AIA Document A1010 - 2017 Standard Form of Agreement Between Owner and Contractor AGREEMENT made as of the 3rd day of September in the year 2024. BETWEEN the Owner: Kittitas County 205 West 5th Avenue, Suite 108 Ellensburg, Washington 98926-2887 and the Contractor: Belsaas & Smith Construction, Inc. PO Box 926 Ellensburg, WA 98926 for the following Project: Lower Valley Transfer Station 2600 West Green Avenue Ellensburg, Washington 98950 The project includes the following components as defined by the contract documents, including, but not limited to: 1. Mobilization and demobilization of equipment and personriel for the project. 2. Construction layout and surveying, including location of existing, below grade and above grade utilities in the work area. 3. Establishment and maintenance of erosion and sediment control throughout the project. 4. Clear and grub work areas. 5. Removal of unsuitable soil. 6. Placement and compaction of soil embankment material. 7. Installation of water, sanitary sewer, electric, stormwater, and fire suppression systems/structures. 8. Construction of Transfer Building, Scales, Scalehouse, MRW Building, Administration Building. 9. Rough grading, fine grading, geotextile installation, subgrade preparation, base course, and asphalt for road and parking lots. 10. Installation of fencing and gates, signage, and striping. II. Construction Quality Control (CQC) testing. 12. Completion of record drawings and related documentation. 13. Repair/replacement of existing features impacted during construction. The Architect/Engineer: SCS Engineers 2405 140' Avenue NE, #107 Bellevue, Washington 98005 The Owner and Contractor agree as follows. TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM PAYMENTS DISPUTE RESOLUTION TERMINATION OR SUSPENSION MISCELLANEOUS PROVISIONS ENUMERATION OF CONTRACT DOCUMENTS EXHIBIT A INSURANCE AND BONDS ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary, and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement, and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations, or agreements, either written or oral. An enumeration of the Contract Documents, other than a Modification, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3.1 The date of commencement of the Work shall be: September 23, 2024. § 3.2 The Contract Time shall be measured from the date of commencement of the Work. § 3.3 Substantial Completion § 3.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents, the Contractor shall achieve Substantial Completion of the entire Work: [xj Not later than 450 calendar days from the date of commencement of the Work. § 3.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, if portions of the Work are to be completed prior to Substantial Completion of the entire Work, the Contractor shall achieve Substantial Completion of such portions by the following dates: All work shall be substantially completed Not later Than 450 Calendar Days from the date of commencement of work § 3.3.3 If the Contractor fails to achieve Substantial Completion as provided in this Section 3.3, liquidated damages, if any, shall be assessed as set forth in Section 4.5. ARTICLE 4 CONTRACT SUM § 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be $19,991,062.74 for the base bid and Additive Alternative A2-MRW Building,inclusive of State of Washington Sales Tax (8.4%), subject to additions and deductions as provided in the Contract Documents. § 4.2 Alternates § 4.2.1 Alternates included in the Contract Sum: Item Price Additive Alternative Bid Item No. A2 — MRW Building $1,707,000.00 Contractor agrees to hold bid prices for 30 Calendar days following issuance of Notice to Proceed for the following Additive Alternative bid items: Item Price 1. At — Administration Building $642,000.00 2. A3- Tire Drop-off Area $130,000,00 3. A4 — Hauling Soil to Ryegrass Landfill $784,000.00 § 4.2.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner following execution of this Agreement. Upon acceptance, the Owner shall issue a Modification to this Agreement. None § 4.3 Allowances, if any, included in the Contract Sum: None § 4.4 Unit prices, if any: Unit Prices Listed in the Bid Schedule. § 4.5 Liquidated damages, if any: $500 Per Calendar Day § 4.6 Other: None ARTICLE 5 PAYMENTS § 5.1 Progress Payments § 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. § 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: Other mutually agreed date by OWNER and Contractor. § 5.1.3 Provided that an Application for Payment is received by the Architect not later than the 7`' day of a month, the Owner shall make payment of the amount certified to the Contractor not later than 30 calendar days. If an Application for Payment is received by the Architect after the application date fixed above, payment of the amount certified shall be made by the Owner not later than 45 calendar days after the Architect receives the Application for Payment. § 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form, and supported by such data to substantiate its accuracy, as the Architect may require. This schedule of values shall be used as a basis for reviewing the Contractor's Applications for Payment. § 5.1.5 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. § 5.1.6 In accordance with AIA Document A20ITM-2017, General Conditions of the Contract for Construction, and subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: § 5.1.6.1 The amount of each progress payment shall first include: .1 That portion of the Contract Sum properly allocable to completed Work; .2 That portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction, or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing; and .3 That portion of Construction Change Directives that the Architect determines, in the Architect's professional judgment, to be reasonably justified. § 5.1.6.2 The amount of each progress payment shall then be reduced by: .1 The aggregate of any amounts previously paid by the Owner; .2 The amount, if any, for Work that remains uncorrected and for which the Architect has previously withheld a Certificate for Payment as provided in Article 9 of AIA DocumentA201-2017; .3 Any amount for which the Contractor does not intend to pay a Subcontractor or material supplier, unless the Work has been performed by others the Contractor intends to pay; .4 For Work performed or defects discovered since the last payment application, any amount for which the Architect may withhold payment, or nullify a Certificate of Payment in whole or in part, as provided in Article 9 of AIA Document A201-2017; and .5 Retainage withheld pursuant to Section 5.1.7. § 5.1.7 Retainage § 5.1.7.1 For each progress payment made prior to Substantial Completion of the Work, the Owner may withhold the following amount, as retainage, from the payment otherwise due: 5% 5.1.7.1.1 The following items are not subject to retainage: Not applicable. § 5.1.7.2 Reduction or limitation of retainage, if any, shall be as follows: Not applicable. § 5.1.7.3 Except as set forth in this Section 5.1.7.3, upon Substantial Completion of the Work, the Contractor may submit an Application for Payment that includes the retainage withheld from prior Applications for Payment pursuant to this Section 5.1.7. The Application for Payment submitted at Substantial Completion shall not include retainage as follows: Not applicable. § 5.1.8 If final completion of the Work is materially delayed through no fault of the Contractor, the Owner shall pay the Contractor any additional amounts in accordance with Article 9 of AIA Document A201-2017. § 5.1.9 Except with the Owner's prior approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. § 5.2 Final Payment § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Spun, shall be made by the Owner to the Contractor when 1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Article 12 of AIA Document A201-2017, and to satisfy other requirements, if any, which extend beyond final payment; and .2 a final Certificate for Payment has been issued by the Architect. § 5.2.2 The Owner's final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect's final Certificate for Payment. § 5.3 Interest Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. ARTICLE 6 DISPUTE RESOLUTION § 6.1 Initial Decision Maker The Architect will serve as the Initial Decision Maker pursuant to Article 15 of AIA Document A201-2017, unless the parties appoint below another individual, not a party to this Agreement, to serve as the Initial Decision. Maker. Casey McFarlane, PE Project Manager Kittitas County § 6.2 Binding Dispute Resolution For any Claim subject to, but not resolved by, mediation pursuant to Article 15 of AIA Document A201-2017, the method of binding dispute resolution shall be as follows: [ X ] Arbitration pursuant to Section 15.4 of AIA Document A201-2017 If the Owner and Contractor do not select a method of binding dispute resolution, or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court of competent jurisdiction. ARTICLE 7 TERMINATION OR SUSPENSION § 7.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A201-2017. § 7.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A201-2017. ARTICLE 8 MISCELLANEOUS PROVISIONS § 8.1 Where reference is made in this Agreement to a provision of AIA Document A201-2017 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. § 8.2 The Owner's representative: Casey McFarlane, PE Kittitas County 925 Industrial Way Ellensburg, WA 98926 casey.mcfarlane@co.kittitas.wa.us § 8.3 The Contractor's representative: Brandon Drexler Belsaas & Smith Construction, Inc. PO Box 926 Ellensburg, WA 98926 § 8.4 Neither the Owner's nor the Contractor's representative shall be changed without ten days' prior notice to the other party. § 8.5 Insurance and Bonds § 8.5.1 The Owner and the Contractor shall purchase and maintain insurance as set forth in AIA Document A101TM-2017, Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum, Exhibit A, Insurance and Bonds, and elsewhere in the Contract Documents. § 8.5.2 The Contractor shall provide bonds as set forth in AIA Document AJOITM-2017 Exhibit A, and elsewhere in the Contract Documents. § 8.6 Notice in electronic format, pursuant to Article 1 of AIA Document A201-2017, may be given in accordance with a building information modeling exhibit, if completed, or as otherwise set forth below: Not Applicable. § 8.7 Oflier provisions: Not Applicable. ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS § 9.1 This Agreement is comprised of the following documents: .1 AIA Document A101T"L-2017, Standard Form of Agreement Between Owner and Contractor .2 AIA Document A101TM-2017, Exhibit A, Insurance and Bonds .3 AIA Document A201TM-2017, General Conditions of the Contract for Constiuction .4 Drawings Conformed set of Drawings, dated August 30, 2024. (167 drawings) .5 Specifications Conformed set of specifications dated August 30, 2024 (857 Pages) .6 Addenda: Addendum No. 1 July 17, 2024 Addendum No. 2 July 23, 2024 Addendum No. 3 July 24, 2024 Addendum No. 4 July 29, 2024 Response to RFI Questions August 1, 2024 ,7 Other Exhibits: [ X] Supplementary and other Conditions of the Contract: Document Title Date Pages A. Instruction to Bidders Section 00 00 03 June 18, 2024 8 B. Supplementary Instruction to Section 00 00 03.1 June 18. 2024 1 Bidders C. Bid Proposal Form/Bid Section 00 00 04 July 29, 2024 5 Schedule Section 00 00 04.1 July 29, 2024 D. Supplementary General Section 00 00 05.1 _ June 18, 2024 2 Conditions E. Unanticipated Find Plan August 30, 2024 3 Language F. Geotechnical Report — HWA June 13, 2023 81 .9 Other documents, if any, listed below: None This Agreement entered into as of the day and year first written above. OWNER (Signature) Brett Wachsmith, Chair, Board of County Commissioners (Printed name and title) CONTRACTOR (Signature) Brian Nelson, Secretary (Printed name and fide) AIA Document A2 010 -- 2007 General Conditions of the Contract for Construction for the following PROJECT: (Nance and location or address) Lower Valley Transfer Station 2600 West Green Ave Ellensburg, WA 98950 ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. THE OWNER: The author may also have (Nance, legal status and address) revised the text of the Kittltas County original AIA standard form. 205 W 5`hAvenue Suite 108 An Additions and Deletions Report that notes added Ellensburg, WA 98926-2887 information as well as revisions to the standard THE ARCHITECT ENGINEER (HEREAFTER NOTED AS ARCHITECT): form text is available from the author and should be (Nance, legal status and address) reviewed. SCS Engineers This document has important 2405 140`hAve NE, #107 legal consequences. Bellevue WA 98005 Consultation with an attorney is encouraged with TABLE OF ARTICLES respect to its completion or modification. 1 GENERAL PROVISIONS 2 OWNER 3 CONTRACTOR 4 ARCHITECT 5 SUBCONTRACTORS 6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS 7 CHANGES IN THE WORK 8 TIME 9 PAYMENTS AND COMPLETION 10 PROTECTION OF PERSONS AND PROPERTY 11 INSURANCE AND BONDS 12 UNCOVERING AND CORRECTION OF WORK ELECTRONIC COPYING of any portion of this AIA" Document 13 MISCELLANEOUS PROVISIONS to another electronic file is prohibited and constitutes a violation of copyright laws 14 TERMINATION OR SUSPENSION OF THE CONTRACT as set forth in the footer of this document. 15 CLAIMS AND DISPUTES AIA Document A201 - 2007. Copyright 1,5 1911, 1915, 1918, 1925, 1931, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract 1 Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:51:37 PT on 05/13/2024 under order D1o. 4 10 4243047 which expires on 06110/2024, is not for resale, is licensed fur one-time use only, and may only be used in accordance :with the AIA Contract Documents." Terms of Service. To report copyright violations, e-mail docinf@aiacontracts.com. User Notes: (1164916017) INDEX (Topics and numbers in bold are section headings.) Acceptance of Nonconforming Work 9.6.6, 9.9.3, 12.3 Acceptance of Work 9.6.6,9.8.2,9.9.3,9.10.1,9.10.3, 12.3 Access to Work 3.16, 6.2.1, 12.1 Accident Prevention 10 Acts and Omissions 3.2, 3.3.2, 3.12.8, 3.18, 4.2.3, 8.3.1, 9.5.1, 10.2.5, 10.2.8, 13.4.2, 13.7, 14.1, 15.2 Addenda 1.1.1, 3.11 Additional Costs, Claims for 3.7.4, 3.7.5, 6.1.1, 7.3.7.5, 10.3, 15.1.4 Additional Inspections and Testing 9.4.2, 9.8.3, 12.2.1, 13.5 Additional Insured 11.1.4 Additional Time, Claims for 3.2.4, 3.7.4, 3.7.5, 3.10.2, 8.3.2, 15.1.5 Administration of the Contract 3.1.3, 4.2, 9.4, 9.5 Advertisement or .Invitation to Bid LLI Aesthetic Effect 4.2.13 Allowances 3.8, 7.3.8 All-risk Insurance 11.3.1, 11.3.1.1 Applications for Payment 4.2.5, 7.3.9, 9.2, 9.3, 9.4, 9.5.1, 9.6.3, 9.7, 9. 10, 11.1.3 Approvals 2.1.1,2.2.2,2.4,3.1.3,3.10.2,3.12.8,3.12.9,3.12.10, 4.2.7, 9.3.2, 13.5.1 Arbitration 8.3.1, 11.3.10, 13.1, 15.3.2, 15.4 ARCHITECT 4 Architect, Definition of 4.1.1 Architect, Extent of Authority 2.4, 3.12.7, 4.1, 4.2, 5.2, 6.3, 7.1.2, 7.3.7, 7.4, 9.2, 9.3.1,9.4,9.5,9.6.3,9.8,9.10.1,9.10.3, 12.1, 12.2.1, 13.5.1, 13.5.2, 14.2.2, 14.2.4, 15.1.3, 15.2.1 Architect, Limitations of Authority and Responsibility 2.1.1, 3.12.4, 3.12.8, 3.12.10, 4.1.2, 4.2.1, 4.2.2, 4.2.3, 4.2.6, 4.2.7, 4.2.10, 4.2.12, 4.2.13, 5.2.1, 7.4, 9.4.2, 9.5.3, 9.6.4, 15.1.3, 15.2 Architect's Additional Services and Expenses 2.4, 11.3.1.1, 12.2.1, 13.5.2, 13.5.3, 14.2.4 Architect's Administration of the Contract 3.1.3, 4.2, 3.7.4, 15.2, 9.4.1, 9.5 Architect's Approvals 2.4, 3.1.3, 3.5, 3.10.2, 4.2.7 Architect's Authority to Reject Work 3.5, 4.2.6, 12.1.2, 12.2.1 Architect's Copyright 1.1.7, L5 Architect's Decisions 3.7.4,4.2.6,4.2.7,4.2.11,4.2.12,4.2.13,4.2.14,6.3, 7.3.7, 7.3.9, 8.1.3, 8.3.1, 9.2, 9.4.1, 9.5, 9.8.4, 9.9.1, 13.5.2, 15.2, 15.3 Architect's Inspections 3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.8.3, 9.9.2, 9.10.1, 13.5 Architect's Instructions 3.2.4, 3.3.1, 4.2.6, 4.2.7, 13.5.2 Architect's Interpretations 4.2.11, 4.2.12 Architect's Project Representative 4.2.10 Architect's Relationship with Contractor 1.1.2, 1.5, 3.1.3, 3.2.2, 3.2.3, 3.2.4, 3.3.1, 3.4.2, 3.5, 3.7.4, 3.7.5, 3.9.2, 3.9.3, 3 . 10, 3.11, 3.12, 3.16, 3.18, 4.1.2, 4.1.3, 4.2, 5.2, 6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 9.5, 9.7, 9.8, 9.9, 10.2.6, 10.3, 11.3.7, 12, 13.4.2, 13.5, 15.2 Architect's Relationship with Subcontractors 1.1.2, 4.2.3, 4.2.4, 4.2.6, 9.6.3, 9.6.4, 11.3.7 Architect's Representations 9.4.2, 9.5.1, 9.10.1 Architect's Site Visits 3.7.4,4.2.2,4.2.9,9.4.2,9.5.1,9.9.2,9.10.1, 13.5 Asbestos 10.3.1 Attorneys' Fees 3.18.1, 9.10.2, 10.3.3 Award of Separate Contracts 6.1.1, 6.1.2 Award of Subcontracts and Other Contracts for Portions of the Work 5.2 Basic Definitions 1.1 Bidding Requirements 1.1.1, 5.2.1, 11.4.1 Binding Dispute Resolution 9.7,11.3.9,11.3.10,13.1,15.2.5,15.2.6.1,15.3.1, 15.3.2, 15.4.1 Boiler and Machinery Insurance 11.3.2 Bonds, Lien 7.3.7.4, 9.10.2, 9.10.3 Bonds, Performance, and Payment 7.3.7.4, 9.6.7, 9,10.3, 11.3.9, 11.4 Building Permit 3.7.1 Capitalization 1.3 AIA Document A201 - 2007. Copyright 0 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects," "American institute of Architects," "AIA,` the AIA Logo, and "AIA Contract Documents` are trademarks of The American Institute of Architects. This draft was produced at 09:51:37 PT on 05/13/2024 under order A1o.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-k.ime use only, and may only be used in accordance with the AIA Contract Documents" Terms of Service. To report copyright violations, e-mail docir.fo@aiacontracts.com. User Notes: (1164916017) Certificate of Substantial Completion 9.8.3, 9.8.4, 9.8.5 Certificates for Payment 4.2.1, 4.2.5, 4.2.9, 9.3.3, 9.4, 9.5, 9.6.1, 9.6.6, 9.7, 9.10.1, 9.10.3, 14.1.1.3, 14.2.4, 15.1.3 Certificates of Inspection, Testing or Approval 13.5.4 Certificates of Insurance 9.10.2, 11.1.3 Change Orders 1. 1. 1, 2.4, 3.4.2, 3.7.4, 3.8.2.3, 3.11, 3.12.8, 4.2.8, 5.2.3, 7.1.2, 7.1.3, 7.2, 7.3.2, 7.3.6, T19, 7.3.10, 8.3.1, 9.3.1.1, 9.10.3, 10.3.2, 11.3.1.2, 11.3.4, 11.39, 12.1.2, 15.1.3 Change Orders, Definition of 7.2.1 CHANGES IN THE WORK 2.2.1, 3.11, 4.2.8, 7, 7.2.1, 7.3.1, 7.4, 8.3.1, 9.3. 1. 1, 113.9 Claims, Definition of 15.1.1 CLAIMS AND DISPUTES 3.2.4, 6.1.1, 6.3, 7.3.9, 9.3.3, 9.10.4, 10.3.3, 15, 15.4 Claims and Timely Assertion of Claims 15.4.1 Claims for Additional Cost 3.2.4, 3.7.4, 6.1.1, 7.3.9, 10.3.2, 15.1.4 Claims for Additional Time 3.2A, 3.7.4, 6.1.1, 8.3.2, 10.3.2, 15.1.5 Concealed or Unknown Conditions, Claims for 3.7.4 Claims for Damages 3.2.4, 3.18, 6.1.1, 8.3.3, 9.5.1, 9.6.7, 10.3.3, 11.1.1, 11. 3.5, 11.3.7, 14.1.3, 14.2.4, 15.1.6 Claims Subject to Arbitration 15.3.1, 15.4.1 Cleaning Up 3.15, 6.3 Commencement of the Work, Conditions Relating to 2.2.1, 3.2.2, 3.4.1, 3.7.1, 3.10.1, 3.12.6, 5.2.1, 5.2.3, 6.2.2, 8.1.2, 8.2.2, 8.3.1, 11.1, 11.3.1, 11.3.6, 11.4.1, 15.1.4 Commencement of the Work, Definition of 8.1.2 Communications Facilitating Contract Administration 3.9.1, 4.2.4 Completion, Conditions Relating to 3.4.1,3.11,3.15,4.2..2,4.2.9,8.2,9.4.2,9.8,9.9.1, 9.10, 12.2, 1.3.7, 14.1.2 COMPLETION, PAYMENTS AND 9 Completion, Substantial 4.2.9, 8.1.1, 8.1.3, 8.2.3, 9.4.2, 9.8, 9.9 . 1, 9.10.3, 12.2, 13.7 Compliance with Laws 1.6, 3.2.3, 3.6, 3.7, 3.12.10, 3.13, 4.1.1, 9.6.4, 10.2.2, 11. 1, 11.3, 13.1, 13.4, 13.5.1, 13.5.2, 13.6, 14. 1. 1, 14.2.1.3, 15.2.8, 15.4.2, 15.4.3 Concealed or Unknown Conditions 3.7.4, 4.2.8, 8.3.1, 10.3 Conditions of the Contract 1.1.1, 6.1.1, 6.1.4 Consent, Written 3.4.2, 3.7.4, 3.12.8, 3.14.2, 4.1.2, 9.3.2, 9.8.5, 9.9. 1, 9.10.2, 9.10.3, 11.3.1, 13.2, .13.4.2, 15.4.4.2 Consolidation or Joinder 15.4.4 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS 1.1.4, 6 Construction Change Directive, Definition of 7.3.1 Construction Change Directives 1.1.1,3.4.2,3.12.8,4.2.8,7.1.1,7.1.2,7.1.3,7.3, 9.3.1.1 Constriction Schedules, Contractor's 3.10, 3.12.1, 3,12.2, 6.1.3, 15.1.5.2 Contingent Assignment of Subcontracts 5.4, 14.2.2.2 Continuing Contract Performance 15.1.3 Contract, Definition of 1.1.2 CONTRACT, TERMINATION OR SUSPENSION OF THE 5.4.1.1, 11.3.9, 14 Contract Administration 3.1.3, 4, 9.4, 9.5 Contract Award and Execution, Conditions Relating to 3.7.1, 3.10, 5.2, 6.1, 11.1.3, 1.1.3.6, 11.4.1 Contract Documents, Copies Furnished and Use of 1.5.2, 2.2.5, 5.3 Contract Documents, Definition of 1.1.1 Contract Sum 3.7.4,3.8,5.2.3,7.2,7.3,7.4,9.1,9.4.2,9.5.1.4, 9.6.7, 9.7, 10.3.2, 11.3.1, 14.2.4, 14.3.2, 15.1.4, 15.2.5 Contract Sum, Definition of 9.1 Contract Time 3.7.4, 3.7.5, 3.10.2, 5.2.3, 7.2.1.3, 7.3.1, 7.3.5, 7.4, 8.1.1, 8.2.1, 8.3.1, 9.5.1, 9.7, 10.3.2, 12.1.1, 14.3.2, 15.1.5.1, 15.2.5 Contract Time, Definition of 8.1.1 CONTRACTOR 3 Contractor, Definition of 3.1, 6.1.2 AIA Document A201 - 2007, Copyright O 1.911, 1915, 1918, 1925, 1937, 1951,.1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. A1l. rights reserved. "The American insti. to to of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American :Institute of Architects. This draft was produced at 09:51:37 PT on 05/13/2024 under Order L10.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents" Terms of Service. To report copyright violations, e-mail docinf0aiacontracts.com. User Notes: (1164916017) Contractor's Construction Schedules 3.10, 3.12.1, 3.12.2, 6.1.3, 15.1.5.2 Contractor's Employees 3.3.2, 3.4.3, 3.8.1, 3.9, 3.18.2, 4.2.3, 4.2.6, 10.2, 10.3, 11.1.1, 11.3.7, 14.1, 14.2.1.1 Contractor's Liability Insurance 11.1 Contractor's Relationship with Separate Contractors and Owner's Forces 3.12.5, 3.14.2, 4.2.4, 6, 11.3.7, 12.1.2, 12.2.4 Contractor's Relationship with Subcontractors 1.2.2, 3.3.2, 3.18.1, 3.18.2, 5, 9.6.2, 9.6.7, 9.10.2, 11.3.1.2, 11.3.7, 11.3.8 Contractor's Relationship with the Architect 1.1.2, 1.5, 3.1.3, 3.2.2, 3.2.3, 3.2.4, 3.3.1, 3.4.2, 3.5, 3.7.4, 3.10, 3.11, 3.12, 3.16, 3.18, 4.1.3, 4.2, 5.2, 6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 9.5, 9.7, 9.8, 9.9, 10.2.6, 10.3, 11.3.7, 12, 13.5, 15.1.2, 15.2.1 Contractor's Representations 3.2.1,3.2.2,3.5,3.12.6,6.2.2,8.2.1,9.3.3,9.8.2 Contractor's Responsibility for Those Performing the Work 3.3.2, 3.18, 5.3, 6.1.3, 6.2, 9.5.1, 10.2.8 Contractor's Review of Contract Documents 3.2 Contractor's Right to Stop the Work 9.7 Contractor's Right to Terminate the Contract 14.1, 15.1.6 Contractor's Submittals 3.10, 3.11, 3.12.4, 4.2.7, 5.2.1, 5.2.3, 9.2, 9.3, 9.8.2, 9.8.3, 9.9.1, 9.10.2, 9.10.3, 11.1.3, 11.4.2 Contractor's Superintendent 3.9, 10.2.6 Contractor's Supervision and Construction Procedures 1.2.2, 3.3, 3.4, 3.12.10, 4.2.2, 4.2.7, 6.1.3, 6.2.4, 7.1.3, 7.3.5, 7.3.7, 8.2, 10, 12, 14, 15.1.3 Contractual Liability Insurance 11.1.1.8, 11.2 Coordination and Correlation 1.2, 3.2.1, 3.3.1, 3.10, 3.12.6, 6.1.3, 6.2.1 Copies Furnished of Drawings and Specifications 1.5, 2.2.5, 3.11 Copyrights 1.5, 3.17 Correction of Work 2.3,2.4,3.7.3,9.4.2,9.8.2,9.8.3,9.9.1, 12.1.2,12.2 Correlation and Intent of the Contract Documents 1.2 Cost, Definition of 7.3.7 Costs 2.4, 3.2.4, 3.7.3, 3.8.2, 3.15.2, 5.4.2, 6.1.1, 6.2.3, 7.3.3.3, 7.3.7, 7.3.8, 7.3.9, 9.10.2, 10.3.2, 10.3.6, 11.3, 12.1.2, 12.2.1, 12.2.4, 13.5, 14 Cutting and Patching 3.14, 6.2.5 Damage to Construction of Owner or Separate Contractors 3.14.2, 6.2.4, 10.2.1.2, 10.2.5, 10.4, 11.1.1, 11.3, 12.2.4 Damage to the Work 3.14.2, 9.9.1, 10.2.1.2, 10.2.5, 10.4, 11.3.1, 12.2.4 Damages, Claims for 3.2.4, 3.18, 6.1.1, 8.3.3, 9.5.1, 9.6.7, 10.3.3, 11.1.1, 11.3.5, 11.3.7, 14.1.3, 14.2.4, 15.1.6 Damages for Delay 6.1.1, 8.3.3, 9.5.1.6, 9.7, 10.3.2 Date of Commencement of the Work, Definition of 8.1.2 Date of Substantial Completion, Definition of 8.1.3 Day, Definition of 8.1.4 Decisions of the Architect 3.7.4, 4.2.6, 4.2.7, 4.2.11, 4.2.12, 4.2.13, 15.2, 6.3, 7.3.7, 7.3.9, 8.1.3, 8.3.1, 9.2, 9.4, 9.5.1, 9.8.4, 9.9.1, 13.5.2, 14.2.2, 14.2.4, 15.1, 15.2 Decisions to Withhold Certification 9.4.1, 9.5, 9.7, 14.1.1.3 Defective or Nonconforming Work, Acceptance, Rejection and Correction of 2.3, 2.4, 3.5, 4.2.6, 6.2.5, 9.5.1, 9.5.2, 9.6.6, 9.8.2, 9.9.3, 9.10.4, 12.2.1 Definitions 1.1, 2.1.1, 3.1.1, 3.5, 3.12.1, 3.12.2, 3.12.3, 4.1.1, 15.1.1,5.1,6.1.2,7.2.1,7.3.1,8.1,9.1,9.8.1 Delays and Extensions of Time 3.2, 3.7.4, 5.2.3, 7.2.1, 7.3.1, 7.4, 8.3, 9.5.1, 9.7, 10.3.2,10.4,14.3.2,15.1.5,15.2.5 Disputes 6.3, 7.3.9, 15.1, 15.2 Documents and Samples at the Site 3.11 Drawings, Definition of 1.1.5 Drawings and Specifications, Use and Ownership of 3.11 Effective Date of Insurance 8.2.2, 11.1.2 Emergencies 10.4, 14.1.1.2, 15.1.4 Employees, Contractor's 3.3.2, 3.4.3, 3.8.1, 3.9, 3.18.2, 4.2.3, 4.2.6, 10.2, 10.3.3, 11.1.1, 11.3.7, 14.1, 14.2.1.1 Equipment, Labor, Materials or 1.1.3, 1.1.6, 3.4, 3.5, 3.8.2, 3.8.3, 3.12, 3.13, 3.15.1, 4.2.6, 4.2.7, 5.2.1, 6.2.1, 7.3.7, 9.3.2, 9.3.3, 9.5.1.3, 9.10.2, 10.2.1, 10.2.4, 14.2.1.1, 14.2.1.2 Execution and Progress of the Work 1.1.3, 1.2.1, 1.2.2, 2.2.3, 2.2.5, 3.1, 3.3.1, 3.4.1, 3.5, 3.7.1, 3.10.1, 3.12, 3.14, 4.2, 6.2.2, 7.1.3, 7.3.5, 8.2, 9.5.1, 9.9.1, 10.2, 10.3, 12.2, 14.2, 14.3.1, 15.1.3 AIA Document A201 - 2007. Copyright O 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1.966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:51:37 PT on 05/13/2024 under Order No.4104243047 which expires cn 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents" Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (116491.6017) Extensions of Time Insurance, Loss of Use 3.2.4,3.7.4,5.2.3,7.2.1,7.3,7.4,9.5.1,9.7, 10.3.2, 11.3.3 10.4, 14.3, 15.1.5, 15.2.5 Insurance, Owner's Liability Failure of Payment 11.2 9.5.1.3, 9.7, 9.10.2, 13.6, 14.1.1.3, 14.2.1.2 Insurance, Property Faulty Work 10.2.5, 11.3 (See Defective or Nonconforming Work) Insurance, Stored Materials Final Completion and Final Payment 9.3.2 4.2.1, 4.29, 9.8.2, 9.10, 11.1.2, 11.1.3, 11.3.1, 11.3.5, INSURANCE AND BONDS 12.3, 14.2.4, 14.4.3 11 Financial Arrangements, Owner's Insurance Companies, Consent to Partial Occupancy 2.2.1, 13.2.2, 14.1.1.4 9.9.1 Fire and Extended Coverage Insurance Intent of the Contract Documents 11.3.1.1 1.2.1, 4.2.7, 4.2.12, 4.2.13, 7.4 GENERAL PROVISIONS Interest 1 13.6 Governing Law Interpretation 13.1 1.2.3, 1.4, 4.1.1, 5.1, 6.1..2, 15.1.1 Guarantees (See Warranty) Interpretations, Written Hazardous Materials 4.2.11, 4.2.12, 15.1.4 10.2.4, 10.3 Judgment on Final Award Identification of Subcontractors and Suppliers 15.4.2 5.2.1 Labor and Materials, Equipment Indemnification 1.1.3, 1.1.6, 3.4, 3.5, 3.8.2, 3.8.3, 3.12, 3.13, 3.15.1, 3.17, 3.18, 9.10.2, 10.3.3, 10.3.5, 103.6, 11.3.1.2, 4.2.6, 4.2.7, 5.2.1, 6.2.1, 73.7, 9.3.2, 9.3.3, 9.5.1.3, 11.3.7 9.10.2, 10.2.1, 10.2.4, 14.2.1.1, 14.2.1.2 Information and Services Required of the Owner Labor Disputes 2.1.2, 2.2, 3.2.2, 3.12.4, 3.12.10, 6.1.3, 6.1.4, 6.2.5, 8.3.1 9.6.1, 9.6.4, 9.9.2, 9.10.3, 10.3.3, 11.2, 11.4, 13.5.1, Laws and Regulations 13.5.2, 14.1.1.4, 14.1.4, 15.1.3 1.5, 3.2.3, 3.6, 3.7, 3.12.10, 3.13, 4.1.1, 9.6.4, 9.9.1, Initial Decision 10.2.2, 11.1.1, 11.3, 13.1, 13.4, 1-1.5.1, 13.5.2, 13.6, 15.2 14, 15.2.8, 15.4 Initial Decision Maker, Definition of Liens 1.1.8 2.1.2, 9.3.3, 9.10.2, 9.10.4, 15.2.8 Initial Decision Maker, Decisions Limitations, Statutes of 14.2.2,14.2.4,15.2.1,152.2,15.2.3,15.2.4,15.2.5 12.2.5, 13.7, 15.4.1.1 Initial Decision Maker, Extent of Authority Limitations of Liability 14.2.2, 14.2.4, 15.1.3, 15.2.1, 15.2.2, 15.2.3, 15.2.4, 2.3, 3.2.2, 3.5, 3.12.10, 3.17, 3.18.1, 4.2.6, 4.2.7, 15.2.5 4.2.12, 6.2.2, 9.4.2, 9.6.4, 9.6.7, 10.2.5, 10.3.3, Injury or Damage to Person or Property 11.1.2, 11.2, 11.3.7, 12.2.5, 13.4.2 10.2.8, 10.4 Limitations of Time Inspections 2.1.2, 2.2, 2.4, 3.2.2, 3.10, 3.11, 3.12.5, 3.15.1, 4.2.7, 3.1.3, 3.3.3, 3.7.1, 4.2.2, 4.2.6, 4.2.9, 9.4.2, 9.8.3, 5.2, 5.3, 5.4.1, 6.2.4, 7.3, 7.4, 8.2, 9.2, 9.3.1, 9.3.3, 9.9.2, 9.10.1, 12.2.1, 13.5 9.4.1, 9.5, 9.6, 9.7, 9.8, 9.9, 9.10, 11.1.3, 11.3.1.5, Instructions to Bidders 11.3.6, 11.3.10, 12.2, 13.5, 13.7, 14, 15 1.1.1 Loss of Use Insurance Instructions to the Contractor 11.3.3 3.2.4, 3.3.1, 3.8.1, 5.2.1, 7, 8.2.2, 12, 13.5.2 Material Suppliers Instruments of Service, Definition of 1.5, 3.12.1, 4.2.4, 4.2.6, 5.2.1, 9.3, 9.4.2, 9.6, 9.10.5 1.1.7 Materials, Hazardous Insurance 10.2.4, 10.3 3.18.1, 6.1.1, 7.3.7, 9.3.2, 9.8.4, 9.9.1, 9.10.2, 11 Materials, Labor, Equipment and Insurance, Boiler and Machinery 1.1.3, 1.1.6, 1.5.1, 3.4.1, 3.5, 3.8.2, 3.8.3, 3.12, 3.13, 11.3.2 3.15.1, 4.2.6, 4.2.7, 5.2.1, 6.2.1, 7.3.7, 9.3.2, 9.3.3, Insurance, Contractor's Liability 9.5.1.3, 9.10.2, 10.2.1.2, 10.2.4, 14.2.1.1, 14.2.1.2 11.1 Means, Methods, Techniques, Sequences and Insurance, Effective Date of Procedures of Construction 8.2.2, 11.1.2 3.3.1, 3.12.10, 4.2.2, 4.2.7, 9.4.2 AIA Document A201 - 2007. Copyright O 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract 5 Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:51:37 PT on 05/13/2024 under Order 110.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-ti.me use only, and may only be used in accordance with the AIA Contract Documents'" Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (1164916017) Mechanic's Lien 2.1.2, 15.2.8 Mediation 8.3.1,10.3.5,10.3.6,15.2.1,15.2.5,15.2.6,15.3, 15.4.1 Minor Changes in the Work 1.1.1,3.12.8,4.2.8,7.1,7.4 MISCELLANEOUS PROVISIONS 13 Modifications, Definition of 1.1.1 Modifications to the Contract 1.1.1, 1.1.2,3.11,4.1.2,4.2.1,5.2.3,7,8.3.1,9.7, 10.3.2, 11.3.1 Mutual Responsibility 6.2 Nonconforming Work, Acceptance of 9.6.6, 9.9.3, 12.3 Nonconforming Work, Rejection and Correction of 2.3, 2.4, 3.5, 4.2.6, 6.2.4, 9.5.1, 9.8.2, 9.9.3, 9.10.4, 12.2.1 Notice 2.2.1, 2.3, 2.4, 3.2.4, 3.3.1, 3.7.2, 3.12.9, 5.2.1, 9.7, 9.10, 10.2.2, 11.1.3, 12.2.2. 1, 13.3, 13.5.1, 13.5.2, 14.1, 14.2, 15.2.8, 15.4.1 Notice, Written 2.3,2.4,3.3.1,39.2,3.12.9,3.12.10,5.2.1,9.7,9.10, 10.2.2,10.3,111.3,11.3.6,12.2.2.1,13.3,14,15.2.8, 15.4.1 Notice of Claims 3.7.4, 10.2.8, 15.1.2, 15.4 Notice of Testing and Inspections 13.5.1, 13.5.2 Observations, Contractor's 3.2, 3.7.4 Occupancy 2.2.2, 9.6.6, 9.8, 11.3.1.5 Orders, Written 1.1.1, 2.3, 3.9.2, 7, 8.2.2, 11.3.9, 12.1, 12.2.2.1, 13.5.2, 14.3.1 OWNER 2 Owner, Definition of 2.1.1 Owner, Information and Services Required of the 2.1.2, 2.2, 3.2.2, 3.1.2.10, 6.1.3, 6.1.4, 6.2.5, 9.3.2, 9.6.1, 9.6.4, 9.9.2, 9.10.3, 10.3.3, 11.2, 11.3, 13.5.1, 13.5.2, 14.1.1.4, 14.1.4, 15.1.3 Owner's Authority 1.5, 2.1.1, 2.3, 2.4, 3.4.2, 3.8.1, 3.12.10, 3.14.2, 4.1.2, 4.1.3, 4.2.4, 4.2.9, 5.2.1, 5.2.4, 5.4.1, 6.1, 6.3, 7.2.1, 7.3.1, 8.2.2, 8.3.1, 9.3.1, 9.3.2, 9.5.1, 9.6.4, 9.9.1, 9.10.2, 10.3.2, 11.1.3, 11.3.3, 11.3.10, 12.2.2, 12.3, 13.2.2, 14.3, 14.4, 15.2.7 Owner's Financial Capability 2.2.1, 13.2.2, 14.1.1.4 Owner's Liability Insurance 11.2 Owner's Relationship with Subcontractors 1. L2, 5.2, 5.3, 5.4, 9.6.4, 9.10.2, 14.2.2 Owner's Right to Carry Out the Work 2.4, 14.2.2 Owner's Right to Clean Up 6.3 Owner's Right to Perform Construction and to Award Separate Contracts 6.1 Owner's Right to Stop the Work 2.3 Owner's Right to Suspend the Work 14.3 Owner's Right to Terminate the Contract 14.2 Ownership and Use of Drawings, Specifications and Other Instruments of Service 1.1.1, 1.1.6, 1.1.7, 1.5, 2.2.5, 3.2.2, 3.11, 3.17, 4.2.12, 5.3 Partial Occupancy or Use 9.6.6, 9.9, 11.3.1.5 Patching, Cutting and 3.14, 6.2.5 Patents 3.17 Payment, Applications for 4.2.5,7.3.9,9.2,9.3,9.4,9.5,9.6.3,9.7,9.8.5,9.10.1, 14.2.3, 14.2.4, 14.4.3 Payment, Certificates for 4.2.5,4.2.9,9.3.3,9.4,9.5,9.6.1,9.6.6,9.7,9.10.1, 9.10.3, 13.7, 14.1.1.3, 14.2.4 Payment, Failure of 9.5.1.3, 9.7, 9.10.2, 13.6, 14.1.1.3, 14.2.1.2 Payment, Final 4.21, 4.2.9, 9.8.2, 9.10, 11.1.2, 11.1.3, 11.4.1, 12.3, 13.7, 14.2.4, 14.4.3 Payment Bond, Performance Bond and 7.3.7.4, 9.6.7, 9.10.3, 11.4 Payments, Progress 9.3, 9.6, 9.8.5, 9.10.3, 13.6, 14.2.3, 15.1.3 PAYMENTS AND COMPLETION 9 Payments to Subcontractors 5.4.2, 9.5.1.3, 9.6.2, 9.6.3, 9.6.4, 9.6.7, 14.2.1.2 PCB 10.3.1 Performance Bond and Payment Bond 7.3.7.4, 9.6.7, 9.10.3, 11.4 Permits, Fees, Notices and Compliance with Laws 2.2.2, 3.7, 3.13, 7.3.7.4, 10.2.2 PERSONS AND PROPERTY, PROTECTION OF 10 Polychlorinated Biphenyl 10.3.1 Product Data, Definition of 3.12.2 AIA Document A201 - 2007. Copyright: © 1911, 1915, 1.912, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:51:37 PT on 05/13/2024 under order No.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents" Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (1164916017) Product Data and Samples, Shop Drawings 3.11, 3.12, 4.2.7 Progress and Completion 4.2.2, 8.2, 9.8, 9.9.1, 14.1.4, 15.1.3 Progress Payments 9.3, 9.6, 9.8.5, 9.10.3, 13.6, 14.2.3, 15.1.3 Project, Definition of 1.1.4 Project Representatives 4.2.10 Property Insurance 10.2.5, 11.3 PROTECTION OF PERSONS AND PROPERTY 10 Regulations and Laws 1. 5, 3.2.3, 3.6, 3.7, 3.12.10, 3.13, 4.1.1, 9.6.4, 9.9. 1, 10.2.2, 11.1, 11.4,13.1, 13.4, 13.5.1, 13.5.2, 13.6, 14, 15.2.8, 15.4 Rejection of Work 3.5, 4.2.6, 12.2.1 Releases and Waivers of Liens 9.10.2 Representations 3.2.1,3.5,3.12.6,6.2.2,8.2.1,9.3.3,9.4.2,9.5.1, 9.8.2, 9.1.0.1 Representatives 2.1.1,3.1.1,3.9,4.1.1,4.2.1,4.2.2,4.2.10,5.1.1, 5.1.2, 13.2.1 Responsibility for Those Performing the Work 3.3.2, 3.18, 4.2.3, 5.3, 6.1.3, 6.2, 6.3, 9.5.1, 10 Retainage 9.3.1,9.6.2,9.8.5,9.9.1,9.10.2,9.10.3 Review of Contract Documents and Field Conditions by Contractor 3.2, 3.12.7, 6.1.3 Review of Contractor's Submittals by Owner and Architect 3.10.1, 3.10.2, 3.11, 3.12, 4.2, 5.2, 6.1.3, 9.2, 9.8.2 Review of Shop Drawings, Product Data and Samples by Contractor 3.12 Rights and Remedies 1. 1.2, 2.3, 2.4, 3.5, 3.7.4, 3.15.2, 4.2.6, 5.3, 5.4, 6. 1, 6.3, 7.3.1, 8.3, 9.5.1, 9.7, 10.2.5, 10.3, 12.2.2, 12.2.4, 13.4, 14, 15.4 Royalties, Patents and Copyrights 3.17 Rules and Notices for Arbitration 15.4.1 Safety of Persons and Property 10.2, 10.4 Safety Precautions and Programs 3.3.1, 4.2.2, 4.2.7, 5.3, 10.1, 10.2, 10.4 Samples, Definition of 3.12.3 Samples, Shop Drawings, Product Data and 3.11, 3.12, 4.2.7 Samples at the Site, Documents and 3.11 Schedule of Values 9.2, 9.3.1 Schedules, Construction 3.10, 3.12.1, 3.12.2, 6.1.3, 15.1.5.2 Separate Contracts and Contractors 1.1.4, 3.12.5, 3.14.2, 4.2.4, 4.2.7, 6, 8.3.1, 12.1.2 Shop Drawings, Definition of 3.12.1 Shop Drawings, Product Data and Samples 3.11, 3.12, 4.2.7 Site, Use of 3.13, 6.1.1, 6.11 Site Inspections 3.2.2, 3.3.3, 3.7.1, 3.7.4, 4.2, 9.4.2, 9.10.1, 13.5 Site Visits, Architect's 3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.5.1, 9.9.2, 9.10.1, 13.5 Special Inspections and Testing 4.2.6, 12.2.1, 13.5 Specifications, Definition of 1.1.6 Specifications 1.1.1, 1.1.6, 1.2.2, 1.5, 3.11, 3.12.10, 3.17, 4.2.14 Statute of Limitations 13.7, 15.4.1.1 Stopping the Work 2.3, 9.7, 10.3, 14.1 Stored Materials 6.2.1, 9.3.2, 10.2.1.2, 10.2.4 Subcontractor, Definition of 5.1.1 SUBCONTRACTORS 5 Subcontractors, Work by 1.2.2, 3.3.2, 3.12.1, 4.2.3, 5.2.3, 5.3, 5.4, 9.3.1.2, 9.6.7 Subcontractual Relations 5.3, 5.4, 9.3.1.2, 9.6, 9.10, 10.2.1, 14.1, 14.2.1 Submittals 3.10, 3.11, 3.12, 4.2.7, 5.2.1, 5.2.3, 7.3.7, 9.2, 9.3, 9.8, 9.9.1, 9.10.2, 9.10.3, 11.1.3 Submittal Schedule 3.10.2, 3.12.5, 4.2.7 Subrogation, Waivers of 6.1.1, 11.3.7 Substantial Completion 4.2.9, 8.1.1, 8.1.3, 8.2.3, 9.4.2, 9.8, 9.9.1, 9.10.3, 12.2, 13.7 Substantial Completion, Definition of 9.8.1 Substitution of Subcontractors 5.2.3, 5.2.4 Substitution of Architect 4.1.3 Substitutions of Materials 3.4.2, 3.5, 7.3.8 AIA Document A201 - 2007. Copyright O 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects," `American Institute of Architects," 'AIA," the AIA Logo, and "AIA ConCract ,' Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:51:37 PT or,05/13/2024 tinder Order No.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents` Terms of Service. To report copyright violations, e-mail docinfo@aiaconttracts.com. User Notes: (1164916017) Sub -subcontractor, Definition of 5.1.2 Subsurface Conditions 3.7.4 Successors and Assigns 13.2 Superintendent 3.9, 10.2.6 Supervision and Construction Procedures 1.2.2, 3.3, 3.4, 3.12.10, 4.2.2, 4.2.7, 6.1.3, 6.2.4, 7.1.3, 7.3.7, 8.2, 8.3.1, 9.4.2, 10, 12, 14, 15.1.3 Surety 5.4.1.2, 9.8.5, 9.10.2, 9.10.3, 14.2.2, 15.2.7 Surety, Consent of 9.10.2, 9.10.3 Surveys 2.2.3 Suspension by the Owner for Convenience 14.3 Suspension of the Work 5.4.2, 14.3 Suspension or Termination of the Contract 5.4.1.1, 14 Taxes 3.6, 3.8.2.1, 7.3.7.4 Termination by the Contractor 14.1, 15.1.6 Termination by the Owner for Cause 5.4.1.1, 14.2, 15.1.6 Termination by the Owner for Convenience 14.4 Termination of the Architect 4.1.3 Termination of the Contractor 14.2.2 TERMINATION OR SUSPENSION OF THE CONTRACT 14 Tests and Inspections 3.1.3, 3.3.3, 4.2.2, 4.2.6, 4.29, 9.4.2, 9.8.3, 9.9.2, 9.10.1, 10.3.2, 11.4.1, 12.2.1, 13.5 TIME 8 Time, Delays and Extensions of 3.2.4, 3.7.4, 5.2.3, 7.2.1, 7.3.1, 7.4, 8.3, 9.5.1, 9.7, 10.3.2,10.4,14.3.2,15.1.5,1.5.2.5 Time Limits 2.1.2,2.2,2.4,3.2.2,3.10,3.11,3.12.5,3.15.1,4.2, 5.2,5.3,5.4,6.2.4,7.3,7.4,8.2,9.2,9.3.1,9.3.3, 9.4.1, 9.5, 9.6, 9.7, 9.8, 9.9, 9.10, 11.1.3, 12.2, 13.5, 13.7, 14, 15.1.2, 15.4 Time Limits on Claims 3.7.4, 10.2.8, 13.7, 15.1.2 Title to Work 9.3.2, 9.3.3 Transmission of Data in Digital Form 1.6 UNCOVERING AND CORRECTION OF WORK 12 Uncovering of Work 12.1 Unforeseen Conditions, Concealed or Unknown 3.7.4, 8.3.1, 10.3 Unit Prices 7.3.3.2, 7.3.4 Use of Documents 1.1.1, 1.5, 2.2.5, 3.12.6, 5.3 Use of Site 3.13, 6.1.1, 6.2.1 Values, Schedule of 9.2, 9.3.1 Waiver of Claims by the Architect 13.4.2 Waiver of Claims by the Contractor 9.10.5, 13.4.2, 15.1.6 Waiver of Claims by the Owner 9.9.3, 9.10.3, 9.10.4, 12.2.2.1, 13.4.2, 14.2.4, 15.1.6 Waiver of Consequential Damages 14.2.4, 15.1.6 Waiver of Liens 9.10.2, 9.10.4 Waivers of Subrogation 6.1.1, 11.3.7 Warranty 3.5, 4.2.9, 9.3.3, 9.8.4, 9.9.1, 9.10.4, 12.2.2, 13.7 Weather Delays 15.1.5.2 Work, Definition of 1.1.3 Written Consent 1.5.2, 3.4.2, 3.7.4, 3.12.8, 3.14.2, 4.1.2, 9.3.2, 9.8.5, 9.9.1, 9.10.2, 9.10.3, 11.4.1, 13.2, 13.4.2, 15.4.4.2 Written Interpretations 4.2.11, 4.2.12 Written Notice 2.3,2.4,3.3.1,39,3.12.9,3.12.10,5.2.1,8.2.2,9.7, 9.10, 10.2.2, 10.3, 11.1.3, 12.2.2, 12.2.4, 13.3, 14, 15.4.1 Written Orders 1.1.1, 2.3, 3.9, 7, 8.2.2, 12.1, 12.2, 13.5.2, 14.3.1, 15.1.2 AIA Document A201 - 2007. Copyright 0 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All 22hts reserved. "The American institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:51:37 PT on 05/13/2024 under order No.4104^_43047 which expires on 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents" Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (1164916017) ARTICLE 1 GENERAL PROVISIONS § 1.1 BASIC DEFINITIONS § 1.1.1 THE CONTRACT DOCUMENTS The Contract Documents are enumerated in the Agreement between the Owner and Contractor (hereinafter the Agreement) and consist of the Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of the Contract, other documents listed in the Agreement and Modifications issued after execution of the Contract. A Modification is (1) a written amendment to the Contract signed by both parties, (2) a Change Order, (3) a Construction Change Directive or (4) a written order for a minor change in the Work issued by the Architect. Unless specifically enumerated in the Agreement, the Contract Documents do not include the advertisement or invitation to bid, Instructions to Bidders, sample forms, other information furnished by the Owner in anticipation of receiving bids or proposals, the Contractor's bid or proposal, or portions of Addenda relating to bidding requirements. § 1.1.2 THE CONTRACT The Contract Documents form the Contract for Construction. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. The Contract may be amended or modified only by a Modification. The Contract Documents shall not be construed to create a contractual relationship of any kind (1) between the Contractor and the Architect or the Architect's consultants, (2) between the Owner and a Subcontractor or a Sub -subcontractor, (3) between the Owner and the Architect or the Architect's consultants or (4) between any persons or entities other than the Owner and the Contractor. The Architect shall, however, be entitled to performance and enforcement of obligations under the Contract intended to facilitate performance of the Architect's duties. § 1.1.3 THE WORK The term "Work" means the construction and services required by the Contract Documents, whether completed or partially completed, and includes all other labor, materials, equipment and services provided or to be provided by the Contractor to fulfill the Contractor's obligations. The Work may constitute the whole or a part of the Project. § 1.1.4 THE PROJECT The Project is the total construction of which the Work performed under the Contract Documents may be the whole or a part and which may include construction by the Owner and by separate contractors. § 1.1.5 THE DRAWINGS The Drawings are the graphic and pictorial portions of the Contract Documents showing the design, location and dimensions of the Work, generally including plans, elevations, sections, details, schedules and diagrams. § 1.1.6 THE SPECIFICATIONS The Specifications are that portion of the Contract Documents consisting of the written requirements for materials, equipment, systems, standards and workmanship for the Work, and performance of related services. § 1.1.7INSTRUMENTS OF SERVICE Instruments of Service are representations, in any medium of expression now known or later developed, of the tangible and intangible creative work performed by the Architect and the Architect's consultants under their respective professional services agreements. Instruments of Service may include, without limitation, studies, surveys, models, sketches, drawings, specifications, and other similar materials. § 1.1.8INITIAL DECISION MAKER The Initial Decision Maker is the person identified in the Agreement to render initial decisions on Claims in accordance with Section 15.2 and certify termination of the Agreement under Section 14.2.2. § 1.2 CORRELATION AND INTENT OF THE CONTRACT DOCUMENTS § 1.2.1 The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work by the Contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all; performance by the Contractor shall be required only to the extent consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the indicated results. AIA Document A201 - 2007. Copyright .D 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract n Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:51:37 PT on 05/13/2024 under Order 7 No.4104243047 ;which expires On 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents" Terms of. Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (1164916017) § 1.2.2 Organization of the Specifications into divisions, sections and articles, and arrangement of Drawings shall not control the Contractor in dividing the Work among Subcontractors or in establishing the extent of Work to be performed by any trade. § 1.2.3 Unless otherwise stated in the Contract Documents, words that have well-known technical or construction industry meanings are used in the Contract Documents in accordance with such recognized meanings. § 1.3 CAPITALIZATION Terms capitalized in these General Conditions include those that are (1) specifically defined, (2) the titles of numbered articles or (3) the titles of other documents published by the American Institute of Architects. § 1.4INTERPRETATION In the interest of brevity the Contract Documents frequently omit modifying words such as "all" and "any" and articles such as "the" and "an," but the fact that a modifier or an article is absent from one statement and appears in another is not intended to affect the interpretation of either statement. § 1.5 OWNERSHIP AND USE OF DRAWINGS, SPECIFICATIONS AND OTHER INSTRUMENTS OF SERVICE § 1.5.1 The Architect and the Architect's consultants shall be deemed the authors and owners of their respective Instruments of Service, including the Drawings and Specifications, and will retain all common law, statutory and other reserved rights, including copyrights. The Contractor, Subcontractors, Sub -subcontractors, and material or equipment suppliers shall not own or claim a copyright in the Instruments of Service. Submittal or distribution to meet official regulatory requirements or for other purposes in connection with this Project is not to be construed as publication in derogation of the Architect's or Architect's consultants' reserved rights. § 1.5.2 The Contractor, Subcontractors, Sub -subcontractors and material or equipment suppliers are authorized to use and reproduce the Instruments of Service provided to them solely and exclusively for execution of the Work. All copies made under this authorization shall bear the copyright notice, if any, shown on the Instruments of Service. The Contractor, Subcontractors, Sub -subcontractors, and material or equipment suppliers may not use the Instruments of Service on other projects or for additions to this Project outside the scope of the Work without the specific written consent of the Owner, Architect and the Architect's consultants. § 1.6 TRANSMISSION OF DATA IN DIGITAL FORM If the parties intend to transmit Instruments of Service or any other information or documentation in digital form, they shall endeavor to establish necessary protocols governing such transmissions, unless otherwise already provided in the Agreement or the Contract Documents. ARTICLE 2 OWNER § 2.1 GENERAL § 2.1.1 The Owner is the person or entity identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number. The Owner shall designate in writing a representative who shall have express authority to bind the Owner with respect to all matters requiring the Owner's approval or authorization. Except as otherwise provided in Section 4.2.1, the Architect does not have such authority. The term "Owner" means the Owner or the Owner's authorized representative. § 2.1.2 The Owner shall furnish to the Contractor within fifteen days after receipt of a written request, information necessary and relevant for the Contractor to evaluate, give notice of or enforce mechanic's lien rights. Such information shall include a correct statement of the record legal title to the property on which the Project is located, usually referred to as the site, and the Owner's interest therein. § 2.2INFORMATION AND SERVICES REQUIRED OF THE OWNER § 2.2.1 Prior to commencement of the Work, the Contractor may request in writing that the Owner provide reasonable evidence that the Owner has made financial arrangements to fulfill the Owner's obligations under the Contract. Thereafter, the Contractor may only request such evidence if (1) the Owner fails to make payments to the Contractor as the Contract Documents require; (2) a change in the Work materially changes the Contract Sum; or (3) the Contractor identifies in writing a reasonable concern regarding the Owner's ability to make payment when due. The Owner shall furnish such evidence as a condition precedent to commencement or continuation of the Work or the portion of the Work affected by a material change. After the Owner furnishes the evidence, the Owner shall not materially vary such financial arrangements without prior notice to the Contractor. AIA Document A201 - 2007. Copyright o 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract to Documents" are trademarks of The American Institute of Architects. This draft was produced at 09: 51:37 PT 0n OS/13/2024 under Order N0.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents" Terms of Service. To report copyright violations, e-mail docinfe@aiacontracts.com. User Notes: (116491601.7f § 2.2.2 Except for permits and fees that are the responsibility of the Contractor under the Contract Documents, including those required under Section 3.7.1, the Owner shall secure and pay for necessary approvals, easements, assessments and charges required for construction, use or occupancy of permanent structures or for permanent changes in existing facilities. § 2.2.3 The Owner shall furnish surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and a legal description of the site. The Contractor shall be entitled to rely on the accuracy of information furnished by the Owner but shall exercise proper precautions relating to the safe performance of the Work. § 2.2.4 The Owner shall furnish information or services required of the Owner by the Contract Documents with reasonable promptness. The Owner shall also furnish any other information or services under the Owner's control and relevant to the Contractor's performance of the Work with reasonable promptness after receiving the Contractor's written request for such information or services. § 2.2.5 Unless otherwise provided in the Contract Documents, the Owner shall ftunish to the Contractor one copy of the Contract Documents for purposes of making reproductions pursuant to Section 1.5.2. § 2.3 OWNER'S RIGHT TO STOP THE WORK If the Contractor fails to correct Work that is not in accordance with the requirements of the Contract Documents as required by Section 12.2 or repeatedly fails to carry out Work in accordance with the Contract Documents, the Owner may issue a written order to the Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, the right of the Owner to stop the Work shall not give rise to a duty on the part of the Owner to exercise this right for the benefit of the Contractor or any other person or entity, except to the extent required by Section 6.1.3. § 2.4 OWNER'S RIGHT TO CARRY OUT THE WORK If the Contractor defaults or neglects to carry out the Work in accordance with the Contract Documents and fails within a ten-day period after receipt of written notice from the Owner to commence and continue correction of such default or neglect with diligence and promptness, the Owner may, without prejudice to other remedies the Owner may have, correct such deficiencies. In such case an appropriate Change Order shall be issued deducting from payments then or thereafter due the Contractor the reasonable cost of correcting such deficiencies, including Owner's expenses and compensation for the Architect's additional services made necessary by such default, neglect or failure. Such action by the Owner and amounts charged to the Contractor are both subject to prior approval of the Architect. If payments then or thereafter due the Contractor are not sufficient to cover such amounts, the Contractor shall pay the difference to the Owner. ARTICLE 3 CONTRACTOR § 3.1 GENERAL § 3.1.1 The Contractor is the person or entity identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number. The Contractor shall be lawfully licensed, if required in the jurisdiction where the Project is located. The Contractor shall designate in writing a representative who shall have express authority to bind the Contractor with respect to all matters under this Contract. The term "Contractor" means the Contractor or the Contractor's authorized representative. § 3.1.2 The Contractor shall perform the Work in accordance with the Contract Documents. § 3.1.3 The Contractor shall not be relieved of obligations to perform the Work in accordance with the Contract Documents either by activities or duties of the Architect in the Architect's administration of the Contract, or by tests, inspections or approvals required or performed by persons or entities other than the Contractor. § 3.2 REVIEW OF CONTRACT DOCUMENTS AND FIELD CONDITIONS BY CONTRACTOR § 3.2.1 Execution of the Contract by the Contractor is a representation that the Contractor has visited the site, become generally familiar with local conditions under which the Work is to be performed and correlated personal observations with requirements of the Contract Documents. AIA Document A2O1 - 2007. Copyright O 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract 11 Documents" are trademarks of The American Institute of Architects. This draft_ was produced at 09:51:37 PT on 05/13/2024 under Order t1o.4104243047 which expires on 06/1.0/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents" Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (1164916017) § 3.2.2 Because the Contract Documents are complementary, the Contractor shall, before starting each portion of the Work, carefully study and compare the various Contract Documents relative to that portion of the Work, as well as the information furnished by the Owner pursuant to Section 2.2.3, shall take field measurements of any existing conditions related to that portion of the Work, and shall observe any conditions at the site affecting it. These obligations are for the purpose of facilitating coordination and construction by the Contractor and are not for the purpose of discovering errors, omissions, or inconsistencies in the Contract Documents; however, the Contractor shall promptly report to the Architect any errors, inconsistencies or omissions discovered by or made known to the Contractor as a request for information in such form as the Architect may require. It is recognized that the Contractor's review is made in the Contractor's capacity as a contractor and not as a licensed design professional, unless otherwise specifically provided in the Contract Documents. § 3.2.3 The Contractor is not required to ascertain that the Contract Documents are in accordance with applicable laws, statutes, ordinances, codes, rules and regulations, or lawful orders of public authorities, but the Contractor shall promptly report to the Architect any nonconformity discovered by or made known to the Contractor as a request for information in such form as the Architect may require. § 3.2.4 If the Contractor believes that additional cost or time is involved because of clarifications or instructions the Architect issues in response to the Contractor's notices or requests for information pursuant to Sections 3.2.2 or 3.2.3, the Contractor shall make Claims as provided in Article 15. If the Contractor fails to perform the obligations of Sections 3.2.2 or 3.2.3, the Contractor shall pay such costs and damages to the Owner as would have been avoided if the Contractor had performed such obligations. If the Contractor performs those obligations, the Contractor shall not be liable to the Owner or Architect for damages resulting from errors, inconsistencies or omissions in the Contract Documents, for differences between field measurements or conditions and the Contract Documents, or for nonconformities of the Contract Documents to applicable laws, statutes, ordinances, codes, rules and regulations, and lawful orders of public authorities. § 3.3 SUPERVISION AND CONSTRUCTION PROCEDURES § 3.3.1 The Contractor shall supervise and direct the Work, using the Contractor's best skill and attention. The Contractor shall be solely responsible for, and have control over, construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract, unless the Contract Documents give other specific instructions concerning these matters. If the Contract Documents give specific instructions concerning construction means, methods, techniques, sequences or procedures, the Contractor shall evaluate the jobsite safety thereof and, except as stated below, shall be fully and solely responsible for the jobsite safety of such means, methods, techniques, sequences or procedures. If the Contractor detennines that such means, methods, techniques, sequences or procedures may not be safe, the Contractor shall give timely written notice to the Owner and Architect and shall not proceed with that portion of the Work without further written instructions from the Architect. If the Contractor is then instructed to proceed with the required means, methods, techniques, sequences or procedures without acceptance of changes proposed by the Contractor, the Owner shall be solely responsible for any loss or damage arising solely from those Owner -required means, methods, techniques, sequences or procedures. § 3.3.2 The Contractor shall be responsible to the Owner for acts and omissions of the Contractor's employees, Subcontractors and their agents and employees, and other persons or entities performing portions of the Work for, or on behalf of, the Contractor or any of its Subcontractors. § 3.3.3 The Contractor shall be responsible for inspection of portions of Work already performed to determine that such portions are in proper condition to receive subsequent Work. § 3.4 LABOR AND MATERIALS § 3.4.1 Unless otherwise provided in the Contract Documents, the Contractor shall provide and pay for labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation, and other facilities and services necessary for proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated in the Work. § 3.4.2 Except in the case of minor changes in the Work authorized by the Architect in accordance with Sections 3.12.8 or 7.4, the Contractor may make substitutions only with the consent of the Owner, after evaluation by the Architect and in accordance with a Change Order or Construction Change Directive. AIA Document A201 - 200'7. Copyright 9 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All. rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract 12 Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:51:37 PT on 05/13/2024 under Order. 