the Project is located.
AtA Docunent Al01 -
"tuerican Institute 2018. Copyrighl
of Architects,"
@ 1"910, l9'14, L91a, 798'1, 1991 and 2018. A11 righte
"AIA," the AIA Logo. and 'AIA Contract Docudent3" are
reserved. 'The Anerican In5titute of AEchitects."
AEchitects. thig dEaft was produced at 09:50:34 Pr on o5l!3/?o24 under oEder No.4704243041
tEadenarks of The Anerican Institute of
uhich expiEes on O6/Lo/2o24, i3 not for Eesale, O
iE licensed ior one-t.ine uge nay onty be used in accordance uilh the AIA contEact Docunent5o ?erns of Service. To rePort
copycighL vioLations, e-nail
t945244259\Urat lot€r:
Kittitas County - Lower Valley
Transfer Station
I nstructions to Bidders
(AlA Document A701)
June 18, 2024
onlyr and
docinfo0s iacontracts.com
6 of 8
$ 7.1.4 Unless otherwise indicated below, the Penal Sum of the Payment and Performance Bonds shall be the amount ol
the Contract Sum.
(f Payment or Performance Bonds ate to be in an anount other than 11tr% of the Contract Sum, indicate the dollar
amount or percentage of the Contract Sum.)
g 7.2Time of Delivery and Fom of Bonds
$ Z.Z.t fl. Bidder shall deliver the required bonds to the Owner not later than thLree days following the date of
ixecution of the Contract. If the Work is to commence sooner in response to a letter of intent, the Bidder shall, prior to
commencement of the Work, submit evidence satisfactory to the Owner that such bonds will be fumished and delivered
in accordance with this Section 7.2.1 .
$ 7.2.2 Unless otherwise provided, the bonds shall be written on AIA Document A312, Perfiormance Bond and Payment
Bond.
$ 7.2.3 The bonds shall be dated on or after the date ofthe Contract.
$ 7.2.4 The Bidder shall require the attomey-in-fact who executes the required bonds on behalf of the surety to affix to
the bond a certified and current copy of the power of a$omey.
ARTICLE 8 FORM OF AGREEMENT BETWEEN OIVNER AND CONTRACTOR
de€sm€n*€'i
,1 ,AJA Deeunrer* Al0lru ?91?; Unless othenvise required in the Bidding Documents. the Agreement
for the Work will be written on AIA Document 4101. Standard Form of Agreement Between Owner
and
,2 lU^Deewnen+r\l0lrM 201?,D;dribitrtkrsrsan€eeEdBerCs;unlessetl€rwbestetedbelew,
(huer t tlee eenelete ={'1 Deement numbeh iti,e'lu#lng year; and Deeumettt title,)
,3 IJA Deerrnent A20Fu 2gl?; General eerCitiens ef the eentreet fer eenskuetion; nrdess etherwise
stetedbelet*'
(qwfi the ee,*pletu '4J,1 Da€ament fiumbet hgladint leat aqd Deanment title,)
,1 nJAD€€r*n€nt E303rM 2013; Buildir€ Infermatie*Aledclin€ en€l Digi{slDeta lit*}ibiq dstBd es
hCiested$€ler++W
S--+re*.ings
Ncmber
S---Speeige*iens
Sedien
Ti{o
+i{l€
Dele
Sate Pag€s
AIA Docunent Al01 - 2018. copyright @ L91at 1914,
"tnerican Institute of Architects," "AIA,' the AIA
Architects. This draft was produced at 09i50:34 pT
is licensed for one-tine use only, and nay only be
copycight violations, e-EaiI docinf ol3aiacontracts'coa
urel lotar:
LglB, Lg}'?,199? and 2018- AII rights reserved. "The Merican Institute of Architects,"
Logo, 6nd "AIA controct Docudents- are tradenarks of the Anerican Institute of
on 05/L3/2024 under Order No-410424304? uhich expires on 06/lo/2a24, is not for resale'
used in accordance uith the ATA contract Docunentg'ftrm3 of service. b repoat
7
Kittitas County - Lower ValleY
Transfer Station
r9452442591
lnstructions to Bidders
(AlA Document A701)
June 18,2024
7of8
#-addendsr
l,lufibef DelE Teg€s
S----€the*E*Hbitsr
(€\rc& all berees that Wb and itlr'laCe Wrep iate *tfe'rrltatien idendfrit8 tlrc e*ltibit nls e t equit e&)
I l llJADeewnentE2elru@
@
Title Sate Pag€s
t 1 Suppl€mentery srC e*ter C
Deeimst TiS€D*e PaCee
W
(Ltsthere a,ry eddtttetml fu% n
Beanfletq*)
I Contractor Where the Basis of Payment Is a Stipulated Sum.
AIA Docunent A?01 - 2018. Copyright @ 1970, t914,
"Anecican rnstitute of Architects," "AIA/" the AR
Architects. This dEaft ,as produced at 09:50:34 PT
i.s licensed for one-tire use only, and nay only be
copyright violations, e-naiI docinf,o@aidconttacts'co6grar lotar:
1918, lg87' 199? and 2018- AII rights reserved. "The herican Institute of AEchitects,'
!ogo, and 'AIA Contract Docu[ents' aEe tradenarks of The ]\nerican Institute of
on 05/L3/2024 under order No.410424304? uhich expiies oa 06/f0/2024, is not for tesale.
used in accordance uith the AII contract Docunentst rerns of service. To report
8
Kittitas County - Lower ValleY
Transfer Station
t9452442591
I nstructions to Bidders
(AlA Document A701)
June 18, 2024
8of8
sEcfloN 00 00 03.1
SUPPLEMENTARY INSTRUCTIONS TO BIDDERS
The following Supplementary lnstructions to Bidders modify, delete or expand on the requirements as published
in AIA Document A701 - 2018 "lnstructions to Bidders." Where any article, paragraph, or subparagraph is
modified, the unaltered portions shall remain in effect as published,
ARTICLE 4 - SUBMISSION OF BIDS4.2.1 DELETE the first sentence and INSERT the following:
Each Bid shall be accompanied by a bid security in the form and
amount required on the Bid Form.
4.4.1 ADD the following:
Bidders agree not to modify, withdraw or cancel bid proposals for a
period of sixty (60) days after date set for receipt of bids.
ARTICLE 5 - CONSIDERATION OF BIDS
5.1 ADD new subparagraphs and clauses as follows.
5.1.1 Per Chapter 39.12 RCW, Bidder shall provide the names of all
subcontractors whose subcontract amount will be more than ten
percent (10%) of the contract price and with whom the Bidder, if
awarded a contract, intends to subcontract for performance of the
categories of work designated on the submitted list.
ARTICLE 6 - POST BID INFORMATION6.3.1 DELETE as printed and INSERT the following:
The Bidder shall, within 5 working days of the date of written notification
of consideration for award of a Contract, furnish to the Owner through
the Architect in writing:
ARTICLE 7 - PERFORMANCE BOND AND PAYMENT BOND
7.1.1 REVISE the first sentence to read as follows:
The Bidder shall furnish bonds covering faithful performance of the
Contract and payment of all obligations arising thereunder.
7.1.2 DELETE as printed and INSERT the following:
The cost of furnishing such bonds shall be included in the Bid
7.2.2 DELETE as printed and INSERT the following:
Bidder will be required to furnish satisfactory Performance Bond and
Payment Bond, each written in the amount of 100% of the contract
price, on contract form AIA Document A312, Performance Bond and
Payment Bond, latest edition by a qualified surety. All subcontractors
shall be bondable.
END OF SUPPLEMENTARY INSTRUCTIONS TO BIDDERS
Kittitas County - Lower ValleY
Transfer Station
Supplementary lnstructions
to Bidders
June 18, 2024
1of1
sEcTloN 00 00 04
BID PROPOSAL FORM (ADDENDUIU NO.ll
FOR: Kittitas County - Lower Valley Transfer Station
TO: Kittitas County Board of
Commissioners 205 W.
5th Ave., Suite 108
Ellensburg, Washin gton 98926-2887
1. EXAMINATION OF DOCUMENTS
A,
B. Receipt of Addenda numbered \ to
2. COMPLETION OF BID PROPOSAL:
Having carefully examined all Bidding Documents entitled Lower Valley
Transfer Statioh dated June 18,2024, as prepared by SCS Engineers,
as well as the site and local conditions atfecting the work, the
undersigned proposes to perform all work in accordance with the
Contracl Documents for a compensation to be computed from the
enclosed bid amounts.
A.
s hereby acknowledged
Follow all bidding procedures and other requirements of lnstructions to
Bidders, Supplementary lnstructions to Bidders and all Contract
Documents.
Contractor shall provide State of Washington contractor license and
classification.
License Classification
License No.
3
: 6t,reo'r,\ffi
4. BID SECURITY: Bid Security as required by Bidding Documents is attached
to this Bid Proposal Form in the amount of 5% of Base Bid'
5. AWARD OF CONTRACT:
lf written notice of acceptance of all or part of this proposal is mailed,
telegraphed, or delivered to undersigned within 30 days after opening
of pioposals, the undersigned will, within 10 days after date of such
noiice, execute and deliver the Form of Agreement as specified and
furnish lnsurance Certificates, Performance Bonds and Labor and
Material Payment Bonds as required.
The undersigned hereby designates his office of record to which notices
may be mailed, telegraphed, or delivered as:
ft.r- t 5w' *h [''nvr.\br \.r.c-\r *, , \rr,
A.
B
Be a\, z\
1of 3
LiiA
Kittitas County - Lower ValleY
Transfer Station
Bid Proposal Form
June 18, 2024
c.lf the undersigned fails to complete the above requirements, total
amount of Bid Security shall be forfeited to the Owner.
6. CONTRACT TIME:
A.Work shall be substantially complete and ready for Owner's use within
450 calendar days of Notice to Proceed.
Liquidated Damages. Should the Contractor fail to complete the Work
within the ContractTime, as revised by approved extensions, the Owner
shall reserve the right to assess the Contractor liquidated damages in
the sum of five hundred dollars ($SOO1 per calendar day or as modified
in the Contract until such time as the Work is substantially complete.
See Section 8,24 of lhe Supplementary General Conditions for
additional requirements for Liquidated Damages.
7. BID AMOUNTS:
A. The bid amounts provided shall not include Washington State Sales Tax,
B. The bid amounts shall be written out in words as well as figures. ln
case of discrepancy, the written form takes precedence over the
numerals.
8, BASE BID:
Contractor shall complete the Bid Schedule in Section 00 00 04.1 and insert Base Bid total
below.
A. Base Bid:
B.
o
s I (-r1?c/, ?3q. 0o
(Numerical)
/r"*4
All Subcontractors, or Sub-subcontractors with whom a contract in an amount
greater than 1O% of the total Base Bid is anticipated, must be listed below for
consideration for Award of Contract. List name of Subcontractor category of
Work intended to be performed by their respective forces, and the dollar value
of their portion of the Work.
Subcontractor Contract Amount
f,rv.,wlflco * € $,e Sxee ,sr eJ ($ 3@, oeo , oo I
9*''u^€sntsrdb ($ibo,oao.oor
R
Kittitas County - Lower ValleY
Transfer Station
t
.oo
/ t/O, @q e6 )
B
Bid Proposal Form
June 18,2024
2of3
l,100,o&"9O1
z0
g /t$erffi@'t
)
ocK
c.
(r. c4 s)Yv\r
&
10. SUBMITTED BY:
BIDDER*'d \^u
BY T3v \\e. \
TI
ADD c €:
C.t\^x-ttc rrcrrl t1e
CITY, STATE, ZI Pz\f.n SV;tLr t13 .],\,
TELEPHON .< - O-'t q1
't* NOTE: lf a Corporation, write State of lncorporation under signature, if a
Partnership, give full names of all Partners,
END OF BID PROPOSAL FORM
Kittitas County - Lower ValleY
Transfer Station
Bid Proposal Form
June 18, 2024
3of3
Kittitas County
lower Valley Transfer Statlon
sEcfloN 00 00 04.1
8ld Schedule - Addendum No.4
SCS Engineers
Contfactor Nam€:
8id ltem uoM@
quantityffi
L Mobilization/Demobiliration (5% Maximuml t5 I I
2 Proiect SurvevlnE L5 L 196-oO
3 Qualitv Control Testing LS 1 -?'tt@rOO
4 soil Eroslon and Sedlment Control L5 1 J
civll/Slt€work
5 ear and Grub AC 3A t t'f 1f ^n).nn
5 Unsultable Soils - Excavation CY 49.000 -r.tdA?-^( al tr 4*> a^
7 ubsrad€ Preoaration 5Y 45,400
I 6eotextiles SY s5,400
9 Fill CY 82.300 n, *.1 4aQ A<I 6. ;-tJ
10 Crushed Surface Ease course - 5"SY 45,400 ^1,a.<ot(.O. tb
71"Hot Mix Asphalt - 7"5Y 20,200
-nb'/'t6 - .F
72 Hot Mix Asphalt - 4"SY 25..200 ,1,o s?/'LAo.ea
13 site strioinc - Double Yellow LF 6,323 , lt4 ucjl i<. ao
14 LF 12.646 eu,lll t. <o
15 Site SisnaNe L5 7 at96.ta
L6 !ite Concrete L5 7 ' Ato/4,. do 4 *E&. rf,il
17 Site F€ncing - 6' Chainllnk LF 3,975 I
18 site Fencins - Gates EA 8
19 site Seedins AC 30 ttJa/r. a|O oe
20 LandscaDlng ts I
Utilitie3
2L Site Domestlc Water System t5 1
22 Slte Flre water System L5 L
23 Site Sewer System LS 1 J aoO.c8
24 Sit€ Stormwater 5y5tem t5 1
25 Electrical LS 1 tQ lylr).oo l-, a- t 3tr6- att
tl
fransfer 6ulldlnr
26 Concrete ts L
Miscellaneous Metals LS L o
'4,,,s.o
0b-n6
Page 1 of 2
Kittitas County
lower Valley Tranefer Station
SECTTON 00 00 04.1
8ld Schedule - Addendum No. 4
Page 2 ot 2
SCS Engineers
q
4A<a tA-a6 Z.*>SLoDo oa2APre-Ensineered Metal Buildine {PEMB)LS I al.l to0- 6tLS1. -QC,J GEN EO29Ereak Room
ts I ?Et W.oa 2 6'r- aor 6A30Mechanical/Plumbine
l ,lr *+d-rt t t\?-' ooo. oGFire Protection Svstem ts L1L
LS I 4i- aaa.a 4at 'DOb A'n-32 Misting Svstem
I -, 14 a6a an 4 qr" naa. a o33LS1
Comoostinr Aret
LS 1 1<< gg6,@ ssFl tao,oi34ASP " Concrete Walls and Pad
7 Ql-(tj ata o.,?r- f-i ata.taAsP - Mechanic6l/Electrical LS35
laa-brl nsconcrete Block walls - Portable (2rxz'x6')LS I l3 atoA *a35
1 l!'lJ aaa o^Lt1n D6o h37Contact Water Pond L5
llt4lla ^n ILt4'Aaa-ror^0ffice Bulldins-Prefabricated L5 138
Re6/clins Droo-oft Area
*t4EnO rntsLu'-a-i#clv39Concrete Pad
LS L .Zil 4l.e&n'Llt'moa act40Steel Ramps
Scale House
4.u4 Offi.6,1k1r66, Q6L5L475calehouse
Ltl. I A^^ .r^,Jf- t'a6rA. tbf\L5 742fruck scales
TOTAI. COST L Lba4ua<4 ?O
NTER THIS NUMBER ON ITd[4 IA 6F THE BIO FONM
@
ts ry ffi#@
A1
t1C| 6QQ. 06L51A2MRW Euildine
L\m atott, aOL5IA3fire Drop-Otf Ar€a
') Acl tt &. r4)CY 49.000Hauling Soll to Rye Grass Ldndflll (Plan Quantity) - Haul onlyA4
sEcfloN 00 00 05.1
SUPPLEMENTARY GENERAL CONDITIONS OF THE CONTRACT
ARTICLE 1: DEFINITIONS:
Paragraph t.I.L, CHANGE the last sentence to read:
The Contract Documents include lnstructions to Bidders, Bid Proposal Form, Plans and Specifications, and
Standard Forms and Compliances.
THE CONTRACT DOCUMENTS: ADD the following to Paragraph 1.L'1
It shall be the responsibility of the Contractor and each subcontractor to apprise themselves of all conditions,
limitations and requirements of these documents which are considered a part of each Section of each Division
of this Specification as if printed therein.
LI.LJ ADD the following text and clauses:
Conflicts in the Documents shall be brought to the Architect's attention. ln the event of conflicts or
discrepancies among the Contract Documents, interpretations will be made by the Architect in accordance
with this principle of complementary relationship among documents, with reference to the following priorities
if necessary to reach a conclusion:
.L The Agreement.
.2 National, State and LocalCodes and Ordinances.
.3 The Supplementary Conditions.
.4 The General Conditions of the Contract for Construction.
.5 The Project Manual and any Addenda; Addenda of later date take precedence over those of earlier
date.
.6 The Drawings; drawings of larger scale and greater detail take precedence over drawings of smaller
scale and less detail.
t.1'L.z Should conflict occur in or between Drawings and Specifications, Contractor is deemed to have
estimated the more expensive way of doing work unless he asked for and obtained written decision by
Addenda as to which method or materials will be required.
i..1.1.3 Where the word "similar" occurs on drawings, it shall be used in its general sense and not as meaning
identical, and all details shall be worked out in relationship to their location and their connection to
other parts of the work.
L.L.L.4 Where used in conjunction with the Architect's response to submittals, requests, applications,
inquiries, reports and claims by the Contractor, the meaning of the term "approved" will be held to the
limitations of the Architect's responsibilities and duties as specified in the Conditions of the Contract.
ln no case will "approval" by the Architect be interpreted as an assurance to the Contractor that the
requirements of the contract documents have been fulfilled.
THE DRAWINGS: ADD the following to Paragraph L.1.5
Where on any drawings a portion of work is drawn out and remainder is indicated in outline, the drawn out
parts shall apply also to other like portions of the work. Where detail is indicated by starting only, such details
Kittitas County - Lower Valley
Transfer Station
Supplementary General
Conditions of the Contract
June 18, 2024
Lof24
shall be continued throughout the courses or parts in which it occurs and shall also apply to all other similar
parts in the work unless otherwise indicated.
Drawings are in general diagrammatic and do not necessarily show complete details of the work, or materials,
and do not necessarily show the construction sequence that may affect the Contractor means and methods.
The Contractor shall coordinate to sequence the parts to a completed whole.
Add the following Subparagraphs 1.2.4 through L.2.6to 7.2:
I.2.4 Conditions of the Contract shall be read by all prime contractors and by each
subcontractor or sub-subcontractor and shall be considered a part of each section
of the Technical Specifications. Provisions of Contract Documents are binding on
the contractors, subcontractor and sub-subcontractors for all work shown or
indicated on the original Contract Documents plus any additional work authorized
by change order, interpretation or field orders.
1.2.5 The Contractor shall notify the Architect of any condition he finds where, in his
judgment, it will be desirable to modify the requirements to produce the best
results. lf the Contractor fails to make such request, he is deemed to have accepted
the specified and/or detailed method of installation as being adequate to produce
first class, satisfactory work. Should conflict occur in or between drawings and
specifications, the Contractor is deemed to have estimated on the more expensive
way of doing the work unless he shall have asked for, and obtained a written
decision seven (7) calendar days before submission of proposal as to which method
or materials will be required. Manufacturer's equipment specifications are based
on models and/or construction and installation methods prevailing at the date of
invitation and/or advertisement to submit to manufacturer's model and/or
construction changes and other variations from the items specified shall be
furnished and installed at no additional cost to Owner.
1.2.6 Requests by the Contractor for written interpretations and/or detail drawings shall
be made to the Architect in a timely manner such as will allow ample time for their
preparation and delivery without causing delays in the work. Failure of the
Contractor to request needed clarifications and/or his proceeding with affected
work prior to receiving same shall indicate his acceptance of any and all costs
and/or delays required on account of necessary corrections.
ARTICLE 2. OWNER
2.2.5 DELETE as published and insert as follows:
2.2.5The Contractor will be furnished free of charge 5 copies of Drawings and Project Manuals.
Additional sets will be furnished at the cost of reproduction, postage and handling.
ARTICLE 3 - CONTRACTOR
3.2.1 ADD the following text:
lf the Contractor observes any errors, discrepancies or omissions in the Contract
Documents, he shall promptly notify the Architect, requesting clarification. lf the
Contractor proceeds with Work affected by such errors, discrepancies or omissions
without receiving such clarification, he does so at his own risk. Any adjustments
involving such circumstances made by the Contractor, priorto approval by the
Kittitas County - Lower Valley
Transfer Station
Supplementary General
Conditions of the Contract
June 18, 2024
2o124
Architect, shall be at the Contractor's risk and the settlement of any complications
or disputes arising therefrom shall be at the Contractor's sole expense.
3.3 SUPERVTSION AND CONSTRUCTION PROCEDURES: ADD the following subparagraphs to
Article 3.3:
3.3.2 ADD the following text:
Coordinate work of all subcontractors.
3.3.4 Add the following new subparagraph 3.3.4: "The Contractor shall be solely
responsible for any claims for wages or compensations by the Contractor's
employee, agents, representatives, including subcontractors, and shall save and hold
the Owner harmless therefrom."
3.3.5 Add the following Subparagraph 3.3.5: All grades, levels, bench marks, locations and
corners shall be correctly verified by the Contractor.
3.4 ADD the following new subparagraphs and clauses:
LABOR AND MATERIALS: ADD the following subparagraph to Article 3.4:
3.4.I.t The Contractor shall be solely responsible for all materials and
equipment until the completed project is delivered and accepted by the
Owner. The Contractor shall, at his own expense, secure and maintain a
storage area for his materials and equipment."
Add the following Subparagraphs 3.4.2.1 and 3.4.2.2
3.4.2.L After the Contract has been executed the Owner and the Architect will
consider a formal request for the substitution of products in place of those
specified only under the following conditions set forth in the General
Requirements (Division 1 of the Specifications).
.L Required product cannot be supplied in time for compliance with Contract
time requirements.
.2 Required product is not acceptable to governing authority, or determined to
be non- compatible, or cannot be properly coordinated, warranted, or
insured, or has other recognized disability as certified by Contractor.
.3 Substantial advantage is offered Owner after deducting offsetting
disadvantages including delays, additional compensation to
Architect/Engineer for redesign, investigation, evaluation, and other
necessary services, and similar considerations.
3.4.2.2 By making requests for substitutions based on Subparagraph 3.4.3 above, the
Contractor:
.1 represents that the Contractor has personally investigated the proposed
substitute product and determined that it is equal or superior in all respects to
that specified;
.2 represents that the Contractor will provide the same warranty for the
substitutions that the Contractor would for that specified;
.3 certifies that the cost data presented is complete and includes all related costs
under this contract, except the Architect's redesign costs, and waives all claims
for additional costs related to the substitution which subsequently become
apparent; and
Kittitas County - Lower ValleY
Transfer Station
Supplementary General
Conditions of the Contract
June 18, 2024
3of24
.4 will coordinate the installation of the accepted substitute, making such
changes as may be required for the work to be complete in all respects.
3,4.2.3 Submit request for substitution utilizing the Substitution Request Form located
in Section 01 25 00.
3.4.4 After the Contract has been executed, the Owner and the Architect will
consider a formal request for the substitution of products in place of those
specified only under the conditions set forth in the General Requirements
(Division L of the Specifications).
3.4.5 By making requests for Substitutions based on Subparagraph 3.4.3 above, the
Contractor:
.1 represents that the Contractor has personally investigated the proposed
substitute product and determined that it is equal or superior in all respects to
that specified;
.2 represents that the Contractor will provide the same warranty for the
substitution that the Contractor would for that specified;
.3 certifies that the cost data presented is complete and includes all related costs
under this Contract except the Architect's redesign costs, and waives all claims for
additional costs related to the substitution which subsequently become apparent;
and
.4 will coordinate the installation of the accepted substitute, making such changes
as may be required for the Work to be complete in all respects.
3.5 WARRANTY
3.5.L REVISE the sentence "Work, materials or equipment not conforming to these requirements, may be
considered defective." to read as follows:
Work not conforming to these requirements, including substitutions not properly approved
and authorized, shall be considered defective.
3.5.1 DELETE the phrase "lf required by the Architect" from the last sentence so that it reads: The Contractor
shall furnish satisfactory evidence as to the kind and quality of materials and equipment.
3.5.1 Add the following sentence to the end of Subparagraph 3.5'L:
The Contractor shall maintain such warranty for a period of one (1) year from the date of Substantial
Completion of the project not withstanding more extensive warranty requirements specified for certain
elements and products used in the work in which case the longer warranty requirement shall apply.
TAXES: ADD the following to Paragraph 3.6.1:
The contract sum and any agreed variations thereof shall include all taxes imposed by law, and properly
chargeable to the project except Sales Tax. Sales Tax applicable to the contract sum will be collected from the
Owner and shall be paid to the State Department of Revenue by the Contractor in conformance with the law.
State of Washington Sales Tax shall not be included in the bid price, except that the retail sales tax upon sales
and rentals to prime contractors and subcontractors of tools, machinery and equipment, and consumable
supplies, such as hand and machine tools, cranes, air compressors, bulldozers, lubricating oil, sandpaper and
form lumber which are primarily for use by the Contractor rather than for resale as a component part of the
Kittitas County - Lower ValleY
Transfer Station
Supplementary General
Conditions of the Contract
June 18, 2024
4of24
finished structure, shall be included in the bid price. (See WAC-2O-tO7 State Department of Revenue Rule 107)
3.7 PERMITS, FEES AND NOTICES
Delete Subparagraph 3.7.1 and substitute the following:
3.7.1 The Owner will pay for the plan review and building permit fees. The Contractor will
secure and pay for all other permits and governmental fees, licenses and
inspections necessary for proper execution and completion of the Work which are
customarily secured after execution of the Contract and which are legally required
when bids are received or negotiations concluded.
3.7.t.2The Contractor shall pay for the use of municipal or private property for
storage of materials, parking, temporary obstructions, enclosures, opening and
patching of streets, etc., off of the property arising from construction and
completion of work. The Contractor shall furnish to the Owner and the Architect no
later than the preconstruction conference the permit numbers for all trades
working on this project and any other required permits that must be obtained
through governing agencies.
L. lnternational Building Code
2. NFPA Life Safety Code
3. lnternational Plumbing Code
4. lnternational Mechanical Code
5. National Electrical Code
6. Americans with Disabilities Act (ADA)
7. Federal and State Safety Codes as adapted and/or modified by
the State and Local Ordinances
3.9 SUPERINTENDENT
Delete Subparagraph 3.9.1 in its entirety and substitute the following:
3.9.1 The Contractor shall employ a competent superintendent who shall be in attendance at the
Project site during the progress of the Work. The superintendent shall be satisfactory to the Owner
and the Architect and shall not be changed except with the consent of the Owner and the
Architect, unless the superintendent proves to be unsatisfactory to the Contractor and ceases to
be in his employ. The superintendent shall represent the Contractor and all communication given
to the superintendent shall be as binding as if given to the Contractor. lmportant communications
will be confirmed in writing. Other communications will be so confirmed on written request in
each case.
3.9.1.1 Contractor shall be responsible to fully inform his Superintendent of all project
progress, problems, decisions, changes, and deficiencies as they happen.
3.9.1,.2 Unless otherwise agreed in writing, the Superintendent shall remain on the Project
site whenever Subcontractors of any tier are present and not less than eight (8)
hours per day, five (5) days per week unless the job is closed down due to a legal
holiday, a general strike, conditions beyond the control of the Contractor,
termination of the Contract in accordance with the Contract Documents, or Final
Completion is attained. The Superintendent shall not be changed without the
approval of the Owner, which shall not be unreasonably withheld.
The Superintendent shall not be employed on any other project during the course of the work.
Kittitas County - Lower ValleY
Transfer Station
Supplementary General
Conditions of the Contract
June t8,2024
5of24
3.11 DOCUMENTS AND SAMPLES AT THE SITE
Add the following Clauses 3.LL.L.I and 3.LL.L.2 to 3.11.1:
3.L1.1.1 Record drawings shall be kept clean, and notations shall be made using clear,
concise drafting techniques acceptable to the Architect.
3.LL.L.2 The Contractor shall also maintain at the site for availability of the Owner
and/or Architect one copy of all inspection reports and other written
communications from the Architect and/or subcontractors, other prime
contractors, materials suppliers, etc. Delete Subparagraph 3.18.1 and
substitute the following:
3.18.1 Subject to the following conditions, the Contractor shall defend, indemnify, and
hold harmless the Owner, the Owner's Agent, and the Architect and their agents,
employees, and consultants, successors, and assigns, ('lndemnitee') from and
against all claims, damages, losses, and expenses, direct and indirect or
consequential, including costs, design professional fees, and attorney's fees
incurred on such claims and in proving the right to indemnification, arising out of
or resulting from any act or omission of the Contractor, its agents, any of its
Subcontractors and Suppliers of any tier, and anyone directly or indirectly employed by the
Contractor, any Subcontractors or Suppliers of any tier ('lndemnitor').
