HomeMy WebLinkAboutResolution 2024-163BOARD OF COT]NTY COMMISSIONERS
COT]NTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2024. I LOb
TO AWARD THE CONTRACT FOR THE KITTITAS COUNTY LOWER COUNTY
TRANSFER STATION PROJECT
WHEREAS: Kittitas County solicited bids for the Kittitas County Lower County
Transfer Station Project; and
WHEREAS: Sealed bids were opened on August 2, 2024 in the Kittitas County
Commissioners conference room at205 W. 5th Ave. Ellensburg, WA; and
WHEREAS: Two (2) bids were received for the project. The bids have been reviewed
by our project engineers at SCS Engineers which recommends award to
the lowest responsible bidder, Belsaas and Smith LLC. SCS Engineers
found the contractor to be compliance with state licensing requirements
and all bid requirements for the project and recommends award;
NOW THEREFORE, BE IT HEREBY RESOLVED: that the Board of County
Commissioners, in the best interest of the public, does hereby award the
contract for the Kittitas County Lower County Transfer Station Project to
Belsaas and Smith Construction LLC. in the Amount of $18,441,939.80
plus sales tax.
ADOPTED this &w 2024
BOARD OF COT]NTY COMMISSIONERS
KITTITAS CO ,w GTON
t
Chair
Vice-Chairman
Commissioner
7
$u-l
L/\LS
(<4irttV
ATTESfl APPROVED AS TO FORM:
.fcler|of the Board- Julie Kjorsvik Douglas R. Mitchell, Deputy Prosecuting Attorney
n Deputy Clerk of the Board- Mandy Buchholz
SCS ENGINEERS Environmentol Consulionts & Controctors
August 8,2024
Proj ect N o. 01222292.00
Patti Stacey, Director
Kittitas County Solid Waste/Facility Maintenance Director
925Industrial Way
Ellensburg,WA 98926
Subiecl Lower Valley Transfer Station
Recommendation for Award
Dear Ms. Stacey
On Friday, August 2,2024, two (2) bids were received and opened for the Kittitas County
Lower Valley Transfer Station project. SCS Engineers (SCS) has reviewed all submitted bid
documents for accuracy and conformity to the requirements listed in the Instruction to Bidders.
Bid Tabulations
Bids were received from two bidders: 1. Belsaas and Smith ConstructiorL Inc., Ellensburg,WA,
2: Apollo, Inc., Kennewick, WA. Both bidders had attended the mandatory pre-bid meeting.
A11 requirements for submittal of bids were met and all bids were thus deemed responsive.
Following the bid opening, an independent summary and arithmetic check was performed on
all bids. All bids were arithmetically correct, with one minor exception on the bid from Belsaas
and Smittu which did not change the bid amount.
Belsaas and Smith is the apparent low bidder with an extended price of $16,734,939.80 (not
including State of Washington Sales Tax). Please see the attached sheets for a bid summary and
their proposed prices.
SCS's Opinion of Probable Cost is $16,081,657.00.
Review of Bidder's Qualifications and Proposal
Upon confirmation of Belsaas and Smith, Inc. as the apparent low bidder. SCS reviewed the
Bid Form and determined that all items were completed. Our review confirmed that Belsaas
and Smith, Inc. currently possess required State of Washington contractors' licenses and
registrations.
240514OthAve. NE,Suiie 107, Bellevue, WA98005 | 425-746-4600 | eFox 5A3-684-6948 {i
Kittitos County Lower Volley Tronsfer Stotion
August 8,2024
Poge 2
Recommendation for Award
Based upon our review, SCS recommends Kittitas County award the contract to Belsaas and
Smith, Inc. in the amount of. $16,734,939.80 (Not Including Sales Tax). Additive options will be
added as funding becomes available.
Please contact SCS if you should have any questions.