11o.4104243047 which expires on 06/10/2024, is not for resale, is Licensed for one-time use only, and may only be used in accordance with the AIA Contract_ Documents` Terms of Service. To report copyright violations, e-mail doc info@ ai acont racts. com. User Notes: (1164916017) § 3.4.3 The Contractor shall enforce strict discipline and good order among the Contractor's employees and other persons carrying out the Work. The Contractor shall not permit employment of unfit persons or persons not properly skilled in tasks assigned to them. § 3.5 WARRANTY The Contractor warrants to the Owner and Architect that materials and equipment furnished under the Contract will be of good quality and new unless the Contract Documents require or permit otherwise. The Contractor further warrants that the Work will conform to the requirements of the Contract Documents and will be free from defects, except for those inherent in the quality of the Work the Contract Documents require or permit. Work, materials, or equipment not conforming to these requirements may be considered defective. The Contractor's warranty excludes remedy for damage or defect caused by abuse, alterations to the Work not executed by the Contractor, improper or insufficient maintenance, improper operation, or normal wear and tear and normal usage. If required by the Architect, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. § 3.6 TAXES The Contractor shall pay sales, consumer, use and similar taxes for the Work provided by the Contractor that are legally enacted when bids are received or negotiations concluded, whether or not yet effective or merely scheduled to go into effect. § 3.7 PERMITS, FEES, NOTICES AND COMPLIANCE WITH LAWS § 3.7.1 Unless otherwise provided in the Contract Documents, the Contractor shall secure and pay for the building permit as well as for other permits, fees, licenses, and inspections by government agencies necessary for proper execution and completion of the Work that are customarily secured after execution of the Contract and legally required at the time bids are received or negotiations concluded. § 3.7.2 The Contractor shall comply with and give notices required by applicable laws, statutes, ordinances, codes, rules and regulations, and lawful orders of public authorities applicable to performance of the Work. § 3.7.3 If the Contractor performs Work knowing it to be contrary to applicable laws, statutes, ordinances, codes, rules and regulations, or lawful orders of public authorities, the Contractor shall assume appropriate responsibility for such Work and shall bear the costs attributable to correction. § 3.7.4 Concealed or Unknown Conditions. If the Contractor encounters conditions at the site that are (1) subsurface or otherwise concealed physical conditions that differ materially from those indicated in the Contract Documents or (2) unknown physical conditions of an unusual nature, that differ materially from those ordinarily found to exist and generally recognized as inherent in construction activities of the character provided for in the Contract Documents, the Contractor shall promptly provide notice to the Owner and the Architect before conditions are disturbed and in no event later than 21 days after first observance of the conditions. The Architect will promptly investigate such conditions and, if the Architect determines that they differ materially and cause an increase or decrease in the Contractor's cost of, or time required for, performance of any part of the Work, will recommend an equitable adjustment in the Contract Sum or Contract Time, or both. If the Architect determines that the conditions at the site are not materially different from those indicated in the Contract Documents and that no change in the terms of the Contract is justified, the Architect shall promptly notify the Owner and Contractor in writing, stating the reasons. If either party disputes the Architect's determination or recommendation, that party may proceed as provided in Article 15. § 3.7.5 If, in the course of the Work, the Contractor encounters human remains or recognizes the existence of burial markers, archaeological sites or wetlands not indicated in the Contract Documents, the Contractor shall immediately suspend any operations that would affect them and shall notify the Owner and Architect. Upon receipt of such notice, the Owner shall promptly take any action necessary to obtain governmental authorization required to resume the operations. The Contractor shall continue to suspend such operations until otherwise instructed by the Owner but shall continue with all other operations that do not affect those remains or features. Requests for adjustments in the Contract Sum and Contract Time arising from the existence of such remains or features may be made as provided in Article 15. § 3.8 ALLOWANCES § 3.8.1 The Contractor shall include in the Contract Sum all allowances stated in the Contract Documents. Items covered by allowances shall be supplied for such amounts and by such persons or entities as the Owner may direct, AIA Document A201 - 2007, Copyright 0 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract �� Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:51:37 PT on 05/13/2024 under Order No.4104243047 which expires on 06/10/2024, is notfor resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents" Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (116491601'7) but the Contractor shall not be required to employ persons or entities to whom the Contractor has reasonable objection. § 3.8.2 Unless otherwise provided in the Contract Documents, .1 Allowances shall cover the cost to the Contractor of materials and equipment delivered at the site and all required taxes, less applicable trade discounts; .2 Contractor's costs for unloading and handling at the site, labor, installation costs, overhead, profit and other expenses contemplated for stated allowance amounts shall be included in the Contract Sum but not in the allowances; and .3 Whenever costs are more than or less than allowances, the Contract Sum shall be adjusted accordingly by Change Order. The amount of the Change Order shall reflect (1) the difference between actual costs and the allowances under Section 3.8.2.1 and (2) changes in Contractor's costs under Section 3.8.2.2. § 3.8.3 Materials and equipment under an allowance shall be selected by the Owner with reasonable promptness. § 3.9 SUPERINTENDENT § 3.9.1 The Contractor shall employ a competent superintendent and necessary assistants who shall be in attendance at the Project site during performance of the Work. The superintendent shall represent the Contractor, and communications given to the superintendent shall be as binding as if given to the Contractor. § 3.9.2 The Contractor, as soon as practicable after award of the Contract, shall furnish in writing to the Owner through the Architect the name and qualifications of a proposed superintendent. The Architect may reply within 14 days to the Contractor in writing stating (1) whether the Owner or the Architect has reasonable objection to the proposed superintendent or (2) that the Architect requires additional time to review. Failure of the Architect to reply within the 14 day period shall constitute notice of no reasonable objection. § 3.9.3 The Contractor shall not employ a proposed superintendent to whom the Owner or Architect has made reasonable and timely objection. The Contractor shall not change the superintendent without the Owner's consent, which shall not unreasonably be withheld or delayed. § 3.10 CONTRACTOR'S CONSTRUCTION SCHEDULES § 3.10.1 The Contractor, promptly after being awarded the Contract, shall prepare and submit for the Owner's and Architect's information a Contractor's constriction schedule for the Work. The schedule shall not exceed time limits current under the Contract Documents, shall be revised at appropriate intervals as required by the conditions of the Work and Project, shall be related to the entire Project to the extent required by the Contract Documents, and shall provide for expeditious and practicable execution of the Work. § 3.10.2 The Contractor shall prepare a submittal schedule, promptly after being awarded the Contract and thereafter as necessary to maintain a current submittal schedule, and shall submit the schedule(s) for the Architect's approval. The Architect's approval shall not unreasonably be delayed or withheld. The submittal schedule shall (1) be coordinated with the Contractor's constriction schedule, and (2) allow the Architect reasonable time to review submittals. If the Contractor fails to submit a submittal schedule,, the Contractor shall not be entitled to any increase in Contract Sum or extension of Contract Time based on the time required for review of submittals. § 3.10.3 The Contractor shall perform the Work in general accordance with the most recent schedules submitted to the Owner and Architect. § 3.11 DOCUMENTS AND SAMPLES AT THE SITE The Contractor shall maintain at the site for the Owner one copy of the Drawings, Specifications, Addenda, Change Orders and other Modifications, in good order and marked currently to indicate field changes and selections made during construction, and one copy of approved Shop Drawings, Product Data, Samples and similar required submittals. These shall be available to the Architect and shall be delivered to the Architect for submittal to the Owner upon completion of the Work as a record of the Work as constructed. AIA Document A201 - 2007. Copyright O 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract 14 Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:51:37 PT on 05/13/2024 under order No.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents" Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (1161916017) § 3.12 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES § 3.12.1 Shop Drawings are drawings, diagrams, schedules and other data specially prepared for the Work by the Contractor or a Subcontractor, Sub -subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work. § 3.12.2 Product Data are illustrations, standard schedules, performance charts, instructions, brochures, diagrams and other information furnished by the Contractor to illustrate materials or equipment for some portion of the Work. § 3.12.3 Samples are physical examples that illustrate materials, equipment or workmanship and establish standards by which the Work will be judged. § 3.12.4 Shop Drawings, Product Data, Samples and similar submittals are not Contract Documents. Their purpose is to demonstrate the way by which the Contractor proposes to conform to the information given and the design concept expressed in the Contract Documents for those portions of the Work for which the Contract Documents require submittals. Review by the Architect is subject to the limitations of Section 4.2.7. Infonnational submittals upon which the Architect is not expected to take responsive action may be so identified in the Contract Documents. Submittals that are not required by the Contract Documents may be returned by the Architect without action. § 3.12.5 The Contractor shall review for compliance with the Contract Documents, approve and submit to the Architect Shop Drawings, Product Data, Samples and similar submittals required by the Contract Documents in accordance with the submittal schedule approved by the Architect or, in the absence of an approved submittal schedule, with reasonable promptness and in such sequence as to cause no delay in the Work or in the activities of the Owner or of separate contractors. § 3.12.6 By submitting Shop Drawings, Product Data, Samples and similar submittals, the Contractor represents to the Owner and Architect that the Contractor has (1) reviewed and approved them, (2) determined and verified materials, field measurements and field construction criteria related thereto, or will do so and (3) checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents. § 3.12.7 The Contractor shall perform no portion of the Work for which the Contract Documents require submittal and review of Shop Drawings, Product Data, Samples or similar submittals until the respective submittal has been approved by the Architect. § 3.12.8 The Work shall be in accordance with approved submittals except that the Contractor shall not be relieved of responsibility for deviations from requirements of the Contract Documents by the Architect's approval of Shop Drawings, Product Data, Samples or similar submittals unless the Contractor has specifically informed the Architect in writing of such deviation at the time of submittal and (1) the Architect has given written approval to the specific deviation as a minor change in the Work, or (2) a Change Order or Construction Change Directive has been issued authorizing the deviation. The Contractor shall not be relieved of responsibility for errors or omissions in Shop Drawings, Product Data, Samples or similar submittals by the Architect's approval thereof. § 3.12.9 The Contractor shall direct specific attention, in writing or on resubmitted Shop Drawings, Product Data, Samples or similar submittals, to revisions other than those requested by the Architect on previous submittals. In the absence of such written notice, the Architect's approval of a resubmission shall not apply to such revisions. § 3.12.10 The Contractor shall not be required to provide professional services that constitute the practice of architecture or engineering unless such services are specifically required by the Contract Documents for a portion of the Work or unless the Contractor needs to provide such services in order to carry out the Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. The Contractor shall not be required to provide professional services in violation of applicable law. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of the Contractor by the Contract Documents, the Owner and the Architect will specify all performance and design criteria that such services must satisfy. The Contractor shall cause such services or certifications to be provided by a properly licensed design professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, Shop Drawings and other submittals prepared by such professional. Shop Drawings and other submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to the Architect. The Owner and the Architect shall be entitled AIA Document. A201 - 2007. Copyright () 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. Ail rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract 15 Documents" are trademarks of The American Institute of. Architects. This draft was produced at 09:51:37 PT on 05/13/2024 under Order No.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents" Terms of Service. To report copyright violations, e-mail docinfo@alacontracts.com. User Notes: (116491601.7) to rely upon the adequacy, accuracy and completeness of the services, certifications and approvals performed or provided by such design professionals, provided the Owner and Architect have specified to the Contractor all performance and design criteria that such services must satisfy. Pursuant to this Section 3.12.10, the Architect will review, approve or take other appropriate action on submittals only for the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Documents. The Contractor shall not be responsible for the adequacy of the performance and design criteria specified in the Contract Documents. § 3.13 USE OF SITE The Contractor shall confine operations at the site to areas permitted by applicable laws, statutes, ordinances, codes, rules and regulations, and lawful orders of public authorities and the Contract Documents and shall not unreasonably encumber the site with materials or equipment. § 3.14 CUTTING AND PATCHING § 3.14.1 The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly. All areas requiring cutting, fitting and patching shall be restored to the condition existing prior to the cutting, fitting and patching, unless otherwise required by the Contract Documents. § 3.14.2 The Contractor shall not damage or endanger a portion of the Work or fully or partially completed construction of the Owner or separate contractors by cutting, patching or otherwise altering such construction, or by excavation. The Contractor shall not cut or otherwise alter such construction by the Owner or a separate contractor except with written consent of the Owner and of such separate contractor; such consent shall not be unreasonably withheld. The Contractor shall not unreasonably withhold from the Owner or a separate contractor the Contractor's consent to cutting or otherwise altering the Work. § 3.15 CLEANING UP § 3.15.1 The Contractor shall keep the premises and surrounding area free from accumulation of waste materials or rubbish caused by operations under the Contract. At completion of the Work, the Contractor shall remove waste materials, rubbish, the Contractor's tools, construction equipment, machinery and surplus materials from and about the Project. § 3.15.2 If the Contractor fails to clean up as provided in the Contract Documents, the Owner may do so and Owner shall be entitled to reimbursement from the Contractor. § 3.16 ACCESS TO WORK The Contractor shall provide the Owner and Architect access to the Work in preparation and progress wherever located. § 3.17 ROYALTIES, PATENTS AND COPYRIGHTS The Contractor shall pay all royalties and license fees. The Contractor shall defend suits or claims for infringement of copyrights and patent rights and shall hold the Owner and Architect harmless from loss on account thereof, but shall not be responsible for such defense or loss when a particular design, process or product of a particular manufacturer or manufacturers is required by the Contract Documents, or where the copyright violations are contained in Drawings, Specifications or other documents prepared by the Owner or Architect. However, if the Contractor has reason to believe that the required design, process or product is an infringement of a copyright or a patent, the Contractor shall be responsible for such loss unless such information is promptly furnished to the Architect. § 3.18INDEMNIFICATION § 3.18.1 To the fullest extent permitted by law the Contractor shall indemnify and hold harmless the Owner, Architect, Architect's consultants, and agents and employees of any of them from and against claims, damages, losses and expenses, including but not limited to attorneys' fees, arising out of or resulting from performance of the Work, provided that such claim, damage, loss or expense is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the Work itself), but only to the extent caused by the negligent acts or omissions of the Contractor, a Subcontractor, anyone directly or indirectly employed by them or anyone for whose acts they may be liable, regardless of whether or not such claim, damage, loss or expense is caused in part by a party indemnified hereunder. Such obligation shall not be construed to negate, abridge, or reduce AIA Document A201 - 2007. Copyright J 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract 1 C Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:51.:37 PT on 05/13/2024 under Order V Cio.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents"Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (1164916017) other rights or obligations of indemnity that would otherwise exist as to a party or person described in this Section 3.18. § 3.18.2 In claims against any person or entity indemnified under this Section 3.18 by an employee of the Contractor, a Subcontractor, anyone directly or indirectly employed by them or anyone for whose acts they may be liable, the indemnification obligation under Section 3.18.1 shall not be limited by a limitation on amount or type of damages, compensation or benefits payable by or for the Contractor or a Subcontractor under workers' compensation acts, disability benefit acts or other employee benefit acts. ARTICLE 4 ARCHITECT § 4.1 GENERAL § 4.1.1 The Owner shall retain an architect lawfully licensed to practice architecture or an entity lawfully practicing architecture in the jurisdiction where the Project is located. That person or entity is identified as the Architect in the Agreement and is referred to throughout the Contract Documents as if singular in number. § 4.1.2 Duties, responsibilities and limitations of authority of the Architect as set forth in the Contract Documents shall not be restricted, modified or extended without written consent of the Owner, Contractor and Architect. Consent shall not be unreasonably withheld. § 4.1.3 If the employment of the Architect is terminated, the Owner shall employ a successor architect as to whom the Contractor has no reasonable objection and whose status Linder the Contract Documents shall be that of the Architect. § 4.2 ADMINISTRATION OF THE CONTRACT § 4.2.1 The Architect will provide administration of the Contract as described in the Contract Documents and will be an Owner's representative during construction until the date the Architect issues the final Certificate for Payment. The Architect will have authority to act on behalf of the Owner only to the extent provided in the Contract Documents. § 4.2.2 The Architect will visit the site at intervals appropriate to the stage of construction, or as otherwise agreed with the Owner, to become generally familiar with the progress and quality of the portion of the Work completed, and to determine in general if the Work observed is being performed in a manner indicating that the Work, when fully completed, will be in accordance with the Contract Documents. However, the Architect will not be required to make exhaustive or continuous on -site inspections to check the quality or quantity of the Work. The Architect will not have control over, charge of, or responsibility for, the construction means, methods, techniques, sequences or procedures, or for the safety precautions and programs in connection with the Work, since these are solely the Contractor's rights and responsibilities under the Contract Documents, except as provided in Section 3.3.1. § 4.2.3 On the basis of the site visits, the Architect will keep the Owner reasonably informed about the progress and quality of the portion of the Work completed, and report to the Owner (1) known deviations from the Contract Documents and from the most recent construction schedule submitted by the Contractor, and (2) defects and deficiencies observed in the Work. The Architect will not be responsible for the Contractor's failure to perform the Work in accordance with the requirements of the Contract Documents. The Architect will not have control over or charge of and will not be responsible for acts or omissions of the Contractor, Subcontractors, or their agents or employees, or any other persons or entities performing portions of the Work. § 4.2.4 COMMUNICATIONS FACILITATING CONTRACT ADMINISTRATION Except as otherwise provided in the Contract Documents or when direct communications have been specially authorized, the Owner and Contractor shall endeavor to communicate with each other through the Architect about matters arising out of or relating to the Contract. Communications by and with the Architect's consultants shall be through the Architect. Communications by and with Subcontractors and material suppliers shall be through the Contractor. Communications by and with separate contractors shall be through the Owner. § 4.2.5 Based on the Architect's evaluations of the Contractor's Applications for Payment, the Architect will review and certify the amounts due the Contractor and will issue Certificates for Payment in such amounts. § 4.2.6 The Architect has authority to reject Work that does not conform to the Contract Documents. Whenever the Architect considers it necessary or advisable, the Architect will have authority to require inspection or testing of the AIA Document A201 - 2007, Copyright 0 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract 1,1 Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:51:37 PT on 05/13/2024 under Order t4o.41O4243O47 which expires on 06/1.0/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents" Terms of Service. To report copyright violations, e-mail docinfo@aiacontract:s.com. User Notes: (1164916017) Work in accordance with Sections 13.5.2 and 1.3.5.3, whether or not such Work is fabricated, installed or completed. However, neither this authority of the Architect nor a decision made in good faith either to exercise or not to exercise such authority shall give rise to a duty or responsibility of the Architect to the Contractor, Subcontractors, material and equipment suppliers, their agents or employees, or other persons or entities perfonning portions of the Work. § 4.2.7 The Architect will review and approve, or take other appropriate action upon, the Contractor's submittals such as Shop Drawings, Product Data and Samples, but only for the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Documents. The Architect's action will be taken in accordance with the submittal schedule approved by the Architect or, in the absence of an approved submittal schedule, with reasonable promptness while allowing sufficient time in the Architect's professional judgment to permit adequate review. Review of such submittals is not conducted for the purpose of detennining the accuracy and completeness of other details such as dimensions and quantities, or for substantiating instructions for installation or performance of equipment or systems, all of which remain the responsibility of the Contractor as required by the Contract Documents. The Architect's review of the Contractor's submittals shall not relieve the Contractor of the obligations under Sections 3.3, 3.5 and 3.12, The Architect's review shall not constitute approval of safety precautions or, unless otherwise specifically stated by the Architect, of any construction means, methods, techniques, sequences or procedures. The Architect's approval of a specific item shall not indicate approval of an assembly of which the item is a component. § 4.2.8 The Architect will prepare Change Orders and Construction Change Directives, and may authorize minor changes in the Work as provided in Section 7.4. The Architect will investigate and make determinations and recommendations regarding concealed and unknown conditions as provided in Section 3.7.4. § 4.2.9 The Architect will conduct inspections to determine the date or dates of Substantial Completion and the date of final completion; issue Certificates of Substantial Completion pursuant to Section 9.8; receive and forward to the Owner, for the Owner's review and records, written warranties and related documents required by the Contract and assembled by the Contractor pursuant to Section 9.10; and issue a final Certificate for Payment pursuant to Section 9.10. § 4.2.10 If the Owner and Architect agree, the Architect will provide one or more project representatives to assist in carrying out the Architect's responsibilities at the site. The duties, responsibilities and limitations of authority of such project representatives shall be as set forth in an exhibit to be incorporated in the Contract Documents. § 4.2.11 The Architect will interpret and decide matters concerning perforamance under, and requirements of, the Contract Documents on written request of either the Owner or Contractor. The Architect's response to such requests will be made in writing within any time limits agreed upon or otherwise with reasonable promptness. § 4.2.12 Interpretations and decisions of the Architect will be consistent with the intent of, and reasonably inferable from, the Contract Documents and will be in writing or in the form of drawings. When making such interpretations and decisions, the Architect will endeavor to secure faithful performance by both Owner and Contractor, will not show partiality to either and will not be liable for results of interpretations or decisions rendered in good faith. § 4.2.13 The Architect's decisions on matters relating to aesthetic effect will be final if consistent with the intent expressed in the Contract Documents. § 4.2.14 The Architect will review and respond to requests for information about the Contract Documents. The Architect's response to such requests will be made in writing within any time limits agreed upon or otherwise with reasonable promptness. If appropriate, the Architect will prepare and issue supplemental Drawings and Specifications in response to the requests for information. ARTICLE 5 SUBCONTRACTORS § 5.1 DEFINITIONS § 5.1.1 A Subcontractor is a person or entity who has a direct contract with the Contractor to perform a portion of the Work at the site. The term "Subcontractor" is referred to throughout the Contract Documents as if singular in number and means a Subcontractor or an authorized representative of the Subcontractor. The term "Subcontractor" does not include a separate contractor or subcontractors of a separate contractor. AIA Document A201 - 2007. Copyright 0 1911, 1.915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects," "American institute of Architects," 'AIA," the AIA Logo, and "AIA Contract 1Q Documents" are trademarks of The American Institute of Architects. This draft was produced at: 09:51.:37 PT on 05/13/2024 under Order O No.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents" Terms of Service. To report copyright violations, e-mail docinf0ai..acont:racts. com. User Notes: (116491601'7) § 5.1.2 A Sub -subcontractor is a person or entity who has a direct or indirect contract with a Subcontractor to perform a portion of the Work at the site. The term "Sub -subcontractor" is referred to throughout the Contract Documents as if singular in number and means a Sub -subcontractor or an authorized representative of the Sub - subcontractor. § 5.2 AWARD OF SUBCONTRACTS AND OTHER CONTRACTS FOR PORTIONS OF THE WORK § 5.2.1 Unless otherwise stated in the Contract Documents or the bidding requirements, the Contractor, as soon as practicable after award of the Contract, shall furnish in writing to the Owner through the Architect the names of persons or entities (including those who are to furnish materials or equipment fabricated to a special design) proposed for each principal portion of the Work. The Architect may reply within 14 days to the Contractor in writing stating (1) whether the Owner or the Architect has reasonable objection to any such proposed person or entity or (2) that the Architect requires additional time for review. Failure of the Owner or Architect to reply within the 14-day period shall constitute notice of no reasonable objection. § 5.2.2 The Contractor shall not contract with a proposed person or entity to whom the Owner or Architect has made reasonable and timely objection. The Contractor shall not be required to contract with anyone to whom the Contractor has made reasonable objection. § 5.2.3 If the Owner or Architect has reasonable objection to a person or entity proposed by the Contractor, the Contractor shall propose another to whom the Owner or Architect has no reasonable objection. If the proposed but rejected Subcontractor was reasonably capable of performing the Work, the Contract Sum and Contract Time shall be increased or decreased by the difference, if any, occasioned by such change, and an appropriate Change Order shall be issued before commencement of the substitute Subcontractor's Work. However, no increase in the Contract Sum or Contract Time shall be allowed for such change unless the Contractor has acted promptly and responsively in submitting names as required. § 5.2.4 The Contractor shall not substitute a Subcontractor, person or entity previously selected if the Owner or Architect makes reasonable objection to such substitution. § 5.3 SUBCONTRACTUAL RELATIONS By appropriate agreement, written where legally required for validity, the Contractor shall require each Subcontractor, to the extent of the Work to be performed by the Subcontractor, to be bound to the Contractor by terms of the Contract Documents, and to assume toward the Contractor all the obligations and responsibilities, including the responsibility for safety of the Subcontractor's Work, which the Contractor, by these Documents, assumes toward the Owner and Architect. Each subcontract agreement shall preserve and protect the rights of the Owner and Architect under the Contract Documents with respect to the Work to be performed by the Subcontractor so that subcontracting thereof will not prejudice such rights, and shall allow to the Subcontractor, unless specifically provided otherwise in the subcontract agreement, the benefit of all rights, remedies and redress against the Contractor that the Contractor, by the Contract Documents, has against the Owner. Where appropriate, the Contractor shall require each Subcontractor to enter into similar agreements with Sub -subcontractors. The Contractor shall make available to each proposed Subcontractor, prior to the execution of the subcontract agreement, copies of the Contract Documents to which the Subcontractor will be bound, and, upon written request of the Subcontractor, identify to the Subcontractor terms and conditions of the proposed subcontract agreement that may be at variance with the Contract Documents. Subcontractors will similarly make copies of applicable portions of such documents available to their respective proposed Sub -subcontractors. § 5.4 CONTINGENT ASSIGNMENT OF SUBCONTRACTS § 5.4.1 Each subcontract agreement for a portion of the Work is assigned by the Contractor to the Owner, provided that .1 assignment is effective only after termination of the Contract by the Owner for cause pursuant to Section 14.2 and only for those subcontract agreements that the Owner accepts by notifying the Subcontractor and Contractor in writing; and .2 assignment is subject to the prior rights of the surety, if any, obligated under bond relating to the Contract. When the Owner accepts the assignment of a subcontract agreement, the Owner assumes the Contractor's rights and obligations under the subcontract. AIA Document A201 - 2007. Copyright 0 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1.963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract n Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:51:37 ?T on 05/13/2021 under Order 7 Ho.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents`' Terms of Service. To report copyright violations, e-mail cioci.nfo@ai.acontracts.com. User Notes: (1164916017) § 5.4.2 Upon such assignment, if the Work has been suspended for more than 30 days, the Subcontractor's compensation shall be equitably adjusted for increases in cost resulting from the suspension. § 5.4.3 Upon such assignment to the Owner under this Section 5.4, the Owner may further assign the subcontract to a successor contractor or other entity. If the Owner assigns the subcontract to a successor contractor or other entity, the Owner shall nevertheless remain legally responsible for all of the successor contractor's obligations under the subcontract. ARTICLE 6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS § 6.1 OWNER'S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS § 6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner's own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim as provided in Article 15. § 6.1.2 When separate contracts are awarded for different portions of the Project or other construction or operations on the site, the term "Contractor" in the Contract Documents in each case shall mean the Contractor who executes each separate Owner -Contractor Agreement. § 6.1.3 The Owner shall provide for coordination of the activities of the Owner's own forces and of each separate contractor with the Work of the Contractor, who shall cooperate with them. The Contractor shall participate with other separate contractors and the Owner in reviewing their construction schedules. The Contractor shall make any revisions to the construction schedule deemed necessary after a joint review and mutual agreement. The construction schedules shall then constitute the schedules to be used by the Contractor, separate contractors and the Owner until subsequently revised. § 6.1.4 Unless otherwise provided in the Contract Documents, when the Owner performs construction or operations related to the Project with the Owner's own forces, the Owner shall be deemed to be subject to the same obligations and to have the same rights that apply to the Contractor under the Conditions of the Contract, including, without excluding others, those stated in Article 3, this Article 6 and Articles 10, 11 and 12. § 6.2 MUTUAL RESPONSIBILITY § 6.2.1 The Contractor shall afford the Owner and separate contractors reasonable opportunity for introduction and storage of their materials and equipment and performance of their activities, and shall connect and coordinate the Contractor's construction and operations with theirs as required by the Contract Documents. § 6.2.2 If part of the Contractor's Work depends for proper execution or results upon construction or operations by the Owner or a separate contractor, the Contractor shall, prior to proceeding with that portion of the Work, promptly report to the Architect apparent discrepancies or defects in such other construction that would render it unsuitable for such proper execution and results. Failure of the Contractor so to report shall constitute an acknowledgment that the Owner's or separate contractor's completed or partially completed construction is fit and proper to receive the Contractor's Work, except as to defects not then reasonably discoverable. § 6.2.3 The Contractor shall reimburse the Owner for costs the Owner incurs that are payable to a separate contractor because of the Contractor's delays, improperly timed activities or defective construction. The Owner shall be responsible to the Contractor for costs the Contractor incurs because of a separate contractor's delays, improperly timed activities, damage to the Work or defective construction. § 6.2.4 The Contractor shall promptly remedy damage the Contractor wrongfully causes to completed or partially completed construction or to property of the Owner or separate contractors as provided in Section 10.2.5. § 6.2.5 The Owner and each separate contractor shall have the same responsibilities for cutting and patching as are described for the Contractor in Section 3.14. AIA Document A201. - 2007. Copyright G 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1,966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects," "American Institute of Architects,` "AIA," the AIA Logo, and "AIA Contract 20 Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:51:37 PT on 05/13/2024 under Order t1o.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents" Terms of Service. To report copyright violations, e-mail dorinfo@aiacontracts.com. User Notes: (1164916017) § 6.3 OWNER'S RIGHT TO CLEAN UP If a dispute arises among the Contractor, separate contractors and the Owner as to the responsibility under their respective contracts for maintaining the premises and surrounding area free from waste materials and rubbish, the Owner may clean up and the Architect will allocate the cost among those responsible. ARTICLE 7 CHANGES IN THE WORK § 7.1 GENERAL § 7.1.1 Changes in the Work may be accomplished after execution of the Contract, and without invalidating the Contract, by Change Order, Construction Change Directive or order for a minor change in the Work, subject to the limitations stated in this Article 7 and elsewhere in the Contract Documents. § 7.1.2 A Change Order shall be based upon agreement among the Owner, Contractor and Architect; a Construction Change Directive requires agreement by the Owner and Architect and may or may not be agreed to by the Contractor; an order for a minor change in the Work may be issued by the Architect alone. § 7.1.3 Changes in the Work shall be performed under applicable provisions of the Contract Documents, and the Contractor shall proceed promptly, unless otherwise provided in the Change Order, Construction Change Directive or order for a minor change in the Work. § 7.2 CHANGE ORDERS § 7.2.1 A Change Order is a written instrument prepared by the Architect and signed by the Owner, Contractor and Architect stating their agreement upon all of the following: .1 The change in the Work; .2 The amount of the adjustment, if any, in the Contract Sum; and .3 The extent of the adjustment, if any, in the Contract Time. § 7.3 CONSTRUCTION CHANGE DIRECTIVES § 7.3.1 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work prior to agreement on adjustment, if any, in the Contract Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusted accordingly. § 7.3.2 A Construction Change Directive shall be used in the absence of total agreement on the terms of a Change Order. § 7.3.3 If the Construction Change Directive provides for an adjustment to the Contract Sum, the adjustment shall be based on one of the following methods: .1 Mutual acceptance of a lump sum properly itemized and supported by sufficient substantiating data to permit evaluation; .2 Unit prices stated in the Contract Documents or subsequently agreed upon; .3 Cost to be determined in a manner agreed upon by the parties and a mutually acceptable fixed or percentage fee; or .4 As provided in Section 7.3.7. § 7.3.4 If unit prices are stated in the Contract Documents or subsequently agreed upon, and if quantities originally contemplated are materially changed in a proposed Change Order or Construction Change Directive so that application of such unit prices to quantities of Work proposed will cause substantial inequity to the Owner or Contractor, the applicable unit prices shall be equitably adjusted. § 7.3.5 Upon receipt of a Construction Change Directive, the Contractor shall promptly proceed with the change in the Work involved and advise the Architect of the Contractor's agreement or disagreement with the method, if any, provided in the Construction Change Directive for determining the proposed adjustment in the Contract Sum or Contract Time. § 7.3.6 A Construction Change Directive signed by the Contractor indicates the Contractor's agreement therewith, including adjustment in Contract Sum and Contract Time or the method for determining them. Such agreement shall be effective immediately and shall be recorded as a Change Order. AIA Document A201 - 2007. Copyright U 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 7.970, 1976, 1987, 1997 and 2007. All. rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract ,21 Documents" are trademarks of The American Ins t,itute of Architects. This draft was produced at 09:51.:37 PT on 05/13/2024 under Order No.4104243047 which expires cn 05/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents" Terms of Service. To report copyright violations, e-mail doc info@ a iacont racts. coat. User Notes: (1164916017) § 7.3.7 If the Contractor does not respond promptly or disagrees with the method for adjustment in the Contract Sum, the Architect shall determine the method and the adjustment on the basis of reasonable expenditures and savings of those performing the Work attributable to the change, including, in case of an increase in the Contract Sum, an amount for overhead and profit as set forth in the Agreement, or if no such amount is set forth in the Agreement, a reasonable amount. In such case, and also under Section 7.3.3.3, the Contractor shall keep and present, in such form as the Architect may prescribe, an itemized accounting together with appropriate supporting data. Unless otherwise provided in the Contract Documents, costs for the purposes of this Section 7.3.7 shall be limited to the following: .1 Costs of labor, including social security, old age and unemployment insurance, fringe benefits required by agreement or custom, and workers' compensation insurance; .2 Costs of materials, supplies and equipment, including cost of transportation, whether incorporated or consumed; .3 Rental costs of machinery and equipment, exclusive of hand tools, whether rented from the Contractor or others; .4 Costs of premiums for all bonds and insurance, permit fees, and sales, use or similar taxes related to the Work; and .5 Additional costs of supervision and field office personnel directly attributable to the change. § 7.3.8 The amount of credit to be allowed by the Contractor to the Owner for a deletion or change that results in a net decrease in the Contract Sum shall be actual net cost as confirmed by the Architect. When both additions and credits covering related Work or substitutions are involved in a change, the allowance for overhead and profit shall be figured on the basis of net increase, if any, with respect to that change. § 7.3.9 Pending final determination of the total cost of a Construction Change Directive to the Owner, the Contractor may request payment for Work completed under the Construction Change Directive in Applications for Payment. The Architect will make an interim determination for purposes of monthly certification for payment for those costs and certify for payment the amount that the Architect determines, in the Architect's professional judgment, to be reasonably justified. The Architect's interim determination of cost shall adjust the Contract Sum on the same basis as a Change Order, subject to the right of either party to disagree and assert a Claim in accordance with Article 15. § 7.3.10 When the Owner and Contractor agree with a determination made by the Architect concerning the adjustments in the Contract Sum and Contract Time, or otherwise reach agreement upon the adjustments, such agreement shall be effective immediately and the Architect will prepare a Change Order. Change Orders may be issued for all or any part of a Construction Change Directive. § 7.4 MINOR CHANGES IN THE WORK The Architect has authority to order minor changes in the Work not involving adjustment in the Contract Sum or extension of the Contract Time and not inconsistent with the intent of the Contract Documents. Such changes will be effected by written order signed by the Architect and shall be binding on the Owner and Contractor. ARTICLE 8 TIME § 8.1 DEFINITIONS § 8.1.1 Unless otherwise provided, Contract Time is the period of time, including authorized adjustments, allotted in the Contract Documents for Substantial Completion of the Work. § 8.1.2 The date of commencement of the Work is the date established in the Agreement. § 8.1.3 The date of Substantial Completion is the date certified by the Architect in accordance with Section 9.8. § 8.1.4 The term "day" as used in the Contract Documents shall mean calendar day unless otherwise specifically defined. § 8.2 PROGRESS AND COMPLETION § 8.2.1 Time limits stated in the Contract Documents are of the essence of the Contract. By executing the Agreement the Contractor confirms that the Contract Time is a reasonable period for performing the Work. AIA Document A201 - 2007, Copyright 6) 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987,.1997 and 2007. All. rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract 22 Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:51:37 PT on 05/13/2024 under Order 17o.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents" Terms of Service. To report copyright violations, e-mail docinfo@aiacon tracts. com. User Notes: (1164916017) § 8.2.2 The Contractor shall not knowingly, except by agreement or instruction of the Owner in writing, prematurely commence operations on the site or elsewhere prior to the effective date of insurance required by Article 1 I to be furnished by the Contractor and. Owner. The date of commencement of the Work shall not be changed by the effective date of such insurance. § 8.2.3 The Contractor shall proceed expeditiously with adequate forces and shall achieve Substantial Completion within the Contract Time. § 8.3 DELAYS AND EXTENSIONS OF TIME § 8.3.1 If the Contractor is delayed at any time in the commencement or progress of the Work by an act or neglect of the Owner or Architect, or of an employee of either, or of a separate contractor employed by the Owner; or by changes ordered in the Work; or by labor disputes, fire, unusual delay in deliveries, unavoidable casualties or other causes beyond the Contractor's control; or by delay authorized by the Owner pending mediation and arbitration; or by other causes that the Architect detennines may justify delay, then the Contract Time shall be extended by Change Order for such reasonable time as the Architect may determine. § 8.3.2 Claims relating to time shall be made in accordance with applicable provisions of Article 15. § 8.3.3 This Section 8.3 does not preclude recovery of damages for delay by either parry under other provisions of the Contract Documents. ARTICLE 9 PAYMENTS AND COMPLETION § 9.1 CONTRACT SUM The Contract Sum is stated in the Agreement and, including authorized adjustments, is the total amount payable by the Owner to the Contractor for performance of the Work under the Contract Documents. § 9.2 SCHEDULE OF VALUES Where the Contract is based on a stipulated sum or Guaranteed Maximum Price, the Contractor shall submit to the Architect, before the first Application for Payment, a schedule of values allocating the entire Contract Sum to the various portions of the Work and prepared in such form and supported by such data to substantiate its accuracy as the Architect may require. This schedule, unless objected to by the Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. § 9.3 APPLICATIONS FOR PAYMENT § 9.3.1 At least ten days before the date established for each progress payment, the Contractor shall submit to the Architect an itemized Application for Payment prepared in accordance with the schedule of values, if required under Section 9.2, for completed portions of the Work. Such application shall be notarized, if required, and supported by such data substantiating the Contractor's right to payment as the Owner or Architect may require, such as copies of requisitions from Subcontractors and material suppliers, and shall reflect retainage if provided for in the Contract Documents. § 9.3.1.1 As provided in Section 7.3.9, such applications may include requests for payment on account of changes in the Work that have been properly authorized by Construction Change Directives, or by interim determinations of the Architect, but not yet included in Change Orders. § 9.3.1.2 Applications for Payment shall not include requests for payment for portions of the Work for which the Contractor does not intend to pay a Subcontractor or material supplier, unless such Work has been performed by others whom the Contractor intends to pay. § 9.3.2 Unless otherwise provided in the Contract Documents, payments shall be made on account of materials and equipment delivered and suitably stored at the site for subsequent incorporation in the Work. If approved in advance by the Owner, payment may similarly be made for materials and equipment suitably stored off the site at a location agreed upon in writing. Payment for materials and equipment stored on or off the site shall be conditioned upon compliance by the Contractor with procedures satisfactory to the Owner to establish the Owner's title to such materials and equipment or otherwise protect the Owner's interest, and shall include the costs of applicable insurance, storage and transportation to the site for such materials and equipment stored off the site. AIA Document A201 - 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961,.1963, 1966, 1970, 1976, 1987, 1997 and 2007. A11 rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:51:37 AT on 05/13/2024 under Order 23 tlo.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents" Tetras of Service. To report copyright violations, e-mail docinfo@aiacont.racts.com. User Notes: (1164916017) § 9.3.3 The Contractor warrants that title to all Work covered by an Application for Payment will pass to the Owner no later than the time of payment. The Contractor further warrants that upon submittal of an Application for Payment all Work for which Certificates for Payment have been previously issued and payments received from the Owner shall, to the best of the Contractor's knowledge, information and belief, be free and clear of liens, claims, security interests or encumbrances in favor of the Contractor, Subcontractors, material suppliers, or other persons or entities making a claim by reason of having provided labor, materials and equipment relating to the Work. § 9.4 CERTIFICATES FOR PAYMENT § 9.4.1 The Architect will, within seven days after receipt of the Contractor's Application for Payment, either issue to the Owner a Certificate for Payment, with a copy to the Contractor, for such amount as the Architect determines is properly due, or notify the Contractor and Owner in writing of the Architect's reasons for withholding certification in whole or in part as provided in Section 9.5.1. § 9.4.2 The issuance of a Certificate for Payment will constitute a representation by the Architect to the Owner, based on the Architect's evaluation of the Work and the data comprising the Application for Payment, that, to the best of the Architect's knowledge, information and belief, the Work has progressed to the point indicated and that the quality of the Work is in accordance with the Contract Documents. The foregoing representations are subject to an evaluation of the Work for conformance with the Contract Documents upon Substantial Completion, to results of subsequent tests and inspections, to correction of minor deviations from the Contract Documents prior to completion and to specific qualifications expressed by the Architect. The issuance of a Certificate for Payment will further constitute a representation that the Contractor is entitled to payment in the amount certified. However, the issuance of a Certificate for Payment will not be a representation that the Architect has (1) made exhaustive or continuous on - site inspections to check the quality or quantity of the Work, (2) reviewed construction means, methods, techniques, sequences or procedures, (3) reviewed copies of requisitions received from Subcontractors and material suppliers and other data requested by the Owner to substantiate the Contractor's right to payment, or (4) made examination to ascertain how or for what purpose the Contractor has used money previously paid on account of the Contract Sum. § 9.5 DECISIONS TO WITHHOLD CERTIFICATION § 9.5.1 The Architect may withhold a Certificate for Payment in whole or in part, to the extent reasonably necessary to protect the Owner, if in the Architect's opinion the representations to the Owner required by Section 9.4.2 cannot be made. If the Architect is unable to certify payment in the amount of the Application, the Architect will notify the Contractor and Owner as provided in Section 9.4.1. If the Contractor and Architect cannot agree on a revised amount, the Architect will promptly issue a Certificate for Payment for the amount for which the Architect is able to make such representations to the Owner. The Architect may also withhold a Certificate for Payment or, because of subsequently discovered evidence, may nullify the whole or a part of a Certificate for Payment previously issued, to such extent as may be necessary in the Architect's opinion to protect the Owner from loss for which the Contractor is responsible, including loss resulting from acts and omissions described in Section 3.3.2, because of .1 defective Work not remedied; .2 third party claims filed or reasonable evidence indicating probable filing of such claims unless security acceptable to the Owner is provided by the Contractor; .3 failure of the Contractor to make payments properly to Subcontractors or for labor, materials or equipment; .4 reasonable evidence that the Work cannot be completed for the unpaid balance of the Contract Sum; .5 damage to the Owner or a separate contractor; .6 reasonable evidence that the Work will not be completed within the Contract Time, and that the unpaid balance would not be adequate to cover actual or liquidated damages for the anticipated delay; or repeated failure to carry out the Work in accordance with the Contract Documents. § 9.5.2 When the above reasons for withholding certification are removed, certification will be made for amounts previously withheld. § 9.5.3 If the Architect withholds certification for payment under Section 9.5.1.3, the Owner may, at its sole option, issue joint checks to the Contractor and to any Subcontractor or material or equipment suppliers to whom the Contractor failed to make payment for Work properly performed or material or equipment suitably delivered. If the Owner makes payments by joint check, the Owner shall notify the Architect and the Architect will reflect such. payment on the next Certificate for Payment. AIA Document A201. - 2007. Copyright (D 191.1, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract 24 Documents" are trademarks of The American Institute of Architects. This draft was produced at. 09:51:37 PT on 05/13/2024 under Order Dio.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents`-' Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (1164916017) § 9.6 PROGRESS PAYMENTS § 9.6.1 After the Architect has issued a Certificate for Payment, the Owner shall make payment in the manner and within the time provided in the Contract Documents, and shall so notify the Architect. § 9.6.2 The Contractor shall pay each Subcontractor no later than seven days after receipt of payment from the Owner the amount to which the Subcontractor is entitled, reflecting percentages actually retained from payments to the Contractor on account of the Subcontractor's portion of the Work. The Contractor shall, by appropriate agreement with each Subcontractor, require each Subcontractor to make payments to Sub -subcontractors in a similar manner. § 9.6.3 The Architect will, on request, furnish to a Subcontractor, if practicable, information regarding percentages of completion or amounts applied for by the Contractor and action taken thereon by the Architect and Owner on account of portions of the Work done by such Subcontractor. § 9.6.4 The Owner has the right to request written evidence from the Contractor that the Contractor has properly paid Subcontractors and material and equipment suppliers amounts paid by the Owner to the Contractor for subcontracted Work.. If the Contractor fails to furnish such evidence within seven days, the Owner shall have the right to contact Subcontractors to ascertain whether they have been properly paid. Neither the Owner nor Architect shall have an obligation to pay or to see to the payment of money to a Subcontractor, except as may otherwise be required by law. § 9.6.5 Contractor payments to material and equipment suppliers shall be treated in a manner similar to that provided in Sections 9.6.2, 9.6.3 and 9.6.4. § 9.6.6 A Certificate for Payment, a progress payment, or partial or entire use or occupancy of the Project by the Owner shall not constitute acceptance of Work not in accordance with the Contract Documents. § 9.6.7 Unless the Contractor provides the Owner with a payment bond in the full penal sum of the Contract Sum, payments received by the Contractor for Work properly performed by Subcontractors and suppliers shall be held by the Contractor for those Subcontractors or suppliers who performed Work or furnished materials, or both, under contract with the Contractor for which payment was made by the Owner. Nothing contained herein shall require money to be placed in a separate account and not commingled with money of the Contractor, shall create any fiduciary liability or tort liability on the part of the Contractor for breach of trust or shall entitle any person or entity to an award of punitive damages against the Contractor for breach of the requirements of this provision. § 9.7 FAILURE OF PAYMENT If the Architect does not issue a Certificate for Payment, through no fault of the Contractor, within seven days after receipt of the Contractor's Application for Payment, or if the Owner does not pay the Contractor within seven days after the date established in the Contract Documents the amount certified by the Architect or awarded by binding dispute resolution, then the Contractor may, upon seven additional days' written notice to the Owner and Architect, stop the Work until payment of the amount owing has been received. The Contract Time shall be extended appropriately and the Contract Sum shall be increased by the amount of the Contractor's reasonable costs of shut- down, delay and start-up, plus interest as provided for in the Contract Documents. § 9.8 SUBSTANTIAL COMPLETION § 9.8.1 Substantial Completion is the stage in the progress of the Work when the Work or designated portion thereof is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. § 9.8.2 When the Contractor considers that the Work, or a portion thereof which the Owner agrees to accept separately, is substantially complete, the Contractor shall prepare and submit to the Architect a comprehensive list of items to be completed or corrected prior to final payment. Failure to include an item on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. § 9.8.3 Upon receipt of the Contractor's list, the Architect will make an inspection to determine whether the Work or designated portion thereof is substantially complete. If the Architect's inspection discloses any item, whether or not included on the Contractor's list, which is not sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work or designated portion thereof for its intended use, the Contractor AIA Document A201 -- 2007. Copyright O 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects,- "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract ,25 Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:51:37 PT on 05/13/2024 under Order Mo.