Loading...
HomeMy WebLinkAboutResolution 2024-163BOARD OF COT]NTY COMMISSIONERS COT]NTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2024. I LOb TO AWARD THE CONTRACT FOR THE KITTITAS COUNTY LOWER COUNTY TRANSFER STATION PROJECT WHEREAS: Kittitas County solicited bids for the Kittitas County Lower County Transfer Station Project; and WHEREAS: Sealed bids were opened on August 2, 2024 in the Kittitas County Commissioners conference room at205 W. 5th Ave. Ellensburg, WA; and WHEREAS: Two (2) bids were received for the project. The bids have been reviewed by our project engineers at SCS Engineers which recommends award to the lowest responsible bidder, Belsaas and Smith LLC. SCS Engineers found the contractor to be compliance with state licensing requirements and all bid requirements for the project and recommends award; NOW THEREFORE, BE IT HEREBY RESOLVED: that the Board of County Commissioners, in the best interest of the public, does hereby award the contract for the Kittitas County Lower County Transfer Station Project to Belsaas and Smith Construction LLC. in the Amount of $18,441,939.80 plus sales tax. ADOPTED this &w 2024 BOARD OF COT]NTY COMMISSIONERS KITTITAS CO ,w GTON t Chair Vice-Chairman Commissioner 7 $u-l L/\LS (<4irttV ATTESfl APPROVED AS TO FORM: .fcler|of the Board- Julie Kjorsvik Douglas R. Mitchell, Deputy Prosecuting Attorney n Deputy Clerk of the Board- Mandy Buchholz SCS ENGINEERS Environmentol Consulionts & Controctors August 8,2024 Proj ect N o. 01222292.00 Patti Stacey, Director Kittitas County Solid Waste/Facility Maintenance Director 925Industrial Way Ellensburg,WA 98926 Subiecl Lower Valley Transfer Station Recommendation for Award Dear Ms. Stacey On Friday, August 2,2024, two (2) bids were received and opened for the Kittitas County Lower Valley Transfer Station project. SCS Engineers (SCS) has reviewed all submitted bid documents for accuracy and conformity to the requirements listed in the Instruction to Bidders. Bid Tabulations Bids were received from two bidders: 1. Belsaas and Smith ConstructiorL Inc., Ellensburg,WA, 2: Apollo, Inc., Kennewick, WA. Both bidders had attended the mandatory pre-bid meeting. A11 requirements for submittal of bids were met and all bids were thus deemed responsive. Following the bid opening, an independent summary and arithmetic check was performed on all bids. All bids were arithmetically correct, with one minor exception on the bid from Belsaas and Smittu which did not change the bid amount. Belsaas and Smith is the apparent low bidder with an extended price of $16,734,939.80 (not including State of Washington Sales Tax). Please see the attached sheets for a bid summary and their proposed prices. SCS's Opinion of Probable Cost is $16,081,657.00. Review of Bidder's Qualifications and Proposal Upon confirmation of Belsaas and Smith, Inc. as the apparent low bidder. SCS reviewed the Bid Form and determined that all items were completed. Our review confirmed that Belsaas and Smith, Inc. currently possess required State of Washington contractors' licenses and registrations. 