Sincerelp
fusH*
Thomas D. Parker, PE, BCEE
Project Director
SCS Engineers
Klttltas County - Lower Valley Transfer Station SECT|ON 00 00 04,1
BID SCHEDULE
June 18, 2024
Addendum No, 1
ContEdor Name:B€lsaas and Smith
c€neral
Extended Pilce Unlt PrlceI Extended PrlceIs 1.994.060.00
Unlt PrlceI Ertended PrlceBld ltemI I qu.ntltyI unit Prlce
1 Vlobilization/Demobilizatlon (5% Maximum)ts 1 5 8oo.ooo.oo s 800.000.00 s 1.139.000.00 1.139.000.00 a10.000_o0 810.000.o0
))rojed Surveving ts I s 12s.000.00 S 125.ooo.oo s 113.000.00 113.000.00 80.000.o0 80-000.oo
3 Quality Control Testing ts 1 s 2s0.000.00 S 25o.ooo.oo s 113.000.00 S 113.ooo.oo 78.000.00 7a_000-00
4 Soil Erosion and Sediment Control LS 1 5 loo,ooo.oo S loo.ooo.oo s 629.060.00 S G29.o6o.oo 43.000.00 43.O00_OO
ClvlUSltework
S i.2so.469.6s
5 Clearend Grub AC 30 s 8.000.00 S 24o.ooo.oo S 4.430.00 s 132.900-00 4.800.00 144.000.00
5 lJnsuitable Solls - Excavetion CY 49,000 s 10.00 S 49o,ooo.oo s 12.00 s 588.000.00 7.80 382.200.00
7 Sub{rade PreDaration SY 45,400 5.00 5 227,ooo.oo s 1.90 s 86.250.00 5.20 236.080.00
8 6eotetriles SY 5s,400 3.25 s 180,050.00 s 11.80 s 653.720.00 7.30 404.420.OO
9 Common Fill (Plan Quantiw)CY 82,300 15.00 S 1.234.500.00 s 41.80 s 3.440.140.0t 5 24.EO 5 2.041.040.00
10 Crushed Suface Base Course - 6"SY 45,400 s 8.00 S 363,200.00 s 11.00 s 499.400.00 7.40 335_960-00
11 Hot Mix Asohalt - 7"20,200 36.00 s 727.200.00 s 36.60 s 739-320.00 35.00 707.000.00
t2 Hot Mix Asohalt -4"25,200 20.00 S so4,ooo.oo s 21.86 S sso.872.oo s 27.OO 529.200.00
13 Site SiriDino - Double Y€llow IF 6,323 10.00 s 63.230.00 s 0.85 s 5.374.s5 1.10 6.955.30
14 Site Strioino - Sindle White IF 12,646 5.00 s 63,230.00 s 0.60 S 7.s87.60 o.7ss 9.484.50
15 Site Si!nape ts 1 s 57.000.00 5 s7,ooo.oo S 35.2oo.oo s 35.200.00 S 41.ooo.oo 41.000.00
16 Site Concrete ts 1 s 35,500.00 s 35.500.00 S 46.541.00 S 46.s41.00 S 7s.ooo.oo 75.000.00
77 Site Fencinp - 5'Chainlink IF 3,975 5 50.00 5 198,750.00 5 59.50 S 236.512.s0 s 159.000.00 s 159.m0.00
18 Site Fencinp - Gates FA 5 2,500.00 s 20.000.00 S 2.714.00 S 2t.7L2.oo 700.00 5.600.00
19 Site Seedinp AC 30 1,500.00 S 45,ooo.oo S 4.071.00 S 122.130.00 S 1.4oo.oo 42.000.00
20 LandscaDins ts 1 20,000.00 S 2o,ooo.oo S 84.8oo.oo S 84.8oo.oo s 52.000.00 S 52.ooo.oo
llte utilities
S 3.617.3s0.00
2t ;ite Domestic Water Svdem ls 1 483,250.00 S 483,2s0.00 5 747,7oo.oo S 747.too.oo S 607.000.00 607.000,00
22 iite Fire Water Svstem ls 1 s 560,734.00 s 660.734.00 S 1s9,5oo.oo S 159.500.00 s 142.000.00 S 142.ooo.oo