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents' Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (1164916017) shall, before issuance of the Certificate of Substantial Completion, complete or correct such item upon notification by the Architect. In such case, the Contractor shall then submit a request for another inspection by the Architect to determine Substantial Completion. § 9.8.4 When the Work or designated portion thereof is substantially complete, the Architect will prepare a Certificate of Substantial Completion that shall establish the date of Substantial Completion, shall establish responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, damage to the Work and insurance, and shall fix the time within which the Contractor shall finish all items on the list accompanying the Certificate. Warranties required by the Contract Documents shall commence on the date of Substantial Completion of the Work or designated portion thereof unless otherwise provided in the Certificate of Substantial Completion. § 9.8.5 The Certificate of Substantial Completion shall be submitted to the Owner and Contractor for their written acceptance of responsibilities assigned to them in such Certificate. Upon such acceptance and consent of surety, if any, the Owner shall make payment of retainage applying to such Work or designated portion thereof. Such payment shall be adjusted for Work that is incomplete or not in accordance with the requirements of the Contract Documents. § 9.9 PARTIAL OCCUPANCY OR USE § 9.9.1 The Owner may occupy or use any completed or partially completed portion of the Work at any stage when such portion is designated by separate agreement with the Contractor, provided such occupancy or use is consented to by the insurer as required under Section 11.3.1.5 and authorized by public authorities having jurisdiction over the Project. Such partial occupancy or use may commence whether or not the portion is substantially complete, provided the Owner and Contractor have accepted in writing the responsibilities assigned to each of them for payments, retainage, if any, security, maintenance, heat, utilities, damage to the Work and insurance, and have agreed in writing concerning the period for correction of the Work and commencement of warranties required by the Contract Documents. When the Contractor considers a portion substantially complete, the Contractor shall prepare and submit a list to the Architect as provided under Section 9.8.2. Consent of the Contractor to partial occupancy or use shall not be unreasonably withheld. The stage of the progress of the Work shall be determined by written agreement between the Owner and Contractor or, if no agreement is reached, by decision of the Architect. § 9.9.2 Immediately prior to such partial occupancy or use, the Owner, Contractor and Architect shall jointly inspect the area to be occupied or portion of the Work to be used in order to determine and record the condition of the Work. § 9.9.3 Unless otherwise agreed upon, partial occupancy or use of a portion or portions of the Work shall not constitute acceptance of Work not complying with the requirements of the Contract Documents. § 9.10 FINAL COMPLETION AND FINAL PAYMENT § 9.10.1 Upon receipt of the Contractor's written notice that the Work is ready for final inspection and acceptance and upon receipt of a final Application for Payment, the Architect will promptly make such inspection and, when the Architect finds the Work acceptable under the Contract Documents and the Contract fully performed, the Architect will promptly issue a final Certificate for Payment stating that to the best of the Architect's knowledge, information and belief, and on the basis of the Architect's on -site visits and inspections, the Work has been completed in accordance with terms and conditions of the Contract Documents and that the entire balance found to be due the Contractor and noted in the final Certificate is due and payable. The Architect's final Certificate for Payment will constitute a further representation that conditions listed in Section 9.10.2 as precedent to the Contractor's being entitled to final payment have been fulfilled. § 9.10.2 Neither final payment nor any remaining retained percentage shall become due until the Contractor submits to the Architect (1) an affidavit that payrolls, bills for materials and equipment, and other indebtedness connected with the Work for which the Owner or the Owner's property might be responsible or encumbered (less amounts withheld by Owner) have been paid or otherwise satisfied, (2) a certificate evidencing that insurance required by the Contract Documents to remain in force after final payment is currently in effect and will not be canceled or allowed to expire until at least 30 days' prior written notice has been given to the Owner, (3) a written statement that the Contractor knows of no substantial reason that the insurance will not be renewable to cover the period required by the Contract Documents, (4) consent of surety, if any, to final payment and (5), if required by the Owner, other data establishing payment or satisfaction of obligations, such as receipts, releases and waivers of liens, claims, security interests or encumbrances arising out of the Contract, to the extent and in such form as may be designated by the Owner. If a Subcontractor refuses to furnish a release or waiver required by the Owner, the Contractor may furnish a AIA Document A201 - 2007. Copyright 0 1911, 1915, 1918, 1925, 1937, 1951,.1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA,' the AIA Logo, and "AIA Contract e Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:51:37 PT on 05/13/2024 under Order V No.4104243047 which expires on 06I10(2024, is not for resale, is Licensed for one-time use only, and may only be used 1n accordance with the AIA Contract Documents" Terms of Service. To report copyright violations, e-mail. docinfo@aiacontracts.com. User Notes: (1164916017) bond satisfactory to the Owner to indemnify the Owner against such lien. If such lien remains unsatisfied after payments are made, the Contractor shall refund to the Owner all money that the Owner may be compelled to pay in discharging such lien, including all costs and reasonable attorneys' fees. § 9.10.3 If, after Substantial Completion of the Work, final completion thereof is materially delayed through no fault of the Contractor or by issuance of Change Orders affecting final completion, and the Architect so confirms, the Owner shall, upon application by the Contractor and certification by the Architect, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance for Work not fully completed or corrected is less than retainage stipulated in the Contract Documents, and if bonds have been furnished, the written consent of surety to payment of the balance due for that portion of the Work fully completed and accepted shall be submitted by the Contractor to the Architect prior to certification of such payment. Such payment shall be made under terms and conditions governing final payment, except that it shall not constitute a waiver of claims. § 9.10.4 The making of final payment shall constitute a waiver of Claims by the Owner except those arising from .1 liens, Claims, security interests or encumbrances arising out of the Contract and unsettled; .2 failure of the Work to comply with the requirements of the Contract Documents; or .3 terms of special warranties required by the Contract Documents. § 9.10.5 Acceptance of final payment by the Contractor, a Subcontractor or material supplier shall constitute a waiver of claims by that payee except those previously made in writing and identified by that payee as unsettled at the time of final Application for Payment. ARTICLE 10 PROTECTION OF PERSONS AND PROPERTY § 10.1 SAFETY PRECAUTIONS AND PROGRAMS The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the performance of the Contract. § 10.2 SAFETY OF PERSONS AND PROPERTY § 10.2.1 The Contractor shall take reasonable precautions for safety of, and shall provide reasonable protection to prevent damage, injury or loss to .1 employees on the Work and other persons who may be affected thereby; .2 the Work and materials and equipment to be incorporated therein, whether in storage on or off the site, under care, custody or control of the Contractor or the Contractor's Subcontractors or Sub - subcontractors; and .3 other property at the site or adjacent thereto, such as trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction. § 10.2.2 The Contractor shall comply with and give notices required by applicable laws, statutes, ordinances, codes, rules and regulations, and lawful orders of public authorities bearing on safety of persons or property or their protection from damage, injury or loss. § 10.2.3 The Contractor shall erect and maintain, as required by existing conditions and performance of the Contract, reasonable safeguards for safety and protection, including posting danger signs and other warnings against hazards, promulgating safety regulations and notifying owners and users of adjacent sites and utilities. § 10.2.4 When use or storage of explosives or other hazardous materials or equipment or unusual methods are necessary for execution of the Work, the Contractor shall exercise utmost care and carry on such activities under supervision of properly qualified personnel. § 10.2.5 The Contractor shall promptly remedy damage and loss (other than damage or loss insured under property insurance required by the Contract Documents) to property referred to in Sections 10.2.1.2 and 10.2.1.3 caused in whole or in part by the Contractor, a Subcontractor, a Sub -subcontractor, or anyone directly or indirectly employed by any of them, or by anyone for whose acts they may be liable and for which the Contractor is responsible under Sections 10.2.1.2 and 10.2.1.3, except damage or loss attributable to acts or omissions of the Owner or Architect or anyone directly or indirectly employed by either of them, or by anyone for whose acts either of them may be liable, AIA Document A201 - 2007. Copyright 0 1911, 1915, 1918, 1925, 1937, 1951, 1958, i961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract 2,' Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:51:37 PT on 05/13/2024 under order Ho.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents" Terms of Service. To report copyright violations, e-mail docinfo@ai.acontracts.com. User Notes: (116491601'7) and not attributable to the fault or negligence of the Contractor. The foregoing obligations of the Contractor are in addition to the Contractor's obligations under Section 3.18. § 10.2.6 The Contractor shall designate a responsible member of the Contractor's organization at the site whose duty shall be the prevention of accidents. This person shall be the Contractor's superintendent unless otherwise designated by the Contractor in writing to the Owner and Architect. § 10.2.7 The Contractor shall not pen -nit any part of the construction or site to be loaded so as to cause damage or create an unsafe condition. § 10.2.8INJURY OR DAMAGE TO PERSON OR PROPERTY If either party suffers injury or damage to person or property because of an act or omission of the other party, or of others for whose acts such party is legally responsible, written notice of such injury or damage, whether or not insured, shall be given to the other party within a reasonable time not exceeding 21 days after discovery. The notice shall provide sufficient detail to enable the other party to investigate the matter. § 10.3 HAZARDOUS MATERIALS § 10.3.1 The Contractor is responsible for compliance with any requirements included in the Contract Documents regarding hazardous materials. If the Contractor encounters a hazardous material or substance not addressed in the Contract Documents and if reasonable precautions will be inadequate to prevent foreseeable bodily injury or death to persons resulting from a material or substance, including but not limited to asbestos or polychlorinated biphenyl (PCB), encountered on the site by the Contractor, the Contractor shall, upon recognizing the condition, immediately stop Work in the affected area and report the condition to the Owner and Architect in writing. § 10.3.2 Upon receipt of the Contractor's written notice, the Owner shall obtain the services of a licensed laboratory to verify the presence or absence of the material or substance reported by the Contractor and, in the event such material or substance is found to be present, to cause it to be rendered harmless. Unless otherwise required by the Contract Documents, the Owner shall furnish in writing to the Contractor and Architect the names and qualifications of persons or entities who are to perform tests verifying the presence or absence of such material or substance or who are to perform the task of removal or safe containment of such material or substance. The Contractor and the Architect will promptly reply to the Owner in writing stating whether or not either has reasonable objection to the persons or entities proposed by the Owner. If either the Contractor or Architect has an objection to a person or entity proposed by the Owner, the Owner shall propose another to whom the Contractor and the Architect have no reasonable objection. When the material or substance has been rendered harmless, Work in the affected area shall resume upon written agreement of the Owner and Contractor. By Change Order, the Contract Time shall be extended appropriately and the Contract Sum shall be increased in the amount of the Contractor's reasonable additional costs of shut -down, delay and start-up. § 10.3.3 To the fullest extent permitted by law, the Owner shall indemnify and hold harmless the Contractor, Subcontractors, Architect, Architect's consultants and agents and employees of any of them from and against claims, damages, losses and expenses, including but not limited to attorneys' fees, arising out of or resulting from performance of the Work in the affected area if in fact the material or substance presents the risk of bodily injury or death as described in Section 10.3.1 and has not been rendered harmless, provided that such claim, damage, loss or expense is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the Work itself), except to the extent that such damage, loss or expense is due to the fault or negligence of the party seeking indemnity. § 10.3.4 The Owner shall not be responsible under this Section 10.3 for materials or substances the Contractor brings to the site unless such materials or substances are required by the Contract Documents. The Owner shall be responsible for materials or substances required by the Contract Documents, except to the extent of the Contractor's fault or negligence in the use and handling of such materials or substances. § 10.3.5 The Contractor shall indemnify the Owner for the cost and expense the Owner incurs (1) for remediation of a material or substance the Contractor brings to the site and negligently handles, or (2) where the Contractor fails to perform its obligations under Section 10.3.1, except to the extent that the cost and expense are due to the Owner's fault or negligence. AIA Document A201 - 2007. Copyright J 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the ATA Logo, and "AIA Contract ,28 Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:51:37 PT on 05/13/2024 under Order No.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents, , 'Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (1164916017) § 10.3.6 If, without negligence on the part of the Contractor, the Contractor is held liable by a government agency for the cost of remediation of a hazardous material or substance solely by reason of performing Work as required by the Contract Documents, the Owner shall indemnify the Contractor for all cost and expense thereby incurred. § 10.4 EMERGENCIES In an emergency affecting safety of persons or property, the Contractor shall act, at the Contractor's discretion, to prevent threatened damage, injury or loss. Additional compensation or extension of time claimed by the Contractor on account of an emergency shall be determined as provided in Article 15 and Article 7. ARTICLE 11 INSURANCE AND BONDS § 11.1 CONTRACTOR'S LIABILITY INSURANCE § 11.1.1 The Contractor shall purchase from and maintain in a company or companies lawfully authorized to do business in the jurisdiction in which the Project is located such insurance as will protect the Contractor from claims set forth below which may arise out of or result from the Contractor's operations and completed operations under the Contract and for which the Contractor may be legally liable, whether such operations be by the Contractor or by a Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable: .1 Claims under workers' compensation, disability benefit and other similar employee benefit acts that are applicable to the Work to be performed; .2 Claims for damages because of bodily injury, occupational sickness or disease, or death of the Contractor's employees; .3 Claims for damages because of bodily injury, sickness or disease, or death of any person other than the Contractor's employees; .4 Claims for damages insured by usual personal injury liability coverage; .5 Claims for damages, other than to the Work itself, because of injury to or destruction of tangible property, including loss of use resulting therefrom; .6 Claims for damages because of bodily injury, death of a person or property damage arising out of ownership, maintenance or use of a motor vehicle; .7 Claims for bodily injury or property damage arising out of completed operations; and .8 Claims involving contractual liability insurance applicable to the Contractor's obligations under Section 3.18. § 11.1.2 The insurance required by Section 11.1.1 shall be written for not less than limits of liability specified in the Contract Documents or required by law, whichever coverage is greater. Coverages, whether written on an occurrence or claims -made basis, shall be maintained without interruption from the date of commencement of the Work until the date of final payment and termination of any coverage required to be maintained after final payment, and, with respect to the Contractor's completed operations coverage, until the expiration of the period for correction of Work or for such other period for maintenance of completed operations coverage as specified in the Contract Documents. § 11.1.3 Certificates of insurance acceptable to the Owner shall be filed with the Owner prior to commencement of the Work and thereafter upon renewal or replacement of each required policy of insurance. These certificates and the insurance policies required by this Section 11.1 shall contain a provision that coverages afforded under the policies will not be canceled or allowed to expire until at least 30 days' prior written notice has been given to the Owner. An additional certificate evidencing continuation of liability coverage, including coverage for completed operations, shall be submitted with the final Application for Payment as required by Section 9.10.2 and thereafter upon renewal or replacement of such coverage until the expiration of the time required by Section 11.1.2. Information concerning reduction of coverage on account of revised limits or claims paid under the General Aggregate, or both, shall be fiirnished by the Contractor with reasonable promptness. § 11.1.4 The Contractor shall cause the commercial liability coverage required by the Contract Documents to include (1) the Owner, the Architect and the Architect's consultants as additional insureds for claims caused in whole or in part by the Contractor's negligent acts or omissions during the Contractor's operations; and (2) the Owner as an additional insured for claims caused in whole or in part by the Contractor's negligent acts or omissions during the Contractor's completed operations. § 11.2 OWNER'S LIABILITY INSURANCE The Owner shall be responsible for purchasing and maintaining the Owner's usual liability insurance. AIA Document A201 - 2007. Copyright c) 1911, 1915, 1918, 1925, 1937, 1951, 1.958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American institute of Architects. This draft was produced at 09:51:37 PT on 05/13/2024 under Order 29 No.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents" Terms of Service. To report copyright violations, e-mail. docinfo@aiacontracts.com. User Notes: (1164916017) § 11.3 PROPERTY INSURANCE § 11.3.1 Unless otherwise provided, the Owner shall purchase and maintain, in a company or companies lawfully authorized to do business in the jurisdiction in which the Project is located, property insurance written on a builder's risk "all-risk" or equivalent policy form in the amount of the initial Contract Sum, plus value of subsequent Contract Modifications and cost of materials supplied or installed by others, comprising total value for the entire Project at the site on a replacement cost basis without optional deductibles. Such property insurance shall be maintained, unless otherwise provided in the Contract Documents or otherwise agreed in writing by all persons and entities who are beneficiaries of such insurance, until final payment has been made as provided in Section 9.10 or until no person or entity other than the Owner has an insurable interest in the property required by this Section 11.3 to be covered, whichever is later. This insurance shall include interests of the Owner, the Contractor, Subcontractors and Sub - subcontractors in the Project. § 11.3.1.1 Property insurance shall be on an "all-risk" or equivalent policy form and shall include, without limitation, insurance against the perils of fire (with extended coverage) and physical loss or damage including, without duplication of coverage, theft, vandalism, malicious mischief, collapse, earthquake, flood, windstorm, falsework, testing and startup, temporary buildings and debris removal including demolition occasioned by enforcement of any applicable legal requirements, and shall cover reasonable compensation for Architect's and Contractor's services and expenses required as a result of such insured loss. § 11.3.1.2 If the Owner does not intend to purchase such property insurance required by the Contract and with all of the coverages in the amount described above, the Owner shall so inform the Contractor in writing prior to commencement of the Work. The Contractor may then effect insurance that will protect the interests of the Contractor, Subcontractors and Sub -subcontractors in the Work, and by appropriate Change Order the cost thereof shall be charged to the Owner. If the Contractor is damaged by the failure or neglect of the Owner to purchase or maintain insurance as described above, without so notifying the Contractor in writing, then the Owner shall bear all reasonable costs properly attributable thereto. § 11.3.1.3 If the property insurance requires deductibles, the Owner shall pay costs not covered because of such deductibles. § 11.3.1.4 This property insurance shall cover portions of the Work stored off the site, and also portions of the Work in transit. § 11.3.1.5 Partial occupancy or use in accordance with Section 9.9 shall not commence until the insurance company or companies providing property insurance have consented to such partial occupancy or use by endorsement or otherwise. The Owner and the Contractor shall take reasonable steps to obtain consent of the insurance company or companies and shall, without mutual written consent, take no action with respect to partial occupancy or use that would cause cancellation, lapse or reduction of insurance. § 11.3.2 BOILER AND MACHINERY INSURANCE The Owner shall purchase and maintain boiler and machinery insurance required by the Contract Documents or by law, which shall specifically cover such insured objects during installation and until final acceptance by the Owner; this insurance shall include interests of the Owner, Contractor, Subcontractors and Sub -subcontractors in the Work, and the Owner and Contractor shall be named insureds. § 11.3.3 LOSS OF USE INSURANCE The Owner, at the Owner's option, may purchase and maintain such insurance as will insure the Owner against loss of use of the Owner's property due to fire or other hazards, however caused. The Owner waives all rights of action against the Contractor for loss of use of the Owner's property, including consequential losses due to fire or other hazards however caused. § 11.3.4 If the Contractor requests in writing that insurance for risks other than those described herein or other special causes of loss be included in the property insurance policy, the Owner shall, if possible, include such insurance, and the cost thereof shall be charged to the Contractor by appropriate Change Order. § 11.3.5 If during the Project construction period the Owner insures properties, real or personal or both, at or adjacent to the site by property insurance under policies separate from those insuring the Project, or if after final AIA Document A201 - 2007. Copyright O 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects," "American Institute of Architects," 'AIA," the AIA Logo, and "AIA Contract 30 Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:51:37 PT on 05/13/2024 under Order No.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents°' Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (1164916017) payment property insurance is to be provided on the completed Project through a policy or policies other than those insuring the Project during the construction period, the Owner shall waive all rights in accordance with the terms of Section 11.3.7 for damages caused by fire or other causes of loss covered by this separate property insurance. All separate policies shall provide this waiver of subrogation by endorsement or otherwise. § 11.3.6 Before an exposure to loss may occur, the Owner shall file with the Contractor a copy of each policy that includes insurance coverages required by this Section 11.3. Each policy shall contain all generally applicable conditions, definitions, exclusions and endorsements related to this Project. Each policy shall contain a provision that the policy will not be canceled or allowed to expire, and that its limits will not be reduced, until at least 30 days' prior written notice has been given to the Contractor. § 11.3.7 WAIVERS OF SUBROGATION The Owner and Contractor waive all rights against (1) each other and any of their subcontractors, sub - subcontractors, agents and employees, each of the other, and (2) the Architect, Architect's consultants, separate contractors described in Article 6, if any, and any of their subcontractors, sub -subcontractors, agents and employees, for damages caused by fire or other causes of loss to the extent covered by property insurance obtained pursuant to this Section 11.3 or other property insurance applicable to the Work, except such rights as they have to proceeds of such insurance held by the Owner as fiduciary. The Owner or Contractor, as appropriate, shall require of the Architect, Architect's consultants, separate contractors described in Article 6, if any, and the subcontractors, sub - subcontractors, agents and employees of any of them, by appropriate agreements, written where legally required for validity, similar waivers each in favor of other parties enumerated herein. The policies shall provide such waivers of subrogation by endorsement or otherwise. A waiver of subrogation shall be effective as to a person or entity even though that person or entity would otherwise have a duty of indemnification, contractual or otherwise, did not pay the insurance premium directly or indirectly, and whether or not the person or entity had an insurable interest in the property damaged. § 11.3.8 A loss insured under the Owner's property insurance shall be adjusted by the Owner as fiduciary and made payable to the Owner as fiduciary for the insureds, as their interests may appear, subject to requirements of any applicable mortgagee clause and of Section 1.1.3.10. The Contractor shall pay Subcontractors their just shares of insurance proceeds received by the Contractor, and by appropriate agreements, written where legally required for validity, shall require Subcontractors to make payments to their Sub -subcontractors in similar manner. § 11.3.9 If required in writing by a party in interest, the Owner as fiduciary shall, upon occurrence of an insured loss, give bond for proper performance of the Owner's duties. The cost of required bonds shall be charged against proceeds received as fiduciary. The Owner shall deposit in a separate account proceeds so received, which the Owner shall distribute in accordance with such agreement as the parties in interest may reach, or as determined in accordance with the method of binding dispute resolution selected in the Agreement between the Owner and Contractor. If after such loss no other special agreement is made and unless the Owner terminates the Contract for convenience, replacement of damaged property shall be performed by the Contractor after notification of a Change in the Work in accordance with Article 7. § 11.3.10 The Owner as fiduciary shall have power to adjust and settle a loss with insurers unless one of the parties in interest shall object in writing within five days after occurrence of loss to the Owner's exercise of this power; if such objection is made, the dispute shall be resolved in the manner selected by the Owner and Contractor as the method of binding dispute resolution in the Agreement. If the Owner and Contractor have selected arbitration as the method of binding dispute resolution, the Owner as fiduciary shall make settlement with insurers or, in the case of a dispute over distribution of insurance proceeds, in accordance with the directions of the arbitrators. § 11.4 PERFORMANCE BOND AND PAYMENT BOND § 11.4.1 The Owner shall have the right to require the Contractor to furnish bonds covering faithful performance of the Contract and payment of obligations arising thereunder as stipulated in bidding requirements or specifically required in the Contract Documents on the date of execution of the Contract. § 11.4.2 Upon the request of any person or entity appearing to be a potential beneficiary of bonds covering payment of obligations arising under the Contract, the Contractor shall promptly furnish a copy of the bonds or shall authorize a copy to be furnished. AIA Document A201 - 2007. Copyright CJ 1911, 1915,.1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects," "American Zns ti.tute of Architects," "AIA," the AIA Logo, and "AIA Contract �� Documents" are trademarks of The American Institute of Architects. 'Phis draft was produced at 09:51:37 PT on 05/13/2024 under Order Ho.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents" Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.ccm. User Notes: (1164916017) ARTICLE 12 UNCOVERING AND CORRECTION OF WORK § 12.1 UNCOVERING OF WORK § 12.1.1 If a portion of the Work is covered contrary to the Architect's request or to requirements specifically expressed in the Contract Documents, it must, if requested in writing by the Architect, be uncovered for the Architect's examination and be replaced at the Contractor's expense without change in the Contract Time. § 12.1.2 If a portion of the Work has been covered that the Architect has not specifically requested to examine prior to its being covered, the Architect may request to see such Work and it shall be uncovered by the Contractor. If such Work is in accordance with the Contract Documents, costs of uncovering and replacement shall, by appropriate Change Order, be at the Owner's expense. If such Work is not in accordance with the Contract Documents, such costs and the cost of correction shall be at the Contractor's expense unless the condition was caused by the Owner or a separate contractor in which event the Owner shall be responsible for payment of such costs. § 12.2 CORRECTION OF WORK § 12.2.1 BEFORE OR AFTER SUBSTANTIAL COMPLETION The Contractor shall promptly correct Work rejected by the Architect or failing to conform to the requirements of the Contract Documents, whether discovered before or after Substantial Completion and whether or not fabricated, installed or completed. Costs of correcting such rejected Work, including additional testing and inspections, the cost of uncovering and replacement, and compensation for the Architect's services and expenses made necessary thereby, shall be at the Contractor's expense. § 12,2.2 AFTER SUBSTANTIAL COMPLETION § 12.2.2.1 In addition to the Contractor's obligations under Section 3.5, if, within one year after the date of Substantial Completion of the Work or designated portion thereof or after the date for commencement of warranties established under Section 9.9.1, or by terms of an applicable special warranty required by the Contract Documents, any of the Work is found to be not in accordance with the requirements of the Contract Documents, the Contractor shall correct it promptly after receipt of written notice from the Owner to do so unless the Owner has previously given the Contractor a written acceptance of such condition. The Owner shall give such notice promptly after discovery of the condition. During the one-year period for correction of Work, if the Owner fails to notify the Contractor and give the Contractor an opportunity to make the correction, the Owner waives the rights to require correction by the Contractor and to make a claim for breach of warranty. If the Contractor fails to correct nonconforming Work within a reasonable time during that period after receipt of notice from the Owner or Architect, the Owner may correct it in accordance with Section 2.4. § 12.2.2.2 The one-year period for correction of Work shall be extended with respect to portions of Work first performed after Substantial Completion by the period of time between Substantial Completion and the actual completion of that portion of the Work. § 12.2.2.3 The one-year period for correction of Work shall not be extended by corrective Work performed by the Contractor pursuant to this Section 12.2. § 12.2.3 The Contractor shall remove from the site portions of the Work that are not in accordance with the requirements of the Contract Documents and are neither corrected by the Contractor nor accepted by the Owner. § 12.2.4 The Contractor shall bear the cost of correcting destroyed or damaged construction, whether completed or partially completed, of the Owner or separate contractors caused by the Contractor's correction or removal of Work that is not in accordance with the requirements of the Contract Documents. § 12.2.5 Nothing contained in this Section 12.2 shall be construed to establish a period of limitation with respect to other obligations the Contractor has under the Contract Documents. Establishment of the one-year period for correction of Work as described in Section 12.2.2 relates only to the specific obligation of the Contractor to correct the Work, and has no relationship to the time within which the obligation to comply with the Contract Documents may be sought to be enforced, nor to the time within which proceedings may be commenced to establish the Contractor's liability with respect to the Contractor's obligations other than specifically to correct the Work. AIA Document A201 - 2007. Copyright Q 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. Ali rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract 32 Documents" are trademarks of The American Institute of Architects. This draft. was produced at 09:51:37 PT on 05/13/2024 under Order Ilo.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents" Terms of Service. To report copyright vi.ola.ti.ons, e-mail docinf0aiacontracts.com. User Notes: (1164916017) § 12.3 ACCEPTANCE OF NONCONFORMING WORK If the Owner prefers to accept Work that is not in accordance with the requirements of the Contract Documents, the Owner may do so instead of requiring its removal and correction, in which case the Contract Sum will be reduced as appropriate and equitable. Such adjustment shall be effected whether or not final payment has been made. ARTICLE 13 MISCELLANEOUS PROVISIONS § 13.1 GOVERNING LAW The Contract shall be governed by the law of the place where the Project is located except that, if the parties have selected arbitration as the method of binding dispute resolution, the Federal Arbitration Act shall govern Section 15.4. § 13.2 SUCCESSORS AND ASSIGNS § 13.2.1 The Owner and Contractor respectively bind themselves, their partners, successors, assigns and legal representatives to covenants, agreements and obligations contained in the Contract Documents. Except as provided in Section 13.2.2, neither party to the Contract shall assign the Contract as a whole without written consent of the other. If either parry attempts to make such an assignment without such consent, that party shall nevertheless remain legally responsible for all obligations under the Contract. § 13.2.2 The Owner may, without consent of the Contractor, assign the Contract to a lender providing construction financing for the Project, if the lender assumes the Owner's rights and obligations under the Contract Documents. The Contractor shall execute all consents reasonably required to facilitate such assignment. § 13.3 WRITTEN NOTICE Written notice shall be deemed to have been duly served if delivered in person to the individual, to a member of the firm or entity, or to an officer of the corporation for which it was intended; or if delivered at, or sent by registered or certified mail or by courier service providing proof of delivery to, the last business address known to the party giving notice. § 13.4 RIGHTS AND REMEDIES § 13.4.1 Duties and obligations imposed by the Contract Documents and rights and remedies available thereunder shall be in addition to and not a limitation of duties, obligations, rights and remedies otherwise imposed or available by law. § 13.4.2 No action or failure to act by the Owner, Architect or Contractor shall constitute a waiver of a right or duty afforded them under the Contract, nor shall such action or failure to act constitute approval of or acquiescence in a breach there under, except as may be specifically agreed in writing. § 13.5 TESTS AND INSPECTIONS § 13.5.1 Tests, inspections and approvals of portions of the Work shall be made as required by the Contract Documents and by applicable laws, statutes, ordinances, codes, rules and regulations or lawful orders of public authorities. Unless otherwise provided, the Contractor shall make arrangements for such tests, inspections and approvals with an independent testing laboratory or entity acceptable to the Owner, or with the appropriate public authority, and shall bear all related costs of tests, inspections and approvals. The Contractor shall give the Architect timely notice of when and where tests and inspections are to be made so that the Architect may be present for such procedures. The Owner shall bear costs of (1) tests, inspections or approvals that do not become requirements until after bids are received or negotiations concluded, and (2) tests, inspections or approvals where building codes or applicable laws or regulations prohibit the Owner from delegating their cost to the Contractor. § 13.5.2 If the Architect, Owner or public authorities having jurisdiction determine that portions of the Work require additional testing, inspection or approval not included under Section 13.5.1, the Architect will, upon written authorization from the Owner, instruct the Contractor to make arrangements for such additional testing, inspection or approval by an entity acceptable to the Owner, and the Contractor shall give timely notice to the Architect of when and where tests and inspections are to be made so that the Architect may be present for such procedures. Such costs, except as provided in Section 13.5.3, shall be at the Owner's expense. § 13.5.3 If such procedures for testing, inspection or approval under Sections 13.5.1 and 13.5.2 reveal failure of the portions of the Work to comply with requirements established by the Contract Documents, all costs made necessary AIA Document A201 - 2007, Copyright o 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All r igt,to reserved. "The American Institute of Architects," "American institute of Architects," "AIA," the AIA Logo, and "AIA Contract 33 Documents" are trademarks of The American Institute of Architects. This draft. was produced at. 09:51:37 PT on 05/13/2024 under Order No.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents`" Terms of Service. To report copyright violations, e-mail doc.inf0aiacontracts.com. User Notes: (116491601.7) by such failure including those of repeated procedures and compensation for the Architect's services and expenses shall be at the Contractor's expense. § 13.5.4 Required certificates of testing, inspection or approval shall, unless otherwise required by the Contract Documents, be secured by the Contractor and promptly delivered to the Architect. § 13.5.5 If the Architect is to observe tests, inspections or approvals required by the Contract Documents, the Architect will do so promptly and, where practicable, at the normal place of testing. § 13.5.6 Tests or inspections conducted pursuant to the Contract Documents shall be made promptly to avoid unreasonable delay in the Work. § 13.6INTEREST Payments due and unpaid under the Contract Documents shall bear interest from the date payment is due at such rate as the parties may agree upon in writing or, in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. § 13.7 TIME LIMITS ON CLAIMS The Owner and Contractor shall commence all claims and causes of action, whether in contract, tort, breach of warranty or otherwise, against the other arising out of or related to the Contract in accordance with the requirements of the final dispute resolution method selected in the Agreement within the time period specified by applicable law, but in any case not more than 10 years after the date of Substantial Completion of the Work. The Owner and Contractor waive all claims and causes of action not commenced in accordance with this Section 13.7. ARTICLE 14 TERMINATION OR SUSPENSION OF THE CONTRACT § 14.1 TERMINATION BY THE CONTRACTOR § 14.1.1 The Contractor may terminate the Contract if the Work is stopped for a period of 30 consecutive days through no act or fault of the Contractor or a Subcontractor, Sub -subcontractor or their agents or employees or any other persons or entities performing portions of the Work under direct or indirect contract with the Contractor, for any of the following reasons: .1 Issuance of an order of a court or other public authority having jurisdiction that requires all Work to be stopped; .2 An act of government, such as a declaration of national emergency that requires all Work to be stopped; .3 Because the Architect has not issued a Certificate for Payment and has not notified the Contractor of the reason for withholding certification as provided in Section 9.4.1, or because the Owner has not made payment on a Certificate for Payment within the time stated in the Contract Documents; or .4 The Owner has failed to furnish to the Contractor promptly, upon the Contractor's request, reasonable evidence as required by Section 2.2.1. § 14.1.2 The Contractor may terminate the Contract if, through no act or fault of the Contractor or a Subcontractor, Sub -subcontractor or their agents or employees or any other persons or entities performing portions of the Work under direct or indirect contract with the Contractor, repeated suspensions, delays or interruptions of the entire Work by the Owner as described in Section 14.3 constitute in the aggregate more than 100 percent of the total number of days scheduled for completion, or 120 days in any 365-day period, whichever is less. § 14.1.3 If one of the reasons described in Section 14.1.1 or 14.1.2 exists, the Contractor may, upon seven days' written notice to the Owner and Architect, terminate the Contract and recover from the Owner payment for Work executed, including reasonable overhead and profit, costs incurred by reason of such termination, and damages. § 14.1.4 If the Work is stopped for a period of 60 consecutive days through no act or fault of the Contractor or a Subcontractor or their agents or employees or any other persons performing portions of the Work under contract with the Contractor because the Owner has repeatedly failed to fulfill the Owner's obligations under the Contract Documents with respect to matters important to the progress of the Work, the Contractor may, upon seven additional days' written notice to the Owner and the Architect, terminate the Contract and recover from the Owner as provided in Section 14.1.3. AIA Document A201 - 2007. Copyright 0 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1.976, 1987, 1997 and 2007. Ali rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract 34 Documents" are trademarks of The American Institute of Architects. This draft was produced. at 09:51:37 PT on 05/13/2024 under Order No.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents"' Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (1164916017) § 14.2 TERMINATION BY THE OWNER FOR CAUSE § 14.2.1 The Owner may terminate the Contract if the Contractor .1 repeatedly refuses or fails to supply enough properly skilled workers or proper materials; .2 fails to make payment to Subcontractors for materials or labor in accordance with the respective agreements between the Contractor and the Subcontractors; .3 repeatedly disregards applicable laws, statutes, ordinances, codes, rules and regulations, or lawful orders of a public authority; or .4 otherwise is guilty of substantial breach of a provision of the Contract Documents. § 14.2.2 When any of the above reasons exist, the Owner, upon certification by the Initial Decision Maker that sufficient cause exists to justify such action, may without prejudice to any other rights or remedies of the Owner and after giving the Contractor and the Contractor's surety, if any, seven days' written notice, terminate employment of the Contractor and may, subject to any prior rights of the surety: .1 Exclude the Contractor from the site and take possession of all materials, equipment, tools, and construction equipment and machinery thereon owned by the Contractor, .2 Accept assignment of subcontracts pursuant to Section 5.4; and .3 Finish the Work by whatever reasonable method the Owner may deem expedient. Upon written request of the Contractor, the Owner shall furnish to the Contractor a detailed accounting of the costs incurred by the Owner in finishing the Work. § 14.2.3 When the Owner terminates the Contract for one of the reasons stated in Section 14.2.1, the Contractor shall not be entitled to receive further payment until the Work is finished. § 14.2.4 If the unpaid balance of the Contract Sum exceeds costs of finishing the Work, including compensation for the Architect's services and expenses made necessary thereby, and other damages incurred by the Owner and not expressly waived, such excess shall be paid to the Contractor. If such costs and damages exceed the unpaid balance, the Contractor shall pay the difference to the Owner. The amount to be paid to the Contractor or Owner, as the case may be, shall be certified by the Initial Decision Maker, upon application, and this obligation for payment shall survive termination of the Contract. § 14.3 SUSPENSION BY THE OWNER FOR CONVENIENCE § 14.3.1 The Owner may, without cause, order the Contractor in writing to suspend, delay or interrupt the Work in whole or in part for such period of time as the Owner may determine. § 14.3.2 The Contract Sum and Contract Time shall be adjusted for increases in the cost and time caused by suspension, delay or interruption as described in Section 14.3.1. Adjustment of the Contract Sum shall include profit. No adjustment shall be made to the extent .1 that performance is, was or would have been so suspended, delayed or interrupted by another cause for which the Contractor is responsible; or .2 that an equitable adjustment is made or denied under another provision of the Contract. § 14.4 TERMINATION BY THE OWNER FOR CONVENIENCE § 14.4.1 The Owner may, at any time, terminate the Contract for the Owner's convenience and without cause. § 14.4.2 Upon receipt of written notice from the Owner of such termination for the Owner's convenience, the Contractor shall .1 cease operations as directed by the Owner in the notice; .2 take actions necessary, or that the Owner may direct, for the protection and preservation of the Work; and .3 except for Work directed to be performed prior to the effective date of termination stated in the notice, terminate all existing subcontracts and purchase orders and enter into no further subcontracts and purchase orders. § 14.4.3 In case of such termination for the Owner's convenience, the Contractor shall be entitled to receive payment for Work executed, and costs incurred by reason of such termination, along with reasonable overhead and profit on the Work not executed. AIA Document A201 - 2007. Copyright D 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract 3 rJ Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:51:37 PT on 05/13/2024 under Order ^To.4104243047 which expires on 06/10/2024, is net for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents`` Terms of Service. To report copyright violations, e-mail docinfo@aiacontraer.s.com. User Notes: (1164916017) ARTICLE 15 CLAIMS AND DISPUTES § 15.1 CLAIMS § 15.1.1 DEFINITION A Claim is a demand or assertion by one of the parties seeking, as a matter of right, payment of money, or other relief with respect to the terms of the Contract. The term "Claim" also includes other disputes and matters in question between the Owner and Contractor arising out of or relating to the Contract. The responsibility to substantiate Claims shall rest with the party making the Claim. § 15.1.2 NOTICE OF CLAIMS Claims by either the Owner or Contractor must be initiated by written notice to the other party and to the Initial Decision Maker with a copy sent to the Architect, if the Architect is not serving as the Initial Decision Maker. Claims by either party must be initiated within 21 days after occurrence of the event giving rise to such Claim or within 21 days after the claimant first recognizes the condition giving rise to the Claim, whichever is later. § 15.1.3 CONTINUING CONTRACT PERFORMANCE Pending final resolution of a Claim, except as otherwise agreed in writing or as provided in Section 9.7 and Article 14, the Contractor shall proceed diligently with performance of the Contract and the Owner shall continue to make payments in accordance with the Contract Documents. The Architect will prepare Change Orders and issue Certificates for Payment in accordance with the decisions of the Initial Decision Maker. § 15.1.4 CLAIMS FOR ADDITIONAL COST If the Contractor wishes to make a Claim for an increase in the Contract Sum, written notice as provided herein shall be given before proceeding to execute the Work. Prior notice is not required for Claims relating to an emergency endangering life or property arising under Section 10.4. § 15.1.5 CLAIMS FOR ADDITIONAL TIME § 15.1.5.1 If the Contractor wishes to make a Claim for an increase in the Contract Time, written notice as provided herein shall be given. The Contractor's Claim shall include an estimate of cost and of probable effect of delay on progress of the Work. In the case of a continuing delay, only one Claim is necessary. § 15.1.5.2 If adverse weather conditions are the basis for a Claim for additional time, such Claim shall be documented by data substantiating that weather conditions were abnormal for the period of time, could not have been reasonably anticipated and had an adverse effect on the scheduled construction. § 15.1.6 CLAIMS FOR CONSEQUENTIAL DAMAGES The Contractor and Owner waive Claims against each other for consequential damages arising out of or relating to this Contract. This mutual waiver includes .1 damages incurred by the Owner for rental expenses, for losses of use, income, profit, financing, business and reputation, and for loss of management or employee productivity or of the services of such persons; and .2 damages incurred by the Contractor for principal office expenses including the compensation of personnel stationed there, for losses of financing, business and reputation, and for loss of profit except anticipated profit arising directly from the Work. This mutual waiver is applicable, without limitation, to all consequential damages due to either parry's termination in accordance with Article 14. Nothing contained in this Section 15.1.6 shall be deemed to preclude an award of liquidated damages, when applicable, in accordance with the requirements of the Contract Documents. § 15.2INITIAL DECISION § 15.2.1 Claims, excluding those arising under Sections 10.3, 10.4, 11.3.9, and 11.3.10, shall be referred to the Initial Decision Maker for initial decision. The Architect will serve as the Initial Decision Maker, unless otherwise indicated in the Agreement. Except for those Claims excluded by this Section 15.2.1, an initial decision shall be required as a condition precedent to mediation of any Claim arising prior to the date final payment is due, unless 30 days have passed after the Claim has been referred to the Initial Decision Maker with no decision having been rendered. Unless the Initial Decision Maker and all affected parties agree, the Initial Decision Maker will not decide disputes between the Contractor and persons or entities other than the Owner. AIA Document All O1 - 200'7, Copyright Gi 1°ll, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects ," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:51:37 PT on 05/13/2024 under Order 6 6 Nc.4104243047 which expires on 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents" Terms of Service. To report copyright vio Lations, e-mail Jocinfo@aiacontracts.com. User Notes: (1164916017! § 15.2.2 The Initial Decision Maker will review Claims and within ten days of the receipt of a Claim take one or more of the following actions: (1) request additional supporting data from the claimant or a response with supporting data from the other party, (2) reject the Claim in whole or in part, (3) approve the Claim, (4) suggest a compromise, or (5) advise the parties that the Initial Decision Maker is unable to resolve the Claim if the Initial Decision Maker lacks sufficient information to evaluate the merits of the Claim or if the Initial Decision Maker concludes that, in the Initial Decision Maker's sole discretion, it would be inappropriate for the Initial Decision Maker to resolve the Claim. § 15.2.3 In evaluating Claims, the Initial Decision Maker may, but shall not be obligated to, consult with or seek information from either party or from persons with special knowledge or expertise who may assist the Initial Decision Maker in rendering a decision. The Initial Decision Maker may request the Owner to authorize retention of such persons at the Owner's expense. § 15.2.4 If the Initial Decision Maker requests a party to provide a response to a Claim or to furnish additional supporting data, such party shall respond, within ten days after receipt of such request, and shall either (1) provide a response on the requested supporting data, (2) advise the Initial Decision Maker when the response or supporting data will be furnished or (3) advise the Initial Decision Maker that no supporting data will be furnished. Upon receipt of the response or supporting data, if any, the Initial Decision Maker will either reject or approve the Claim in whole or in part. § 15.2.5 The Initial Decision Maker will render an initial decision approving or rejecting the Claim, or indicating that the Initial Decision Maker is unable to resolve the Claim. This initial decision shall (1) be in writing; (2) state the reasons therefor; and (3) notify the parties and the Architect, if the Architect is not serving as the Initial Decision Maker, of any change in the Contract Sum or Contract Time or both. The initial decision shall be final and binding on the parties but subject to mediation and, if the parties fail to resolve their dispute through mediation, to binding dispute resolution. § 15.2.6 Either party may file for mediation of an initial decision at any time, subject to the terms of Section 15.2.6.1. § 15.2.6.1 Either party may, within 30 days from the date of an initial decision, demand in writing that the other party file for mediation within 60 days of the initial decision. If such a demand is made and the party receiving the demand fails to file for mediation within the time required, then both parties waive their rights to mediate or pursue binding dispute resolution proceedings with respect to the initial decision. § 15.2.7 In the event of a Claim against the Contractor, the Owner may, but is not obligated to, notify the surety, if any, of the nature and amount of the Claim. If the Claim relates to a possibility of a Contractor's default, the Owner may, but is not obligated to, notify the surety and request the surety's assistance in resolving the controversy. § 15.2.8 If a Claim relates to or is the subject of a mechanic's lien, the party asserting such Claim may proceed in accordance with applicable law to comply with the lien notice or filing deadlines. § 15.3 MEDIATION § 15.3.1 Claims, disputes, or other matters in controversy arising out of or related to the Contract except those waived as provided for in Sections 9.10.4, 9.10.5, and 15.1.6 shall be subject to mediation as a condition precedent to binding dispute resolution. § 15.3.2 The parties shall endeavor to resolve their Claims by mediation which, unless the parties mutually agree otherwise, shall be administered by the American Arbitration Association in accordance with its Constriction Industry Mediation Procedures in effect on the date of the Agreement. A request for mediation shall be made in writing, delivered to the other party to the Contract, and filed with the person or entity administering the mediation. The request may be made concurrently with the filing of binding dispute resolution proceedings but, in such event, mediation shall proceed in advance of binding dispute resolution proceedings, which shall be stayed pending mediation for a period of 60 days from the date of filing, unless stayed for a longer period by agreement of the parties or court order. If an arbitration is stayed pursuant to this Section 15.3.2, the parties may nonetheless proceed to the selection of the arbitrator(s) and agree upon a schedule for later proceedings. AIA Document A201 - 2007. Copyright 0 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA ," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of At chitect.s. This draft was produced at 09:51:37 PT on 05/13/2024 under order 37 Ilo.4104243047 which expires co 06/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the ALA Contract Documents`" Terms of Service. To report copyright violations, e-mail docinfo@ai.acontracts.com. User Notes: (1164916017) § 15.3.3 The parties shall share the mediator's fee and any filing fees equally. The mediation shall be held in the place where the Project is located, unless another location is mutually agreed upon. Agreements reached in mediation shall be enforceable as settlement agreements in any court having jurisdiction thereof. § 15.4 ARBITRATION § 15.4.1 If the parties have selected arbitration as the method for binding dispute resolution in the Agreement, any Claim subject to, but not resolved by, mediation shall be subject to arbitration which, unless the parties mutually agree otherwise, shall be administered by the American Arbitration Association in accordance with its Constriction Industry Arbitration Rules in effect on the date of the Agreement. A demand for arbitration shall be made in writing, delivered to the other party to the Contract, and filed with the person or entity administering the arbitration. The party filing a notice of demand for arbitration must assert in the demand all Claims then known to that party on which arbitration is permitted to be demanded. § 15.4.1.1 A demand for arbitration shall be made no earlier than concurrently with the filing of a request for mediation, but in no event shall it be made after the date when the institution of legal or equitable proceedings based on the Claim would be barred by the applicable statute of limitations. For statute of limitations purposes, receipt of a written demand for arbitration by the person or entity administering the arbitration shall constitute the institution of legal or equitable proceedings based on the Claim. § 15.4.2 The award rendered by the arbitrator or arbitrators shall be final, and judgment may be entered upon it in accordance with applicable law in any court having jurisdiction thereof. § 15.4.3 The foregoing agreement to arbitrate and other agreements to arbitrate with an additional person or entity duly consented to by parties to the Agreement shall be specifically enforceable under applicable law in any court having jurisdiction thereof. § 15.4.4 CONSOLIDATION OR JOINDER § 15.4.4.1 .Either party, at its sole discretion, may consolidate an arbitration conducted under this Agreement with any other arbitration to which it is a party provided that (1) the arbitration agreement governing the other arbitration permits consolidation, (2) the arbitrations to be consolidated substantially involve common questions of law or fact, and (3) the arbitrations employ materially similar procedural rules and methods for selecting arbitrator(s). § 15.4.4.2 Either party, at its sole discretion, may include by joinder persons or entities substantially involved in a common question of law or fact whose presence is required if complete relief is to be accorded in arbitration, provided that the party sought to be joined consents in writing to such joinder. Consent to arbitration involving an additional person or entity shall not constitute consent to arbitration of any claim, dispute or other matter in question not described in the written consent. § 15.4.4.3 The Owner and Contractor grant to any person or entity made a party to an arbitration conducted under this Section 15.4, whether by joinder or consolidation, the same rights of joinder and consolidation as the Owner and Contractor under this Agreement. AIA Document A201 -- 2007. Copyright © 1911, 1915, 1918, 1.925, 1937, 1951, 1958, 1961,.1963, 1966, 1970, 1976, 1987, 1997 and 2007, All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Cont.xact 38 Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:51:37 PT on 05/13/2024 under Order H— 4104243047 shich expires on 06/10/2024, is not for resale, is I'conned for one-time use only, and may only be used in accordance ;with the AIA Contract Documents" Terms of Service. To report copyright violations, e-mail docinfo@a.iacontracts.com. User Notes: (1164916017) KITTITAS COUNTY — LOWER VALLEY TRANSFER STATION ADDENDUM NO. 1 JULY 17, 2024 The above -referenced Contract Documents shall be amended as indicated in detail below. One signed copy of the Certification page shall be included with the bid. The inclusion of this Addendum will be noted in the Agreement, and the execution of the Contract shall indicate full acceptance by all parties of the provisions contained herein. All other provisions of the Plans, Specifications, and other Contract Documents not noted in the Addendum shall remain unchanged and in full effect. This Addendum shall be attached to and become a part of the Plans and Specifications for the project. Addendum Document Section, Page Description of Change Item Number, or Sheet 1.01 Response to RFI -- Response to RFI Questions List is added Questions List to Addendum No. 1. 1.02 Sample AIA Contract -- The sample AIA contract to be executed between Kittitas County and the selected contractor is added to Addendum No. 1. 