HomeMy WebLinkAboutStaff Report Contract for New Transfer Station (2)KITTITAS COUNTY
SOLID WASTE DEPARTMENT
AGENDA STAFF REPORT
AGENDA DATE: September 3, 2024
ACTION REQUESTED: Request Boards approval for Chairs Signature on AIA
Contract with Belsaas & Smith LLC. for the Lower Valley
Transfer Station
BACKGROUND: Kittitas County Solid Waste received bids on August 2, 2024, for the
new Lower Valley Transfer Station project. Two bids were received for the project.
SCS Engineers, our design engineers for the project, have reviewed the bids and have
recommended award to Belsaas & Smith LLC. In addition, SCS Engineers has confirmed
that Belsaas & Smith LLC. is in good standing with their license with the State of
Washington.
SCS Engineers has prepared the AIA contracts for the Lower Valley Transfer Station
project in the amount of $19,991,064.74 including sales tax. This price includes the base
bid for the Transfer Station Building, the Compost Facility and the alternate bid item for
the Moderate Risk Waste (MRW) Facility.
As part of the contract, we have asked the contractor to hold the bid prices for the other
alternate bid items for an additional 30 days to allow the County time to look at available
options to fund these items.
INTERACTION: Patti Stacey Director, SCS Engineers and the Prosecutor
RECOMMENDATION: Recommend Board’s approval for Chairs signature on AIA
Contract with Belsaas and Smith LLC. for the Lower Valley Transfer Station.
HANDLING: Return signed copy.
ATTACHMENTS: AIA 101-2007 and AIA 201-207
LEAD STAFF: Patti Stacey, Facilities & Waste Operations Director.