23 iite SewerSvstem ts 1 s 283,470.00 s 283.470.00 S 224,300.00 s 224.300.00 S 185.ooo.oo 185.000.00
24 ;ite Stormwater Svstem ts 1 12&758.00 s 128.758.00 S 382.700.00 S 382.700.00 s 309.000.00 309.000.00
25 Site Eledrical ts !s 865.462.00 s 865.462.00 S 2.103.150.00 5 2.103.150.00 1.738.000.00
Tiansfer Bulldlns
S 6.651.66s.00
26 Concrete ts 1 1,537,239.00 s 1,537.239.00 s 2.737.4r0-OO S 2.r37.47o.0o s 1.347.000.00 s 1.347.000-00
Miscellan€ous Metals ts 1 304800.00 i 304800.00 5 468,310.00 S 468.310.00 s 423.000.00 s 423.000-00
2a Prc-Enpineered Metal Euildinp {PEMBI ts 1 2,259,900.00 2,259.900.00 3,218.115.00 S 3.218.115.00 S 2.852.ooo.oo s 2.852.000.00
29 Break Room ts I 198,000.00 19&000.00 222,773.00 s 222.773-00 5 94.ooo.oo S 94.ooo.oo
30 Mechanical/Plumbins ts 1 196,726.00 5 196,726.00 239,772.00 s 239;112.00 5 2o3,ooo.oo 5 2o3.ooo.oo
31 Fire Protection svsem ts 1 302 oat oo 5 302,088.00 250,000.00 5 2so,ooo.oo 5 136,000.00 g 136.000.00
Mistihd Svstem ts I 5? OOO OO s2000.00 95,945.00 5 95,94s.00 S 36,000.00 S 36.000.00
33 Electrical/LiehtinE LS 1 714.7MOO 734,744.OO s 20,000.00 S 2o,ooo.oo S 274,ooo.oo 5 274,ooo.oo
Comoostlns Area
; 2,t75.434.00
34 ASP - Concrete Walls ahd Pad ts 1 407.489 00 407,889.00 s 7s2,244.00 752,2M.00 s 359.000.00 S 359.ooo.oo
35 ASP - Mechanical/Electrical ts 1 163.5?5 00 163,525.00 228,991.00 224,991.00 s 366.000.00 S 366.000.00
36 Concrete Block Walls - Ponable {2'x2'x6'l ts 1 5?.500 00 52500.00 66,289.00 5 66,289.00 s 18.000.00 S l8,ooo.oo
Contact Water Pohd ts 1 530.038 00 630,038.00 ; 919,708.00 s 919,708.00 s 477.000.00 s 477.000.00
38 Cffice Euildinc-Prefabricated LS 1 95.500 00 gq \o0 00 204,202.00 204,202.oo 5 142,000.00 s 142.000.00
Redclins DroDotf Area
39 :oncrete Pad L5 1
40 ;teel Ramps LS 1 47.500-OO 69 )29 OO 69,224.OO 41,000.00
icale House
1,108,577.00
47 ;calehouse LS 1 409.874.00 409.A74.OO 474.56?.OO 424,563.O0 343,000.00 s 343.000.00
42 Truck scales LS 1 524.000.00 524_OOO.OO 584.O14.OO 461,000.00
I
A1
I
ts ----i-t-IS s51.s32.0o
5 10061,657.00Is 813.840.00
A2 MRW BuildinE ts I 1.574.288-00 t.s7 4.2AA.OO 1.47 ).73?.OO 7,472,733.00 1.707,000.00 s 1,707,000.00
A3 Tire Drop-offArea LS I 186.000-00 1a6.O00_oo 150.r50 00 150,250.00 5 130,000.00 s 130,000.00
A4 Haulinq soil to Rve Gra5s Landfill CY 49.000 10.38 504.520_oo 21 qO 1,053,500.00 784,000.00
Additive Alternates 2.984.s36.sO 403&0$.m
fotal 19.164.405.00 25,94,7 .65 s 19,997,939.m
lotal with WA State Sales Tax (8.4%s 20,774,215.O2 S 29.164.801.74 2'.,677 .766.74