1.03 AIA Bid Form — 310 The AIA Bid Form — 310 to be completed and included with the contractors bid is added to Addendum No. 1. 1.04 Groundwater Elevation -- Technical memorandum prepared by Monitoring Data Jacobs regarding groundwater depth measurements is added to Addendum No. 1. In addition, the County measured groundwater elevations daily at an existing well identified as "PVC in Case, N613270.58, E1617507.90, Elev 1548.8' on Drawing C1 from June 28 to July 15, 2024. Groundwater depths ranged from 37" to 39" below ground surface. 1.05 2019 Boring Logs -- 2019 boring logs are added to Addendum No. 1. Page 1 of 5 1.06 Bid Item Schedule Section 00 00 04.1 Replace Section 00 00 04.1 Bid Schedule with the attached revised bid schedule. Changed seeding to unit price, and added landscape bid item (lump sum). Contractor must provide price for all four (4) additive alternative bid items. Contractor will be selected on lowest responsive base bid. Depending on base bid price and available funding, the County may include additive alternative bid items to the contract. 1.06.1 Revised Bid Proposal Section 00 00 04 Replace existing bid proposal form with Form revised form. 1.07 Measurement and Section 00 43 01 Replace Measurement and Payment Payment Section section in its entirety. Revised seeding bid item to unit price and added Landscape bid item No. 20. 1.08 Civil AUTOCAD Files -- Civil AUTOCAD files are available upon request. Contact Danny Duong (DDuong@scsengineers.com). 1.09 Section 010100 Section 010100 Section 010100 is added to Addendum Summary of Work No. 1. Construction of the compost area lined leachate ponds shall not start until July/August 2025. 1.10 Section 0104 00 Section 0104 00 Please add under Subsection H the Coordination with Part 13.1 following statement: Others Subsection I CONTRACTOR shall use Trimble ProjectSight for the construction management software. OWNER will provide and pay far a maximum of two (2) licenses to the general contractor for the duration of the project. 1.11 Lighting Substitution -- The Lighting Substitution submittal is Approval approved and added to Addendum No. 1. 1.12. Revised Electrical Drawings E200, The following changes and additions Drawings E602, E603, E701 are shown on the revised electrical drawings. Page 2 of 5 1) Sheet E603 & E701-The electrical panel PP -ASP is changed from a 120/208V 3ph panel to a 277/480V 3ph panel as shown on the one -line and in the schedules. 2) Sheet E701- There is a minor adjustment on the one -line for the main switchboard —two circuit breakers have been updated to the correct size and location. 3) Sheet E701- The notes indicate the irrigation pump enclosure will require a stepdown transformer and it is identified as being supplied by the irrigation pump manufacturer. 4) Drawing E200 was added to identify the required conduit and wiring for the aeration and recirculation pump power and controls. 1.12.1 Revised Civil Drawings Sheets C20, C24, Revised drawings are added to C27 Addendum No. 1. 1.13 Revised Specification Section 40 95 13 Revised specification is added to Section 40 95 13 Control Addendum No. 1. Panels, VFDS, and RMC 1.14 Water Recirculation Section 40 95 14 New specification is added to System Specification Addendum No. 1 for Leachate Pond water recirculation system. 1.15 Dewatering Section 0150 00 Add following statement at the end of Part 1.9, the paragraph of Part 1.9, subsection B Subsection B in Section 0150 00: If dewatering is required, the Contractor will be required to build temporary sedimentation ponds or sedimentation trap BMPs which discharge to the project storm system in accordance with State of Washington - Department of Ecology - 2019 Stormwater Management Manual for Eastern Washington, Chapter 7, Element #10, Page 769. Alternately, BMPs can drain to a temporary gravity or pumped conveyance system draining Page 3of5 directly to the adjacent channel. Proposed dewatering BMPs must conform to the Washinton State Ecology design standards and shall be submitted to the engineer for approval prior to dewatering activities. 1.16 Pre -Bid Agenda, -- The Pre -Bid agenda, presentation, and Presentation, and Sign- sign -in sheet are added to Addendum In Sheet. No. 1. 1.17 Earthwork Notes Sheet G5 Sheet G5 - Earthwork Notes #1, add the following statement: Estimated removal depth is based on available geotechnical data and may change depending on field conditions. Contractor shall install geotextile fabric at the bottom of all unsuitable soil excavations. Contractor shall excavate material at a maximum slope of 1.5H:1.OV for all unsuitable soil excavations. 1.18 Geomembrane Liner — 022100 Add new technical specification section Leak Location Survey 02 2100 to the project documents requiring leak location survey for both the primary and secondary geomembrane liners at the compost leachate pond. 1.19 Revised Sheet C3 Sheet C3 Revised Sheet C3 showing the 4-inch and 7-inch asphalt paved surfaces is added to Addendum No. 1. END OF ADDENDUM NO. 1 Page 4 of 5 CERTIFICATION OF RECEIPT AND ACCEPTANCE OF ADDENDUM NO. 1 KITTITAS COUNTY , LOWER VALLEY TRANSFER STATION The undersigned hereby acknowledges receipt of Addendum No. 1 prior to the submission of his bid; and hereby agrees to the inclusion of this Addendum in the Agreement and in the Contract Documents; and further agrees that the other provisions of the Contract Documents shall remain unchanged and in full effect. Contractor gL301ZMA . - - Date Page 5of5 KITTITAS COUNTY — LOWER VALLEY TRANSFER STATION ADDENDUM NO.2 JULY 23, 2024 The above -referenced Contract Documents shall be amended as indicated in detail below. One signed copy of the Certification page shall be included with the bid. The inclusion of this Addendum will be noted in the Agreement, and the execution of the Contract shall indicate full acceptance by all parties of the provisions contained herein. All other provisions of the Plans, Specifications, and other Contract Documents not noted in the Addendum shall remain unchanged and in full effect. This Addendum shall be attached to and become a part of the Plans and Specifications for the project. Addendum Document Section, Page Description of Change Item Number, or Sheet 2.01 Response to RFI -- Response to RFI Questions List is Questions List hereby added and included in the contract documents. 2.02 Bid Schedule -- Attached is the Addendum No. 1 Excel Spreadsheet spreadsheet that the contractor can use for the bid. 2.03 Electrical Drawings E200, E602, E603, Replace electrical drawings E200, E602, Revision 2 E701 E603, and E701. 2.04 Site Plan C3 Add the approximate unsuitable soil stockpile location to Sheet C3. 2.05 Revised Specification 11 14 05 In Specification 1114 05 —Truck Scale, 11 14 05 change the following: Part 2.2.A — Change "80-foot" to "70- foot". Part 2.3.A — Change "80 feet" to "70 feet". Part 2.4.A—Change to "The load cell shall be constructed of stainless steel." Part 2.5.CC — Delete scale instrument manufacturer note. Part 2.8.H — Delete lightning protection system manufacturer note. Part 3.2.G — Delete inbound unattended enclosure note. Page 1 of 3 Part 3.2.1-1 — Delete the outbound unattended enclosure note. 2.06 Hot Mixed Asphalt 5-04 Add Special Document No. 2 — Hot Mix Special Specification Asphalt Special Specifications to the Special Document Section located after Technical Specifications. 2.07 Civil Site Details Sheet Sheet C18 Add note under "Scale installation C18 Notes" in Detail Section A/C18: THE CONTRACTOR SHALL COORDINATE THE LOCATION OF THE SCALEHOUSE TRANSACTION WINDOW AND THE EDGE OF THE SCALE. THE SPACING BETWEEN THE WINDOW AND EDGE OF THE SCALE WILL BE A MAXIMUM OF 18 INCHES. 2.08 Specification 07 13 26 07 13 26 Change: 2.01.A2b to read "GCP Bituthene 4000". 2.09 Specification 07 22 70 07 22 70 Delete Specification 07 22 70 — Roof Anchor Posts. 2.10 Specification 07 25 00 07 25 00 In Specification 07 25 00 — Weather Barriers, change Part 2.1.131a to read "GCP Perm A Barrier VPS 30". 2.11 Specification 081100 081100 Specification 08 1100 - Storefront is added to Addendum No. 2. 2.12 Specification 10 26 01 10 26 01 Delete Specification 10 26 01 — Wall and Corner Guards. 2.13 Specification 10 75 00 10 75 00 Delete Specification 10 75 00 — Flagpoles. 2.14 Door Hardware -- The exit device substitution Substitution (Dormakaba Precision 2000 Series) is approved; however, the door closer substitution (Dormakaba QDC100 Series) is rejected. 2.15 Hard-Cem Substitution The structural engineer has no exception to the Hard-Cem Integral Hardening Admixture for concrete finish. 2.16 Hi -Tech PE90 The structural engineer has no Substitution exception to the Hi -Tech PE90 substitution request for joint filler. END OF ADDENDUM NO. 2 Page 2 of 3 CERTIFICATION OF RECEIPT AND ACCEPTANCE OF ADDENDUM NO.2 KITTITAS COUNTY — LOWER VALLEY TRANSFER STATION The undersigned hereby acknowledges receipt of Addendum No. 2 prior to the submission of his bid; and hereby agrees to the inclusion of this Addendum in the Agreement and in the Contract Documents; and further agrees that the other provisions of the Contract Documents shall remain unchanged and in full effect. onxractor EW6�q Date Page 3 of 3 KITTITAS COUNTY — LOWER VALLEY TRANSFER STATION ADDENDUM NO.3 JULY 24, 2024 The above -referenced Contract Documents shall be amended as indicated in detail below. One signed copy of the Certification page shall be included with the bid. The inclusion of this Addendum will be noted in the Agreement, and the execution of the Contract shall indicate full acceptance by all parties of the provisions contained herein. All other provisions of the Plans, Specifications, and other Contract Documents not noted in the Addendum shall remain unchanged and in full effect. This Addendum shall be attached to and become a part of the Plans and Specifications for the project. Addendum Document Section, Page Description of Change Item Number, or Sheet 3.01 Response to RFI -- Response to RFI Questions List is Questions List hereby added and included in the contract documents. 3.02 Door Operator -- The door operator substitution (Horton Substitution Series 7000) is approved. 3.03 Architectural Drawings A1_A601, Make the following changes below: A2_A801, Sheets A1_A601, A2_A801, A3_A801: A3_A801, WOM-1 and WM-1 are both Walk Off A2_A101, Mats. A2_A801, A3_A101 Sheet A2_A101: Provide Walk Off Mat per Flag Note 8 in Lobby. Sheet A2_A801: Room Finish Schedule: Delete RF-1 at Lobby floor Sheet A3_A101: Provide Walk Off Mat per Flag Note 9. Floor Plan Room 3-01 3.04 Electrical Drawings E100, E100 -Remove EV Chargers at the E602 Compost Area. E100 - Add the following note: Concrete duct banks are required for road crossings per the designed and future roadways where heavy vehicles travel over conduits. Duct banks installed not under roadways shall be properly compacted with sand/gravel base with compacted overfill. All Page 1 of 3 underground cables are pulled inside UPVC conduits. E602 - Add the following note: The main cable from the Utility equipment to the customer disconnect switch, then to the ATS and to the main switch board shall be (24) 600 MCM AL conductor pulled inside (6) 4" conduits. 3.05 Door Operator -- The door operator substitution (Horton Substitution Series 7000) is approved. 3.06 EV Charger Add the following to the technical Specifications specifications: The EV chargers shall operate on the normal power source only not on backup power. Level (2) 7.2 KW EV chargers shall be fed through 1-phase 10 KVA step down transformer next to each pedestal (Grouping under one transformer is allowed). EV Chargers shall be Leviton Model EC32W with EPED1 Single Mount Charging Station Pedestal or approved equal. Total of 4 EV charging stations: 3 at the Administration Building and 1 at the Scalehouse. END OF ADDENDUM NO. 3 Page 2 of 3 CERTIFICATION OF RECEIPT AND ACCEPTANCE OF ADDENDUM NO. 3 K1771TAS COUNTY — LOWER VALLEY TRANSFER STATION The undersigned hereby acknowledges receipt of Addendum No. 3 prior to the submission of his bid; and hereby agrees to the inclusion of this Addendum in the Agreement and in the Contract Documents; and further agrees that the other provisions of the Contract Documents shall remain unchanged and in full effect. Contractor 91-301 Date Page 3 of 3 KITTITAS COUNTY — LOWER VALLEY TRANSFER STATION ADDENDUM NO.4 JULY 29, 2024 The above -referenced Contract Documents shall be amended as indicated in detail below. One signed copy of the Certification page shall be included with the bid. The inclusion of this Addendum will be noted in the Agreement, and the execution of the Contract shall indicate full acceptance by all parties of the provisions contained herein. All other provisions of the Plans, Specifications, and other Contract Documents not noted in the Addendum shall remain unchanged and in full effect. This Addendum shall be attached to and become a part of the Plans and Specifications for the project. Addendum Document Section, Description of Change Item Page Number, or Sheet 4.01 Response to -- Response to RFI Questions List is hereby added and RFI Questions included in the contract documents. List 4.02 Bid Due Date -- Change Bid Due Date to August 2, 2024 at 10:00 AM Pacific Time Zone on the INVITATION TO BID document. Revised excel spreadsheet provided to contractors. 4.03 Revised Bid Attached is the revised Bid Schedule. Contractor must use Schedule Addendum No 4 Bid Schedule with its bid. Four(4) Bid quantities revised. Bid Item 5 — Clear and Grub — increased bid quantity to 30 acres. Bid Item 8 — Geotextiles- Increased Bid Qty to 55,400 SY. Bid Item No. 17 — Site Fencing - 6' High Chainlink- increased bid quantity to 3,975 LF. Bid Item No. 18 — Site Fencing — Gates- reduced bid quantity to: 8 ea. Gates shall be installed at the following locations: Four (4) —10' Wide Gates at main entrance. Two (2) — 10' Wide Gates along Hwy 97 at temporary construction entrance Two (2) —12' Wide gates at Northwest corner of site. Page 1 of 3 4.04 Civil Sheet C- Sheet C-3 Add the following note to drawing Sheet C-3: 3 Curb and gutter will be required on both sides of the Transfer Building access road starting at the entrance to the Transfer Building north for 235 LF (470 LF total). Contractor to coordinate with Owner and Engineer for final curb and gutter location. 4.05 Specification 00 43 01 In Part 3, under 3.0 - Bid Item #15 - Site Signage, add 00 43 01 thermoplastic stop bars to lump sum price. Measurement and Payment 4.06 Specification 09900 In Section 09 9 00, change the following: 09 29 00 Gypsum Paragraph 2.02E — (GB) 5/8" Type C. Change to 5/8" Type Board X The following items are not used on this project and shall be deleted from Specification Section 09 9 00: Delete paragraph: 2.01, A.2 Delete paragraph: 2.02, B.5 Delete paragraph, 2.02 8.5.5 Delete paragraph, 2.02 C Delete paragraph 2.02 D Delete paragraph 2.02 E Delete paragraph 2.02 D Delete paragraph 3.01.15 Delete paragraph 3.01.16 Revise paragraph 3.01D.2. Provide a level 4 finish 4.07 Specification 09 22 16 Provide flat bar backing per E.3b. Other backing is 09 22 16 provided as an option to the contractor. 4.08 Specification 10 81 12 Bird netting not required. Delete references to bird 10 81 12 netting: Bird Control Delete paragraph: 1.3 Devices Delete paragraph: 2.01C Delete paragraph: 2.03 4.09 Hot Mix 5-04 Add the following: to Special Specification 5-04: Asphalt Special All asphalt shall have a nominal aggregate size of %-inch. Specifications 5-04 END OF ADDENDUM NO. 4 Page 2 of 3 CERTIFICATION OF RECEIPT AND ACCEPTANCE OF ADDENDUM NO, 4 KITTITAS COUNTY — LOWER VALLEY TRANSFER STATION The undersigned hereby acknowledges receipt of Addendum No. 4 prior to the submission of his bid; and hereby agrees to the inclusion of this Addendum in the Agreement and in the Contract Documents; and further agrees that the other provisions of the Contract Documents shall remain unchanged and in full effect. Contractor eJ�o1ZD4 Date Page 3 of 3 LOWER VALLEY TRANSFER STATION RESPONSE TO RFI QUESTIONS - August 1, 2024 SEcr1014 DATE a+ECWM If RA QU88TM 460,01W4E The bid item for seeding has been changed to unit quantity. In addition, a 00 43 01 6/24/2024 1 Will seeding be paid by Lump Sum or unit price? lump sum bid item has been added to include landscaping work. See addendum No. 1. The Lighting Substitution submittal is approved. Approved submittal is -- 7/3%2024 2 lighting Substitution included in Addendum No. 1. The scope of work for Bid Item No. 6 - Unsuitable Soils Excavation includes 00 43 01 Pre -Bid 06/27/24 3 What is the scope of work for Bid Item - 6 - Unsuitable Soils Excavation? dewatering (if required), excavation, loading soil into a vehicle, transporting to a stockpile on site, unloading material. The County owns the soil. The bid item includes hauling soil from the site to -- Pre -Bid OfiJ27/24 4 For the Additive Alternative Bid Item No. 4 - Hauling soil to Ryegrass landfill, who owns the soil? the Ryegrass Landfill only. Kittitas County will have equipment at the Rye What does this bid item include? Is the soil contaminated? Grass Landfill to spread the material. The soil is not contaminated. If dewatering is required, the Contractor will be required to build temporary sedimentation ponds or sedimentation trap SMPs which discharge to the project storm system in accorance with State of Washington - Department of Ecology - 2019 Stormwater Management Manual for Eastern Washington, Chapter 7, Element #10, Page 769. Alternately, BMPs can drain to a temporary -- Pre -Bid 06/27/24 5 Excavation of unsuitable soil may require dewatering. Where water be discharged? gravity or pumped conveyance system draining directly to the adjacent channel. Proposed dewatering BMPs must conform to the Washinton State Ecology design standards and shall be submitted to the engineer for approval prior to dewatering activities. Addendum No. 1 added this information at the end of the paragraph of Part 1.9, subsection a in Section 015000 -- Pre -Bid 06/27/24 6 Will AIA Bid Form A 310 be provided? Yes, AA Bid Form 310 is provide in Addendum No.]. The Contractor shall retain the services of an Independent Quality Control Testing for to perform soil and concrete testing during construction. See Technical Specification Section 014000 for Quality Control Testing. Payment -- Pre. Bid 06/27/24 7 Who is responsible for Quality Control Testing? for QC testing will be paid in accordance with Bid Item No. 3 - Quality Contol Testing. The City of Ellensburg will be performing Inspection of water and sewer system components. In addition, the Engineer will perform specialty steel inspection services. For Additive Alternative Bid Item No. I - Administration Building, Additive Alternative Bid Items No. 2 - MAW Building, and Additive Alternative Bid Item No. 3 -Tire Recycling Area, the bid item should include all items above the -- Pre -Bid 06/27/24 8 For the Additive alternative bid items No. 1, 2, 3, what is the construction limit for these items. subgrade completion layer including plumbing, electrical, water, foundation soils, concrete, and all other building components. As part of utility bid items, the Contractor shall install and cap all utilities within 5' of the building - Pre -Bid 06/27/24 9 Is there additional Groundwater depth information available? Piezometer and monitoring is provided in Addendum No. 1. Yes, Civil AutoCADD drawings are available upon request. Contact Danny -- Pre -Bid O6{27/24 10 Can Civil Autcadd Drawings be provided? Duong (DduongiIi)suengineers.com). Geotextile fabic shall be placed under all gravel and paved surfaces and at the -- Pre -Bid 06/27/24 11 Clarify limits of Bid Item No. 7 - Geotextiles. bottom of the unsuitable soil excavation (note was added to Earthwork General Notes in Addendum No. 1, sheet (35). The exit device substitution (Dormakaba Precision 2000 Series) is approved; -- 7/12(2024 12 Door Hardware Substitution however, the door closer substitution (Dormakaba QDC100 Series) is rejected. Sheet C3 was revised to clearly identify the 4-inch and 7-inch asphalt paved -- -- 13 Clarify 4-inch and 7-inch asphalt paved surfaces shown on plan sheet C3. surfaces and is included in Addendum No. 1. Are the fire alarm systems in the four buildings going to be connected together for monitoring Yes. All SFACP are connected to the FRCP. The FACP is the supervising station -- 7/16/2024 14 reasons? Or, do they need to be connected singularly? Also, for beam detection, there are five of that will contact the fire department. The quantity of beam detectors is them that may be more than needed. lust wanted to confirm. subject to change by the fire alarm certified designer. All SFACP are connected to the FACP. The connection protocols allowed are any of the following: 1. Directly connected non coded system. One building shows FACP and the other 3 are SFACP so I was assuming that the SFACP are sub- 2. Digital alarm communicator transmitter (DACT) panels to the main panel to form a network. If this is correct we need to install a PVC conduit 3. Telephone lines -- 7/17/2024 1S between all buildings so I can install a 16/2 twisted pair wire for my network and this way all 4. Two-way radio frequency (RF) buildings will be connected and we only use one cellular for the monitoring of all buildings. 5. Private microwave radio transmitter. If the contractor choose the telephone lines option, there is an available 2" conduit feeding into each building. Spec 113 34 19 1.2 B 1 c) says Manufacturer must provide FM Global approved roof and wall FM Global approval is not required where PEMB manufacturer is only 13 34 19 7/17/2024 16 assemblies, when PEMB manufacturers are only supplying the wall panel and roof panel, not an supplying wall panels or roof panels. assembly, Please confirm whether or not FM Global is a requirement for the wall and roof panels. The specs are correct. The wind speed in the plans will be revised as follows: 133419 7/17/2024 17 Please Confirm Wind Speed - 110MPH in Plans on 0 5001 and 99MPH in Specs 13-34-19 Vult = 99 mph 23EA.c.4.a. Vasd = 77 mph 13 3419 7(17{2024 18 Full height wall liner panel called out In specs (13 34 19 2.2 A 1), but no liner panel shown inside Confirmed. PEMB in plans. Please confirm no interior liner panel inside PEMBs. 8/1/2024 LOWER VALLEY TRANSFER STATION RESPONSE TO RFI QUESTIONS - August 1, 2024 SECIPM DATE RECIEM If M QUESMN MPOWA Spec section (13 34 19 2.2 A 2) calls out cross bracing as indicated on plans, but I cannot find any Gridlines 1.1 & 9.1 require (4) braced frames each. The frame locations are 13 34 19 7/17/2024 19 bracing locations on the plan set. Please provide bracing locations as (13 34 19 2.3 D 1 a) does not flexible, but need to be at interior bays, within grids BA to G.I. Coordinate allow for bracing anywhere other than locations shown on drawings. the locations with architectural and mechanical to avoid any clashes. Window Type 5: Vinyl is specified. Provide full divided lite mullions per manufacturer standard details at interior horizontal and vertical. -- 7/17/2024 20 Can Window Types 5 & 6 be fiberglass? Window Type 6: Provide HM frame as detailed with horizontal and vertical mullions as detailed Fiberglass frames can be substituted with an approved substitution request. Transaction windows (Window Types 4A & 4B) are per spec section 08 56 59 08 56 59 7/17/2 7/17/2024 21 Do window t types 4A & 4B / transaction windows correspond to spec? Motorized Service Window. Where does simple saver system go inside the PEMS structures and what is required thickness in Simple saver system to be used in areas where there is exposed insulation. roof and walls, if required? R-49 is called out in specs (13 34 19 2A A 2 b). PEMB wall details show This includes rooms in the MRW as well as the Electrical and Mechanical 133419 7/17/2024 22 no insulation (A_A009 Detail 3). Is bird flashing required in areas that are to receive simple saver Rooms in the Transfer Building. Bird flashing is not required where Simple insulation system? Saver Insulation System Is installed. PEMB Manufacturer will not allow stainless steel fasteners due to rust and corrosion of materials. PEMB Manufacturer's corrosion resistant fasteners will be reviewed during -- 7/17/2024 23 Are PEMB Manufacturer's standard fasteners acceptable or can we not bid using the PEMB PEMB submittal review and approved. Manufacturer if they won't allow stainless steel fasteners? Wall panel profiles are not consistent between plans and specs. Please provide profile for PEMB wall panels. Specs (13 34 19 2.7 A 8) notes eStylwall 11- Flutes 4 IN wide flutes. Plans (1 A902 The profiles in the drawings are the Basis of Design. Detail 1 in sheet 1_A902 13 34 19 7/17/2024 24 detail 1) WPI, WP2, and WP3 to be PBR/R. Panel. Please clarify what wall panel profile you shown profile views. require. If there is more than one panel profile specified, please provide locations. Specs for the Transfer Station PEMB lean-to structure appear to be requesting the design, Lean-to is to be designed by PEMB Manufacturer. Steel stud framing is shown -- 7/17/2024 25 engineering, and materials for the lean-to to be provided by PEMB Manufacturer, but the plans to indicate general design intent including insulation, and energy code show a steel stud framed structure, independent of the main PEMB. Please confirm the lean to is requirements. Stud framing is not required. to be designed by PEMB Manufacturer and clarify if it is required to be steel stud framed, Minimum clear height of the Transfer Station PEMB is called out at 28'-6" in plans and 30'-0" in 2816' -- 7/17/2024 P6 specs. Which is accurate? -- 7/18/2024 27 Are there 3 scales in this project? 2 scales as shown on sheet C3. Are the two 70' scales to be above ground or in ground scales? If above ground, do they want side Above -- 7/18/2024 28 rails included with the scale? ground, side rails required. -- 7/18/2024 29 For concrete or steel deck option, do they want to see pricing for both options? Concrete deck required. Specifications revised in Addendum No. 2 It looks like the load cell spec for the Part 2 80' scale calls for digital load cells. while the spec for Per Part 1.4.H, the load cell should be stainless steel. Revised in Addendum it 1405 7/19/2024 30 load cells for the Part 1 scales mentions stainless steel and integration with the scales, but no other spec No. 2. It looks like the only scale instruments specified are the scale indicators and the remote displays (Matko OAE), with a requirement to interface to Paradigm. Is that correct? 1 see a note about Yes, scale instrument specified are the scale indicators and remote displays, 11 14 05 7/18/2024 31 installing unattended enclosures, my assumption is that this is equipment supplied by the county No unattended enclosures. Revised in Addendum No. 2. for the contractor to install? With the 10 year warranty including damage due to surge voltage and lightning, and specifying 10 year warrant Is required per Part 1.9, and the lightning protection is 11 14 05 7/18/2024 32 that it is not complicated, have you seen their example that they are pointing to in this spec required per Part 2.8, section (2.8)7 -- 7/19/2024 33 Under the item for Clearing and Grubbing, you require 6" of removal to stockpile. Is that quantity 6" thick toposoil removal is included in the Clearing and Grubbing bid item. of material included in the items associated with 'unsuitable soil' removal? Can you identify on the plans where the unsuitable material and grubbed material will be Addendum No.2 includes a site plan showing the stockpile location of the stockpiled on site? Specific area on site with dimensions or drawn to scale and general unsuitable material, top soil, and grubbed material on site. The proposed -- 7/19/2024 34 description of how it is to be left upon completion? It will be a massive pile that could require location is located north of the contractor staging, west of compost, and the additional work to stack if confined in a small area or grade flat if required. contractor must avoid the wetlands. The contractor shall perform a topographic survey for each unsuitable soil In Addendum 1, note 1.17, you brought up the fact that we will have to slope the deep removal area prior to starting excavation. Once the excavation Is complete, -- 7/19/2024 35 excavations for the unsuitable soils at a 1.5:1. Can you confirm that the sail removed for the the contractor will perform a final topographic survey and will be paid based sloping will be quantified and included in the paid quantity for Bid Item tt6? And the earth on the soil removed and topographic surveys. Common fill will be calculated removed in those slopes will be replaced with material quantified as 'common fill'? using the same methodology. -- 7/19/2024 36 Will there be any additional Contract Time added with the acceptance of Additive Alternate items? No additional time will be added to the contract. There is a spec sectton 1312 00 for Preassembleed Modular Buildings, but we cannot locate this Preassembled modular building is shown on Sheet C3, and it is called out as 131200 7/19/2024 37 building on site. Please advise. "Office Trailer" in the compost area. I don't see a spec on the asphalt paving for the project. You just have a description on how you Yes, specification on the asphalt paving for the project is included In -- 7/19/2024 38 are paying for the bid item. The soils report tells me what soil to use. Is there going to be another Addendum No. 2. addendum? 111405 I/19/2024 39 In section 1.4 A & e, it notes two 70' x 11' scales, concrete or steel deck, with no manufacturer Unitec scale or approved equal. s ecified. 11 14 05 7/19/2024 40 In section 2.2 A, it notes a Unitec scale or approved equal. Unitec scale or approved equal. Both scales are above ground concrete deck. 70' in length is required. Revised 111405 7/19/2024 41 In section 2.2 e, it says one 80' x 10' low profile above ground concrete deck scale. in Addendum no. 2 072270 7/14/2024 42 We cannot find any reference to the roof anchor posts on the drawings (spec section 07 22 701, No roof anchor posts to be provided. Delete spec section 07 22 70. Please provide quantity and locations. 084110 7/19/2024 43 Please provide a spec for the aluminum entrance doors for the scale house and admin building. Specification 08 41 10 is added to Addendum No. 2. 10 26 01 7/19/2024 44 Spec section 10 26 01 indicates corner guards, but none are shown on the plans. Please clarify. Delete Specification Section 10 26 01 Wail and Corner Guards. There are no flag poles on the project. Delete Specification Section 10 75 00 10 75 00 7/19/2024 45 Please indicate the location and quantity of flag poles on the drawings. Flagpoles. 8/1/2024 LOWER VALLEY TRANSFER STATION RESPONSE TO RFI QUESTIONS - August 1, 2024 SECTION OAn RECSIEVE110 # Rr4 QUESTION RESPONSE -- 7/19/2024 46 Please indicate which windows receive roller shades. Provide roller shades at all exterior windows. A. Cabinets to have 1 mm ASS/PVC edgeband to match cabinet box color. A. What edgeband thickness/material for casework boxes? B. Fronts to have 3mm ABS/PVC edgeband to match door and drawer color. -- 7/19/2024 47 B. What edgeband thickness/material for casework fronts? C. Laminate countertops to have plastic laminate edge to match countertop C. What edgeband thickness/material for casework laminate countertops? color and finish. Sheet C3 references a 6' high chain link fence with tan slats, type 3 per WSDOT standard detail L- 20. 10-03, This type of fencing (tension wire in lieu of top and bottom rails) does not fair well with Top and bottom rails are required if using slats. The diameter of the top and - 7/19/2024 48 slats as the wind will usually push the screen around causing damage relatively quickly, bottom rails should match the diameter of the side rails and posts. Recommend adding top and bottom rails if the slats are going to be installed. Electrical Ductbank Requirements: Add the following note to Sheet E100: Could we Please get clarification on what requires an electrical ductbank and what doesn't? Concrete duct banks are required for road crossings per the designed and According to the specifications, all underground raceways should be encased in concrete unless future roadways where heavy vehicles travel over conduits. Duct banks -- 7/22/2024 49 otherwise specified in the drawings. There are no details or notes on E100 specifying what installed not under roadways shall be property compacted with sand/gravel requires a ductbank. Our primary concern is the requirement for ductbanks for light pole base with compacted overfill. All underground cables are pulled inside UPVC underground conduits, EV stations, underground conduits around the water pond, and control conduits. panels. General Note 13 on E100: apart. The 200' rule does not a I per Lighting apply g g Poles are less than Sheet E100 7(22/2024 50 Could we et clarification on the re g requirements outlined In General Note 13 on ES00? are required for underground conduit run for general note 13. Manholes are r Specificallplease y, will manholes be required for light poles every 200'? Note 5 mentions no handholes. distances more than 200'. We need clarification on the requirements for manholes. Thank you. Utility Meter Responsibility on E701: Drawing E701, Construction Note 7, indicates that the utility meter will be provided by others. The meter base and the consumer disconnect switch supplied by the Sheet E701 7/22/2024 51 However, the general notes indicate that the utility company supplies up to the transformer and contractor, while the meter will be supplied by the Utility. Follow the electrical everything on the load side of the transformer is provided by the owner. Could we please get utility standard for distribution of responsibility. clarification on whether the utility meter section will be supplied by the electrical contractor or others? Thank you. Feeder Numbers on E602: Could we please get a feeder number from the utility meter to the automatic transfer switch, Add the following note to Sheet E602: assuming we are supplying this as per my previous question? Additionally, could we get a feeder The main cable from the Utility equipment to the customer disconnect switch, Sheet E602 7/22/2024 52 number from the automatic transfer switch to the main switchboard? The information needed for then to the ATS and to the main switch board shall be (24) 600 MCM AL each feeder number includes the number of conductors, conductor types, number of conduits, conductor pulled inside (6) 4" conduits. and conduit sizes. The EV chargers shall operate on the normal power source only not on backup power. Level (2) 7.2 KW EV chargers shall be fed through 1-phase 10 KVA step down transformer next to each pedestal (Grouping under one transformer is allowed). EV Chargers shall be Leviton Model EC32W with EPEDi Single Mount Charging Station Pedestal or approved equal. Leviton Model EC32W with EPEDS Single Mount Charging Station Pedestal EV Specifications: Amperage: 32 A Breaker : 40 A Charge Connector Cord: #10 AWG SAE J1772 Number of Phase / wire : Ll, L2 and Ground, Bottom Feed Details on EV Stations: : Operating Temperature -30° C to 50°C -- 7/22/2024 S3 Could we get more details on the EV stations? There are no specifications, but the notes mention Output Power: 7.6kW EV 7.2KW, 8000 VA, and a 40A single pole breaker. General notes state that EV chargers shall not Short Circuit Current Rating : 20 mA CCID per UL 2231 run on the generator. voltage: 208/240 VAC Enclosure Material : Plastic (PC+PBT) Enclosure Rating : NEMA Type 3R Status Indicator: Power Present, Charging, Fault Altitude : Up to 6,500 ft. (2,000 m) Charging Cable Operating Temperature : -22°F to +122°F (-30°C to +50°C) Cooling: Natural Cooling Operating Humidity : < 95% Relative Humidity, NonCondensing Cable Length : 18 ft. (55 m) Standards and Certifications : UL2594 1 UL 2231-11 UL 2231- 21 UL 22511 UL 621 UL 991 I UL 19981 NFPA 70 Article 6251 UL840 1 CSA Std. C22.2#280 ( OCPP 1.6 Compliant Location of PP -Scale Transformer: The PP -scale transformer shall be located north of the FIVAC unit on a Sheet E100 7/22/2024 54 Could we please get the location of the PP -scale transformer on the site plan E100? housekeeping concrete pad at the scale house. Generally, yes but also depending on the type of fiber optic cable being Fiber Conduit Requirements: provided. Fiber optic cables running through electrical vaults must be properly -- 7/22J2024 55 Can wee run the spare 2" fiber optic conduit through the power manholes, or do we need to supply marked and protected from damage for new and future power cabling additional handholes or manholes every 200 feet for the 2" fiber optic conduits? installation. Also refer to NEC 770.133 (A) Additional 2" PVC Conduits: Where It indicates 2" additional PVC conduits for fiber cables, are they referring to the conduit in There is a total of two (2) 2" conduits for fiber and communication cabling, Sheet E101 7/22/2024 56 the trench or from a vault? Callout 102 and 101 feeders are marked for two additional 2" PVC running parallel to power, going to each building. These conduits are for conduits for fiber cables. Will this be a total of 4 conduits or 2 conduits from 102/101 back to their connecting fire alarm, data and telecommunication for the project. source? Thank you. White Goods Area: The PP-O panel is part of the future expansion, which is not part of this Sheet E701 7/22/2024 57we F011,,eandl please get the missing drawings for the PP-O panel schedule and building drawings? PP- 701 isn't marked with Construction Note 3 for future expansion. Thank you. contract. 8/1/2024 LOWER VALLEY TRANSFER STATION RESPONSE TO RFI QUESTIONS - August 1, 2024 SECTION GATE RECTO a An QUESTION RESPONSE Sales Building(PP-sales): The Sales Building isn't marked with Construction Note 3 for future expansion. Additionally, there The feeder callout 109 is part of the future expansion, which is not part of this Sheet E100 7/22/2024 58 is a feeder callout 109 for this circuit, but there is no tag 109 on the site plans. Could we please contract. clarify whether this conduit needs to be run somewhere on the site plans E100? Clarification on Feeder 106 on E602: (20) 500 MCM AL Conductors in (2) 6" conduits. (12) $00 MCM in (1) 6" and Sheet E602 7/22/2024 59 Could we please get clarification on callout feeder 106 on E602? Do they want 7 — 6" conduits (8) SOOMCM in a (1) 6" conduit. (NOTE: the contractor can provide other with 3600 kcmli? combinations of wire and cabling as long as it satisfies the NEC.) Fire Pump Conduit Size: Electric Fire Pump is future and there are no conduits/wires. The Main Sheet E701 7/22/2024 60 What size conduit is required for the fire pump? Construction Note 2 on plan E701. mentions Switchboard shall be equipped with connection lugs to accommodate the underground conduits, and we assume it is 6" based on other 6" underground conduits. Could future Electric Fire Pump. you please confirm? On plan sheet C3, the 4" thick pavement hatching is shown going through the recycling center. See the red clouded area in the snip below. Please confirm this area will receive asphalt pavement. Sheet C3 7J22/2024 61 Yes, asphalt paving is required in the recycling center. Also on plan sheet C3, the 4" thick pavement hatching is shown going through the MRW building. No asphalt paving required within the MRW building. This area In the MRW Sheet C3 7/22/2024 62 See the green clouded area in the snip below. However, in the structural plans, the MRW building building will be constructed of a concrete slab. is shown with a slab floor. Please confirm whether this area will receive asphalt pavement. Explosion proof heat detection works as well and should be part of the Fire Also the MRW building has a note about being explosion proof at least out in the main area. If so, Specialists design based on the performance specifications. you would most likely not want smoke and heat detection on the ceiling as smokes that are Since this is a performance specification, code minimum will work for horn -- 7/22/2024 43 explosion proof are 4k each my cost, heat detectors are not as bad as they run around 300 each. strobes. Also, they show a huge number of horn strobes in there, more than needed and those are very The quantities and location of the fire alarm equipment are an estimate in the expensive as well. 1 just need to know if we can do code minimum or if All those devices are design and are dependent upon the Washington State Certified Alarm actually explosion proof. I left another message today with your firm. Specialist that will detail the entire system during construction. Sheet C9 Detail A/C9 shows a road section with curb & gutter on both sides. Note below says The only location on the project where curb and gutter is required (Detail A on 'transfer building north entrance and exit'. The plan sheets for this area do not appear to show a C-9) is along the sloped access road leading into the transfer building. Curb Sheet C9 7/24/2024 64 curb or have call out to this detail. Can you clarify where, if any, concrete curb and gutter would and gutter will be required on both sides of the transfer building access road be located? starting at the entrance to the transfer building north for 2351f (4701f total). Spec Section 10 81 12- Bird Control Devices- 10 81 12 7/24/2024 65 Spec Section 10 81 12- Bird Control Devices- What are the locations and limits for the bird netting? Delete paragraphs 1.3 Bird Netting, 2.01C Bird Netting, and 2.03 Bird Netting Hardware See Addendum No. 4 for changes to Section 09 29 00. Structural drawings show wood framing. Architectural shows a mix of steel stud and wood framing, but the wall types page A009 shows all steel stud framing. Further, there is no 054000- specification section, which is typically where we would see the exterior wall or load bearing framing. There is a 092216 non-structural metal stud framing specification, but it does not Refer to structural for exterior wall framing at Admin and Scalehouse (Wood reference the framing of exterior walls. Is there any metal stud framing on this project? framed). Assembly types shown on page A009 that are keyed to Admin, Scalehouse, MAW and Trasfer Building are shown to indicate general design GWB specification includes many different types of GWB, some which come at a much higher intent including insulation and energy code requirements. All elements of price per SF. I cannot find anywhere in the drawings that identifies where to use each different MRW and Transfer building to be designed by PEMS MFR, steel stud framing type of GWB. Some of the concerning GWB products include: is not required. 092900 2.028— (GB) 5/8" Type C —this board is typically used in specific UL assemblies. I am not Provide flat bar backing per E.3b, Other backing is provided as an option to seeing any fire rated GWB assemblies in these buildings. Also, note 5 on the Assembly page A009 the contractor. directs me to use a more standard 5/8" Type X GWB product. 0929002.02B,S—(WRG13) USG Fiberock Aqua -Tough — This product does match the description. This is not a paper faced product, and therefore requires significant work to finish. 092900 2.028.5 (Part 2) jFRX-G) — Impact Resistant G W8 — where is this located? 092900 2.02C— Coated Tile backer board and underlayment — USG Fiberock eackerboard— I will qualify a GP Denshield Tilebacker. 092900 2.02D —Cement Backer Board —this shows 5/8" Wallboard, W Flooring underlayment — '.. they do not identify a product, and I would be excluding flooring underlayment. 092900 2.2E— Lists Gyp sheathing as being in spec section 061000. Spec 061000 does not show gyp sheathing. 1 would be excluding all exterior sheathing. 092900 2.2 F — Abuse Resistant Panels (ARP) — where is this located? 092900 3.01AS — Instructs us to use WRGB in wet locations not scheduled to receive the finish or (ARP). 092900 3.01.16 — Instructs us to use Coated Fiber -faced Gypsum Board in areas scheduled to �ncr�mn cc mewve tile. finish. 8/1/2024 LOWER VALLEY TRANSFER STATION RESPONSE TO RFI QUESTIONS - August 1, 2024 sEcrwx DATE RECIMO ff Will QUIESTM FISPON" The GWB products that I would expect to use on a project like this would include: Georgia Pacific 5/8" Type X GW8 at all locations other than what I list below. Georgia Pacific 5/8" Tilebacker — at all locations scheduled to receive wall tile, (Shown in restrooms only to S' AFF.) Georgia Pacific 5/8" Mold Guard paper faced GWB— in wet areas as defined in 0929DO 1.03A. Abuse and/or Impact Resistant GWB—This would only be at specified areas, of which I cannot find. This seems like an unusual product for this type of project, and I would prefer t0 exclude this product unless we can determine where it is needed. Fiberglass Faced GWB such as Georgia Pacific Dens Armour/USG Fiberock Aqua Tough — this would typically be called out in extremely wet areas, or areas where we would be hanging GWB prior to the building being dried in. Or perhaps a high humidity area such as an indoor pool. 1 would prefer to exclude this product unless we can determine where it is needed. 092900 3.010.2.a — Calls for Level 5 at all surfaces exposed to view that are to receive paint. Seems expensive and strange given the type of buildings these are, but I will figure a level 5 finish, unless you direct me otherwise. 095100—The finish schedules identify ACT-1 at all locations scheduled to receive ACT. The 095100 specification identifies 3 different types of ACT. Where do we identify which tile is ACTQ? Is it correct that there is only 1 type of ACT on this project? 095100 & 095300 — It may be too late, but we would be able to offer a significant savings on the ACT package if Certainteed ACT comparable products would be acceptable. (If you can confirm the desired ACT product, we can offer a VE deduct if there is a Certainteed comparable tile and grid product if that works for you.) On plan page C8 there is a note saying that there needs to be Thermoplastic Stop Bars at all STOP -- 7/25/2024 67 signs. Where are we suppose to put these in the bid tab? There is only Double Yellow and Single This item can be added to Bid Base Item #15 - Site Signage. white striping bid items. Insulation is required per Wall Sections 6/AS_A501, 7/Al_A501, 2/A4 A501, and 3/A4 A501. Structural steel paint requirements added to Addendum No. 4. Add the following to Section 09 96 002.01 B ACCEPTABLE MANUFACTURERS Basis of Design: Supply Sherwin-Williams Company products Indicated or comparable products from those listed below: Steel Substrates: Pigmented Polyurethane over Epoxy System 1. Prime Coat: Epoxy, high -build, low gloss: 1st Coat: S-W Macropoxy 646-100 Fast Cure Epoxy, B58 Series 17.043.5 mils wet, 5.0-10.0 mils dry per coat. 2. Intermediate Coat: S-W Hi -Solids Polyurethane Semi -Gloss, 865-350 Series. 3. Topcoat: Polyurethane, two -component, pigmented, gloss: 5-W Hi -Solids Polyurethane Semi -Gloss, B65-350 Series. (4.5-8.0 mils wet, 3.0-5.0 mils dry per coat. 4. Epoxy Primer: 1st Coat: a. If the metal does not have a zinc rich primer already applied, use the 1. Is insulation required on the transfer station and the MRW building? If so what is required and following as a first step: where is it located? (See recommendations below) b. 5-W Corothane I GalvaPac 2K Zinc -Rich Primer B65G70 (3.0-4.0 mils dry) -- 7/25/2024 68 Metal: 2. What paint specifically is required for all structural steel located at the Transfer Station and 5. Miscellaneous, ferrous Metal, Railings MRW Buildings? a. Waterbased: Semi -Gloss Finish: 1st Coat: S-W Pro Industrial Pro -Cry[ Universal Primer, B66-1310 Series (5.0 mils wet, 2.0 mils dry) 2nd Coat: S-W Pro Industrial Waterbased Alkyd Urethane Enamel Semi - Gloss, B53-1150 Series. 3rd Coat: S-W Pro Industrial Waterbased Alkyd Urethane Enamel Semi - Gloss, BS3-1150 Series (4.0-5.0 mils wet, 1.4 1.7 mils dry per coat) 6. Manufacturers: Subject to compliance with requirements, provide products by one of the following: International Protective Coatings; AkzoNobel. PPG Paints; PPG Industries, Inc. Rust-Oleum Corporation; a subsidiary of RPM International, Inc. Sherwin-Williams Company (The). Tnemec Company, Inc. RFI spreadsheet - No. 35 response addresses unsuitable soil payment: The contractor shall perform a topographic survey for each unsuitable soil -- 7(25{2024 69 Will the sloping or shoring area necessary for the deep excavations be included in the surveyed removal area prior to starting excavation. Once the excavation is complete, calculation for payment? That soil removed for sloping paid as unsuitable soils? the contractor will perform a final topographic survey and will be paid based on the soil removed and topographic surveys. Common fill will be calculated usingthe same methodolo Just curious if the structured cabling (voice/data/fiber) is being provided by owner? I have an electrical contractor who is requesting a bid an that portion of the work and I don't see any -- 7/26/2024 70 specifications (Div. 27000). Please let me know as soon as possible beings the bid is due on the Yes, cabling will be provided by Owner. 30th. If the owner is providing this work could you please forward my information to them, thanks. 8/1/2024 LOWER VALLEY TRANSFER STATION RESPONSE TO RFI QUESTIONS - August 1, 2024 sE0m t/ATERECWM M RHquEmm RESPONSE A revised bid schedule is Included in Addendum No. 44 for revising the 6' high chain link fence quantity and gates. Shall include a top and bottom rail. The bid schedule calls for 28501f of chain link fence and 10 gates. The plan page C3 only shows 4 gates (2 - 20'wide double swing gates). The scale may be off, I'm getting a total of 3,9101f total of The 6' high chain link fence w/ tan slats are for the perimeter site fencing and the fence. Please clarify where the 6 missing gates are located and what kind of gates are shall be galvanized. 7/26/2024 71 needed(single swings, double swings, roll gates, etc.) Section 32 31 13 -Chain Link, fencing, and Gates is for fencing at the MAW Regarding the specifications, they call for a black fence with can privacy slats. Plan page C3 calls Building. for a "6' high chain link fence w/tan slats per WSDOT standard plans. Please confirm if the fence is galvanized or black. Section 05 50 00 - Metal Fabrications address metal grating and wire mesh on the south elevation of the Transfer Building. The water and sewer systems shall be constructed in accordance with the City 7/29/2024 72 Are there any domestic requirements for materials ? of Ellensburg Standard Specifications. The specifications do not mention We cannot find in the specs if there Is . domestic requirements for materials. Street Lighting: Type IV similar to the MGLED 571W Sheet E100 for location Sheet E503 for the detail Specs 26 56 2.03 (8) for pole details Flood light at composite area: Similar to RSXF4 85,000 LM 646W I am not able to find any information provided on what the exterior floodlights are supposed to be Sheet E100 for location mounting to? Can you please confirm? Mounting Height 40' Specs 26 56 2,03 (8) for pole details -- J/25/2024 73 -Mounting height Flood light on the exterior of MRW and the transfer buildings - Pole type {square, round, etc.} Similar to RSXF4 85,000 LM 646W Color Wall mounted by wall bracket -Size 28' AFFL at the transfer building 26' AFFK at the MRW building First and foremost, the spec is calling out a voice/evac system. This is something that is not required for this occupancy type and is very costly. Is this being mandated? Also, two of the bldgs (scale and Admin) don't even require a fire alarm system as well. I'm all for going above and beyond what's needed but wanted to make sure. Maybe on those two bldgs we The Hazardous area is within the MRW building where this general note lives. could put in remote annunciators to save money. Just a thought if FA is not needed. Refer to sheet 0 A001 (Scope of work, paragraph (2)). There are also things called out in the spec that are not on the drawings, c, elevator shutdowns, The fire alarm notifies the people to evacuate. The voice notification is not chute Interlocks, kitchen hoods, generator heat, duct smokes, etc. I also don't see anything for required. doors and there's a whole section (E) dedicated to that on the spec. -- 7/29/2024 74 All buildings shall have fire alarm system. If the spec calls for something that is not there should I just ignore it? Exclude from 2446 00 2.03 the system interfaces that do not exist: Also, is this within city limits? The city requires exterior strobes on the address side of each Items (A) (7 & 8) building that has a new fire alarm panel and everything to be keyed as cat30, Items (8) (2, 3, 4, & 5) Items (C) and (E) The General Notes on 4_E101 says "All electrical raceways, equipment, and devices to be rated for installation in explosion hazardous areas" but the drawing doesn't actually show which area is an explosion hazard. Does the whole site need to ran in conduit? That wasn't called out either on if so, whether it's EMT or Rigid. 1. Yes, recycling area is paved with asphalt. The contractor shall put zero for 1. Addendum 3 clarified that the Recycling Area is paved with asphalt, but Bid Item 39 for the area Bid Item #39. calls for a'Concrete Pad'. What is included in this bid item? 2. One steel ramp is required on the east and west end of the Recycling drop- -- 7(29)2024 IS 2. Bid Item 40 in the Recycling Area calls for 'Steel Ramps'. Is there a detail or plan for the ramps? off area. Steel ramp details are shown on sheet C-19. Contractor shall provide a price to install two steel ramps for Bid Item Jl40. 3. Sheet C19 has details for an aluminum ADA ramp system. We could not find a call out for this ramp, but have assumed that it was meant to be ADA access for the modular building? 3. These ramps are for the Recycling drop-off area. In Specification 10 14 00, The building numbers in the specs and the plans do not match, the listing for signs in the specs do -- 7/28/2024 76 not correlate to anything that is on the plans like room number, room use, etc. Delete paragraphs-3.028, C, D, E.1, E7 -11 Add paragraph 3.02 A.g: Quantity: 4 Looking through addendum 2 for the HMA it references .75M ESAL PG 64H-28 with payment by -- 7/29/2024 77 the ton and the addendum 2 bid sheet references the HMA by the square yard. Is the square yard Payment will be made by the square yard. still the correct unit of measure? -- 7/30/2024 78 For sheet E701, the note N1 for generator and transfer switch indicates "Optional if needed." There is no transfer switch or generator required for bidding purposes. There is no specification on the generator. 8/1/2024 LOWER VALLEY TRANSFER STATION RESPONSE TO RFI QUESTIONS - August 1, 2024 ucrroa DATE REMAD x 101 QUESTION USPOIN4E 1.Terminal/Stretch/line Post/Top Rail Sizing & Galvanization: We are proposing/clarifying the use of 2-7/8" 40 wt. terminal and stretch posts with 2-3/8" 40 wt. line posts with 1-5/8" 40 wt top and bottom rail. This is the industry standard for a 6-ft chain link commercial fence with privacy slats. Currently the WSDOT specifications call out for 2-3/8" terminals with 1-7/8" line posts with 1-7/8" top rail and bottom rail. The end caps and bottom rail two way brackets are available but very rare and expensive and way outside of the norm for a project of this scope. 2.1're-Slatted Mesh or Traditional Bottom Lock Privacy Slats: 1. Contractor shall bid using WSDOT specifications. If contractor is awarded Currently the specifications call out for traditional (Tan) bottom lock privacy slats which have to be the contract, Owner will entertain value engineering proposals. manually installed one by one. This Is not a conflict and very standard. There is another product which is a pre -slatted chain link mesh which has wider diamonds and I don't believe you can get it 2. Contractor shall bid using project specifications. If contractor is awarded standard in the 2.0 oz galvanization coating but it saves on labor to manually install the traditional the contract, Owner will entertain value engineering proposals. -- 7/30/2024 79 privacy slats and we want to clarify to make sure that we are to bid the traditional bottom lock privacy slats and not the pre -slatted mesh? 3. Provide ASTM F1043 Heavy Industrial Pipe 3. Post and Top/Bottom Rail ASTM Requirements: 4. Per ASTM A392, provide Class 2 weight of 2.0 oz/SF. Contractor shall bid Currently there is a conflict within the fencing specifications in regards to the ASTM requirements using 2.0 oz/SF specification. If contractor is awarded the contract, Owner will on the posts and top/bottom rail. It states the use of ASTM F1083 pipe schedule 40 domestic but entertain value engineering proposals. then it also states in section 2.03 Source Quality Control kl the use of ASTM F1043 Heavy Industrial pipe which is more the industry standard and the latter is definitely less expensive for generally the same product. Which are we to use? 4. Galvanized Chain Link Mesh: Currently the specifications read to use ASTM A392 zinc coated steel which is the 2.0 oz/SF specification. The industry standard is usually the 1.2 oz/FS. There is a significant cost difference between the two and we just want to clarify which mesh to use specifically. Hardware Group 7 (1,16-7): Restrooms. Hinge x3 McKinney T4A3386 US32D 4.Sx4.5 Lockset Corbin Russwin ML2055 NSA 630 SA114 M17 LC M26 Mortise Housing (key) Best CoreMax Construction Core Best TEMP-4 RED Closer Norton PR7500SSM 6895N6 Wall Stop Trimco 1270CV 626 Gasket Pemko S88D length as required. Kickpiate Trimco K005010x2"LDW 630 Thumb Latch and Status Indicator -- 7/30/2024 80 087100 hardware spec is missing hardware for groups 7 and 8 can you get clarification please? Hardware Group 8 (HG-8): Conference, Offices Hinge x3 McKinney T4A3386 U532D 4.5x4.5 Lockset Corbin Russwin ML2055VR NSV 630 SA114 M17 LC M26 Mortise Housing (key) Best CoreMax Construction Core Best TEMP-4 RED Closer Norton PR750OSSM 689 SNB Wall Stop Trimco 1270CV 626 Gasket Pemko 588D length as required. Kickplate Trimco K0050 30x2"LDW 630 Threshold Pemko 271A FHSL25 Door Bottom Pemko 216APK 36" 1. In regards to Detail 2, 9 and 11 on 1_S303 How is the 5/8 plate attached to the push wall framing? I don't see a weld size or layout callout? And at the joints of the 5/8 plate, is it a close butt joint with no weld or is that a welded seam? If 1. Attach the HSS framing to the vertical 5/8" plate with 3/16" fillet each side welded is it ground flush? at 2" length and 12" pitch. Provide a grove weld and grind flush. 2. 1s the steel push wall 8' -6" overall including the angled 5/8" plate on top? Or if just the level 2. The angled 5/8" plates will sit on top of the 8'.6" steel wall. portion of the steel wall V-6" then the angled plates above that? 3. The material callout for the armor plate is A36. 3. What is the material callout for the armor plate? AR400 or something else? — 7/30/2024 B1 4. The 5/8" armor plate is only required at concrete push walls. Weld the 4. Does the armor plate run the length of the steel push wall? Or just embedded in the concrete seam between the armor plate and steel wall plate with a groove weld and wall? And does the weld joints need to be ground flush7 grind flush. 5. What are the diameter and length of the concrete anchors that hold the steel push wall? S. 3/4" 0, 8" of minimum embed, 16' on center. And at what spacing? 6. Change the note to read: HOPPER PER STRUCTURAL, 6. We assume note on detail 1, sheet 1-A102 that points to the hopper and says "future steel" Is a typo? 8/1/2024 LOWER VALLEY TRANSFER STATION RESPONSE TO RFI QUESTIONS - August 1, Z024 Sa[T1oN DAM marito a IVI gAUM 8EINKM 1.41rd nS li mrea for the eels• erhvrrmy byg eyes, eed wr9 pli0s 4r4 shown nd snee4 HIM, ] E101, 1_E201,3 E101, ands E101, .r a. 0 W.5 7/30120I4 82 Them is n0 flruurm tolled Out fur the kill, Emmipaney ahlit fyaN or wed packs. e a• 4 � 7 OYLI C., •�,'r�en,rnwst� id.:rssi+h a_� „y.;w Ma[erlal Thal meat, the 95 prgvldad Ir t4wg j(a) In Ptnu elarlly that GRIGMU}pvcl4kaktgni}rvg4imd rqr 8e-brave liner ReglNad 15 ofG91'GM33 will ba.,,died. The EnElneer will upollre the •• 7/3012014 81 Moto laUNr1411114tle n, fpedllaklpn k0 ceTply wlkh currant mdW[ry roqukrefiMls alter N411ce ui Award is Issued to rho- mletred GontratGM, 8/1/2024 SECTION 00 00 03 INSTRUCTIONS TO BIDDERS (AIA Document A701 — FOR REFERENCE ONLY) AIA Document A701" - 2018 Instructions to Bidders for the following Project: (Name, location, and detailed description) Lower Vallev Transfer Station 2600 West Green Ave ADDITIONS AND DELETIONS: Ellensburg. WA98950 The author of this document has added information needed for its completion. THE OWNER: The author.- may also have (Name, legal status, address, and otherinforniation) tevised the tear of the oriai.nal AIA standard forth. An Additions and Deletions KlttttasCountV Report that notes added 205 W 51h Avenue Suite 108 information as well as Ellensburg, WA 98926-2887 revisions to the standard Form text is available from the author and should be THE ENGINEER (HEREAFTER REFERENCED AS ARCHITECT): reviewad, (Name, legal status, address, and other information) This document has important legal consequences. SCS F-miners Consultation with an 2405140`t'Ave, #107 attorney is encouraged with Bellevue. WA9800S respect. to its completion or modification. FEDERAL, STATE, AND LOCAL LAWS MAY IMPOSE TABLE OF ARTICLES REQUIREMENTS ON PUBLIC PROCUREMENT CONTRACTS. 