240514OthAve. NE,Suiie 107, Bellevue, WA98005 | 425-746-4600 | eFox 5A3-684-6948 {i Kittitos County Lower Volley Tronsfer Stotion August 8,2024 Poge 2 Recommendation for Award Based upon our review, SCS recommends Kittitas County award the contract to Belsaas and Smith, Inc. in the amount of. $16,734,939.80 (Not Including Sales Tax). Additive options will be added as funding becomes available. Please contact SCS if you should have any questions. Sincerelp fusH* Thomas D. Parker, PE, BCEE Project Director SCS Engineers Klttltas County - Lower Valley Transfer Station SECT|ON 00 00 04,1 BID SCHEDULE June 18, 2024 Addendum No, 1 ContEdor Name:B€lsaas and Smith c€neral Extended Pilce Unlt PrlceI Extended PrlceIs 1.994.060.00 Unlt PrlceI Ertended PrlceBld ltemI I qu.ntltyI unit Prlce 1 Vlobilization/Demobilizatlon (5% Maximum)ts 1 5 8oo.ooo.oo s 800.000.00 s 1.139.000.00 1.139.000.00 a10.000_o0 810.000.o0 ))rojed Surveving ts I s 12s.000.00 S 125.ooo.oo s 113.000.00 113.000.00 80.000.o0 80-000.oo 3 Quality Control Testing ts 1 s 2s0.000.00 S 25o.ooo.oo s 113.000.00 S 113.ooo.oo 78.000.00 7a_000-00 4 Soil Erosion and Sediment Control LS 1 5 loo,ooo.oo S loo.ooo.oo s 629.060.00 S G29.o6o.oo 43.000.00 43.O00_OO ClvlUSltework S i.2so.469.6s 5 Clearend Grub AC 30 s 8.000.00 S 24o.ooo.oo S 4.430.00 s 132.900-00 4.800.00 144.000.00 5 lJnsuitable Solls - Excavetion CY 49,000 s 10.00 S 49o,ooo.oo s 12.00 s 588.000.00 7.80 382.200.00 7 Sub{rade PreDaration SY 45,400 5.00 5 227,ooo.oo s 1.90 s 86.250.00 5.20 236.080.00 8 6eotetriles SY 5s,400 3.25 s 180,050.00 s 11.80 s 653.720.00 7.30 404.420.OO 9 Common Fill (Plan Quantiw)CY 82,300 15.00 S 1.234.500.00 s 41.80 s 3.440.140.0t 5 24.EO 5 2.041.040.00 10 Crushed Suface Base Course - 6"SY 45,400 s 8.00 S 363,200.00 s 11.00 s 499.400.00 7.40 335_960-00 11 Hot Mix Asohalt - 7"20,200 36.00 s 727.200.00 s 36.60 s 739-320.00 35.00 707.000.00 t2 Hot Mix Asohalt -4"25,200 20.00 S so4,ooo.oo s 21.86 S sso.872.oo s 27.OO 529.200.00 13 Site SiriDino - Double Y€llow IF 6,323 10.00 s 63.230.00 s 0.85 s 5.374.s5 1.10 6.955.30 14 Site Strioino - Sindle White IF 12,646 5.00 s 63,230.00 s 0.60 S 7.s87.60 o.7ss 9.484.50 15 Site Si!nape ts 1 s 57.000.00 5 s7,ooo.oo S 35.2oo.oo s 35.200.00 S 41.ooo.oo 41.000.00 16 Site Concrete ts 1 s 35,500.00 s 35.500.00 S 46.541.00 S 46.s41.00 S 7s.ooo.oo 75.000.00 77 Site Fencinp - 5'Chainlink IF 3,975 5 50.00 5 198,750.00 5 59.50 S 236.512.s0 s 159.000.00 s 159.m0.00 18 Site Fencinp - Gates FA 5 2,500.00 s 20.000.00 S 2.714.00 S 2t.7L2.oo 700.00 5.600.00 19 Site Seedinp AC 30 1,500.00 S 45,ooo.oo S 4.071.00 S 122.130.00 S 1.4oo.oo 42.000.00 20 LandscaDins ts 