HomeMy WebLinkAboutResolution_Annual Road Program_2025KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
AGENDA DATE
ACTION REQUESTED
AGENDA STAFF REPORT
October 1, 2024
Request to Approve a Resolution adopting the Annual Road
Program for 2025.
BACKGROUND: Public Works has prepared the Annual Road Program for
2025. The Annual Road Program includes the Annual
Construction Program, the Annual Maintenance Plan, and
the Annual Equipment Purchase and Major Repair Plan.
The Annual Construction Program (Exhibit A) is consistent
with the Six Year Transportation Improvement Program for
the year 2025. It also indicates whether the work will be
performed using County Forces.
The Annual Maintenance Plan (Exhibit B) was developed
utilizing the prior year's maintenance costs.
The Annual Equipment Purchase and Major Repair Plan
(Exhibit C) was developed with the help of maintenance
staff, based on their needs.
INTERACTION: Public Works
RECOMMENDATION: Request to Approve a Resolution adopting the Annual Road
Program for 2025.
HANDLING: Return one (1) original to Public Works
ATTACHMENTS: Resolution; Annual Construction Program; Annual
Maintenance Plan; Annual Equipment Purchase and Major
Repair Plan
LEAD STAFF: Cameron Curtis, County Engineer
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2024 -
ADOPTING AN ANNUAL ROAD PROGRAM FOR THE YEAR 2025
WHEREAS: RCW 36.81.130 and Ch. 136-16 WAC call for the County Engineer, on or before
the first Monday in October, to file with the County Legislative Authority for
consideration and adoption, a recommended plan for laying out, construction, and
maintenance of county roads for the ensuing fiscal year; and,
WHEREAS: the Annual Road Program consists of three components, an Annual Construction
Program and cost thereof, an annual maintenance plan and cost thereof, and a
road equipment purchases and major repairs plan and cost thereof; and,
WHEREAS: the Annual Construction Program's content meets Ch. 136-16-020 WAC and,
conforms as nearly practicable to the county's long range road program contained
in the 2025 — 2030 Six Year Transportation Improvement Program; and,
WHEREAS: the Annual Construction Program indicates whether such work is to be done by
County Forces or by publicly advertised contract; and,
WHEREAS: the Board has considered the Annual Road Program consisting of the Annual
Construction Program, an annual maintenance plan, and a road equipment
purchase and major repair plan, and revisions and changes were made and, shall
adopt an Annual Road Program any time prior to the adoption of the county road
budget; and,
WHEREAS: any appropriations contained in the county road budget shall be void unless the
county's Annual Road Program is adopted prior to such appropriation; and,
WHEREAS: the Annual Road Program shall not hereafter be changed except by unanimous
vote of the Board members present and, the modifications shall be by Resolution
or Ordinance; and,
WHEREAS: the Annual Construction Program is attached hereto as Exhibit A, the
maintenance plan is attached hereto as Exhibit B, and the equipment purchase and
major repair plan is hereto attached as Exhibit C; and,
WHEREAS: the 2025 Annual Construction Program shall be filed with the County Road
Administration Board within 30 days after adoption but not later than December
31 st of each year.
NOW, THEREFORE, BE IT RESOLVED by the Board of Commissioners of Kittitas County
that the Annual Road Program for 2025 is hereby adopted.
DATED this 1 st day of October 2024, at Ellensburg, Washington
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Brett Wachsmith, Chairman
Laura Osiadacz, Vice -Chairman
Cory Wright, Commissioner
Exhibit A: The Annual Construction Program
uo1l:)njlsuo:)
o
-4
Ln
N
Ln
0
N
Ln
M
a-1
M
l0
ct
(D) 2uiaaaulBU3
`4
N
uoil:)njlsuoD
a
nn
Ae;o 142121
uoi
oo
m
Ln
u91sa4
N
N
i-1
M
r4
Sumueid
N
N
# saa
rn
N
O
N
'i %D
O
O
C O
.�
N
O
N
N
N
# da
N
N
N
LM
N
N
N
a
00
M
N
u
M
M
C
M
M
aagwnu loafoid
`o
°D
N
LL
y
N
V)
cc
C
U.
S
m
>
Q
M
E
T
O
CO
N
N
O
LL
N
V
N
U
d'
K
OC
d'
K
d'
J
L
a
F'
N
L
O
O
Z
bo
3
tov
G
a
'0
y
3
u
0
cc
d
E
LL
a
a
=
Z
H
C.
O
N
v°
Z
�
3
3
o
g
a
>
>
2
O
U
y
c
0
W
accc
Mw
_
d
n
L
N
=
N
Q
0
Q
N
f6
w
Cm
OV
W
UJ
y
O
v
N
tY,1
d
J
D
O
CO
a
a+=
C
s
>
o
N
9
Z
a
a
v
>'
on
o
E
_
Q
a
Z
W
a
n
>
n
CL
a
£
£
a
a
°
a!