Add the following Subparagraphs 3.18.1.1and 3.18.t'2to 3.L8.1:
3.L8.1.1 The Contractor will fully indemnify lndemnitee for the sole negligence of
the lndemnitor.
3.L8.1.2 To the extent of the lndemnitor's negligence, the Contractor will indemnify
lndemnitee for the concurrent negligence of the lndemnitor. The Contractor agrees
to be added by the owner or the Architect as a party to any mediation or litigation
with third parties in which the Owner or Architect alleges indemnification or
contribution from the Contractor, any of its Subcontractors or Suppliers of any tier,
any one directly or indirectly employed by any of them, or any one for whose acts
any of them may be liable. The Contractor agrees that all of its subcontractors and
suppliers of any tier will in the subcontracts, similarly stipulate; in the event any
does not, the Contractor shall be liable in place of such Subcontractor(s) or
Suppliers of any tier. To the extent any portion of this indemnification provision is
stricken by a court for any reason, all remaining provisions shall retain their vitality
and effect.
Change existing Subparagraph 3.L8.2 to 3.L8.3 and add the following new subparagraph 3.18.2
3.L8.2 To the fullest extent permitted by law, the Contractor shall indemnify and hold
harmless the Owner, Owner's Agent, and the Architect and their agents and
employees from all suits, action, claims of any character, damages, losses and
expenses, including, but not limited to, attorney's fees, brought on account of any
injuries or damages sustained by any person or property in consequence of any
neglect in safeguarding the work, or through the use of unacceptable materials in
the construction of the improvement, or on account of any act or omission by the
Contractor or the Owner or their employees, or agents, or from any claims or
amounts arising or recovered under the workmen's compensation laws or any other
law, bylaw, ordinance, regulation, order, or decree. During the prosecution of the
work the
Kittitas County - Lower ValleY
Transfer Station
Supplementary General
Conditions of the Contract
June 18,2024
6ot24
Contractor shall be responsible for all damage or injury to any person or property
of any character resulting from any act, omission, neglect or misconduct in the
manner or method of executing said work satisfactorily, or due to the non-
execution of said work at any time, or due to defective work or materials. This
responsibility shall include all claims arising from acts before the date of issuance
of the Certificate of Substantial Completion. Such obligation shall not be construed
to negate, abridge, or otherwise reduce any other right or obligation of indemnity
that would otherwise exist as to any part or person described in this Paragraph
3.18.
Add the following Subparagraphs to 3,18:
3.18.4 A statement stipulating the provision of indemnity coverage shall be included
in the certificate of liability insurance issued to the Owner.
3.18.5 ln any and all claims against the Owner or the Architect or any of their agents or
employees by any employee of the Contractor, any Subcontractor, anyone directly
or indirectly employed by any of them or anyone for whose acts any of them may
be liable, the indemnification obligation under this Paragraph 3.18 shall not be
limited in any way on the amount or type of damages, compensation or benefits
payable by or for the Contractor or any Subcontractor under workmen's
compensation acts, disability benefit acts or other employee benefit acts.
3.18.6 The obligations of the Contractor under this Paragraph 3.L8 shall not extend to the
liability of the Architect, his agents, or employees arising out of (1) the preparation
or approval of maps, drawings, opinions, reports, surveys, change orders, designs
or specifications, or (2) the giving of or the failure to give directions or instructions
by the Architect, his agents or employees provided such giving or failure to give is
the primary cause of the injury or damage.
ARTICTE 4. ADMINISTRATION OF THE CONTRACT
4.2.3 ADD the following text:
lf the Architect believes the work is not being performed in accordance with the
Contract Documents, the Architect will advise the Owner in writing of the specific
deficiencies. Further, the Architect will recommend to the Owner appropriate
actions the Owner should take to correct or mitigate the deficiencies.
ARTICLE 5: SUBCONTRACTORS
5.3 ADD the following new subparagraph:
5.3.1- "lt is the responsibility of any subcontractor whose work must be applied or
installed on or within work of other trades to examine conditions affecting his work.
The subcontractor shall notify the Contractor, in writing, with copy to the Architect,
of any unsuitable or improperly prepared surfaces or conditions. Commencing work
or absence of notification in writing constitutes acceptance of surfaces or conditions
by a subcontractor, and it will be his responsibility to correct any defect in his work
appearing thereafter."
ARTICLE 7 - CHANGES IN THE WORK
7.2 CHANGE ORDERS
Add the following new subparagraphs:
Kittitas County - Lower Valley
Transfer Station
Supplementary General
Conditions of the Contract
June 18, 2024
7 of24
7.2.2 Any Change Order prepared, including but not limited to those arising by reason of
the parties' mutual agreement or by mediation, shall constitute a final and full
settlement of all matters relating to or affected by the change in the work,
including, but not limited to, all direct, indirect, and consequential costs associated
with such change and any and all adjustments to the Contract Sum and Contract
Time. ln the event a Change Order increases the Contract Sum, the Contractor shall
include the work covered by such Change Order in the Application for Payment as if
such work were originally part of the Project and Contract Documents.
7.2.3 Contractor shall promptly respond to Change Order request for proposal within
ten (10) calendar days or such longer period as may be mutually acceptable for
complex changes.
7.2.4 By the execution of a Change Order, the Contractor agrees and acknowledges that
he has had sufficient time and opportunity to examine the change in work which is
the subject of the Change Order and that he has undertaken all reasonable efforts
to discover and disclose any concealed or unknown conditions which may to any
extent affect the Contractor's ability to perform in accordance with the Change
Order. Aside from those matters specifically set forth in the Change Order, the
Owner shall not be obligated to make any adjustments to either the Contract Sum
or Contract Time by reasons of any conditions affecting the change in work
addressed by the Change Order which could have reasonably been discovered or
disclosed by the Contractor's examination.
7.2.5 When requested by the architect, the contractor shall prepare prices for additional
work utilizing Request for Proposal (RFP) Forms.
7.2.6 For ease of administration, the Owner may seek changes in the work via a Proposal
that will address a specific change or similar set of changes. Once agreed to,
individual Proposals will be packaged into a Change Order. The Contractor shall
respond with complete cost estimates to all Proposals within fourteen (14) calendar
days.
7.2.7 The Contractor shall provide a cost breakdown for all adjustments in the contract
sum, i.e. Change Orders, Proposals, and Construction Change Directives using the
methodology described in 7.3.6. Section 7.3.7,7.3.8, and 7.3.9 shall apply to all
changes in the contract including Change Orders and Proposals.
7.3 CONSTRUCTION CHANGE AUTHORIZATION
Delete Subparagraph 7.3.5 in its entirety and substitute the following:
7.3.5 Upon receipt of a Construction Change Authorization, the Contractor shall promptly
proceed with the change in the Work involved, and within five (5) working days,
advise the Architect, in writing, of the Contractor's agreement or disagreement with
the cost or method, if any, provided in the Construction Change Directive for
Kittitas County - Lower ValleY
Transfer Station
Supplementary General
Conditions of the Contract
June 18, 2024
8of24
determining the proposed adjustment in the Contract Sum or Contract Time. lf the
Contractor disagrees, it shall set forth in writing and detail the reasons for its
disagreement and the amount or other terms that is proposes. WITHOUT SUCH
TIMELY WRITTEN NOTICE, THE CONTRACTOR SHALL CONCLUSIVELY BE DEEMED TO
HAVE ACCEPTED THE OWNER,S VALUE OR METHOD OF ADJUSTMENT. ThC
Contractor's disagreement shall in no way relieve the Contractor of
its obligation to comply promptly with any written noticed issued by the Owner
or Architect. The ultimate adjustment shall not exceed the larger amount under
dispute, be it the
Contractor's or the Owner's stated figure. The method of the adjustment shall
then be determined by the Architect on the basis of reasonable expenditures
and savings of those performing the Work attributable to the Change, in strict
accordance with this Paragraph 7.3 and other applicable provisions of the
Contract Documents.
7.3.6lnthe last sentence, delete "recorded as a" and substitute "incorporated into a future"
7.3.7 ln the first sentence, DELETE the phrase " or if no such amount is set
forth . . . a reasonable amount" and INSERT the phrase " in accordance
with Clauses below." Delete the last sentence of Subparagraph 7.3'7 and
substitute the following:
lf the Contractor disagrees pursuant to Subparagraph 7.3.5, or if cost is to be
determined under Clause 7.3.3.3, the Contractor shall keep and present, in such
forms as the Architect may prescribe, an itemized accounting together with
supporting data. ln order to facilitate checking of such quotations, all proposals,
except those so minor that their propriety can be seen by inspection, shall be
accompanied by complete itemization of costs, including labor, materials, and
subcontract costs. Labor and materials shall be itemized in the manner described
below.
When major cost items arise from Subcontractors or Suppliers of any tier, these items
shall also be itemized. Approval may not be given without such itemization. Failure to
provide data within ten (10) calendar days of the Architect's request shall constitute
waiver of any Claim for changes in the Contract Time or Contract Sum. The total cost
of any change including a Claim under Paragraphs L5.1 or 15.2 shall be limited to the
reasonable value as determined by the Architect (subject to appeal through the
dispute resolution procedure of Paragraph L5.3), according to the following. Unless
otherwise agreed in writing by the owner, the cost shall not exceed the lower of the
prevailing cost for the work in the locality of Project, or the cost of the work in the
current editions of the R.S. Means Company, lnc., Building Construction Cost Data.
a. Direct Labor Costs
These are the estimated labor costs determined by either the estimated or actual
number of additional craft hours and the hourly costs necessary to perform the
change in Work; or the unit labor costs applied to the material quantities, providing
the unit labor costs are developed from the above craft cost; whichever is
applicable, according to industry practice.
Kittitas County - Lower Valley
Transfer Station
Supplementary General
Conditions of the Contract
June L8, 2024
9of24
L. Basic Wages
Current hourly wage rates, for all laborers, apprentices, journeyman, crew
foreman, and general foreman performing and/or directly supervising the
Changed Work on the site.
Prior to the first Change in the Work, the General Contractor shall provide, on a
form provided by the Owner, Direct Labor Costs for all pay levels for major
subcontractors and General
Contractor's own forces for review and approval by the Owner and Architect. These
approved rates shall be the basis for all Changes in the Work for the Project.
The premium portion of overtime wages is not included unless pre-approved by the Owner
2. Fringe Benefits
Fringe benefits paid by the Contractor.
3. Workman's lnsurances
Direct contributions to the State of Washington or to other carriers as lndustrial lnsurance.
4. Federal lnsurances
Direct Contributions required by the Federal lnsurance Compensation Act, (FICA);
Federal Unemployment Tax Act (FUTA); and the State of Washington Unemployment'
b. Direct Material Costs
This is an itemization of the quantity and cost of additional materials necessary to
perform the change in the Work. These costs shall be determined by the unit costs
applied to the quantity and extended. The unit costs shall be based on the following:
(1) The net costs after all offered or available discounts or rebates.
(2) Freight costs; express charges; or special delivery costs when applicable.
No lump sum costs will be allowed except when approved in advance by the Architect.
c. Construction Equipment Usage Costs
This is an itemization of the actual length of time construction equipment
appropriate for the Work will be used solely on the change in the Work at the site
times the applicable rental costs as established by the lower of the prevailing rate
published in The Rental Rate Blue Book by Data Quest, San Jose, California, or the
actual rate paid as evidence by rental receipts. Small tools are not considered
equipment and are not separately compensable. Actual, reasonable mobilization
costs are permitted if the equipment is brought to the Site solely for the change in
the Work. lf more than one rate is applicable, the lowest rate will be utilized. The
rates in effect at the time of the performance of the Change work are the maximum
rates allowable for equipment of modern design and in good working condition and
include full compensation for
furnishing all fuel, oil, lubrication, repairs, maintenance, and insurance. Equipment
not of modern design and/or not in good working condition will have lower rates.
Hourly, weekly, and/or monthly rates, as appropriate will be applied to yield the
Kittitas County - Lower ValleY
Transfer Station
Supplementary General
Conditions of the Contract
June 18, 2024
1.0 of 24
lowest total cost. The rate for equipment necessarily standing by for future use on
the Work shall be 5O% of the rate established above.
d. Prime Subcontractor's Proposals
These are payments the Contractor makes directly to Subcontractors for changes
work performed by the Subcontractor of any tier. Subcontractor's cost of Work is to
be determined as in a, b, and c above.
e. Fees
This is the allowance for all combined overhead, profit, and other costs, including
all office, home office, and site overhead (including project manager, project
engineer, and
superintendent's time), and includes delay, acceleration, and impact costs of any
kind, added to the total cost to the Owner of any Change Order, Construction
Change Directive, Claim or any claim for additional work or extra payment of any
kind on this Project. lt shall be strictly limited in all cases to the following schedule:
(1) Fee by the Contractor When actually Performing the Work
A total amount, not to exceed 15% of items a, b, and c above will be allowed.
This is to compensate such contractor for all personnel not defined in a (L)
above; temporary construction facilities; home office costs; office engineering
and estimating costs; and profit plus any other cost incidental to the
performance of the change in work.
(2) Fee by the Contractor or Subcontractors When not Actually Performing the Work
Contractor
(a) A total amount not to exceed 6% of the total amount of Subcontractor's
proposal as defined in item 'd' above will be allowed for the Fee marking up the
Work of the Subcontractor's actually performing the change in the Work.
(b) No direct labor by the Contractor will be allowed added to a Subcontractor's proposal,
Contractor's direct labor, if required, must be submitted as outlined in Direct Labor Costs.
(3) Subcontractor Administering but not Performing the Work
ln the case of a Subcontractor of any tier providing pass-through administration of
a change, i.e., a change in which Work is performed by a lower tier Subcontractor to
a Subcontractor, the administering Subcontract will be limited to a maximum of 6%
Fee on the amount of the changed Work performed by its sub-subcontractor. A
maximum total of 15% Fee will be allowed for administration by the administering
Subcontractors and Contractor combined on Work performed by lower tier
Subcontractors. ln no case shall the total amount of Fee computed on a change,
including that for Contractor, Subcontractor, or lower tier Sub- Subcontractor,
exceed a total of 3O%.
f. Cost of any lncrease or Decrease in Premium by lnsurance and Bond Caused by the Change
(l-) General Contractor's Liabi lity I nsurance
Kittitas County - Lower ValleY
Transfer Station
Supplementary General
Conditions of the Contract
June18,2024
lI of 24
To the above, the costs of any changes in a Contractor's Liability lnsurance arising
directly from changed Work may be added.
(2) Bond
To the above, the cost of the additional premium for the Contractor's bond arising
directly from the changed work may be added. Upon request, the Contractor shall
provide the Owner with supporting documentation from its insurer or surety.
g. Deductive Changes
Items a,b, c, d, and f will be itemized for deleted changes in the Work.
h. Additive Changes and Deductive Changes Together
(1) lf a change in the Work involves both additive and deductive changes, the
appropriate Fee amount allowed will be added to the net difference of items a, b,
c, and d.
(2) lf other additive changed items are included in the same change proposal, the
appropriate Fee allowed is to be applied to these individual changed items.
7.3.LLADD the following subparagraph: Overhead is defined as costs for all non-
craft labor, temporary construction facilities, field engineering, schedule updating,
as-built drawings, home office cost, B&O taxes, office engineering, estimating costs,
small tools, safety, insurance and any other cost incidental to the change in the
Work.
ARTICLE 8 - TIME
8.2.3 The project must be substantially complete and ready for Owner within 450
calendar days of Notice to Proceed.
The Owner will incur serious and substantial special, incidental and consequential
damages if Substantial Completion does not occur within the Contract Time.
8.2.4 Liquidated Damages. The timely completion of this project is essential to the Owner
The Owner will incur serious and substantial special, incidental and consequential
damages if Substantial Completion of the Work does not occur within the Contract
Time; however, it would be difficult if not impossible to determine the amount of
such damages, which could include, for example, personnel and overtime costs,
transportation costs, design fees, governmental fees, storage costs, portable and
off-site rental and lost opportunities. Consequently, provisions for liquidated
damages are included below. The Owner's right to liquidated damages is not
affected by partial completion, occupancy, or beneficial occupancy. The Contractor
shall be responsible for and pay the liquidated damages contained in the Contract
Documents.
.1- lf Substantial Completion is not attained within the Contract Time, liquidated
damages shall be enforced in the amount of 5500 per day for each calendar day
thereafter until Substantial Completion is attained. lf the Owner elects, he may
complete all uncompleted contract work and back-charge the Contractor for all
Kittitas County - Lower Valley
Transfer Station
Supplementary General
Conditions of the Contract
June !8,2024
1.2 of 24
costs incurred including applicable overhead, in addition to collecting the liquidated
damages. For the purposes of this section, "substantial completion" means the
ability to safely utilize the facility for its intended purpose, without interference or
additional risk to persons or property due to any work remaining to be completed,
related equipment, tools and the like.
DELAYS AND EXTENSIONS OF TIME; DELETE Paragraph 8.3.1 and replace with the
following paragraph:
8.3.1 lf the Contractor is delayed at any time in the commencement or progress of
the Work by an act or neglect of the Owner or Architect, or of an employee of
either, or of a separate contractor employed by the Owner, or by changes ordered
in the Work, or by labor disputes, fire, unavoidable casualties or other causes
beyond the contractor's control, or by delay authorized by the Owner pending
mediation, or by other causes which may justify delay as determined both by the
Architect and Owner, then the Contract Time shall be extended by Change Order
for such reasonable time.
Delete the words "and arbitration" from Subparagraph 8.3.1.
ADD new Paragraph 8.3.4
8.3.4 The Contract time shall be adjusted only for changes in the work pursuant to
Article 7, and excusable delay pursuant to this Paragraph 8.3 as determined by the
Architect. ln the event the Contractor requests an extension of the Contract time,
he shall furnish such justification and supporting evidence as the Architect may
deem necessary for a determination as to whether the Contractor is entitled to an
extension of time under this Contract. After receipt of such documentation, the
Architect shall make his findings of fact and so advise the Contractor in writing. The
determination shall be based upon the approved Contractor's schedule current at
the time of the delay.
ARTICLE 9 . PAYMENTS AND COMPLETION
CONTRACT SUM: ADD the following to Paragraph 9.1:
CHANGE Subparagraph 9.1.1 to include the requirement that the Contract Sum and
adjustment thereof shall include all taxes imposed by law except the Washington
State Sales Tax, which will be paid by the Owner to Contractor, who shall pay tax to
the State of Washington in accordance with the law'
9.2 SCHEDULE OF VALUES
Add the following to Subparagraph 9.2.t:
This schedule shall allocate at least I% of the Contract Sum, (in addition to the
statutory retainage described in Subparagraph 9.3.4) to that portion of the Work
between Substantial Completion and Final Completion, to be entitled "Final
Documentation and Project Closeout", which will be paid as part of the final
payment. This requires the Contractor to recognize that the Contractor and its
subcontractors will expend significant costs in bringing the Work from Substantial
to Final Completion, including, for example, the training of Owner's personnel and
submittal requirements of the Contract Documents.
Kittitas County - Lower Valley
Transfer Station
Supplementary General
Conditions of the Contract
June L8, 2024
13 of 24
9.3 APPLICATIONS FOR PAYMENT
9.3.1 ln the first sentence, delete "At least ten days" and substitute "on or before the
date of the last construction meeting of the month, but not less than twenty-one
(21) days..."
Add the following Clause 9.3.1.3 and 9.3.1.4 to 9.3.L:
9.3.L.3 Until substantial completion, the Owner will pay ninety-five (95) percent of the
amount due the Contractor on account of progress payments. 5% will be held as
retainage.
g.3.1.4 Payments to Subcontractors: No payment request shall include amounts the
Contractor does not intend to pay a Subcontractor or Supplier because of a
dispute or other reason. lf, after making a request for payment but before paying
a Subcontractor or Supplier for its performance covered by the payment request,
the Contractor discovers that part or all of the payment otherwise due to the
Subcontractor or Supplier is subject to withholding from the Subcontractor or
Supplier under the subcontract for unsatisfactory performance, the Contractor
may withhold the amount as allowed under the subcontract, but it shall give the
Subcontractor, the Owner, and the Architect written notice of the remedial
actions that must be taken as soon as practicable after determining the cause for
the withholding but before the due date for the Subcontractor/Supplier payment
and pay the Subcontractor/Supplier within eieht (8) working days after the
Subcontractor/Su pplier satisfactorily completes the remedia I action identified in
the notice.
9.3 ADD new subparagraph as follows:
g.3.4lf any obligations enumerated in Subparagraph 9.3.3 above are not promptly paid
(or if any of such liens are not promptly discharged), the Owner may, at his option,
make such payments (and secure such discharge) and charge against the Contract Sum
or otherwise recover from the Contractor the amount of such payments and all costs
(including, but not limited to, attorneys'fees) incurred by the Owner in connection
with such payment (and for securing such discharge).
CERTIFICATES FOR PAYMENT: ADD sentence to Subparagraphg.4.2 to read:
"Payment will not constitute a waiver of any claims by the Owner that the Work fails to
comply with the Contract Documents."
9.6.3 Add the following to Subparagraph 9.6.3:
The Owner, at his discretion, shall have the right to require the General Contractor
to provide an audit of all payments made to Subcontractors and Suppliers. The
Owner shall also have the right to require the General Contractor to furnish
verification of payments made and/or Release of Claims for Payments on Owner-
provided form from each Subcontractor and Supplier with each pay application.
9.6 ADD new subparagraphs 9.5.8 through 9.6.1'4 as follows
Kittitas County - Lower ValleY
Transfer Station
Supplementary General
Conditions of the Contract
June 18, 2024
14 of 24
9.6.8 At Contractor' request upon commencement of the Work, an escrow account
shall be established in a financial institution chosen by the Contractor and
approved by the Owner.
9.6.9 The escrow agreement shall provide that the financial institution will act as escrow
agent, will pay interest on funds deposited in such account in accordance with the
provisions of the escrow agreement and will disburse funds from the account upon
the direction of the Owner as set forth below. Compensation to the escrow agent
for establishing and maintaining the account shall be paid from interest accrued in
the escrow account.
9.6.10 As each progress payment is made, the retainage with respect to that
payment shall be deposited by the Owner in the escrow account.
9.6.L1 The interest earned on funds in the account shall accrue for the benefit of
the Contractor until the completion date named in the Construction Contract or
the expiration of any authorized extension of such date. lnterest earned after
such date shall accrue to the benefit of the Owner. Cost of compensation to the
escrow agent paid out of interest earned shall be borne by the Contractor.
9.6.12 When the Contractor has fulfilled all of the requirements of the Contract
providing for reduction of retained funds, the escrow agent shall release to the
Contractor one-half of the accrued funds but none of the interest thereon. When
the Work has been fully completed in a satisfactory manner and the Architect has
issued a final Certificate for Payment, the escrow agent shall pay to the Contractor
the full amount of funds remaining in the account, including net balance of
interest paid to the account, but less any interest accrued for the benefit of the
Owner, which shall be paid to the Owner.
9.6.13 lf, after Substantial Completion of the Work, final completion thereof is
materially delayed through no fault of the Contractor, the escrow agent shall
make payment to the Contractor as provided in Subparagraph 9.10.3.
9.6.14 No certificate given or payment made shall be evidence of the
performance of the Contract, either wholly or in part, against the claim of the
Owner to the contrary, and no payment shall be construed to be an acceptance
of any defective work which may before or afterwards appear.
9.10.3 INSERT the phrase "in writing" in the first sentence to read as follows:
. . . affecting final completion, and the Architect so confirms in writing, the Owner .
ARTICLE 10. PROTECTION OF PERSONS AND PROPERW
IO.2.L ADD the following new clause:
.4 Contractor shall specifically provide control of on-site pedestrians during all access to
site by construction vehicles or construction material delivery vehicles. Provide all
Kittitas County - Lower Valley
Transfer Station
Supplementary General
Conditions of the Contract
June 18, 2024
15 of 24
vehicles with audible warning signals and guides during the backing of vehicles
ARTICLE ll.INSURANCE
LLl.]-l ADD new text to the end of the clause as follows:
. . . including private entities performing Work at the site and exempt from the
coverage on account of number of employees or occupation, which entities shall
maintain voluntary compensation coverage at the same limits specified for
mandatory coverage for the duration of the Project;
I1.L.I.2 ADD new text to the end of the clause as follows:
. . . or persons or entities excluded by statute from the requirements of Clause 11.1.1.L
but required by the Contract Documents to provide the insurance required by that
Clause;
tL.L.t ADD new Clauses I1.L.L.9 and 11.L.1.L0 as follows:
9 Liability insurance shall include all major divisions of coverage and be on a
comprehensive basis including:
L. Premises Operations (including X, C and U coverages applicable).
2. lndependent Contractors' Protective.
3. Products and Completed Operations.
4. Personal lnjury Liability with Employment Exclusion deleted.
5. Contractual, including specified provision for Contractor's obligation under Paragraph 3.18.
6. Owned, non-owned and hired motor vehicles.
7. Broad Form Property Damage including Completed Operations.
.10 lf the General Liability Coverages are provided by a Commercial General Liability
Policy on a claims-made basis, the policy date or Retroactive Date shall predate the
Contract; the termination date of the policy or applicable extended reporting
period shall be no earlier than the termination date of coverages required to be
maintained after final payment, certified in accordance with Subparagraph 9.10.2.
Regardless of termination date of insurance all coverages should extend to the end
of any applicable limitations (Statue of Limitations).
1,1,.7.2 ADD the following clause:L The Contractor shall secure and maintain in effect at all
times during performance of the Work such insurance required by Subparagraph
tLl.L and/or as stated below, to protect the County ("Owner"), Contractor, its
Support and the Additional lnsureds from all claims, losses, harm, costs, liabilities,
damages and expenses arising out of personal injury (including death) or property
damage that may result from performance of the work or this Agreement, whether
such performance is by Contractor or any of its Support. All insurance shall be issued
by companies admitted to do business in the State of Washington and have a rating
of A-, Class Vll or better in the most recently published edition of Best's Reports unless
otherwise approved by the County. lf an insurer is not admitted, all insurance policies
and procedures for issuing the insurance policies must comply with Chapter 48.15
RCW and 284-75 WAC.
Kittitas County - Lower Valley
Transfer Station
Supplementary General
Conditions of the Contract
June L8, 2024
1.6 of 24
The Contractor shall provide proof of insurance for:
ffi Commercial General Liabilitv lnsurance
Coverage limits not less than:
Kittitas County - Lower Valley
Transfer Station
o $5,000,000 per occurrence
o $1,000,000 products & completed operations aggregate
o $1,000,000 personal and advertising injury, each offense
o Certificate Holder - Kittitas County
o The Certificate must name the County as additional insured
o Sixty (60) days written notice to the County of cancellation of the insurance policy
ffi Commercial Automobile Liabilitv lnsurance (if ANY use of vehicle in performance)
Automobile Liability for owned, non-owned, hired, and leased vehicles (MCS 90
endorsement and a CA 9946 endorsement must be attached if 'pollutonts' ore to be
transported)
r Coverage limits not less than:
o $1,000,000 combined single limit
' Thirty (30) days written notice to the County of cancellation of the insurance policy.
Workers'moensation
Workers' Compensation in amounts required by law
X Stop Gap/Emplovers Liabilitv
Coverage limits not less than:
o $L,000,000 each accident
o $1,000,000 disease - policy limit
o $1,000,000 disease - each employee
r ThirtV (30) days written notice to the County of
cancellation of the insurance policy.
X Professional Liabilitv
The Contractor and/or its Subcontractor and/or its consultant providing
professional services shall provide evidence of Professional Liability lnsurance
covering professional errors and omissions. Such policy must provide the
following minimum limits:
Sl,ooo,ooo per claim
Supplementary General
Conditions of the Contract
June t8,2024
L7 ot 24
. 52,000,000 annual aggregate
. lf insurance is on a claims-made form, its retroactive date, and that of all
subsequent renewals, shall be no later than the effective date of this
Agreement.
E Propertv Damage
The Contractor shall provide a policy that covers damage to Kittitas County
facilities, including buildings, equipment, grounds, etc. Such policy shall
provide the following minimum coverage:
r $1,000,000 per occurrence
ffi Umbrella Coveraee
Umbrella policies shall provide coverage at least as broad as specified for
underlying coverages (CGL, Auto, Employer's Liability) and cover those
insured in the underlying policies, including additional insured.
o Amount required for this Agreement: $5,000,000
Contractor shall furnish the County a Certificate of lnsurance to include the Policy
Endorsements/Exclusions as evidence that policies providing insurance required by this
Agreement are in full force and effect. Contractor hereby waives all rights of recourse,
including any right to which another may be subrogated, against Kittitas County for
personal injury, including death, and property damage. Contractor's insurance policies
required above shall be primary insurance and shall be non-contributing with any other
insurance maintained by Kittitas County.
The Contractor shall assume full responsibility for all loss or damage from any cause
whatsoever to any tools, Contractor's employee-owned tools, machinery, equipment, or
motor vehicles owned or rented by the Contractor, or the Contractor's agents, suppliers or
contractors as well as to any temporary structures, scaffolding and protective fences.