1 DEFINITIONS CONCULT LOCAL AUTFR)RITIES OR AN ATTORNEY TO VERIFY REQUIREMEN'PS APPLICABLE TO 2 BIDDER'S REPRESENTATIONS 7HIs PRocrrREMENT BEFORE COMPLETING THIS FOR11. 3 BIDDING DOCUMENTS It is intended that AIA Document G612'°-ZUl"7, 4 BIDDING PROCEDURES Owner's Instructions to the Architect, Parts A and B 5 CONSIDERATION OF BIDS be ctad prior to usinn g thiss dd0cocument. usi 6 POST -BID INFORMATION 7 PERFORMANCE BOND AND PAYMENT BOND 8 ENUMERATION OF THE PROPOSED CONTRACT DOCUMENTS ELECTRONIC COPYING of any portion of this AIA" Document to anther electronic file is prohibited and constitutes a violation of copyright laws as set forth in the tooter of this document. AIA DOC`.lment F.?Ol - 201B. Copyright 2 1070, 1974, 1970, 1407, '_997 and 2018. All cighto reserved. "The American institute of Architects," Architects,""', clean inst LtUte of ACChite ta," "AIA,' the AIA Log', and "AIA Contract, ►Join."Into" are trsdefiarks of The �ari.an Institute of 1 Architects. This draft w s producer At 09:50:34 IT on 05/13/2024 under Order Ne.4104243047 which expires on 06/10/2024, i net for resaic, s licensed for one-timeau only, and May only be, used in accordance with the AIA Contract Documents° Terms of sar—o. To report COP}'right 'JSO].AtlOnS, e- oil doell:fol?A19Nntr8Ct9.COm. Ui¢L not- (945244c59) Kittitas County — Lower Valley 1 of 8 Instructions to Bidders Transfer Station (AIA Document A701) June 18. 2024 ARTICLE I DEFINITIONS § 1.1 Bidding Documents include the Bidding Requirements and the Proposed Contract Documents. The Bidding Requirements consist of the advertisement or invitation to bid, Instructions to Bidders, supplementary instructions to bidders, the bid form, and any other bidding forms. The Proposed Contract Documents consist of the unexecuted form of Agreement between the Owner and Contractor and that Agreement's Exhibits, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, all Addenda, and all other documents enumerated in Article 8 of these Instructions. § 1.2 Definitions set forth iii the General Conditions of the Contract for Construction, or in other Proposed Contract Documents apply to the Bidding Documents. § 1.3 Addenda are written or graphic instruments issued by the Architect, which, by additions, deletions, clarifications, or corrections, modify or interpret the Bidding Documents. § 1.4 A Bid is a complete and properly executed proposal to do the Work for the sum s stipulated therein, subin itted in accordance with the Bidding Documents. § 1.5 The Base Bid is the sum stated in the Bid for which the Bidder offers to perform the Work described in the Bidding Documents, to which Work may be added or deleted by sums stated in Alternate Bids. § 1.6 An Alternate Bid (or Alternate) is an amount stated in the Bid to be added to or deducted from, or that does not change, the Base Bid if the corresponding change in the Work, as described in the Bidding Documents, is accepted. § 1.7 A Unit Price is an amount stated in the Bid as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, as described in the Bidding Documents. § 1.8 A Bidder is a person or entity who submits a Bid and who meets the requirements set forth in the Bidding Documents. § 1.9 A Sub -bidder is a person or entity who submits a bid to a Bidder for materials, equipment, or labor for a portion of the Work. ARTICLE 2 BIDDERS REPRESENTATIONS 2.1 By submitting a Bid, the Bidder represents that: .1 the Bidder has read and understands the Bidding Documents; .2 the Bidder understands how the Bidding Documents relate to other portions of the Project, if any, being bid concurrently or presently under construction; .3 the Bid complies with the Bidding Documents, .4 the Bidder has visited the site, become familiar with local conditions under which the Work is to be performed, and has correlated the Bidder's observations with the requirements of the Proposed Contract Documents; .5 the Bid is based upon the materials, equipment, and systems required by the Bidding Documents without exception, and .6 the Bidder has read and understands the provisions for liquidated damages, if any, set forth in the form of Agreement between the Owner and Contractor. ARTICLE 3 BIDDING DOCUMENTS § 3.1 Distribution § 3.1.1 Bidders shall obtain complete Bidding Documents, AM indiratgd_ helAw—,from the issuing office designated in the advertisement or invitation to bid, for the deposit sum, if any, stated therein. (1446h6WO he;11 94W4 G6 b5'ONMA ;wbs4e; he4 e && r. ps.2 �h o d Ah a 11 6o 6 dding ALA Document M01 - 2018- Copyright C 1970, 1974, 1979, 1987, 31997 and 2018. All rights reserved. "The American In5ritut. of Architects,' "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are tradcmacka of The American Institute of Architects. This draft as produced at 09:50:34 PT on 05/13/2024 under Order No.4104243047 which expices on 06(10/2024, is not for resale, 2 islicensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of service. To report copyright violations, e-mail docinfo@aiacoattact3.com. uger Notes: (94244259) Kittitas County — Lower Valley 2 of 8 Instructions to Bidders Transfer Station (AIA Document A701) June 18. 2024 § 3.1.2 Any required deposit shall be refunded to Bidders who subm it a bona fide Bid and return the paper Bidding Documents in good condition within ten days after receipt of Bids. The cost to replace missing or damaged paper documents will be deducted from the deposit, A Bidder receiving a Contract award may retain the paper Bidding Documents, and the Bidder's deposit will be refunded. § 3.1.3 Bidding Documents will not be issued directly to Sub -bidders unless specifically offered in the advertisement or invitation to bid, or in supplementary instructions to bidders. § 3.1.4 Bidders shall use complete Bidding Documents in preparing Bids. Neither the Owner nor Architect assumes responsibility for errors or misinterpretations resulting from the use of incomplete Bidding Documents. § 3.1.5 The Bidding Documents will be available for the sole purpose of obtaining Bids on the Work. No license or grant of use is conferred by distribution of the Bidding Docum ents. § 3.2 Modification or Interpretation of Bidding Documents § 3.2.1 The Bidder shall carefully study the Bidding Documents, shall examine the site and local conditions, and shall notify the Architect of errors, inconsistencies, or ambiguities discovered and request clarification or interpretation pursuant to Section 3.2.2. § 3.2.2 Requests for clarification or interpretation of the Bidding Documents shall be submitted by the Bidder in writing and shall be received by the Architect at least seven days prior to the date for receipt of Bids. (404GQP he)OL 'queh 6�8 by en;Q4 webS40, 1404 -441#QOC6�, PQPOO- Gef�L 6.hall MjbPW r-0qHC2;9 AF § 3.2.3 Modifications and interpretations of the Bidding Documents shall be made by Addendum. Modifications and interpretations of the Bidding Documents made in any other manner shall not be binding, and Bidders shall riot rely upon them. § 3.3 Substitutions § 3.3.1 The materials, products, and equipment described in the Bidding Documents establish a standard of required function, dimension, appearance, and quality to be met by any proposed substitution. § 3.3.2 Substitution Process § 3.3.2.1 Written requests for substitutions shall be received by the Architect at least ten days prior to the date for receipt of Bids. Requests shall be submitted in the same manner as that established for submitting clarifications and interpretations in Section 3.2.2. § 3.3.2.2 Bidders shall submit substitution requests on a Substitution Request Form if one is provided in the Bidding Documents. § 3.3.2.3 If a Substitution Request Form is not provided, requests shall include (1) the name of the material or equipment specified in the Bidding Documents; (2) the reason for the requested substitution; (3) a complete description of the proposed substitution including the name of the material or equipment proposed as the substitute, performance and test data, and relevant drawings; and (4) any other information necessary for an evaluation. The request shall include a statement setting forth changes in other materials, equipment or other portions of the Work, including changes in the work of other contracts or the impact on any Project Certifications (such as LEED), that will result from incorporation of the proposed substitution. § 33.3 The burden of proof of the merit of the proposed substitution is upon the proposer. The Architect's decision of approval or disapproval of a proposed substitution shall be final. § 3.3.4 If the Architect approves a proposed substitution prior to receipt of Bids, such approval shall be set forth in an Addendum. Approvals made in any other manner shall not be binding, and Bidders shall not rely upon them. § 3.3.5 No substitutions will be considered after the Contract award unless specifically provided for in the Contract Documents. e7 AIA Document A701 - 2018. Copyright �D 1970, 1974, 1978, 1987, 1,997 and 2018. All nights reserved. "The Xnerican Institute of Architects," ican Institute of Architects," "AIA," the ALA Logo, and "ALA Contract Documont3" are trademarks of The American Institute of "Teter te Architects. This draft ft was produced at 09:50!34 PT .. 05J13/2024 under order H4104243047 which expires on 06/10/2024, is not for resale, 3 is licensed for one-time use only, and may only be used in accordance with the AIA Contract DocumentsO Ten" of Service. To report ,copyright violations. e-mail docinfo@aiacontrats.com. V.e. Note.: I945244259) Kittitas County — Lower Valley 3 of 8 Instructions to Bidders Transfer Station (AIA Document A701) June 18. 2024 § 3.4 Addenda § 3.4.1 Addenda will be transmitted to Bidders known by the issuing office to have received complete Bidding Documents. § 3.4.2 Addenda will be available where Bidding Documents are on file § 3.4.3 Addenda will be issued no later than four days prior to the date for receipt of Bids, except an Addendum withdrawing the request for Bids or one which includes postponement of the date for receipt of Bids. § 3.4.4 Prior to submitting a Bid, each Bidder shall ascertain that the Bidder has received all Addenda issued, and the Bidder shall acknowledge their receipt in the Bid. ARTICLE 4 BIDDING PROCEDURES § 4.1 Preparation of Bids § 4.1.1 Bids shall be submitted on the forms included with or identified in the Bidding Documents. § 4.1.2 All blanks on the bid form shall be legibly executed Paper bid forms shall be executed in a non -erasable medium. § 4.1.3 Sums shall be expressed in both words and numbers, unless noted otherwise on the bid form. In case of discrepancy, the amount entered in words shall govern. § 4.1.4 Edits to entries made on paper bid forms must be initialed by the signer of the Bid. § 4.1.5 All requested Altemates shall be bid. If no change in the Base Bid is required, enter "No Change" or as required by the bid form. § 4.1.6 Where two or more Bids for designated portions of the Work have been requested, the Bidder may, without forfeiture of the bid security, state the Bidder's refusal to accept award of less than the combination of Bids stipulated by the Bidder. The Bidder shall neither make additional stipulations on the bid form nor qualify the Bid in any other m anner. § 4.1.7 Each copy of the Bid shall state the legal name and legal status of the Bidder. As part of the documentation submitted with the Bid, the Bidder shall provide evidence of its legal authority to perform the Work in the jurisdiction where the Project is located. Each copy of the Bid shall be signed by the person or persons legally authorized to bind the Bidder to a contract. A Bid by a corporation shall further name the state of incorporation and have the corporate seal affixed. A Bid submitted by an agent shall have a current power of attorney attached, certifying the agent's authority to bind the Bidder. § 4.1.8 A Bidder shall incur all costs associated with the preparation of its Bid. § 4.2 Bid Security § 4.2.1 Each Bid shall be accompanied by A bid security in the form and amount required, if so stipulated, in the Instruction to Bidder § 4.2.2 The Bidder pledges to enter into a Contract with the Owner on the terms stated in the Bid and shall, if required, furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder. Should the Bidder refuse to enter into such Contract or fail to furnish such bonds if required, the amount of the bid security shall be forfeited to the Owner as liquidated damages, not as a penalty. In the event the Owner fails to comply with Section 6.2, the amount of the bid security shall not be forfeited to the Owner. § 4.2.3 If a surety bond is required as bid security, it shall be written on AIA Document A3I oTM, Bid Bond, unless otherwise provided in the Bidding Documents. The attorney -in -fact who executes the bond on behalf of the surety shall AIA Document A701 - 2018. Copyright t 1970, 1974, 1970, 1987, 1997 and 201B. Allrights reserved. "The American Institute of Architects," "American Listitute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" ace trademarks of The American Institute of Architects. This draft was produced at 00;50:34 PT on 05/1312024 under Order No.�11042 i13097 which expir?s un 06l10l2024, is not for resale, 4 is licensed for one -tine use only, and may only be used in accordance upith the AIA Contract Documents'O Terms of service. To report copyright violations, e-mail docinf0aiacontracts.com. Use. Rotes: (945299259) Kittitas County — Lower Valley 4 of 8 Instructions to Bidders Transfer Station (AIA Document A701) June 18, 2024 affix to the bond a certified and current copy of an acceptable power of attorney. The Bidder shall provide surety bonds from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located. § 4.2.4 The Owner will have the right to retain the bid security of Bidders to whom an award is being considered until (a) the Contract has been executed and bonds, if required, have been furnished; (b) the specified time has elapsed so that Bids may be withdrawn, or (c) all Bids have been rejected. however, if no Contract has been awarded or a Bidder has not been notified of the acceptance of its Bid, a Bidder may, beginning days after the opening of Bids, withdraw its Bid and request the return of its bid security. § 4.3 Submission of Bids § 4.3.1 A Bidder shall submit its Bid as indicated belew= on the Advertisement for Bid; § 4.3.2 Paper copies of the Bid, the bid security, and any other documents required to be submitted with the Bid shall be enclosed in a sealed opaque envelope. The envelope shall be addressed to the party receiving the Bids and shall be identified with the Project name, the Bidder's name and address, and, if applicable, the designated portion of the Work for which the Bid is submitted. If the Bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope with the notation "SEALED BID ENCLOSED" on the face thereof. § 4.3.3 Bids shall be submitted by the date and time and at the place indicated in the invitation to bid. Bids submitted after the date and time for receipt of Bids, or at an incorrect place, will not be accepted. § 4.3.4 The Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids. § 4.3.5 A Bid submitted by any method other than as provided in this Section 4.3 will not be accepted. § 4A Modification or Withdrawal of Bid § 4.4.1 Prior to the date and time designated for receipt of Bids, a Bidder may submit a new Bid to replace a Bid previously submitted, or withdraw its Bid entirely, by notice to the party designated to receive the Bids. Such notice shall be received and duly recorded by the receiving party on or before the date and time set for receipt of Bids. The receiving party shall verify that replaced or withdrawn Bids are removed from the other submitted Bids and not considered. Notice of submission of a replacement Bid or withdrawal of a Bid shall be worded so as not to reveal the am ount of the original Bid. § 4.4.2 Withdrawn Bids may be resubmitted up to the date and time designated for the receipt of Bids in the same format as that established in Section 4.3, provided they fully conform with these Instructions to Bidders. Bid security shall be in an amount sufficient for the Bid as resubmitted. § 4.4.3 After the date and time designated for receipt of Bids, a Bidder who discovers that it made a clerical error in its Bid shall notify the Architect of such error within two days, or pursuant to a timeframe specified by the law of the jurisdiction where the Project is located, requesting withdrawal of its Bid. Upon providing evidence of such error to the reasonable satisfaction of the Architect, the Bid shall be withdrawn and not resubmitted. If a Bid is withdrawn pursuant to this Section 4.4.3, the bid security will beatte.;;dad to as 5 returned: ARTICLE 5 CONSIDERATION OF BIDS § 5.1 Opening of lids If stipulated in an advertisement or invitation to bid, or when otherwise required by law, Bids properly identified and received within the specified time limits will be publicly opened and read aloud, A summary of the Bids may be made available to Bidders. § 5.2 Rejection of Bids Unless otherwise prohibited by law, the Owner shall have the right to reject any or all Bids. AIA Document A701 - 2018. Copyright 4' 1970, 1974, 1978, 1987, 1997 and 2018. A17rights reserved. "The American Institute of Architac_ts," "Rmerir_an Institute of Architects," "AIA,- the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This draft was produced at 0a:50:34 PT on 05i 13/2024 under Order No.418424304i which expires on 06/10/2024, is not for resale, 5is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of service. To report copyright violations, e-mail docinfo@aiacontracts.com. user lfot— 045244259) Kittitas County — Lower Valley 5 of 8 Instructions to Bidders Transfer Station (AIA Document A701) June 18, 2024 § 5.3 Acceptance of Bid (Award) § 5.3.1 It is the intent of the Owner to award a Contract to the lowest responsive and responsible Bidder, provided the Bid has been submitted in accordance with the requirements of the Bidding Documents. Unless otherwise prohibited by law, the Owner shall have the right to waive informalities and irregularities in a Bid received and to accept the Bid which, in the Owner's judgm ent, is in the Owner's best interests. § 5.3.2 Unless otherwise prohibited by law, the Owner shall have the right to accept Alternates in any order or combination, unless otherwise specifically provided in the Bidding Documents, and to determine the lowest responsive and responsible Bidder on the basis of the sum of the Base Bid and Alternates accepted. ARTICLE 6 POST -BID INFORMATION § 6.1 Contractor's Qualification Statement Bidders to whom award of a Contract is under consideration shall submit to the Architect, upon request and within the timeframe specified by the Architect, a properly executed AIA Document A305T'I Contractor's Qualification Statement, unless such a Statement has been previously required and submitted for this Bid. § 6.2 Owner's Financial Capability A Bidder to whom award of a Contract is under consideration may request in writing, fourteen days prior to the expiration of the time for withdrawal of Bids, that the Owner furnish to the Bidder reasonable evidence that financial arrangements have been made to fulfill the Owner's obligations under the Contract. The Owner shall then furnish such reasonable evidence to the Bidder no later than seven days prior to the expiration of the time for withdrawal of Bids. Unless such reasonable evidence is furnished within the allotted time, the Bidder will not be required to execute the Agreement between the Owner and Contractor. § 6.3 Submittals § 6.3.1 After notification of selection for the award of the Contract, the Bidder shall, as soon as practicable or as stipulated in the Bidding Documents, submit in writing to the Owner through the Architect: .1 a designation of the Work to be performed with the Bidder's own forces; .2 names of the principal products and systems proposed for the Work and the manufacturers and suppliers of each; and .3 names of persons or entities (including those who are to furnish materials or equipment fabricated to a special design) proposed for the principal portions of the Work. § 6.3.2 The Bidder will be required to establish to the satisfaction of the Architect and Owner the reliability and responsibility of the persons or entities proposed to furnish and perform the Work described in the Bidding Documents. § 6.3.3 Prior to the execution of the Contract, the Architect will notify the Bidder if either the Owner or Architect, after due investigation, has reasonable objection to a person or entity proposed by the Bidder. If the Owner or Architect has reasonable objection to a proposed person or entity, the Bidder may, at the Bidder's option, withdraw the Bid or submit an acceptable substitute person or entity. The Bidder may also submit any required adjustment in the Base Bid or Alternate Bid to account for the difference in cost occasioned by such substitution. The Owner may accept the adjusted bid price or disqualify the Bidder. In the event of either withdrawal or disqualification, bid security will not be forfeited § 6.3.4 Persons and entities proposed by the Bidder and to whom the Owner and Architect have made no reasonable objection must be used on the Work for which they were proposed and shall not be changed except with the written consent of the Owner and Architect. ARTICLE 7 PERFORMANCE BOND AND PAYMENT BOND § 7.1 Bond Requirements § 7.1.1 If stipulated in the Bidding Documents, the Bidder shall furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder. § 7.1.2 If the furnishing of such bonds is stipulated in the Bidding Documents, the cost shall be included in the Bid If the furnishing of such bonds is required after receipt of bids and before execution of the Contract, the cost of such bonds shall be added to the Bid in determining the Contract Sum. § 7.1.3 The Bidder shall provide surety bonds from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located. AIA Document A701 - 2018, Copyright 9 19?0, 1974, 1978, 1987, 1997 and 2D18. A11rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Aeah itects. This draft was produced at 09,50:34 PT on 05/13/2024 under order No.4104243047 which expires on 06/10/2024, is not for resale, 6 is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documentse Terms of service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (945244259) Kittitas County — Lower Valley 6 of 8 Instructions to Bidders Transfer Station (AIA Document A701) June 18, 2024 § 7.1.4 Unless otherwise indicated below, the Penal Sum of the Payment and Performance Bonds shall be the amount of the Contract Sum. (If Payment or Performance Bonds are to be in an amount other than 1001/16 of 'tlae Contract Sum, indicate the dollar amount or percentage of the Contract Sum.) § 7.2 Time of Delivery and Form of Bonds § 7.2.1 The Bidder shall deliver the required bonds to the Owner not later than three days following the date of execution of the Contract. If the work is to commence sooner in response to a letter of intent, the Bidder shall, prior to commencement of the Work, submit evidence satisfactory to the Owner that such bonds will be furnished and delivered in accordance with this Section 72.1. § 7.2.2 Unless otherwise provided, the bonds shall be written on AIA Document A312, Performance Bond and Payment Bond. § 7.2.3 The bonds shall be dated on or after the date of the Contract. § 7.2.4 The Bidder shall require the attorney -in -fact who executes the required bonds on behalf of the surety to affix to the bond a certified and current copy of the power of attorney. ARTICLE 8 FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR § 8.1 .44-4104 Tm 241 ;, Unless otherwise required in the Bidding Documents, the Agreement for the Work will be written on AIA Document A101 Standard Fonn of Agreement Between Owner and " N. -Mba TPA$ Date Seetien Title Date Rages AIA Document A701 - 2018. Copyright D 1910, 1974, 1970, 1987, 1997 and 2018. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIR Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This draft was produced at 09:50:34 PT on 05/1312024 under order No.4104243047 which expires on 06/10f2024, is not for resale, 7 is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents* Terms of service. To report :copyright violations, e-mail docinfo@aiacontracts.com. 4®ez Motes: (945244259) Kittitas County — Lower Valley 7 of 8 Instructions to Bidders Transfer Station (AIA Document A701) June 18, 2024 W.-Mbef Date Pages TiQ#e Date Pages 9acuMant T4" Date Pagan Contractor Where the Basis of Payment Is a Stipulated Sum. AIA Document A701 - 201R. Copyright Q 1970, 1974, 1978, 1987, 1997 and 2018- All rights reserved. "The American Institute of Architects," "American institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are tcadematks of The American Institute of 8 Architects. This draft was produced at 09:59:34 PT on 05/13/202_4 under Order No.4104243047 which expires on O6/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents° Terms of Service. To report copyright violet ions, e-mail docinfoRaiacontracts.com. use. Notes: (945244259) Kittitas County — Lower Valley 8 of 8 Instructions to Bidders Transfer Station (AIA Document A701) June 18, 2024 SECTION 00 00 03.1 SUPPLEMENTARY INSTRUCTIONS TO BIDDERS The following Supplementary Instructions to Bidders modify, delete or expand on the requirements as published in AIA Document A701 - 2018 "Instructions to Bidders." Where any article, paragraph, or subparagraph is modified, the unaltered portions shall remain in effect as published. ARTICLE 4 - SUBMISSION OF BIDS 4.2.1 DELETE the first sentence and INSERT the following: Each Bid shall be accompanied by a bid security in the form and amount required on the Bid Form. 4.4.1 ADD the following: Bidders agree not to modify, withdraw or cancel bid proposals for a period of sixty (60) days after date set for receipt of bids. ARTICLE 5 — CONSIDERATION OF BIDS 5.1 ADD new subparagraphs and clauses as follows. 51.1 Per Chapter 39.12 RCW, Bidder shall provide the names of all subcontractors whose subcontract amount will be more than ten percent (10%) of the contract price and with whom the Bidder, if awarded a contract, intends to subcontract for performance of the categories of work designated on the submitted list. ARTICLE 6 - POST BID INFORMATION 6.3.1 DELETE as printed and INSERT the following: The Bidder shall, within 5 working days of the date of written notification of consideration for award of a Contract, furnish to the Owner through the Architect in writing: ARTICLE 7 - PERFORMANCE BOND AND PAYMENT BOND 7.1.1 REVISE the first sentence to read as follows: The Bidder shall furnish bonds covering faithful performance of the Contract and payment of all obligations arising thereunder. 7.1.2 DELETE as printed and INSERT the following: The cost of furnishing such bonds shall be included in the Bid. 7.2.2 DELETE as printed and INSERT the following: Bidder will be required to furnish satisfactory Performance Bond and Payment Bond, each written in the amount of .100% of the contract price, on contract form AIA Document A312, Performance Bond and Payment Bond, latest edition by a qualified surety. All subcontractors shall be bondable. END OF SUPPLEMENTARY INSTRUCTIONS TO BIDDERS Kittitas County — Lower Valley 1 of 1 Supplementary Instructions Transfer Station to Bidders June 18, 2024 SECTION 00 00 04 BID PROPOSAL FORM ADDENDUM NO. 9 FOR: Kittitas County — Lower Valley Transfer Station TO: Kittitas County Board of Commissioners 205 W. 5th Ave., Suite 108 Ellensburg, Washington 98926-2887 EXAMINATION OF DOCUMENTS: A. Having carefully examined all Bidding Documents entitled Lower Valley Transfer Station dated June 18, 2024, as prepared by SCS Engineers, as well as the site and local conditions affecting the work, the undersigned proposes to perform all work in accordance with the Contract Documents for a compensation to he computed from the enclosed bid amounts. B. Receipt of Addenda numbered �to is hereby acknowledged. 2. COMPLETION OF SID PROPOSAL: A. Fallow all bidding procedures and other requirements of Instructions to Bidders, Supplementary Instructions to Bidders and all Contract Documents. 3. Contractor shall provide State of Washington contractor license and classification. License Classification: License No. 4. BID SECURITY: Bid Security as required by Bidding Documents is attached to this Sid Proposal Form in the amount of 5% of Base Bid. 5. AWARD OF CONTRACT' A, if written notice of acceptance of all or part of this proposal is mailed, telegraphed, or delivered to undersigned within 30 days after opening of proposals, the undersigned will, within 10 days after date of such notice, execute and deliver the Form of Agreement as specified and furnish Insurance Certificates, Performance Bonds and Labor and Material Payment Bonds as required. 8, The undersigned hereby designates his office of record to which notices may be mailed, telegraphed, or delivered as: Kittitas County — Lower Valley I of 3 Bid Proposal Form Transfer Station June 18, 2024 C. if the undersigned fails to complete the above requirements, total amount of Bid Security shall be forfeited to the Owner. 6. CONTRACT TIME: A. Work shall be substantially complete and ready for Owner's use within 450 calendar days of Notice to Proceed. B. Liquidated Damages. Should the Contractor fail to complete the Work within the Contract Time, as revised by approved extensions, the Owner shall reserve the right to assess the Contractor liquidated damages in the sum of five hundred dollars ($500) per calendar day or as modified in the Contract until such time as the Work is substantially complete. See Section 8.24 of the Supplementary General Conditions for additional requirements for Liquidated Damages_ BID AMOUNTS: A. The bid amounts provided shall not include Washington State Sales Tax - The bid amounts shall be written out in words as well as figures. In case of discrepancy, the written form takes precedence over the numerals. 8. BASE BID: Contractor shall complete the Did Schedule in Section 00 00 04.1 and insert Base Bid total below. A. Base Bid: (Written) (Numerical) 9. All Subcontractors, or Sub -Subcontractors with whom a contract in an amount greater than 10% of the total Base Bid is anticipated, must be listed below for consideration for Award of Contract. List name of Subcontractor category of Work intended to be performed by their respective forces, and the dollar value of their portion of the Work. Subcontractor Contract Amount L'VIOCO - Coke ($ 30i o00.00 y Kittitas County — Lower Valley 2 of 3 Bid Proposal Form Transfer Station June 18, 2024 +m 10. SUBMITTED BY: BIDDER** BY 1 /00 ate. ADDRESS 1 L .', ��` ff CITY, STATE. ZIP TELEPHONE L-' y`� NOTE. If a Corporation, write State of Incorporation under signature, if a Partnership, give full names of all Partners. END OF BID PROPOSAL FORM Kittitas County — Lower Valley 3 of 3 Transfer Station Bid Proposal Farm June 18, 2424 Kittitas County SECTION 00 00 04.1 SC$ Engineers tower Valley Transfer Station Bid Schedule - Addendum No. 4 Contractor Name: Bid Item Description UOM Quantity _ Unit PriCe (S) Extended Price ($ BM Bid (tams Gehefil 1 Mobilization/Demobilization (5% Maximum) LS 1 lf1 dd, l . 00 2 Project Survevih L5 1 6XZ3, 00 3 Quality Control Testing L5 1 Q 4 Soil Erasion and Sediment Control t5 1 uJ coo Civil/Sitework 5 Clear and Grub AC 34 dP . 6 Unsuitable 504S • ExcaVatlon _ CY 49,000' 7 Subgrade Preparation SY 45,400 20 'a to Cr .0 0 S Geotextfles SY 55,400 9 Common FIII Plan Quantlt) CY 62,300 2.,% Am t4 0 kL 10 crushed surface Base Course • 6" SY 45,400 . 4 G v� 11 Hot Mix Asphalt - 7" SY 20.200 C b ram' 12 Hot MIN AS haft - 4" SY 25,Z00 7.4d, cro 13 Site Striping - Double Yellow LF 6 an CO c. 'S 0 14 Site Striping • Single White LF 12,646 vEf 5-0 15 Site Si ra a LS 1 0v4D, "Q to 16 5ite CanCrete 06co, u d , en 17 Site Fencing, 6' Chalnllnk LF 1,975 1 5q 000, ja 00D . o 0 18 Site Fentin , Gatei EA a v 19 Site Seadiiiq AL 30 , r- () 4 Z aroto. 20 Landscapin LS 1 ZCpG{j. - 2 000, Site utilities 49 &C) 21 Site Domestic Water 5ystcm 22 Site Dire Water System LS 1 4 i_ a 23 Site Sewer System L5 1 Z, o 0 . O IR 24 Site Stormwiter System LS 1 6 rr •l ±7 25 Site Electrlcai L5 i 5 7 +yp d sw f ' Transfer Sulldlhg 26 Concrete LS 1 d d 0, as 07 Q a 6 27 Miscallaneaus Metals LS t O0 0 • t Page 1 6f 2 Kittitas County SECTION 00 DO 04.1 SCS Engineers Lower Valley Transfer Station Bid Schedule - Addendum No. 4 28 Pre -Engineered Metal 9ullding (PEMB) t5 1 O 420, 29 Break Roam t5 1 (go Ja Q, t7y 30 Me chaNcal/Plumbin LS 1 1. lkw, 31 Fire Protertlon System LS 1 I p, 0 ,d 32 Misting System L5 1 a pp 33 ElertricalfLighting LS l d a Composting Arep 34 ASP - Concrete Watls and Pad LS 1 goo. 04 3S ASP - Mechanical/Electrical LS 1 d + P p 35 Concrete Block Walls - Pprtible Mw2'61 LS 1 37 CPntact Water Pond LS L h b 39 Office BuIld0 .Prefabricated LS 1 RecycllnR Ofop-Off Ana 39 Concrete Pad LS i 40 51eel Ramps L5 1 tr scale Hausa 41 5010h:> We LS 1 W *do, ao 42 Truck Scales LS 1 TOTAL COST (BASE BID ITEMS 1- 42} ENTERTHI5NUMBER ONI BA OFTHEBID FORM ADDITIVE ALTERNATIVE BID ITEMS Al Adminlstratlon Building LS 1 { . O ob A2 MRW Building LS I D A3 The Drop -Off Area L5 1 A4 Hauling Sall to Ave Grass Landfill iPlan Quantity) - Haul Only C1 1 49,000 0). e3 Page 2 012 ZU SECTION 00 00 05.1 SUPPLEMENTARY GENERAL CONDITIONS OF THE CONTRACT ARTICLE 1: DEFINITIONS: Paragraph 1.1.1, CHANGE the last sentence to read: The Contract Documents include Instructions to Bidders, Bid Proposal Form, Plans and Specifications, and Standard Forms and Compliances. THE CONTRACT DOCUMENTS: ADD the following to Paragraph 1.1.1 It shall be the responsibility of the Contractor and each subcontractor to apprise themselves of all conditions, limitations and requirements of these documents which are considered a part of each Section of each Division of this Specification as if printed therein. 1.1.1.1 ADD the following text and clauses: Conflicts in the Documents shall be brought to the Architect's attention. In the event of conflicts or discrepancies among the Contract Documents, interpretations will be made by the Architect in accordance with this principle of complementary relationship among documents, with reference to the following priorities if necessary to reach a conclusion: .1 The Agreement. .2 National, State and Local Codes and Ordinances. .3 The Supplementary Conditions. .4 The General Conditions of the Contract for Construction. .5 The Project Manual and any Addenda; Addenda of later date take precedence over those of earlier date. .6 The Drawings; drawings of larger scale and greater detail take precedence over drawings of smaller scale and less detail. 1.1.1.2 Should conflict occur in or between Drawings and Specifications, Contractor is deemed to have estimated the more expensive way of doing work unless he asked for and obtained written decision by Addenda as to which method or materials will be required. 1.1.1.3 Where the word "similar" occurs on drawings, it shall be used in its general sense and not as meaning identical, and all details shall be worked out in relationship to their location and their connection to other parts of the work. 1.1.1.4 Where used in conjunction with the Architect's response to submittals, requests, applications, inquiries, reports and claims by the Contractor, the meaning of the term "approved" will be held to the limitations of the Architect's responsibilities and duties as specified in the Conditions of the Contract. In no case will "approval" by the Architect be interpreted as an assurance to the Contractor that the requirements of the contract documents have been fulfilled. THE DRAWINGS: ADD the following to Paragraph 1.1.5 Where on any drawings a portion of work is drawn out and remainder is indicated in outline, the drawn out parts shall apply also to other like portions of the work. Where detail is indicated by starting only, such details Kittitas County — Lower Valley 1 of 24 Supplementary General Transfer Station Conditions of the Contract June 18. 2024 shall be continued throughout the courses or parts in which it occurs and shall also apply to all other similar parts in the work unless otherwise indicated. Drawings are in general diagrammatic and do not necessarily show complete details of the work, or materials, and do not necessarily show the construction sequence that may affect the Contractor means and methods. The Contractor shall coordinate to sequence the parts to a completed whole. Add the following Subparagraphs 1.2.4 through 1.2.6 to 1.2: 1.2.4 Conditions of the Contract shall be read by all prime contractors and by each subcontractor or sub -subcontractor and shall be considered a part of each section of the Technical Specifications. Provisions of Contract Documents are binding on the contractors, subcontractor and sub -subcontractors for all work shown or indicated on the original Contract Documents plus any additional work authorized by change order, interpretation or field orders. 1.2.5 The Contractor shall notify the Architect of any condition he finds where, in his judgment, it will be desirable to modify the requirements to produce the best results. If the Contractor fails to make such request, he is deemed to have accepted the specified and/or detailed method of installation as being adequate to produce first class, satisfactory work. Should conflict occur in or between drawings and specifications, the Contractor is deemed to have estimated on the more expensive way of doing the work unless he shall have asked for, and obtained a written decision seven (7) calendar days before submission of proposal as to which method or materials will be required. Manufacturer's equipment specifications are based on models and/or construction and installation methods prevailing at the date of invitation and/or advertisement to submit to manufacturer's model and/or construction changes and other variations from the items specified shall be furnished and installed at no additional cost to Owner. 1.2.6 Requests by the Contractor for written interpretations and/or detail drawings shall be made to the Architect in a timely manner such as will allow ample time for their preparation and delivery without causing delays in the work. Failure of the Contractor to request needed clarifications and/or his proceeding with affected work prior to receiving same shall indicate his acceptance of any and all costs and/or delays required on account of necessary corrections. ARTICLE 2 - OWNER 2.2.5 DELETE as published and insert as follows: 2.2.5 The Contractor will be furnished free of charge 5 copies of Drawings and Project Manuals. Additional sets will be furnished at the cost of reproduction, postage and handling. ARTICLE 3 - CONTRACTOR 3.2.1 ADD the following text: If the Contractor observes any errors, discrepancies or omissions in the Contract Documents, he shall promptly notify the Architect, requesting clarification. If the Contractor proceeds with Work affected by such errors, discrepancies or omissions without receiving such clarification, he does so at his own risk. Any adjustments involving such circumstances made by the Contractor, prior to approval by the Kittitas County — Lower Valley 2 of 24 Supplementary General Transfer Station Conditions of the Contract June 18, 2024 Architect, shall be at the Contractor's risk and the settlement of any complications or disputes arising therefrom shall be at the Contractor's sole expense. 3.3 SUPERVISION AND CONSTRUCTION PROCEDURES: ADD the following subparagraphs to Article 3.3: 3.3.2 ADD the following text: Coordinate work of all subcontractors. 3.3.4 Add the following new subparagraph 3.3.4: "The Contractor shall be solely responsible for any claims for wages or compensations by the Contractor's employee, agents, representatives, including subcontractors, and shall save and hold the Owner harmless therefrom." 3.3.5 Add the following Subparagraph 3.3.5: All grades, levels, bench marks, locations and corners shall be correctly verified by the Contractor. 3.4 ADD the following new subparagraphs and clauses: LABOR AND MATERIALS: ADD the following subparagraph to Article 3.4: 3.4.1.1 The Contractor shall be solely responsible for all materials and equipment until the completed project is delivered and accepted by the Owner. The Contractor shall, at his own expense, secure and maintain a storage area for his materials and equipment." Add the following Subparagraphs 3.4.2.1 and 3.4.2.2: 3.4.2.1 After the Contract has been executed the Owner and the Architect will consider a formal request for the substitution of products in place of those specified only under the following conditions set forth in the General Requirements (Division 1 of the Specifications). .1 Required product cannot be supplied in time for compliance with Contract time requirements. .2 Required product is not acceptable to governing authority, or determined to be non- compatible, or cannot be properly coordinated, warranted, or insured, or has other recognized disability as certified by Contractor. .3 Substantial advantage is offered Owner after deducting offsetting disadvantages including delays, additional compensation to Architect/Engineer for redesign, investigation, evaluation, and other necessary services, and similar considerations. 3.4.2.2 By making requests for substitutions based on Subparagraph 3.4.3 above, the Contractor: .1 represents that the Contractor has personally investigated the proposed substitute product and determined that it is equal or superior in all respects to that specified; .2 represents that the Contractor will provide the same warranty for the substitutions that the Contractor would for that specified; .3 certifies that the cost data presented is complete and includes all related costs under this contract, except the Architect's redesign costs, and waives all claims for additional costs related to the substitution which subsequently become apparent; and Kittitas County — Lower Valley 3 of 24 Supplementary General Transfer Station Conditions of the Contract June 18, 2024 .4 will coordinate the installation of the accepted substitute, making such changes as may be required for the work to be complete in all respects. 3.4.2.3 Submit request for substitution utilizing the Substitution Request Form located in Section 0125 00. 3.4.4 After the Contract has been executed, the Owner and the Architect will consider a formal request for the substitution of products in place of those specified only under the conditions set forth in the General Requirements (Division 1 of the Specifications). 3.4.5 By making requests for Substitutions based on Subparagraph 3.4.3 above, the Contractor: .1 represents that the Contractor has personally investigated the proposed substitute product and determined that it is equal or superior in all respects to that specified; 2 represents that the Contractor will provide the same warranty for the substitution that the Contractor would for that specified; .3 certifies that the cost data presented is complete and includes all related costs under this Contract except the Architect's redesign costs, and waives all claims for additional costs related to the substitution which subsequently become apparent; and .4 will coordinate the installation of the accepted substitute, making such changes as may be required for the Work to be complete in all respects. 3.5 WARRANTY 3.5.1 REVISE the sentence "Work, materials or equipment not conforming to these requirements, may be considered defective." to read as follows: Work not conforming to these requirements, including substitutions not properly approved and authorized, shall be considered defective. 3.5.1 DELETE the phrase "If required by the Architect" from the last sentence so that it reads: The Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. 3.5.1 Add the following sentence to the end of Subparagraph 3.5.1: The Contractor shall maintain such warranty for a period of one (1) year from the date of Substantial Completion of the project not withstanding more extensive warranty requirements specified for certain elements and products used in the work in which case the longer warranty requirement shall apply. TAXES: ADD the following to Paragraph 3.6.1: The contract sum and any agreed variations thereof shall include all taxes imposed by law, and properly chargeable to the project except Sales Tax. Sales Tax applicable to the contract sum will be collected from the Owner and shall be paid to the State Department of Revenue by the Contractor in conformance with the law. State of Washington Sales Tax shall not be included in the bid price, except that the retail sales tax upon sales and rentals to prime contractors and subcontractors of tools, machinery and equipment, and consumable supplies, such as hand and machine tools, cranes, air compressors, bulldozers, lubricating oil, sandpaper and form lumber which are primarily for use by the Contractor rather than for resale as a component part of the Kittitas County — Lower Valley 4 of 24 Supplementary General Transfer Station Conditions of the Contract June 18. 2024 finished structure, shall be included in the bid price. (See WAC-20-107 State Department of Revenue Rule 107). 3.7 PERMITS, FEES AND NOTICES Delete Subparagraph 3.7.1 and substitute the following: 3.7.1 The Owner will pay for the plan review and building permit fees. The Contractor will secure and pay for all other permits and governmental fees, licenses and inspections necessary for proper execution and completion of the Work which are customarily secured after execution of the Contract and which are legally required when bids are received or negotiations concluded. 3.7.1.2 The Contractor shall pay for the use of municipal or private property for storage of materials, parking, temporary obstructions, enclosures, opening and patching of streets, etc., off of the property arising from construction and completion of work. The Contractor shall furnish to the Owner and the Architect no later than the preconstruction conference the permit numbers for all trades working on this project and any other required permits that must be obtained through governing agencies. 1. International Building Code 2. NFPA Life Safety Code 3. International Plumbing Code 4. International Mechanical Code 5. National Electrical Code 6. Americans with Disabilities Act (ADA) 7. Federal and State Safety Codes as adapted and/or modified by the State and Local Ordinances 3.9 SUPERINTENDENT Delete Subparagraph 3.9.1 in its entirety and substitute the following: 3.9.1 The Contractor shall employ a competent superintendent who shall be in attendance at the Project site during the progress of the Work. The superintendent shall be satisfactory to the Owner and the Architect and shall not be changed except with the consent of the Owner and the Architect, unless the superintendent proves to be unsatisfactory to the Contractor and ceases to be in his employ. The superintendent shall represent the Contractor and all communication given to the superintendent shall be as binding as if given to the Contractor. Important communications will be confirmed in writing. Other communications will be so confirmed on written request in each case. 3.9.1.1 Contractor shall be responsible to fully inform his Superintendent of all project progress, problems, decisions, changes, and deficiencies as they happen. 3.9.1.2 Unless otherwise agreed in writing, the Superintendent shall remain on the Project site whenever Subcontractors of any tier are present and not less than eight (8) hours per day, five (5) days per week unless the job is closed down due to a legal holiday, a general strike, conditions beyond the control of the Contractor, termination of the Contract in accordance with the Contract Documents, or Final Completion is attained. The Superintendent shall not be changed without the approval of the Owner, which shall not be unreasonably withheld. The Superintendent shall not be employed on any other project during the course of the work. Kittitas County — Lower Valley 5 of 24 Supplementary General Transfer Station Conditions of the Contract June 18, 2024 3.11 DOCUMENTS AND SAMPLES AT THE SITE Add the following Clauses 3.11.1.1 and 3.11.1.2 to 3.11.1: 3.11.1.1 Record drawings shall be kept clean, and notations shall be made using clear, concise drafting techniques acceptable to the Architect. 3.11.1.2 The Contractor shall also maintain at the site for availability of the Owner and/or Architect one copy of all inspection reports and other written communications from the Architect and/or subcontractors, other prime contractors, materials suppliers, etc. Delete Subparagraph 3.18.1 and substitute the following: 3.18.1 Subject to the following conditions, the Contractor shall defend, indemnify, and hold harmless the Owner, the Owner's Agent, and the Architect and their agents, employees, and consultants, successors, and assigns, ('Indemnitee') from and against all claims, damages, losses, and expenses, direct and indirect or consequential, including costs, design professional fees, and attorney's fees incurred on such claims and in proving the right to indemnification, arising out of or resulting from any act or omission of the Contractor, its agents, any of its Subcontractors and Suppliers of any tier, and anyone directly or indirectly employed by the Contractor, any Subcontractors or Suppliers of any tier ('Indemnitor'). Add the following Subparagraphs 3.18.1.1 and 3.18.1.2 to 3.18.1: 3.18.1.1 The Contractor will fully indemnify Indemnitee for the sole negligence of the Indemnitor. 3.18.1.2 To the extent of the Indemnitor's negligence, the Contractor will indemnify Indemnitee for the concurrent negligence of the Indemnitor. The Contractor agrees to be added by the owner or the Architect as a party to any mediation or litigation with third parties in which the Owner or Architect alleges indemnification or contribution from the Contractor, any of its Subcontractors or Suppliers of any tier, any one directly or indirectly employed by any of them, or any one for whose acts any of them may be liable. The Contractor agrees that all of its subcontractors and suppliers of any tier will in the subcontracts, similarly stipulate; in the event any does not, the Contractor shall be liable in place of such Subcontractor(s) or Suppliers of any tier. To the extent any portion of this indemnification provision is stricken by a court for any reason, all remaining provisions shall retain their vitality and effect. Change existing Subparagraph 3.18.2 to 3.18.3 and add the following new subparagraph 3.18.2: 3.18.2 To the fullest extent permitted by law, the Contractor shall indemnify and hold harmless the Owner, Owner's Agent, and the Architect and their agents and employees from all suits, action, claims of any character, damages, losses and expenses, including, but not limited to, attorney's fees, brought on account of any injuries or damages sustained by any person or property in consequence of any neglect in safeguarding the work, or through the use of unacceptable materials in the construction of the improvement, or on account of any act or omission by the Contractor or the Owner or their employees, or agents, or from any claims or amounts arising or recovered under the workmen's compensation laws or any other law, bylaw, ordinance, regulation, order, or decree. During the prosecution of the work the Kittitas County — Lower Valley 6 of 24 Supplementary General Transfer Station Conditions of the Contract June 18, 2024 Contractor shall be responsible for all damage or injury to any person or property of any character resulting from any act, omission, neglect or misconduct in the manner or method of executing said work satisfactorily, or due to the non - execution of said work at anytime, or due to defective work or materials. This responsibility shall include all claims arising from acts before the date of issuance of the Certificate of Substantial Completion. Such obligation shall not be construed to negate, abridge, or otherwise reduce any other right or obligation of indemnity that would otherwise exist as to any part or person described in this Paragraph 3.18. Add the following Subparagraphs to 3.18: 3.18.4 A statement stipulating the provision of indemnity coverage shall be included in the certificate of liability insurance issued to the Owner. 3.18.5 In any and all claims against the Owner or the Architect or any of their agents or employees by any employee of the Contractor, any Subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, the indemnification obligation under this Paragraph 3.18 shall not be limited in any way on the amount or type of damages, compensation or benefits payable by or for the Contractor or any Subcontractor under workmen's compensation acts, disability benefit acts or other employee benefit acts. 3.18.6 The obligations of the Contractor under this Paragraph 3.18 shall not extend to the liability of the Architect, his agents, or employees arising out of (1) the preparation or approval of maps, drawings, opinions, reports, surveys, change orders, designs or specifications, or (2) the giving of or the failure to give directions or instructions by the Architect, his agents or employees provided such giving or failure to give is the primary cause of the injury or damage. ARTICLE 4 - ADMINISTRATION OF THE CONTRACT 4.2.3 ADD the following text: If the Architect believes the work is not being performed in accordance with the Contract Documents, the Architect will advise the Owner in writing of the specific deficiencies. Further, the Architect will recommend to the Owner appropriate actions the Owner should take to correct or mitigate the deficiencies. ARTICLE 5: SUBCONTRACTORS 5.3 ADD the following new subparagraph: 5.3.1 "It is the responsibility of any subcontractor whose work must be applied or installed on or within work of other trades to examine conditions affecting his work. The subcontractor shall notify the Contractor, in writing, with copy to the Architect, of any unsuitable or improperly prepared surfaces or conditions. Commencing work or absence of notification in writing constitutes acceptance of surfaces or conditions by a subcontractor, and it will be his responsibility to correct any defect in his work appearing thereafter." ARTICLE 7 - CHANGES IN THE WORK 7.2 CHANGE ORDERS Add the following new subparagraphs: Kittitas County — Lower Valley 7 of 24 Supplementary General Transfer Station Conditions of the Contract June 18, 2024 7.2.2 Any Change Order prepared, including but not limited to those arising by reason of the parties' mutual agreement or by mediation, shall constitute a final and full settlement of all matters relating to or affected by the change in the work, including, but not limited to, all direct, indirect, and consequential costs associated with such change and any and all adjustments to the Contract Sum and Contract Time. In the event a Change Order increases the Contract Sum, the Contractor shall include the work covered by such Change Order in the Application for Payment as if such work were originally part of the Project and Contract Documents. 7.2.3 Contractor shall promptly respond to Change Order request for proposal within ten (10) calendar days or such longer period as may be mutually acceptable for complex changes. 7.2.4 By the execution of a Change Order, the Contractor agrees and acknowledges that he has had sufficient time and opportunity to examine the change in work which is the subject of the Change Order and that he has undertaken all reasonable efforts to discover and disclose any concealed or unknown conditions which may to any extent affect the Contractor's ability to perform in accordance with the Change Order. Aside from those matters specifically set forth in the Change Order, the Owner shall not be obligated to make any adjustments to either the Contract Sum or Contract Time by reasons of any conditions affecting the change in work addressed by the Change Order which could have reasonably been discovered or disclosed by the Contractor's examination. 7.2.5 When requested by the architect, the contractor shall prepare prices for additional work utilizing Request for Proposal (RFP) Forms. 7.2.6 For ease of administration, the Owner may seek changes in the work via a Proposal that will address a specific change or similar set of changes. Once agreed to, individual Proposals will be packaged into a Change Order. The Contractor shall respond with complete cost estimates to all Proposals within fourteen (14) calendar days. 7.2.7 The Contractor shall provide a cost breakdown for all adjustments in the contract sum, i.e. Change Orders, Proposals, and Construction Change Directives using the methodology described in 7.3.6. Section 7.3.7, 7.3.8, and 7.3.9 shall apply to all changes in the contract including Change Orders and Proposals. 7.3 CONSTRUCTION CHANGE AUTHORIZATION Delete Subparagraph 7.3.5 in its entirety and substitute the following: 7.3.5 Upon receipt of a Construction Change Authorization, the Contractor shall promptly proceed with the change in the Work involved, and within five (5) working days, advise the Architect, in writing, of the Contractor's agreement or disagreement with the cost or method, if any, provided in the Construction Change Directive for Kittitas County — Lower Valley 8 of 24 Supplementary General Transfer Station Conditions of the Contract June 18, 2024 determining the proposed adjustment in the Contract 5urn or Contract Time. If the Contractor disagrees, itshall set forth inwriting and detail the reasons for its disagreement and the amount or other terms that is proposes. WITHOUT SUCH TIMELY WRITTEN NOTICE, THE CONTRACTOR SHALL CONCLUSIVELY 8EDEEMED TO HAVE ACCEPTED THE OWNER'S VALUE ORMETHOD OFADJUSTMENT. The Contractor's disagreement shall innoway relieve the Contractor of its obligation to comply promptly with any written noticed issued by the Owner or Architect. The ultimate adjustment shall not exceed the larger amount under dispute, be it the Contractor's or the Owner's stated figure. The method of the adjustment shall then be determined by the Architect on the basis of reasonable expenditures and savings of those performing the Work attributable to the Change, in strict accordance with this Paragraph 7.3and other applicable provisions ofthe Contract Documents. 7.3.6 In the last sentence, delete "recorded as a" and substitute "incorporated into a future". 7.3.7|nthe first sentence, DELETE the phrase "orif no such amount isset forth ... areasonable amount" and INSERT the phrase "inaccordance with Clauses be(oxv."Delete the last sentence ofSubparagraph 7.3.7and substitute the following: If the Contractor disagrees pursuant to Subparagraph 7.3.5, or if cost is to be determined under Clause 7.3.3.3, the Contractor shall keep and present, in such forms as the Architect may prescribe, an itemized accounting together with supporting data. In order to facilitate checking of such quotations, all proposals, except those so minor that their propriety can be seen by inspection, shall be accompanied by complete itemization of costs, including labor, materials, and subcontract costs. Labor and materials shall be itemized in the manner described below. When major coytitennsarisefrornSuhcontractorsmrSupp|iersofonytier,theseitenns shall also be itemized. Approval may not be given without such itemization. Failure to provide data within ten (IO) calendar days of the Architect's request shall constitute waiver of any Claim for changes in the Contract Time or Contract Sum. The total cost of any change including a Claim under Paragraphs 15.1 or 15.2 shall be limited to the reasonable value as determined by the Architect (subject to appeal through the dispute resolution procedure of Paragraph 15.3\, according tothe following. Unless otherwise agreed inwriting 6«the owner, the cost shall not exceed the lower ofthe prevailing cost for the work in the locality of Project, or the cost of the work in the current editions of the R.S. Means Company, Inc., Building Construction Cost Data. a. Direct Labor Costs These are the estimated labor costs determined by either the estimated or actual number of additional craft hours and the hourly costs necessary to perform the change in Work; or the unit labor costs applied to the material quantities, providing the unit labor costs are developed from the above craft cost; whichever is applicable, according to industry practice. Kit1itasCounty — Lower Valley 9of24 Supplementary General Transfer Station Conditions ofthe Contract June 18.2O24 1. Basic Wages Current hourly wage rates, for all laborers, apprentices, journeyman, crew foreman, and general foreman performing and/or directly supervising the Changed Work on the site. Prior to the first Change in the Work, the General Contractor shall provide, on a form provided by the Owner, Direct Labor Costs for all pay levels for major subcontractors and General Contractor's own forces for review and approval by the Owner and Architect. These approved rates shall be the basis for all Changes in the Work for the Project. The premium portion of overtime wages is not included unless pre -approved by the Owner. 