E
N
O)
CO
i
V
0
O
0.M
tD
G!
R
O
o
>
-
`�
L6
w
m
C
o
a
y
>
W
>
Y
>,
3
m
v
C
V
N
w
M
W
m
L
fl.
Oq
O
m
S
ra
_
-O.
O.
Z
a
3
0)O
N
C
C
a
3
v
_£
O
A
O
'O
°C
V)
C
O
°
-�.
eiIL[I-
00
g
N
O
L
41
7O
O
zo
M
oo
>
o
a
3
2
)n
N
=
•N
Ln
=
o
z
aQ5
a
N
M
N
O
C
M
_^
N>'o
C
i
m
O
Q)
7
3
O
iOcJN
M
V
t0
r�IrELILlill
Exhibit B: Annual Maintenance Plan
e
J
a
a
D
N
cic
w
x
H
O
cc
LO m
N g
0
N
W
U
Z L LI
a
Z a
W
CY
Z
Ca
G
0) ~
Z
J H
C �
E 0
Z
o O
U U
N h V
O d C
N C
O J 4
G
= O
en W1
ri LO r� N
O ri 00 T4
LO 0000 M
L\ (O O M
co LO
O O O 0
O O N 1l
6 C6 r4 C70
M M n N
a 31 O a-1
ri N r•1 O
N O M
M
N
O O Ln
O LO d'
O N O
Cl) r
O r W
ri 00
14
O O O O
O M T4
ri W C7 O
M r-1 O n
Liz 'T LO CA
O N Ln 00
LLn N w
N
c-I r1
O � Cl) N
(Yi v .4 00
O M co co
N Ln Iq O
O r- C M
ri � cI 00
ri
O O Li
O CO CV
co N N
cI cI 00
14
CD
Z
R
w
w
Z
0
Z
w
Z
O
cc
a Q
w p Z
owC O = 0
o_ w 0 O
0 M Ov U
F
Z
LS7 Lf) LS7 a
O O CV 6 W O CO
M 00 N O In (O L, LO ri LO m N
�t O r4 rl r� ri N M r� r� ri N CO
CVO Iq rr-1 �M M 00 N LO CO M N -LO N
N M O M (O O O N O
r-i O
O O O O
O m O LO
6 ri C0 r--z
r-1 m M m
LO ri ri m
N N O
n M ri
O O
LO O
r--� Ln
Ln rl
N LO
R
O O LO
LO O V
r� O V
V O ri
M N '1
M N M
Ln
O
L()
In
O
O
d
O
Cb
n
r-�
OM
CO
M
M
M
W
L0
O
m
M
LO
n
w
O
L17
L6
O
a4
N
O
�
M
r�-I
w
s-1
N
r,
-4 O
O
(0
m
ri
O Li)
d0
(D
O
O
N O
r-1
r-1
O
N
ri O
rq
00
r-4
O
O ri
C7
d
C6
0)
N
O O M O O 0
O m r- O LO m
V N m n N n
n d, m LO O O
cr O 4 N M N
(C0 0) `-I oN0
N
O O Ln
LO LO 0)
CV n CV
O n 9
00 N I�
r-1 L!7 O
co LO
LO m Cl m O O
Iq 0 M r- O M
Ln M 00 O O CV
c-i (0 O r4 N CO
N N co O T4
r-i M
n CO N r� Ln 6
m I�t O m c0 0
w m O (0 M O
Ln M M O Ln CC)
O LO N r-i rq
N
0 0 0 0 O O M -1 O w
O C00 M O LO O � M n
N N O O 00 O 1-1 r d'
N O O N 000
r-I Cl)
Q
w
2'.
Z Cn W
w >'
OC (� O
U Z M
LU
w Z °�$ f
Z Q w p O z
w = O Q CL Z
w
wOZ2 w
Ow Q a U ja Z� cc Zw OU
w O w 0 Z
U Z cc
'
O Z
Z O D� U w LLLi O Q U Z
Q O c Lu cr Q Q
�0 N N N N cc:
IL No
�O
M Iq LO O O ww COO N 00 � O
N N N N N N N N N N N N 1--
ch 1� d 11 � 'ZT 'It q V d' V q ,a
I R
C9
Exhibit C: Annual Equipment Purchase and Major Repair Plan
Kittitas County
County Road
New and Replacement Equipment List
2025
Item No.
Description
Estimated Cost
1
Boom Mower
Replacement
$ 300,000.00
2
Loader
Replacement
$ 320,000.00
3
Grader
Replacement
$ 430,000.00
4
IlDickup
IReplacement
1 $ 70,000.00
Total
1 $ 1,120,000.00