The Contractor shall have sole responsibility for ensuring the insurance coverage and limits
required are obtained by subcontractors.
NOTE: No contract shall form until and unless a copy of the Certificate of lnsurance
with Endorsements/Exclusions, properly completed and in the amount required, is
attached hereto. Failure of the Contractor to fully comply with the above insurance
requirements during the term of the Agreement shall be considered a material breach of
contract and cause for
immediate termination of the Agreement at the County's discretion. Alternatively, the
County may procure and maintain, at the Contractor's sole expense, insurance to the
extent deemed proper up to the amount of the required coverage(s). The County may
offset the cost of such insurance against payment due to the Contractor under this
Agreement.
L1".3.L REVISE the first sentence by deletion of the phrase "Unless otherwise provided, the
Owner" and insert text to read as follows:
Kittitas County - Lower ValleY
Transfer Station
Supplementary General
Conditions of the Contract
June 18, 2024
L8 of 24
The Contractor shall purchase and maintain, in a company
1L.3.L ADD text to the end of the subparagraph as follows:
The form of policy for this coverage shall be Completed Value. lf the Owner is damaged by
the failure of the Contractor to maintain such insurance, then the Contractor shall bear all
reasonable costs properly attributable thereto.
L1.3.L DELETE Clause tt.3.7.2 and Clause 11.3.1.3
11.3.3 DELETE last sentence.
11..3,4 DELETE Subparagraph LL.3.4.
11.3.6 DELETE Subparagraph 11.3.6 as published and INSERT the following:
11.3.6 Before an exposure to loss may occur, the Contractor shall file with the Owner
two certified copies of the policy or policies providing this Property lnsurance
coverage, each containing those endorsements specifically related to the
Project. Each policy shall contain a provision that the policy will not be canceled
or allowed to expire until at least 30 days prior written notice has been given to
the Contractor.
II.3.7 REVISE text by substituting the word "Contractor" for "Owner" at the end of
the first sentence.
1L.3.8 REVISE text by substituting "Contractor" for "Owner" as fiduciary; except that at
the first reference to "Owner" in the first sentence, the word "this" should be
substituted for "Owner's."
11.3.9 REVISE entire text by substituting the word "Contractor" for "Owner" each
time the latter word appears.
11.3.10 REVISE entire text by substituting the word "Contractor" for "Owner"
each time the latter word aPPears.
11.4 DELETE Subparagraph 11.4.1as published and lNSERTthe following
subparagraph and clauses:
LL. .L The Contractor shall furnish bonds covering the faithful performance of the
Contract and payment of obligations arising thereunder. Bonds may be obtained
through the Contractor's usual source and the cost thereof shall be included in the
Contract Sum. The amount of each bond shall be equal to 100 percent of the
Contract Sum.
L The Contractor shall deliver the required bonds to the Owner not later than
three days following the date the Agreement is entered into, or if the Work is to
be commenced prior thereto in response to a letter of intent, the Contractor
shall, prior to the commencement of the Work, submit evidence satisfactory to
the Owner that such bonds will be furnished.
Kittitas County - Lower ValleY
Transfer Station
Supplementary General
Conditions of the Contract
June 18, 2024
t9 of 24
2 The Contractor shall require the attorney-in-fact who executes the required bonds
on behalf of the surety to affix thereto a certified and current copy of the power of
attorney.
ARTICLE 13 . MISCELTANEOUS PROVISIONS
TESTING AND INSPECTION: ADD the following subparagraph:
L3.5.1.1 The Owner shall employ and pay for the services of an independent agency, testing
laboratory or other qualified firm to perform services which are the Owner's responsibility as
defined by the lnternational Building Code and the "special lnspection Manual" for the
lnternational Building Code.
13.8 ADD the following paragraph and subparagraphs:
13.8 EQUAL OPPORTUNITY
13.8.1 Comply with Owner's affirmative action programs as well as all other applicable
State of Washington and Federal regulations.
13.8.3 The Contractor shall maintain policies of employment as follows:
13.8.3.L The Contractor and the Contractor's Subcontractors shall not discriminate
against any employee or applicant for employment because of race, religion,
color, sex or national origin. The Contractor shall take affirmative action to
insure that applicants are employed, and that employees are treated during
employment without regard to their race, religion, color, sex or national origin.
Such action shall include, but not be limited to, the following: employment,
upgrading, demotion or transfer; recruitment or recruitment advertising; layoff
or termination; rates of pay or other forms of compensation; and selection for
training, including apprenticeship. The Contractor agrees to post in conspicuous
places, available to employees and applicants for employment, notices setting
forth the policies of nondiscrimination.
L3.8.3.2 The Contractor and the Contractor's Subcontractors shall, in all solicitations or
advertisements for employees placed by them or on their behalf, state that all
qualified applicants will receive consideration for employment without regard to
race, religion, color, sex or national origin.
L3.9 ADD the following paragraph and subparagraphs
13.9 CODES AND LAWS
L3.9.L Comply with applicable provisions of Revised Codes of Washington (RCW),
including but not limited to the following (this listing is not intended to limit
applicable RCWs but to emphasize the following):
1 Wage Rates, RCW 39.1-2.
2 Nondiscrimination, RCW 49.60.
3 Hours of Labor, RCW 49.28.
4 Contractor's Bond, RCW 39,08.
5 Contractor's Regulations, RCW L8.27.
6 Handicapped Provisions, RCW 70.92.
Kittitas County - Lower Valley
Transfer Station
Supplementary General
Conditions of the Contract
June 18, 2024
20 of 24
7 Offshore ltems, RCW 39.25
8 Drug Free Workplace, comply with Federal, State and local laws including Drug-Free
Workplace Act of 1988.
9 Tobacco-Free Environment, RCW 28A.210.310.
10 Safety Standards, RCW 49.17 and Chapters 296-155 WAC.
LL Apprenticeship Utilization, RCW 39.04.320.
The Contractor shall provide the following information to the Owner:
1. Contractor name and address.
2. Contract number.
3. Project name.
4. Contract value.
5. The date of the Contractor's notice to proceed.
L3.9.2 Comply with all applicable Federal, State, County and municipal laws and
ordinances, including but not limited to, the following (latest adopted editions):
1.. lnternational Building Code
2. lnternational Plumbing Code
3. lnternational Mechanical Code
4. National Electrical Code
5. Washington I nd ustria I Safety and Health Administration regu lations.
6. Other Federal and State safety regulations.
7. Washington Administrative Code Chapter 51-20.
8. lnternational Fire Code.
9. Adaptations or modifications of any of the above by State and local ordinance.
13.9.3 The Contractor shall hereby protect and hold harmless the Ownerfrom all damages and extra costs
arising from violation of any laws, rules and regulations.
ARTICLE 15 - CLAIMS AND DISPUTES
Delete Subparagraph L5.1.2 and substitute the following:
15.L.zTime Limits on Claims. A Claim, including those in connection with concealed or
unknown conditions by either party must be made by written notice to the Architect
within ten (10) days from the date of the occurrence of the event or discovery of the
condition giving rise to the Claim or within ten (L0) days from the date that the Claimant
knew or should have known of the event or condition. Unless the Claim is made within
the aforementioned time requirements, it shall be deemed to be waived. The written
notice of Claim shall include a factorial statement of the basis for the Claim, pertinent
dates, contract provisions offered in support of the Claim, additional materials offered in
support of the Claim, and the nature of the resolution sought by the Claimant. The
Architect will not consider, and the Owner shall not be responsible or liable for, any
claims from subcontractors, suppliers, manufacturers or other persons or entities not a
party to this contract. Once a Claim is made, the Claimant shall cooperate with the
Architect and the party against whom the Claim is made in order to mitigate the alleged
or potential damages, delay or other adverse consequences arising out of the condition.
Kittitas County - Lower ValleY
Transfer Station
Supplementary General
Conditions of the Contract
June 1.8,2024
27 of 24
15.L2 ADD the following new clause:
.1 Any claim of the Contractor against the Owner for damages, additional payment
for any reason, or extension of time, whether under the Contract or otherwise,
shall be conclusively deemed to have been waived by the Contractor unless a
timely written claim therefor is made pursuant to and in strict accordance with the
applicable provisions of the Contract, or, if no such provision is applicable, unless
such claim is set forth in detail in writing and received by the Owner within ten
(10) days after the facts upon which such claim is based become known or should
have become known to the Contractor. No act, omission, or knowledge, actual or
constructive, of the Owner or the Architect shall in any way be deemed to be a
waiver of the requirement for timely written notice unless the Owner provides the
Contractor with an explicit, unequivocal written waiver of timely notice.
Add Subparagraph 75.L.4.L as follows:
15.L.4.L Final Payment to Contractor
Acceptance of final payment by the Contractor shall constitute a waiver of Claims as
described in Subparagraph 9.10.4.
Add Subparagraph 75.t.4.2 as follows:
L5.1.4.2 Change Orders
The execution of a Change Order shall constitute a waiver of Claims by the Contractor
arising out of the Work to be performed or deleted pursuant to the Change Order,
except as specifically described in the Change Order. General reservations of rights will
be deemed waived and void.
CLAIMS FOR ADDITIONAL TIME: ADD the following to Paragraph L5.1.5.2:
Source of the weather data to be used in documenting weather delays will be NOAA
(National Oceanic and Atmospheric Administration).
L5.2.2lNSERT the phrase "in writing" in the first sentence to read as follows:
The initial decision maker will review Claims and within ten days of the receipt of the claim
take one or more of the following actions in writing:
L5.2.4lNSERT the phrase "in writing" in the first sentence to read as follows: lf the initial
design maker requests a party in writing to provide a written response to a Claim or to
furnish additional supporting data, such party shall respond, within ten days after receipt
of such request, and shall either (1) provide a written response on the requested
supporting data, (2) advise the initial decision maker in writing when the response or
supporting data will be furnished or (3) advise the initial decision maker that no
supporting date will be furnished. Upon receipt of the response or supporting data in
writing, if any, the initial decision maker will recommend to the Owner whether to reject
or approve the Claim in whole or in part.
L5.2.7 REVISE the last sentence to read as follows: "lf the claim relates to a possibility of a
contractor's default, the Owner shall notify the surety and request the surety's assistance in
resolving the controversy."
Kittitas County - Lower Valley
Transfer Station
Supplementary General
Conditions of the Contract
June 18, 2024
22 of 24
Delete Subparagraph 15.2.8 in its entirety
Add the following to subparagraph 15.2:
LS.2.g The Contractor shall submit all Claims to the Owner and the Architect in writing
within ten (10) days of the discovery of the event(s) giving rise to them and shall include a
clear description of the Claim, the proposed change in the Contract Sum and/orTime of
the Claim, and provide data supporting the Claim. The Claim shall be deemed to include
all direct and indirect changes in cost and in time to which the Contractor as well as
Subcontractors and Suppliers of any tier are entitled. Prior to the initiation of the dispute
resolution procedure, the Owner or its representatives shall have the right to audit and
copy the Claim-related books and records of the Contractor and of any Subcontractor or
Supplier of any tier whose claim is a part of or included in the Claim. The claim of a
Subcontractor or Supplier of any tier may be brought only through the Contractor and
only after the Contractor notifies the Owner in writing that the Contractor has reviewed
the Claim and believes to be meritorious.
1.5.3 MEDIATION
ln Subparagraph L5.3.2 delete the third sentence.
Add the following to Subparagraph 15.3
L5.3.4 Mediation
lf the Claim is not resolved in the dispute resolution procedure, neither the Contractor
nor any Subcontractor or Supplier of any tier many bring a claim against the Owner in
litigation unless the claim is first subject to nonbinding mediation before a single mediator
under the Voluntary Construction Mediation Rules of the American Arbitration
Association. This requirement cannot be waived except by an explicit written waiver
signed by the Owner and the Contractor. An officer of the Contractor and the
Superintendent of the Owner, both having full authority to settle the claim, must attend
the mediation session. To the extent there are other parties in interest, such as the
Architect, Subcontractors or Suppliers of any tier, their representatives, with full authority
to settle the claim, shall also attend the mediation session. Unless the
Owner and the Contractor mutually agree in writing otherwise, all unresolved Claims
on the Project shall be considered at a single mediation session which shall occur
prior to Final Acceptance by the Owner. The Contractor is responsible for initiating
the mediation procedure.
15.3.5 Litigation
The Contractor may bring no litigation on claims unless such Claims have been
properly raised and considered in the procedures of Subparagraphs 15.2.L through
15.2.3 above. All unresolved Claims of the Contractor shall be waived and released
unless the Contractor has complied with the time limits of the Contract Documents
and litigation is served and filed within the earlier of; (a) 120 days after the Date of
Substantial Completion designated in writing by the Owner, (b) 60 days after Final
Acceptance. (These dates will be tolled during the pendency of a mediation
Kittitas County - Lower ValleY
Transfer Station
Supplementary General
Conditions of the Contract
June 18, 2024
23 of 24
proceeding.) This requirement cannot be waived except by an explicit written waiver
signed by the Owner.
15.3.5 The Contractor shall diligently carry on the Work and maintain the Contractor's
Construction Schedule during any dispute resolution proceedings, unless otherwise
agreed by it and the Owner in writing.
15.4 Arbitration
Delete entirely all Subparagraphs in 15.4.
END OF SUPPTEMENTARY GENERAL CONDITION
Kittitas County - Lower ValleY
Transfer Station
Supplementary General
Conditions of the Contract
lune 18,2024
24 of 24
Unanticipated Find Plan Language
Post copies of this plan throughout the construction area.
lf ground-disturbing activities encounter human skeletal remains during the course of construction,
then all activity will cease that may cause further disturbance to those remains. The area of the find
will be secured and protected from further disturbance.
The finding of human skeletal remains will be reported to the county medical examiner/coroner and local
law enforcement in the most expeditious manner possible. The remains will not be touched, moved, or
further disturbed.
The county medical examiner/coroner will assume jurisdiction over the human skeletal
remains and make a determination of whether those remains are forensic or non-forensic.
lf the county medical examiner/coroner determines the remains are non-forensic, then they will report
that finding to the Department of Archaeology and Historic Preservation (DAHP), who will then take
jurisdiction over the remains.
The DAHP will notify any appropriate cemeteries and all affected tribes of the find. The State Physical
Anthropologist will make a determination of whether the remains are lndian or Non-lndian and report
that finding to any appropriate cemeteries and the affected tribes. The DAHP will then handle all
consultations with the affected parties regarding the future preservation, excavation, and disposition of
the remains.
ln the event any archaeological or historical materials are encountered during project activity, work in
the immediate area (initially allowing for a L0' buffer, this number may vary by circumstances) must
stop, and the following actions must be taken:
t. lmplement reasonable measures to protect the discovery site, including appropriate
stabilization of covering.
2. Take reasonable steps to ensure the confidentiality of the discovery site.
3. Take reasonable steps to restrict access to the discovery site'
The project proponent will notify the concerned Tribes and all appropriate county, state, and federal
agencies, including the Department of Archeology and Historic Preservation (SHPO for Washington). The
agencies and the Tribe(s)will discuss possible measures to remove or avoid cultural material. They will
reach an agreement with the project proponent regarding actions to be taken and the disposition of the
material.
See Revised Code of Washington, Chapter 27.53, "Archaeological Sites and Resources," for applicable
state laws and statutes. See Washington Executive Order 21-02 (formerly 05-05) "Archaeological and
Cultural Resources." Additional state and federal law(s) may also apply.
When to stop work:
Construction work may uncover previously unidentified Native American or Euro-American artifacts. This
may occur for various reasons but may be associated with access restrictions during project
development or if the area contains impervious surfaces throughout most of the project area, which would
have prevented standard archaeological site discovery methods.
Work must stop when the following types of artifacts and/or features are encountered:
Native American artifacts mdy include (but are not limited to):
o Flaked stone tools (arrowheads, knives, scrapers, etc.)
o Waste flakes that resulted from the construction of flaked stone tools.
e Ground stone tools like mortars and pestles.
o Layers (strata) of discolored earth resulting from fire hearths. lt may be black, red, or mottled
brown and often contain discolored, cracked rocks or dark soil with a broken shell
o Human remains
o Structural remains- wooden beams, post holes, fish weirs
Euro-Americon ortifdcts may include (but are not limited to):
o Glass (from bottles, vessels, windows, etc.)
o Ceramic (from dinnerware, vessels, etc.)
o Metal (nails, drink/food cans, tobacco tins, industrial parts, etc.)
o Building materials (bricks, shingles, etc.)
. Building remains (foundations, architectural components, etc')
o Old Wooden Posts, pilings, or planks (these may be encountered above or below water)
r Even what looks to be old garbage could very well be an important archaeological resource
o Remains of ships or sea-going vessels, marine hardware, etc.
o Old farm equipment may indicate historic resources in the area
When in doubt, call it in!
CONTACTS:
Project Proponent: Kittitas County Solid Waste
Jurisdiction : Kittitas County
Contact Name: Patti Stacey
Phone/Email: 509-962-7542/ Patti.Stacey@co.kittitas.wa.us
Public Works Board (PWB)
Sheila Richardson Broadband Program Director & Tribal Liaison
564.999.t927 or PWBCulturalBevew@commerce.wa.gov
Department of Archeology and Historic Preservation (DAHP)
Rob Whitlam, Ph.D., State Archeologist
350.890.2615 or rob,whitlam@dahp
Confederated Tribes of the Colville Reservation
Guy Moura, Tribal Historical Preservation Office
509.63 4.2695 or Guv.moura(dcolvilletribe.Com
Sauk-Suiattle Indian Tribe
Benjamin Joseph, Tribal Historical Preservation Office
360.436.0333 or bioseph@cauk-suiattle.com
Continued on the next page
Snoqualmie Indian Tribe
Steve Moses, Tribal Historical Preservation Office
425.292.0249 ext 2010 or @
Confederated Tribes and Bands of the Yakama Nation
Casey Barney, Tribat Historical Preservation Office
509.365.5121 ex 4378 or capev barnev@vakama'com
Wanapum Tribe
Honorable Rex Buck, Jr.
s09.764.0s00 x 3113 or lbug&@ggpg&ggg
FINAL GEOTECHNICAL REPORT
KITTITAS COUNTY TRANSFER STATION
ELLENSBURG, WASHINGTON
HWA Project No. 2022-188-2 I
SCS Engineers Inc
June 13,2023
I
GToSCIENCES INC.
Geotechnicql Engineering
Fovement Engineering
Geoenvironmentol
Hydrogeology
lnspection & Testing
IIm
DBE/MWBE
June I 3, 2023
HWA Projecl No. 2022- l8fl-21
SCS Engineers! lnc.
2405 l40rl'Avenue, Suite 107
Bcllcvuc. WA q8(Xl5
Attention: Torn Parkcr, P.E.
Sub.iect Fl ruar, Gt:orr:c'nx lt.:'rt. R rPon'r
Kittitns Clountv'l'ransfer Station Project
Ellcnshurg, Washingtolt
Dcar Tonr,
As authorized, HWA ficosciences Inc, (HWA) has unclertakett a geotechnical investigatit-rn lirr
the proposecl nerv transl'er station in Ellutsburg, Kittitas Counly, Washington' The attached final
report sumrnarizcs the results of'our gcotechnical investigation and pftrvides our geotechnical
rec6nrmendatigns {irr design ancl eonstruction of the new facilities. Pleasc review and comment
al your carliest convcnicnce.
We apprccriate the oppoflunity to ptor,ide geotechnical setvices on this pruject'
Sincersly,
HWA CtroSctr:ruccs IN('.
Steven [']. Creene, t,,[:.Ci,
Senior Engineering 0eologist
Jolyn Cillie P.E.
Geotechnical Engineer, PrinciPal
SE(i:Jt.G:seg
TABLE OF CONTENTS
1.0 INTRODUCTION
1.1 GpNsner..
1.2 Pnorecr DnsczuprloN .........
1.3 ScopB op SenvlcBs AND AuttoRtzRtloN............
2.0 FIELD EXPLORATION AND LABORATORY TESTING..........
2.1 Frcro ExproRRttoN .,..................
2.2 LesoRAroRv TesrING ................
2.3 ExrsrrNc GeorBcnNtcRr DRra..
3.0 GENERAL SITE CONDITIONS............
3.1 SrrBDrscruPrloN
GeNnRer Gporocv
SussuRracs CoNotrtoNs ...........
3.3.1 Soil Descriptions
3.4 GnornlnWerER
3.5 Sons........
4.0 CONCLUSIONS AND RECOMMENDATIONS .
4.I GpNpRRr
4.2 Sersvttc DpstcN PenauernRs.
4.3 LrquerecrloN PoteNriRr
4.4 FotrNpATroNS
4.4.1 Bearing Capacity for Footings .....
4.4.2 Laleral Resistance.............
4.4.3 Settlement
4.5 Froon Srnss
4.5.1 General..
4.5.2 Settlement Considerations for Tipping Floor Slab
4.6 FoorrNc DRerNs
4.7 TneNsrpR SrRnoN RrrerNrNc Wens
4.7,1 Wall Foundations
4.7.2 Lateral Earth Pressures
4.7 .3 Wall Drainage............
4.8 PpnunNrNt FIrr Sropss......
4.9 Cotr,tposr Anre (NonrHwrsr Anre)
4.10UrLrrtes
4.10.1gedding and Pipe Support
4,l0.2Trench Backfill
4. 1 1 PevBIr,teNr CoNsroERATIoNS..
4.lllsubgrade Preparation for Areas to be Paved
4. 1 1.2 Design Traffic Volume....
Page
,..2
...2
..,2
...3
...J
...J
.,,4
...5
...5
3.2
J.J
5
6
6
6
..7
.,7
..7
..7
..8
..9
..9
Iune 13,2023
HWA Project No. 2022-1 88-2 I
4.12.7 Wet Weather Earthworks
5.0 CONDITIONS AND LIMITATIONS...,...
6.0 REFERENCES..
Lrsr or Flcunns (For,lowtNc TEXT)
Site Vicinity Map
Site and Exploration Plan
Geologic Map
Soils Map
Unsuitable Soils Map
Figure B-1
Figures B-2 &B-4
Figure B-5
Figures B-5 & 8-6
Figures B-7 & B-8
Figures B-9 & B-10
4.1 l.3Pavement Structure Requirements ...
4.1 1.4HMA Design Considerations ...........
4. I 1.5 HMA Binder Selection..
4. I 1.6 Pavement Construction.....
4.I L7 Differential Settlement of Roads ......
4. I 2 GrNsneL EARTnwoRK CoNSIDERATIoNS
4.I2.I Subgrade Preparation for Foundations ..'.......
4.l2.2Structural Fill and Compaction ..........,.. "....'.
4.12.3 Ground Water Control.....
4.l2.4Temporary Slope Cuts..........
4.12.5 Temporary Excavations................
4.l2.6Erosion and Sediment Control
......t7
......20
','..,21
)1
......22
.',.,.22
......22
......22
......23
......23
......24
......24
......24
......25
......27
Figure I
Figure 2
Figure 3
Figure 4
Figure 5
Appendices
Appendix A: HWA Exploration Soil Logs
Figure A-1 Legends of Terms and Symbols Used on Exploration Logs
Figures A-2 - A-9 Soil Test Boring Logs
Appendix B: Laboratory Test Results
Summary of Material Properties
Particle-Size Analysis Data Plots
Liquid Limit, Plastic Limit and Plasticity Index of Soils
Laboratory Compaction Characteristics of Soil
CBR (California Bearing Ratio) of Compacted Soils
One Dimensional Consolidation of Soils
Appendix C: Logs of Previous Explorations
Figures C-l through C-5 Soil borings Conducted by Jacobs (2020)
Figures C-6 through C-16 Test Pit Excavations Conducted by Jacobs (2019)
32022-188-21 KCTS - Final Geotechnical Report HWAGEOSCIENCES INC.
FINAL GEOTECHNICAL REPORT
Krrrnls CouNrv Tnc.Nsrnn SrarroN
Er,r,nrvssunc, WISHINGToN
1.0 INTRODUCTION
1.1 GnNnnc,L
This report presents the results of geotechnical investigative work for the proposed new transfer
station and associated improvements for the new Kittitas County Transfer Station in Ellensburg,
Washington, at the location indicated on the Vicinity Map, Figure 1. The purpose of this
investigation was to evaluate the subsurface conditions at the various locations proposed to
accommodate facilities on site and provide geotechnical recommendations for design and
construction of the new facilities. This work was accomplished as part of the SCS design team
effort for the project.
1.2 Pno.lncrDnscnrptroll
The project site for the new transfer station is located adjacent to the Ellensburg Cement
Products facility about 2.5 miles northwest of downtown Ellensburg, Washington (Figure 1).
Access to the property is from Highway 97.
In addition to the transfer station building, improvements consisting of access roadways, a
compost area, scale facilities, recycling and white goods lay down areas, an administration
building, and parking will be constructed. The approximate locations of these new
improvements are shown on the Site and Exploration Plan, depicted on Figure 2.
The existing site access road exits to the east off Highway 97,then continues along the southern
site perimeter before turning north at the southeast property corner. Traffic flow generally
proceeds in a counterclockwise loop that precedes to the scales, then turns west to provide access
to the compost facility and transfer station. An internal access road loops around the transfer
station providing access to the white goods and tire recycling areas before re-connecting with the
main access road west of the scale facility. The recycling area, moderate risk waste (MRW)
building, and administration building are accessed by turning left at a turn-off about 200 north of
the southeast site corner before reaching the scale facility. The scale facility is proposed to
consist of a set of laterally off-set drive-on scales separated by a small island containing the scale
house.
The present design for the new transfer station consists of a structure, comprised of a large,
covered tipping floor (100 x 175 feet), supported by structural filI to achieve the grade separation
necessary to accommodate waste haul trailers, that will receive waste from the transfer station
June 13,2023
HWA Project No. 2022-188-2 I
tipping floor. The tipping floor will be accessed by commercial and self-haulers via a wide paved
driveway ramp that ascends from the perimeter access road southward to the transfer station.
Refuse collected on the tipping floor will be directed by solid waste personnel into a top-loading
system situated above a series of hopper bays located along the eastern side of the structure. To
achieve the grade separation required to accommodate loading waste haul trailers, placement of
fill in excess of l6 feet high is presently envisaged. The fill placed to accommodate the haul
trucks will be retained using a cast-in-place (CIP) concrete retaining wall situated inside the
transfer station near the east side of the facility.
West of the transfer station a 5.07 acre composting facility will be constructed, that will likely
consist of a slightly sloping paved area where compost and/or topsoil is produced. South of the
compost facility another paved area encompassing approximately 10,000 square feet (SF) wiil
serve as a white goods acceptance area with adjacent tire recycling area to the east. Stormwater
will be collected and conveyed to detention ponds situated southwest of the recycling center and
in the southeast property corner.
1.3 Scorr oF SERVIcES AND AurnonzATroN
HWA undertook the geotechnical investigation in accordance with our scope of work and cost
estimate dated December 9, 2022, and agreement dated January 6,2023, with SCS Engineers,
Inc. The main tasks of our scope include:
o Conducting borings at the locations of the transfer station, scale facility, MRW building,
and composting area as depicted on the conceptual layout.
. Conduct a laboratory testing program to characterize site subsoils.
o Prepare a geotechnical report summarizing results of the field investigation, laboratory
testing results and will include recommendations for building and retaining wall
foundations, lateral earth pressures, earthworks, and pavement design.
. Providing one round of plan review to ensure our geotechnical recommendations are
incorporated.
2.0 FIELD EXPLORATION AND LABORATORY TESTING
2.1 Frnr,u Expr,onanon
Our subsurface investigation consisted of drilling eight borings, designated BH-1 through BH-8
and were conducted on February 28 and March 1,2023. The borings were drilled by Holt
Drilling, Inc., of Edgewood, Washington, under subcontract to HWA, using a track-mounted
Diedrich D-50 drill rig equipped with hollow stem augers. The borings were drilled to depths
ranging from about 16.5 to 21.5 feetbelow ground surface (bgs) and were located to obtain
subsurface data atthe approximate location of proposed structures at the time of drilling.
aJ2022-188-21 KCTS - Final Geotechnical Report HWA GEOSCIENCES INC.
June 13,2023
HWA Project No. 2022-188-21
Standard Penetration Test (SPT) sampling was performed at 2.5-foot intervals in the upper
10 feet each boring and at 5-foot interval below 10 feet using a2.}-inch outside diameter split-
spoon sampler driven with a 14O-pound automatic hammer, except at intervals where Shelby
Tube samplers were pushed instead. During the SPT, samples were obtained by driving the
sampler 18 inches into the soil with the hammer free-falling 30 inches. The number of blows
required for each 6 inches of penetration were recorded. The Standard Penetration Resistance
("N-value") of the soil is taken to be the number of blows required for the ftnal 12 inches of
penetration. If a total of 50 blows or more were recorded within a single 6-inch interval, the test
was terminated, and the N-value was recorded as 50 blows for the number of inches of
penetration. The N-value provides an indication of the relative density of the granular soils and
the relative consistency of the cohesive soils.
In selected borings, where soft compressible soils were encountered, thin-walled steel tube
(Shelby Tube) samples were obtained in general accordance with ASTM 2937. The tubes are
bolted on to drill rods and pushed directly into the soil by hydraulic pressure.