2. Fringe Benefits Fringe benefits paid by the Contractor. 3. Workman's Insurances Direct contributions to the State of Washington or to other carriers as Industrial Insurance. 4. Federal Insurances Direct Contributions required by the Federal Insurance Compensation Act, (FICA); Federal Unemployment Tax Act (FUTA); and the State of Washington Unemployment. b. Direct Material Costs This is an itemization of the quantity and cost of additional materials necessary to perform the change in the Work. These costs shall be determined by the unit costs applied to the quantity and extended. The unit costs shall be based on the following: (1) The net costs after all offered or available discounts or rebates. (2) Freight costs; express charges; or special delivery costs when applicable. No lump sum costs will be allowed except when approved in advance by the Architect. c. Construction Equipment Usage Costs This is an itemization of the actual length of time construction equipment appropriate for the Work will be used solely on the change in the Work at the site times the applicable rental costs as established by the lower of the prevailing rate published in The Rental Rate Blue Book by Data Quest, San Jose, California, or the actual rate paid as evidence by rental receipts. Small tools are not considered equipment and are not separately compensable. Actual, reasonable mobilization costs are permitted if the equipment is brought to the Site solely for the change in the Work. If more than one rate is applicable, the lowest rate will be utilized. The rates in effect at the time of the performance of the Change work are the maximum rates allowable for equipment of modern design and in good working condition and include full compensation for furnishing all fuel, oil, lubrication, repairs, maintenance, and insurance. Equipment not of modern design and/or not in good working condition will have lower rates. Hourly, weekly, and/or monthly rates, as appropriate will be applied to yield the Kittitas County — Lower Valley 10 of 24 Supplementary General Transfer Station Conditions of the Contract June 18, 2024 lowest total cost. The rate for equipment necessarily standing by for future use on the Work shall be 50% of the rate established above. d. Prime Subcontractor's Proposals These are payments the Contractor makes directly to Subcontractors for changes work performed by the Subcontractor of any tier. Subcontractor's cost of Work is to be determined as in a, b, and c above. e. Fees This is the allowance for all combined overhead, profit, and other costs, including all office, home office, and site overhead (including project manager, project engineer, and superintendent's time), and includes delay, acceleration, and impact costs of any kind, added to the total cost to the Owner of any Change Order, Construction Change Directive, Claim or any claim for additional work or extra payment of any kind on this Project. It shall be strictly limited in all cases to the following schedule: (1) Fee by the Contractor When actually Performing the Work A total amount, not to exceed 15% of items a, b, and c above will be allowed. This is to compensate such contractor for all personnel not defined in a (1) above; temporary construction facilities; home office costs; office engineering and estimating costs; and profit plus any other cost incidental to the performance of the change in work. (2) Fee by the Contractor or Subcontractors When not Actually Performing the Work Contractor (a) A total amount not to exceed 6% of the total amount of Subcontractor's proposal as defined in item `d' above will be allowed for the Fee marking up the Work of the Subcontractor's actually performing the change in the Work. (b) No direct labor by the Contractor will be allowed added to a Subcontractor's proposal. Contractor's direct labor, if required, must be submitted as outlined in Direct Labor Costs. (3) Subcontractor Administering but not Performing the Work In the case of a Subcontractor of any tier providing pass -through administration of a change, i.e., a change in which Work is performed by a lower tier Subcontractor to a Subcontractor, the administering Subcontract will be limited to a maximum of 6% Fee on the amount of the changed Work performed by its sub -subcontractor. A maximum total of 15% Fee will be allowed for administration by the administering Subcontractors and Contractor combined on Work performed by lower tier Subcontractors. In no case shall the total amount of Fee computed on a change, including that for Contractor, Subcontractor, or lower tier Sub- Subcontractor, exceed a total of 30%. f. Cost of any Increase or Decrease in Premium by Insurance and Bond Caused by the Change. (1) General Contractor's Liability Insurance Kittitas County — lower Valley 11 of 24 Supplementary General Transfer Station Conditions of the Contract June 18, 2024 To the above, the costs of any changes in a Contractor's Liability Insurance arising directly from changed Work may be added. (2) Bond To the above, the cost of the additional premium for the Contractor's bond arising directly from the changed work may be added. Upon request, the Contractor shall provide the Owner with supporting documentation from its insurer or surety. g. Deductive Changes Items a, b, c, d, and f will be itemized for deleted changes in the Work. h. Additive Changes and Deductive Changes Together (1) If a change in the Work involves both additive and deductive changes, the appropriate Fee amount allowed will be added to the net difference of items a, b, c, and d. (2) If other additive changed items are included in the same change proposal, the appropriate Fee allowed is to be applied to these individual changed items. 7.3.11 ADD the following subparagraph: Overhead is defined as costs for all non - craft labor, temporary construction facilities, field engineering, schedule updating, as -built drawings, home office cost, B&O taxes, office engineering, estimating costs, small tools, safety, insurance and any other cost incidental to the change in the Work. ARTICLE 8 - TIME 8.2.3 The project must be substantially complete and ready for Owner within 450 calendar days of Notice to Proceed. The Owner will incur serious and substantial special, incidental and consequential damages if Substantial Completion does not occur within the Contract Time. 8.2.4 Liquidated Damages. The timely completion of this project is essential to the Owner. The Owner will incur serious and substantial special, incidental and consequential damages if Substantial Completion of the Work does not occur within the Contract Time; however, it would be difficult if not impossible to determine the amount of such damages, which could include, for example, personnel and overtime costs, transportation costs, design fees, governmental fees, storage costs, portable and off -site rental and lost opportunities. Consequently, provisions for liquidated damages are included below. The Owner's right to liquidated damages is not affected by partial completion, occupancy, or beneficial occupancy. The Contractor shall be responsible for and pay the liquidated damages contained in the Contract Documents. .1 If Substantial Completion is not attained within the Contract Time, liquidated damages shall be enforced in the amount of $500 per day for each calendar day thereafter until Substantial Completion is attained. If the Owner elects, he may complete all uncompleted contract work and back -charge the Contractor for all Kittitas County — Lower Valley 12 of 24 Supplementary General Transfer Station Conditions of the Contract June 18, 2024 costs incurred including applicable overhead, in addition to collecting the liquidated damages. For the purposes of this section, "substantial completion" means the ability to safely utilize the facility for its intended purpose, without interference or additional risk to persons or property due to any work remaining to be completed, related equipment, tools and the like. DELAYS AND EXTENSIONS OF TIME: DELETE Paragraph 8.3.1 and replace with the following paragraph: 8.3.1 If the Contractor is delayed at any time in the commencement or progress of the Work by an act or neglect of the Owner or Architect, or of an employee of either, or of a separate contractor employed by the Owner, or by changes ordered in the Work, or by labor disputes, fire, unavoidable casualties or other causes beyond the contractor's control, or by delay authorized by the Owner pending mediation, or by other causes which may justify delay as determined both by the Architect and Owner, then the Contract Time shall be extended by Change Order for such reasonable time. Delete the words "and arbitration" from Subparagraph 8.3.1. ADD new Paragraph 8.3.4 8.3.4 The Contract time shall be adjusted only for changes in the work pursuant to Article 7, and excusable delay pursuant to this Paragraph 8.3 as determined by the Architect. In the event the Contractor requests an extension of the Contract time, he shall furnish such justification and supporting evidence as the Architect may deem necessary for a determination as to whether the Contractor is entitled to an extension of time under this Contract. After receipt of such documentation, the Architect shall make his findings of fact and so advise the Contractor in writing. The determination shall be based upon the approved Contractor's schedule current at the time of the delay. ARTICLE 9 - PAYMENTS AND COMPLETION CONTRACT SUM: ADD the following to Paragraph 9.1: CHANGE Subparagraph 9.1.1 to include the requirement that the Contract Sum and adjustment thereof shall include all taxes imposed by law except the Washington State Sales Tax, which will be paid by the Owner to Contractor, who shall pay tax to the State of Washington in accordance with the law. 9.2 SCHEDULE OF VALUES Add the following to Subparagraph 9.2.1: This schedule shall allocate at least 1% of the Contract Sum, (in addition to the statutory retainage described in Subparagraph 9.3.4) to that portion of the Work between Substantial Completion and Final Completion, to be entitled "Final Documentation and Project Closeout", which will be paid as part of the final payment. This requires the Contractor to recognize that the Contractor and its subcontractors will expend significant costs in bringing the Work from Substantial to Final Completion, including, for example, the training of Owner's personnel and submittal requirements of the Contract Documents. Kittitas County — Lower Valley 13 of 24 Supplementary General Transfer Station Conditions of the Contract June 18. 2024 9.3 APPLICATIONS FOR PAYMENT 9.3.1 In the first sentence, delete "At least ten days" and substitute "on or before the date of the last construction meeting of the month, but not less than twenty-one (21) days..." Add the following Clause 9.3.1.3 and 9.3.1.4 to 9.3.1: 9.3.1.3 Until substantial completion, the Owner will pay ninety-five (95) percent of the amount due the Contractor on account of progress payments. 5% will be held as retainage. 9.3.1.4 Payments to Subcontractors: No payment request shall include amounts the Contractor does not intend to pay a Subcontractor or Supplier because of a dispute or other reason. If, after making a request for payment but before paying a Subcontractor or Supplier for its performance covered by the payment request, the Contractor discovers that part or all of the payment otherwise due to the Subcontractor or Supplier is subject to withholding from the Subcontractor or Supplier under the subcontract for unsatisfactory performance, the Contractor may withhold the amount as allowed under the subcontract, but it shall give the Subcontractor, the Owner, and the Architect written notice of the remedial actions that must be taken as soon as practicable after determining the cause for the withholding but before the due date for the Subcontractor/Supplier payment and pay the Subcontractor/Supplier within eight (8) working days after the Subcontractor/Supplier satisfactorily completes the remedial action identified in the notice. 9.3 ADD new subparagraph as follows: 9.3.4 If any obligations enumerated in Subparagraph 9.3.3 above are not promptly paid (or if any of such liens are not promptly discharged), the Owner may, at his option, make such payments (and secure such discharge) and charge against the Contract Sum or otherwise recover from the Contractor the amount of such payments and all costs (including, but not limited to, attorneys' fees) incurred by the Owner in connection with such payment (and for securing such discharge). CERTIFICATES FOR PAYMENT: ADD sentence to Subparagraph 9.4.2 to read: "Payment will not constitute a waiver of any claims by the Owner that the Work fails to comply with the Contract Documents." 9.6.3 Add the following to Subparagraph 9.6.3: The Owner, at his discretion, shall have the right to require the General Contractor to provide an audit of all payments made to Subcontractors and Suppliers. The Owner shall also have the right to require the General Contractor to furnish verification of payments made and/or Release of Claims for Payments on Owner - provided form from each Subcontractor and Supplier with each pay application. 9.6 ADD new subparagraphs 9.6.8 through 9.6.14 as follows: Kittitas County — Lower Valley 14 of 24 Supplementary General Transfer Station Conditions of the Contract June 18. 2024 9.6.8 At Contractor' request upon commencement of the Work, an escrow account shall be established in a financial institution chosen by the Contractor and approved by the Owner. 9.6.9 The escrow agreement shall provide that the financial institution will act as escrow agent, will pay interest on funds deposited in such account in accordance with the provisions of the escrow agreement and will disburse funds from the account upon the direction of the Owner as set forth below. Compensation to the escrow agent for establishing and maintaining the account shall be paid from interest accrued in the escrow account. 9.6.10 As each progress payment is made, the retainage with respect to that payment shall be deposited by the Owner in the escrow account. 9.6.11 The interest earned on funds in the account shall accrue for the benefit of the Contractor until the completion date named in the Construction Contract or the expiration of any authorized extension of such date. Interest earned after such date shall accrue to the benefit of the Owner. Cost of compensation to the escrow agent paid out of interest earned shall be borne by the Contractor. 9.6.12 When the Contractor has fulfilled all of the requirements of the Contract providing for reduction of retained funds, the escrow agent shall release to the Contractor one-half of the accrued funds but none of the interest thereon. When the Work has been fully completed in a satisfactory manner and the Architect has issued a final Certificate for Payment, the escrow agent shall pay to the Contractor the full amount of funds remaining in the account, including net balance of interest paid to the account, but less any interest accrued for the benefit of the Owner, which shall be paid to the Owner. 9.6.13 If, after Substantial Completion of the Work, final completion thereof is materially delayed through no fault of the Contractor, the escrow agent shall make payment to the Contractor as provided in Subparagraph 9.10.3. 9.6.14 No certificate given or payment made shall be evidence of the performance of the Contract, either wholly or in part, against the claim of the Owner to the contrary, and no payment shall be construed to be an acceptance of any defective work which may before or afterwards appear. 9.10.3 INSERT the phrase "in writing" in the first sentence to read as follows: ... affecting final completion, and the Architect so confirms in writing, the Owner. . ARTICLE 10 - PROTECTION OF PERSONS AND PROPERTY 10.2.1 ADD the following new clause: .4 Contractor shall specifically provide control of on -site pedestrians during all access to site by construction vehicles or construction material delivery vehicles. Provide all Kittitas County — Lower Valley 15 of 24 Supplementary General Transfer Station Conditions of the Contract June 18, 2024 vehicles with audible warning signals and guides during the backing of vehicles. ARTICLE 11- INSURANCE 11.1.1.1 ADD new text to the end of the clause as follows: ... including private entities performing Work at the site and exempt from the coverage on account of number of employees or occupation, which entities shall maintain voluntary compensation coverage at the same limits specified for mandatory coverage for the duration of the Project; 11.1.1.2 ADD new text to the end of the clause as follows: ... or persons or entities excluded by statute from the requirements of Clause 11.1.1.1 but required by the Contract Documents to provide the insurance required by that Clause; 11.1.1 ADD new Clauses 11.1.1.9 and 11.1.1.10 as follows: 9 Liability insurance shall include all major divisions of coverage and be on a comprehensive basis including: 1. Premises Operations (including X, C and U coverages applicable). 2. Independent Contractors' Protective. 3. Products and Completed Operations. 4. Personal Injury Liability with Employment Exclusion deleted. 5. Contractual, including specified provision for Contractor's obligation under Paragraph 3.18. 6. Owned, non -owned and hired motor vehicles. 7. Broad Form Property Damage including Completed Operations. .10 If the General Liability Coverages are provided by a Commercial General Liability Policy on a claims -made basis, the policy date or Retroactive Date shall predate the Contract; the termination date of the policy or applicable extended reporting period shall be no earlier than the termination date of coverages required to be maintained after final payment, certified in accordance with Subparagraph 9.10.2. Regardless of termination date of insurance all coverages should extend to the end of any applicable limitations (Statue of Limitations). 11.1.2 ADD the following clause:1 The Contractor shall secure and maintain in effect at all times during performance of the Work such insurance required by Subparagraph 11.1.1 and/or as stated below, to protect the County ("Owner"), Contractor, its Support and the Additional Insureds from all claims, losses, harm, costs, liabilities, damages and expenses arising out of personal injury (including death) or property damage that may result from performance of the work or this Agreement, whether such performance is by Contractor or any of its Support. All insurance shall be issued by companies admitted to do business in the State of Washington and have a rating of A-, Class VII or better in the most recently published edition of Best's Reports unless otherwise approved by the County. If an insurer is not admitted, all insurance policies and procedures for issuing the insurance policies must comply with Chapter 48.15 RCW and 284-15 WAC. Kittitas County — Lower Valley 16 of 24 Supplementary General Transfer Station Conditions of the Contract June 18, 2024 The Contractor shall provide proof of insurance for: El Commercial General Liability Insurance Coverage limits not less than: • $5,000,000 per occurrence • $1,000,000 products & completed operations aggregate • $1,000,000 personal and advertising injury, each offense • Certificate Holder — Kittitas County • The Certificate must name the County as additional insured • Sixty (60) days written notice to the County of cancellation of the insurance policy r` Commercial Automobile Liability Insurance (if ANY use of vehicle in performance) Automobile Liability for owned, non -owned, hired, and leased vehicles (MCS 90 endorsement and a CA 9946 endorsement must be attached if 'pollutants' are to be transported) ■ Coverage limits not less than: • $1,000,000 combined single limit ■ Thirty (30) days written notice to the County of cancellation of the insurance policy. Z Workers' Compensation Workers' Compensation in amounts required by law. Z Stop Gap/Employers Liability Coverage limits not less than: • $1,000,000 each accident • $1,000,000 disease — policy limit • $1,000,000 disease —each employee ■ Thirty (30) days written notice to the County of cancellation of the insurance policy. E, Professional Liability The Contractor and/or its Subcontractor and/or its consultant providing professional services shall provide evidence of Professional Liability Insurance covering professional errors and omissions. Such policy must provide the following minimum limits: ■ $1,000,000 per claim Kittitas County — Lower Valley 17 of 24 Supplementary General Transfer Station Conditions of the Contract June 18. 2024 ■ $2,000,000 annual aggregate ■ If insurance is on a claims -made form, its retroactive date, and that of all subsequent renewals, shall be no later than the effective date of this Agreement. 0 Property Damage The Contractor shall provide a policy that covers damage to Kittitas County facilities, including buildings, equipment, grounds, etc. Such policy shall provide the following minimum coverage: • $1,000,000 per occurrence 0 Umbrella Coverage Umbrella policies shall provide coverage at least as broad as specified for underlying coverages (CGL, Auto, Employer's Liability) and cover those insured in the underlying policies, including additional insured. • Amount required for this Agreement: $5,000,000 Contractor shall furnish the County a Certificate of Insurance to include the Policy Endorsements/Exclusions as evidence that policies providing insurance required by this Agreement are in full force and effect. Contractor hereby waives all rights of recourse, including any right to which another may be subrogated, against Kittitas County for personal injury, including death, and property damage. Contractor's insurance policies required above shall be primary insurance and shall be non-contributing with any other insurance maintained by Kittitas County. The Contractor shall assume full responsibility for all loss or damage from any cause whatsoever to any tools, Contractor's employee -owned tools, machinery, equipment, or motor vehicles owned or rented by the Contractor, or the Contractor's agents, suppliers or contractors as well as to any temporary structures, scaffolding and protective fences. The Contractor shall have sole responsibility for ensuring the insurance coverage and limits required are obtained by subcontractors. NOTE: No contract shall form until and unless a copy of the Certificate of Insurance with Endorsements/Exclusions, properly completed and in the amount required, is attached hereto. Failure of the Contractor to fully comply with the above insurance requirements during the term of the Agreement shall be considered a material breach of contract and cause for immediate termination of the Agreement at the County's discretion. Alternatively, the County may procure and maintain, at the Contractor's sole expense, insurance to the extent deemed proper up to the amount of the required coverage(s). The County may offset the cost of such insurance against payment due to the Contractor under this Agreement. 11.3.1 REVISE the first sentence by deletion of the phrase "Unless otherwise provided, the Owner" and insert text to read as follows: Kittitas County — Lower Valley 18 of 24 Supplementary General Transfer Station Conditions of the Contract June 18, 2024 The Contractor shall purchase and maintain, in a company ... 11.3.1 ADD text to the end of the subparagraph as follows: The form of policy for this coverage shall be Completed Value. if the Owner is damaged by the failure of the Contractor to maintain such insurance, then the Contractor shall bear all reasonable costs properly attributable thereto. 11.3.1 DELETE Clause 11.3.1.2 and Clause 11.3.1.3 11.3.3 DELETE last sentence. 11.3.4 DELETE Subparagraph 11.3.4. 11.3.6 DELETE Subparagraph 11.3.6 as published and INSERT the following: 11.3.6 Before an exposure to loss may occur, the Contractor shall file with the Owner two certified copies of the policy or policies providing this Property Insurance coverage, each containing those endorsements specifically related to the Project. Each policy shall contain a provision that the policy will not be canceled or allowed to expire until at least 30 days prior written notice has been given to the Contractor. 11.3.7 REVISE text by substituting the word "Contractor" for "Owner" at the end of the first sentence. 11.3.8 REVISE text by substituting "Contractor" for "Owner" as fiduciary; except that at the first reference to "Owner" in the first sentence, the word "this" should be substituted for "Owner's." 11.3.9 REVISE entire text by substituting the word "Contractor" for "Owner" each time the latter word appears. 11.3.10 REVISE entire text by substituting the word "Contractor" for "Owner" each time the latter word appears. 11.4 DELETE Subparagraph 11.4.1 as published and INSERT the following subparagraph and clauses: 11.4.1 The Contractor shall furnish bonds covering the faithful performance of the Contract and payment of obligations arising thereunder. Bonds may be obtained through the Contractor's usual source and the cost thereof shall be included in the Contract Sum. The amount of each bond shall be equal to 100 percent of the Contract Sum. 1 The Contractor shall deliver the required bonds to the Owner not later than three days following the date the Agreement is entered into, or if the Work is to be commenced prior thereto in response to a letter of intent, the Contractor shall, prior to the commencement of the Work, submit evidence satisfactory to the Owner that such bonds will be furnished. Kittitas County — Lower Valley 19 of 24 Supplementary General Transfer Station Conditions of the Contract June 18, 2024 2 The Contractor shall require the attorney -in -fact who executes the required bonds on behalf of the surety to affix thereto a certified and current copy of the power of attorney. ARTICLE 13 - MISCELLANEOUS PROVISIONS TESTING AND INSPECTION: ADD the following subparagraph: 13.5.1.1 The Owner shall employ and pay for the services of an independent agency, testing laboratory or other qualified firm to perform services which are the Owner's responsibility as defined by the International Building Code and the "Special Inspection Manual" for the International Building Code. 13.8 ADD the following paragraph and subparagraphs: 13.8 EQUAL OPPORTUNITY 13.8.1 Comply with Owner's affirmative action programs as well as all other applicable State of Washington and Federal regulations. 13.8.3 The Contractor shall maintain policies of employment as follows: 13.8.3.1 The Contractor and the Contractor's Subcontractors shall not discriminate against any employee or applicant for employment because of race, religion, color, sex or national origin. The Contractor shall take affirmative action to insure that applicants are employed, and that employees are treated during employment without regard to their race, religion, color, sex or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the policies of nondiscrimination. 13.8.3.2 The Contractor and the Contractor's Subcontractors shall, in all solicitations or advertisements for employees placed by them or on their behalf, state that all qualified applicants will receive consideration for employment without regard to race, religion, color, sex or national origin. 13.9 ADD the following paragraph and subparagraphs: 13.9 CODES AND LAWS 13.9.1 Comply with applicable provisions of Revised Codes of Washington (RCW), including but not limited to the following (this listing is not intended to limit applicable RCWs but to emphasize the following): 1 Wage Rates, RCW 39.12. 2 Nondiscrimination, RCW 49.60. 3 Hours of Labor, RCW 49.28. 4 Contractor's Bond, RCW 39.08. 5 Contractor's Regulations, RCW 18.27. 6 Handicapped Provisions, RCW 70.92. Kittitas County — Lower Valley 20 of 24 Supplementary General Transfer Station Conditions of the Contract June 18. 2024 7 Offshore Items, RCW 39.25 8 Drug Free Workplace, comply with Federal, State and local laws including Drug -Free Workplace Act of 1988. 9 Tobacco -Free Environment, RCW 28A.210.310. 10 Safety Standards, RCW 49.17 and Chapters 296-155 WAC. 11 Apprenticeship Utilization, RCW 39.04.320. The Contractor shall provide the following information to the Owner: 1. Contractor name and address. 2. Contract number. 3. Project name. 4. Contract value. 5. The date of the Contractor's notice to proceed. 13.9.2 Comply with all applicable Federal, State, County and municipal laws and ordinances, including but not limited to, the following (latest adopted editions): 1. International Building Code 2. International Plumbing Code 3. International Mechanical Code 4. National Electrical Code 5. Washington Industrial Safety and Health Administration regulations. 6. Other Federal and State safety regulations. 7. Washington Administrative Code Chapter 51-20. 8. International Fire Code. 9. Adaptations or modifications of any of the above by State and local ordinance. 13.9.3 The Contractor shall hereby protect and hold harmless the Owner from all damages and extra costs arising from violation of any laws, rules and regulations. ARTICLE 15 - CLAIMS AND DISPUTES Delete Subparagraph 15.1.2 and substitute the following: 15.1.2 Time Limits on Claims. A Claim, including those in connection with concealed or unknown conditions by either party must be made by written notice to the Architect within ten (10) days from the date of the occurrence of the event or discovery of the condition giving rise to the Claim or within ten (10) days from the date that the Claimant knew or should have known of the event or condition. Unless the Claim is made within the aforementioned time requirements, it shall be deemed to be waived. The written notice of Claim shall include a factorial statement of the basis for the Claim, pertinent dates, contract provisions offered in support of the Claim, additional materials offered in support of the Claim, and the nature of the resolution sought by the Claimant. The Architect will not consider, and the Owner shall not be responsible or liable for, any claims from subcontractors, suppliers, manufacturers or other persons or entities not a party to this contract. Once a Claim is made, the Claimant shall cooperate with the Architect and the party against whom the Claim is made in order to mitigate the alleged or potential damages, delay or other adverse consequences arising out of the condition. Kittitas County — Lower Valley 21 of 24 Supplementary General Transfer Station Conditions of the Contract June 18. 2024 15.1.2 ADD the following new clause: .1 Any claim of the Contractor against the Owner for damages, additional payment for any reason, or extension of time, whether under the Contract or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim therefor is made pursuant to and in strict accordance with the applicable provisions of the Contract, or, if no such provision is applicable, unless such claim is set forth in detail in writing and received by the Owner within ten (10) days after the facts upon which such claim is based become known or should have become known to the Contractor. No act, omission, or knowledge, actual or constructive, of the Owner or the Architect shall in any way be deemed to be a waiver of the requirement for timely written notice unless the Owner provides the Contractor with an explicit, unequivocal written waiver of timely notice. Add Subparagraph 15.1.4.1 as follows: 15.1.4.1 Final Payment to Contractor Acceptance of final payment by the Contractor shall constitute a waiver of Claims as described in Subparagraph 9.10.4. Add Subparagraph 15.1.4.2 as follows: 15.1.4.2 Change Orders The execution of a Change Order shall constitute a waiver of Claims by the Contractor arising out of the Work to be performed or deleted pursuant to the Change Order, except as specifically described in the Change Order. General reservations of rights will be deemed waived and void. CLAIMS FOR ADDITIONAL TIME: ADD the following to Paragraph 15.1.5.2: Source of the weather data to be used in documenting weather delays will be NOAA (National Oceanic and Atmospheric Administration). 15.2.2 INSERT the phrase "in writing" in the first sentence to read as follows: The initial decision maker will review Claims and within ten days of the receipt of the claim take one or more of the following actions in writing: 15.2.4 INSERT the phrase "in writing" in the first sentence to read as follows: If the initial design maker requests a party in writing to provide a written response to a Claim or to furnish additional supporting data, such party shall respond, within ten days after receipt of such request, and shall either (1) provide a written response on the requested supporting data, (2) advise the initial decision maker in writing when the response or supporting data will be furnished or (3) advise the initial decision maker that no supporting date will be furnished. Upon receipt of the response or supporting data in writing, if any, the initial decision maker will recommend to the Owner whether to reject or approve the Claim in whole or in part. 15.2.7 REVISE the last sentence to read as follows: "If the claim relates to a possibility of a contractor's default, the Owner shall notify the surety and request the surety's assistance in resolving the controversy." Kittitas County — Lower Valley 22 of 24 Supplementary General Transfer Station Conditions of the Contract June 18. 2024 Delete Subparagraph 15.2.8 in its entirety. Add the following to subparagraph 15.2: 15.2.9 The Contractor shall submit all Claims to the Owner and the Architect in writing within ten (10) days of the discovery of the event(s) giving rise to them and shall include a clear description of the Claim, the proposed change in the Contract Sum and/or Time of the Claim, and provide data supporting the Claim. The Claim shall be deemed to include all direct and indirect changes in cost and in time to which the Contractor as well as Subcontractors and Suppliers of any tier are entitled. Prior to the initiation of the dispute resolution procedure, the Owner or its representatives shall have the right to audit and copy the Claim -related books and records of the Contractor and of any Subcontractor or Supplier of any tier whose claim is a part of or included in the Claim. The claim of a Subcontractor or Supplier of any tier may be brought only through the Contractor and only after the Contractor notifies the Owner in writing that the Contractor has reviewed the Claim and believes to be meritorious. 15.3 MEDIATION In Subparagraph 15.3.2 delete the third sentence. Add the following to Subparagraph 15.3: 15.3.4 Mediation If the Claim is not resolved in the dispute resolution procedure, neither the Contractor nor any Subcontractor or Supplier of any tier many bring a claim against the Owner in litigation unless the claim is first subject to nonbinding mediation before a single mediator under the Voluntary Construction Mediation Rules of the American Arbitration Association. This requirement cannot be waived except by an explicit written waiver signed by the Owner and the Contractor. An officer of the Contractor and the Superintendent of the Owner, both having full authority to settle the claim, must attend the mediation session. To the extent there are other parties in interest, such as the Architect, Subcontractors or Suppliers of any tier, their representatives, with full authority to settle the claim, shall also attend the mediation session. Unless the Owner and the Contractor mutually agree in writing otherwise, all unresolved Claims on the Project shall be considered at a single mediation session which shall occur prior to Final Acceptance by the Owner. The Contractor is responsible for initiating the mediation procedure. 15.3.5 Litigation The Contractor may bring no litigation on claims unless such Claims have been properly raised and considered in the procedures of Subparagraphs 15.2.1 through 15.2.3 above. All unresolved Claims of the Contractor shall be waived and released unless the Contractor has complied with the time limits of the Contract Documents and litigation is served and filed within the earlier of; (a) 120 days after the Date of Substantial Completion designated in writing by the Owner, (b) 60 days after Final Acceptance. (These dates will be tolled during the pendency of a mediation Kittitas County — Lower Valley 23 of 24 Supplementary General Transfer Station Conditions of the Contract June 18, 2024 proceeding.) This requirement cannot be waived except by an explicit written waiver signed by the Owner. 15.3.6 The Contractor shall diligently carry on the Work and maintain the Contractor's Construction Schedule during any dispute resolution proceedings, unless otherwise agreed by it and the Owner in writing. 15.4 Arbitration Delete entirely all Subparagraphs in 15.4. END OF SUPPLEMENTARY GENERAL CONDITION Kittitas County — Lower Valley 24 of 24 Supplementary General Transfer Station Conditions of the Contract June 18, 2024 Unanticipated Find plan Language Post copies of this Ilan throughout the construction area. If ground -disturbing activities encounter human skeletal remains during the course of construction, then all activity will cease that may cause further disturbance to those remains, The area of the find will be secured and protected from further disturbance. The finding of human skeletal remains will be reported to the county medical examiner/coroner and local law enforcement in the most expeditious manner possible. The remains will not be touched, moved, or further disturbed. The county medical examiner/coroner will assume jurisdiction over the human skeletal remains and make a determination of whether those remains are forensic or non -forensic. if the county medical examiner/coroner determines the remains are non -forensic, then they will report that finding to the Department of Archaeology and Historic Preservation (DAHP), who will then take jurisdiction over the remains. The DAHP will notify any appropriate cemeteries and all affected tribes of the find. The State Physical Anthropologist will make a determination of whether the remains are Indian or Ikon -Indian and report that finding to any appropriate cemeteries and the affected tribes. The DAHP will then handle all consultations with the affected parties regarding the future preservation, excavation, and disposition of the remains. In the event any archaeological or historical materials are encountered during project activity, work in the immediate area (initially allowing for a 10' buffer, this number may vary by circumstances) must stop, and the following actions must be taken; 1. Implement reasonable measures to protect the discovery site, including appropriate stabilization of covering. 2. Take reasonable steps to ensure the confidentiality of the discovery site. 3. Take reasonable steps to restrict access to the discovery site. The project proponent will notify the concerned Tribes and all appropriate county, state, and federal agencies, including the Department of Archeology and Historic Preservation (SHPO for Washington). The agencies and the Tribe(s) will discuss possible measures to remove or avoid cultural material. They will reach an agreement with the project proponent regarding actions to be taken and the disposition of the material. See Revised Code of Washington, Chapter 27.53, "Archaeological Sites and Resources," for applicable state laws and statutes. See Washington Executive Order 21-02 (formerly05-05) "Archaeological and Cultural Resources." Additional state and federal law(s) may also apply, When to stop work: Construction work may uncover previously unidentified Native American or Euro-American artifacts. This may occur for various reasons but may be associated with access restrictions during project development or if the area contains impervious surfaces throughout most of the project area, which would have prevented standard archaeological site discovery methods. Work must stop when the fallowing types of artifacts and/or features are encountered: Native American artifacts may include (but are not limited to): ■ Flaked stone tools (arrowheads, knives, scrapers, etc.) • Waste flakes that resulted from the construction of flaked stone tools. • Ground stone tools like mortars and pestles. ■ Layers (strata) of discolored earth resulting from fire hearths. It may be black, red, or mottled brown and often contain discolored, cracked rocks or dark soil with a broken shell • Human remains • Structural remains- wooden beams, post holes, fish weirs Euro-American artifacts may include (but are not limited to): • Glass (from bottles, vessels, windows, etc.) * Ceramic (from dinnerware, vessels, etc.) • Metal (nails, drink/food cans, tobacco tins, industrial parts, etc.) • Building materials (bricks, shingles, etc,) • Building remains (foundations, architectural components, etc.) • Old Wooden Posts, pilings, or planks (these may be encountered above or below water) • Even what looks to be old garbage could very well be an important archaeological resource • Remains of ships or sea -going vessels, marine hardware, etc. • Old farm equipment may indicate historic resources in the area When in doubt, call it in! CONTACTS: Project Proponent. Kittitas County Solid Waste Jurisdiction: Kittitas County Contact Name: Patti Stacey Phone/Email: 509-962-7542/ Patti. Stacey@co.kittitas.wa.us Public Works Board (PWB) Sheila Richardson Broadband Program Director & Tribal Liaison 564.999.1927 or PWBCulturalReyew@commerce.wa.gov Department of Archeology and Historic Preservation (DAMP) Rob Whitlam, Ph.D., State Archeologist 360.890.2615 or rob.whitiam@dahp.wa.gov Confederated Tribes of the Colville Reservation Guy Moura, Tribal Historical Preservation Office 509.634.2695 or [:uy.n�+sua a{tr c�jlvilletrihc.t'rr�ii Sauk-Suiattle Indian Tribe Benjamin Joseph, Tribal Historical Preservation Office 360.436.0333 or bioserfli(a s:�t�l:-sui:�ttic.c�rirr Continued on the next page Snoqualmie Indian Tribe Steve Moses, Tribal Historical Preservation Office 425.292.0249 ext 2010 or steve a,)sno ualmietribe.us Confederated Tribes and Sands of the Yakama Nation Casey Barney, Tribal Historical Preservation Office 509.865.5121 ex 4378 or casey. barney&vakarim,com Wanapum Tribe Honorable Rex Buck, Jr. 509.764.0500 x 3113 or rbuckCrr'gYcnircl.org FINAL GEOTEC1 LAICAL REPORT KITTITAS COUNTY TRANSFER STATION ELLENSBURG, WASHINGTON HWA Project No. 2022-188-21 SCS Engineers Inc. June 13, 2023 "0 GEOSCIENCES INC. DBElMWBE Geotechnical Engineering Pavement Engineering Geoenaironmental Hydrogeology Inspection & Testing June 1 ?. 2023 H WA Project No. 2022- l tilt-21 SCS Engineers, Inc. 2405 Isn't' Avenue, Suite 107 Bellvvue, WA 09005 \11C11tii+n Iorn Parker, P.E. Suhjccl: FIN %L CF.O'1'ECIItiw-m. Rh.11014T Kittita►s ('aunt)' Transfer Station ProJect Ellenshurg, \1 asltsnt;tou Dear Tom, As authorized.. HWA G oSciences Inc. I I iNVA) has undertaken a g,coteclinicaI invest igtttIt, n I',I the proposed new irunster station in Ellensburg, Kitlitas Counly. Washington. Tho atlached until report summarizes the rt Suits ol'our geoteclinicul investigation and proN ides our geotechnical recommendations iM doign and constructic,n of thc nov facilities. Please review and comment ,d ytxn• earliest convenience. We appreciate the opportunity to provide geotechntcal services on ibis projicct. ineerely. FINVA CEOSCIt WTS INC. Sire)» E. Greene. L.E.G, Senior Ejngincering Geologist S1.(i:Jl (+.sq JoLyn Gillie P.E. GeotcOmical Engineer. Principal TABLE OF CONTENTS Pam 1.0 INTRODUCTION ---------------------------------. 2 LlGENERAL ....................................................................................................... 2 1.2 PROJECT DESCRIPTION --------------.------------.Z 1.3 SCOPE 06SERVICES AND AUTHORIZATION -----------------.3 7.0 FIELD EXPLORATION AND LABORATORY TESTING ................................... 3 2] FIELD EXPLORATION ----------------------------.3 2.2 LABORATORY TBSTlNG--------------------------'/1 2.3 EXISTING GEOTECHNICAL DATA ................................................................... 5 ].AGENB[lAL SITE CONDITIONS ............................................................................. 5 3.1 SITE DESCRIPTION -----------------------------'5 3.2 GENERAL GEOLOGY ...................................................................................... 6 3.3 SUBSURFACE CONDITIONS ............................................................................ h 3.3.1 Soil Descriptions -------------------------6 3.4 GROUND WATER ........................................................................................... 7 3.5 SOIL8------------------------------------J 4.0 CONCLUSIONS AND RECOMMENDATIONS ............................................ ...... 7 4.1 GENERAL ....................................................................................................... 7 4.2 SEISMIC DESIGN PARAMETERS ......................................................... ............ 8 4.3 LIQUEFACTION POTENTIAL ............................................................................ 9 4/4 FOUNDATIONS -------------------------------..9 4/4] Bearing Capacity for Footings ------------------l0 4.4.2 Lateral Resistance .......................................................................... lU 4'4.3 Settlement ...................................................................................... lA 4.5 FLOOR SLABS ................................................................................................ l| 4.5.1 General .......................................................................................... ll 4.5.2 Settlement Considerations for Tipping Floor Slab ........................ l| 4.6 FOOTING DRAINS .......................................................................................... l2 4.7 TRANSFER STATION RETAINING WALLS ....................................................... l2 4.7.1 Wall Foundations ................................................................. ........ l2 4.7.2 Lateral Earth Pressures .................................................................. l2 4.7.3 Wall Drainage--------------------------..l] 4.8 PERMANENT FILL SLOPES .............................................................................. l3 4.9 COMPOST AREA -------------------..l3 4.|UUTILITIES ...................................................................................................... 4 4.10.1 Bedding and Pipe Support --------------------]4 4.lU2Trench IBackfiU.............................................................................. l5 4]1PAVBMBNT CONSIDERATIONS ------------------------|5 4.11.1 Subgrade Preparation for Areas b]bcPaved ................................. l5 June 13, 2023 HWA Project No. 2022-188-21 4.11.3 Pavement Structure Requirements .......................... 4.11.4 HMA Design Considerations .......................... 4.11.5 HMA Binder Selection .................................... 4.11.6 Pavement Construction .................................... 4.11.7 Differential Settlement of Roads ..................... 4.12 GENERAL EARTHWORK CONSIDERATIONS ...................... 4.12.1 Subgrade Preparation for Foundations ............ 4.12.2 Structural Fill and Compaction ....................... 4123G dW t C t I ...................17 ...................20 I ... I......................21 ...........................21 ...........................22 ...........................22 ...........................22 ...........................22 . roun a er on IV ...................................................................23 4.12.4Temporary Slope Cuts...................................................................23 4.12.5 Temporary Excavations.................................................................24 4.12.6 Erosion and Sediment Control......................................................24 4.12.7 Wet Weather Earthworks..............................................................24 5.0 CONDITIONS AND LIMITATIONS......................................................................25 6.0 REFERENCES.........................................................................................................27 LIST OF FIGURES (FOLLOWING TEXT) Figure 1 Site Vicinity Map Figure 2 Site and Exploration Plan Figure 3 Geologic Map Figure 4 Soils Map Figure 5 Unsuitable Soils Map Appendices Appendix A: HWA Exploration Soil Logs Figure A -I Legends of Terms and Symbols Used on Exploration Logs Figures A-2 — A-9 Soil Test Boring Logs Appendix B: Laboratory Test Results Figure B-1 Summary of Material Properties Figures B-2 & B-4 Particle -Size Analysis Data Plots Figure B-5 Liquid Limit, Plastic Limit and Plasticity Index of Soils Figures B-5 & B-6 Laboratory Compaction Characteristics of Soil Figures B-7 & B-8 CBR (California Bearing Ratio) of Compacted Soils Figures B-9 & B-10 One Dimensional Consolidation of Soils Appendix C: Logs of Previous Explorations Figures C-1 through C-5 Soil borings Conducted by Jacobs (2020) Figures C-6 through C-16 Test Pit Excavations Conducted by Jacobs (2019) 2022-188-21 KCTS — Final Geotechnical Report 3 HWA GEOSCIENCES INC. FINAL GEOTECHNICAL REPORT KITTITAS COUNTY TRANSFER STATION ELLENSBURG, WASHINGTON 1.0 INTRODUCTION 1.1 GENERAL This report presents the results of geotechnical investigative work for the proposed new transfer station and associated improvements for the new Kittitas County Transfer Station in Ellensburg, Washington, at the location indicated on the Vicinity Map, Figure 1. The purpose of this investigation was to evaluate the subsurface conditions at the various locations proposed to accommodate facilities on site and provide geotechnical recommendations for design and construction of the new facilities. This work was accomplished as part of the SCS design team effort for the project. 1.2 PROJECT DESCRIPTION The project site for the new transfer station is located adjacent to the Ellensburg Cement Products facility about 2.5 miles northwest of downtown Ellensburg, Washington (Figure 1). Access to the property is from Highway 97. In addition to the transfer station building, improvements consisting of access roadways, a compost area, scale facilities, recycling and white goods lay down areas, an administration building, and parking will be constructed. The approximate locations of these new improvements are shown on the Site and Exploration Plan, depicted on Figure 2. The existing site access road exits to the east off Highway 97, then continues along the southern site perimeter before turning north at the southeast property corner. Traffic flow generally proceeds in a counterclockwise loop that precedes to the scales, then turns west to provide access to the compost facility and transfer station. An internal access road loops around the transfer station providing access to the white goods and tire recycling areas before re -connecting with the main access road west of the scale facility. The recycling area, moderate risk waste (MRW) building, and administration building are accessed by turning left at a turn-off about 200 north of the southeast site corner before reaching the scale facility. The scale facility is proposed to consist of a set of laterally off -set drive -on scales separated by a small island containing the scale house. The present design for the new transfer station consists of a structure, comprised of a large, covered tipping floor (1.00 x 175 feet), supported by structural fill to achieve the grade separation necessary to accommodate waste haul trailers, that will receive waste from the transfer station June 13, 2023 HWA Project No. 2022-188-21 tipping floor. The tipping floor will be accessed by commercial and self -haulers via. a wide paved driveway ramp that ascends from the perimeter access road southward to the transfer station. Refuse collected on the tipping floor will be directed by solid waste personnel into a top -loading system situated above a series of hopper bays located along the eastern side of the structure. To achieve the grade separation required to accommodate loading waste haul trailers, placement of fill in excess of 16 feet high is presently envisaged. The fill placed to accommodate the haul trucks will be retained using a cast -in -place (CIP) concrete retaining wall situated inside the transfer station near the east side of the facility. West of the transfer station a 5.07 acre composting facility will be constructed, that will likely consist of a slightly sloping paved area where compost and/or topsoil is produced. South of the compost facility another paved area encompassing approximately 10,000 square feet (SF) will serve as a white goods acceptance area with adjacent tire recycling area to the east. Stormwater will be collected and conveyed to detention ponds situated southwest of the recycling center and in the southeast property corner. 1.3 SCOPE OF SERVICES AND AUTHORIZATION HWA undertook the geotechnical investigation in accordance with our scope of work and cost estimate dated December 9, 2022, and agreement dated January 6, 2023, with SCS Engineers, Inc. The main tasks of our scope include: • Conducting borings at the locations of the transfer station, scale facility, MRW building, and composting area as depicted on the conceptual layout. • Conduct a laboratory testing program to characterize site subsoils. • Prepare a geotechnical report summarizing results of the field investigation, laboratory testing results and will include recommendations for building and retaining wall foundations, lateral earth pressures, earthworks, and pavement design. • Providing one round of plan review to ensure our geotechnical recommendations are incorporated. 2.0 FIELD EXPLORATION AND LABORATORY TESTING 2.1 FIELD EXPLORATION Our subsurface investigation consisted of drilling eight borings, designated BH-1 through BH-8 and were conducted on February 28 and March 1, 2023. The borings were drilled by Holt Drilling, Inc., of Edgewood, Washington, under subcontract to HWA, using a track -mounted Diedrich D-50 drill rig equipped with hollow stem augers. The borings were drilled to depths ranging from about 16.5 to 21.5 feet below ground surface (bgs) and were located to obtain subsurface data at the approximate location of proposed structures at the time of drilling. 2022-188-21 KCTS — Final Geotechnical Report 3 HWA GEOSCIENCES INC. June 13, 2023 HWA Project No. 2022-188-21 Standard Penetration Test (SPT) sampling was performed at 2.5-foot intervals in the upper 10 feet each boring and at 5-foot interval below 10 feet using a 2.0-inch outside diameter split - spoon sampler driven with a 140-pound automatic hammer, except at intervals where Shelby Tube samplers were pushed instead. During the SPT, samples were obtained by driving the sampler 18 inches into the soil with the hammer free -falling 30 inches. The number of blows required for each 6 inches of penetration were recorded. The Standard Penetration Resistance ("N-value") of the soil is taken to be the number of blows required for the final 12 inches of penetration. If a total of 50 blows or more were recorded within a single 6-inch interval, the test was terminated, and the N-value was recorded as 50 blows for the number of inches of penetration. The N-value provides an indication of the relative density of the granular soils and the relative consistency of the cohesive soils. In selected borings, where soft compressible soils were encountered, thin -walled steel tube (Shelby Tube) samples were obtained in general accordance with ASTM 2937. The tubes are bolted on to drill rods and pushed directly into the soil by hydraulic pressure. The explorations were monitored and logged by an HWA geologist. The approximate locations of the borings were determined in the field by handheld GPS and are shown on the Site and Exploration Plan, Figure 2. Soil samples obtained from the borings were classified in the field and representative portions were placed in plastic bags and taken to our Bothell, Washington laboratory for further examination and testing. In addition, pertinent information including soil sample depths, stratigraphy, soil engineering characteristics, and groundwater occurrence was recorded. The stratigraphic contacts shown on the boring logs represent the approximate boundaries between soil types; actual transitions may be more gradual. The soil and groundwater conditions depicted are only for the specific date and locations reported, and therefore, are not necessarily representative of other locations and times. A legend of the terms and symbols used on the exploration logs is presented in Appendix A, Figure A-1, followed by the boring logs on Figures A-2 through A-9. 2.2 LABORATORY TESTING Laboratory testing of samples retrieved from our exploratory borings included moisture content, organic content, Atterberg Limits, particle size analyses, California bearing ratio, and one- dimensional consolidation testing. Physical and mechanical testing was performed at HWA's laboratory in Bothell, Washington. All testing was accomplished in general accordance with ASTM standards, as appropriate. The results of the laboratory testing completed to date are summarized in Appendix B. 2022-188-21 KCTS — Final Geotechnical Report 4 HWA GEOSCIENCES INC. June 13, 2023 HWA Project No. 2022-188-21 2.3 EXISTING GEOTECHNICAL DATA Site conditions have been explored previously by Jacobs Engineering in 2019 and 2020a and 2020b. The initial investigation appears to consist of over 30 test pits (Jacobs, 2019). The available Groundwater Memorandum discusses the excavation of 15 test pits and installation of piezometers to measure seasonal groundwater fluctuations. The Memorandum concluded that seasonal variation in groundwater levels was significant and on the order of 5 to 8 feet over the course of the local irrigation season from May to October when groundwater levels rose to within 3 feet or less below the existing ground surface. The report further concluded that shallow groundwater is a consideration for the design and construction of the new transfer station (Jacobs, 2020a). Review of the test pit logs indicate that surface soils within the interior of the site consist of coarse -grained alluvium overlain by a layer of fine-grained silts and clays of relatively high plasticity and varying organic content that generally thickens from 0 to 10 feet from the southwest to northeast across the site. The second investigation consisted of drilling 6 borings around the site perimeter to assess subsurface conditions and collect data in support a utility extension along the US 97 collector road into the site (Jacobs, 2020b). The borings were each conducted to depths of 16.5 feet and samples were obtained using SPT sampling methods as well as from grab samples obtained from the cuttings. Selected soil samples were analyzed to verify soil classifications assess soil properties. The borings indicate that coarse -grained alluvial sands and gravels are overlain by about 5 feet of medium stiff to stiff, silt at the northwest (B-3), south central (B-5) and southeast (B-6) corners of the site. 3.0 GENERAL SITE CONDITIONS 3.1 SITE DESCRIPTION The project site is located along the east side of US 97 and consists of a portion of SW '/4 and the SE 1/4 of Section 28, Township 18 North, Range 18 East. We understand that Kittitas County owns 50 acres at this location, of which approximately 38.84 acres encompassing the transfer station development (as shown on Figures 1 and 2). The remaining 10.87 acres (not shown on Figures 1 and 2), located to the north and abutting the BNSF right -of Way are set aside for future development of a new lower county vehicle maintenance facility. The transfer station site topography is relatively flat, and slopes gradually from elevation (EL) 1,556 feet near the northern boundary to EL 1,544 feet near the southern boundary. The ground surface includes several earthen ditches which are roughly 3 to 5 feet deep. The lowest point on site is EL 1,537 feet at the ditch invert in the southeastern corner (See Figure 2). Previously, the site was used for agricultural purposes with notable irrigation infrastructure which seasonally influences groundwater levels. Recently, Kittitas County constructed a new paved two-lane access road into the site along the southern lot boundary. 