My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-09-10-minutes-solid-waste-and-maintenance
>
Meetings
>
2024
>
10. October
>
2024-10-01 10:00 AM - Commissioners' Agenda
>
2024-09-10-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2024 1:57:46 PM
Creation date
9/26/2024 1:57:27 PM
Metadata
Fields
Template:
Meeting
Date
10/1/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
122869
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2024-09-10 MINUTES 1 <br /> <br />KITTITAS COUNTY <br />SOLID WASTE AND MAINTENANCE MINUTES <br />BOCC CONFERENCE ROOM, 205 WEST 5TH ROOM 108 - ELLENSBURG <br />Regular Meeting <br /> <br />TUESDAY 2:00 PM September 10, 2024 <br />Board members present: Chairman Brett Wachsmith, Laura Osiadacz Vice- Chairman <br />and Cory Wright Commissioner <br />Others: Patti Stacey, Erica Luce, Amy Cziske Treasurer, Mike Hougardy Assessor and <br />Lisa Murray (Cziske, Hougardy & Murray Out at 2:12 p.m.) <br />Call to Order at 2:00 p.m. <br />Citizen Comments (1 min. time limit) None <br />Treasurer’s Office Update: Patti updated the Board on the repairs to the ceiling tiles in the <br />Treasurer’s office and asbestos concerns. She informed the Board that air samples were taken <br />last Friday and that sampling showed particle levels were below the EPA habitable standard and <br />particles found have been sent for further testing. Patti informed the Board she is meeting with <br />Fulcrum Environmental tomorrow to develop an environmental plan to fix the ceiling that meets <br />L&I environmental requirements. Patti informed the Board the leak that initially caused the <br />damage has been fixed. Discussion was held on possible options to repair both Treasurer’s and <br />Assessor’s ceilings including patching around vents. Further discussion was held on both <br />office’s ability to operate during relocation and length of repair project. The Board suggested <br />Chairman Wachsmith issue a press release and approved setting a not to succeed figure of <br />$50,000.00 for repairs. <br />Solid Waste Updates: Patti notified the Board that Tenelco, Inc began land applying to Ecology <br />approved sites at the Ryegrass facility today and that Ecology is scheduled to observe operations <br />Wednesday at the site. Patti informed the Board she received a significant rate increase from the <br />current household hazardous waste transportation and disposal contractor. Discussion was held <br />on possible disposal alternatives for highly priced items, further discussion was held on <br />alternative disposal options for County septage sludge. Patti informed the Board she is meeting <br />with Brown & Jackson and the County on Friday to discuss costs and the possibilty of a sludge <br />disposal facility at Airport property. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.