The explorations were monitored and logged by an HWA geologist. The approximate locations
of the borings were determined in the field by handheld GPS and are shown on the Site and
Exploration Plan, Figure 2.
Soil samples obtained from the borings were classified in the field and representative portions
were placed in plastic bags and taken to our Bothell, Washington laboratory for further
examination and testing. In addition, pertinent information including soil sample depths,
stratigraphy, soil engineering characteristics, and groundwater occuffence was recorded. The
stratigraphic contacts shown on the boring logs represent the approximate boundaries between
soil types; actual transitions may be more gradual. The soil and groundwater conditions depicted
are only for the specific date and locations reported, and therefore, are not necessarily
representative of other locations and times.
A legend of the terms and symbols used on the exploration logs is presented in Appendix A,
Figure A-1, followed by the boring logs on Figures A-2 through A-9.
2.2 Lanoru.roRYTEsrrNG
Laboratory testing of samples retrieved from our exploratory borings included moisture content,
organic content, Atterberg Limits, particle size analyses, California bearing ratio, and one-
dimensional consolidation testing. Physical and mechanical testing was performed at HWA's
laboratory in Bothell, Washington. All testing was accomplished in general accordance with
ASTM standards, as appropriate. The results of the laboratory testing completed to date are
summarized in Appendix B.
42022-188-21 KCTS - Final Geotechnical Report HWA GEoSCIENCES INC.
June 13,2023
HWA Project No. 2022-188-21
2.3 ExrstrivcGnorncnivrc.llDA,IA,
Site conditions have been explored previously by Jacobs Engineerin g in 2019 and 2020a and
2020b. The initial investigation appears to consist of over 30 test pits (Jacobs, 2019). The
available Groundwater Memorandum discusses the excavation of 15 test pits and installation of
piezometers to measure seasonal groundwater fluctuations. The Memorandum concluded that
seasonal variation in groundwater levels was significant and on the order of 5 to 8 feet over the
course of the local irrigation season from May to October when groundwater levels rose to
within 3 feet or less below the existing ground surface. The report further concluded that
shallow groundwater is a consideration for the design and construction of the new transfer station
(Jacobs, 2020a). Review of the test pit logs indicate that surface soils within the interior of the
site consist of coarse-grained alluvium overlain by a layer of fine-grained silts and clays of
relatively high plasticity and varying organic content that generally thickens from 0 to 10 feet
from the southwest to northeast across the site.
The second investigation consisted of drilling 6 borings around the site perimeter to assess
subsurface conditions and collect data in support a utility extension along the US 97 collector
road into the site (Jacobs, 2020b). The borings were each conducted to depths of 16.5 feet and
samples were obtained using SPT sampling methods as well as from grab samples obtained from
the cuttings. Selected soil samples were analyzedto veriff soil classifications assess soil
properties. The borings indicate that coarse-grained alluvial sands and gravels are overlain by
about 5 feet of medium stiff to stiff, silt at the northwest (B-3), south central (B-5) and southeast
(8-6) corners of the site.
3.0 GENERAL SITE CONDITIONS
3.1 Srrn DpscRrPTIoN
The project site is located along the east side of US 97 and consists of a portion of SW /+ andthe
SE % of Section 28, Township 18 North, Range 18 East. We understand that Kittitas County
owns 50 acres at this location, of which approximately 38.84 acres encompassing the transfer
station development (as shown on Figures I and2). The remaining 10.87 acres (not shown on
Figures I and2),located to the north and abutting the BNSF right-of Way are set aside for future
development of a new lower county vehicle maintenance facility.
The transfer station site topography is relatively flat, and slopes gradually from elevation (EL)
1,556 feet near the northern boundary to EL I,544 feet near the southern boundary. The ground
surface includes several earthen ditches which are roughly 3 to 5 feet deep. The lowest point on
site is EL 1,537 feet at the ditch invert in the southeastern corner (See Figure 2). Previously, the
site was used for agricultural purposes with notable irrigation infrastructure which seasonally
influences groundwater levels. Recently, Kittitas County constructed a new paved two-lane
access road into the site along the southern lot boundary.
52022-188-21 KCTS - Final Geotechnical Report HWA GEOSCIENCES INC.
June 13,2023
HWA Project No. 2022- 1 88-2 I
3.2 GrNsnq,L Gror-ocv
Geologic information for the project area was obtained from the Geologic Map of the Ellensburg
North and Southern Half of the Reecer Canyon 7.5-minute Quadrangles, Kittitas County,
Washington (A.J. Sadowski, et a\,2020). According to this publication, the project site is
underlain by Holocene to Pliocene aged alluvial deposits composed of sand and gravel from
channel deposits on the active flood plain of the Yakima River. To the west, the site is bordered
by modified land (Fill) likely constructed after removal of Holocene to Pliocene non-glacial
deposits consisting of organic and organic rich sediment, peat, muck, silts, and clay that were
deposited in wetland areas that formed in closed depressions on the alluvial plain. The relevant
portion of this map is shown on the Geologic Map in Figure 3.
3.3 SussuRFA,cECoNDITIoNs
3.3.1 SoilDescriptions
Subsurface conditions encountered in the field consisted of I to 1.5 feet of topsoil (agricultural
soil) composed of silty sand to slightly organic sandy silt overlying native alluvial deposits
ranging from sandy lean clay and fat clay to silty sand and poorly to well-graded gravel with silt
and sand. The following are descriptions of soil units encountered during our explorations.
Topsoil (Aericultural Soil): Topsoil consisting of loose silty sand to medium stiff sandy
organic silts containing organic matter and root fragments were encountered at the surface at
all of the boring locations. The topsoil appears to consist of material similar to the
underlying fine-grained alluvial deposits that have been modified for agricultural use. This
layer ranged from 1.5 to about 2 feeL in thickness.
Fine-Grained Alluvium-Beneath the topsoil at all locations, fine-grained alluvial deposits
consisting of medium stiff, sandy silts, to medium stiff to soft clays of moderate to high
plasticity were encountered at all locations. These deposits range from 1.5 to 8.5 feet thick
in our borings and are thickest in the northeast corner of the site in the vicinity of borings
BH-3, BH-4, and BH-5. This soil is likely the result of deposition in shallow depressions or
wetland areas developed on, or marginal to, the floodplain of the Yakima River. These soils
exhibit relatively low strength and moderate to high compressibility. As such, the fine-
grained alluvial soils are not suitable for supporting structures or thick fills. At the locations
of BH-4 and BH-5, the water table was encountered in the lower 0.5 to I foot of this layer at
the time of drilling.
Coarse-Grained Alluvium- The deepest soil units encountered consisted of medium dense
to very dense, gravelly, poorly graded sand with silt or gravelly, silty sands to poorly or
well-graded gravels with silt. Though never fully penetrated by any of our borings, these
deposits were encountered at depths ranging from 3.5 to 10 feet below the existing ground
surface and extend to the termination depths of our borings with layer thicknesses ranging
62022-188-21 KCTS - Final Geotechnical Report HWA GEoSCIsNcss INc
Iune 13,2023
HWA Project No. 2022-188-21
from 5.75 to 17 .25 feet. This soil consists of alluvium deposited in the past by laterally
migrating channels of the Yakima River. These soils exhibit moderate to high strength and
low compressibility. Except at the locations of BH-4 and BH-5, the water table was
encountered in this unit at depths of 7 .5 to 11.5 feet below the existing ground surface
during our explorations.
3.4 Gnouxo W.lrnn
During our subsurface exploration, conducted on February 28,2023, during the winter season,
the ground water table was encountered at depths ranging from 7.5 to 11.5 feet below the ground
surface in our explorations. Ground water surface data collected at the site over an 8-month
period (April to Novemb er,2020a) by Jacobs indicates seasonal variation ranging from 5 to
8 feet depending upon the time of year, with groundwater deepest in early spring and late fall,
and highest during the summer months. Depending upon location, groundwater should be
expected to be within 2 feet of the surface during the summer irrigation season. In view of our
findings and available information, we expect that ground water will be encountered in the sub-
excavation for the scale facility, transfer station, and potentially the MRW and administration
building foundations. Interpreted groundwater sections developed by Jacobs (2020a) indicate
that groundwater surface elevations are sloped down towards the south following the surface
topography.
3.5 Sorr-s
According to the Soils Survey of Kittitas County (available from Natural Resources
Conservation Service (NRCS) - Web Soil Survey online), the project site is predominately
underlain by Cleman very fine sandy loam, 0 to 2 percent slopes, Nanum ashy loam, 0 to
2 percent slopes, Zlllah silt loam, 0 to 2 percent slopes, and Nack-Opinish complex, 0 to
2 percent slopes. These soils form on flood plain and alluvial fans and are derived from alluvial
material with an influence of volcanic ash in the surface. These soils, except for the Cleman
series (Map symbol 424) are considered to be poorly drained and exhibit a shallow groundwater
table, usually with the upper 0.5 to 3 feet below the existing ground surface. The Soils Map for
the site is shown on Figure 4.
4.0 CONCLUSIONS AND RECOMMENDATIONS
4.1 GuNrnlr,
In general, the site is underlain by a veneer of topsoil developed over fine-grained and coarse-
grained alluvial soils. The fine-grained alluvium exhibits low strength and moderate to high
compressibility due to its moisture content, consistency, and plasticity characteristics' The
underlying coarse-grain deposits consisting of sand and gravel generally have high shear strength
72022-188-21 KCTS - Final Geotechnical Report HWA GEOSCIENCES INC.
June 13,2023
HWA Project No. 2022-188-2 1
and are suitable for support of the proposed buildings. The site is also impacted by high ground
water levels during the summer months due to irrigation. Details regarding our
recommendations for design and construction of the proposed improvements are provided in the
following sections.
4,2 Srrsutc DnstcN Panc,Nlnrnns
The contribution of potential earthquake-induced ground motion from known sources is included
in the probabilistic ground motion maps developed by the United States Geologic Survey
(USGS). Design data seismic site charucterization and design recommendations based on USGS
mapping and analysis are implemented in the 20ls International Building Code (lBC). As part
of this code, the design of structures must consider dynamic forces resulting from seismic events.
These forces are dependent upon the magnitude of the earthquake event as well as the properties
of the soils that underlie the site.
As part of the procedure to evaluate seismic forces, the 2018 IBC requires the evaluation of the
Seismic Site Class, which categorizes the site based upon the characteristics of the subsurface
profile 100 feet below the proposed foundation. The Site Class can then be determined in
accordance with Section2}.3 of ASCE 7-16, andthe corresponding values of Fu and Fu
determinedfromTables 11.4-1 and 11.4-2ofASCE7-l6.InSection l1.4.8ofASCE7-16,itis
stated that a site-specific ground motions hazard analysis is required on sites with seismically
isolated structures and structures with dampening systems when Sr greater than or equal to 0.6.
Provided these conditions do not pertain to the proposed structures a site-specifrchazard analysis
is not required. Based on the obtained SPT blow counts noted in our boring logs and
extrapolated to a depth of 100 feet, the site classifies as Site Class "C".
Should the information used as a basis for this design be incorrect, HWA should be notified to
provide appropriate recommendations. The associated probabilistic ground acceleration values
and site coefficients for the general site area were obtained from the Applied Technology
Council Seismic HazardMaps. The risk targeted seismic values and coefficient are presented in
Table l below.
82022-188-21 KCTS - Final Geotechnical Report HWA GEOSCIENCES INC
June 13,2023
HWA Project No. 2022-188-21
Tabte 1: Ground Motion Values, Site Class C*
Period
(sec)
Mapped MCE
Spectral
Response
Acceleration
(e)
Site
Coefficients
Adjusted MCE
Spectral
Response
Acceleration (g)
Design Spectral
Response
Acceleration (g)
0.0 PGA 0.225 Fpct 1.200 PGArra 0.270
0.2 S"0.stz Fo 1.295 .lu"0.663 ,Sp"0.442
1.0 Sr 0.208 F,1.s00 Svt 0.312 Sol 0.208
Notes *20% Probability ofExceedance in 50 yearsfor Latitude 47.0151" and Longihde -120.5912"
PGA : Peakground acceleration
Fpce, : PGA site coeffrcient
PGAv : Maximum considered earthquake geometric mean peak ground acceleration adjusted for Site Class effects
S5 : Short period (0.2 second) Mapped Spectral Acceleration
Sr : 1.0 second period Mapped Spectral Acceleration
Svs = Spectral Response adjusted for site class effects for short period: Fu ' Ss
Srr,rr = Spectral Response adjusted for site class effects for 1-secondperiod = Fu'Sr
Sos = Design Spectral Response Acceleratiou for short period:2/3 ' Sr',rs
Sor = Design Spectral Response Acceleration for l-second period =2/3 ' Srr,rr
F": Short Period Site Coeffrcients
Fu: Long Period Site Coefficients
To = 0.2'SDl/SDs
T.: SDI/SDs
TL = Long Period Transition period
Based on Tables 11.6-1 and 11.6-2 (of ASCET-16), the Seismic Design Category for the site is
,.Drr.
4.3 LrqumLcrloNPorENTIAL
The native fine-grained and coarse-grained alluvial deposits that underlie the project site are
either moderately to highly plastic or dense to very dense and are not generally susceptible to soil
liquefaction. Based on this HWA considered the site soil to have a low susceptibility to soil
liquefaction.
4.4 Foumra,rroxs
We recommend that foundations for the transfer station, the MRW building, the administration
building, and the scale facility be supported on spread footings founded on the underlying
medium dense to dense, coarse-grained alluvium, or properly compacted structural fill placed
directly on native coarse-grained soils. The following sections provide our recommendations for
design and construction of the foundations.
9
Transition
Point
Period
(sec)
To 0.094
Ts 0.470
Tr t6
2022-188-21 KCTS - Final Geotechnical Report HWAGEOSCIENCES INC.
June 13,2023
HWA Project No. 2022-188-2 1
4.4.1 Bearing Capacity for Footings
The proposed structures are located in areas in which the site explorations indicate the presence
of 3 feet to 10 feet of very soft to stiff, potentially compressible, organic topsoil and fine-grained
alluvial soils below the existing ground surface. These fine-grained alluvial soils will not be
suitable for support of the proposed structures. We therefore recommend over-excavating these
soils to expose underlying medium dense to dense coarse-grained alluvial soils. For footings
founded on the coarse-grained native materials, or properly compacted structural fill placed
directly on undisturbed native coarse-grained soils, we recommend using a net allowable bearing
capacity of 3,000 pounds per square foot (psf). For short-term wind and seismic loading
conditions, this allowable bearing pressure may be increased by 33 percent to resist increased
pressures on the edge of the foundation due to over-turning moments, Strip footings should have
a minimum width of 18 inches, and column footings should have a minimum width of 24 inches.
Footings should bear at least 2.5 feet below finished grade to be below the anticipated frost
penetration depth of 24 inches at the site.
4.4.2 LateralResistance
Wind, earthquakes, and unbalanced earth loads will subject the foundation system to lateral
forces which will be resisted by sliding (base) resistance. The frictional force between the native
coarse-grained soils or structural fill and mass concrete can be estimated as 50 percent of the
normal force (a frictional coefficient of 0.5). The friction coefficient is an ultimate value, and we
recommend applying a factor of safety of 1.5 with its use.
4.4.3 Settlement
For footings placed on structural fill placed in accordance with these recommendations provided
in Section 4.12.2, and having subgrades prepared as recommended in Section 4'l2.l,the
foundations would experience up to about % inch of differential settlement over 40 feet where
structural fill depths below the footings are approximately equal. Where the thickness of
structural fill below the footings varies, the differential settlement may be greater. For a
difference of about 10 feet in fiIl depth, differential settlement should be taken as an additional
%-inchand for a difference of about 20 feet of fillheight, an additional I inch should be
assumed. The largest potential for both overall settlement and differential settlement is due to
inadequate preparation/cleaning of the subgrade, and improper backfill and compaction of
structural fill, which is not accounted for in these estimations.
A method to limit differential settlement of smaller buildings placed over structural fill, would be
to cut the base of the excavation to be relatively level and the fill pad built up evenly across the
building footprint. The depth of excavation needed for these structures would likely be
determined during construction once the unsuitable soils have been completely excavated.
2022-188-21KCTS - Final Geotechnical Report 10 HWAGEoSCIENCES INC
June 13,2023
HWA Project No. 2022-188-21
The largest amount of differential settlement between foundations is likely to occur within the
transfer station building at the location of the wall west of the tunnel drive. Design of footings in
this area should take into consideration the abrupt change in settlement that could occur between
the foundations supported near the existing ground surface (on the east side) and those supported
within the fill pad placed to raise site grades up to the base of the tipping floor slab. Methods to
consider would be to structurally isolate foundations between the west and east sides of the wall
such that they can settle independent of each other. Alternatively, foundations could be extended
down to the same elevation and stem walls extended to the ground surface to limit potential for
differential settlement between spread footings.
4.5 Fr,oon Sr,a.ns
4.5.1 General
Grade-supported slabs may be employed for the various facilities, including floor slabs within
the buildings and the transfer station tipping floor. For floor slabs, we recommend the
underlying fine-grain materials be over-excavated and replaced with structural fill, as
recommended for spread footings. Subgrade preparation and structural fill placement for floor
slabs should follow the recommendations in Sections 4.12.1 and 4.12.2'
Grade-supported floor slabs for the various facilities should be placed on at least 6 inches of
freely draining, uniformly graded, crushed rock or washed pea gravel, which will serve as a
capillary break. This capillary break material should have a maximum particle size of 5/8-inch,
and less than l0o/o (by weight) should pass the #20 Standard U.S. sieve. A 10-mi1 (minimum)
thick plastic waterproofing membrane should be placed immediately over the crushed rock as a
vapor barrier. Placement of the vapor barrier should be undertaken with care and construction
activity on the membrane should be limited after placement to limit perforations in the
membrane. Floor slabs supported on a properly prepared subgrade may be designed on the basis
of a modulus of vertical subgrade reaction value of 120 pounds per cubic inch.
4.5.2 Settlement Considerations for Tipping Floor Slab
The tipping floor slab within the transfer station building will be supported by a thick structural
fill pad; however, it will butt up against the tunnel drive wall at the east side of the building. The
wall along the east side of the tipping floor will be founded up to 20 feet lower than the floor slab
and differential settlement between the tipping floor slab and the top of the tunnel drive wall
could be up to about a 1 inch; however, we anticipate that much of this settlement will occur as
the fill is placed. Future settlement after the slab is cast is expected to be small such that large
cracks do not form in the slab, provided drainage is directed away from the foundation of the
slab,
2022-188-21 KCTS - Final Geotechnical Report 11 HWA GEOSCIENCES INC.
June 13,2023
HWA Project No. 2022-188-21
4.6 FoorncDnq,rxs
During periods of high rainfall, ponding of water could occur next to building foundations, and
we recommend that perimeter footing drains be installed around all building foundations.
Footing drains should consist of l00mm (4-inch) minimum diameter slotted plastic pipe bedded
in washed drain rock or pea gravel material. At least 8 inches of drain rock should surround the
drainpipe. Footing drain inverts should be at least 12 inches deeper than the boffom of floor
slabs. Footing drains should discharge into the storm drain system in such away that storm
water cannot backup around the footings and gain ingress beneath floor slab areas. Roof drains
should not be tied into the perimeter drain system, to prevent potential backup into the perimeter
drains during intense storm events. The ground surface around the structures should be graded to
direct surface water away from the structures.
4.7 Tnq,Nsrnn Sr.c.rroN Rrtarnrnc W.ll-r-s
Presently, the transfer station design includes a single-lane tunnel constructed between two CIP
reinforced concrete walls. The eastern wall would be a free-standing wall constructed a few feet
inside the external building shell, and would not retain any fill. The west wall would retain
structural fill placed to support the tipping slab approximately 16 feet above the roadway elevation
of the tunnel drive.
Design of the west wall of the tunnel drive will need to consider the effects of placing and
compacting fill behind the wall as well as how the top of the wall is treated with respect to the
tipping floor slab. Details for design are provided in the following sections.
4.7.1 Wall Foundations
The design of foundations for CIP walls should follow the recommendation provided for spread
footings in Section 4.4.
4.7.2 Lateral Earth Pressures
CIP walls should be designed for the lateral earth pressures associated with their connection
condition at the top of the wall. The earth pressures provided assume properly compacted, well-
drained, granular fill adjacent to the walls. Retaining walls constrained against rotation should
be designed for an at-rest earth pressure equivalent to a fluid weighing 60 pounds per cubic
foot (pcf). Retaining walls allowed to rotate may be designed for an active earth pressure
equivalent to a fluid weighing 40 pounds per cubic foot (pcf). Retaining walls designed for
seismic earth pressures can be designed for active-plus-seismic earth pressures of 55 pcf. This
earth pressure was computed using the Mononobe-Okabe method and a design peak ground
acceleration (PGA) of 0.18 g or 0.4*Sns.
2022-188-21 KCTS - Final Geotechnical Report I2 HWA GEOSCIENCES INC.
June 13,2023
HWA Project No. 2022-188-2 I
For the buried portions of the retaining walls, an allowable passive pressure equal to an
equivalent fluid pressure of 360 pounds per cubic foot may be considered. Passive seismic earth
pressure equal to that generated by a fluid with a unit weight of 250 pounds per cubic foot may
be used in design. The upper 2 feetof passive pressure should be ignored. A factor of safety of
1.5 should be applied to the passive static earth pressure and a factor of 1.1 should be applied to
the passive-seismic earth pressure.
Traffic surcharges should also be included in the wall design, as appropriate. We recommend
that the surcharge pressure from vehicular loading be assumed to be equivalent to an additional
uniform lateral pressure over the entire back of the wall equal to 108 pounds per square foot for a
non-yielding wall and 68 for a yielding wall. This is based on a vehicular load of 250 psf acting
on the slab behind the wall. This traffic load does not account for temporary construction
surcharge loading that may exist above the wall during the course of construction, which should
addressed by the contractor during construction.
4.7.3 Wall Drainage
A minimum 4-inch diameter, perforated, rigid plastic drain pipe should be placed on the up-slope
side at the bottom of retaining walls and be discharged into the local storm drain system or other
suitable outlet. These wall drains should not be connected to the perimeter footing drains in a
manner that would allow water to run from the perimeter drains down into the wall drain. Wall
and foundation drains and roof downspouts should not be tightlined into the same pipe.
4.8 PnnivrnnrNT FILL Sr,opns
Permanent fiIl slopes are planned for the perimeter areas sulrounding the transfer station. All
permanent fills should be no steeper than2H1V. Consideration may be given to providing a
five-foot wide restricted-entry catchment zone along the base of all permanent fills 10 feet or
higher. Movable concrete barriers can be positioned along the outside edge of this zone to
prevent any material that may ravel off the slope from entering an area where it may encounter
vehicles, County personnel and the public. All permanent fill slopes should be protected from
erosion as prescribed in Section 4.12,6.
4.9 Covnosr ARna (Nonrnwosr AREA)
The compost Area is situated in the northwest portion of the site and will consist of a paved
working area roughly 5.07 acres in size that will accommodate grinding, mixing, curing and
storing of composted organic and soil materials. It is anticipated that heavy equipment such as
trommel screens, windrow turners, grinders andtractorlloaders will traverse the pad. Periodic
transfers of material in and out by large tractor trailer haulers are also anticipated. Results of the
soil boring explorations we conducted and review of the pre-existing exploration logs in this area
indicate that the proposed compost pad area footprint is underlain by 4 to 8 feet of topsoil and
2022-188-21 KCTS - Final Geotechnical Report l3 HWA GEOSCIENCES INC.
June 73,2023
HWA Project No. 2022-188-2 1
fine-grained alluvial soils. Additionally, existing plans call for the grade to be raised
approximately 2 feet in this area.
This area is not planned to support any structures and therefore over-excavation in this area is not
desirable from an economic standpoint however it would eliminate the potential development of
dips and sags in pavement placed to support composting activities and minimize future
maintenance costs. Alternatively, consideration could be given to smaller areas of over-
excavation where heavy equipment like the trommel screen or grinder will be parked for years at
a time, thereby minimizing the need for re-leveling of the equipment and pavement repair.
Localizedremoval of settlement prone soils may result in the need for wedge lifts of HMA to be
installed periodically between the fill supported equipment pads and surrounding pavement areas
that remain underlain by alluvial soils.
Partial over-excavation notwithstanding, we recommend that after subgrade preparation is
conducted as described in Section 4.ll.l below. The pavement section should consist of and be
constructed as described in Sections 4.I 1.2 through 4.11.6, below.
4.10 Urrr,Irtps
4.10.1 Bedding and Pipe Support
We currently do not have information regarding proposed utility corridors or proposed invert
elevations. However, due to the presence of soft, compressible subgrade soils we anticipate that
sewer systems that convey gravity flow may develop dips or bellies if supported directly on
compressible subgrade soils. To limit the possibility of developing dips and bellies, over-
excavation of compressible materials could be performed. If over-excavation is not desired,
consideration should be given to designing the pipelines with increased fall that will allow for
proper function of the pipes after as much as 6 inches of settlement occurs along the sewer line.
Flexible connections allowing for rotation and resistance to pulling apart should be constructed
at the points where the pipe transitions of areas with compressible soils to areas where
compressible soils have been over-excavated. Non-settlement sensitive utilities such as
electrical, communication, gas and water can be installed without over excavation provided the
type of pipe and pipe connections can accommodate future settlement.
Utility piping and conduits should be designed with sufficient pipe penetration into manholes
and pull boxes such that they do not pull out as the ground settles. The connections should be
constructed with access vaults to allow for easy access and replacement when needed.
If over-excavation of compressible materials is selected, it will be necessary to over-excavate the
unsuitable material down to coarse granular native subgrade and backfill with pipe bedding
material. In wet conditions, 1-inch minus gravel or permeable crushed rock or similar approved
granular fill may be used to backfill the over-excavatedportion of the trench. Alternatively, the
2022-188-21 KCTS - Final Geotechnical Report T4 HWA GEOSCIENCES INC
June 13,2023
HWA Project No. 2022-188-21
over-excavated areacan be backfilled with controlled density fiIl (CDF) to raise foundations
above wet conditions. Over-excavation to remove compressible soils should extend on either
side of the pipe a distance equal to the depth of over-excavation beneath the pipe.
General recommendations relative to the bedding of underground utility pipelines include:
. Pipe bedding material, placement, and shaping should be in accordance with the project
specifi cations and the pipe manufacturer's recommendations.
. Pipe bedding materials should be placed on relatively undisturbed coarse granular native
soils, or properly compacted fill. If the native subgrade soils are loosened during
excavation, the loosened material should be compacted or removed and replaced with
compacted bedding material. Pipe bedding should provide a ftrm, uniform, support
cradle for the pipe of at least 6 inches thickness.
o Prior to pipe installation, the pipe bedding should be shaped to fit the pipe haunches with
reasonable closeness to provide continuous support along the pipe.
Pipe bedding should extend to at least 6 inches above the top of the pipe, for the full width of the
trench. In areas where a trench box is used, the bedding material should be placed before the
trench box is advanced. Advancement of trench boxes should be performed carefully to prevent
disturbance of the bedding and any backfill.
4,10.2 Trench BackfiIl
Trench backfill should be considered structural fill and should meet the criteria set forth in
Section 4.12.2. However, where pipe trenches exist beneath landscaped areas, backfill
compaction requirements may be reduced, consistent with higher levels of backfill settlement
that may be tolerable.
4.ll PavsNInNr CoNsronnq,TIoNS
HMA (hot mix asphalt) pavement will be required for the extension of the access road, paving
for the recycling center, tire recycling area, scale and transfer station access ramps, compost area
and parking areas. Subgrade preparation, stabilization, placement, and compaction of crushed
rock base course and HMA should be conducted in accordance with the procedures outlined
below.
4.11.1 Subgrade Preparation for Areas to be Paved
Subgrade stripping should be conducted to remove all loose organic topsoil and other deleterious
materials exposing native mineral subgrade, sandy silt or sandy lean clay or sandy gravel with
silt. After stripping and excavating to remove topsoil, and prior to placing any fill, subgrade soils
2022-188-21 KCTS - Final Geotechnical Report 15 HWA GEOSCIENCES INC.
June 13,2023
HWA Project No. 2022-188-21
should be excavated a minimum of 22 inches below the proposed top of pavement subgrade to
accommodate the proposed pavement section, as discussed in Section 4.1 1.3. The subgrade
should then be proof rolled using a with a heavyweight smooth drum roller (on static mode)
under the observation ofthe geotechnical engineer. Any subgrade areas that appear to be
unstable or incapable of supporting construction equipment or traffic should be stabilized as
described below.
We recommend that after subgtade proof rolling is conducted as described above, unstable areas
ofthe subgrade be sub-excavated at least 12-inches (ifnecessary depending upon finish grade)
then covered with a woven geotextile fabric consisting of Tensar HP 570 or equivalent, followed
by a layer of Tensar Triax 160 geogrid prior to placement of l2-inches of compacted CSBC.
All other pavement subgrade areas should be covered with a woven geotextile fabric, such as
Tensar HP 570, or equivalent, prior to placement of structural fill and pavement layers.
