Laserfiche WebLink
KITTITAS COUNTY <br />Board of County Commissioners <br /> <br />AGENDA STAFF REPORT <br /> <br />AGENDA DATE: September 17, 2024 <br /> <br />ACTION REQUESTED: Conduct a public hearing to consider the proposed EV <br />Charging Station Fee. <br /> <br /> <br />BACKGROUND: The Kittitas County constructed a parking lot north of the Jail on <br />the corner of Water and W 6th street. <br /> <br />The parking lot project was required to install a charging station <br />for every 10 parking spaces or portion thereof. This required <br />the County to install 7 EV changing spaces. Since the chargers <br />come as a pair the parking lot contains 8 EV charging stalls. <br /> <br />In working with the City of Ellensburg Utility Department and <br />the Blink charger manufacturer we have calculated the cost to <br />charge at the EV Charging station to be $.33/kW. <br /> <br />INTERACTION: Maintenance, City of Ellensburg, and Blink manufacturing <br /> <br />RECOMMENDATION: Recommend the approval of the proposed resolution setting the <br />fee for the EV Charging stations at $0.33/kW. <br /> <br />HANDLING: Return to Solid Waste <br /> <br />ATTACHMENTS: Proposed Resolution <br /> <br />LEAD STAFF: Patti Stacey <br /> <br /> <br /> <br /> <br />