2022-188-21 KCTS — Final Geotechnical Report 5 HWA GEOSCIENCES INC. June 13, 2023 HWA Project No. 2022-188-21 3.2 GENERAL GEOLOGY Geologic information for the project area was obtained from the Geologic Map of the Ellensburg North and Southern Half of the Reecer Canyon 7.5-minute Quadrangles, Kittitas County, Washington (A.J. Sadowski, et al, 2020). According to this publication, the project site is underlain by Holocene to Pliocene aged alluvial deposits composed of sand and gravel from channel deposits on the active flood plain of the Yakima River. To the west, the site is bordered by modified land (Fill) likely constructed after removal of Holocene to Pliocene non -glacial deposits consisting of organic and organic rich sediment, peat, muck, silts, and clay that were deposited in wetland areas that formed in closed depressions on the alluvial plain. The relevant portion of this map is shown on the Geologic Map in Figure 3. 3.3 SUBSURFACE CONDITIONS 3.3.1 Soil Descriptions Subsurface conditions encountered in the field consisted of 1 to 1.5 feet of topsoil (agricultural soil) composed of silty sand to slightly organic sandy silt overlying native alluvial deposits ranging from sandy lean clay and fat clay to silty sand and poorly to well -graded gravel with silt and sand. The following are descriptions of soil units encountered during our explorations. Topsoil (Agricultural Soil): Topsoil consisting of loose silty sand to medium stiff sandy organic silts containing organic matter and root fragments were encountered at the surface at all of the boring locations. The topsoil appears to consist of material similar to the underlying fine-grained alluvial deposits that have been modified for agricultural use. This layer ranged from 1.5 to about 2 feet in thickness. Fine -Grained Alluvium -Beneath the topsoil at all locations, fine-grained alluvial deposits consisting of medium stiff, sandy silts, to medium stiff to soft clays of moderate to high plasticity were encountered at all locations. These deposits range from 1.5 to 8.5 feet thick in our borings and are thickest in the northeast corner of the site in the vicinity of borings BH-3, BH-4, and BH-5. This soil is likely the result of deposition in shallow depressions or wetland areas developed on, or marginal to, the floodplain of the Yakima River. These soils exhibit relatively low strength and moderate to high compressibility. As such, the fine- grained alluvial soils are not suitable for supporting structures or thick fills. At the locations of BH-4 and BH-5, the water table was encountered in the lower 0.5 to 1 foot of this layer at the time of drilling. Coarse -Grained Alluvium- The deepest soil units encountered consisted of medium dense to very dense, gravelly, poorly graded sand with silt or gravelly, silty sands to poorly or well -graded gravels with silt. Though never fully penetrated by any of our borings, these deposits were encountered at depths ranging from 3.5 to 10 feet below the existing ground surface and extend to the termination depths of our borings with layer thicknesses ranging 2022-188-21 KCTS — Final Geotechnical Report 6 HWA GEOSCIENCES INC. June 13, 2023 HWA Project No. 2022-188-21 from 5.75 to 17.25 feet. This soil consists of alluvium deposited in the past by laterally migrating channels of the Yakima River. These soils exhibit moderate to high strength and low compressibility. Except at the locations of BH-4 and BH-5, the water table was encountered in this unit at depths of 7.5 to 11.5 feet below the existing ground surface during our explorations. 3.4 GROUND WATER During our subsurface exploration, conducted on February 28, 2023, during the winter season, the ground water table was encountered at depths ranging from 7.5 to 11.5 feet below the ground surface in our explorations. Ground water surface data collected at the site over an 8-month period (April to November, 2020a) by Jacobs indicates seasonal variation ranging from 5 to 8 feet depending upon the time of year, with groundwater deepest in early spring and late fall, and highest during the summer months. Depending upon location, groundwater should be expected to be within 2 feet of the surface during the summer irrigation season. In view of our findings and available information, we expect that ground water will be encountered in the sub - excavation for the scale facility, transfer station, and potentially the MRW and administration building foundations. Interpreted groundwater sections developed by Jacobs (2020a) indicate that groundwater surface elevations are sloped down towards the south following the surface topography. 3.5 SOILS According to the Soils Survey of Kittitas County (available from Natural Resources Conservation Service (MRCS) — Web Soil Survey online), the project site is predominately underlain by Cleman very fine sandy loam, 0 to 2 percent slopes, Nanum ashy loam, 0 to 2 percent slopes, Zillah silt loam, 0 to 2 percent slopes, and Nack-Opinish complex, 0 to 2 percent slopes. These soils form on flood plain and alluvial fans and are derived from alluvial material with an influence of volcanic ash in the surface. These soils, except for the Cleman series (Map symbol 424) are considered to be poorly drained and exhibit a shallow groundwater table, usually with the upper 0.5 to 3 feet below the existing ground surface. The Soils Map for the site is shown on Figure 4. 4.0 CONCLUSIONS AND RECOMMENDATIONS 4.1 GENERAL In general, the site is underlain by a veneer of topsoil developed over fine-grained and coarse - grained alluvial soils. The fine-grained alluvium exhibits low strength and moderate to high compressibility due to its moisture content, consistency, and plasticity characteristics. The underlying coarse -grain deposits consisting of sand and gravel generally have high shear strength 2022-188-21 KCTS — Final Geotechnical Report 7 HWA GEOSCIENCES INC. June 13, 2023 HWA Project No. 2022-188-21 and are suitable for support of the proposed buildings. The site is also impacted by high ground water levels during the summer months due to irrigation. Details regarding our recommendations for design and construction of the proposed improvements are provided in the following sections. 4.2 SEISMIC DESIGN PARAMETERS The contribution of potential earthquake -induced ground motion from known sources is included in the probabilistic ground motion maps developed by the United States Geologic Survey (USGS). Design data seismic site characterization and design recommendations based on USGS mapping and analysis are implemented in the 2018 International Building Cade (IBC). As part of this code, the design of structures must consider dynamic forces resulting from seismic events. These forces are dependent upon the magnitude of the earthquake event as well as the properties of the soils that underlie the site. As part of the procedure to evaluate seismic forces, the 2018 IBC requires the evaluation of the Seismic Site Class, which categorizes the site based upon the characteristics of the subsurface profile 100 feet below the proposed foundation. The Site Class can then be determined in accordance with Section 20.3 of ASCE 7-16, and the corresponding values of Fa and Fv determined from Tables 11.4-1 and 11.4-2 of ASCE 7-16. In Section 11.4.8 of ASCE 7-16, it is stated that a site -specific ground motions hazard analysis is required on sites with seismically isolated structures and structures with dampening systems when Si greater than or equal to 0.6. Provided these conditions do not pertain to the proposed structures a site -specific hazard analysis is not required. Based on the obtained SPT blow counts noted in our boring logs and extrapolated to a depth of 100 feet, the site classifies as Site Class "C". Should the information used as a basis for this design be incorrect, HWA should be notified to provide appropriate recommendations. The associated probabilistic ground acceleration values and site coefficients for the general site area were obtained from the Applied Technology Council Seismic Hazard Maps. The risk targeted seismic values and coefficient are presented in Table 1 below. 2022-188-21 KCTS — Final Geotechnical Report 8 HWA GEOSCIENCES INC. June 13, 2023 HWA Project No. 2022-188-21 Table 1: Ground Motion Values, Site Class C* Mapped MCE Adjusted MICE Period Spectral Site Spectral Design Spectral (sec) Response Coefficients Response Response Acceleration Acceleration (g) Acceleration (g) 0.0 PGA 0.225 FPGA 1.200 PGAM 0.270 - - 0.2 S, 0.512 Fa 1.295 sm, 0.663 SDI 0.442 1.0 Sr 0.208 F, 1.500 SMI 0.312 Sw 0.208 Transition Point Period (sec) To 0.094 Ts 0.470 IL—TL 16 Notes. *2% Probability of Exceedance in 50 years for Latitude 47.0151 ° and Longitude-120.5912° PGA = Peak ground acceleration FPGA = PGA site coefficient PGAM = Maximum considered earthquake geometric mean peak ground acceleration adjusted for Site Class effects Ss = Short period (0.2 second) Mapped Spectral Acceleration Si = 1.0 second period Mapped Spectral Acceleration SMs = Spectral Response adjusted for site class effects for short period = Fa • Ss SM) = Spectral Response adjusted for site class effects for I -second period = F • S) SIDS = Design Spectral Response Acceleration for short period =2/3 • SMs SDI = Design Spectral Response Acceleration for 1-second period =2/3 • SMi F,1 = Short Period Site Coefficients F = Long Period Site Coefficients To= 0.2•SDI/SDs T, = SDI/SDs TIL = Long Period Transition period Based on Tables 11.6-1 and 11.6-2 (of ASCE 7-16), the Seismic Design Category for the site is «D„ 4.3 LIQUEFACTION POTENTIAL The native fine-grained and coarse -grained alluvial deposits that underlie the project site are either moderately to highly plastic or dense to very dense and are not generally susceptible to soil liquefaction. Based on this HWA considered the site soil to have a low susceptibility to soil liquefaction. 4.4 FOUNDATIONS We recommend that foundations for the transfer station, the MRW building, the administration building, and the scale facility be supported on spread footings founded on the underlying medium dense to dense, coarse -grained alluvium, or properly compacted structural fill placed directly on native coarse -grained soils. The following sections provide our recommendations for design and construction of the foundations. 2022-188-21 KCTS — Final Geotechnical Report 9 HWA GEOSCIENCES INC. June 13, 2023 HWA project No. 2022-188-21 4A.1 Bearing Capacity for Footings The proposed structures are located in areas in which the site explorations indicate the presence of 3 feet to 10 feet of very soft to stiff, potentially compressible, organic topsoil and fine-grained alluvial soils below the existing ground surface. These fine-grained alluvial soils will not be suitable for support of the proposed structures. We therefore recommend over -excavating these soils to expose underlying medium dense to dense Coarse -grained alluvial soils. For footings founded on the coarse -grained native materials, or properly compacted structural fill placed directly on undisturbed native coarse -grained soils, we recommend using a net allowable bearing capacity of 3,000 pounds per square foot (psf). For short-term wind and seismic loading conditions, this allowable bearing pressure may be increased by 33 percent to resist increased pressures on the edge of the foundation due to over -turning moments. Strip footings should have a minimum width of 18 inches, and column footings should have a minimum width of 24 inches. Footings should bear at least 2.5 feet below finished grade to be below the anticipated frost penetration depth of 24 inches at the site. 4.4.2 Lateral Resistance Wind, earthquakes, and unbalanced earth loads will subject the foundation system to lateral forces which will be resisted by sliding (base) resistance. The frictional force between the native coarse -grained soils or structural fill and mass concrete can be estimated as 50 percent of the normal force (a frictional coefficient of 0,5). The friction coefficient is an ultimate value, and we recommend applying a factor of safety of 1,5 with its use. 4.4.3 Settlement For footings placed on structural fill placed in accordance with these recommendations provided in Section 4.12,2, and having subgrades prepared as recommended in Section 4.12.1, the foundations would experience up to about'/z inch of differential settlement over 40 feet where structural fill depths below the footings are approximately equal. Where the thickness of structural fill below the footings varies, the differential settlement may be greater. For a difference of about 10 feet in fill depth, differential settlement should be taken as an additional '/z-inch and for a difference of about 20 feet of fill height, an additional 1 inch should be assumed. The largest potential for both overall settlement and differential settlement is due to inadequate preparation/cleaning of the subgrade, and improper backfill and compaction of structural fill, which is not accounted for in these estimations. A method to limit differential settlement of smaller buildings placed over structural fill, would be to cut the base of the excavation to be relatively level and the fill pad built up evenly across the building footprint. The depth of excavation needed for these structures would likely be determined during construction once the unsuitable soils have been completely excavated. 2022-188-21 KCTS — Final Geotechnical Report I () HWA GEOSCIENCES INC. June 13, 2023 HWA, Project No. 2022-188-21 The largest amount of differential settlement between foundations is likely to occur within the transfer station building at the location of the wall west of the tunnel drive. Design of footings in this area should take into consideration the abrupt change in settlement that could occur between', the foundations supported near the existing ground surface (on the east side) and those supported within the fill pad placed to raise site grades up to the base of the tipping floor slab. Methods to consider would be to structurally isolate foundations between the west and east sides of the wall such that they can settle independent of each other. Alternatively, foundations could be extended down to the same elevation and stem walls extended to the ground surface to limit potential for differential settlement between spread footings. 4.5 'FLOOR SLABS 4.5.1: General Grade -supported slabs may be employed for the various facilities, including floor slabs within the buildings and the transfer station tipping floor. For floor slabs, we recommend the underlying fine-grain materials be over -excavated and replaced with structural fill, as recommended for spread footings. Subgrade preparation and structural fill placement for floor slabs should follow the recommendations in Sections 4,12.1 and 4.12.2. Grade -supported floor slabs for the various facilities should be placed on at least 6 inches of freely draining, uniformly graded, crushed rock or washed pea gravel, which will serve as a capillary break. This capillary break material should have a maximum particle size of 5/8-inch, and less than 10% (by weight) should pass the ##20 Standard US. sieve. A I0-mil (minimum) thick plastic waterproofing membrane should be placed immediately over the crushed rock as a vapor barrier. Placement of the vapor barrier should be undertaken with care and construction activity on the membrane should be limited after placement to limit perforations in the membrane. Floor slabs supported on a properly prepared subgrade may be designed on the basis of a modulus of vertical subgrade reaction value of 120 pounds per cubic inch. 4.5.2 Settlement Considerations for Tipping Floor Slab The tipping floor slab within the transfer station building will be supported by a thick structural fill pad; however, it will butt up against the tunnel drive wall at the east side of the building. The wall along the east side of the tipping floor will be founded up to 20 feet lower than the floor slab and differential settlement between the tipping floor slab and the top of the tunnel drive wall could be up to about a I inch; however, we anticipate that much of this settlement will occur as the fill is placed. Future settlement after the slab is cast is expected to be small such that large cracks do not form in the slab, provided drainage is directed away from the foundation of the slab. 2 02 2-1 R9•21 KCI'S - Final CcoicchnicaI Rcpun 1 I HWA GroSCIENCES INC. June 13, 2023 HWA Project No. 2022-188-21 4.6 FOOTING DRAINS During periods of high rainfall, ponding of water could occur next to building foundations, and we recommend that perimeter footing drains be installed around all building foundations. Footing drains should consist of 100mm (4-inch) minimum diameter slotted plastic pipe bedded in washed drain rock or pea gravel material. At least 8 inches of drain rock should surround the drainpipe. Footing drain inverts should be at least 12 inches deeper than the bottom of floor slabs. Footing drains should discharge into the storm drain system in such a way that storm water cannot backup around the footings and gain ingress beneath floor slab areas. Roof drains should not be tied into the perimeter drain system, to prevent potential backup into the perimeter drains during intense storm events. The ground surface around the structures should be graded to direct surface water away from the structures. 4.7 TRANSFER STATION RETAINING WALLS Presently, the transfer station design includes a single -lane tunnel constructed between two CIP reinforced concrete walls. The eastern wall would be a free-standing wall constructed a few feet inside the external building shell, and would not retain any fill. The west wall would retain structural fill placed to support the tipping slab approximately 16 feet above the roadway elevation of the tunnel drive. Design of the west wall of the tunnel drive will need to consider the effects of placing and compacting fill behind the wall as well as how the top of the wall is treated with respect to the tipping floor slab. Details for design are provided in the following sections. 4.7.1 Wall Foundations The design of foundations for CIP walls should follow the recommendation provided for spread footings in Section 4.4. 4.7.2 Lateral Earth Pressures CIP walls should be designed for the lateral earth pressures associated with their connection condition at the top of the wall. The earth pressures provided assume properly compacted, well - drained, granular fill adjacent to the walls. Retaining walls constrained against rotation should be designed for an at -rest earth pressure equivalent to a fluid weighing 60 pounds per cubic foot (pcf). Retaining walls allowed to rotate may be designed for an active earth pressure equivalent to a fluid weighing 40 pounds per cubic foot (pcf). Retaining walls designed for seismic earth pressures can be designed for active -plus -seismic earth pressures of 55 pcf. This earth pressure was computed using the Mononobe-Okabe method and a design peak ground acceleration (PGA) of 0.18 g or 0.4*SDS. 2022-188-21 KCTS — Final Geotechnical Report 12 HWA GEOSCIENCES INC. June 13, 2023 HWA Project No. 2022-188-21 For the buried portions of the retaining walls, an allowable passive pressure equal to an equivalent fluid pressure of 360 pounds per cubic foot may be considered. Passive seismic earth pressure equal to that generated by a fluid with a unit weight of 250 pounds per cubic foot may be used in design. The upper 2 feet of passive pressure should be ignored. A factor of safety of 1.5 should be applied to the passive static earth pressure and a factor of 1.1 should be applied to the passive -seismic earth pressure. Traffic surcharges should also be included in the wall design, as appropriate. We recommend that the surcharge pressure from vehicular loading be assumed to be equivalent to an additional uniform lateral pressure over the entire back of the wall equal to 108 pounds per square foot for a non -yielding wall and 68 for a yielding wall. This is based on a vehicular load of 250 psf acting on the slab behind the wall. This traffic load does not account for temporary construction surcharge loading that may exist above the wall during the course of construction, which should addressed by the contractor during construction. 4.7.3 Wall Drainage A minimum 4-inch diameter, perforated, rigid plastic drain pipe should be placed on the up -slope side at the bottom of retaining walls and be discharged into the local storm drain system or other suitable outlet. These wall drains should not be connected to the perimeter footing drains in a manner that would allow water to run from the perimeter drains down into the wall drain. Wall and foundation drains and roof downspouts should not be tightlined into the same pipe. 4.8 PERMANENT FILL SLOPES Permanent fill slopes are planned for the perimeter areas surrounding the transfer station. All permanent fills should be no steeper than 2H:IV. Consideration may be given to providing a five-foot wide restricted -entry catchment zone along the base of all permanent fills 10 feet or higher. Movable concrete barriers can be positioned along the outside edge of this zone to prevent any material that may ravel off the slope from entering an area where it may encounter vehicles, County personnel and the public. All permanent fill slopes should be protected from erosion as prescribed in Section 4.12.6. 4.9 COMPOST AREA (NORTHWEST AREA) The compost Area is situated in the northwest portion of the site and will consist of a paved working area roughly 5.07 acres in size that will accommodate grinding, mixing, curing and storing of composted organic and soil materials. It is anticipated that heavy equipment such as trommel screens, windrow turners, grinders and tractor/loaders will traverse the pad. Periodic transfers of material in and out by large tractor trailer haulers are also anticipated. Results of the soil boring explorations we conducted and review of the pre-existing exploration logs in this area indicate that the proposed compost pad area footprint is underlain by 4 to 8 feet of topsoil and 2022-188-21 KCTS — Final Geotechnical Report 13 HWA GEOSCIENCES INC. June 13, 2023 HWA Project No. 2022-188-21 fine-grained alluvial soils, Additionally, existing plans call for the grade to be raised approximately 2 feet in this area. This area is not planned to support any structures and therefore over -excavation in this area is not desirable from an economic standpoint however it would eliminate the potential development of dips and sags in pavement placed to support composting activities and minimize future maintenance costs. Alternatively, consideration could be given to smaller areas of over - excavation where heavy equipment like the trammel screen or grinder will be parked for years at a time, thereby minimizing the need for re -leveling of the equipment and pavement repair. Localized removal of settlement prone soils may result in the need for wedge lifts of HMA to be installed periodically between the fill supported equipment pads and surrounding pavement areas that remain underlain by alluvial soils. Partial over -excavation notwithstanding, we recommend that after subgrade preparation is conducted as described in Section 411,1 below. The pavement section should consist of and be constructed as described in Sections 4.11.2 through 4.11.6, below. 4.10 UTILITIES 4.10.1 Bedding and Pipe Support We currently do not have information regarding proposed utility corridors or proposed invert elevations. However, due to the presence of soft, compressible subgrade soils we anticipate that sewer systems that convey gravity flow may develop dips or bellies if supported directly on compressible subgrade soils. To limit the possibility of developing dips and bellies, over - excavation of compressible materials could be performed. If over -excavation is not desired, consideration should be given to designing the pipelines with increased fall that will allow for proper function of the pipes after as much as 6 inches of settlement occurs along the sewer line. Flexible connections allowing for rotation and resistance to pulling apart should be constructed at the points where the pipe transitions of areas with compressible soils to areas where compressible soils have been over -excavated. Non -settlement sensitive utilities such as electrical, communication, gas and water can be installed without over excavation provided the type of pipe and pipe connections can accommodate future settlement. Utility piping and conduits should be designed with sufficient pipe penetration into manholes and pull boxes such that they do not pull out as the ground settles. The connections should be constructed with access vaults to allow for easy access and replacement when needed. If over -excavation of compressible materials is selected, it will be necessary to over -excavate the unsuitable material down to coarse granular native subgrade and backfill with pipe bedding material. In wet conditions, 1-inch minus gravel or permeable crushed rock or similar approved granular fill may be used to backfill the over -excavated portion of the trench. Alternatively, the 2022-188-21 KCTS — Final Geotechnical Report 14 HWA GEOSCIENCES INC. June 13, 2023 HWA Project No. 2022-188-21 over -excavated area can be backfilled with controlled density fill (CDF) to raise foundations above wet conditions. Over -excavation to remove compressible soils should extend on either side of the pipe a distance equal to the depth of over -excavation beneath the pipe. General recommendations relative to the bedding of underground utility pipelines include: • Pipe bedding material, placement, and shaping should be in accordance with the project specifications and the pipe manufacturer's recommendations. Pipe bedding materials should be placed on relatively undisturbed coarse granular native soils, or properly compacted fill. If the native subgrade soils are loosened during excavation, the loosened material should be compacted or removed and replaced with compacted bedding material. Pipe bedding should provide a firm, uniform, support cradle for the pipe of at least 6 inches thickness. • Prior to pipe installation, the pipe bedding should be shaped to fit the pipe haunches with reasonable closeness to provide continuous support along the pipe. Pipe bedding should extend to at least 6 inches above the top of the pipe, for the full width of the trench. In areas where a trench box is used, the bedding material should be placed before the trench box is advanced. Advancement of trench boxes should be performed carefully to prevent disturbance of the bedding and any backfill. 4.10.2 Trench Backfill Trench backfill should be considered structural fill and should meet the criteria set forth in Section 4,12.2. However, where pipe trenches exist beneath landscaped areas, backfill compaction requirements may be reduced, consistent with higher levels of backfill settlement that may be tolerable. 4.11 PAVEMENT CONSIDERATIONS HMA (hot mix asphalt) pavement will be required for the extension of the access road, paving for the recycling center, tire recycling area, scale and transfer station access ramps, compost area and parking areas. Subgrade preparation, stabilization, placement, and compaction of crushed rock base course and HMA should be conducted in accordance with the procedures outlined below. 4.11.1 Subgrade Preparation for Areas to be Paved Subgrade stripping should be conducted to remove all loose organic topsoil and other deleterious materials exposing native mineral subgrade, sandy silt or sandy lean clay or sandy gravel with silt. After stripping and excavating to remove topsoil, and prior to placing any fill, subgrade soils 2022-188-21 KCTS — Final Geotechnical Report 15 HWA GEOSCIENCES INC. June 13, 2023 HWA Project No. 2022-188-21 should be excavated a minimum of 22 inches below the proposed top of pavement subgrade to accommodate the proposed pavement section, as discussed in Section 4.11.3. The subgrade should then be proof rolled using a with a heavyweight smooth drum roller (on static mode) under the observation of the geotechnical engineer. Any subgrade areas that appear to be unstable or incapable of supporting construction equipment or traffic should be stabilized as described below. We recommend that after subgrade proof rolling is conducted as described above, unstable areas of the subgrade be sub -excavated at least 12-inches (if necessary depending upon finish grade) then covered with a woven geotextile fabric consisting of Tensar HP 570 or equivalent, followed by a layer of Tensar Triax 160 geogrid prior to placement of 12-inches of compacted CSBC. All other pavement subgrade areas should be covered with a woven geotextile fabric, such as Tensar HP 570, or equivalent, prior to placement of structural fill and pavement layers. Material used to raise site grades, or placed directly under pavement structure is classified as structural fill. Imported structural fill should consist of either Crushed Surfacing Base Coarse or Select Borrow depending on application as specified herein and meeting the requirements of WSDOT Standard Specifications Section 9-03.9(3) and 9-03.14(2), respectively. 4.11.2 Design Traffic Volume Traffic information, provided by SCS, Inc., indicated that the site could be divided into 4 discrete zones that support varying traffic loads (K. Shah, electronic communication, 2023) as described below. Southwest Area: This area includes the tire recycling area and consists of a paved rectangular area situated just of the compost area. The area serves as a laydown and loading area for tires. The pavement will support pickups, pickup with trailers, and occasional heavyweight 40 cyd trailers. Based on the traffic data provided we estimate a total design ESAL's factor of 2,337 for this area as presented in Table 2. Southeast Area: The southeast area encompasses the recycle area which consists of a broad paved area where a series of containers are arranged within a median to accept paper, glass, metal and other recyclable materials. The area also includes access and parking for the MRW and administration buildings. The pavement will support pickups and passenger vehicles, and occasional heavyweight roll-on/roll-off trucks and 24-foot long 3-axle trucks. Based on the traffic data provided we estimate a total design ESAL's factor of 275,000 for this area as presented in Table 2. Northeast Area: The paved area includes the scale and transfer station facilities situated in the northeastern portion of the site. All vehicles carrying loads that require a tipping fee will need to 2022-188-21 KCTS — Final Geotechnical Report 16 HWA GEOSCIENCES INC. June 13, 2023 HWA Project No. 2022-188-21 travel through the scales in and out. This includes passenger vehicles, pick-ups with or without trailers, heavyweight transfer trailers, 40 cyd trailers, and occasional water trucks. Based on the traffic data provided we estimate a total design ESAL's factor of 130,000 for this area as presented in Table 2. Northwest Area The northwest area encompasses the compost area located in the northwest portion of the site and is accessed from the east on the north perimeter access road. Yard waste will be processed on -site by County personnel into compost. It is expected that this area will be frequented by pick-ups with and without trailers and occasional heavy weight water trucks. Processing will be accomplished using heavy equipment such as front-end loaders. It will also support heavy static loads such as the grinder. Based on the traffic data provided we estimate a total design ESAL's factor of 2,741 for this area as presented in Table 2. Table 2. Assumptions Utilized for Estimation of ESAL Traffic Information Southwest Area Southeast Area Northeast Area Northwest Area Design Period (years) 25 25 25 25 Growth Factor 2.5% 2,5% 2.5% 2.5% ESAL 2.337 275,000 130,000 2,741 The pavement recommendations presented in this report are based on these traffic estimates. If improved traffic count information is obtained that varies appreciably from these values, the recommendations given in this report should be reviewed and revised as necessary. 4.11.3 Pavement Structure Requirements The subgrade soils along the project alignment consist of sandy lean clays, which are moderately frost -susceptible. The maximum depth of frost penetration measured in the area is 30 inches. This occurred during the extremely cold winters of 1949 and 1950 (WSDOT, 1995). For frost -susceptible subgrade soils, the WSDOT Pavement Design Guide recommends that the minimum thickness of pavement structure should be at least 75% of the frost depth. Therefore, the minimum pavement section for this site should be at least 22 inches in depth. We expect the depth of frost penetration will control minimum section thicknesses. 2022-188-21 KCTS — Final Geotechnica( Report 17 HWA GEOSCIENCES INC. June 13, 2023 HWA Project No. 2022-188-21 Based on the results of our investigation and our previous experience, we have based the pavement structure design assuming a prepared subgrade (lean clay) design resilient modulus (Mr) of 5 kips per square inch (ksi) We have undertaken the pavement design using the DARWin computer program which is based on the AASHTO Guide for Design of Pavement Structures, 1993. The following parameters, based on recommendations given in the AASHTO Guide, were used in the analysis: ■ Initial Serviceability 4.5 ■ Terminal Serviceability 3.0 ■ Reliability Level 90% ■ Overall Standard Deviation 0.5 The recommended pavement layer thickness requirements are summarized on Tables 3 through 6 for the recycling area, tire recycling area, scale and transfer station and the compost area, respectively: Table 3. Recommended Pavement Layer Thickness for Southwest Area Material Description Minimum Pavement Layer Thickness (inches) WSDOT Standard Specification HMA' 4.0 9-02.1(4) CSBC2 6.0 9-03.9(3) Select Borrow 12.03 9-03.14(2) (1) HMA: Hot Mix Asphalt: Binder Grade PG 641-1-28. HMA shall be placed in 2 lifts. (2 ) CSBC: Crushed Surfacing Base Course, compacted as specified. 131 Thickness of Select Borrow may be reduced if base of over -excavation and replacement with CSBC is at least 22 inches below the top of new roadway. 2022-188-21 KCTS — Final Geotechnical Report 18 HWA GEOSC[ENCES INC. June 13, 2023 HWA Project No. 2022-188-21 Table 4. Recommended Pavement Layer Thickness for Southeast Area Material Description Minimum Pavement Layer Thickness (inches) WSDOT Standard Specification HMA' 7.0 9-02.1(4) CSBC2 6.0 9-03.9(3) Select Borrow 9.01 9-03.14(2) (1) HMA: Hot Mix Asphalt: Binder Grade PG 64H-28. HMA shall be placed in 2 lifts. (2) CSBC: Crushed Surfacing Base Course, compacted as specified. 0) Thickness of Select Borrow may be reduced if base of over -excavation and replacement with CSBC is at least 22 inches below the top of new roadway. Table 5. Recommended Pavement Layer Thickness for Northeast Area Material Description Minimum Pavement Layer Thickness (inches) WSDOT Standard Specification HMA' 7.0 9-02.1(4) CSBC2 6.0 9-039(3) Select Borrow 9.01 9-03.14(2) 0) HMA: Hot Mix Asphalt: Binder Grade PG 64H-28. HMA shall be placed in 2 lifts. t2 1 CSBC: Crushed Surfacing Base Course, compacted as specified. (1) Thickness of Select Borrow may be reduced if base of over -excavation and replacement with CSBC is at least 22 inches below the top of new roadway. 2022-188-21 KCTS — Final Geotechnical Report 19 HWA GEOSCIENCES INC. June 13, 2023 HWA Project No. 2022-188-21 Table 6. Recommended Pavement Layer Thickness for the Northwest Area Material Description Minimum Pavement Layer Thickness (inches) WSDQT Standard Specification HMA' 4.0* 9-02.1(4) CSBC2 6.0 9-03.9(3) Select Borrow 12.01 9-03.14(2) *Note: Thickness does not account for potential surface damage by repetitive equipment movement and scraping by loader bucket, etc. HMA: Hot Mix Asphalt: Binder Grade PG64H-28. HMA shall be placed in 2 lifts. �5> CSBC: Crushed Surfacing Base Course, compacted as specified. (6) Thickness of Select Borrow may be reduced if base of over -excavation and replacement with CSBC is at least 22 inches below the top of new roadway. 4.11.4 HMA Design Considerations The following design considerations should be noted and implemented: • Pavement design using a reliability level of 90% can be interpreted as meaning that prior to the end of the design period, about 10% of the pavement will require reconstruction because of structural failure. Therefore, as the design life is approached, the serviceability of the pavement should be critically viewed to determine the need for and extent of any overlay application that may be required. • The pavement will likely require a thin functional overlay after about 10 to 14 years because of non-structural associated distress caused by environmental factors such as degradation of the asphalt surface and rutting. Areas subject to surface abrasion by heavy equipment operation may require repair more frequently. HMA pavements are susceptible to shoving and rutting from heavy trucks particularly at intersections. In these areas, more frequent maintenance and even premature reconstruction of the pavement may be required. • It is essential to the satisfactory performance of the pavement that good drainage is provided to prevent water ponding alongside the pavement and saturation of the pavement and subgrade layers. The base layers should be configured to prevent water from being trapped within the layer. 2022-188-21 KCTS — Final Geotechnical Report 20 HWA GEOSCIENCES INC. June 13, 2023 HWA Project No. 2022-188-21 4.11.5 HMA Binder Selection The selection of the optimum asphalt binder type for the prevailing climate is critical to ensure long-term pavement performance. Use of the wrong binder can result in low temperature cracking or permanent deformation at high temperatures. Based on the climate in Ellensburg, we recommend Superpave Performance Grade binder PG 64H-28 be used for HMA pavement. Placement of HMA should be in accordance with Section 5-04 of the WSD©T Standard Specifications (WSDOT, 2023). Particular attention should be paid to the following: 4.11.6 Pavement Construction HMA should not be placed until the engineer has evaluated and approved the crushed aggregate base rock layer. • HMA should not be placed on any frozen or wet surface. • HMA should not be placed when precipitation is anticipated before the pavement can be compacted, or before any other weather conditions which could prevent proper handling and compaction of HMA. • HMA should not be placed when the average surface temperatures are less than 45' F. • HMA temperature behind the paver should be in excess of 2400 F. Compaction should be completed before the mix temperature drops below 180° F. Comprehensive temperature records should be kept during the HMA placement. • Sufficient tack coat must be applied uniformly and allowed to break and set before placing HMA above an existing HMA layer in order to create a strong bond between layers. The surface of the pavement should be thoroughly cleaned prior to tack coat application. Improper tack coat application can cause unbonded layers and will lead to premature pavement distress/failure. • For cold joints, tack coat should be applied to the edge to be joined and the paver screed should be set to overlap the first mat by 1 to 2 inches. • The longitudinal joints in the HMA wearing course should coincide with a line lane or an edge line. Crushed Surfacing Top Course (CSTC) can be substituted with for the upper 2 inches of Crushed Surfacing Base Course (CSBC) as specified by WSDOT Standard Specifications (WSDOT, 2023), in order to provide a smooth surface for placing the HMA layer. 2022-188-21 KCTS — Final Geotechnical Report 21 HWA GEOSCIENCES INC. June 13, 2023 HWA Project No. 2022-188-21 4.11.7 Differential Settlement of Roads Roadways supported on geosynthetic stabilized fine-grained native subgrade will settle overtime and dips can develop at the approach area where roads encounter slabs or other pavement structures supported on full -depth structural fills. In order to minimize the amount of differential settlement between these features we recommend that the excavation conducted for the removal of compressible soils beneath the scale facility and transfer station access ramp extend from the base of the cut to subgrade elevation at an inclination of 3H:1 V instead of 1 H:1 V in the direction of travel. 4.12 GENERAL EARTHWORK CONSIDERATIONS 4.12.1 Subgrade Preparation for Foundations In the proposed footing areas, subgrade preparation should begin with the removal of all topsoil, deleterious material, and vegetation. Using a smooth bucket, the soils should be excavated to the proposed subgrade elevation. The exposed subgrade should be inspected by the Geotechnical Engineer, or their representative, and any loose or unsuitable soils should be over -excavated to expose the coarse -grained alluvial soils. Where excavation below the elevations of the foundation or floor slabs is needed, the width of the excavation should extend beyond the edge of the footing a distance equal to the depth of the over -excavation required to reach the bearing soils. After exposing coarse -grained native soils, and prior to placing any fill, exposed subgrade soils should be static rolled with a smooth drum roller under the observation of the geotechnical engineer prior to placement of structural fill. In order to avoid point -load contacts between concrete footings and the supporting coarse - grained soils, it is recommended that the foundations be constructed on a minimum 8-inch thick layer of compacted Crushed Surfacing Base Course (CSBC) meeting the requirements of Section 9-03.9(3) of the WSDOT Standard Specifications (WSDOT, 2023). 4.12.2 Structural Fill and Compaction For the purposes of this report, all fill placed under structures, floor slabs, utilities, sidewalks, roads and other paved areas should be considered structural fill. Structural fill should be a relatively well -graded soil, which is free of organic material, contains non -plastic fines, and should have a maximum particle size no greater than 1/3 the thickness of the lifts being placed. Its moisture content should be within 2% of optimum for compaction purposes. The native sandy silt or clay is not suitable for use as structural fill as it is too wet for proper compaction. We understand that Select Borrow fill material meeting the specifications of WSDOT Section 9-03.14(2) is available locally for use as structural fill. However, in wet weather or wet conditions, structural fill should contain no more than 5% non -plastic fines (material passing the No. 200 US Standard sieve) based on the minus 3/4-inch (19 mm) soil fraction. 2022-188-21 KCTS — Final Geotechnical Report 22 HWA GEOSCIENCES INC. June 13, 2023 HWA Project No. 2022-188-21 Structural fill should be moisture conditioned, placed in loose horizontal lifts less than 8-inches thick, and compacted to at least 95% of maximum dry density as determined using test method ASTM D 1557 (Modified Proctor) for material containing less than 30% coarse gravel by weight. Achievement of proper density of a compacted fill depends on the size and type of compaction equipment, the number of passes, thickness of the layer being compacted, and soil moisture -density properties. In areas where limited space restricts the use of heavy equipment, smaller equipment can be used, but the soil must be placed in thin enough layers to achieve the required compaction. When the first fill is placed in a given area, and/or anytime the fill material changes, the area should be considered a test section. The test section should be used to establish fill placement and compaction procedures required to achieve proper compaction. The geotechnical consultant should observe placement and compaction of material in the test section to assist in establishing an appropriate compaction procedure. Once a placement and compaction procedure is established, the contractor's operations should be monitored and sufficient periodic density tests performed to verify that proper compaction is being achieved throughout. 4.12.3 Ground Water Control We anticipate that groundwater seepage may be encountered locally in the fine-grained alluvium or within the coarse -grained alluvium. Ground water monitoring conducted by others indicates that the ground water level is likely higher during the summer months during the local irrigation season. Therefore, we recommend that excavation in excess of what is required for subgrade preparation take place in the fall months after local irrigation has been terminated. During construction, the Contractor should be prepared with appropriate means and methods to ensure work takes place in relatively dry conditions during over -excavation and removal and replacement of compressible soils as necessary. It is recommended that if excavation takes place during the irrigation season the Contractor be prepared to control ground water through use of a combination of sumps and pumps and ditching to convey water away from the work area. The Contractor should limit the area opened up to that which can be backfilled with minimal sidewall sloughing during one shift. Quarry spalls or other permeable rockfill may be used to backfill below the ground water table and provide a stable base for placement of structural fill. Where quarry spalls or permeable rockfill is used, a non -woven geotextile meeting the requirements for separation found in Table 3 of Section 9-33.2(1) of the WSDOT Standard Specifications (WSDOT, 2023) shall be installed over the rockfill prior to placement of structural fill. 4.12.4 Temporary Slope Cuts We anticipate that the foundation cuts for the new transfer station building, and the new scale facility can be made with conventional excavating equipment. However, excavation wherever the coarse -grained alluvium is encountered, difficult digging conditions may be expected to exist, and the Contractor should be prepared to encounter cobbles and boulder -sized material. 2022-188-21 KCTS — Final Geotechnical Report 23 HWA GEOSCIENCES INC June 13, 2023 HWA Project No. 2022-188-21 4.12.5 Temporary Excavations For all excavations maintenance of safe working conditions, including temporary excavation stability, is the responsibility of the contractor and must be performed in accordance with Part N of Washington Administrative Code (WAC) 296-155, latest revisions. The fine-grained alluvium and coarse -grained alluvium and fill at the site classify as Type C soils. Time and the presence of seepage and/or precipitation can significantly reduce the stability of temporary unsupported cut slopes. Therefore, all temporary slopes should be protected from erosion by installing a surface water diversion ditch or berm at the top of the slope and by covering the cut face with well -anchored plastic sheets. In addition, the contractor should monitor the stability of all temporary cut slopes and adjust the construction schedule and slope inclination accordingly. 4.12.6 Erosion and Sediment Control The site soils have relatively high fines content and in the wet season this will result in substantial entrained sediment load in runoff water and, in the dry season, large amounts of dust and fines. The work site should be protected from uncontrolled runoff during construction by constructing berms and ditches to direct runoff around the work site, and the use of temporary sumps to collect runoff and prevent water from ponding and damaging exposed subgrade areas. Crushed gravel should be provided, where necessary, to protect against soil erosion. Erosion of the work site can be minimized by careful grading practices, the appropriate use of silt fences and by implementing the recommendations in the Wet Weather Earthwork section of this report. Surface grading measures and drainage systems should be incorporated in the final grading design such that surface runoff is permanently directed away from paved areas and into swales or other controlled drainage devices. Permanent fill slopes should be protected from erosion by seeding for growth of vegetation as soon as possible after grading. 4.12.7 Wet Weather Earthworks Although earthwork under wet weather conditions is not recommended for this site, if it is necessary, the following recommendations apply to wet season earthworks: • Earthwork should be undertaken in small sections to minimize exposure to wet weather. Excavation or the removal of unsuitable soil should be followed promptly by the placement and compaction of a suitable thickness of clean crushed rock or sand and gravel. The size and type of construction equipment used may have to be limited to minimize soil disturbance. 2022-188-21 KCTS — Final Geotechnical Report 24 HWA GEOSCIENCES INC. June 13, 2023 HWA Project No. 2022-188-21 • Material used as structural fill should consist of clean granular soil, of which not more than 5% by dry weight passes the U.S. Standard No. 200 sieve, based on wet sieving the fraction passing the 3/4-inch sieve. The fine-grained portion of the structural fill soils should be non -plastic. • The ground surface within the construction area should be sloped and sealed with a smooth -drum vibratory roller, to promote rapid runoff of precipitation and to prevent ponding of water. • No soil should be left uncompacted so it can absorb water. Soils that become too wet for compaction should be removed and replaced with clean granular materials. 5.0 CONDITIONS AND LIMITATIONS We have prepared this report for use by SCS, Inc., and Kittitas County Solid Waste and other members of the project design team during the design and construction of the geotechnical aspects of this project. However, the conclusions and interpretations presented should not be construed as a warranty of the subsurface conditions. Experience has shown that subsurface soil and ground water conditions can vary significantly over small distances. Inconsistent conditions can occur between explorations and may not be detected by a geotechnical study. If, during future site operations, subsurface conditions are encountered which vary appreciably from those described herein, HWA should be notified for review of the recommendations of this report, and revision of such, if necessary. We recommend that a knowledgeable and experienced geotechnical engineer or inspector should inspect footing excavations, pavement subgrade preparation, subsurface drainage, and review potential fill and bedding materials for suitability. Within the limitations of approved scope, schedule and budget, HWA attempted to execute these services in accordance with generally accepted professional principles and practices in the fields of geotechnical engineering and engineering geology at the time the report was prepared. No warranty, express or implied, is made. The scope of our work did not include environmental assessments or evaluations regarding the presence or absence of wetlands or hazardous substances in the soil, surface water, or ground water at this site. HWA does not practice or consult in the field of safety engineering. We do not direct the contractor's operations and cannot be responsible for the safety of personnel other than our own on the site. As such, the safety of others is the responsibility of the contractor. However, the contractor should notify the owner if any of the recommended actions presented herein are considered unsafe. O.O 2022-188-21 KCTS — Final Geotechnical Report 25 HWA GEOSCIENCES INC. June 13, 2023 11MIA Project No. 2022-1 SS-21 We appreciate and Ihank you for the opportunity to provide this guoicchnic al report. Should you have any questions regarding, this report, or require additional services. please comact either tit' Ilic undersigned at your convenience. We appreciate this opportunity to be ol-scrvice. Sincerely, H1YA CF,i)SCIF.NCES INC. GE VY a, 0 eQ STEVEN ELLIOTT OAF -ENE Steveli V. Grctiic, Senior Engineering Gcologisf Vice -President ,5r202-1 JoLyn [Tillie, P.I:. Cocotechnical Engineer. Principal ,()2?IK?f•_!3{II� 1maliicowthni:al8rpll 26 HWA(i1,laSrIIN('15Iur June 13, 2023 HWA Project No. 2022-188-21 6.0 REFERENCES Jacobs Engineering Group (CH2M), 2019, Geotechnical Data Memorandum: Kittitas County Transfer Station Site, prepared for Kittitas County and published July 15, 2019. Jacobs Engineering Group, 2020a, Kittitas County Transfer Station Site: Groundwater Monitoring Memorandum, Ellensburg, Washington, prepared for Kittitas County and published on July 17, 2020. Jacobs Engineering Group, 2020b, Kittitas County Transfer Station Site- Geotechnical Data Report, prepared for Kittitas County and published August 31, 2020. Sadowski, A.J, J.B. McCosby, M.L. Anderson, T.R Lau, A. Steiner, S.A. DuFrane, T. Rittenour, and B. Housen, 2020, Geologic Map of the North and Southern half of the Reecer Canyon 7.5- Minute Quadrangles, Kittitas County, Washington. Washington Geological Survey Map Series, 2020-01. WSDOT, 1995, WSDOT Pavement Guide Volume 2 Pavement Notes, Washington State Department of Transportation. WSDOT, 2023, Standard Specifications for Road, Bridge and Municipal Construction, Washington State Department of Transportation. 2022-188-21 KCTS — Final Geotechnical Report 27 HWA GEOSCIENCES INC. SITE MAP VICINITY MAP 1 ■ *'l a sue, iooa, im, zaaol r ;,(ALE: 1" . 5000' 4,kl% N1k•bod - tow 4000t , S000' i SCAB: ]" = 4000' SITE AND VICINITY MAP GEOSCIENCES INC KIMTAS COUNTY TRANSFER STATION AHE/MWBE ELLENSBURG, WASHINGTON C:WSERSICFRYV0E5KT0P=22.198.21 KITTITAS COUNTY TRANSFER STAMNQ022-188.21 KITTITAS COUNTY TRANSFER STATIONZWO -Is Ploged: 2120/2023 6:30 PM DRAWN BY: CriECK BY: CF 5EG lRQ)ECT a ?ft77_1 QQ_')1 I -, TP•:wPI I •y\ l '.+r � li L_ •ems .awl ,, Y lIP1 7P•7 I a TP.27{P) V T �x ! � I 6�1•S JII ` f I ,i, J `� ...-�— � , �`--------�r+.Lc,awa w�, � •• � 9' / TP,011P1 YV j ,uvPnGv •.Lrx n„i.K .q. .r�a+wL rol w7j TR1 P' eH� ` i 1r 1' TP f �^ N'..owwrsAL'M r � �'',LL�a 111 ,..�aa noon , ierr.w EXPLCRA. W L gr—CI 0 eH I PROPOSEO9411EHO49 PE51GriATION AND APPROXIMATE LO[A.YTON KMITAS COUNTY TRANSFER STATION Br.w .• . Twr .' TP•IIPIhm TEST PIT(s)PA02PREYER zNIVALATION 6ESIOn4TIO4 AND APPROXII44TE LOUTION(JAC495. 2019) TP•i+ TEST PIT EXCAVATION OE51QNAT14N Ar{OAPPRg)3NATE LO[ATMN JAME3, 3CR91 e 2+r WROiag bgltkATION AND APPROX3tiATE LocATI6H (lAcoB5, 2D2o} APO zozr•,9e-xI I QNNVMI 4k 08� � I 4.1N. HOLOCENE TO PLIOCENE NON -GLACIAL DEPOSITS LEGEND Qp - PEAT (HOLOCENE TO PLIOCENE) - Organic and organic -doh sed{ment: includes peat, gylga, muck, silt, and clay; typically In closed depresslons; mapped In wetland areas and dlatlnctty fiat -bottomed depressions. HOLOCENE TO PLIOCENE ALLUVIA L.DEPOSIT$.LEOEND Qa • ALLUVIUM jHQLOCENE) - Composed of sand and gravel from channel daposils on active Flood plain. This unit has been heavily modified by agrlculturat cultivatlon. KIrT]TAS UWA GEOSCIENCES INC K17TTTA5 COUNTY TRANSFER STATION GEOLOGIC MAP Due,lylwnr; ELLENSBURG, WASHI,NGTON lag-71 KI?TITAN 00uNTY TkAN9FER 9TATION.000 �3• Pi.mH 517J2923 4 OP PY k —0 rN 9r: FIGURE No.; CF K 9Y! PaoJECT NO.: SEG 2022-188-21 USDA. SOIL SERIES SYMBOL LEGEND 424-CIE}man very fine sandy $oam, 0 to 2 percent 91006S 48D-Nanum ashy loarn, 0 to 2 percent stapes 560-Woldale clay loam. C to 2 percent slopes 59$-ZiElah silt loam, 0 to 2 percent slopes 60t-SMckmitl gravelly ashy loan, 0 to 2 percent slopea 795-Nack-Opnish oomplek, 0 to 2 percent slopes BASE MAP PMOVK40 4Y: NATURAL RE50URCES CONSERVATION SERVILE WE9900. SURVEY VAL 5011 SURVEY ARFA, KITTITAS EOUMY AREA,WASHINaQN �iEOS�ENC�S I,~IG KITTI`fA5 COUNTY TRANSFER STATION ELLENSBURG, WASHINGTON � t�rl:Jr�nvI11. .A• MOO if3Q17023 SOIL MAP k\ DRAWN BV' F3GURC NO.: EIIECN gyF 4RDJECT NO.: SEG 2022-188-21 EXRLORATiON LE[8AV ^- H" I PROP010 60REHOlE DESIGNATION AND AMOXIMATE LOCATION TN 11P1 W TEST PR (P) PIEIDMMR INSTALLATION DESIGNATION AND APPROXINATL LOCATION (JACO115, 2010) TP'T j1 TEST PIT EXCAVATION IDMONATIDN AMP APPR011IMATF, JXAI" (JA[M 20191 6-2 WRENOLE DESIGNATION ANDAPPR011INATE LOCATION (JACADS, 2020) -• THICKNESS OF OH SOIL (LN f6tY ( im 0 200 1 ADO 2422-189-21 RELATIVE DENSITY OR CONSISTENCY VERSUS SPT N-VALUE COHESIONLESS SOILS COHESIVE SOILS Approximate Density N (blowslft) Approximate Consistency N (blows/ft) Undrained Shear Relative Density(%) Strength (sf) Very Loose 0 to 4 0 - 15 Very Soft 0 to 2 <250 Loose 4 to 10 15 - 35 Soft 2 to 4 250 - 500 Medium Dense 10 to 30 35 - 65 Medium Stiff 4 to 8 500 - 1000 Dense 30 to 50 65 - 85 Stiff 8 to 15 1000 - 2000 Very Dense over 50 85 - 100 Very Stiff 15 to 30 2000 - 4000 Hard 1 over30 >4000 USCS SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS GROUP DESCRIPTIONS Gravel and GW Well -graded GRAVEL Coarse Clean Gravel • ` Grained Gravelly Soils (little or no fines) Ij o Q GP Poorly -graded GRAVEL Soils More than 50 % of Coarse Gravel with a GM Silty GRAVEL Fraction Retained Fines (appreciable on No. 4 Sieve amount of fines) GC Clayey GRAVEL Sand and Clean Sand :• SW Well graded SAND Sandy Soils (little or no fines) More than SP Poorly -graded SAND 50 % Retained 50 % or More on No. Sand with $M Silty SAND of Coarse 200 Sieve Fines (appreciable Fraction Passing Size amount of fines) SC Clayey SAND No. 4 Sieve ML SILT Fine Silt Liquid Limit Grained and CL Lean CLAY Soils Less than 50 % Clay _ - OIL ---- - Organic SILT/Organic CLAY MH Elastic SILT 50 % or More a tl Liquid Limit Passing 50% or More CH Fat CLAY No. 200 Sieve Clay - ••• Size OH Organic SILT/Organic CLAY Highly Organic Soils � r PT PEAT COMPONENT DEFINITIONS COMPONENT SIZE RANGE Boulders Larger than 12 in Cobbles 3 in to 12 in Gravel 3 in to No 4 (4.5mm) Coarse gravel 3 in to 3/4 in Fine gravel 3/4 in to No 4 (4.5mm) Sand No. 4 (4.5 mm) to No. 200 (0.074 mm) Coarse sand No. 4 (4.5 mm) to No. 10 (2.0 mm) Medium sand No. 10 (2.0 mm) to No. 40 (0.42 mm) Fine sand No. 40 (0.42 mm) to No. 200 (0.074 mm) Silt and Clay Smaller than No. 200 (0.074mm) TEST SYMBOLS %F Percent Fines AL Atterberg Limits: PL = Plastic Limit, LL = Liquid Limit CBR California Bearing Ratio CN Consolidation DID Dry Density (pcf) DS Direct Shear GS Grain Size Distribution K Permeability MD Moisture/Density Relationship (Proctor) MR Resilient Modulus OC Organic Content pH pH of Soils PID Photoionization Device Reading PP Pocket Penetrometer (Approx. Comp. Strength, tsf) Res. Resistivity SG Specific Gravity CD Consolidated Drained Triaxial CU Consolidated Undrained Triaxial UU Unconsolidated Undrained Triaxial TV Torvane (Approx. Shear Strength, tsf) UC Unconfined Compression SAMPLE TYPE SYMBOLS ® 2.0" OD Split Spoon (SPT) (140 lb. hammer with 30 in. drop) IShelby Tube Non-standard Penetration Test (3.0" OD Split Spoon with Brass Rings) OSmall Bag Sample Large Bag (Bulk) Sample Core Run ® 3-1/4" OD Split Spoon GROUNDWATER SYMBOLS Groundwater Level (measured at time of drilling) T Groundwater Level (measured in well or open hole after water level stabilized) COMPONENT PROPORTIONS PROPORTION RANGE DESCRIPTIVE TERMS < 5% Clean 5 - 12% Slightly (Clayey, Silty, Sandy) 12 - 30 % Clayey, Silty, Sandy, Gravelly 30 - 50 % Very (Clayey, Silty, Sandy, Gravelly) Components are arranged in order of increasing quantities. NOTES: Soil classifications presented on exploration logs are based on visual and laboratory observation. Soil descriptions are presented in the following general order: MOISTURE CONTENT Density/consistency, color, modifier (if any) GROUP NAME, additions to group name (if any), moisture DRY Absence of moisture, dusty, content. Proportion, gradation, and angularity of constituents, additional comments. dry to the touch. (GEOLOGIC INTERPRETATION) MOIST Damp but no visible water. Please refer to the discussion in the report text as well as the exploration logs for a more WET Visible free water, usually complete description of subsurface conditions. soil is below water table. n k T" Kittitas County Transfer Station LEGEND OF TERMS AND SYMBOLS USED ON Ual Geotechnical Investigation EXPLORATION LOGS Ellensburg, Washington GEOSCIENCES INC. PROJECT NO.: 2022-1 H8 FIGURE: A-1 LEGEND 2022-188.GPJ 5110123 DRILLING COMPANY: Holt Services, Inc. DATE STARTED: 2/28/2023 DRILLING METHOD: Hollow Stem Auger, Mobile Drill B57 Track Rig. DATE COMPLETED: 2128/2023 SAMPLING METHOD: SPT w/ Autohammer LOGGED BY: V. Oskierko LOCATION: See Figure 2. e 1 10 1 15 1 20 1 25 DESCRIPTION m w 0 z of Standard Penetration Test a L w ¢ (140 lb. weight, 30" drop) z c H o ♦ Blows per foot z O w w w N z D d a- z o W x O w m � ° a ' O U 0 10 20 30 40 50 w SM Loose, yellowish brown, silty SAND with roots and organic material, moist. (TOPSOIL) ML Medium stiff, olive gray, very sandy, SILT, moist. Contains scattered roots. (FINE-GRAINED ALLUVIUM) SM Loose, olive gray, very silty, SAND, moist. (COARSE -GRAINED ALLUVIUM) Only recovered 1 coarse gravel in tip of sampler. Dense, olive gray, silty fine to medium SAND, wet. Poor SM recovery. Rough drilling from 10'-12.5' BGS. Very dense, grayish brown, fine gravelly, poorly graded SP SAND, wet. Very dense, grayish brown, slightly silty, fine to coarse SP SM gravelly, poorly graded SAND, wet. Exploration terminated at 17-feet below ground surface (BGS) due to auger refusal. Groundwater was encountered at 10' BGS. Borehole abandoned with 3/8" bentonite chips. A bulk sample of drill cuttings was taken while drilling from approximately U-5 BGS and combined with the bulk sample obtained from BH-6 for particle -size determination, organic content, and CBR testing. S-1 3-3-3 S-2 2-3-3 S-3 2-2-7 GS S-4 3-3-1 Sz S-5 5-8-13 S-6 14-38-50/4" S-7 25-38-50/4" NOTE: This log of subsurface conditions applies only at the specified location and on the date indicated and therefore may not necessarily be indicative of other times and/or locations. 