Material used to raise site grades, or placed directly under pavement structure is classified as
structural fill. Imported structural fill should consist of either Crushed Surfacing Base Coarse or
Select Borrow depending on application as specified herein and meeting the requirements of
WSDOT Standard Specifications Section 9-03.9(3) and 9-03.14(2), respectively.
4.11.2 Design Traffic Volume
Traffic information, provided by SCS, Inc., indicated that the site could be divided into 4 discrete
zones that support varying traffrc loads (K. Shah, electronic communication,2023) as described
below.
Southwest Area: This area includes the tire recycling area and consists of a paved rectangular
area situated just of the compost area. The area serves as a laydown and loading area for tires.
The pavement will support pickups, pickup with trailers, and occasional heavyrveight 40 cyd
trailers. Based on the traffrc data provided we estimate a total design ESAL's factor of 2,337 for
this area as presented in Table 2.
Southeast Area: The southeast area encompasses the recycle area which consists of a broad
paved area where a series of containers are arranged within a median to accept paper, glass,
metal and other recyclable materials. The area also includes access and parking for the MRW
and administration buildings. The pavement will support pickups and passenger vehicles, and
occasional heavyweight roll-on/roll-off trucks and 24-fooL long 3-axle trucks. Based on the
traffrc data provided we estimate a total design ESAL's factor of 275,000 for this atea as
presented inTable2.
Northeast Area: The paved area includes the scale and transfer station facilities situated in the
northeastern portion of the site. All vehicles carrying loads that require a tipping fee will need to
2022-188-21KCTS - Final Geotechnical Report I6 HWA GEOSCIENCES INC.
June 13,2023
HWA Project No. 2022-188-21
travel through the scales in and out. This includes passenger vehicles, pick-ups with or without
trailers, heavyweight transfer trailers, 40 cyd trailers, and occasional water trucks. Based on the
trafFrc data provided we estimate a total design ESAL's factor of 130,000 for this area as
presented in Table 2.
Northwest Area The northwest area encompasses the compost area located in the northwest
portion of the site and is accessed from the east on the north perimeter access road. Yard waste
will be processed on-site by County personnel into compost. It is expected that this area will be
frequented by pick-ups with and without trailers and occasional heavy weight water trucks.
Processing will be accomplished using heavy equipment such as front-end loaders. It will also
support heavy static loads such as the grinder. Based on the traffic data provided we estimate a
total design ESAL's factor of 2,7 4l for this afea as presented inTable 2.
Table 2. Assumptions Utilized for Estimation of ESAL
The pavement recommendations presented in this report are based on these traffic estimates. If
improved traffic count information is obtained that varies appreciably from these values, the
recommendations given in this report should be reviewed and revised as necessary.
4.11.3 Pavement Structure Requirements
The subgrade soils along the project alignment consist of sandy lean clays, which are moderately
frost-susceptible. The maximum depth of frost penetration measured in the area is 30 inches.
This occurred during the extremely cold winters of 1949 and 1950 (WSDOT, 1995).
For frost-susceptible subgrade soils, the WSDOT Pavement Design Guide recommends that the
minimum thickness of pavement structure should be at least 75o/o of the frost depth. Therefore,
the minimum pavement section for this site should be at least 22 inches in depth. We expect the
depth of frost penetration will control minimum section thicknesses.
Traffic
Information
Southwest
Area
Southeast
Area
Northeast
Area
Northwest
Area
Design Period
(years)
25 25 25 25
Growth Factor 2.5%2,50 2.5%25%
ESAL 2.337 275,000 130,000 2,741
2022-188-21 KCTS - Final Geotechnical Report t7 HWAGEOSCIENCES INC.
June 13,2023
HWA Project No. 2022-188-21
Based on the results of our investigation and our previous experience, we have based the
pavement structure design assuming a prepared subgrade (lean clay) design resilient modulus
(M) of 5 kips per square inch (ksi)
We have undertaken the pavement design using the DARWin computer program which is based
on the AASHTO Guidefor Design of Pavement Structures,l993. The following parameters,
based on recommendations given in the AASHTO Guide, were used in the analysis:
Initial Serviceability 4.5
Terminal Serviceability 3.0
Reliability Level 90%
Overall Standard Deviation 0.5
The recommended pavement layer thickness requirements are summarized on Tables 3 through 6
for the recycling area,tire recycling area, scale and transfer station and the compost area,
respectively:
Table 3. Recommended Pavement Layer Thickness for Southwest Area
Material
Description
Minimum Pavement Layer Thickness
(inches)
WSDOT Standard
Specification
HMAI 4.0 e-02.1(4)
CSBC2 6.0 e-03.e(3)
Select Borrow 12.03 9-03.1,4(2)
(1) HMA: Hot Mix Asphalt: Binder Grade PG 64H-28. HMA shall be placed in 2 lifts.
(2) CSBC: Crushed Surfacing Base Course, compacted as specified.
(3) Thickness of Select Borrow may be reduced if base of over-excavation and replacement with
CSBC is at least 22 inches below the top of new roadway'
2022-188-21 KCTS - Final Geotechnical Report 18 HWAGEoSCIENCES INC,
June 13,2023
HWA Project No. 2022-188-21
Table 4. Recommended Pavement Layer Thickness for Southeast Area
(r) HMA: Hot Mix Asphalt: Binder Grade PG 64H-28. HMA shall be placed in 2 lifts.
(2) CSBC: Crushed Surfacing Base Course, compacted as specified.
(3) Thickness of Select Borrow may be reduced if base of over-excavation and replacement with
CSBC is at least 22 inches below the top of new roadway.
Table 5. Recommended Pavement Layer Thickness for Northeast Area
HMA: Hot Mix Asphalt: Binder Grade PG 64H-28. HMA shall be placed in 2 lifts.
CSBC: Crushed Surfacing Base Course, compacted as specified.
Thickness of Select Borrow may be reduced if base of over-excavation and replacement with
CSBC is at least 22 inches below the top of new roadway.
(l)
(2)
(3)
Material
Description
Minimum Pavement Layer Thickness
(inches)
WSDOT Standard
Specification
HMA'7.0 e-02.1(4)
CSBC2 6.0 e-03.e(3)
Select Borrow 9.03 e-03.r4(2)
Material
Description
Minimum Pavement Layer Thickness
(inches)
WSDOT Standard
Specification
HMAI 7.0 9-02.r(4)
CSBC2 6.0 e-03.e(3)
Select Borrow 9.03 9-03.14(2)
2022-188-21 KCTS - Final Geotechnical Report 19 HWAGEOSCIE}.ICES INC.
Iune 13,2023
HWA Project No. 2022-188-21
Tabte 6. Recommended Pavement Layer Thickness for the Northwest Area
*Note: Thickness does not account for potential surface damage by repetitive equipment
movement and scraping by loader bucket, etc.
(4) HMA: Hot Mix Asphalt: Binder Grade PG64H-28. HMA shall be placed in 2 lifts.
(5) CSBC: Crushed Surfacing Base Course, compacted as specified.
(6) Thickness of Select Borrow may be reduced if base of over-excavation and replacement with
CSBC is at least 22 inches below the top of new roadway.
4.11.4 HMA Design Considerations
The following design considefations should be noted and implemented:
. Pavement design using a reliability level of 90% can be interpreted as meaning that prior
to the end of the design period, about 10% of the pavement will require reconstruction
because of structural failure. Therefore, as the design life is approached, the
serviceability of the pavement should be critically viewed to determine the need for and
extent of any overlay application thatmay be required.
o The pavement will likely require a thin functional overlay after about 10 to 14 years
because of non-structural associated distress caused by environmental factors such as
degradation of the asphalt surface and rutting. Areas subject to surface abrasion by heavy
equipment operation may require repair more frequently.
o HMA pavements are susceptible to shoving and rutting from heavy trucks particularly at
intersections. In these areas? more frequent maintenance and even premature
reconstruction of the pavement may be required.
o It is essential to the satisfactory performance of the pavement that good drainage is
provided to prevent water ponding alongside the pavement and saturation of the
pavement and subgrade layers. The base layers should be configured to prevent water
from being trapped within the layer.
Material
Description
Minimum Pavement Layer Thickness
(inches)
WSDOT Standard
Specification
HMAl 4.0*9-02.1(4)
CSBC2 6.0 e-03.e(3)
Select Borrow t2.01 e-03.t4(2)
2022-188-21 KCTS - Final Geotechnical Report 20 HWAGEOSCIENCES INC.
Iune 13,2023
HWA Project No. 2022-188-21
4.11.5 HMA Binder Selection
The selection of the optimum asphalt binder type for the prevailing climate is critical to ensure
long-term pavement performance. Use of the wrong binder can result in low temperature
cracking or perrnanent deformation at high temperatures.
Based on the climate in Ellensburg, we recommend Superpave Performance Grade binder
PG 64H-28 be used for HMA pavement.
Placement of HMA should be in accordance with Section 5-04 of the WSDOT Standard
Specifications (WSDOT,2023). Particular attention should be paid to the following:
4.11.6 Pavement Construction
HMA should not be placed until the engineer has evaluated and approved the crushed aggregate
base rock layer.
o HMA should not be placed on any frozen or wet surface.
o HMA should not be placed when precipitation is anticipated before the pavement can
be compacted, or before any other weather conditions which could prevent proper
handling and compaction of HMA.
o HMA should not be placed when the average surface temperatures are less than 45o F
o HMA temperature behind the paver should be in excess of 240oF. Compaction
should be completed before the mix temperature drops below 180" F. Comprehensive
temperature records should be kept during the HMA placement.
o Sufficient tack coat must be applied uniformly and allowed to break and set before
placing HMA above an existing HMA layer in order to create a strong bond between
layers. The surface of the pavement should be thoroughly cleaned prior to tack coat
application. Improper tack coat application can cause unbonded layers and will lead
to premature pavement distress/failure.
o For cold joints, tack coat should be applied to the edge to be joined and the paver
screed should be set to overlap the first mat by I to 2 inches.
o The longitudinal joints in the HMA wearing course should coincide with a line lane
or an edge line.
Crushed Surfacing Top Course (CSTC) can be substituted with for the upper 2 inches of
Crushed Surfacing Base Course (CSBC) as specified by WSDOT Standard Specifications
(WSDOT, 2023), in order to provide a smooth surface for placing the HMA layet.
2022-188-21 KCTS - Final Geotechnical Report 2l HWAGEOSCIENCES INC.
Iune 13,2023
HWA Project No. 2022-188-21
4.11.7 Differential Settlement of Roads
Roadways supported on geosynthetic stabilized fine-grained native subgrade will settle overtime
and dips can develop at the approach area where roads encounter slabs or other pavement
structures supported on full-depth structural fills. In order to minimize the amount of differential
settlement between these features we recommend that the excavation conducted for the removal
of compressible soils beneath the scale facility and transfer station access ramp extend from the
base of the cut to subgrade elevation at an inclination of 3H: lV instead of lH:lV in the direction
of travel.
4.12 GpNnnar, ElRruwoRK CoNSIDERATIoNS
4.12.1 Subgrade Preparation for Foundations
In the proposed footing areas, subgrade preparation should begin with the removal of all topsoil,
deleterious material, and vegetation. Using a smooth bucket, the soils should be excavated to the
proposed subgrade elevation. The exposed subgrade should be inspected by the Geotechnical
Engineer, or their representative, and any loose or unsuitable soils should be over-excavated to
expose the coarse-grained alluvial soils. Where excavation below the elevations of the
foundation or floor slabs is needed, the width of the excavation should extend beyond the edge of
the footing a distance equal to the depth of the over-excavation required to reach the bearing
soils. After exposing coarse-grained native soils, and prior to placing any fill, exposed subgrade
soils should be static rolled with a smooth drum roller under the observation of the geotechnical
engineer prior to placement of structural fill.
In order to avoid point-load contacts between concrete footings and the supporting coarse-
grained soils, it is recommended that the foundations be constructed on a minimum 8-inch thick
layer of compacted Crushed Surfacing Base Course (CSBC) meeting the requirements of
Section 9-03.9(3) of the WSDOT Standard Specifications (wSDoT,2023).
4.12,2 Structural Fill and Compaction
For the purposes of this report, all fill placed under structures, floor slabs, utilities, sidewalks,
roads and other paved areas should be considered structural fill. Structural fill should be a
relatively well-graded soil, which is free of organic mateial, contains non-plastic fines, and
should have a maximum particle size no greater than l13 the thickness of the lifts being placed.
Its moisture content should be within 2o/o of optimum for compaction purposes. The native
sandy silt or clay is not suitable for use as structural fill as it is too wet for proper compaction.
We understand that Select Borrow fill material meeting the specifications of WSDOT
Section 9-03.14(2) is available locally for use as structural fill. However, in wet weather or wet
conditions, structural fill should contain no more than 5o/o non-plastic fines (material passing the
No. 200 US Standard sieve) based on the minus 3/q-inch (19 mm) soil fraction'
2022-188-21 KCTS - Final Geotechnical Report 22 HWA GEOSCIENCES INC.
June 13,2023
HWA Project No. 2022-188-2 1
Structural fill should be moisture conditioned, placed in loose horizontal lifts less than 8-inches
thick, and compacted to at least 95o/o of maximum dry density as determined using test method
ASTM D 1557 (Modified Proctor) for material containing less than 30olo coarse gravel by
weight. Achievement of proper density of a compacted fill depends on the size and type of
compaction equipment, the number of passes, thickness of the layer being compacted, and soil
moisture-density properties. In areas where limited space restricts the use of heavy equipment,
smaller equipment can be used, but the soil must be placed in thin enough layers to achieve the
required compaction.
When the first fill is placed in a given area, andlor anytime the fill material changes, the area
should be considered a test section. The test section should be used to establish fill placement
and compaction procedures required to achieve proper compaction. The geotechnical consultant
should observe placement and compaction of material in the test section to assist in establishing
an appropriate compaction procedure. Once a placement and compaction procedure is
established, the contractor's operations should be monitored and sufficient periodic density tests
performed to veriff that proper compaction is being achieved throughout.
4.12,3 Ground Water Control
We anticip ate that groundwater seepage may be encountered locally in the fine-grained alluvium
or within the coarse-grained alluvium. Ground water monitoring conducted by others indicates
that the ground water level is likely higher during the summer months during the local inigation
season. Therefore, we recommend that excavation in excess of what is required for subgrade
preparation take place in the fall months after local irrigation has been terminated.
During construction, the Contractor should be prepared with appropriate means and methods to
ensure work takes place in relatively dry conditions during over-excavation and removal and
replacement of compressible soils as necessary. It is recommended that if excavation takes place
during the inigation season the Contractor be prepared to control ground water through use of a
combination of sumps and pumps and ditching to convey water away from the work area. The
Contractor should limit the area opened up to that which can be backfilled with minimal sidewall
sloughing during one shift. Quarry spalls or other permeable rockfill may be used to backfill
below the ground water table and provide a stable base for placement of structural fill. Where
quarry spalls or permeable rockfill is used, a non-woven geotextile meeting the requirements for
separation found in Table 3 of Sectiong-33.2(l) of the WSDOT Standard Speci/ications
(WSDOT, 2023) shall be installed over the rockfill prior to placement of structural fiIl.
4,12.4 Temporary Slope Cuts
We anticip ate that the foundation cuts for the new transfer station building, and the new scale
facility can be made with conventional excavating equipment. However, excavation wherever
the coarse-grained alluvium is encountered, difficult digging conditions may be expected to
exist, and the Contractor should be prepared to encounter cobbles and boulder-sized material.
2022-188-21 KCTS - Final Geotechnical Report 23 HWA GEoSCIENCES INC.
Iune 13,2023
HWA Project No. 2022-188-21
4.12.5 Temporary Excavations
For all excavations maintenance of safe working conditions, including temporary excavation
stability, is the responsibility of the contractor and must be performed in accordance with Part N
of Washington Administrative Code (WAC) 296-155, latest revisions. The fine-grained
alluvium and coarse-grained alluvium and fill at the site classifiy as Type C soils.
Time and the presence of seepage and/or precipitation can significantly reduce the stability of
temporary unsupported cut slopes. Therefore, all temporary slopes should be protected from
erosion by installing a surface water diversion ditch or berm at the top of the slope and by
covering the cut face with well-anchored plastic sheets. In addition, the contractor should
monitor the stability of all temporary cut slopes and adjust the construction schedule and slope
inclination accordingly.
4,12,6 Erosion and Sediment Control
The site soils have relatively high fines content and in the wet season this will result in
substantial entrained sediment load in runoff water and, in the dry season, large amounts of dust
and fines.
The work site should be protected from uncontrolled runoff during construction by constructing
berms and ditches to direct runoff around the work site, and the use of temporary sumps to
collect runoff and prevent water from ponding and damaging exposed subgrade areas. Crushed
gravel should be provided, where necessary, to protect against soil erosion. Erosion of the work
site can be minimized by careful grading practices, the appropriate use of silt fences and by
implementing the recommendations in the Wet Weather Earthwork section of this report. Surface
grading measures and drainage systems should be incorporated in the final grading design such
that surface runoff is permanently directed away from paved areas and into swales or other
controlled drainage devices.
Permanent fill slopes should be protected from erosion by seeding for growth of vegetation as soon
as possible after grading.
4,12.7 Wet Weather Earthworks
Although earthwork under wet weather conditions is not recommended for this site, if it is
necessary, the following recommendations apply to wet season earthworks:
Earthwork should be undertaken in small sections to minimize exposure to wet
weather. Excavation or the removal of unsuitable soil should be followed promptly
by the placement and compaction of a suitable thickness of clean crushed rock or
sand and gravel. The size and type of construction equipment used may have to be
limited to minimize soil disturbance.
a
2022-188-2I KCTS - Final Geotechnical Report 24 HWA GEOSCIENCES INC.
Iune 13,2023
HWA Project No. 2022-188-21
a
a
a
Material used as structural fill should consist of clean granular soil, of which not
more than 5%by dry weight passes the U.S. Standard No. 200 sieve, based on wet
sieving the fraction passing the3/+-inch sieve. The fine-grained portion of the
structural fill soils should be non-plastic.
The ground surface within the construction area should be sloped and sealed with a
smooth-drum vibratory roller, to promote rapid runoff of precipitation and to prevent
ponding of water.
No soil should be left uncompacted so it can absorb water. Soils that become too wet
for compaction should be removed and replaced with clean granular materials.
5.0 CONDITIONS AND LIMITATIONS
We have prepared this report for use by SCS, Inc,, and Kittitas County Solid Waste and other
members of the project design team during the design and construction of the geotechnical
aspects of this project. However, the conclusions and interpretations presented should not be
construed as a waffanty of the subsurface conditions. Experience has shown that subsurface soil
and ground water conditions canvary significantly over small distances. Inconsistent conditions
can occur between explorations and may not be detected by a geotechnical study. If, during
future site operations, subsurface conditions are encountered which vary appreciably from those
described herein, HWA should be notified for review of the recommendations of this report, and
revision of such, if necessary. We recommend that aknowledgeable and experienced
geotechnical engineer or inspector should inspect footing excavations, pavement subgrade
preparation, subsurface drainage, and review potential fill and bedding materials for suitability.
Within the limitations of approved scope, schedule and budget, HWA attempted to execute these
services in accordance with generally accepted professional principles and practices in the fields
of geotechnical engineering and engineering geology at the time the report was prepared. No
warranty, express or implied, is made.
The scope of our work did not include environmental assessments or evaluations regarding the
presence or absence of wetlands orhazardous substances in the soil, surface water, or ground
water at this site.
HWA does not practice or consult in the field of safety engineering. We do not direct the
contractor's operations and cannot be responsible for the safety of personnel other than our own on
the site. As such, the safety of others is the responsibility of the contractor. However, the contractor
should notifu the owner if any of the recommended actions presented herein are considered unsafe.
o
2022-188-21 KCTS - Final Geotechnical Report 25 HWAGEOSCIENCES INC
June 13,2023
llWA l'roject No, 2022- lttB-21
We appreciate ancl thank you lor the opportunity 1o pnrvidc lhis geolechnical repotl. Should you
lravc any qucslions regarding lhis reporl, or rcquire additional sert'ices, pleasc oonlacl eithcr ol'
the undersigned at your convcnience. Wc apprcciate this optrrortunity to he o{'scrvice.
Sinccrcly,
H WA Gr,:oSc'tnxcus I N(r.
I 3/uzh
Steven [i. (irecne, [",8.6.
Senior Engineering Geologist
Vice-Prcsident
Jolyn Cillie, P,E.
Geotechnical Enginccr, Principal
sIEVS{zutorT SEEilE
4682
?022 l3:l-21 K( l5 tnal(icotechnrcalRqrlrt 26 l'lWA (it'itSt tt Nt t's INt
June 13,2023
HWA Project No. 2022-188-21
6.0 REFERENCES
Jacobs Engineering Group (CH2M), 2019, Geotechnical Data Memorandum: Kittitas County
Transfer Station Site,prepared for Kittitas County and published July 15,2019.
Jacobs Engineering Group, 2020a, Kittitas County Transfer Station Site: Groundwater
Monitoring Memorandum, Ellensburg, Washington,prepared for Kittitas County and published
on July 17,2020.
Jacobs Engineering Group, 2020b, Kittitas County Transfer Station Site- Geotechnical Data
Report, prepared for Kittitas County and published August 31,2020-
Sadowski, A.J, J.B. McCosby, M.L. Anderson, T.R Lau, A. Steiner, S.A. DuFrane, T. Rittenour,
and B. Housen, 2020, Geologic Map of the North and Southern half of the Reecer Canyon 7.5-
Minute Quadrangles, Kittitas County, Washington Washington Geological Survey Map Series,
2020-0r.
WSDOT, 7995, WSDOT Pavement Guide Volume 2 Pavement Notes, Washington State
Department of Transportation.
WSDOT, 2023, Standard Specifications for Road, Bridge and Municipal Construction,
Washington State Department of Transportation.
2022-188-21 KCTS - Final Geotechnical Report 27 HWA GEoscnuces ltc.
SITE MAP
VICINITY MAP
1000'
SCALET 1" . 1000'
2000'
: rlu'"t
0 500'
4-qty
1500'
\"
I
!
&en$urg
\'t
0 4000'
SCALE: 1" = 4000'
6000',
NO.r
1
ifUN lc*so'ogt.l$'*
E
It
SITE AND VICINITY MAP
KITTITAS COUNTY TMNSFER STATION
ELLENSBURG, WASHINGTON
ClUSERS\CFRY\DESKTOPUO22-18S.21 KITTITAS COUNTY TRANSFER STATION\2022J88.21 KITTITAS COUNTY TRANSFER STATION.DWG <1> Plotted: 212012023 4:30 PM
CF
BY:
SEG
CFsnE &
EXPLOMTION PLAN
KTTTITAS COUNTY T&ANSFER STATION
ELLENSBURG, WASHINGTONIIIE$l*'wffi
.x-
/o
TP.29(P)
qq
!
:
i+
1P-27(P)
.';
i,
a:f.
a:.
E1?1p"84rp-ry- !-€pEM
8Hl<| rnorosEo eoREHoLf DEsIGNATIoN ANo AppRoKMATE LoGTIoN
rP-t(P)1f, resr rn (n) prtzoMfiER INsrALunoN DESIGNATIoN AND AppRoxIMAIt LocATIoN (JAcoBs, 2019)
Tp'1S resr pr rxovmoN DEsTGNAnoN ANo AppRoxt4ATE LoGnoN (lAcoas, 2019)
B'2f aoneou orstcNAnoN AND AppRoxlr'4ATE LoGnoN (JAcoBs, 2020)
A s ,* 290 ,* 4q0
hr+rt;p4-i-l
2022'188.21
HOLOCENE TO PLIOCENE NON.GLACIAL OEPOSITS IEGEND
Qp - PEAT (HOLOCENE TO PLIOCENE) - Organic and organlc'rieh sediment;
includes peat, gyttja, muck, silt, and elay; typically in closed depressions;
mapped in wetland areas and distlnclly flal-bottomed depressions.
HoLOCENE TO luggElls ALLUVnLqEPOSITS LEGENq
Qa - ALLUVIUM (HOLOCENE) - Composed of sand and gravel from chann€l
deposits on active flood plain. This unit has been heavily modified by
agricultural cultivation.
II|WN lcuos***^"2022-188-2L
usDA soIL sEB!F$-9yUF-qL LLG-E[9
At44G;il;-Gty flrre landy loam, 0 to 2 percent slopes
480"Nanum ashy loam, 0 to 2 percent slopes
58o-Woldal€ clay loam, 0 to 2 percent slopes
598-Zillah sllt loam, 0 to 2 petcent slopes
801-Brickmlll gravelly ashy loan, 0 to 2 percent slopes
795-Nack-Opnish complex, 0 to 2 percent slopes
lf[n lc*s""g"tgg
A
4
NO.:
2022-188-21
SOIL MAP
SEG
8Yr
CF
KITTITAS COUNTY TMNSFER STATION
ELLENSBURG, WASHINGTON
CFCOMPRESSIBLE SOIL
THICKNESS MAP
(rN rEEr)SEG
KITIITAS COUNTY TMNSFER STATION
ELLENSBURG, WASHINGTONi[M| lc"so'nig;gJg
EX4AMT/alv-lreEuQ
gHi + moroseo BoREHoLE DEsTGNAnoN AND APPRonMATE LocATloN
TP{(PhF- TEsr prr (p) pIEzoMEmR lNsrAtrAltoN oEsIGilATtoN AtiD trPRoxIMATE LmnoN (lAcoBs, 2019)
TP-I{F. ftsir pn EXcqvAnoN DEsIGNAnoN AND AppRoxlMATE LocAiloN (lAcoBs, 2019)
B-2"f, aoneHou oeslcNATroN AND AppRoxn ATE LoGnoN (lAcoas, 2020)
--- r--. frlCKNESs OF DH SOIL (IN FEEr)
$rulA9_equNlSA[s,tEB-SIA[o_Nscrla: 1'= 200{'
A s ,* 290 * 490b#
2022-188-21
ApppxurxA
HWA EXPLORATION SOIL LOGS
COHESIONLESS SOILS COHESIVE SOILS
Density N (blows/ft)Approximat€
Relative Density(o/o)
Consistency N (blows/ft)
Approximate
Undrained Shear
Sirenoth (osf)
V€ry Loose
L@se
Medium Dense
Dense
Vsry Oense
0to4
4to10
10 to 30
30 to 50
over 50
0-15
15-35
35-65
65-85
85 - 100
Very Soft
Sofl
Medium Stiff
stiff
Very Stiff
Hard
0lo2
2lo4
4to8
8 to'15
15 lo 30
over 30
<250
2s0 - 500
500 - 1000
1000 - 2000
2000 - 4000
>4000
RELATIVE DENSITY OR CONSISTENCY VERSUS SPT N-VALUE
USCS SOIL CLASSIFICATION SYSTEM
COMPONENT DEFINITIONS
COMPONENT SIZE RANGE
Boulders
Cobbles
Gravel
Coarse gravel
Fine gravel
Sand
Coaree sand
Medium sand
Fino sand
Silt and Clay
Larger lhan 12 in
3into12in
3 in to No 4 (4.5mm)
3 in to 3/4 in
3/4 in to No 4 (4.5mm)
No. 4 (4.5 mm) to No. 200 (0.074 mm)
No. 4 (4.5 mm) to No. 10 (2.0 mm)
No. 10 (2.0 mm) to No.40 (0-42 mm)
No.40 (0.42 mm) to No. 200 (0.074 mm)
Smaller lhan No. 200 (0.074mm)
NOTES: Soil classifications presentsd on exploration logs are based on visual and laboralory observation.
Soil descriptions are presented in the following general order:
Density/consistency, color, modilier (if any) GROUP NAME, addiAons to group name (if any), moisture
content. Propottion, gradaqon, and angularity of constituents, additional comments'
(GEOLOGI C I NTERP R ETATION)
Pleaso refer to the discussion in the report text as well as ths exploration logs for a more
complote description of subsurface conditions.
%F
AL
CBR
CN
DD
DS
GS
K
MD
MR
oc
pH
PID
PP
Res.
SG
CD
CU
UU
TV
UC
mI
Non-standa.d Penetration Tost
(3.0" OD Split Spoon with Brass Rings)
Small Bag Sample
Large Bag (Bulk) Sample
Core Run
3-1/4" OD Split Spoon
GROUNDWATER SYMBOLS
Groundwater Level (measured at
lime of drilling)
Groundwater Level (measured in well or
open hole after water level stabilized)
COMPONENT PROPORTIONS
MOISTURE CONTENT
DRY
MOIST
WET
Absence of moisture, dusty,
dry to the touch.
Oamp but no visible waler.