1 20,000.00 S 2o,ooo.oo S 84.8oo.oo S 84.8oo.oo s 52.000.00 S 52.ooo.oo llte utilities S 3.617.3s0.00 2t ;ite Domestic Water Svdem ls 1 483,250.00 S 483,2s0.00 5 747,7oo.oo S 747.too.oo S 607.000.00 607.000,00 22 iite Fire Water Svstem ls 1 s 560,734.00 s 660.734.00 S 1s9,5oo.oo S 159.500.00 s 142.000.00 S 142.ooo.oo 23 iite SewerSvstem ts 1 s 283,470.00 s 283.470.00 S 224,300.00 s 224.300.00 S 185.ooo.oo 185.000.00 24 ;ite Stormwater Svstem ts 1 12&758.00 s 128.758.00 S 382.700.00 S 382.700.00 s 309.000.00 309.000.00 25 Site Eledrical ts !s 865.462.00 s 865.462.00 S 2.103.150.00 5 2.103.150.00 1.738.000.00 Tiansfer Bulldlns S 6.651.66s.00 26 Concrete ts 1 1,537,239.00 s 1,537.239.00 s 2.737.4r0-OO S 2.r37.47o.0o s 1.347.000.00 s 1.347.000-00 Miscellan€ous Metals ts 1 304800.00 i 304800.00 5 468,310.00 S 468.310.00 s 423.000.00 s 423.000-00 2a Prc-Enpineered Metal Euildinp {PEMBI ts 1 2,259,900.00 2,259.900.00 3,218.115.00 S 3.218.115.00 S 2.852.ooo.oo s 2.852.000.00 29 Break Room ts I 198,000.00 19&000.00 222,773.00 s 222.773-00 5 94.ooo.oo S 94.ooo.oo 30 Mechanical/Plumbins ts 1 196,726.00 5 196,726.00 239,772.00 s 239;112.00 5 2o3,ooo.oo 5 2o3.ooo.oo 31 Fire Protection svsem ts 1 302 oat oo 5 302,088.00 250,000.00 5 2so,ooo.oo 5 136,000.00 g 136.000.00 Mistihd Svstem ts I 5? OOO OO s2000.00 95,945.00 5 95,94s.00 S 36,000.00 S 36.000.00 33 Electrical/LiehtinE LS 1 714.7MOO 734,744.OO s 20,000.00 S 2o,ooo.oo S 274,ooo.oo 5 274,ooo.oo Comoostlns Area ; 2,t75.434.00 34 ASP - Concrete Walls ahd Pad ts 1 407.489 00 407,889.00 s 7s2,244.00 752,2M.00 s 359.000.00 S 359.ooo.oo 35 ASP - Mechanical/Electrical ts 1 163.5?5 00 163,525.00 228,991.00 224,991.00 s 366.000.00 S 366.000.00 36 Concrete Block Walls - Ponable {2'x2'x6'l ts 1 5?.500 00 52500.00 66,289.00 5 66,289.00 s 18.000.00 S l8,ooo.oo Contact Water Pohd ts 1 530.038 00 630,038.00 ; 919,708.00 s 919,708.00 s 477.000.00 s 477.000.00 38 Cffice Euildinc-Prefabricated LS 1 95.500 00 gq \o0 00 204,202.00 204,202.oo 5 142,000.00 s 142.000.00 Redclins DroDotf Area 39 :oncrete Pad L5 1 40 ;teel Ramps LS 1 47.500-OO 69 )29 OO 69,224.OO 41,000.00 icale House 1,108,577.00 47 ;calehouse LS 1 409.874.00 409.A74.OO 474.56?.OO 424,563.O0 343,000.00 s 343.000.00 42 Truck scales LS 1 524.000.00 524_OOO.OO 584.O14.OO 461,000.00 I A1 I ts ----i-t-IS s51.s32.0o 5 10061,657.00Is 813.840.00 A2 MRW BuildinE ts I 1.574.288-00 t.s7 4.2AA.OO 1.47 ).73?.OO 7,472,733.00 1.707,000.00 s 1,707,000.00 A3 Tire Drop-offArea LS I 186.000-00 1a6.O00_oo 150.r50 00 150,250.00 5 130,000.00 s 130,000.00 A4 Haulinq soil to Rve Gra5s Landfill CY 49.000 10.38 504.520_oo 21 qO 1,053,500.00 784,000.00 Additive Alternates 2.984.s36.sO 403&0$.m fotal 19.164.405.00 25,94,7 .65 s 19,997,939.m lotal with WA State Sales Tax (8.4%s 20,774,215.O2 S 29.164.801.74 2'.,677 .766.74 l\rlrjlrl lll:i/j,\rt r,l:ll :i,!ik Page 1 of 1