0 20 40 60 80 100 Water Content (%) Plastic Limit i 0 Liquid Limit Natural Water Content BORING: Kittitas County Transfer Station BH-1 Geotechnical Investigation UEllensburg, Washington PAGE: 1 of 1 GEOSCIENCES INC. PROJECT NO.: 2022-188 FIGURF A-2 BORING-DSM 2022-188.GPJ 5/11/23 DRILLING COMPANY: Holt Services, Inc. DATE STARTED: 3/1/2023 DRILLING METHOD: Hollow Stem Auger, Mobile Drill B57 Track Rig. DATE COMPLETED: 3/1/2023 SAMPLING METHOD: SPT w/ Autohammer LOGGED BY: V. Oskierko LOCATION: See Figure 2. 5 1 10 1 15 1 20 mz w w Standard Penetration Test } 2 r ¢ (140 lb. weight, 30" drop) E Z H z ♦ Blows per foot z O w w w w F- a CL Z) j _ DESCRIPTION vi U) oWz a a O 0 0 10 20 30 40 w 50 OL Medium stiff, dark brown, organic SILT, with roots, moist. _ No recovery. Description based on drill cuttings. (TOPSOIL) CL Medium stiff to soft, dark brown, very sandy, lean CLAY, very moist. (FINE-GRAINED ALLUVIUM) No recovery. ----------------------- Very dark brown, sandy, lean CLAY, moist. Push shelby tube. CL Refusal after pushing 18". Recovered 18" in tube. Dry Density= 88.5 pcf @ 31.6% MC. Sp Organic Content = 2.8% Drilling becomes rough. SM Very dense, brown, slightly silty, gravelly, poorly graded SAND, moist. Gravel broken by sampler. (COARSE -GRAINED ALLUVIUM) I Rough drilling from 7.5'-10' BGS. _ _ _ _ _ _ _ _ _ _ Sp SM Very dense, brown, slightly silty, very gravelly, poorly graded SAND. Dense, bluish gray, fine gravelly, silty SAND, wet. SM Very dense, bluish gray, very gravelly, silty SAND, wet. SM Very rough drilling from 16-18' BGS. No recovery. Sampler came up wet. Exploration terminated at 21.25-feet below ground surface (BGS). Groundwater was encountered at 9' BGS. Borehole abandoned with 3/8" bentonite chips. A bulk sample of drill cuttings was taken while drilling from approximately 0'-5 BGS. 25 s-1 T 1 z-z-2 S-2 1-1-2 S-3 D AL L %F S-4 11-36-24 Q S-5 7-25-38 S-6 6-19-30 S-7 10-45-45 GS S-8 28-35-50/3" NOTE: This log of subsurface conditions applies only at the specified location and on the date indicated and therefore may not necessarily be indicative of other times and/or locations. L » >>. 0 20 40 60 80 100 Water Content (%) Plastic Limit I-- *0 j Liquid Limit Natural Water Content "01 BORING: Kittitas County Transfer Station BH-2 Geotechnical Investigation UEllensburg, Washington PAGE: 1 of 1 GEOSCIENCES INC. PROJECT NO.: 2022-188 FIG LJRF- A-3 BORING-DSM 2022-188.GPJ 5/11/23 DRILLING COMPANY: Holt Services, Inc. DATE STARTED: 3/1/2023 DRILLING METHOD: Hollow Stem Auger, Mobile Drill B57 Track Rig. DATE COMPLETED: 3/1/2023 SAMPLING METHOD: SPT w/ Autohammer LOGGED BY: V. Oskierko LOCATION: See Figure 2. 5 1 10 1 15 1 20 1 25 DESCRIPTION mz w W Standard Penetration Test W W ¢ (140 lb. weight, 30" drop) z c w ~ A Blows per foot z O W Z h o=O W can Cn a O O 0 10 20 30 40 50 W = OL Stiff, dark brown, sandy, organic SILT, with roots, moist. (TOPSOIL) CH Medium stiff, grayish brown, sandy, fat CLAY, moist. (FINE-GRAINED ALLUVIUM) CH ---------------------- Medium stiff, dark brown, sandy, fat CLAY, moist. Push shelby tube. Refusal after pushing 21". Recovered 21" in tube. Dry Density= 73.2 pcf @ 42.4% MC Organic Content= 3.5% GP Drilling becomes rough. GM Dense, brown, slightly silty, very sandy, poorly graded o GRAVEL, moist. 0 Gravel broken by sampler. o Very rough drilling from 10'-12.5' BGS. e (COARSE -GRAINED ALLUVIUM) Becomes very dense, wet. 0 °.. SP ---------------------- Dense, grayish brown, fine gravelly, poorly graded SAND, wet. Exploration terminated at 16.5-feet below ground surtace (BGS) . Groundwater was encountered at 11.5' BGS. Borehole abandoned with 3/8" bentonite chips. A bulk sample of drill cuttings was taken while drilling from approximately 0'-5' BGS and combined with a bulk sample from BH-4 for particle -size determination, organic content, and CBR testing. S-1 4-7-7 S-2 1-2-3 S-3 1-1-2 S-4 DID AL %F CN S-5 12-14-16 GS V S-6 15-28-25 S-7 5-15-29 NOTE: This log of subsurface conditions applies only at the specified location and on the date indicated and therefore may not necessarily be indicative of other times and/or locations. 0 20 40 60 80 100 Water Content (%) Plastic Limit 1-0 Liquid Limit Natural Water Content Kittitas County Transfer Station BORING: "01 BH-3 Geotechnical Investigation UEllensburg, Washington PAGE: 1 of , GEOSCIENCES INC. PROJECT NO.: 2022-188 FIGURE: A-4 BORING-DSM 2022-188.GPJ 5/11/23 DRILLING COMPANY: Holt Services, Inc. DATE STARTED: 3/1/2023 DRILLING METHOD: Hollow Stem Auger, Mobile Drill B57 Track Rig. DATE COMPLETED: 3/1/2023 SAMPLING METHOD: SPT w/ Autchammer LOGGED BY: V. Oskierko LOCATION: See Figure 2. 5 1 10 1 15 1 20 1 25 w U a m Z H Nc U W Z h- 4 F c Iw- w w w�co X 0 DESCRIPTION N a o- g O 0n OL Medium stiff, dark brown, sandy, organic SILT, moist. = (TOPSOIL) CL Soft, dark grayish brown, lean CLAY, moist, plastic. (FINE-GRAINED ALLUVIUM) CH ---------------------- Very soft, fat CLAY, very moist. Becomes sandy. GP Medium dense, brown, slightly silty, sandy, poorly graded ° GM GRAVEL, wet. 0 DQ Rough drilling from 10'-12.5' BGS. o (COARSE -GRAINED ALLUVIUM) No recovery. ° Rough drilling form 12.6-15' BGS. O Dense, grayish brown, slightly silty, poorly graded SAND, wet. SP SM Exploration terminated at 16.5-feet below ground surface (BGS) . Groundwater was encountered at 9.5' BGS. Borehole abandoned with 3/8" bentonite chips. A bulk sample of drill cuttings was taken while drilling from approximately 0'-6 BGS and combined with a bulk sample from BH-3 for particle -size determination, organic content, and CBR testing. S-1 2-3-2 S-2 0-0-2 S-3 0-0-0 S-4 0-0-1 V S-5 3-7-12 GS S-6 18-17-10 S-7 9-22-22 NOTE: This log of subsurface conditions applies only at the specified location and on the date indicated and therefore may not necessarily be indicative of other times and/or locations. Standard Penetration Test (140 lb. weight, 30" drop) Z ♦ Blows per foot O 1n 2n 3n 4n 5n w m I u ♦... 0 20 40 60 80 100 Water Content (%) Plastic Limit i 40 Liquid Limit Natural Water Content BORING: Kittitas County Transfer Station BH-4 M Geotechnical Investigation Ellensburg, Washington PAGE: 1 of 1 GEOSCIENCES INC. PROJECT NO.: 2022-188 FIGURE: A-5 BORING-DSM 2022-188.GPJ 5111/23 DRILLING COMPANY: Holt Services, Inc. DATE STARTED: 3/1/2023 DRILLING METHOD: Hollow Stem Auger, Mobile Drill B57 Track Rig. DATE COMPLETED: 3/1/2023 SAMPLING METHOD: SPT w/ Autohammer LOGGED BY: V. Oskierko LOCATION: See Figure 2. J J O o ° V) D 0 5 1 16 1 15 I 20 1 25 DESCRIPTION W U m Z - W Z U) Cuj W z D Q 0 (n d O 0 OL Medium stiff, dark brown, sandy, organic SILT, with roots, = moist. (TOPSOIL) ML Soft to medium stiff, very dark brown, SILT, very moist. (FINE-GRAINED ALLUVIUM) Becomes sandy. ---------------------- Soft, dark brown, sandy, fat CLAY, moist, plastic. CH Push shelby tube 24". Recovered 24" in tube. Dry Density-- 80.0 pcf @ 38.4% MC Organic Content= 3.5% CH ---------------------- Very soft, dark brown, fat CLAY, very moist. Drilling becomes rough. GP Very dense, brown, slightly silty, poorly graded GRAVEL, wet. ° GM Gravel broken by sampler. 0 ° (COARSE -GRAINED ALLUVIUM) --------ra------------- Very dense, brownish gray, poorly graded GRAVEL, wet. GP DO o3 o Becomes sandy. Exploration terminated at 15.75-feet below ground surface (BGS). Groundwater was encountered at 9' BGS. Borehole abandoned with 3/8" bentonite chips. A bulk sample of drill cuttings was taken while drilling from approximately 0'-5' BGS and combined with a bulk sample from BH-8 for particle -size determination, organic content, and CBR testing. S-1 2-2-3 S-2 1-3-2 S-3 DD AL %F CN S-4 0-0-0 S-5 15-38-50/6" S-6 9-14-37 S-7 40-50/3" NOTE: This log of subsurface conditions applies only at the specified location and on the date indicated and therefore may not necessarily be indicative of other times and/or locations. Standard Penetration Test (140 lb. weight, 30" drop) ♦ Blows per foot 0 10 20 30 40 W >>. 0 20 40 60 80 100 Water Content (%) Plastic Limit �� Liquid Limit Natural Water Content Z OLU w BORING: It" Kittitas County Transfer Station BH-5 Geotechnical Investigation Ual Ellensburg, Washington PAGE: 1 of 1 GEOSCIENCES INC. PROJECT NO.: 2022-1 8$ FIGURE: A-6 BORING-DSM 2022-188.GPJ 5/11/23 DRILLING COMPANY: Holt Services, Inc. DATE STARTED: 2/28/2023 DRILLING METHOD: Hollow Stem Auger, Mobile Drill 657 Track Rig. DATE COMPLETED: 2/28/2023 SAMPLING METHOD: SPT w/ Autohammer LOGGED BY: V. Oskierko LOCATION: See Figure 2. 1 20 - 1 25 - m w 0 Z Of W v a} �s co a J O0 W w Lu ~ Z J J X(p n u}i Z) DESCRIPTION vi (n Lu O 0- g of O 0 OL Medium stiff, dark brown, organic SILT, with roots, moist. 3-1 2-2-2 = (TOPSOIL) CL Medium stiff, dark brown, sandy, lean CLAY, moist, with trace organic matter. S-2 0-1-3 (FINE-GRAINED ALLUVIUM) S-3 9-10-10 GW Medium dense, grayish brown, slightly silty, fine to coarse • GM sandy, poorly -graded GRAVEL, moist. H • California sampler driven. • (COARSE -GRAINED ALLUVIUM) • Poor recovery. Only recovered broken rock. S4 4-6-10 • • ---------------------- V GP Very dense, grayish brown, slightly silty, very sandy, poorly S-5 10-20-31 ° GM graded GRAVEL, wet. O Rough drilling from 10'-12.5' BGS. GW ---------------------- Dense, grayish brown, slightly silty, very sandy, well graded S-6 9-8-20 GS • GM GRAVEL, wet. • Dense, grayish brown, fine to coarse gravelly, poorly graded S-7 33 20-22 SP SAND, wet. Rough drilling from 15' to 18'. No recovery. ® S-8 50/6" Exploration terminated at 18.5-feet below ground surface (BGS) due to auger refusal. Groundwater was encountered at 10' BGS. Borehole abandoned with 3/8" bentonite chips. A bulk sample of drill cuttings was taken while drilling from approximately 0'-5' BGS and combined with a bulk sample from BH-1 for particle -size determination, organic content, and CBR testing. NOTE: This log of subsurface conditions applies only at the specified location and on the date indicated and therefore may not necessarily be indicative of other times and/or locations. Standard Penetration Test (140 lb. weight, 30" drop) ♦ Blows per foot D 10 20 30 40 50 ♦: 0 20 40 60 80 100 Water Content (%) Plastic Limit ' 0 Liquid Limit Natural Water Content z O Lu w Kittitas County Transfer Station BORING: � BH-6 Geotechnical Investigation Ellensburg, Washington PAGE: 1 of 1 U I GEOSCIENCES INC. PROJECT NO.: 2022-188 FIGURE: A-7 BORING-DSM 2022-188.GPJ 5111123 DRILLING COMPANY: Holt Services, Inc. DATE STARTED: 2/28/2023 DRILLING METHOD: Hollow Stem Auger, Mobile Drill B57 Track Rig. DATE COMPLETED: 2/28/2023 SAMPLING METHOD: SPT w/ Autohammer LOGGED BY: V. Oskierko LOCATION: See Figure 2. 5 1 10 1 15 1 20 rf w d <� U W } 4 t— Z U ~ w co tr Z 0 Lu (D DESCRIPTION U) (n a- a O n ML Medium stiff, dark brown, SILT, with roots, moist. (TOPSOIL) OL Medium stiff, dark brown, gravelly, organic SILT, moist. (FINE-GRAINED ALLUVIUM) GP Last 6-inches of sample driven on gravel. Rough drilling at GM 3.5 to 5' 0 Poor recovery. Only recovered broken rock. Rough drilling to 0 7.5' 0 (COARSE -GRAINED ALLUVIUM) 0 o Dense, brown, slightly silty, sandy, poorly graded GRAVEL, 0 wet. O GW Very dense, grayish brown, slightly silty, very sandy, well • GM graded GRAVEL, wet. • • No Recovery. • • Very dense, grayish brown, gravelly, poorly graded SAND, SP wet. Becomes very gravelly. Exploration terminated at 20.75-feet below ground surface (BGS). Groundwater was encountered at 7.5 BGS. Borehole abandoned with 3/8" bentonite chips. 25 S-1 2-4-3 S-2 1-2-14 S-3 2-40-50/3" Q S-4 5-21-16 S-5 7-25-29 GS S-6 50/6" S-7 50/5" S-8 40-50/3" NOTE: This log of subsurface conditions applies only at the specified location and on the date indicated and therefore may not necessarily be indicative of other times and/or locations. Standard Penetration Test (140 lb. weight, 30" drop) ♦ Blows per foot O H ui 10 20 30 40 50 w w w ♦: 0 20 40 60 80 100 Water Content (%) Plastic Limit i — 0 Liquid Limit Natural Water Content BORING: M Kittitas County Transfer Station BH-7 U I Geotechnical Investigation Ellensburg, Washington PAGE: 1 of , GEOSCIENCES INC. PROJECT NO.: 2022-188 FIGURE: A-8 BORING-DSM 2022-188.GPJ 5/11123 DRILLING COMPANY: Holt Services, Inc. DATE STARTED: 3/1/2023 DRILLING METHOD: Hollow Stem Auger, Mobile Drill B57 Track Rig. DATE COMPLETED: 3/1/2023 SAMPLING METHOD: SPT w/ Autohammer LOGGED BY: V. Oskierko LOCATION: See Figure 2. E 1 10 1 15 1 20 1 25 of w U W m Z — Z � w rr m z 0. CL 3 DESCRIPTION 0)(n 0 d fl Q 0 0 OL Medium stiff, dark brown, organic SILT, with roots, moist. = (TOPSOIL) CL Medium stiff, grayish brown, very sandy, lean CLAY, moist. (FINE-GRAINED ALLUVIUM) Push shelby tube. Refusal after pushing 15". Recovered 12" T in tube. 1 Becomes dark brown. SP Dry Density- 90.7 pcf @ 21.1 % MC Organic Content= 3.8% GW Material at the bottom of tube appears to be a poorly graded 1 • GM � SAND, moist. ) • Dense, gray, slightly silty, sandy, well graded GRAVEL, moist. • Gravel broken by sampler. w (COARSE -GRAINED ALLUVIUM) Rough drilling from 7.6-10' BGS. Becomes very dense. Very rough drilling from 10'-12.5' BGS. GP Very dense, grayish brown, slightly silty, sandy, poorly graded ° GM GRAVEL, wet. C? ---------------------- Very dense, grayish brown, gravelly, poorly graded SAND, SP wet. Exploration terminated at 16.5-feet below ground surface (BGS). Groundwater was encountered at 9' BGS. Borehole abandoned with 3/8" bentonite chips. A bulk sample of drill cuttings was taken while drilling from approximately 0'-5' BGS and combined with a bulk sample from BH-5 for particle -size determination, organic content, and CBR testing. S-1 2-4-3 S-2 2-2-4 S-3 DD AL %F S-4 5-19-16 GS Q S-5 18-30-42 S-6 16-32-40 S-7 12-20-32 NOTE: This log of subsurface conditions applies only at the specified location and on the date indicated and therefore may not necessarily be indicative of other times and/or locations. Standard Penetration Test (140 lb. weight, 30" drop) Z A Blows per foot O J 10 20 30 40 50 w - > 0 20 40 60 80 100 Water Content (%) Plastic Limit i —0 Liquid Limit Natural Water Content Kittitas County Transfer Station BORING: BH_8 Geotechnical Investigation Ellensburg, Washington PAGE: 1 of 1 GEOSCIENCES INC. PROJECT NO.: 2022-1 HS FIGURE: A"9 BORING-DSM 2022-188.GPJ 5/12123 TEST RESULTS APPENDIX B LABORATORY TEST RESULTS The soil samples obtained from the test pits and borings were taken to HWA's soils laboratory for testing. Laboratory tests were conducted on selected soil samples to characterize relevant engineering properties of the on -site soils. Laboratory tests, as described below, included determination of moisture content, grain size distributions, Atterberg Limits, California Bearing Ratio, and one-dimensional consolidation of representative samples. MOISTURE CONTENT (BY MASS): The moisture content of selected soil samples were determined in general accordance with ASTM D 2216. Test results are presented on the exploration logs in Appendix A, and Figures B-1 and B-2, in Appendix B, which provide a summary of material properties. PARTICLE SIZE ANALYSIS OF SOILS: Selected samples were tested to determine the particle size distribution of material in general accordance with ASTM D422. The results are summarized on the Grain Size Distribution report, Figures B-3 and B-7 which also provide information regarding the classification of the sample and the moisture content at the time of testing. LIQUID LIMIT, PLASTIC LIMIT, AND PLASTICITY INDEX OF SOILS (ATTERBERG LIMITS): Selected samples were tested using method ASTM D 4318, multi -point method. The results are reported on the Liquid Limit, Plastic Limit, and Plasticity Index report, Figure B-8 and B-9. CBR (CALIFORNIA BEARING RATIO) OF LABORATORY COMPACTED SOILS: Selected composite samples were tested in general accordance with method ASTM D 1883. Each material was moisture conditioned to near optimum moisture content and compacted to approximately 95% of its laboratory maximum dry density as determined per ASTM D 1557. The test results are summarized on the attached CBR of Laboratory Compacted Soils reports shown on Figures B-10 through B-12. ONE DIMENSIONAL CONSOLIDATION PROPERTIES OF SOIL: The consolidation properties of selected soil samples were measured in general accordance with ASTM D2435. Saturation was maintained by inundation of the sample throughout the test. The sample was subjected to increasing increments of total stress. Loads on the sample were maintained for a period of 24- hours to collect sufficient data for use in the estimation of secondary consolidation. Unloading of the samples was carried out incrementally. The test results are presented on the attached Consolidation Test Report, Figures B-13 through B-14. 2022-188-21 B-1 HWA GeoSciences Inc. ZZ 4OF0 R.g55 w W° N �- � = 0- ° ce m W" aZ 5 UU '✓ UZ O OU > U U m ATTERBERG LIMITS (%) � > t' ° ,' z o �U OLL ¢ O SAMPLE DESCRIPTION LL PL PI 8M-1,s-t 0.0 1.5 25.8 SM Yellowish -brown, Silty SAND BH-1,S-2 2.5 4.0 29.2 ML Olive -gray, Sandy SILT BH-1,S-3 5.0 6.5 24.5 8.8 52.6 38.5 SM Olive -gray, Silty SAND SH-1 & BH-6,Bulk-1 0.0 5.0 33.0 3.8 36 27 9 0.8 40.1 59.1 ML Olive brown, Sandy SILT BH-2,S-3 5.0 6.5 31.6 2.8 34 24 10 54.1 CL Very dark brown, Sandy Lean CLAY BH-2.S-4 75 9.0 8.9 SP-SM Olive -brown, Poorly graded SAND with silt and gravel BH-2,S-7 15.0 16.5 10.8 42.1 43.7 14.2 SM Gray, Silty SAND with gravel 13H-3.S-1 0.0 1.5 30.4 OL Dark grayish -brown, Organic SILT with sand BH-3,S-2 2.5 4.0 40.3 CH Olive -brown, Fat CLAY with sand BH-3.S-3 5.0 6.5 44.3 CH Dark grayish -brown, Fat CLAY BH-3,S-4 7.5 9.3 45.8 3.5 59 27 32 85.4 CH Dark brown, Fat CLAY BH-3,S-5 10.0 11.5 7.2 60.5 30.1 9.5 GP -GM Olive -gray, Poorly graded GRAVEL with silt and sand 1314-3 & BHA,Bulk-1 0.0 5.0 35.5 3A 38 24 14 0.3 23.6 76.1 CL Olive brown, lean CLAY with sand BH4,S-1 0.0 1.5 27.8 OL Dark brown, Organic SILT SH-4,S-2 2.5 4.0 31.9 CL dark grayish -brown, Lean CLAY 8114,S-3 5.0 6.5 50.3 CH light Olive -brown, Fat CLAY BH4,S4 7.5 9.0 34.8 CH dark olive -brown, Fat CLAY with sand BH-4,S-5 10.0 11.5 9.1 75.0 19,2 5.7 GP -GM Olive Gray, Poorly graded GRAVEL with silt and sand BHs,S-1 0.0 1.5 34.7 OL Dark Olive -brown, Organic SILT with sand SH-5,9-2 2.5 4.0 32.0 ML Olive -brown, SILT Notes: 1. This table summarizes information presented elsewhere in the report and should be used in conjunction with the report test, other graphs and tables, and the exploration logs. 2. The soil classifications in this table are based on ASTM D2487 and D24B8 as applicable. Kittitas County Transfer Station Geotechnical Investigation Ellensburg, Washington SUMMARY OF MATERIAL PROPERTIES PAGE: 1 of 2 GEOSCIENCES INC. PROJECT NO.: 2022-188 FIGURE: B-1 INDEX MATSUM 3 2022-188.GPJ 5/11123 01 Op �OJO a w o ~ W O _ H a. Lu Lu 2 O m_ WZtlI- � NW o Z 0O 0 o > ATTERBERG LIMITS (%) N Q NZ ZN LL O =ON���LLfN/J SAMPLE DESCRIPTION LL PL PI BH-5,5-3 5.0 7.0 38.4 3.5 50 24 26 86,5 CH Very dark brown, Fat CLAY BH-5,5-a 7.5 9.0 41.0 CH Dark brown, Fat CLAY BH-5 & 81-1-8,8u1k-i 0.0 5.0 27.2 2.5 37 20 17 0.2 31.2 68.5 CL Olive brown, Sandy lean CLAY BH-6,S-1 0,0 1.5 40.0 OL Dark brown, Organic SILT BH-65-2 2.5 4.0 36.7 CL Dark brown, Lean CLAY with sand BH-6,S-6 12.5 14.0 13.7 52.9 39.1 8.0 GW-GM Dark Brown, Well graded GRAVEL with silt BWTS-1 0.0 1.5 33.3 ML Very dark brown, SILT BH-7,S-2 2.5 4.0 29.4 OL Very dark broom. Organic SILT with gravel BH-7,Sr 7.5 9.0 10.4 GP -GM Dark yellowish -brown, Poorly graded GRAVEL with silt BH-7,S-5 10.0 11.5 11.7 55.7 39.1 5.2 GW-GM Dark brown, Well graded GRAVEL with silt and sand BH-8,S-1 0.0 t5 27.9 OL Very dark brown. Organic SILT 81-1-8,S-2 2.5 4.0 34.7 CL Very dark Brown, Lean CLAY with sand BH-8,S-3 5.0 6.3 21.1 3.8 44 23 21 50.3 CL Very dark brown, Sandy lean CLAY BH-8,S1 7.5 9.0 5.0 67.2 26.6 6.2 GW-GM Very dark Grayish -brown, Well graded GRAVEL with silt an Notes: 1. This table summarizes information presented elsewhere in the report and should be used in conjunction with the report test, other graphs and tables, and the exploration logs. 2. The soil classifications in this table are based on ASTM D2487 and D2488 as applicable. ulul Kittitas County Transfer Station Geotechnical Investigation Ellensburg, Washington SUMMARY OF MATERIAL PROPERTIES PAGE: 2 of 2 GEOSCIENCES INC. PROJECT NO.: 2022-188 FIGURE: B-2 INDEX MATSUM 3 2022.188,GPJ 511 V23 sal imm�illill§El�lillioL 11"Ellm IN off ## SYMBOL SAMPLE DEPTH (ft.) CLASSIFICATION OF SOIL- ASTM D2487 Group Symbol and Name % MC LL PL pl Gravel Sand Fio es • BH-1 S-3 5.0 - 6.5 ISM) Olive -gray, Silty SAND 24 8.8 52.6 38.5 ■ BH-1 & BH- Bulk-1 0.0 - 5.0 (ML) Olive brown, Sandy SILT 33 36 27 9 0.8 40.1 59.1 A BH-2 S-3 5.0 - 6.5 (CL) Very dark brown, Sandy Lean CLAY 32 34 24 10 54.1 ■ ■ Kittitas County Transfer Station PARTICLE-SIZEOF SOILSNALYSIS �� Geotechnical Investigation METHOD ASTM D6913/D7928 Ellensburg, Washington GEOSCIENCES INC. PROJECT NO.: 2022-188 FIGURE: B-3 HwAGRSZ 2022-188.GPJ 5111123 i SYMBOL SAMPLE DEPTH (ft.) CLASSIFICATION OF SAIL- ASTM D2487 Group Symbol and Name % MC LL PL pl Gravel Sand Fines • BH-2 S-7 15.0 - 16.5 (SM) Gray, Silly SAND with gravel 11 42.1 43.7 14.2 ■ BH-3 S-4 7.5 - 9.3 (CH) Dark brown, Fat CLAY 46 59 27 32 85.4 ♦ BH-3 S-5 10.0 - 11.5 (GP -GM) Olive -gray, Poorly graded GRAVEL with silt and sand 7 60.5 30.1 9.5 PARTICLE -SIZE ANALYSIS Kittitas County Transfer Station OF SOILS Geotechnical Investigation METHOD ASTM D6913/D7928 /-� Ellensburg, Washington GEOSC[ENCES INC PROJECT NO.: 2022-188 FIGURE: B-4 HWAGRSZ 2022-188.GPJ 5111/23 Ito milli 11111111111011111111 jIjj1Ej�lj Nk7,j1. MINE Mill i SYMBOL SAMPLE DEPTH (ft.) CLASSIFICATION OF SOIL- ASTM D2487 Group Symbol and Name % MC LL PL pl Gravel Sand Fines • BH-3 & BH Bulk-1 0.0 - 5.0 (CL) Olive brown, lean CLAY with sand 36 38 24 14 0.3 23.6 76.1 ■ BH•4 S-5 10.0 - 11.5 (GP -GM) Olive Gray, Poorly graded GRAVEL with silt and sand 9 75.0 19.2 5.7 A BH-5 S-3 5.0 - 7.0 (CH) Very dark brown, Fat CLAY 38 50 24 26 86.5 PARTICLE -SIZE ANALYSIS MAI , Kittitas County Transfer Station OF SOILS Geotechnical Investigation METHOD ASTM D69131D7928 Ellensburg, Washington GEOSCIENCES INC PROJECT NO.: 2022-188 FIGURE: B-5 HWAGRSZ 2022-188.GPJ 511123 50 10 5 1 0.5 0.1 0.05 0.01 0.005 0.001 0.0005 GRAIN SIZE IN MILLIMETERS SYMBOL SAMPLE DEPTH (ft.) CLASSIFICATION OF SOIL- ASTM D2487 Group Symbol and Name % MC LL I PL PI Gravel Sand Finn- • BH-5 & BH4 Bulk-1 0.0 - 5.0 (CL) Olive brawn, Sandy lean CLAY 27 37 20 17 0.2 31.2 68.5 ■ BH-6 S-6 12.5 - 14.0 (GW-GM) Dark Brawn, Well graded GRAVEL with silt and sand 14 52.9 39.1 8.0 ♦ BH-7 S-5 10.0 - 11.5 (GW-GM) Dark brawn, Well graded GRAVEL with silt and sand 12 55.7 39.1 5.2 ■ ■ Kittitas County Transfer Station PARTICLE-SIZEOF SOILSNALYSIS U07 Geotechnical Investigation METHOD ASTM D6913/D7928 INC.11ensburg, Washington GEDSaENCES NC. PROJECT NO.: 2022-188 FIGURE. B-6 HWAGRSZ 2022-188.GPJ 5111123 i A SYMBOL SAMPLE DEPTH (ft.) CLASSIFICATION OF SOIL- ASTM D2487 Group Symbol and Name % MC LL PL pl Gravel Sand Fines i BH-8 S-3 5.0 - 6.3 :.a (CL) Very dark brown, Sandy lean CLAY 21 44 23 2t 50.3 ■ 3.. BH-8 S-4 7.5 - 9.0 (GW-GM) Very dark Grayish -brown, Well graded GRAVEL with silt and sand 5 67.2 26.6 6.2 &71 Kittitas County Transfer Station PARTIC OF SOISNALYSIS Geotechnical Investigation METHOD ASTM D6913/D7928 Ellensburg, Washington GEOSCIENCES INC PROJECT NO.: 2022-188 FIGURE: B-7 HWAGRSZ 2022-188.GPJ 511123 60 CL CH 50 X 40 W 0 Z >- 30 U H -100 eft 20 CL - o 10 CL-ML ML MH 01 1�✓ 0 20 40 60 80 100 LIQUID LIMIT (LL) SYMBOL SAMPLE DEPTH (ft) CLASSIFICATION % MC LL PL PI %Fines • -1 & BH 6 Bulk-1 0.0 - 5.0 (ML) Olive brown, Sandy SILT 33 36 27 9 59.1 ■ BH-2 S3 5.0 - 6.5 (CL) Very dark brown, Sandy lean CLAY 32 34 24 10 54.1 ♦ BH-3 S-4 Z5 - 9.3 (CH) Dark brown, Fat CLAY 46 59 27 32 85.4 O -3 & BH 4 Bulk-1 O.D - 5.0 (CL) Olive brown, lean CLAY with sand 36 38 24 14 76.1 ❑ BH-5 S-3 5.0 - 7.0 (CH) Very dark brown, Fat CLAY 38 50 24 26 86.5 A -5 8 BH 8 Bulk-1 0.0 - 5.0 (CL) Olive brown, Sandy lean CLAY 27 37 20 17 68.5 ■ f Kittitas County Transfer Station LIQUID LIMIT, PLASTIC LIMIT AND U �' Geotechnicai Investigation PLAEX OF STICITY D4 181LS Ellensburg, Washington GEOSCIENCES INC. PROJECT NO.: 2022-188 FIGURE: B-8 HWAATTB 2022-198.GPJ 511/23 60 CL CH 50 d 7C 40 W 0 Z_ >- 30 H U E- 20 d 10 CL-ML ML 0 0 20 40 60 80 100 LIQUID LIMIT (LL) SAMPLE DEPTH (ft) CLASSIFICATION % MC LL PL PI %Fines SYMBOL • BH-8 S-3 5.0 - 6.3 {CL) Very dark brown, Sandy lean CLAY 21 44 23 21 50.3 ■ f Kittitas County Transfer Station LIQUID LIMIT, PLASTIC LIMIT AND �, Geotechnical Investigation PLASTICITY INDEX OF SOILS Ellensburg, Washington METHOD ASTM D4318 GEOSCIENCES INC. PROJECT NO.: 2022-188 FIGURE: B-9 HWAATrB 2022-188.GPJ 5/1/23 CBR (California Bearing Ratio) OF LAB COMPACTED SOILS II:�.ii1f (ASTM D 1883) WI CLIENT: SCS Engineers HWAG> OSCZENCES INC. PROJECT: Kittitas County Transfer Station SAMPLE ID: _BH-1+BH-6 PROJECT NO: 2022-188 Sampled By: VO Tested By: NJ Date Sampled: 31512023 Date Received: 31512023 Date Tested: 311612023 Material Description: Soft, olive brown sandy SILT (ML) Sample Location: Composite of upper 5 feet of soil frm SH-1 and BH-6. Compaction Standard: 7x D698 ®D1557 Condition: QSoaked Far 96 hisUnsoaked Max. Dry Density: 81.6 pcf @ 35.9 % M.G. with 1 % scalped -off an the 3/4" sieve Test Results Dry Density c 81.6 Percent Com action 100.0 Moisture before Compaction °/a 35.9 Moisture alter Compaction % 35.0 Percent Swell initial ht = 7" -4.4 Moisture, after Soaking % 34.9 Moisture To 1" after Soak(%),33.8 Surcharge Weight lbs 10 CBR at 0.1" Penetration 0.8 CBR at 0.2" Penetration 0.7 CBR Value 0.8 16 14 12 10 c. m --- m 8 � 6 4 2 - 0 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 Displacement (in) 4.9 n.s 0.7 0.6 0.5 0.4 0.3 02 0.1 0.0 Bn 82 84 86 88 90 92 94 96 98 10o % Compaction REVIEWED BY: SEG FIGURE: 10 CBR (California Bearing Ratio) OF LAB COMPACTED SOILS 1M, (ASTM 6 18B3) CLIENT: SCS Engineers HWAGEOSCIENCES INC. PROJECT: Kittitas County Transfer Station SAMPLE ID: BH-3+BH-4 PROJECT NO: 2022.188 Sampled By: VO Tested By: NJ Date Sampled: 3/512023 date Received: 31512023 Date Tested: 3116/2023 Material Description: 11 Sample Location: Composite of upper 5 feet of soil from BH-3 and BH-4. Compaction Standard: F--ID698 ®D1557 Condition: QSoaked for 96 hrs []Unsoaked Max. Dry Density: 79.2 pcf @ 37.4 % M_G_ with 0 %fl scalped -oft can the 3/4" sieve Test Results Dry Density c 79.2 Percent Compaction 100.0 Moisture before Compaction °Io 37.4 Moisture after Compaction % 36.8 Percent Swell initial ht = 7" -4.4 Moisture, after Soaking % 37.0 Moisture Top_1" after Soak % 36.1 Surcharge Weight Ibs 10 CBR at 0.1" Penetration 1.0 CBR at 0.2" Penetration 0.8 CBR Value 1.0 18 1B t+oaa 14 12 a 10 Y in in ` p s 4 2 0 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 Displacement (in) 1.2 1.0 0.8 m 0,6 0.4 0.2 0.0 as 82 84 86 88 90 92 94 95 98 100 % Compaction REVIEWED BY: SEG FIGURE: 11 CBR (California Bearing Ratio) OF LAB COMPACTED SOILS (ASTM D 18$3) CLIENT: SCS Engineers HWAGEOSCIENCES INC, PROJECT: Kittitas County Transfer Station SAMPLE ID: _BH-S+BH-8 PROJECT NO: 2022-188 Sampled By: VO Tested By: NJ Date Sampled: 31512023 Date Received: 31512023 Date Tested: 311612023 Material Description: Olive brown, sandy lean CLAY (C_) Sample Location: Composite of soil cuttings from upper 5 feet of BH-5 and BH-8. Compaction Standard: F—ID698 ®D1557 Condition: QSoaked for 96 hrs Ejunsoaked Max. Dry Density: 91,7 pcf 27.9 % M.C. with 0 % scalped -off on the 3W' sieve Test Results Dry Density C 91.7 Percent Compaction 100.0 Moisture before Cam action °% 27,9 Moisture after Compaction %0 27.3 Percent Swell initial ht = 7" Moisture, after Soaking % 28.1 Moisture Top 1" after Soak (%) 27.7 Surchar a Weight Ibs 10 CBR at 0.1" Penetration 2,4 CBR at 0.2" Penetration 2.0 CBR Value 2.4 45 40000 35 30 — - 25 I 20 is 10 5 0 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0,50 Displacement (in) 3.0 2.5 2.0 1.0 I 0.5 0.0 Bo 82 84 86 88 90 92 94 96 98 100 % Compaction REVIEWED BY: SEG FIGURE: 12 CONSOLIDATION TEST REPORT — — -0.2 0.1 0.4 - c 0.7 U] — 1.0 c� m Q` 7110% 1.;i I 1.6 - 19� 2.2 2.5 25 20 y, 15 ro >� U �y — � 1D 5 O-T- Applied Pressure - ksf Natural Dry Dens. (Pef) ILL P1 Sp. Gr. t}SCS AASHTb Initial Void Ratio Saturation Moisture 83.6 % 1 42.4 % 69.4 59 32 2.65 CH 1.345 MATERIAL DESCRIPTION Very dark brown, fat CLAY Project No. 2022-188 Client: SCS Engineers Project: i4ittitas County Transfer Station Source of Sample: till-3 Sample Number: S-4 Remarks: Assumed Specific Gravity Figure B-13 GEOCIENCES INC. 0,0EfMW0e Tested By: AH Checked By: SEG CONSOLIDATION TEST REPORT -0.2 0.0 0.2 0.4 an 0.6 r� w d) 0.8 1.0 1.2 1.4 2G 20 16 — — - - - y 12 �'o � N 8 4 0 0,1 1 10 Applied Pressure - ksf Natural Dry Dens. (Pcf) LL PI Sp, Gr. USCS AASHTO Initial Void Ratio Saturation Moisture 93.4 % 38.4 % $0.0 50 26 2.65 CH 1.090 MATERIAL DESCRIPTION Very dark brown, Project No. 2022-188 Client: SC5 Lngineers Project: Kittiitas County Transfer Station Source of Sample: BH: -5 Depth: 5.0-7.0 Sample Number: S-3 Remarks: Assumed Specific Gravity Figure B-14 CIEC)C I E N E S I. NC, n�Ert�uvs� Tested By: AH Checked By: SEC PREVIOUS SITE EXPLORATIONS 2022-188-21 B-2 HWA GeoSciences Inc. PROJECT NUMBER: TEST PIT NUMBER: 684127CH.05.02 TP-01 (P) SHEET I OF 1 Wo TEST PIT LOG PROJECT: Kittitas County Transfer Station, Kittitas County, WA LOCATION: West Entrance (613492.9 N, 1617194.2 E) ELEVATION: 1548.1 ft NAVD88 CONTRACTOR: C. Van De Venter/Kittitas Co. EXCAVATION EQUIPMENT: Hitachi Zaxis 135US Excavator w/ 30" bucket DATE EXCAVATED: 4/9/2019 1.1.0 1 M/C. C. 14 n 4 — APPRox nimFNqinN.,,- Tv0do 10' Iona LOGGER: M. Kacmarcik SAMPLE SOIL DESCRIPTION COMMENT DIFFICULTY IN EXCAVATION, 3: S SOIL NAME, USCS GROUP SYMBOL, COLOR, RUNNING GRAVEL CONDITION, 'U' <� > MOISTURE CONTENT, RELATIVE DENSITY OR COLLAPSE OF WALLS, SAND HEAVE, < WW, omw W LU CONSISTENCY, SOIL STRUCTURE, MINERALOGY DEBRIS ENCOUNTERED, WATER Z) I- SEEPAGE GRADATIONAL CONTACTS, Z TFST IN"IKAP:NTATION Organic SILT (ML): brown to black, moist. Roots. (TOPSOIL) - — — — — — — — — — — — — — — — — — — — — — — — — — — — - Silty SAND with GRAVEL (SM)— : brown, moist. Approx 30% elastic silt, <10% rounded gravel. Some grey mottling. Root fibers to 3 feet. 1.0 1-BUL 2.0 Much sidewall sloughing in gravels below 3 feet. Sandy GRAVEL (GP): brown, moist. Gravels uniform 1 to 3" diameter rounded. Gravels are mixed lithology. 4.0 2-BULK 5.0 - — — — — — — — — — — — — — — — — — — — — — — — — — — — — - Well -Graded GRAVEL (GW): brown, moist. Gravels larger than above, Excavation becomes more difficult below 6 feet. max size 12" diameter, and mixed lithology. iiiii iiiii iiiii 0 09 a a Becomes coarser and more well -graded with iiiiidepth. iiiii iiiii iiiii iiiii 10 iiiii Becomes wet at 11 feet bgs. Water visibly flowing into it. .iiiiiiiii iiiii Install 1 inch diameter Schedule 40 PVC Bottom of Boring at 13.5 ft bgs on 4/912019 piezometer with field -slotted V screen in backwall of test pit. Pipe is 10' long. Backfill test pit to ground surface with compacted excavation 1 spoils. 151 PROJECT NUMBER: TEST PIT NUMBER: Ir A 684127CH.05.02 TP-02 (P) SHEET I OF 1 4A IM TEST PIT LOG PROJECT: Kittitas County Transfer Station, Kjttitas County, WA LOCATION: Scalehouse (613340.5 N. 1617516.8 E) ELEVATION: 1547.0 ft NAVD88 CONTRACTOR: C. Van De Venter/Kttitas Co. EXCAVATION EQUIPMENT: Hitachi Zaxis 135US Excavator w/ 30" bucket DATE EXCAVATED: 4/9/2019 UIATPQ I rVt=1 IZ-A n ff h- APPROX. DIMENSIONS: Twide 10'lonq LOGGER: M. Kacmarcik SAMPLE SOIL DESCRIPTION COMMENT DIFFICULTY IN EXCAVATION, LL 0 J RUNNING GRAVEL CONDITION, SOIL NAME, USCS GROUP SYMBOL, COLOR, 0 a. MOISTURE CONTENT, RELATIVE DENSITY OR COLLAPSE OF WALLS, SAND HEAVE, ww< omw W CONSISTENCY, SOIL STRUCTURE, MINERALOGY DEBRIS ENCOUNTERED, WATER W SEEPAGE GRADATIONAL CONTACTS, D 9 Tr-qT 1NqTBUMFNTATI0N Silty SAND with GRAVEL and C09BLF-S (SM): dark brown/black, Begin TP excavation at 11: 10, Ground surface is moist. Many roots. (TOPSOIL) grass pasture. 0.5 1-BULK Sidewall caving below 1.5 feet, difficult to 1.5 Well -Graded Sandy Gravel with Cobbles (GW): dark brown, moist, relatively easy digging. Maximum size observed in 8 inch diameter maintain open excavation >8'deep rounded cobble. Estimate 30% sand. - - - - - - - - 00000 - - - - - - - - - - - - - - - - - - - - - Layer of finer gravels with no cobbles. 0 *000 *sees Well -Graded Sandy Gravel with Cobbles (GW): dark brown, moist. Operator notes relatively easy digging. Install 1" diameter Schedule 40 PVC piezomete—r in test pit with field slotted screen from 7 to 8' bgs. see** 10 Backfill test pit to ground surface with compacted Bottom of Boring at 10.5 ft bgs on 4/9/2019 excavation spoils. 15 PROJECT NUMBER: 684127CH.05.02 jr 4A? Olt W* TEST PIT LOG PROJECT: Kittitas County Transfer Station Kittitas County WA LOCATION: Access Road (613156.1 N 1617968.8 E) ELEVATION: 1545.1 ft NAVD88 CONTRACTOR: C. Van De Venter/Kittitas Co. SHEET 1 OF 1 EXCAVATION EQUIPMENT: Hitachi Zaxis 135US Excavator w/ 30" bucket DATE EXCAVATED: 4/9/2019 1ArATC0 I MIM e. Q n a I— APPROX_ DIMENSIONS: T wide 10' Iona LOGGER: M. Kacmarcik SAMPLE SOIL DESCRIPTION COMMENT F DIFFICULTY IN EXCAVATION, w SOIL NAME, USCS GROUP SYMBOL, COLOR, RUNNING GRAVEL CONDITION, a o U > a MOISTURE CONTENT, RELATIVE DENSITY OR v = COLLAPSE OF WALLS, SAND HEAVE, W W a a m f W xc CONSISTENCY, SOIL STRUCTURE, MINERALOGY DEBRIS ENCOUNTERED, WATER SEEPAGE GRADATIONAL CONTACTS, a z TEST. IN IMFNTATInN Sandy gilty with Organics: black to brown with orange Begin TP excavation at 11:45. Ground surface is mottling, moist, medium plasticity. (TOPSOIL) r, .;�!;; .,+ grass pasture. Weather is clear and windy. Easy- digging in soft soil. >iT�, 2.0 LABORATORY: w(%)=48.0, Organic Content=6.8% 1-BULK .+ _ LL=59%, PL=23%, PI=36% Roots extend to 4 feet. Dark brown/black color suggests very deep topsoil. 5 Test pit walls begin caving below 6' bgs. LABORATORY: 7.5 Poorly -Graded Gravelly SAND (SP): Greyish brown, wet. Trends coarser to Well -Graded Sandy Cobbley GRAVEL with depth. P200 = 6.5% 2-BULK2-BULK _ Groundwater at 8.0' bgs. Much caving below water level. _ 8.5 10 Backfill TP to ground surface with compacted Bottom of Boring at 12.0 ft bgs on 4/9/2019 excavation spoils. 15 PROJECT NUMBER: 684127CH.05.02 TP-05 TEST PIT LOG SHEET 1 OF 1 PROJECT: Kittitas County Transfer Station Kittitas County WA LOCATION: Southeast Stormwater Pond (613022.3 N, 1618456.0 E) ELEVATION: 1544.8 ft NAVD88 CONTRACTOR: C. Van De Venter/Kittitas Co. EXCAVATION EQUIPMENT: Hitachi Zaxis 135US Excavator w/ 30" bucket DATE EXCAVATED: 4/9/2019 IA/CD 1 MIrl Q 7 r fl Lv APPROX_ DIMENSIONS: T wide 10' Iona LOGGER: M. Kacmarcik SAMPLE SOIL DESCRIPTION COMMENT 0 DIFFICULTY IN EXCAVATION, w SOIL NAME, USCS GROUP SYMBOL, COLOR, of RUNNING GRAVEL CONDITION, a ° v LU > n MOISTURE CONTENT, RELATIVE DENSITY OR v a COLLAPSE OF WALLS, SAND HEAVE, DEBRIS ENCOUNTERED, WATER o ro w CONSISTENCY, SOIL STRUCTURE, MINERALOGY SEEPAGE GRADATIONAL CONTACTS, z Sandy brown to black with orange mottling, moss . Begin excavation at 12:11. Ground surface is Moderate plasticity. (TOPSOIL} �, :+!..+ grass pasture. Weather is clear and windy with — r' '1 estiamted 30mph gusts. Dark brown/black soils (r =- suggest thick topsoil deposits. _ LABORATORY: 3.0 w(%)=56.4, Organic content=7.0% _ 1-BULK,.' ' '. LL=70%, PL=26%, PI=44% 4.0 5 SIT' — al Test pit walls caving below 7 feet bgs 7.0 Gravelly SAND (SP): grey, wet, less than 10 percent fines. 2-BULKGroundwater at 7.5' bgs Install 1" diameter Schedule 40 PVC piezometer 8.0 in test pit. Field slotted screen from 8.0 to 9.0' _ bgs. Well -Graded Sandy GRAVEL with Cobbles (GW): grey -brown, wet, • • • • • oaorr rounded. 10 room .coca .roar a.r.r roar. rasa rorrr aorrr rorrr moor room — — _ Backfill to ground surface with compacted Bottom of Boring at 12.0 ft bgs on 4/9/2019 excavation spoils. 15 PROJECT NUMBER: TEST PIT NUMBER: 684127CH.05.02 TP-09 SHEET 1 OF 1 jr M 4A tA? mot * TEST PIT LOG PROJECT: Kittitas County Transfer Station Kittitas County WA LOCATION: Loadout Embankment (613452.7 N, 1618410.1 E) ELEVATION: 1550.5 ft NAVD88 CONTRACTOR: C. Van De Venter/Kittitas Co. EXCAVATION EQUIPMENT: Hitachi Zaxis 135US Excavator w/ 30" bucket DATE EXCAVATED: 4/9/2019 \A/ATCR 1 rVrl Q: A n H Ma APPROX. DIMENSIONS: T wide 10' lono LOGGER: M. Kacmarcik SAMPLE SOIL DESCRIPTION COMMENT DIFFICULTY IN EXCAVATION, _ `J w SOIL NAME, USCS GROUP SYMBOL, COLOR, RUNNING GRAVEL CONDITION, a ° U > a MOISTURE CONTENT, RELATIVE DENSITY OR 0 = COLLAPSE OF WALLS, SAND HEAVE, w w a a m w s> CONSISTENCY, SOIL STRUCTURE, MINERALOGY DEBRIS ENCOUNTERED, WATER SEEPAGE GRADATIONAL CONTACTS, U) r z Organic Sandydark brown, moist, organic ` Begin TP excavation at 13:30. Ground surface is grass pasture. Weather is clear with high winds— Sandy SILT (ML): brown with grey mottling, moist. Roots observed to ±4' bgs. Easy digging in sandy silt soils. 3.0 1-BULK 4.0 5 _ Groundwater at 8.0' bgs at interface with gravel Well -Graded Sandy GRAVEL (GW): brown, wet. Rounded. 1 to 3 inch • • • • • diameter. Estimate ±30% sand. .ease layer. •aria 9.0 2-BULKaaaaa _ 10 •saga aaaaa _ 10.0 ••••• •aria •assa Backfill to ground surface with compacted Bottom of Boring at 12.0 ft bgs on 4/9/2019 excavation spoils. Good compaction _ difficulttimpossible in saturated gravel. 15 PROJECT NUMBER: 684127CH.05.02 Ir 4A AA? wif Mo TP-10 TEST PIT LOG PROJECT: Kittitas County Transfer Station Kittitas County WA LOCATION: Transfer Building (613659.7 N, 1618241.5 E) ELEVATION: 1551.9 It NAVD88 CONTRACTOR: C. Van De Venter/Kittitas Co. SHEET 1 OF 1 EXCAVATION EQUIPMENT: Hitachi Zaxis 135US Excavator w/ 30" bucket DATE EXCAVATED: 4/10/2019 UlATCD i M/M C- 7 r R tw APPROX_ DIMENSIONS: T wide 10' Iona LOGGER: M. Kacmarcik SAMPLE SOIL DESCRIPTION COMMENT LL 0 DIFFICULTY IN EXCAVATION, = 3 w a w ° SOIL NAME, USC5 GROUP SYMBOL, COLOR, ow RUNNING GRAVEL CONDITION, COLLAPSE OF WALLS, SAND HEAVE, ° v w w { > W MOISTURE CONTENT, RELATIVE DENSITY OR = DEBRIS ENCOUNTERED, WATER o m X w r u CONSISTENCY, SOIL STRUCTURE, MINERALOGY SEEPAGE GRADATIONAL CONTACTS, 0) z Sandy : greyish brown with orange and grey mottling, moist. Begin TP excavation at 08:37. Ground surface is grass pasture. Weather is clear, light wind. — LABORATORY: 2.0 w(%)=32.5 1-BULK _ LL=52%, PL=21%, PI=11% TORVANE = 2.0 to 2.2 kg/cmA2 3.0 Ash layer visible in TIP sidewall 5 _ Color change to vivid mottled bright orange and 6.5 2-BULK grey _ LI Gravel and groundwater at 7.5'. Test pit sidewalls 7.5 Well -Graded Cobbley GRAVEL with SILT (GW-GM): brown, wet, rounded. Sizes up to 6" diameter. FI } cave readily below 7.5' _ �ry+ Install 1" diameter Schedule 40 PVC piezometer �I with field slotted screen from 8.5 to 9.5' bgs. _ 9.0 '� �l LABORATORY: 3-BULK3�3 P200=13.0% _ 10 i�lf�� 10.0 Backfill to ground surface with compacted Bottom of Boring at 12.0 ft bgs on 4/10/2019 excavation spoils. 15 684127CH.05.02 • wo .ST PIT NUMBER: TP-1 3 (P) TEST PIT LOG PROJECT: Kittitas County Transfer Station, Kittitas CountV, WA LOCATION: Wall Loadout (613890.7 N, 1618418.6 E) ELEVATION: 1553.7 ft NAVD88 CONTRACTOR: C. Van De Venter/Kittitas Co. SHEET I OF 1 EXCAVATION EQUIPMENT: Hitachi Zaxis 135US Excavator w/ 30" bucket DATE EXCAVATED: 4/10/2019 %AIATC:D I MIM Q- A n ff G APPROX. DIMENSIONS: T wide 10'lona LOGGER: M. Kacmarcik SAMPLE SOIL DESCRIPTION COMMENT P —ca DIFFICULTY IN EXCAVATION, U. Ual SOIL NAME, USCS GROUP SYMBOL, COLOR, 0 RUNNING GRAVEL CONDITION, <3 'U' CL , < LU > MOISTURE CONTENT, RELATIVE DENSITY OR COLLAPSE OF WALLS, SAND HEAVE, DEBRIS ENCOUNTERED, WATER LU , am, Lu CONSISTENCY, SOIL STRUCTURE, MINERALOGY CL < SEEPAGE GRADATIONAL CONTACTS, z TEST, INSTRUMENTATION Silty SAND (SM): black, moist, medium plasticity. Suspect high organic Begin TP excavation at 13:50. Ground surface is content (TOPSOIL). grass pasture. Weather is clear and windy. 1.0 1-BULI LABORATORY: Yi w(%)=29. 1, Organic content=5.3% 2.0 7. 7 LL=34%, PL=23%, PI=1 I% P200=44.7% — — — — — — — — — — — — — — — — — — — — — — — — — — — — — -- Sandy SILT (ML): olive brown, moist. 4.0 2-BULK 5 5.0 Groundwater at 8.0' bgs. Sidewall caving below 8 Fat CLAY (CH): light brown with orange and grey mottling, medium plasticity, moist. feet. — 8.5 LABORATORY: 1 w(%)=38.7 3-BULK LL=52%, PL=21%, PI=31% Install V diameter Schedule 40 PVC piezometer in test pit with field slotted screen from 8.0 to 9.0' 9.5 10 bgs. — Well -Graded GRAVEL with Cobbles (GW): greyish brown, wet. Rounded gravels and cobbles up to 7 inch diameter. Estimate ±30% sand. see** Backfill to ground surface with compacted Bottom of Boring at 12.0 ft bgs on 4/10/2019 excavation spoils. 15 1 1 1 1 PROJECT NUMBER: TEST PIT NUMBER: jr684127CH.05.02 TP-1 5 (P) SHEET I OF I 4A �* TEST PIT LOG PROJECT: Kittitas County Transfer Station, Kittitas County, WA LOCATION: Windrow Area, South (613342.4 N, 16180413 E) ELEVATION: 1548.2 ft NAVD88 CONTRACTOR: C. Van De Venter/Kittitas Co. EXCAVATION EQUIPMENT: Hitachi Zaxis 135US Excavator w/ 30" bucket DATE EXCAVATED: 411012019 — — _ APPROX r)IMFNqlnN.q- Twirip 10'k)no LOGGER: M. Kacmarcik SAMPLE SOIL DESCRIPTION COMMENT 0 DIFFICULTY IN EXCAVATION, 0 RUNNING GRAVEL CONDITION, U, �_00 Uj 0. SOIL NAME, USCS GROUP SYMBOL, COLOR, COLLAPSE OF WALLS, SAND HEAVE, a. , , Uj Uj X MOISTURE CONTENT, RELATIVE DENSITY OR DEBRIS ENCOUNTERED, WATER , omw LU CONSISTENCY, SOIL STRUCTURE, MINERALOGY M I.- K SEEPAGE GRADATIONAL CONTACTS, TPRT INc;TRUWPNTAT1nN Organic any MILT (ML): dark brown to black, moist, organic Begin TP excavation at 09:13. Ground surface is (TOPSOIL) L/ • , A*. grass pasture. Weather is clear and windy. --- -- — — — — — — — — — — - STn(Ty LeanT917_(dF�r_oWn_,M_01it, mediumplasticity. Approx 10" topsoil. 2.0 1-BULK LABORATORY: w(%)=29.4 LL=40%, PL=23%, PI=117% 10 P200=62.7% Well -Graded Sandy GRAVEL (GW): brown, moist. Rounded gravels and cobbles to 8" diameter. goes* 00 a a 0 Install 1" diameter PVC piezometer in test pit with field slotted screen from 8.5 to 9.5' logs. 9.0 2-BULK 10 10.0 Sees* • 00 00 00 Backfill to ground surface with compacted Bottom of Boring at 12.0 ft bgs on 4/10/2019 excavation spoils. 15 PROJECT NUMBER: 684127CH.05.02 Ir 4AJ TP-1 9 TEST PIT LOG PROJECT: Kittitas County Transfer Station, Kittitas County, WA LOCATION: Windrow Area, North (613674.6 N, 1618019.1 E) ELEVATION: 1551.6 ft NAVD88 CONTRACTOR: C. Van De Venter/Kittitas Co. SHEET I OF I EXCAVATION EQUIPMENT: Hitachi Zaxis 135US Excavator w/ 30" bucket DATE EXCAVATED: 4/10/2019 WATC0 I MIM Q- 0 r R ti APPROX. DIMENSIONS- X wide 10'lona LOGGER: M. Kacmarcik SAMPLE SOIL DESCRIPTIONLL COMMENT 0 DIFFICULTY IN EXCAVATION, Uj u SOIL NAME, USCS GROUP SYMBOL, COLOR, of RUNNINGGRAVEL CONDITION, (5 ' 0- , < > a' MOISTURE CONTENT, RELATIVE DENSITY OR 2 COLLAPSE OF WALLS, SAND HEAVE, WW, ck� W CONSISTENCY, SOIL STRUCTURE, MINERALOGY DEBRIS ENCOUNTERED, WATER SEEPAGE GRADATIONAL CONTACTS, n U) z TFST IN I IKAF:NTATION Sandy CLAY (CL): black, moist, soft, organic. (TZIPSZ51L) Begin TP excavation at 09:48. Ground surface is grass pasture. Weather is clear and windy. 2.0 1-BULK LABORATORY: W(%)=31.5, Organic content=6.8% LL=38%, PL=21%, PI=17% 3.0 P200=52.2% — — — — — — — — — — — — — — — — — — — — — — — — — — — — — -- Color change to brown at 4.0' bgs. 5 5.0 2-BULK 6.0 — — — — — — — — — — — — — — — — — — — — — — — — — — — — — --------- Very soft, sandy, and wet Groundwater at 8.5' bgs. Well -Graded GRAVEL with Cobbles and SILT (GW-GM): greyish brown, wet. Color grades to reddish brown at 11 .0'. Rounded gravel and cobbles to 6" diameter. Estimate ±1 5% fines. 10 Minimal caving observed in gravels below groundwater level. Backfill test pit to ground surface with compacted Bottom of Boring at 12.0 ft bgs on 4/10/2019 excavation spoils. 15 PROJECT NUMBER: TEST PIT NUMBER: Ir A0 M 684127CH.05.02 TP-23 SHEET 1 OF 1 4A A? mot TEST PIT LOG PROJECT: Kittitas County Transfer Station Kittitas County WA LOCATION: Grinder (613785.6 N 1617860.3 E) ELEVATION: 1551.3 ft NAVD88 CONTRACTOR: C. Van De Venter/Kittitas Co. EXCAVATION EQUIPMENT: Hitachi Zaxis 135US Excavator w/ 30" bucket DATE EXCAVATED: 4/10/2019 IATFR I FVPI R- 9 n ft hn APPROX. DIMENSIONS: T wide 10' lonq LOGGER: M. Kacmarcik SAMPLE SOIL DESCRIPTION DIFFICULTY IN EXCAVATION, = 3 w IOU NAME, USCS GROUP SYMBOL, COLOR, of RUNNING GRAVEL CONDITION, a. O, v > a MOISTURE CONTENT, RELATIVE DENSITY OR v a COLLAPSE OF WALLS, SAND HEAVE, DEBRIS ENCOUNTERED, WATER o m w CONSISTENCY, SOIL STRUCTURE, MINERALOGY SEEPAGE GRADATIONAL CONTACTS, ? c� Organic Sandydark brown to black, moist, medium Begin TP excavation at 10:22. Ground surface is plasticity. Organics. (TOPSOIL) �..+ I grass pasture. Weather is clear and windy. Sandy SILT (ML/MH): brown, moist, medium plasticity. Estimate t20% 8" topsoil _ fine sand. 3.0 1-BULK— 4.0 5 _ No caving above gravels, test pit walls stand vertical. 8.0 2-BULK— Groundwater at 9.0' bgs. 9.0 Well -Graded Cobbley GRAVEL (GW): grey from 9.5 to 10% then brown 10 below 10', wet. Gravel and cobbles to 8" diameter. ..... Backfill to ground surface with compacted Bottom of Boring at 12.0 ft bgs on 4/10/2019 excavation spoils. 15 PROJECT NUMBER: TEST PIT NUMBER: 684127CH.05.02 TP-25 P SHEET 1 OF 1 jr 4A 4A? M�Mo TEST PIT LOG PROJECT: Kittitas County Transfer Station Kittitas County WA LOCATION: Biofilter (613924.0 N 1617653.6 E) ELEVATION: 1551.3 ft NAVD88 CONTRACTOR: C. Van De Venter/Kittitas Co. EXCAVATION EQUIPMENT: Hitachi Zaxis 135US Excavator w/ 30" bucket DATE EXCAVATED: 4/9/2019 %AIATFR I M/M C• R n ft kn APPROX. DIMENSIONS: 3 wide 10' lono LOGGER: M. Kacmarcik SAMPLE SOIL DESCRIPTION COMMENT LL (D DIFFICULTY IN EXCAVATION, = 3 w u w SOIL NAME, USCS GROUP SYMBOL, COLOR, o RUNNING GRAVEL CONDITION, a o � > °' MOISTURE CONTENT, RELATIVE DENSITY OR COLLAPSE OF WALLS, SAND HEAVE, o m � w u CONSISTENCY, SOIL STRUCTURE, MINERALOGY a DEBRIS ENCOUNTERED, WATER I- SEEPAGE GRADATIONAL CONTACTS, V) z Begin TP excavation at 14:23. Ground surface is Clayey : orange -brown with grey mottling, moist, medium plasticity. grass pasture. Weather is clear and windy. — 1.0 1-BULK LABORATORY: w(%)=19.9 _ LL=38%, PL=21%, PI=17% 2.0 P200=44.0% _ Volcanic ash layer at 2.5' bgs, approx 2" thick Sandy SILT (ML): Similar to above with estimated 30% fine to medium sand. 5 _ No sidewall sloughing in silt Well -Graded Cobbley GRAVEL (GW): brown, moist. Rounded gravels to 8 inch diameter. see** ••••• 7.0 2-BULK••••• ••••• — LABORATORY: • • • • P200=6.2% • • • • • Groundwater at 8.0' bgs. Install 1" diameter &0 • • • • Schedule 40 PVC piezometer in test pit with field sees* ••••• slotted screen from 8.0 to 9.0' bgs. 10 ••••• Backfill to ground surface with compacted Bottom of Boring at 11.0 ft bgs on 4/9/2019 excavation spoils. 15 684127CH.05.02 I TP-26 (P) SHEET I OF I chzm* TEST PIT LOG PROJECT: Kittitas County Transfer Station, Kittitas County, WA LOCATION: Central Stormwater Pond (613595.8 N, 1617678.4 E) ELEVATION: 1548.1 ft NAV088 CONTRACTOR: C. Van De Venter/Kittitas Co. EXCAVATION EQUIPMENT: Hitachi Zaxis 135US Excavator w/ 30" bucket DATE EXCAVATED: 4/10/2019 ATPP I 1=\/[=[ 0- 7 n ft h APPROX. DIMENSIONS: Twide lO'Ionq LOGGER: M. Kacmarcik SAMPLE SOIL DESCRIPTION COMMENT DIFFICULTY IN EXCAVATION, z W W SOIL NAME, USCS GROUP SYMBOL, COLOR, 00 RUNNING GRAVEL CONDITION, 6 S y UJ 0- MOISTURE CONTENT, RELATIVE DENSITY OR L) COLLAPSE OF WALLS, SAND HEAVE, DEBRIS ENCOUNTERED, WATER W omm X LU CONSISTENCY, SOIL STRUCTURE, MINERALOGY D F_ SEEPAGE GRADATIONAL CONTACTS, U) z Sandy can CLAY (CL): Black, moist, organic, roots. (TOPSM7— Begin TIP excavation at 11:07. Ground surface is grass pasture. Weather is clear and windy. 1.0 1-BUL 2.0 Sandy Lean TL7A7_((5_L): 6r0wn, moist, eSi7l;atJd 0% fine to medium sand. M 3.0 2-BULK LABORATORY: w(%)=34.3 LL=48%, PL=20%, PI=28% 4.0 P200=70.0% 5— Sandy Lean CLAY (CL): grey -brown, moist Wood and roots observed in clay layer. 5.5 3-BULK LABORATORY: w(%)=35.6 LL=37%, PL=20%, PI=17% 6.5 P200=621% Groundwater at 7.0'bgs, gravels caving below TO Well -Graded GRAVEL (GW): orange, wet, rounded, approx 2" max diameter. 7.0'bgs. 4-BULK LABORATORY: P200=5.3% 8.0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Well -Graded Cobbley GRAVEL (GW): grey -brown, wet, rounded, Install 1" diameter Schedule 40 PVC plezometer cobbles to 8" diameter ... o. with field slotted screen from 8.5 to 9.5' bgs. 10 0 0 a es Backfill test pit to ground surface with compacted Bottom of Boring at 12.0 ft bgs on 4/10/2019 excavation spoils. 151 1 1 PROJECT NUMBER: TEST PIT NUMBER: 684127CH.05.02 TP-27 P SHEET I OF 1 MA k�*TEST PIT LOG PROJECT: Kittitas County Transfer Station Kittitas County WA LOCATION: Recycling Drop-off Area (613697.4 N 1617459.6 E) ELEVATION: 1548.7 ft NAVD88 CONTRACTOR: C. Van De Venter/Kittitas Co. EXCAVATION EQUIPMENT: Hitachi Zaxis 135US Excavator wl 30" bucket DATE EXCAVATED: 4/9/2019 U/OTER LEVELS: S: 9 0 ft iln APPROX. DIMENSIONS: T wide 10' Iona LOGGER: M. Kacmarcik SAMPLE SOIL DESCRIPTION COMMENT a DIFFICULTY IN EXCAVATION, U. _ $ w S w SOIL NAME, USCS GROUP SYMBOL, COLOR, a RUNNING GRAVEL CONDITION, a ° > ° MOISTURE CONTENT, RELATIVE DENSITY OR v a COLLAPSE OF WAILS, SAND HEAVE, DEBRIS ENCOUNTERED, WATER o M `a` w CONSISTENCY, SOIL STRUCTURE, MINERALOGY D X SEEPAGE GRADATIONAL CONTACTS, zTFST INSTRUMENTATION SILT (MUMH): black, moist, organic. '—' Begin TP excavation at 15:22. Ground surface is grass pasture. Weather is clear and windy. — T — ---------------------------- Sandy SILT (ML): brown with orange and grey mottling. Estimated 20 1.0 percent fine sand. 1-BULK _ 2.0 Well -Graded Gravelly SAND with SILT (SW-SM): brown, moist to wet.. M.F1�J 1 Estimate 10% silt. {�I�;lr+ — 1 f+i.�g1 — 4.0 2-BULK .I' 1 1 'I. _ 5 5.0 KIKIf _ -: >tl - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Well -Graded Cobbley GRAVEL (GW): brown, wet, rounded sandy seei • • • • gravel with cobbles up to 8" diameter. • • • • • iii•• ir••• i i i • • — — ii.i• iii•• rii•• • • • • • Install 1" diameter Schedule 40 PVC piezometer in test pit with field slotted screen from 8.0 to 9.0' — iris• iir•. bgs. • • • • • iir.• iir•• Groundwater at 9.0 feet bgs. _ 10 iris• i i • • • ii••• Backfill to ground surface with compacted Bottom of Boring at 11.0 ft bgs on 4/9/2019 excavation spoils 15 684127CH.05.02 I TP-29 SHEET I OF I ChzM1* TEST PIT LOG PROJECT: Kittitas County Transfer Station, Kittitas County, WA LOCATION: Recycling Exit (614180.0 N. 1617422.3 E) ELEVATION: 1551.2 ft NAVD88 CONTRACTOR: C. Van De Venter/Kittitas Co. EXCAVATION EQUIPMENT: Hitachi Zaxis 135US Excavator w/ 30" bucket DATE EXCAVATED: 419/2019 .— 1 -1.1 0. - n 4 -- APPRnx niMFNRI(')N,1,- TvArip 10'lona LOGGER: M. Kacmarck SAMPLE SOIL DESCRIPTIONLL COMMENT 0 DIFFICULTY IN EXCAVATION, X?: SOIL NAME, USCS GROUP SYMBOL, COLOR, 0. RUNNING GRAVEL CONDITION, �Ouj fL � 0 < > MOISTURE CONTENT, RELATIVE DENSITY OR COLLAPSE OF WALLS, SAND HEAVE, UJ,< U� X Lu CONSISTENCY, SOIL STRUCTURE, MINERALOGY a. DEBRIS ENCOUNTERED, WATER SEEPAGE GRADATIONAL CONTACTS, U) z TEST, IN I Sandy rganic blL I (UH/OL): brown to black, moist, medium Begin TIP excavation at 14:57. Ground surface is plasticity. Estimated 45% fine sand. (TOPSOIL) grass pasture. Weather is clear and windy. 0.5 1-BULK 1.5 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Elastic SILT (MH): orange brown with grey mottling, moist. Ash layer at 2.0' bgs. 3.0 2-BULK 4.0 5- Gravelly Silty SAND (SM): brown, moist to wet. 6" layer of GW from 6.0 to 6.5' GT--i---T-VffTW -ro, ----- MellajedSnayob;Ie GRAVEL Gbrown, wet, rounded gravels and cobbles to 8" diameter sees* 00000 Install 1" diameter Schedule 40 PVC piezometer with field slotted screen from 8.0 to 9.0' bgs. 10 sews seeee Groundwater at 10.0' bgs. _ Backfill to ground surface with compacted Bottom of Boring at 11.0 ft bgs on 4/9/2019 excavation spoils. 15 PROJECT NUMBER: TEST PIT NUMBER: 684127CH.05.02 I TP-30 SHEET I OF 1 SIM* TEST PIT LOG PROJECT: K(ittitas County Transfer Station, Kittitas County, WA LOCATION: Southwest Corner (613164.1 N, 1617152.1 E) ELEVATION: 1546.4 ft NAVD88 CONTRACTOR: C. Van De Venter/Kittitas Co. EXCAVATIONEQUIPMENT: Hitachi Zaxis 135US Excavator wl 30" bucket DATE EXCAVATED: 4/10/2019 WATPP I rk/r-1 IZ- 111- APPROX. DIMENSIONS: Twide 10'lona LOGGER: M. Kacmarcik SAMPLE SOIL DESCRIPTION COMMENT iz — DIFFICULTY IN EXCAVATION, U. LU SOIL NAME, USCS GROUP SYMBOL, COLOR, 0 RUNNING GRAVEL CONDITION, 0¢ LU,< MOISTURE CONTENT, RELATIVE DENSITY OR COLLAPSE OF WALLS, SAND HEAVE, DEBRIS ENCOUNTERED, WATER am� X W ac CONSISTENCY, SOIL STRUCTURE, MINERALOGY SEEPAGE GRADATIONAL CONTACTS, U) z T IMPNTATION Sandy SIL I (ML): brown, moist, Ground surface is grass pasture. Informal test pit to check depth to gravels in southwest corner of site. GPS coordinates are 47' 0.890'1\1, 120' 35.525'W Well -Graded Sandy GRAVEL (GW): brown moist. Backfill to ground surface with compacted Bottom of Boring at 2.5 ft bgs on 4/10/2019 excavation spoils. 5 10 15 JACOBS PROJECT NUMBER: BORING NUMBER: ❑3396900 I B-1 SHIEET 1 OF 1 SOIL BORING LOG PROJECT, Klttilas County Transfer Station Site, Ellensburg, WA LOCATION, Lat: 47.t713168*1 Long: -12G.591361° ELEVATION : TBD DRILLING CONTRA R : Haz•Tech Drillinq. Naml2s, Idaho DRIIJ ING METHOD AND EQUIPMENT : Hollow Stem Au er OD = 8 inches Iq = 4.5 inches IAYA 5 R I IEVO C • 5 9n fh k— CTAPT 71711911 n7'nn FNn , 7171 r7n nq,nn I-OGGFR : Yousx®r S. DEPTH nELOW GROUND SURFACE (fl) STANDARD SOIL DESCRIPTION COMMENTS INTERVAL (ft) PENETRATION TEST RESULTS SOIL NAME, USCS GROUP SYMBOL, DOLOR, DEPTH OF CASING, DRILLING RATE, RECOVERY(M) {fl) MOISTURE CONTENT, RELATIVE DENSITY OR DRILLING FLUID LOSS, TESTS, AND #TYPE CONSISTENCY, SOIL STRUCTURE, MINERALOGY INSTRUMENTATION 6��,45„ (N) p-pp WELL_G_RADED SAND WITH SILT AND GRAVEL S( W-SM) 1.d0 SS-1 (17) gray and brown, dry, medium dense 1.54 LEAN QLAY NTH $ILT AND GRAVEL (CLI driller Note: Ground water at about 5 It below - 4-4-4 brawn, moist, medium stiff, medium plastic ground su+feice, C so SS-2 {} 5U [Driller Nate: rounded gravels (medium to large in size} and small cobbles are present from 4 ft below ground surface to the bottom of the boring. 1 {1 1 fl.hli POORLY GRADED SAND WITH GRAVEL. ISPI wet. gray, medium dense U.3U $S•3 j70) 1 1 5{1 15 15 [10 Similar to SS-3, l ut very dense 0,5p SS-4 -1 (67) 20 PROJECT NUMBER: BORING NUMBER: D3396900 I B-2 SHEET 1 OF 1 SOIL BORING LOG PROJECT: Kittltas County Transfer Station Site. Ellensburg, WA LOCATION, Lat: 4 7.014384°I Long! -120.590565' ELEVATION: TBD DRILLING CONTRACTOR : Haz-Tech Drillina, Nam a Idaho DRILLING METHOD AND EQUIPMENT Hollow Siam Auger. OD = 8 inches iD = 4.5 inches Uf&=b I Merl C - A eh fk k— CTART 7M717n n4-w i:mn 701on in•4S I Oc.Grrz - YdJ559f 6. DEPTH BELOW GROUND SURFACE (ft) 8TANDARD SOIL DESCRIPTION COMMENTS INTERVAL (RI PENETRATION TEST RESULTS SOIL NAMr-. USCS GROUP SYMBOL. COLOR, DEPTH OF CASING, DRILLING RATE, RECOVERY M) MOISTURE CONTENT. RELATIVE DENSITY OR DRILLING FLUID LOSS, TESTS, AND yTY�E CONSISTENCY, SOIL STRUCTURE, MINERALOGY INSTRUMENTATION 6W.6" (N) r; Ot1 ILT ANO GRAVEL WELL GRADED SAND IMTH S-GRAVEL - -- B-13-18 51 W-SM1 0.40 S5-1 (32) gray, dry, dense 1.50 5 5.00 POORLY GRADED SAND WITH G13A_ VEL_LS_ P_ 1 010 SS-2 4_8_11 gray, moist, medium dense Driller Note: Ground water at about 5.5 ft below (T9) ground surface 6,50 TO 10,00 Similar to SS-2, but very dense (5blfi") 11.50 Driller Nate: rounded gravels (medium to large in size) and small cobbles are noticed in smolt quantity near the bottom of the boring. 15 15.00 Similar to SS-3 0.60 SS-4 37-36-4" (77) 16-50 20 PRQJF-CT NUMBER: 13ORING NUMBER: D3396900 I B-3 SHFI;T f OF 9 SOIL BORING LOG PROJECT: Kittilas County Transfer Station Site, Eltensbur , WA LOCATION: Lat: 47.014915°1 Long; -120,590164, ELEVATION! TB❑ DRILLING CONTRACTOR: Hax-Toch DnPirig, Nampo, Id ho ❑RILLING METHOD AND E UIPMENT : Hollow Stem Auger, OD = $ iriche5 ID = 4.5 In h s Whirr-R 1 F'l1Pl q • F cin ff h— ATART 7191171) 10,0o FN0 : 70117.0 11:35 LOGGER: Yousser B, DEPTH BELOW GROUND SURFACE (11) STANDARD SOIL DESCRIPTION COMMENTS INTERVAL (ft} PENETRATION TEST RESULTS SOIL NAME, USGS GROUP SYMBOL, COLOR, DEPTH Or CASING, DRILLING RATE, RECOVERY t1l} MOISTURE CONTENT, RELATIVE DENSITY OR DRILLING FLUID LOSS, TESTS, AND #TYPE CONSISTENCY, SOIL STRUCTURE, MINERALOGY INSTRUMENTATION 8" 8" 8' (N) 0.00 L 2.4-4 brown, dry, medium Stiff, low plasticity 0.517 5S-1 (SI 1,50 5 5,00 POORLY GRADED SAKI] WITH GRAVEL f3P1 12-20-17 brown and gray, wet, dense 0.60 SS-2 (37) 8,54 Orlller Note: Ground water at about 6.9 ft below ground surface 10 10.00 Similar to SS-2 0.60 SS-3 121$-20 (38) 11,50 Driller Note: rounded gravels (medium to large in size) and small cobbles are noticed in small quantity near the bottom of the boring. 15 15,00 Similar l0 SS-3, but very dense 0.74 SS-4 13.28-44 (72) 16.50 20 PROJECT NUMBER: BORING NUMBER: D3396900 I B-4 SHEET 1 OF 1 SOIL BORING LOG PROJECT : Kiitilas ClAinly Transfer Station Site, Ellensburg. WA LOCATION : Lat: 47 016898°I i-on :-120.592319° ELEVATION; T30 DRILLING CONTRACTOR : Hex -Tech Drillina. Narni3a. Idaho ❑RILLING METHOD AND EQUIPMF.,NT ! Hollow Stem Auger, OD = 8 inches ID - 4.5 inches W&TAR I Fum C 0 7 7ri 1t K'. RTAF?T 7171f7n 11-5n FIUr1 • 701/2n 1'4,d.5 l 0CCFR : Yousser S. .DEPTH BELOW GROUND SURFACE (fl) STANDARD SOIL DESCRIPTION COMMENTS INTERVAi PENETRATION TEST RESULTS SOIL NAME, USCS GROUP SYMBOL, COLOR, DEPTH OF CASING, DRILLING RATE, RECOVERY (h) MOISTURE CONTENT, RELATIVE DENSITY OR DRILLING FLUID LOSS, TESTS, AND NTYPE CONSISTENCY, SOIL STRUCTURE, MINERALOGY INSTRUMENTATION 6W.B., IN) 0,00 SILT (MLj 2-2-4 gray and brown, dry, medium stiff, taw plasticity 0.60 55-1 (B) 1. Drlller Note: Ground water at about 3.7 ft below ground surface 5 5.00 POORLY GRADED SAND WITH_-0i (SP) 5-27-42 gray, wet. very den8e 0,10 95-2 (bg) Driller Note: rounded graveN (medium to large in 6.50 Size) and small cobbles are present from 6 ft below ground surface to the bottom of the boring, 10 10,00 Similar to SS-2 0.20 SS-3 32.5015"-11 {Bi) 11.50 15 15.00 Similar to SS-2 070 SS 4 12-2440 (64) 16 50 20 PROJECT NUMBER: BARING NUMBER: D3396900 I B-5 SHIEET 1 OF 1 SOIL BORING LOG PROJECT: Khtltas County Transfer Station Site Ellensburg WA LOCATION : Lat: 47.D140841! Lon :-120.590514" ELEVATION: TBD DRILLING CONTRACTOR : Haz-Tech Dtiling Nang, Idaho DRILLING METHOD AND EQUIPMENT: Nohow Stem Au er 00 = S inches ID = 4.5Inches WATC0 1 C%JCl c . � 7n R ti-. C"TAOT - T111M IA-M Ghlrl - 7011W11A.An I n(-.r.FR YnllC£Ff R DEPTH KLOW GROUNl7 SURFACE (M) STANDARD SOIL DESCRIPTION COMMENTS INTERVAL(R) PENETRATION 7E8Y RESULTS SOIL NAME, UK$ GROUP SYMBOL, COLOR, DEPTH OF CASING, DRILLING RATE, RECOVERY (4) MOISTURE CONTENT, RELATIVE DENSITY OR DRILLING FLUID LOSS, TESTS, AND #TYPE CONSISTENCY, SOIL STRUCTURE, MINERALOGY INSTRUMENTATION 6""$" (N) O.OQ SILT (MLI 4.4.6 brawn, dry, stiff, )ow plasticity 0.50 5S-1 {14) 1.50 _ Driller Nate: Ground water at about 2.2 ft below ground surface Driller Note: rourded gravels (medium L❑ large in size) and small cobbles are present from 1.5 ft 5 5.00 below ground surface to the bottom of the baring. POORLY GRADED SAND WITH GRAVEL (SP) 7-12-21 gray, wet, dense 0.20 SS-2 (3s) 6.50 10 10.00 Similar to SS-2 0.10 SS-3 1$-19-30 (49) 11.50 15 15.00 _ Similar to SS-3, but very dense 0,40 SS-4 15.36-45 {S1} 16.50 L2D JACOBS PROJECT NUMBER.- BORING NUMBER: D3396900 I B-6 SHEET 1 OF 1 SOIL BORING LOG PROJECT: KhRas County Transfer Station Site 2IIensbwrq.WA LOCATIOW Lat, 47.014424'1 Lon 120,589793° ELEVATION: TBD DRILLING CONTRACTOR, Haz-Tech Drilling, Nam a Idaho DRILLING METHOD AND EQUIPMENT: H00owStem Au er OD z B inches ID = 4.5 Inches watFa i ti`uFi .0 - ? An H hr,a ,TART • 719119A 19•nn FNn W91190 17-2n LOGGER , Youssef B. DEPTH 8ELOW GROUND SURFACE (R) STANDARD SOIL DESCRIPTION COMMENTS INTERVAL (ft) PENETRATION TEST RESULYS SOIL NAME USCS GROUP SYMBOL, COLOR, DEPTH OF CASING, DRILLING RATE, RECOVERY (II) MOISTURE CONTENT, RELATIVE DENSITY OR DRILLING FLUID LOSS, TESTS, AND NTYPE g°-g" CONSISTENCY, SOIL STRUCTURE, MINERALOGY INSTRUMENTATION (N) 0100 SILT (MIL) 6-5-7 brgwn, dry, stiff, low IjlaSI'City 0.60 5S 1 (12) 1.50 Driller Note: Ground water at about 2.5 ft below ground surface Driller Note, rounded gravels (medium to large in size) and small cobbles are present from 1.5 ft 5 5. 0 below ground surface to the bottom of the boring. POORLY GRADED SAND WITH GRAVEL (SP) Z 2-32-27 gray, wet, very dense D.80 5S F (59) s_50 Similar to SS-2 0,70 SS-3 10-32-45 (-77) 11.50 15 15.W POORLY GRADED GRAVEL WITH SAND AND — 15.19-49 COOKIES (GP} 0.40 SS-4 (60) gray, wet, very dense 1f_50 20