Visible {re€ water, usually
TEST SYMBOLS
Porcent Fines
Att€rberg Limits: PL = Plastic Limit, LL = Liquid Limit
California Bearing Ratio
Consolidation
Dry Density (pcf)
Direct Shsar
Grain Size Distribution
Permeability
Moisture/Density Rolationship (Proctor)
Resilient Modulus
Organic Content
pH of Soils
Photoionization Device Reading
Pocket Penetrometer (Approx. Comp. Strength, tsf)
Resistivity
Specific Gravity
Consolidated Drained Triaxial
Consolidated Undrained Triaxial
Unconsolidated Undrainod Triaxial
Torvano (Approx. Shsar Strength, tsO
Unconlined Compression
SAMPLE TYPE SYMBOLS
2.0" OD Split Spoon (SPT)
(140 lb. hammer with 30 in. drop)
Shelby Tube
0
EI
n
g
t
MAJOR DIVISIONS GROUP DESCRIPTIONS
Coarse
Gralned
Soils
More than
50% Retained
on No.
200 Sieve
Size
Gravel and
Gravelly Soils
More than
50% of Coarse
Fraction R€tained
on No. 4 Sievs
Clean Gravel
(little or no fines)
)v!.]GW Well{raded GRAVEL
)v!
"o'GP Poorly{raded GRAVEL
Gravel wlth
Fin€s (appreciable
amounl of flnes)
GM Silty GRAVEL
GC Clayey GRAVEL
Sand and
Sandy Soils
5070 or More
of Coarse
Fraction Passing
No- 4 Sieve
Clean Sand
(little or no linss)
SW Woll{raded SAND
SP P@rly€raded SAND
Sand with
Fines (appreciable
amount of fines)
SM Silty SAND
SC Clayey SAND
Fine
Grained
Soils
50o/o or More
Passing
No. 200 Sieve
Size
sitt
and
Clay
Liquid Limit
Less than 50%
ML SILT
CL Lean CLAY
OL Organic SILT/Organic CLAY
silt
and
Clay
Liquld Limit
50% or More
MH Elastic SILT
CH Fat CLAY
OH Organic SILT/Organic CLAY
Highly Organic Soils
\r r/
PT PEAT
t
PROPORTION RANGE DESCRIPTIVE TERMS
< 5o/o
5-12%
12 -30%
30 - 50%
Clean
Slightly (Clayey, Silty, Sandy)
Clayey, Silty, Sandy, Gravelly
Very (Clayey, Silty, Sandy, Gravslly)
Components arc arranged in order of increasing quantities.
!,lf\fill Kittitas countv rransrer station '-T;il3""r:1r=#t#tll UflI T,ij:ll[:'#;ff[',il:'' EXPLoMloN Locs
GEOSIIENEE!.NC. pRoJEcrNo: 2022-188 FGURE: A-1
DRILLING COMPANY: Holt Services, lnc.
DRILLING METHOD: Hollow Stem Auger, Mobile Drill 857 Track Rig.
SAMPLING METHOD: SPTWAutohammer
LOCATION: See Figure 2.
DATE STARTED.. 2]2812023
DATE COMPLETED: 212812023
LOGGED BY: V. Oskierko
U'a
J
J
JOou,coo+,.cd3
E
H
U)
m
m
m
m
m
m
m
tul
d)
fz
uJJ(L
a
s-1
IIJo
SEh€a.E#e-;=
FE
aFU'
uJF
dIJIFo
Standard Penetration Test
(140 lb. weight, 30" drop)
A Blows per foot
zsF
t!J
llJ
IF(L
ulo
0
DESCRIPTION 0 10 20 30 40 50
oo
3-3-3
s-2 2-3-3
5 s-3 2-2-7 GS
s4 3-3-1
10 Vs-5 5-8-13
s-6 14-38-s0/4'
15 s-7 2S38-50/4"
Exploration terminated at 17-feet below ground surface (BGS)
due to auger refusal. Groundwaterwas encountered at 10'
BGS. Borehole abandoned with 3/8" bentonite chips.
20
A bulk sample of drill cuftings was taken while drilling from
approximately 0'-5' BGS and combined with the bulk sample
obtained from BH-6 for particle-size determination, organic
content, and CBR testing.
25
0 20 40 60 80
Water Content (%)
PlasticLimit |--ff LiquidLimit
Natural Water Content
100
NOTE: This log of subsurface conditions applies only at the specified location and on the date indicated
and therefore may not necessarily be indicative of other times and/or locations.
,.1,l,il
SM
Medium stiff, olive gray, very sandy, SILT, moist. Contains
scattered roots.
(FINE.GRANED ALLUVIUM)llll-
SM Loose, olive gray, very silty, SAND, moist.
(COARSE-GMJNED ALLUVIUM)
Only recovered 1 coarse gravel in tip of sampler
Dense, olive gray, silty fine to medium SAND, wet. Poor
recovery.
Rough drilling from 10'-12.5' BGS.
Very dense, grayish brown, fine gravelly, poorly graded
SAND, wet.
Very dense, grayish brown, slightly silty, fine to coarse
gravelly, poorly graded SAND, wet.
SP
,,,f|trl
*
Kittitas County Transfer Station
Geotechnical I nvestigation
Ellensburg, Washington
GEOSCffiXCES INC. pRoJECrNo.: 2022-188 FTGURE: A-2
BORTNG-DSM 2022-1 88.GP J 5l 1 1 t23
llm BORING:
BH-1
PAGE: 1 of 1
DRILLING COMPANY: Holt Services, lnc.
DRILLING METHOD: Hollow Stem Auger, Mobile Drill 857 Track Rig.
SAMPLING METHOD: SPT w/ Autohammer
LOCATION: See Figure 2.
DATESTARTED: 31112023
DATE COMPLETED: 31 1 12O23
LOGGED BY: V. Oskierko
aoIo
J
6ao
a
t
uJ.., dtt=>JlzuJ u.JJJ(L(L
oa
m"'
Oil7a a F
EE E *es x 1t2 = ailr: F EE9 o o o 10
Standard Penetration Test
(140 lb. weight, 30" drop)
A Blows per foot
zo
F
uJJ
uJ
IF(L
ulo
0
oo
Jodt
a DESCRIPTION 20 30 40 50
oo
2-2-2
m
I
m
m
m
m
s-2 1-1-2
5 s-3 DD
AL
o/oF
s-4 11-36-24
g
10 s-5 7-25-38
s-6 6-19-30
15 s-7 10-45-45 GS
20 s-8 28-3$50i3',
Exploration terminated al21,2Sleel below ground surface
(BGS). Groundwater was enmuntered at I' BGS. Borehole
abandoned with 3/8" bentonite chips.
A bulk sample of drill cuttings was taken wtrile drilling from
approximately 0'-5' BGS.
25 0 20 40 60 80
Water Content (o/o)
PlasticLimit |---H LiquidLimit
Natural Water Content
100
NOTE: This log of subsurface conditions applies only at the specified location and on the date indicated
and thdrefore may not necessarily be indicalive of other times and/or locations.
OL Medium stiff, dark brown, organic SILT, with roots, moist.
No recovery. Description based on drill cuttings.
(TOPSOIL)
CL
Drilling becomes rough.
Very dense, brown, slightly silty, gravelly, poorly graded
SAND, moist.
Gravel broken by sampler.
(COARSE.GRAINED ALLUVIUM)
rSgvc!7.5'-1o',BGS.
Very dense, brown, slightly silty, very gravelly, poorly graded
SAND.
Dense, bluish gray, fine gravelly, silty SAND, wet.
Very dense, bluish gray, very gravelly, silty SAND, wet.
Very rough drilling from 15'-18' BGS.
No recovery. Sampler crme up wet.
CL
SP
SM
SP
SM
::[.
I
.[.
SM
SM
T
Kittitas County Transfer Station
Geotechnical I nvestigation
Ellensburg, Washington
BORING
BH.2
PAGE: 1 of 1
GEOSCIENCES INC. ercrecruo, 2022-188
BORTNG-DSM 2022-'|88.GPJ 511 1123
DRILLING COMPANY: Holt Services, lnc.
DRILLING METHOD: Hollow Stem Auger, Mobile Drill B57 Track Rig.
SAMPLING METHOD: SPT w/ Autohammer
LOCATION: See Figure 2.
DATESTARTED: 31112023
DATE COMPLETED: 31 1 12023
LOGGED BY: V. Oskierko
aaIo
J
6aaoa
tr
UJ
uqlz
-t9o- lL
oo
f,l s-r
N
uJoz^gE
baa.g
Hgt>
F3
4-7-7
aFa
uJFt
uJIFo
Standard Penetration Test
('140 lb. weight, 30" drop)
A Blows per foot
z
tr
>-
IJJ ittJO
l!I
IF(r
tuo
0
oo
Jo(D
o DESCRIPTION 0 10 20 30 40 50
m
m
I
m
m
m
s-2 1-2-3
C s-3 1-1-2
S4 DD
AL
%F
CN
10 s-5 12-14-16 GS
V
s-6 15-28-25
15 s-7 5-'l$29
Exploration terminated at 16.$feet below ground surface
(BGS) . Groundwater was encountered at 1 1.5' BGS,
Borehole abandoned with 3/8" bentonite chips.
20
A bulk sample of drill cuttings was taken while drilling from
approximately 0'-5' BGS and combined with a bulk sample
from BH-4 for particle-size determination, organic content,
and CBR testing.
25 0 20 40 60 80
Water Content (%)
PlasticLimit |---ff Liquidlimit
Natural Water Content
100
NOTE: This log of subsurface conditions applies only at the specilied location and on the date indicated
and th6refore may not necessarily be indicative of other times and/or locations.
OL Stiff, dark brown, sandy, organic SILT, with roots, moist.
(roPsorL)
CH Medium stiff, grayish brown, sandy, fat CLAY, moist.
(FINE.GRAINED ALLUVIUM)
Medium stiff, dark brown, sandy, fat CLAY, moist.
Push shelby tube. Refusal after pushing 21". Recovered 21"
in tube.
Dry Density= 73.2pd @42j%MC
Organic Content= 3.5%
CH
GP
GM
Drilling bemmes rough.
Dense, brown, slightly silty, very sandy, poorly graded
GMVEL, moist.
Gravel broken by sampler.
Very rough drilling from 10'-12.5 BGS.
(COARSE.GRAINED ALLUVIUM)
Becrmes very dense, wet.
Dense, gralsh brown, fine gravelly, poorly graded SAND, wet.SP
Kittitas County Transfer Station
Geotechnical I nvestigation
Ellensburg, Washington
GEOSCIENCES INC pRoJEcr No.: 2022-188 FTGURE: A-4
BORTNG-DSM 2022-1 88.GP J 51 1 1 123
llm BORING
BH.3
PAGE: 1 of 1
DRILLING COMPANY: Holt Services, lnc.
DRILLING METHOD: Hollow Stem Auger, Mobile Drill 857 Track Rig.
SAMPLING METHOD: SPT w/ Autohammer
LOCATION: See Figure 2.
DATESTARTED: 31112023
DATE COMPLETED: 31 1 12O23
LOGGED BY: V. Oskierko
aaI
CJ
J,66u,d]og i, q
H
F
H
a
m
m
m
m
m
m
m
frUt
=rts,EEg He t Zt Fg E I o
Standard Penetration Test
(140 lb. weight, 30" drop)
A Blows per foot
z
F
aaJO
so ue
IF(!
UJo
0
DESCRIPTION 10
s-1 2-3-2
s-2 0-0-2
5 s-3 0-0-0
s4 0-0-1
V
10 s-5 3-7-12 GS
s-6 18-17-10
15 s-7 9-22-22
Exploration terminated at 16.$feet below ground surface
(BGS) . Groundwater was encountered at 9.5' BGS. Borehole
abandoned with 3/8" bentonite chips.
20
A bulk sample of drill cuttings was taken while drilling from
approximately 0'-5 BGS and combined with a bulk sample
from BH-3 for particle-size determination, organic content,
and CBR testing.
25 20 40 60 80
Water Content (%)
Plasticlimit |---ff LiquidLimit
Natural Water Content
100
NOTE: This log of subsurface conditions applies only at the specified location and on the date indicated
and therefore may not necessarily be indicative of other times and/or locations.
OL Medium stiff, dark brown, sandy, organic SILT, moist.
(TOPSOIL)
CL Soft, dark grayish brown, lean CLAY, moist, plastic.
(FINE.GRAINED ALLUVIUM)
Very soft, fat CLAY, very moist.
Bemmes sandy.
CH
GP
GM
Medium dense, brolvn, slightly silty, sandy, poorly graded
GMVEL, wet.
Rough drilling from 10'-12.5'BGS.
(COARSE.GRAINED ALLUVIUM)
No recovery.
Rough drilling form 12.5'-15' BGS.
Dense, grayish brown, slightly silty, poorlygraded SAND, wet.SP
SM
Kittitas County Transfer Station
Geotechnical I nvestigation
Ellensburg, Washington
BORING:
BH.4
T
GEOSEIENEE!.INC. pRoJEcrNo: 2022-188 FGURE: A-5
BORTNG-DSM 202?-1 88.GP J 51 1 1 123
PAGE: 1 of 1
DRILLING COMPANY: Holt Services, lnc.
DRILLING METHOD: Hollow Stem Auger, Mobile Drill B57 Track Rig.
SAMPLING METHOD: SPT w/ Autohammer
LOCATION: See Figure 2.
DATESTARTED: 31112023
DATE COMPLETED: 31 1 12023
LOGGED BY: V. Oskierko
aa
5
C)
J,dT-aFeg 3Hg>-3
"tt
H
a
m
m
m
m
m
X
d
uJdl
fz
LrJJtr
o
s-1
s-2
s-3
s4
Ut
rtsrfrHHs *
=Fg E 8
O
Standard Penetration Test
(140 lb. weight, 30" drop)
A Blows per foot
zIF
)atU i1)JO
50 r,lJ ItDESCRIPTION10
2-2-3
1-3-2
DD
AL
o/oF
CN
0-0-0
V
10 s-s 1s38-50/6"
s-6 9-14-37
15 s-7 40-50/3',
Exploration terminated at 1s.7$feet below ground surface
(BGS). Groundwater was encountered at 9 BGS. Borehole
abandoned with 3/8" bentonite chips.
20
A bulk sample of drill cuttings was taken while drilling from
approximately 0'-5' BGS and combined with a bulk sample
from BH-8 for particle-size determination, organic content,
and CBR testing.
25 0 20 40 60 80
Water Content (%)
Plasticlimit |---ff Liquidlimit
NaturalWater Content
100
NOTE: This log of subsurface conditions applies only at the specilied location and on the date indicated
and therefore may not necessarily be indicative of other times and/or locations.
OL Medium stiff, dark brown, sandy, organic SILT, with roots,
moist.
(roPsolL)
ML
CH
CH
Soft to medium stiff, very dark brown, SILT, very moist.
(FINE.GRANED ALLUVIUM)
Bemmes sandy.
Soft, dark brown, sandy, fat CLAY, moist, plastic.
Push shelby tube 24". Rec,overed 24" in tube.
Dry Density= 80.0 pc'f @ 38.4% MC
Organic Content= 3.5%
Very soft, dark brown, fat CLAY, very moist.
Drillinq becomes rough
o
q
GP
GM
GP
Very dense, brown, slightly silty, poorly graded GRAVEL, wei.
Gravel broken by sampler.
(COARSE.GRAINED ALLUVIUM)
Very dense, brownish gray, poorly graded GMVEL, wet.
Becomes sandy
o
o
Kittitas County Transfer Station
Geotech nical I nvestigation
Ellensburg, Washington
GroSctENQEs lNC. pRoJEcr No: 2022-188 FrcuRE: A-6
BORING-DSM 2022-188.GPJ 5111123
rr,FilUllllt
BORING:
BH.5
PAGE: 1 of 1
DRILLING COMPANY: Holt Services, lnc.
DRILLING METHOD: Hollow Stem Auger, Mobile Drill 857 Track Rig.
SAMPLING METHOD: SPT M Autohammer
LOCATION: See Figure 2.
DATESTARTED: 22812023
DATE COMPLETEO: 22812023
LOGGED BY: V. Oskierko
aa
5o
4oaooa
dL!
Hg>JF-ZuJ lrlJJo-(L
U'A
m*'
UJoz^SE'a6
o.EHe;=
F3
oFaujF
&
uJxFo
tr
uJF
Eoztoto
Standard Penetration Test
(140 lb. weight, 30" drop)
Blows per foot
zo
F
[rbJO
50 [!9
IF(r
ulo
0
oog
Jo
TD
=a DESCRIPTION 0 10 30 40
2-2-2
m
E
m
m
m
m
s-2 0-1-3
5 s-3 9-10-10
s4 4-6-10
10 vs-5 10-20-31
s-6 9-8-20 GS
15 s-7 33-20-22
X s-e so/6"
20
Exploration terminated at 18.Sfeet below ground surface
(BGS) due to auger refusal. Groundwater was enc,ountered at
10'BGS. Borehole abandoned with 3/8" bentonite chips.
A bulk sample of drill cuttings was taken while drilling from
approximately 0'-5' BGS and combined with a bulk sample
from BH-1 for parlicle-size determination, organic content,
and CBR testing.
25 0 20 40 60 80
Water Conlent (%)
Plasticlimit |---ff Liquidlimit
Natural Water Content
100
NOTE: This log of subsurface conditions applies only at the specilied location and on the date indicated
and therefore may not necessarily be indicative of other times and/or locations.
OL Medium stiff, dark brown, organic SILT, with roots, moist.
(TOPSOIL)
CL Medium stiff, dark brown, sandy, lean CLAY, moist, with trace
organic matter.
(FINE.GRANED ALLUVIUM)
ixi
ill
rii
GW
GM
ffi
GP
GM
iii,(ll.ll
GW
GM
SP
Kittitas County Transfer Station
Geotechnical I nvestigation
Ellensburg, Washington
GEOSCIENCES INC. pRoJEcrNo.: 2022-188 FGURE: A-7
BORTNG-DSM 2022-1 88.GP J 5l I'l 123
IIm BORING:
BH.6
PAGE: 1 of 1
DRILLING COMPANY: Holt Services, lnc.
DRILLING METHOD: Hollow Stem Auger, Mobile Drill 857 Track Rig.
SAMPLING METHOD: SPT w/ Autohammer
LOCATION: See Figure 2.
DATESTARTED: 42812023
DATE COMPLETED: 22812023
LOGGED BY: V. Oskierko
Jo
d)
a
aaIo
J
6a
aOof
t
LrJ
HE>JtzuJ LlJJJ&(L
aa
m-'
uJoz^SE'45
a.E
Hg2>
H;_
aFar!F
Et!IFo
d
I.IJF
=ozlotroo
Standard Penetration Test
(140 lb. weight, 30" drop)
A Blows per foot
zIF
lrJJul
IFt!ula
0
oo DESCRIPTION
og
24-3
m
m
m
m
s-2 1-2-14
s-3 2-40-5013'
g
s4 5-21-16
'10 s-s 7-25-29 GS
X s-o 50/6'
15 X s-z so/s"
20
X s-8 40-50/3'
Exploration terminated at 20.7sfeet below ground surface
(BGS). Groundwater was encountered at 7.5' BGS. Borehole
abandoned with 3/8" bentonite chips.
25
0 20 40 60 80
Water Content (%)
PlasticLimit ]---ff LiquidLimit
Natural Water Content
100
NOTE: This log of subsurface conditions applies only at the specified location and on the date indicated
and therefore may not necessarily be indicative of other times and/or locations.
ilt
ML Medium stiff, dark brown, SILT, with roots, moist.
(TOPSOIL)
OL Medium stiff, dark brown, gravelly, organic SILT, moist.
(FINE-GRANED ALLUVIUM)
GP
GM
Last 6-inches of sample driven on gravel. Rough drilling at
3.5' to 5'
Poor recovery. Only recovered broken rock. Rough drilling to
7.5'
(COARSE.GRAINED ALLUVIUM)
Dense, brown, slightly silty, sandy, poorty graded GRAVEL,
wet.
Very dense, grayish brown, slightly silty, very sandy, well
graded GMVEL, wet.
No Recovery.
Very dense, grayish brown, gravelly, poorly graded SAND,
wet.
Becomes very gravelly.
ili
ifl{
fri
GW
GM
SP
Kittitas County Transfer Station
Geotechnical I nvestigation
Ellensburg, Washington
GEOSCH{CES tNC. pRoJECrNo.: 2022-188 FrcuRE: A-8
BORTNG-DSM 2022-'|88.GPJ 51',11123
fim BORING:
BH.7
PAGE: 1 of 1
DRILLING COMPANY: Holt Services, lnc.
DRILLING METHOD: Hollow Stem Auger, Mobile Drill 857 Track Rig.
SAMPLING METHOD: SPT w/ Autohammer
LOCATION: See Figure 2.
DATE STARTED: 31112023
DATE COMPLETED.. 31 1 /2023
LOGGED BY: V. Oskierko
Jo(n
a
oaI
O
J
oaaoal
d.ulH9>-Jl-zuJ ulJJ(L(L
aa
m"'
uJ
C)z^SEq5o.g
H*-;t
FE
aFa
UJF
d
uJ-Fo
e.
uJF
=ozlotoo
Standard Penetration Test
(140 lb. weight, 30" drop)
A Blows per foot
zo
F
ulJ
uJ
IF(I
UJo
0
oo DESCRIPTION 10 20 30 40 50
oo
24-3
m
I
m
m
m
m
s-2 2-24
5 s-3 DD
AL
%F
s4 5-19-16 GS
g
10 s-5 18-30-42
s-6 16-32-40
15 s-7 12-20-32
Exploration terminated at 16.sfeet below ground surface
(BGS). Groundwater was encountered at 9' BGS. Borehole
abandoned with 3/8" bentonite chips.
20
A bulk sample of drill cuttings was taken while drilling from
approximately 0'-5'BGS and combined with a bulk sample
from BH-s for particle-size determination, organic content,
and CBR testing.
25
0 20 40 60 80
Water Content (%)
PlasticLimit |-ff LiquidLimit
Natural Water Content
100
NOTE: This log of subsurface conditions applies only at the specilied location and on the date indicated
and therefore may not necessarily be indicative of other times and/or locations.
OL Medium stiff, dark brown, organic SILT, with roots, moist.
(TOPSoIL)
CL
I Material at the bottom of tube appears to be a poorly graded /-
\saruo,moist.
Dense, gray, slightly silty, sandy, well graded GRAVEL, moist.
Gravel broken by sampler.
(COARSE.GMJNED ALLUVIUM)
Rough drilling from 7.5'-10'BGS.
Becomes very dense.
Very rough drilling from 10'-12.5' BGS.
Very dense, grayish brown, slightly silty, sandy, poorly graded
GMVEL, wet.
Very dense, grayish brown, gravelly, poorly graded SAND,
wet.
SP
GW
GM
GP
GM
SP
Kittitas County Transfer Station
Geotechnical I nvestigation
Ellensburg, Washington
GEOSCENCES INC. pRoJECrNo.: 2022-188 FTGURE: A-9
BORTNG-DSM 2022-1 Bg.GP J 5l't2!23
IIm BORING
BH.8
PAGE: 1 of 1
Appnxurx B
GEOTE CHNICAL LABORATORY
TEST RESULTS
AppnNnrx B
Lnnonn ronv TBsr Rnsur,rs
The soil samples obtained from the test pits and borings were taken to HWA's soils laboratory
for testing. Laboratory tests were conducted on selected soil samples to characterize relevant
engineering properties of the on-site soils. Laboratory tests, as described below, included
determination of moisture content, grain size distributions, Atterberg Limits, California Bearing
Ratio, and one-dimensional consolidation of representative samples.
Morsrunn Coilrpnr (nv vrass): The moisture content of selected soil samples were determined
in general accordance with ASTM D 2216. Test results are presented on the exploration logs in
Appendix A, and Figures B-l and B-2, inAppendix B, which provide a summary of material
properties.
Panrrcr,n Srzn Axar.ysls oF Sorr,s: Selected samples were tested to determine the particle size
distribution of material in general accordance with ASTM D422. The results are summarized on
the Grain Size Distribution report, Figures B-3 and B-7 which also provide information
regarding the classification of the sample and the moisture content at the time of testing.
Lrqum Lnntr, Pr.asrrc Llvrrr, AND PLASTrcrry lNrrx oF SoILs (AmnnnnRc LIMITS):
Selected samples were tested using method ASTM D 4318, multi-point method. The results are
reported on the Liquid Limit, Plastic Limit, and Plasticity Index report, Figure B-8 and B-9.
CBR (Clr rronnrA BEARTNG RATro) oF LABoRAToRy CoMPACTED Sotr-s: Selected
composite samples were tested in general accordance with method ASTM D 1883. Each
material was moisture conditioned to near optimum moisfure content and compacted to
approximately 95o/o of its laboratory maximum dry density as determined per ASTM D 1557.
The test results are summarized on the attached CBR of Laboratory Compacted Soils reports
shown on Figures B-10 through B-12.
ONn DrvmNSroNAL CoNsor,mATroN PnoprnrrEs oF Sorr,: The consolidation properties of
selected soil samples were measured in general accordance with ASTM D2435. Saturation was
maintained by inundation of the sample throughout the test. The sample was subjected to
increasing increments of total stress. Loads on the sample were maintained for a period of 24-
hours to collect sufficient data for use in the estimation of secondary consolidation. Unloading
of the samples was carried out incrementally. The test results are presented on the attached
Consolidation Test Report, Figures B-13 through B-14.
2022-188-2r B-l HWA GeoSciences Inc
ATTERBERG
LilVilTS (%)
PI
JU
to
6z
a
:s
oUz
G
:s
zotrr^<
3aF<AJ<o SAMPLE DESCRIPTION
2z
!20
frg
90LOXUrtd
IFIUo
^oa
IFAua
=FFoo E
sU:-
iU,q,
66>o
8ob
1Foz&.oo ()
E
#oogoUca LL PL
BH-1.S-1 0.0 1.5 25.8 SM Yellowish-brown, Silty SAND
BH-1.S-2 )4 4.0 29.2 ML Oliw-gray, Sandy SILT
5.0 6_5 24.5 8.8 52.6 38.5 sin OllFgray, SiltySANDBHi,S-3
BH-1 & BH6.B!lk-1 0.0 5.0 33.0 3-8 36 27 I 0.8 40.1 59.'1 ML Olive brown, Sandy SILT
24 10 54.1 CL Very dark broM, Sandy Lean CLAYBH-2,S-3 5.0 6.5 3't.6 2.4
BH"2,S4 7.5 9.0 8.9 SP.SM OliFbrown, Poorlygraded SAND with silt and gravel
42.1 43-7 '14.2 SM Gray, SiltySAND with gravelBH-2.S-7 '15.0 16.5 10.8
0,0 '1.5 30.4 OL Dark grayish-brown, Organic SILT with sandBH-3,S-1
CH Olive-brown, Fat CLAY with sandBH-3,S-2 2.5 4.0 40.3
6.5 44.3 CH Dark grayish-brown, Fat CLAYBH-3,S-3 5.0
Dark brown, Fat CLAYBH-3,S-4 9.3 45.8 3.5 59 32 85.4 CH
60.5 30.1 GP-GM oliw-gray, Pooriygraded GRAVEL with silt and sandBH-3,S-5 10.0 'l 1.5 7.2
BH.3 & BH4,Bulk-t 0.0 5.0 35.5 3.4 38 24 14 0_3 23.6 76.1 CL Olive brown, lean CLAY with sand
OL Dark brown, Organic SILTaH4.S-l 0.0 1.5 27.8
8H4,S-2 2.5 4.0 31.9 dark grayish-brown, Lean CLAY
CH light OliBbrown, Fat CLAYBH4,S-3 5.0 6-5 50.3
7.5 9.0 34.8 CH dark oliw-brown, Fat CLAYwith sandBH-4.S4
BH{,S-5 '10.0 11.5 9.1 75.0 19.2 5.7 GP.GM Oliw Gray, Poorly graded GMVEL with silt and sand
OL Dark Olivebrown, Organic slLT with sand8H-s,S-1 0.0 1.5 u.7
8H€,S-2 2.5 4.0 32.0 ML olive-brown, SILT
2. The soil classifications in this table are based on ASTM D2487 and D2488 as appli€ble.
Notes:
Kittitas County Transfer Station
Geotechnical I nvestigation
Ellensburg, Washington
SUMMARY OF
MATERIAL PROPERTIES
PAGE: 'l of 2
GEOSCTENCES INC. pRoJEcr No.: 2022-188 FGURE: B-1
INDEX MATSiUM 3 2022.188.CPJ 5111123
6aFE
#4q6
LOXUuJo
IFcUo
aB
xF&Uo
oF^bs69
utfFoo
=
s
FzuFz
o
2
o
&,o
*
FzuFzol)
E
#(,
o*ouoo
ATTERBERG
L|MTTS (%)
u
Eo
oz
a
>R
aUz
Ls
zo
F
2AF<AJ<o SAMPLE DESCRIPTIONLLPL
BH-5.S-3 5.0 7.O 38.4 3.5 50 24 86.5 CH V€rydark broM, Fat CLAY
BH-s.S4 7.5 9.0 41.O CH Oark brown, Fat CLAY
BH-S & BH-8,Bulk-1 0.0 5.0 2.5 17 0-2 31.2 68.5 CL Olive brown, Sandy lean CLAY
8H6.S-t 0.0 1.5 40.0 OL Dark brown, organlc slLT
BH{,S-2 2.5 4.0 35.7 CL Dark brown, Lean CLAY with sand
sH-6,S-6 12.5 14.0 't3.7 52.9 33.1 8.0 GW-GM Dark Brown, Wdl graded GMVEL with silt
8H-7.S-'l 0.0 33,3 ML Verydark broM. SILT
BH-7,S-2 2.5 4.0 29.4 OL Verydark broM, Organlc SILT wlth gravel
BH-7,54 9.0 '1o.4 GP-GM Dark y€llowish-brown, Poody graded GMVEL wilh silt
BH-7,S-5 10.0 11.5 't1.7 55.7 5.2 GW.GM Dark brown, Well graded GRAVEL with silt and sand .
BH-8,S1 0.0 1.5 27.9 OL Very dark brom, Organic SILT
sH-8,S-2 2.5 4.0 34.7 CL Very dark Brown. Lean CLAY with sand
BH4,S-3 5.0 6.3 21.1 3.8 44 23 21 50.3 CL Very dark broM, Sandylean CLAY
8H{.S{7.5 9.0 5.0 67.2 26.6 6.2 GW-GM Very dark Gayish-brown, Wdl gEded GMVEL wilh silt an
Notes:
2. The soil classifications in lhis table are bas€d on ASTM D2487 and D2488 as appli@ble.
sa
lf\m Kittitas County Transfer Station
Geotechnical I nvestigation
Ellensburg, Washington
SUMMARY OF
MATERIAL PROPERTIES
PAGE:2of2
PRoJEcrNo.: 2022-188 FIGURE: B-2GEOSCIENCES INC,
|NDEX MABUM 3 2022.188.G?J 5t11r23
GRAVEL SAND SILT CLAY
Coarse Fine Coarse Medium Fine
U.S. STANDARD SIEVE SIZES
#20 #40 #60
GRAIN SIZE IN MILLIMETERS
#4
10 5
#10
'100
90
80
70
60
50
40
30
20
10
0
FII
ut
E
6
E
uJz
TL
FzuoE
UJ(L
0.001 0.00050.1 0.05 0.01 0,005500.5
'lII
\
I
I
\
\L
I
I
I
)
I.\
I
L I
-I ---r
SAMPLE DEPTH (ft.)CLASSIFICATION OF SOIL- ASTM D2487 Group Synbol and Name %MC LL PL PI Gravel
o/^
Sand
o/^
Fins
o
T
A
BH-1
BH.1 & BH.(
BH.2
D-J
Bulk-1
93
5.0 - 6.5
0.0 - 5.0
5.0 - 6.5
(SM) Oliv+gray, Silty SAND
(ML) Ollve brown, Sandy SILT
(CL) Very dark broiln, Sandy Lean CLAY
24
33
32
36
u
27
24
o
10
8.8
0.8
52.6
40.1
38.5
59.1
54.1
ITUEI
Kittitas County Transfer Station
Geotechnical I nvestigation
Ellensburg, Washington
PARTICLE-SIZE ANALYS IS
OF SOILS
METHOD ASTM D69131D7928
GEOSCIENCES INC. pnoLecr r.ro.: 2022-'t88 FTGURE: B-3
HWAGRSZ 2022-188.GPJ 5/11/23
GRAVEL SAND SILT CLAY
Coarse Fine Coarse Medium Fine
Nt\
Ii
ltl
ltl
I
I
I
\\tit
l!l
I
I"tt
\lil
!\
I
\
I
I
I \
I
I
1
I
\
\
I
I
I
U.S. STANDARD SIEVE SIZES
5/8" 3/8" M #10 #20 #40 #60
FI(,
tJJ
=ot
tuztr
Fzuot
uJL
100
90
80
70
60
50
40
30
20
10
0
50 105 0-5 0.1 0.05 0.01 0.005 0.001 0.0005
GRAIN SIZE IN MILLIMETERS
SAMPLE DEPrH (ft.)CLASSIFICATION OF SOIL- ASTM D2487 Group Symbol and Name %MC LL PL PI Gravel Sand Fines
a
I
A
BH.z
BH-3
BH.3
$7
s-4
95
15.0
7.5
10.0
16.5
dt
11.5
(SNI) Gray, Silty SAND with gravel
(CH) Dark brown, Fat CLAY
(GP-GM) Olive-gray, Poorly graded GMVEL with silt and sand
11
46
7
59 27 32
42.1
60.5
43,7
30.1
14.2
85.4
9.5
E\m Kittitas County Transfer Station
Geotechnical I nvesti gation
Ellensburg, Washington
PARTICLE-SIZE ANALYSIS
OF SOILS
METHOD ASTM D69131D7928
GEOSCIENCES INC. pneieprNor2Q22:l-g- FGUnE: 84
HWAGRSZ 2022-188.GPJ 5/1 1/23
GRAVEL SAND SILT CLAY
Coarse Fine Coarse Medium Fine
U.S. STANDARD SIEVE SIZES
314"
1-'U2'5/8' 3/8' #4 #10 #20 #200
FI(,
ul
=ot
UJz
LL
Fz
I.JJot
uJ
o-
100
90
80
70
60
50
40
30
20
10
50 10 5 0.5 0.1 0.05 0.01 0.005 0.001 0.0005
GRAIN SIZE IN MILLIMETERS
\\I
I
I
\
I
I
I
I
L
\
\
l.
1 \!I
I
!\F
SAMPLE DEPTH (ft.)CLASSIFICATION OF SOIL- ASTM D2487 Group Syrnbol and Name %MC LL PL PI Gravel Sand Fines
a
T
A
BH-3 & BH]
BH4
BH-5
Bulk-1
$5
93
0.0 - 5.0
10.0 - 11.5
5.0 - 7.0
(CL) Olive brMn, lean CLAY with sand
(GP-GM) Olive Gray, Poorly graded GMVEL with silt and sand
(CH) Very dark brown, Fat CLAY
36
o
38
38
50
24
24
14
26
0.3
75.0
23.6
19.2
76.1
5.7
86.5
II\m Kittitas County Transfer Station
Geotechnical lnvestigation
Ellensburg, Washington
GIOSCIENCES INC, pRoJEcr No.: 2022-188 FrcuRE: B-5
HWAGRSZ 2022-188.GPJ 5/11/23
PARTICLE-SIZE ANALYSIS
OF SOILS
METHOD ASTM D691 3/D7928
GRAVEL SAND SILT CLAY
Coarse Fine Coarse Medium Fine
\\lit
ltl t itJ
ll
ll
I I
it
\
lit
t il
!t
til'\lil
ittit
I
I
I
I
I
I
I
I
I
\
tit
I
\tit
t!t
I\\\tit
\I -ltil.lit I \{-\!J tittit
lil
I
I
I
r-l il
U.S. STANDARD SIEVE SIZES
314"#40 #60 #100 #?003" 1-1t2"5/8' 3/8" #4
FII
IIJ
3
o
E
UJz
I!-
Fz
uJot
uJ(L
100
90
80
70
60
50
40
30
20
10
0
50 10 5 1 0.5 0.1 0.05 0.01 0.005 0.001 0-0005
GRAIN SIZE IN MILLIMETERS
SAMPLE DEPTH ( ft.)CLASSIFICATION OF SOIL- ASTM D2487 Group Symbol and Name %MC LL PL PI Gravel Sand Fines
a
I
BH-s & BH{
BH.6
BH.7
Bulk-1
s-6
$5
0.0 - 5.0
12.5 - 14.0
10.0 - '11.s
(CL) Olive brown, Sandy lean CLAY
(GW-GM) Dark Bro,t/n, Wellgraded GRAVEL with silt and sand
(GW-GM) Dark bror/n, Well graded GRAVEL with silt and sand
27
14
12
37 20 17 0.2
52.9
55.7
31.2
39.1
39.1
68.5
8.0
5.2
II\m Kittitas County Transfer Station
Geotechnical I nvestigation
Ellensburg, Washington
PARTICLE-SIZE ANALYSIS
OF SOILS
METHOD ASTM D691 3/D7928
GfOSqfNCfS INC, pRorecr No.: 2022-188 Frcune: 8-6
HWAGRSZ 2022-',t88.GPJ 5/11/23
GRAVEL SAND SILT CLAY
Coarse Fine Coarse Medium Fine
U,S. STANDARD SIEVE SIZES
314',5/8" 3/8' #4 #10 #100 #200
FII
UJ3
cl
trulz
LL
FzulotIu(L
100
90
80
70
60
50
40
30
10
0
50 10 5 0.5 0.1 0.05 0.0r 0.005 0.001 0.0005
GRAIN SIZE IN MILLIMETERS
SAMPLE DEPTH ( ft.)CLASSIFICATION OF SOIL- ASTM D2487 Group Syrnbol and Name %MC LL PL PI Gravel Sand
o/^
Fines
a
I
BH.8
BH-8
D-J
s-4
5_0 - 6.3
7,5 - 9.0
(CL) Very dark brffin, Sandy lean CLAY
(GW-GM) Very dark Grayish-bro|n, Well graded GMVEL with silt and sand
21
5
44 23 2'l
67.2 26.6
50.3
6.2
tit
I
I
I
I
I
I
I
I
I\tit
til
I
I
lil
lil
tit
tit
I
I
I
I
I
Ilft
I
Ir'tit
\\tit
Ifr
Iil
r
I
r--l
lil
EM Kittitas County Transfer Station
Geotechnical lnvestigation
Ellensburg, Washington
GEOSCIENCESINC rrclEsr'{ai 2022:-1-gB eraqBEi B-7
HWAGRSZ 2022J88.GPJ 5/',1',1/23
PARTICLE-SIZE ANALYSIS
OF SOILS
METHOD ASTM D691 3/D7928
60
50
d
x40
LrJoz
F
Otr
3,o(L
10
0
60
LTQUTD LrMrr (LL)
80020
@ @
A
A
_/
@ @
/"
SYMBOL SAMPLE DEPTH (ft)CLASSIFICATION %MC LL PL PI % Fines
a
I
A
o
D
A E
H.1 & BH
BH.2
BH.3
H-3 & BH
BH-5
3-5 & BH.
6 Bulk-1
s-3
s-4
4 Bulk- l
s-3
8 Bulk-1
0.0 - 5.0
5.0 - 6.5
7.5 - 9.3
0.0 - 5.0
5.0 - 7.0
0.0 - 5.0
(ML)Olive brown, Sandy SILT
(CL) Very dark brom, Sandy l€an CLAY
(CH) Dark broM, Fat CLAY
(CL) Olive brown, lean CLAY with sand
(CH) Very dark broM, Fat CLAY
(CL) Olive brown, Sandy lean CLAY
33
32
46
36
38
27
36
34
EO
38
50
37
27
24
27
24
24
20
I
10
32
't4
26
17
59.1
54.1
85.4
76.1
86.5
68.5
II\m LIQUID LIMIT, PLASTIC LIMIT AND
PLASTICITY INDEX OF SOTLS
METHOD ASTM D4318
GEOSCIENCES INC, pno.recrNo.: 2022-188 FrcuRe: B-8
I{VVAATTB 2OZI88.GPJ 91123
Kittitas County Transfer Station
Geotechnical I nvestigation
Ellensburg, Washington
60
50
d
x40uloz
>30F
C)tr
3,0
o_
10
0
80 100020
LTQUTD LrMrr (LL)
@ @
a./
@ @
SYMBOL SAMPLE DEPTH (fr)CLASSIFICATION %MC LL PL PI o/o Fines
a BH.8 s-3 5.0 - 6.3 (CL) Very dark broM, Sandy lean CLAY 21 44 23 21 50.3
rr,t'T'llll llllr Kittitas County Transfer Station
Geotechnical I nvestigation
Ellensburg, Washington
LIQUID LIMIT, PLASTIC LIMIT AND
PLASTICITY INDEX OF SOILS
METHOD ASTM D4318
lNC.188 FIGURE: B-9
CBR (Galifornia Bearing Ratio) OF LAB COMPACTED SOILS
(ASTM D 1 883)
CLIENT: SCS Engineers
PROJECT: Kittitas County Transfer Station
PROJECT NO: 2022-188
lI\Ml
FI\^/AGEOS CI ENCES INC.
SAMPLE lD: BH'l+BH-6
Date Sampled: 3/5/2023
Sampled By:
Date Received: 3/5/2023
Tested By:NJ
Date Tested: 3/16/2023
VO
Material Description
Sample Location:Composite of upper 5 feet of soil frm BH-1 and BH-6.
Soft, olive brown sandy SILT (ML)
X 0Compaction Standard
Max. Dry Density:
Soaked for 96 hrs l_lUnsoaked
pcf @ 35.9 % M.C. with 1 % scalped-off on the 3/4" sieve
X
81.6
D698 D1557 Condition
Test Results
Drv Densitv (ocfl 81.6
Percent Comoaction 100.0
Moisture before Compaction (%)3s.9
Moisture after Compaction %l 3s.0
Percent ht=-4.4
Moisture, after Soaking r 34.9
Moisture. Top 1". after Soak (%)33.8
10
CBR at 0.1" Penetration 0.8
CBR at 0.2" Penetration 0.7
CBR Value 0.8
oc
6
ano
o
16
14
12
10
B
6
4
2
0
0-00 0.05 0.10 0.15 0.20 0.25
Displacement (in)
0.30 0.35 0.40 0.45 0.50
+100.0
,-zl
trdl
C)
0.9
0.8
0.7
0.6
0.5
0.4
0.3
4.2
0.1
0.0
80 82 84 86 88 90
% Gompaction
92 94 96 98 100
REVIEWED BY SEG FIGURE: 10
GBR (California Bearing Ratio) OF LAB COMPACTED SOILS
(ASTM D 1883)
CLIENT: SCS Engrneers
PROJECT: Kittitas County Transfer Station
PROJECT NO: 2022-188
li\Ml
I-IWAGEOSCIENCES INC.
SAMPLE lD: BH-3+BH'4
Date Sampled: 3/5/2023
Sampled By:
Date Received: 3/5/2023
Tested By: NJ
Date Tested: 3/16/2023
VO
Material Description
Sample Location:
11
Composite of upper 5 feet of soilfrom BH-3 and BH-4.
Compaction Standard
Max. Dry Density:
D698 D1 557 Condition:
with 0
X Soaked for 96 hrs I-l Unsoaked
79.2 pcf @ 37.4 %M.c.% scalped-off on the 3/4" sieve
0
Test Results
Drv Densitv (pcfl 79.2
Percent Comoaction 100.0
Moisture before Compaction (%)37.4
Moisture after Compaction '
otto 36.8
Percent Swell i initial ht = 7"-4.4
Moisture, after Soaking
'
37.0
Moisture. Top 1". after Soak (%)36.1
Surcharqe Wei bs 10
CBR at 0.1" Penetration 1.0
CBR at 0.2" Penetration 0.8
CBR Value f.0
,6
o.
otho
o
18
16
14
12
,,1 0
B
b
4
2
0
0.00 0.05 0.10 0.15 0.20 0.25
Displacement (in)
0.30 0.35 0.40 0.45 0.50
t
/
/
/o(J
1.2
1.0
0.8
0.6
0.4
0.2
0.0
80 82 84 B6 88 90
% Compaction
92 94 96 98 100
REVIEWED BY SEG FIGURE: 11
CBR (California Bearing Ratio) OF LAB COMPACTED SOILS
(ASTM D 1883)
CLIENT: SCS Ensineers
PROJECT: Kittitas County Transfer Sfafion
trunt
FIWAGEOSCIENCES INC.
SAMpLE 19. BH-!+BH-8
PROJECT NO
Date Sampled:
2022-188
3/5/20n
Sampled By: VO
Date Received: 3/5/2023
Tested By:NJ
Date Tested: 3/16/2023
Material Description
Sample Location:
Olive brown, sandy lean CLAY (CL)
Composite of soilcuttings from upper 5 feet of BH-5 and BH-8.
Compaction Standard: f, oOea D1557 Condition Soaked for 96 hrs nUnsoaked
Max. Dry Density: 91.7 pcf @ 27.9 % M.C. with 0 % scalped-off on the 3/4" sieve
0 X
Test Results
Drv Densitv (pcf)91.7
Percent Compaction 100.0
Moisture before Gomoaction (%)27.9
Moisture after Gom 27.3
Percent Swell ,-0.8
r 28.1
Moisture. Top 1", after Soak (%)27.7
Surcharge Weight (lbs)t0
CBR at 0.1" Penetration 2.4
GBR at 0.2" Penetration 2.0
CBR Value 2.4
oiL
Q
th(,
o
45
40
35
30
25
20
'15
10
5
0
0.00 0.05 0.10 0.15 0.20 0.25
Displacement (in)
0.30 0.35 0.40 0.45 0.50
+100.0
/
E,oo
3.0
2.5
2.0
1.5
1.0
0.5
0.0
BO 82 84 86 8B 90
% Compaction
92 94 96 98 100
REVIEWED BY:SEG FIGURE: 12
CONSOLIDATION TEST REPORT
c'o
a
Cq)oL
o)(L
-0.5
-0.2
0.1
0.4
0.7
1.0
'1.3
1.6
1.9
2.2
2.5
25
20
Stso>E(J N--
9to
5
0
Applied Pressure - ksf
l-..-
\\
\
\
\\
-l \\
I \\\
\
th
\
t
o---1
,t \
r-\
(r-
Natural Dry Dens
(pcf)LL PI Sp. Gr USCS AASHTO lnitialVoid
RatioSaturationMoisture
83.6 Yr 42.4%69.4 59 )L 2.65 CH 1.34s
MATERIAL DESCRIPTION
Very darkbrown, fat CLAY
Project No. 2022-188 Glient: SCS Engineers
Project: Kittitas County Transfer Station
Source of Sample: BH-3 Sample Number: S-4
Remarks:
Assumed Specific Gravity
Figure B-13[rwH I
GTOSCIENCES TNC,'*=r-* r*='
Tested By:AH Checked By:SEG
CONSOLIDATION TEST REPORT
.Eo!
U)
c
c)g
o(L
-0.4
-0.2
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
20
16
o>E
O c\-;
1 2
B
4
0
101
Applied Pressure - ksf
L
\\\
\\
\
\\I-
\\\\
\\
\
\
5
()
\
L
(/\Yv
Natural Dry Dens
(pcf)LL PI Sp. Gr USCS AASHTO lnitialVoid
RatioSaturationMoisture
93.4%38.4%80.0 50 26 2.65 CH 1.090
MATERIAL DESCRIPTION
Very dark brown,
Project No. 2022-188 Client: SCS Engineers
Project: Kittitas County Transfer Station
Source of Sample: BH-5 Depth: 5.0-7.0 Sample Number: S-3
Remarks:
Assumed Specifi c Gravity
Figure B-14EI\TEI
I
GEOSCIENCES INC"
r>B€/M\A/E]E
Tested By:AH Checked By:SEG
AppnNnrx C
PREVIOUS SITE EXPLORATIONS
2022-t88-2r B-2 HWA GeoSciences Inc.
PROJECT NUMBER:
684127CH.05.02
TEST PIT NUMBER:
TP-01 (P)SHEET 1 OF 1
TEST PIT LOGehtn*
PRO-IFCT' Kiltites Countv Transfer Station l(ilrirra a^' 'hlv l/\rA I n(:ATI.lN' l /aet Fhfran.e l6'1M92 I N 16'1719L )
trI FVATION' 154R 1 fI NAVD88 f: \/rn De \/entar/Kitlit* e6
EXCAVATION EQUIPMENT: Hitachi Zaxis 1 35US Excavator w/ 30" bucket DATE EXCAVATED: 41912019
APPROX. DIMENSIONS: 3'LOGGER: M. Kacmarcik
(:OMMtrNTSAMPLESOIL DESCRIPTION
oJ
i
0-
Eo
DIFFICULTY IN EXCAVATION,
RUNNING GMVEL CONDITION,
COLLAPSE OF WALLS, SAND HEAVE,
DEBRIS ENCOUNTERED, WATER
SEEPAGE GRADATIOML CONTACTS,
TtrET INSTPIIN/ltrNTATIr)N
FL
Uo(tf,a
-if,qu;ioE
C
J
E.
UJF
=
U
0-
Ir
SOIL NAME, USCS GROUP SYMBOL, COLOR,
MOISTURE CONTENT, RELATIVE DENSITY OR
CONSISTENCY, SOIL STRUCTURE, MINERALOGY
1.0
1-BULI
z.u
4.0
2.BUL},(
Much sidewall sloughing in gravels below 3 feet.
Excavation becomes more difficult below 6 feet.
Becomes coarser and more well-graded with
depth.
Becomes wet at 11 feet bgs. Water visibly
flowing into pit.
;l
1l
l'
a
I
I
a
I
sirty-sn-N6-riiintnnvet--tsMl-*low-i,?disra-pp-roisT"Z''fr slicsiif -
<10% rounded gravel. Some grey mottling. Root fibers to 3 feet.
-w?irGEa?atnnve-r-Gwl-n6fr ir,ffi ;t.-oaveGrg-'iFttrinauoG,-
max size 12" diameter, and mixed lithology.
Gravels are mixed lithology.
diameter
lnstall 1 inch diameter Schedule 40 PVC
piezometer with field-slotted 1'screen in backwall
bf test pit. Pipe is 10' long. Backfill test pit to
ground surface with compacted excavation
spoils.
Bottom of Boring at 13.5 ft bgs on 419120'19
5
15
10_
5.0
SHEET 1 OF 'I
TEST PIT NUMBER:
TP-02 (P)
PROJECT NUMBER:
684127CH.05.02
TEST PIT LOGehln*
PROJECT: Kittitas Countv Transfer Station.Kittitas Cdriniv WA I OCATION'-Selehouse {613340.5 N. 1617516.8 E)
Fl FVATION: 1547.Oft NAVD88 CONTRACTOR' C Van lle Venter/Kitfitas C6
EXCAVATION EQUIPMENT: Hitachi Zaxis 135US Excavator W 30" bucket DATE EXCAVATED:41912019
APPROX. DIMENSIONS: 3' wide 0'
anIr^rtrNlTSAMPLESOIL DESCRIPTION
DIFFICULTY IN EXCAVATION,
RUNNING GMVEL CONDITION,
COLLAPSE OF WALLS, SAND HEAVE,
DEBRIS ENCOUNTERED, WATER
SEEPAGE GRADATIONAL CONTACTS,
TCCT INETAIIN'trTITATIANI
IUFz
u(L
It
SOIL NAME, USCS GROUP SYMBOL, COLOR,
MOISTURE CONTENT, RELATIVE DENSIW OR
CONSISTENCY, SOIL STRUCTURE, MINERALOGY
(,oJIr
0-
t(,
trL
Fes
E*$
fo
!:j! !=.
r) .;ir,'. .r
'{ li. \i l,
ti. \t, . \l
0.5
1.BULK
silty SANIJ with GKAVEL and uotsBLE$ (sM): darK brown/bracK,
moist. Many roots. (TOPSOIL)
aaaa
aaaaalla
alaaalaa
aaaaalaa
aaa
l-t_l_.Laa!at
aaa
aalalaaaa
!aa
ala
att
!_!-!-!laaaaa
a
a
a
a
a
a
a
a
a
a
a
a
Begin TP excavation at 1 1 :10. Ground surface is
grass pasture.
Sidewall caving below 1.5 feet, difficult to
maintain open excavation >B'deep
Operator notes relatively easy digging.
lnstall 1" diameter Schedule 40 PVC piezometer
in test pit with field slotted screen from 7 to 8'
bgs.
Well-Graded Sandy Gravel with Cobbles (GW): dark brown, moist,
relatively easy digging. Maximum size observed in 8 inch diameter
rounded cobble. Estimate 30% sand.
Well-Graded Sandy Gravel with Cobbles moist.
no cobbles.
Backfill test pit to ground surface with compacted
excavation spoils.
10_
1q
5_
1.5
Bottom of Boring at 't0.5 ft bgs on 41912019
SHEET 1 OF 1
TEST PIT NUMBER:
TP.O3
PROJECT NUMBER:
684127CH.05.02
TEST PIT LOGehln*
PRO.IFCT: Kittitas Countv Transfer Slation.Cnr rnlrr WA I OCATION'Access Road (613156 1 N 1617968.8 E)
FI FVATION. '1545'I ft NAVD88 (ir)NTRA(:TOR' C Van f)c Venler/Kittitas Co
EXCAVATION EQUIPMENT: Hitachi Zaxis 135US ExcavatorW 30" bucket DATE EXCAVATED:41912019
3'wide 0'LOGGER: M. Kacmarcik
anirirtrt\tTSOIL DESCRIPTIONSAMPLE
ooJII
o-
t
DIFFICULTY IN EXCAVATION,
RUNNING GRAVEL CONDITION,
COLLAPSE OF WALLS, SAND HEAVE,
DEBRIS ENCOUNTERED, WATER
SEEPAGE GRADATIOML CONTACTS,
TFST INSTFII IMFNTATION
Fr
U
Itla
I=
dY
HE
o
J
&
UJFz
U
o-
SOIL NAME, USCS GROUP SYMBOL, COLOR,
MOISTURE CONTENT, RELATIVE DENSITY OR
CONSISTENCY, SOIL STRUCTURE, MINEMLOGY
1-BULK
2.0
u.!:J.
Z
";r..1jj.r.r,
'; .i 17. .t
i: i-1 .!
.t t . at.lr,
? v...J
i-?.!-2
?. f-{Z.!
:J. }J
'11: t1q
2 n,, !
*r r^ ir li
2'it:.!
.\t14 \tt
i lt.i
Sandy Silty CLAY (CH) with organics: blacl( to brown with orange
mottling, moist, medium plasticity. (TOPSOIL)
3.0
7.5
2.BULI(
Begin TP excavation at 11:45. Ground surface is
grass pasture. Weather is clear and windy. Easy
digging in soft soil.
w(%;=49. g, organic Content=6.8%
LL=59%, PL=23o/o, Pl=36o/o
Roots extend to 4 feet. Dark brown/black color
suggests very deep topsoil.
Test pit walls begin caving below 6' bgs
LABORATORY:
P2Q0 = 6.50/o
Groundwater at 8.0' bgs. Much caving below
water level.
LABORATORY:
Poorly-Graded Gravelly SAND (SP): Greyish brown, wet. Trends
coarser to WellGraded Sandy Cobbley GRAVEL with depth.
Backfill TP to ground surface with compacted
excavation spoils.
u.5
Bottom of Boring at 12.0 ft bgs on 4/9/2019
10
15
5
SHEET ,I OF 1
TEST PIT NUMBER:
TP-05 (P)
PROJECT NUMBER:
684127CH.05.02
TEST PIT LOGcham.
PRO.IFCT: Kittitas Countv Steti^n Kittifrq Cnuntv WA I OCA Snrrthoasi.Qtarmwarcr 9an1 (F.1alr?) 3 N 1618456 0 E)
ELEVATION: 1U4.8tl C Van De Venter/Kittitas Co.
EXCAVATION EQUIPMENT: Hitachi Zaxis 135US Excavator w/ 30" bucket DATE EXCAVATED: 419 12019
APPROX. DIMENSIONS: 3' wide LOGGER: M. Kacmarcik
coili nrtrNTSOIL DESCRIPTIONSAMPLE
ooJo
I
0-
t(D
DIFFICULTY IN EXCAVATION,
RUNNING GMVEL CONDITION,
COLLAPSE OF WALLS, SAND HEAVE,
DEBRIS ENCOUNTERED, WATER
SEEPAGE GMDATIONAL CONTACTS,
TtrET INSTPI I[/ltrNTATIrlN
SOIL NAME, USCS GROUP SYMBOL, COLOR,
MOISTURE CONTENT, RELATIVE DENSITY OR
CONSISTENCY, SOIL STRUCTURE, MINERALOGY
trLE=;h 90
EH#
lo
)
t!JFz
uo.
F
3.0
1-BULK
L:..]=.!sl!
i.-t {!
; .i rr. .t
jr".!1
i..r-r .s
v...J4
.'lz-. g-k
11 \t lr. \l
I4r{,
L ..t lr.
^t
ir l"i riU
?{-Li
t !!:!
'$ 17 1\|
brown to blacK wth orange momlng, molsl.
(TOPSOTL)
Sandy CLAY (CH):
Moderate plasticity.
4.Q
7.O
2.BULK
a
a
o
a
a
o
a
!
a
a
a
a
a
a
a
Begin excavation al 12'.11 , Ground surface is
grass pasture. Weather is clear and windy with -
estiamted 30mph gusts. Dark brown/black soils
suggest thick topsoil deposits.
LABORATORY:
w(%;=56.4, Organic content=7'0%
LL=7 0%, PL=26%, Pl=44o/o
Test pit walls caving below 7 feet bgs
lnstall 1" diameter Schedule 40 PVC piezometer
in test pit. Field slotted screen from 8.0 to 9.0' _
bgs.
Groundwater at 7.5' bgs
Gravelly SAND (SP): grey, wet, less than 10 percent fines.
Well-Graded Sandy GRAVEL with Cobbles grey-brown, wet,
rounded.
Backfill to ground surface with compacted
excavation spoils.
U.U
Bottom of Boring at 12.0 ft bgs on 41912019
15
10
5
PROJECT NUMBER:
684127CH.05.02 SHEET 1 OF 1
TEST PIT NUMBER:
TP.O9
TEST PIT LOGehun
PR.) lFnT' kitlitac e^r rhtu Trrnefar Slalian Kittitrs Cnuntv WA I ^e.l^'rt trmhanLmanr /A11A4)-l N lAlA4ln 1 Fl
Fl EVATION: 1550.5 ft NAVD88 CONTRACTOR C Van De Venter/Kittitas Co
EXCAVATION EQUIPMENT: Hitachi Zaxis 135US Excavator W 30" bucket DATE EXCAVATED: 4l9l 2O1 9
APPROX. DIMENSIONS: 3'wide
antrrl\rtrNlTSAMPLESOIL DESCRIPTION
ooJ
9I
0-
ttq
DIFFICULTY IN EXCAVATION,
RUNNING GMVEL CONDITION,
COLLAPSE OF WALLS, SAND HEAVE,
DEERIS ENCOUNTERED, WATER
SEEPAGE GMDATIONAL CONTACTS,
TECT INETPIII'tr[ITATIAN
FL
u.lo
r
lo
-B
Eq
3g
c
J
tUFz
ulI
5r
SOIL NAME, USCS GROUP SYMBOL. COLOR,
MOISTURE CONTENT, RELATIVE DENSITY OR
CONSISTENCY, SOIL STRUCTURE, MINERALOGY
organic sandy slL I (ML): oarK brown, morsl, organrc ( luPsulL)
1.BULI(
3.0
Sandy SILT (ML): brown with grey mottling, moist. Roots observed to
+4'bgs.
4.0
9.0
2.BULK
Begin TP excavation at 13:30. Ground surface is
grass pasture. Weather is clear with high winds-
Easy digging in sandy silt soils.
Groundwater at 8.0' bgs at interface with gravel
layer.
Well-Graded Sandy GRAVEL (GW): brown, wet. Rounded. 1 to 3 inch
diameter. Estimate +30% sand.
I a a I I
I I a a I
t a a a a
I !a a I
I I a a a
I a a a I
t a a I I
t a a a I
I a a a I
I I a a I
I a a a I
t !a a I
I I a a t
I I I a I
t a a t I
I a a a I
I a a !a
I a I !I
I a I a I
I a a a t
I a I a t
I a a a I
Backfill to ground surface with compacted
excavation spoils. Good compaction
difficulVimpossible in saturated gravel.
10_
,t5
5
1U.U
Bottom of Boring at 12.0 ft bgs on 4/9/201 9
SHEET 1 OF 1
TEST PIT NUMBER:
TP-l0 (P)
PROJECT NUMBER:
684',127CH.05.02
TEST PIT LOGehZwt
PROJECT: Kittitas Countv Station. Kittitas Counlv. WA LOCA Transfer Buildino (613659.7 N. 1618241.5 E)
FI F\/ATION. 1551 q ft NAVD88 CoNTFIACTOR'C Van De Venter/Kittitas Co-
EXCAVATTON EeUtpMENT: Hitachi Zaxis 135US Excavator W 30" bucket DATE EXCAVATED:411012O19
DIMENSIONS: 3'wide M. Kacmarcik
cr)irnrtrNTSAMPLESOIL DESCRIPTION
(,oJIr
0-
t(1
DIFFICULTY IN EXCAVATION,
RUNNING GRAVEL CONDITION,
COLLAPSE OF WALLS, SAND HEAVE,
DEBRIS ENCOUNTERED, WATER
SEEPAGE GMDATIONAL CONTACTS,
TtrqT INqTPII['trNTATIAN
trLEI;h voilii<o6&
la
€)
t
LIJFz
Uo.
E
SOIL NAME, USCS GROUP SYMBOL, COLOR,
MOISTURE CONTENT, RELATIVE DENSITY OR
CONSISTENCY, SOIL STRUCTURE, MINERALOGY
2.0
1-BULF
3.0
Sandy SILT (MH): greyish brown wrth orange ano grey motulng, molsl.
6.5
2-BULh
7.5
9.0
3.BULK
t
Begin TP excavation at 08:37. Ground surface is
grass pasture. Weather is clear, light wind.
LABORATORY:
w(%)=32.5
LL=52%, P L=21 o/o, P l= 1 1 %
TORVANE = 2.0 lo 2.2 kg/cm^2
Ash layer visible in TP sidewall
Color change to vivid moftled bright orange and-
grey
Gravel and groundwater at 7.5'. Test pit sidewalls
cave readily below 7.5'
lnstall 1" diameter Schedule 40 PVC piezometer
with field slotted screen from 8.5 to 9.5' bgs.
LABORATORY:
P200=13.0%
Well-Graded Cobbley GMVEL with SILT (GW-GM): brown, wet,
rounded. Sizes up to 6" diameter.
Backfill to ground surface with compacted
excavation spoils.Bottom of Boring at 12.Oft bgs on 4/10/2019
10
'15
5
10.0
SHEET 1 OF 1
TEST PIT NUMBER:
TP-l3 (P)
PROJECT NUMBER:
684127CH.05.02
TEST PIT LOGe*l?trvrriJ-
pRO.IFCT' Kittitas Countv Transfer Station.Kittitac Cnr rnhr \A/A I OCATION'Wall I oadout f613890 7 N 16'18418.6 E)
trI FVATION. 155? 7 fI NAVD88 CONTRACTOR' C Van f)c Venler/Kitlitas Co
EXCAVATION EQUIPMENT: Hitachi Zaxis 135US Excavator W 30" bucket DATE EXCAVATED'.411012019
3'wide 0'LOGGER: M.
ar\l\iiiltrNTSOIL DESCRIPTIONSAMPLE
oJ
o
c
d(,
DIFFICULTY IN EXCAVATION,
RUNNING GRAVEL CONDITION,
COLLAPSE OF WALLS, SAND HEAVE,
DEBRIS ENCOUNTERED, WATER
SEEPAGE GMDATIONAL CONTACTS,
TFST INSTR1IMFNTATION
FG
Uo
dla
rB
f,q
HH
-
J
tl!Fz
U
o-
s
SOIL NAME, USCS GROUP SYMBOL, COLOR,
MOISTURE CONTENT, RELATIVE DENSIry OR
CONSISTENCY, SOIL STRUCTURE, MINEMLOGY
1.0
1-BULI
2.0
4.0
2.BULN
Sandy SILT (ML): olive brown, moist.
content (TOPSOIL).
with orange
plasticity, moist.
grey
5.0
6.5
3.BULK
I I a a
I I a a
I I a a
I a a a
I o a a
I a a a
I I a a
I a a I
t a a
I a a I
Begin TP excavation at 13:50. Ground surface is
grass pasture. Weather is clear and windy.
w(%l=29.1, Organic content=S.3%
LL=34%,PL=23%,Pt=11%
Groundwater at 8.0' bgs. Sidewall caving belowl
feet.
LABOMTORY:
w(o/o)=39.7
LL= 52%, PL=21 %, P I =3 1 o/o
lnstall l" diameter Schedule 40 PVC piezometer
in test pit with field slotted screen from 8.0 to 9.0
bgs.
LABORATORY:
P2OO=M.7o/.
Well-Graded GRAVEL with Cobbles (GW): greyish brown, wet.
Rounded gravels and cobbles up to 7 inch diameter. Estimate t30%
sand.
Backfill to ground surface with compacted
excavation spoils.
9.5
Bottom of Boring at 12.0 ft bgs on 4/10/2019
15
5
10
SHEET 1 OF 'I
TEST PIT NUMBER:
TP-l5 (P)
PROJECT NUMBER:
684127CH.05.02
TEST PIT LOGehU*t
PR.t.|Fr:T Kiltitrs Cnuntv Cr.fi^h Kitrifa. Cnilnrv WA I OCA l^/i^dr ,^, Araa enrrrh /A1?11? d N 1A1An41 7 F)
FLEVATION: 1&8.2ft C Van De Venter/Kiltitas Cn
EXCAVATION EQUIPMENT: Hitachi Zaxis 135US Excavator w/ 30'' bucket DATE EXCAVATED: 4l1Ol2O19
3'wide M. Kacmarcik
1:r)f\rnrtrNTSAMPLESOIL DESCRIPTION
DIFFICULTY IN EXCAVATION,
RUNNING GRAVEL CONDITION,
COLLAPSE OF WALLS, SAND HEAVE,
DEBRIS ENCOUNTERED, WATER
SEEPAGE GRADATIONAL CONTACTS,
TtrAT INICTPII[,ltrNTATIr)N
J
i
0-
tro
trrT=;irYq
8s$
:)0
-
J
tUFz
u
0-
F
SOIL NAME, USCS GROUP SYMBOL, COLOR,
MOISTURE CONTENT, RELATIVE DENSITY OR
CONSISTENCY, SOIL STRUCTURE, MINEMLOGY
l=.)=.
i*,i
2.O
1.BULI(
3.0
9.0
2-BULh
aa
Begin TP excavation at 09:13. Ground surface is
grass pasture. Weather is clear and windy. -
LABOMTORY:
w(%)=2s.4
LL= 40%, P L=23o/o, P l= 1 7 %
P200=62.7o/o
lnstall l" diameter PVC piezometer in test pit with
field slotted screen from 8.5 to 9.5' bgs.
Approx 10" topsoilLean CLAY (CL): brown, moist, medium
moist. Rounded
and cobbles to 8" diameter
Sandy
Backfill to ground surface with compacted
excavation spoils.Bottom of Boring at 12.0 ft bgs on 4/10/2019
15
5_
10_
10.0
SHEET 1 OF 1
TEST PIT NUMBER:
TP-19
PROJECT NUMBER:
684127CH.05.02
TEST PIT LOGe*t
PRO.JFCT: Kittitas Countu Transfer Station.Car rnlv WA I OCATION'WindrowArea North 1613674.6 N. 161 1F\
Fl FVATION: '1551.6 ft NAVD88 CoNTRACTOR' (: Van De Venter/Kittitas Cn
EXCAVATION EOUIPMENT: Hitachi Zaxis 1 35US Excavator w/ 30" bucket DATE EXCAVATED: 411012019
DI 3'wide 0'LOGGER: M. Kacmarcik
anttrtrrtrNTSOIL DESCRIPTIONSAMPLE
SOIL NAME, USCS GROUP SYMBOL, COLOR,
MOISTURE CONTENT, RELATIVE DENSITY OR
CONSISTENCY, SOIL STRUCTURE, MINEMLOGY
oJ
o
=c
t(9
DIFFICULTY IN EXCAVATION,
RUNNING GMVEL CONDITION,
COLLAPSE OF WALLS, SAND HEAVE,
DEBRIS ENCOUNTERED, WATER
SEEPAGE GMDATIONAL CONTACTS,
TtrST INSTRIIMFNTATION
FL
uo
I
&.fo
I3ao
8g
-
J
dUFz
U
o-
F
2.0
1-BULK
aat
aat
aaa
aaa
aaa
aaa
aaa
aaa
aaa
aaa
aaa
aaa
aaa
aaa
aaaaaa
.i./,
3.U
2-BULI
5.0
Color change to brown at
Very soft, sandy, and wet
gravelgrades to reddish brown at 11.0'
diameter. Estimate r15% fines.
brown, wet. Color
and cobbles to 6"
Begin TP excavation at 09:48. Ground surface is
grass pasture. Weather is clear and windy. -
LABORATORY:
w(%)=31.5, Organic content=6.8%
LL=38%, PL=21Yo, Pl=17 o/o
P200=52.2%
Minimal caving observed in gravels below
groundwater level.
Groundwater at 8.5' bgs.
Backfill test pit to ground surface with compacted
excavation spoils.
6.0
Bottom of Boring al 12.0 ll bgs on 4/10/2019
10
15
5
SHEET I OF 1
TEST PIT NUMBER:
TP.23
PROJECT NUMBER:
684127CH.05.02
TEST PIT LOGeh?rnfi-
PROJECT: Kittitas County Stetion. Kittitas Countv. WA Grinder 16'13785.6 N. 1617860.3 E)
FI FVATION. I55,I 3fINAVD88 (-..)NTFIACTOR'C Van De Venter/Kittitas Co
EXCAVATION EQUIPMENT: Hitachi Zaxis 135US Excavatoril 3O'' bucket DATE EXCAVATED:411012O19
DIMENSIONS: 3'wide 0'M. Kacmarcik
r:.)tir[rtrNTSAMPLESOIL DESCRIPTION
(,
9II
0-
t(D
DIFFICULTY IN EXCAVATION,
RUNNING GMVEL CONDITION,
COLLAPSE OF WALLS, SAND HEAVE,
DEBRIS ENCOUNTERED, WATER
SEEPAGE GMDATIOML CONTACTS,
TtrA.r INIETPIII\,ltrNTATIAN
FLE=;h vo
Es#
fo
-
J
tuFz
ul
Ir
SOIL NAME. USCS GROUP SYMBOL, COLOR,
MOISTURE CONTENT, RELATIVE DENSIW OR
CONSISTENCY, SOIL STRUCTURE, MINERALOGY
3.0
1-BULI'
4.O
8.0
2.BULN
-siidi SII-T (ilturr,r-n)lniwn, rniiii fre-3ium-pl-asiniil. estim?e tZ% -
fine sand.
below 10', wet. Gravel and
m
to
5 to 10', then brown9.
L)plasticity. Organics.(roPSo
t
a a
a
a I
a a
a
a
a a
I a
a
I a
a a
a I
Begin TP excavation at 1Q:22. Ground surface is
grass pasture. Weather is clear and windy.
S" topsoil
No caving above gravels, test pit walls stand
vertical.
Groundwater at 9.0' bgs.
Backfill to ground surface with compacted
excavation spoils.Bottom of Boring at 12.0 ft bgs on 4/10/2019
15
5
10
9.0
SHEET 1 OF 1
TEST PIT NUMBER:
TP-25 (P)
PROJECT NUMBER:
684127CH.05.02
TEST PIT LOGehnn
pRO.lFCT Kittitas Countv Transfer Stalion lctfirrc a^r'ntv lA/A I O(]AT|ON Flinfilt.r 1613O?4 O N 1617653 6 F)
trr F\/artoN. 1551 3 ft NAVD88 a:r)NTPAa:TnR' ll \/an flp \/entcr/Kiftitas Co
EXCAVATION EQUIPMENT: Hitachi Zaxis 'l35US Excavator w/ 30" bucket DATE EXCAVATED" 41912019
APPROX.0'LOGGER: M. Kacmarcik
COMMFNTSAMPLESOIL DESCRIPTION
oJo
IA
to
DIFFICULTY IN EXCAVATION,
RUNNING GRAVEL CONDITION,
COLLAPSE OF WALLS, SAND HEAVE,
DEBRIS ENCOUNTERED, WATER
SEEPAGE GMDATIONAL CONTACTS,
TtrST INSTRI IMtrNTATION
FL
U
Itlo
rBFO
8H
E
J
E.ulFz
Uo.
F*
SOIL NAME, USCS GROUP SYMBOL. COLOR,
MOISTURE CONTENT, RELATIVE DENSIry OR
CONSISTENCY, SOIL STRUCTURE, MINERcLOGY
1.0
1-BULK
sanuvsri-tv[i:El6iu-rtoauo-ve-wi-thGs-tim-atea-so7-rin;6m-ed'rufr -
GRAVEL (GW): brown, moist.
to 8 inch diameter
grey
sand.
2.t)
2.BULK
7-O
a a a
a a a
a a a
o a a
a a a
a a I
I a a
a a a
a a a
t a a
t a a
a a a
a a a
a I a
a a I
a a a
I I a
I a a
a a a
a a I
a t I
I I I
a a I
a a I
a I a
a a a
a a I
a I I
Begin TP excavation at 14:23. Ground surface is
grass pasture. Weather is clear and windy.
LABOMTORY:
w(%)=19.9
LL=38%, PL=21o/o, Pl=17To
P200=M.Oo/o
Volcanic ash layer at 2.5' bgs, approx 2" thick
No sidewall sloughing in silt
LABORATORY:
P200=6.2%
Groundwater at 8.0' bgs. lnstall '1" diameter
Schedule 40 PVC piezometer in test pit with fleld
slotted screen from 8.0 to 9.0'bgs.
Backfill to ground surface with compacted
excavation spoils.Boftom of Boring at 1 1 .0 ft bgs on 4/9/20'19
10
A
15
'l
6.0
SHEET 1 OF 1
TEST PIT NUMBER:
TP-26 (P)
PROJECT NUMBER:
684127CH.05.02
TEST PIT LOGehtn*
PRO.IFCT: Kittitas Countv Transfer Station.kiltiire r.nrhh, M/A I ocATloN'Centrel Stormweter Pond 1613595-8 N. 1 7A7A A F\
FI FVATION. 1548 1 ft NAVIJSS CoNTRACTOR' C Ven De Venfer/Kittitas Co
EXCAVATION EQUIPMENT: Hitachi Zaxis 135US Excavator w/ 30" bucket DATE EXCAVATED:4110120'19
3'wide LOGGER: M.
^a\itIrrtrNT
SOIL DESCRIPTIONSAMPLE
DIFFICULTY IN EXCAVATION,
RUNNING GMVEL CONDITION,
COLLAPSE OF WALLS, SAND HEAVE,
DEBRIS ENCOUNTERED, WATER
SEEPAGE GMDATIONAL CONTACTS,
TECT INIQTDIIA'trNlTATIr]NI
SOIL NAME, USCS GROUP SYMBOL, COLOR,
MOISTURE CONTENT, RELATIVE DENSITY OR
CONSISTENCY, SOIL STRUCTURE, MINERALOGY
(,oJo
Io-
E.o
-h
FE5
EHE
U'
d
J
duFz
u
o-
s
!= !::4.
1els! {!
Ijrl
-.-.:
1.0
1-BIJLK
2.O
3.0
2-BULK
SanavGan-ct-Af idlild6wll,m;st,estimateoso"/T
sand.
medium
moist
4.O
5.5
3.BULI
6.5
7.0
4-BULI
Begin TP excavation at 11:07 . Ground surface is
grass pasture. Weather is clear and windy.
LABORATORY:
w(%)=34.3
LL=48%, PL=2Oo/o, P l=28o/o
P200=70.0%
Wood and roots observed in clay layer
LABORATORY:
w(%)=35.6
LL=37 %, PL=20%, P l= 1 7 o/o
P200=62.7o/o
Groundwater at 7.0'bgs, gravels caving below
7.0'bgs.
LABORATORY:
P200=5.3%
lnstall 1" diameter Schedule 40 PVC piezometer
with field slotted screen from 8.5 to 9.5'bgs.
a a
a t
a a
a !
a a
a a
a a
I
I
a
I
I
I
I
I
a
o
o
o
a
t
a
t
t
a
a
Well-Graded GMVEL (GW): orange, wet, rounded, approx 2" max
--wEitGE<i-ea-cou-uev-e-nFrEf ldvTgr#-br;wilGtJoTn-de?----
cobbles to 8" diameter
diameter
Backfill test pit to ground surface with compacted
excavation spoils.
U.U
Bottom of Boring at 12.0 ft bgs on 4/10/2019
15
5
'10
TEST PIT NUMBER:
TP-27 (P)SHEET 1 OF 1
PROJECT NUMBER:
684',127CH.05.02
TEST PIT LOGehtn*
PRO.iFCT: Kittitas Countv Slatinn Kiftita< Carrnlv WA I OCA PA^rnlihd llrnrunff Area (6'l?697 4 N '1617459.6 E)
Fr FVAT|ON. 154A7 ft al \/.n na \/anlar/Kilfitaq ed
EXCAVATION EQUIPMENT: Hitachi Zaxis 135US Excavator w/ 30" bucket DATE EXCAVATED: 419 l2O1 9
APPROX. DIMENSIONS: 3'wide LOGGER: M. Kacmarcik
COMMtrNTSOIL DESCRIPTIONSAMPLE
JIx
0-
to
DIFFICULTY IN EXCAVATION,
RUNNING GMVEL CONDITION,
COLLAPSE OF WALLS, SAND HEAVE,
DEBRIS ENCOUNTERED, WATER
SEEPAGE GMDATIONAL CONTACTS,
TtrST INSTRI IMtrNTATION
SOIL NAME, USCS GROUP SYMBOL, COLOR,
MOISTURE CONTENT, RELATIVE DENSIry OR
CONSISTENCY, SOIL STRUCTURE, MINERALOGY
FI
=l;h vo
Es$
lo
d
J
tut-z
uL
F
l:t v.
i s.!
1a. .\ tr
1.0
1-BULI
2.O
2-BULK
4.O
Begin TP excavation at 15:22. Ground surface is
grass pasture. Weather is clear and windy.
lnstall 1" diameter Schedule 40 PVC piezometer
in test pit with field slotted screen from 8.0 to 9.0
bgs.
Groundwater at 9.0 feet bgs.
aa
aa
aa
aa
aa
aa
aa
aa
aa
aa
aa
aa
aa
aa
aa
aa
aa
aa
at
aa
aaaa
aa
aaaa
I
t
II
t
II
I
II
t
Sinov slT (M[):Triwn wTtrtEn-ge and grey
percent fine sand.
Well-Graded Cobbley GRAVEL (GW):
gravel with cobbles up to 8" diameter.
SAND with
Estimate 10% silt.
wet..
wet,sandy
20
Backfill to ground surface with compacted
excavation spoils
5.0
Bottom of Boring at 11.0 ft bgs on 41912019
15
5
10
SHEET 1 OF 'I
TEST PIT NUMBER:
TP.29
PROJECT NUMBER:
684127CH.05.02
TEST PIT LOGehnw
ftR.) IF(:T. Kittites C6rhtv Trensfer Stalion Kittifac f:^rht\, \A/A I ocATlON' Rccvelino Fxit (614180 0 N. 1617422.3E\
Fl EVATION: 1551.211 C \/an l)e Venier/Kiltitas Co
EXCAVAT|ON EQUIPMENT: Hitachi Zaxis 135US Excavator w/ 30" bucket DATE EXCAVATED:41912019
APPROX.3'wide M.
SAMPLE SOIL DESCRIPTION
RUNNING GRAVEL CONDITION,
COLLAPSE OF WALLS, SAND HEAVE,
DEBRIS ENCOUNTERED, WATER
SEEPAGE GMDATIOML CONTACTS,
ooJI
0-
d
a
J
tuFz
uc
F
SOIL NAME, USCS GROUP SYMBOL, COLOR,
MOISTURE CONTENT, RELATIVE DENSITY OR
CONSISTENCY, SOIL STRUCTURE, MINERALOGY
trIE=;h 90
BgE
la
0.5
1.BULN
1.5
3.0
2.BULK
?t?Gi-ic5llT-tvtr)la-an-ge-br;il;witngreim-ott-lins,moist.
Well-Graded Sandy Cobbley GRAVEL
mated 45% fine sand.
(SM): brown, moist to wet.
6.0 to 6.5'
wet,
gravels and cobbles to S" diameter
laa
tla
Begin TP excavation at 14:57 . Ground surface is
grass pasture. Weather is clear and windy.
lnstall 1" diameter Schedule 40 PVC piezometer
with field slotied screen from 8.0 to 9.0'bgs.
Ash layer at 2.0' bgs.
Groundwater at 10.0' bgs
Backfill to ground surface with compacted
excavation spoils.Boftom of Boring at 11.0 ft bgs on 41912019
5
15
10_
4.O
ehrnn+684127CH.05.02 TP-30 SHEET 1 OF
TEST PIT LOG
ft
EXCAVATION EQUIPMENT:Hitachi Zaxis 13SUS Excavator W 30,, bucket DATE EXCAVAT ED: 4t,t O t201 9
C- Van Co
3'
M.
SAMPLE solL DESCRIPTION
FL
uo
Lufo
r;:
EC
8g
(
J
Et!Fz
U
0-
*.ffi#lvili#F,sftiY#lfl.,iptrsE"
ooJ
moist.a
aI
I
a
aa
aa
al
la
lT.".pr] test pit to check depth to gravets in
;?:'[!ffi l i,: Tr% :lil !?r9fi,.
cooid i nates a re
Ground surface is grass pasture.
Bottom of Boring at 2.S ft bgs on 4/10/2019
excavation spoils.
to
FI ON
SOIL DESCRIPTION
COMMENTS
STANDARD
PENETRATION
TEST RESULTS
DEPTH BELOW GROUND SURFACE (fr)
INTERVAL (ft)
RECOVERY (fr)
#TYPE 6L6.-6."yTi#i+i!ir.tiF,{4ir#1fl:i:me',BF?L?^1H5ilH:ifi
,iHf.xilF0.00
1.00 SS-1 9-8-9
(17)
0.50 ss-2 4-4-4
(8)
0.30 ss-3 4-7-13
(20)
0.50 SS.4 3-18-49
(67)
WEL,sP.
brown, dry, medium dense
Similar to SS-3, but very dense
gray
Driller Note: Ground water at about 5 ft belowground surface
|5ii lu::l:,, ffi "Ti1;,;,.9:.1,#H fl,n "'oetow ground surface to ttre,Uottom'oiine loring.
5
10
D3396900
B-1 SHEET 1 oF1
SOIL BORING LOG
Tcch
I
l
I
/
TION Lat:47.o Lono: -
soll
RESULTS
OEPIH BELOW GROUND SURFACE (ft)
INTERVAL (ft)
RECOVERY (ft)
#TYPE 6',l6'-6'"fitiffi&i!:Ftiff .+ir#:flilsff."ft
"
Btrtrffsll#Xii#xrs
ss-1 B-13-19
(32)
0.80 ss-2 4-8-.t1
(1e)
0.70 ss-3 15-50/6'
(50/6)
0.60 ss-4 37-36-41
(77)
Similar to SS-2, but very dense
Similar to SS_3
gray,dense
r"':firt"rF;3J"und water at about 5.s ft berow
fl#r,il{llf,j*ftitilgffi rr,""'
D339 6900
B-2 SHEET 1 oFl
SOIL BORNG LOG
I
l
s
sotLTION
RESULTS COMMENTS
DEPTH BELOW GROUND SURFACE (ft)
TNTERVAL (ft)
RECOVERY (ft)
#TYPE 6',-6'-6'"fitiffi iff F{tF#&:r#:fl.,isffft
',
BF?n1'Hf+liffiifiHttHs
0.50 SS-1 2-4-4
(B)
0.60 SS-2 12-20-17
(37)
0.60 ss-3 12-18-20
(38)
SS.4 13-28_44
(72)
Similar to SS-2
Similar to SS_3, but very dense
dry,medium lowstiff,plasticity
3'liili:,1?F;3J"und water at about 6 e ft berow
fli"rffi fl:tr?dj1fl ;iff"1H,*:?,.,",
D33 96900
B-3 SHEET 1 oF1
SOIL BORNG LOG
-1 64"
TBD 47
.ING
SOJL
RESULTS
DEPTH BELOW GROUND SURFACE (ft)
INTERVAL (ft)
RECOVERY (ft)
#TYPE 6"-6'-6'.fitlffi?s$irr,$,itit#:fl+$Sff:ft
"
Bilrftlfiiffiiffiws
0.60 ss-1 2-2-4
(6)
0.10 ss-2 5-27-42
(6e)
ss-3 32-50/5"_11
(61)
0.70 SS.4 12-24_40
(64)
dry, medium stiff, low plasticity
Similar to SS-2
Similar to SS_2
gray
r"':[ilYFr"?"und water at abour 3.7 ft berow
;?#i:Hfnt,#"'j":*iiifffl,:r,f,
rffi ;
1oF1B4SHEET
SOIL BORNG LOG
.oD=8 =4
SOILSTANDARD
TSRESUL
DEPTH BELOW GROUND SURFACE (ft)
INTERVAL (fl)
RECOVERY (ft)
#TYPE 6"-6"-6'
"$fi#"?i!i,,;*,H;tir#1fllTFfi?ft
"
8trilr,:f5lli#xiffi'$3Hs0.00
ss-1 4-4-6
(10)
0.20 ss-2
(33)
7-12-21
0.10 ss-3 1 B-1 9-30
(4e)
0.40 SS.4 15-36_45
(81)
stiff, low plasticity
Similar to SS-2
Similar to SS_3, but very dense
i':iflrT?F;""J"und water at about2.2 ft berow
fl#i'ff fnfl:#lir#r,"",#[t:l*;
B-5 SHEET 1 oF1
SOIL BOruNG LOG
47
Haz-
D3396900
B-6 SHEET
' OF
SOIL BORING LOG
-1
DEPTH BELOW GROUND SURFACE (fr)
INTERVAL (ft)
RECOVERY (ft)
#TYPE
ss-1
ss-2
ss-3
0.60
0.70
0.80
0.40 ss-4
STANDARD
PENETMTION
TEST RESULTS
SOIL DESCRIPTION
COMMENTS
6'-6'-6'"ffi.,Hffi?i!:F.ff fr{+:r#:fl.hsd:ft
"
BffilT'""1.?ti#,-"a,,"{'i!'$t}JF'
6-5-7
(12)
dry, stiff, low plasticity
12-32-27
(se)
pr
Driller Note; Ground water at about 2.5 ft belowground surface
;:#ffr{"*1":i1;:lfffl ,F.f,
i::fl ;
Similar to SS-2
10-32-45
(77)
15-19-49
(68)
@rHsArpANp
gray, wet, very dense
10
1t